NZ776627B2 - Thermal control system - Google Patents
[go: Go Back, main page]

NZ776627B2 - Thermal control system - Google Patents

Thermal control system Download PDF

Info

Publication number
NZ776627B2
NZ776627B2 NZ776627A NZ77662719A NZ776627B2 NZ 776627 B2 NZ776627 B2 NZ 776627B2 NZ 776627 A NZ776627 A NZ 776627A NZ 77662719 A NZ77662719 A NZ 77662719A NZ 776627 B2 NZ776627 B2 NZ 776627B2
Authority
NZ
New Zealand
Prior art keywords
enclosed space
time
temperature
schedule
refrigeration system
Prior art date
Application number
NZ776627A
Other versions
NZ776627A (en
Inventor
John Richardson Crawford
Jesse Dylan Crossno
Tiara Lee Flewelling
Bryan Thomas Kaye
Jesse Scott Tootell
Gabriel Len West
Daniel Thomas Wintz
Elliott Gerard Wolf
Alexander James Woolf
Alexander Ming Zhang
Original Assignee
Lineage Logistics Llc
Filing date
Publication date
Priority claimed from US15/993,259 external-priority patent/US10323878B1/en
Priority claimed from US16/413,309 external-priority patent/US11181316B2/en
Application filed by Lineage Logistics Llc filed Critical Lineage Logistics Llc
Priority to NZ811129A priority Critical patent/NZ811129B2/en
Publication of NZ776627A publication Critical patent/NZ776627A/en
Publication of NZ776627B2 publication Critical patent/NZ776627B2/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2500/00Problems to be solved
    • F25B2500/19Calculation of parameters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D13/00Stationary devices, e.g. cold-rooms
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D2500/00Problems to be solved
    • F25D2500/04Calculation of parameters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D2700/00Means for sensing or measuring; Sensors therefor
    • F25D2700/12Sensors measuring the inside temperature
    • F25D2700/123Sensors measuring the inside temperature more than one sensor measuring the inside temperature in a compartment
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D29/00Arrangement or mounting of control or safety devices
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/04Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
    • G05B13/042Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators in which a parameter or coefficient is automatically adjusted to optimise the performance
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D23/00Control of temperature
    • G05D23/19Control of temperature characterised by the use of electric means
    • G05D23/1917Control of temperature characterised by the use of electric means using digital means
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D23/00Control of temperature
    • G05D23/19Control of temperature characterised by the use of electric means
    • G05D23/1919Control of temperature characterised by the use of electric means characterised by the type of controller
    • G05D23/1923Control of temperature characterised by the use of electric means characterised by the type of controller using thermal energy, the cost of which varies in function of time

Abstract

The subject matter of this specification can be embodied in, among other things, a method for time shifting when a cold storage facility is cooled that includes determining a thermal model of a cold storage facility, obtaining an energy cost model that describes a schedule of variable energy costs over a predetermined period of time in the future, determining an operational schedule for at least a portion of a refrigeration system based on the thermal model, the energy cost model, and a maximum allowed temperature, and powering on the portion the refrigeration system based on the operational schedule, cooling, by the powered portion of the refrigeration system to a temperature below the maximum allowed temperature, reducing power usage of the powered portion of the refrigeration system based on the operational schedule, and permitting the facility to be warmed by ambient temperatures toward the maximum allowed temperature.

Claims (20)

1. A cold storage facility comprising: a cold storage enclosure defining an enclosed space; a refrigeration system configured to cool the enclosed space; and a control system comprising: a data processing tus; and a memory device storing instructions that when executed by data processing apparatus cause the control system to perform operations comprising: obtaining an energy demand model, the energy demand model including a schedule of an energy demand over a ermined period of time in the future; obtaining a ics schedule for the enclosed space that identifies inventory expected to arrive at or be distributed from the cold storage facility over the predetermined period of time in the future; determining an amount of heat energy to be added to the ed space by the ics schedule over the predetermined period of time in the future; determining an operational schedule for at least a portion of the refrigeration system based on the energy demand model and the determined amount of heat energy for the logistics schedule, and a maximum allowed temperature for the enclosed space, wherein the operational schedule identifies, at least, (i) a target ature nt to which the enclosed space is to be cooled to maintain a temperature below the maximum allowed ature while the refrigeration system is deactivated, and (ii) a time schedule identifying, at least, a first time at which the refrigeration system is activated to reach the target ature setpoint, a second time at which the refrigeration system is adjusted, and a third time at which the refrigeration system is scheduled to be resumed to reach the target temperature setpoint; powering on, at the first time, the at least a portion of the refrigeration system based on the operational schedule; cooling, by the powered at least a portion of the refrigeration Attorney : 41979-0025001 system, the enclosed space to the target ature setpoint below the maximum allowed temperature; reducing, at the second time, power usage of the powered at least a portion of the eration system based on the operational schedule; permitting the ed space to be warmed toward the maximum allowed temperature; and reactivating, at the third time, the at least a portion of the refrigeration system to maintain the enclosed space below the maximum allowed temperature.
2. The cold storage ty of claim 1, wherein cooling the enclosed space comprises: cooling, from the first time to the second time, the enclosed space to the target temperature setpoint below the m allowed temperature by powering on the at least a portion of the refrigeration system.
3. The cold storage facility of claim 2, wherein permitting the enclosed space to be warmed toward the maximum allowed temperature comprises: permitting, from the second time to the third time, the enclosed space to be warmed toward the maximum allowed temperature by reducing power usage of the powered at least a portion of the refrigeration system.
4. The cold storage facility of claim 1, wherein permitting the enclosed space to be warmed toward the maximum allowed temperature comprises: permitting the enclosed space to be warmed by ambient atures toward the maximum allowed temperature.
5. The cold e facility of claim 1, wherein permitting the enclosed space to be warmed toward the maximum allowed temperature comprises: permitting the enclosed space to be warmed by ambient atures toward the m allowed temperature while the logistics schedule is performed. Attorney Docket: 41979-0025001
6. The cold storage ty of claim 1, n reactivating the at least a portion of the refrigeration system ses: reactivating, at the third time, the at least a portion of the refrigeration system to maintain the enclosed space below the m allowed temperature after the logistics schedule has been performed while the at least a portion of eration system was deactivated.
7. The cold storage facility of claim 1, wherein the target temperature setpoint is configured as a ature setpoint to which the ed space is to be cooled to maintain a temperature below the maximum allowed temperature while the logistics schedule is performed and while the at least a portion of the refrigeration system is deactivated.
8. The cold storage facility of claim 1, the operations further comprising: determining a measured temperature of the enclosed space; and powering on at least a portion of the refrigeration system based on the determined measured temperature and a predetermined threshold temperature value that is less than the maximum allowed temperature.
9. The cold storage facility of claim 1, the operations further comprising: determining a thermal model of the enclosed space, n determining the operational le includes: determining the operational schedule for at least the portion of the refrigeration system based on the thermal model, the determined amount of heat energy for the logistics le, and the maximum allowed temperature for the enclosed space.
10. The cold storage facility of claim 1, the operations further comprising: obtaining an energy cost model, wherein determining the operational schedule includes: Attorney Docket: 41979-0025001 determining the ional schedule for at least the portion of the refrigeration system based on the energy cost model, the determined amount of heat energy for the logistics le, and the maximum allowed temperature for the enclosed space.
11. The cold storage facility of claim 9, n the thermal model is representative of at least one of a thermal capacity of content within the enclosed space or a thermal resistance of the cold storage enclosure.
12. The cold storage facility of claim 10, n determining an operational schedule based on the energy cost model, the determined amount of heat energy for the logistics schedule, and the maximum allowed temperature for the enclosed space comprises: identifying, based on the energy cost model, a first period of time during which energy costs a first amount per unit; identifying, based on the energy cost model, a second period of time ing the first period of time, during which energy costs a second amount per unit that is less than the first amount per unit; adding information descriptive of the second period of time to the operational schedule, the information being representative of time during which the refrigeration system is to be powered on to cool the ed space below the maximum allowed temperature; and adding information descriptive of the first period of time to the operational schedule, the information being representative of time during which the enclosed space is allowed to warm toward the maximum allowed temperature.
13. The cold storage facility of claim 9, wherein determining a thermal model of the enclosed space comprises: ng on the portion the refrigeration system based on the operational schedule; cooling, by the powered portion of the refrigeration system, the enclosed space to a temperature below the maximum d temperature; Attorney Docket: 41979-0025001 ng power usage of the d portion of the refrigeration system based on the operational schedule; determining a first plurality of temperature levels sensed by a plurality of temperature sensors; permitting the enclosed space to be warmed by ambient atures toward the maximum allowed temperature; determining a second plurality of temperature levels sensed by the plurality of temperature sensors; and determining a thermal capacity of content of the enclosed space.
14. A cold storage management computer system for shifting times when a cold storage facility is , the cold storage management computer system comprising: a data processing apparatus; and a memory device g instructions that when executed by data processing apparatus cause the cold storage management computer system to perform ions comprising: receiving, from a control system, a request for an operational schedule for at least a portion of the eration system; obtaining a logistics schedule for an ed space of the cold storage facility, the logistics schedule identifying inventory expected to arrive at or be distributed from the cold storage facility over the ermined period of time in the future; determining an amount of heat energy to be added to the enclosed space by the logistics le over the predetermined period of time in the future; determining an operational schedule for at least a portion of the refrigeration system based on the determined amount of heat energy for the logistics schedule, and a maximum allowed temperature for the enclosed space, wherein the operational schedule identifies, at least, (i) a target temperature setpoint to which the enclosed space is to be cooled to in a ature below the maximum allowed temperature while the refrigeration system is deactivated, and (ii) a time schedule identifying, at least, a first time at which the refrigeration system is activated to reach the target temperature setpoint, a second time at which the refrigeration system is adjusted, Attorney Docket: 41979-0025001 and a third time at which the refrigeration system is scheduled to be resumed to reach the target temperature setpoint; and providing, in response to the request, the operational schedule.
15. The cold storage management computer system of claim 14, wherein the operational schedule is configured such that the at least a portion of the refrigeration system is d on from the first time to the second time to cool the enclosed space to the target temperature setpoint below the maximum allowed temperature.
16. The cold storage management computer system of claim 15, wherein the operational schedule is configured such that power usage of the at least a portion of the refrigeration system is d from the second time to the third time to permit the enclosed space to be warmed toward the maximum allowed temperature.
17. The cold storage management er system of claim 14, wherein the operational schedule is configured such that the enclosed space is permitted to be warmed by ambient temperatures toward the maximum allowed temperature.
18. The cold e ment computer system of claim 14, wherein the operational schedule is configured such that the enclosed space is ted to be warmed by ambient temperatures toward the maximum allowed temperature while the ics le is performed.
19. The cold storage management computer system of claim 14, wherein the operational schedule is configured such that the at least a portion of the refrigeration system is reactivated at the third time to maintain the enclosed space below the maximum allowed temperature after the logistics schedule has been performed while the at least a portion of eration system was deactivated. Attorney Docket: 41979-0025001
20. The cold storage ment computer system of claim 14, wherein the target temperature setpoint is configured as a ature setpoint to which the enclosed space is to be cooled to maintain a temperature below the maximum allowed temperature while the logistics schedule is performed and while the at least a portion of the refrigeration system is deactivated. Warehouse Refrigeration Inventory Other Info Provider(s) ‘~~~~~~~~~~
NZ776627A 2019-05-30 Thermal control system NZ776627B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
NZ811129A NZ811129B2 (en) 2019-05-30 Thermal control system

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US15/993,259 US10323878B1 (en) 2018-05-30 2018-05-30 Thermal control system
US16/413,309 US11181316B2 (en) 2018-05-30 2019-05-15 Thermal control system
NZ771638A NZ771638B2 (en) 2018-05-30 2019-05-30 Thermal control system

Publications (2)

Publication Number Publication Date
NZ776627A NZ776627A (en) 2024-07-05
NZ776627B2 true NZ776627B2 (en) 2024-10-08

Family

ID=

Similar Documents

Publication Publication Date Title
GB2589771A (en) Thermal control system
US8090476B2 (en) System and method to control data center air handling systems
US10146279B2 (en) Solid state memory thermal regulation
US20160021792A1 (en) Air conditioning controlling system and air conditioning controlling method
US20120215373A1 (en) Performance optimization in computer component rack
CN109982600B (en) Apparatus and method for use with refrigeration apparatus including temperature controlled container system
US20110296155A1 (en) Automatically starting servers at low temperatures
CN113438865B (en) Method, system, storage medium and equipment for controlling heat dissipation of server cabinet
US20130325196A1 (en) Personalized heating and cooling systems
WO2014015099A2 (en) Data center cooling system
WO2014005234A1 (en) Method for operating a portable electronic device
CA3173572A1 (en) Method for controlling a cooling system operatively connected to a data processing device
US12190170B2 (en) Virtual machine placement system and virtual machine placement method for implementing prediction management of virtual machines considering performance degration of physical server
US10047966B2 (en) Method for air conditioning an IT environment or an environment which contains heat generators
JP2009174734A (en) Air conditioning control device, air conditioning control method, air conditioning equipment, and air conditioning system
US11625082B2 (en) Computing system with a cooling function utilizing formula with algorithm
US20090099705A1 (en) Temperature management system for a multiple core chip
TW201419180A (en) Solder paste management system and solder paste management method
US7484380B2 (en) Determining maximum cooling for a component by retrieving an offset value
NZ776627B2 (en) Thermal control system
JP6277777B2 (en) Air conditioning control system and air conditioning control method
US20150192316A1 (en) Management of airflow provisioning to meet a cooling influence redundancy level
US11079131B2 (en) Control method, control apparatus, and non-transitory computer-readable storage medium for storing program performed by computer
CN114361631B (en) Energy storage system heat management method, device, equipment and storage medium
JP7215069B2 (en) Control program, control method and control device