RU85174U1 - COLUMN ASSEMBLY ASSEMBLY - Google Patents
COLUMN ASSEMBLY ASSEMBLY Download PDFInfo
- Publication number
- RU85174U1 RU85174U1 RU2009100854/22U RU2009100854U RU85174U1 RU 85174 U1 RU85174 U1 RU 85174U1 RU 2009100854/22 U RU2009100854/22 U RU 2009100854/22U RU 2009100854 U RU2009100854 U RU 2009100854U RU 85174 U1 RU85174 U1 RU 85174U1
- Authority
- RU
- Russia
- Prior art keywords
- column
- prefabricated
- crossbar
- monolithic
- outlets
- Prior art date
Links
- 230000002787 reinforcement Effects 0.000 claims abstract description 11
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 8
- 230000008878 coupling Effects 0.000 claims abstract description 4
- 238000010168 coupling process Methods 0.000 claims abstract description 4
- 238000005859 coupling reaction Methods 0.000 claims abstract description 4
- 239000004567 concrete Substances 0.000 description 6
- 210000001503 joint Anatomy 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000009415 formwork Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 3
- 150000001875 compounds Chemical class 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000021615 conjugation Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
Сопряжение ригеля с колонной железобетонного каркаса здания, включающее сборную колонну с отверстием в уровне перекрытий, сборные ригели с выпусками арматуры по торцам и на верхней грани, при этом вертикальные выпуски расположены по длине ригеля с фиксированным шагом, а на торцевых гранях выполнены шпонки в виде горизонтальных углублений треугольного сечения, и сборные плиты перекрытия с зазором между их торцами, замоноличенные заодно с отверстием в колонне, выпущенными в него арматурными выпусками из сборного ригеля и опорной арматурой, уложенной в монолитной части ригеля, при этом отверстие железобетонной колонны в уровне перекрытия выполнено высотой, равной суммарной высоте сборного ригеля и монолитной его части, а торцевые поверхности сборных плит перекрытий выполнены наклонными к плоскости плиты по всей ее высоте.The coupling of the crossbar with the column of the reinforced concrete frame of the building, including the prefabricated column with a hole at the level of the floors, prefabricated crossbars with reinforcement outlets at the ends and on the upper face, with vertical outlets located along the length of the crossbar with a fixed pitch, and dowels in the form of horizontal recesses of a triangular section, and prefabricated floor slabs with a gap between their ends, monolithic at the same time with a hole in the column, reinforced outlets from the prefabricated crossbar and supporting reinforcement released into it minutes, laid in a monolithic part beams, wherein the aperture in the reinforced concrete column at the overlap formed height equal to the total height of the beam and the precast monolithic part and end surfaces of precast slabs are inclined to the plane of the panel along its entire height.
Description
Полезная модель относится к области строительства и может быть использована для устройства сопряжения ригелей с колоннами железобетонных каркасов зданий и сооружений.The utility model relates to the field of construction and can be used to interface bolts with columns of reinforced concrete frames of buildings and structures.
Известно стыковое соединение (Авторское свидетельство СССР №670699, 28.02.78, кл. Е04В 1/38, Е04С 3/34), представляющее собой сопряжение колонны с ригелем, изготовленных индустриальным способом, включающее бетон замоноличивания, жестко соединенные между собой верхние и нижние арматурные выпуски, диагональные раскосы и накладки нижних выпусков.A butt joint is known (USSR Author's Certificate No. 670699, 02.28.78, CL Е04В 1/38, Е04С 3/34), which is the conjugation of a column with a crossbar made by an industrial method, including concrete filling, rigidly interconnected upper and lower reinforcing bars issues, diagonal braces and overlays of the lower issues.
Недостатками этого соединения модели являются:The disadvantages of this connection model are:
- применение известного соединения возможно только в сборных каркасах;- the use of known compounds is possible only in prefabricated frames;
- используемые в стыке сборные элементы требуют высокой точности монтажа конструкций, что приводит к увеличению трудозатрат;- prefabricated elements used in the joint require high accuracy of installation of structures, which leads to an increase in labor costs;
- металлоемкость стыка повышается из-за большого количества закладных деталей;- the metal consumption of the joint increases due to the large number of embedded parts;
- увеличение энергозатрат при устройстве стыка связано с большим количеством сварных работ.- the increase in energy consumption when connecting the joint is associated with a large number of welded work.
Известно стыковое соединение (Авторское свидетельство СССР №1325142, 07.03.86, кл. Е04В 1/38, Е04В 1/20) ригеля с колонной, включающее скошенную опорную грань скрытой консоли колонны, закладные детали опорной грани консоли и опорной части ригеля, бетон замоноличивания полости стыка.A butt joint is known (USSR Author's Certificate No. 1325142, 07.03.86, class Е04В 1/38, Е04В 1/20) of a crossbar with a column, including a beveled support face of the hidden console of the column, embedded parts of the support face of the console and the support part of the crossbar, concrete joint cavity.
Описанное соединение имеет следующие недостатки:The described compound has the following disadvantages:
- оно применимо только в сборных каркасах;- it is applicable only in prefabricated frames;
- конструктивные особенности опорной консоли увеличивают трудоемкость изготовления опалубки сборных колонн;- design features of the support console increase the complexity of manufacturing the formwork of prefabricated columns;
- применение закладных деталей консоли колонны с направляющими болтами требуют высокой точности монтажа конструкций для обеспечения попадания болтов колонны в отверстия ригелей, что повышает трудоемкость;- the use of embedded parts of the console of the column with guide bolts require high accuracy of installation of structures to ensure that the bolts of the column get into the holes of the crossbars, which increases the complexity;
- использование закладных деталей увеличивает материалоемкость стыка, что приводит к удорожанию конструкции.- the use of embedded parts increases the material consumption of the joint, which leads to an increase in the cost of the structure.
Наиболее близким по решению и достигаемому эффекту является стыковое соединение железобетонных ригеля и колонны (Авторское свидетельство СССР №767305, 24.01.74, кл. Е04В 1/38), включающее расположенные в верхней части, соединяемые между собой встык арматурные выпуски ригеля и колонны, а в нижней части - закладную деталь, расположенную в колонне и имеющую в консольной части продольный уступ.The closest to the solution and the achieved effect is the butt joint of the reinforced concrete crossbar and the column (USSR Author's Certificate No. 767305, 01.24.74, class E04B 1/38), including the reinforcing outlets of the crossbar and the column located in the upper part, butted together, and in the lower part there is a embedded part located in the column and having a longitudinal ledge in the cantilever part.
Недостатками стыкового соединения железобетонных ригеля и колонны являются:The disadvantages of the butt joints of reinforced concrete beams and columns are:
- ограничение его использования - только в сборных каркасах;- restriction of its use - only in prefabricated frames;
- трудоемкость монтажа за счет большого количества сварных работ;- the complexity of installation due to the large number of welded works;
- повышенная металлоемкость из-за наличия массивных закладных деталей;- increased metal consumption due to the presence of massive embedded parts;
- увеличение энергозатрат из-за осуществления соединения сборных элементов путем сварки арматурных выпусков.- increased energy costs due to the implementation of the connection of prefabricated elements by welding reinforcing outlets.
Полезная модель направлена на создание жесткого узла сопряжения ригеля с колонной, позволяющего применять его при строительстве сборно-монолитных каркасных зданий повышенной этажности, обеспечивающего при этом высокую надежность сопряжения, снижение трудоемкости при изготовлении сборных элементов из-за простоты опалубочных форм и высокую технологичность сборки.The utility model is aimed at creating a rigid assembly of the crossbar with the column, which allows it to be used in the construction of prefabricated monolithic frame buildings of high storeys, while ensuring high reliability of the pair, reducing the complexity in the manufacture of prefabricated elements due to the simplicity of formwork and high manufacturability.
Результат достигается тем, что узел сопряжения ригеля с колонной, состоящий из сборной железобетонной колонны с отверстием в уровне перекрытия, сборных ригелей с выпусками арматуры по торцам и на верхней грани, при этом вертикальные выпуски расположены по длине ригеля с фиксированным шагом, а на торцевых гранях выполнены шпонки в виде горизонтальных углублений треугольного сечения, и сборных плит перекрытий с зазором между их торцами, замоноличенные заодно с отверстием в колоннах, выпущенными в них арматурными выпусками из сборного ригеля и опорной арматурой, укладываемой в монолитной части ригеля, железобетонные колонны имеют отверстие высотой, равной суммарной высоте сборного ригеля и монолитной его части, торцевые поверхности сборных плит перекрытий должны быть выполнены наклонными к плоскости плиты.The result is achieved by the fact that the junction of the crossbar with the column, consisting of a precast reinforced concrete column with a hole in the level of overlap, precast bolts with reinforcement outlets at the ends and on the upper face, while the vertical outlets are located along the length of the crossbar with a fixed pitch, and on the end faces dowels are made in the form of horizontal recesses of a triangular section, and prefabricated floor slabs with a gap between their ends, monolithic at the same time with a hole in the columns, the reinforced outlets from the prefabricated rigs released into them To support and reinforcement to be laid in a monolithic part beams, concrete columns have an opening height equal to the total height of the beam and the precast monolithic part, the end surfaces of precast floor slabs must be performed to the inclined plane of the plate.
Полезная модель поясняется на чертежах. На фиг.1 представлен узел сопряжение ригеля с колонной. На фиг.2 дано сечение 1-1 узла сопряжения ригеля с колонной.A utility model is illustrated in the drawings. Figure 1 shows the node pair of the crossbar with the column. Figure 2 shows a section 1-1 node pairing the crossbar with the column.
Узел сопряжения состоит из сборной колонны 1, имеющей отверстие 2 в уровне перекрытия, сборного ригеля 3, торцевые грани которого имеют горизонтальные углубления треугольного сечения 4, с выпусками арматуры 5 на верхней грани с фиксированным шагом s и по торцам 6, сборных плит перекрытий 7, соединенных путем одновременного замоноличивания отверстия 2 в колонне 1. Монолитная часть ригеля 8, совпадает с зазором между сборными плитами перекрытий 7, опирающимися на сборный ригель 3, выпуски арматуры 5 по верхней грани сборного ригеля обеспечивают совместную работу сборной 3 и монолитной 8 частей ригеля, в уровне монолитной части 8 которого укладывается опорная арматура 9.The interface consists of a prefabricated column 1 having a hole 2 in the level of overlap, a prefabricated crossbar 3, the end faces of which have horizontal recesses of a triangular section 4, with releases of reinforcement 5 on the upper face with a fixed pitch s and along the ends 6, of prefabricated floor slabs 7, connected by simultaneous monolithic holes 2 in the column 1. The monolithic part of the crossbar 8, coincides with the gap between the prefabricated floor slabs 7, based on the prefabricated crossbar 3, the releases of the reinforcement 5 along the upper face of the precast crossbar provide local work team 3 and 8 parts monolithic pins, which fit in the level of a monolithic part 8 of the support fittings 9.
Узел сопряжения ригеля с колонной испытывает сложное деформированное состояние при работе его в составе каркаса. Растягивающие усилия, возникающие в верхней зоне опорной части сборно-монолитного ригеля воспринимаются опорной арматурой 9. Сжимающие усилия воспринимаются монолитным бетоном, а перерезывающие - бетоном шпонок 4. Преимуществом данного узла сопряжения является то, что в работу включаются две составляющие - монолитный и сборный бетоны. Тем самым получаем жесткое сопряжение даже без выполнения сварочных работ.The assembly of the crossbar with the column experiences a complex deformed state when it is operated as part of the frame. The tensile forces arising in the upper zone of the supporting part of the precast-monolithic crossbar are perceived by the supporting reinforcement 9. The compressive forces are perceived by the monolithic concrete, and the cutting forces by the concrete keys 4. The advantage of this coupling unit is that two components are included in the work - monolithic and precast concrete. Thus, we obtain a rigid interface even without welding.
Совместная работа монолитной части 8 и сборного ригеля 3 достигается обеспечением прочности контактного шва за счет работы вертикальных выпусков арматуры 5 по верхней грани сборного ригеля 3, установленных с фиксированным шагом s.The joint work of the monolithic part 8 and the prefabricated crossbar 3 is achieved by ensuring the strength of the contact seam due to the operation of the vertical outlets of the reinforcement 5 along the upper face of the precast crossbar 3 installed with a fixed pitch s.
Количество шпонок 4 по торцевой грани сборного ригеля 3 может варьироваться в зависимости от высоты сечения ригеля. Несущая способность узла сопряжения повышается за счет работы шпонок 4 на срез, треугольная форма которых по результатам экспериментальных исследований обеспечивает наибольшую прочность.The number of dowels 4 along the end face of the crossbar 3 can vary depending on the cross-sectional height of the crossbar. The bearing capacity of the interface increases due to the work of the keys 4 on the slice, the triangular shape of which, according to the results of experimental studies, provides the greatest strength.
Сборные плиты перекрытий 7, опирающиеся на сборный ригель 3, по всей высоте сечения имеют скошенные торцевые грани, наклонные к плоскости плиты, с углом наклона 14÷16° для формирования сечения монолитной части ригеля.Prefabricated floor slabs 7, based on a prefabricated crossbar 3, have slanted end faces that are inclined to the plane of the slab with an inclination angle of 14 ÷ 16 ° over the entire section height to form a section of the monolithic part of the crossbar.
Предлагаемый узел сопряжения ригеля с колонной позволил применить его при строительстве сборно-монолитных каркасных зданий повышенной этажности, повысить жесткость и надежность сопряжения ригеля с колонной за счет работы в сжатой зоне монолитного бетона, а в растянутой - арматуры, снизить трудоемкость при изготовлении сборных элементов за счет простоты опалубочных форм и уменьшения количества типоразмеров, повысив при этом технологичность сборки.The proposed assembly of the crossbar with the column allowed it to be used in the construction of prefabricated monolithic frame buildings of increased number of storeys, to increase the rigidity and reliability of the coupling of the crossbar with the column due to work in the compressed zone of monolithic concrete, and in the stretched - reinforcement, to reduce the complexity in the manufacture of prefabricated elements due to simplicity of formwork and reducing the number of sizes, while increasing the manufacturability of the assembly.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| RU2009100854/22U RU85174U1 (en) | 2009-01-11 | 2009-01-11 | COLUMN ASSEMBLY ASSEMBLY |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| RU2009100854/22U RU85174U1 (en) | 2009-01-11 | 2009-01-11 | COLUMN ASSEMBLY ASSEMBLY |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| RU85174U1 true RU85174U1 (en) | 2009-07-27 |
Family
ID=41048715
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| RU2009100854/22U RU85174U1 (en) | 2009-01-11 | 2009-01-11 | COLUMN ASSEMBLY ASSEMBLY |
Country Status (1)
| Country | Link |
|---|---|
| RU (1) | RU85174U1 (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108867855A (en) * | 2018-08-24 | 2018-11-23 | 三筑工科技有限公司 | Vertically concrete frame structure body and book moulding body are overlapped with horizontal entirety |
| CN110295754A (en) * | 2018-03-23 | 2019-10-01 | 浙江欣捷建设有限公司 | A kind of detachable prefabricated stand column bar reinforcement positioning device and its installation method |
| RU221241U1 (en) * | 2023-07-26 | 2023-10-26 | Общество с ограниченной ответственностью Специализированный застройщик "ПСФ "КРОСТ" | Knot “column-transom-slab of permanent formwork” |
-
2009
- 2009-01-11 RU RU2009100854/22U patent/RU85174U1/en active
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110295754A (en) * | 2018-03-23 | 2019-10-01 | 浙江欣捷建设有限公司 | A kind of detachable prefabricated stand column bar reinforcement positioning device and its installation method |
| CN108867855A (en) * | 2018-08-24 | 2018-11-23 | 三筑工科技有限公司 | Vertically concrete frame structure body and book moulding body are overlapped with horizontal entirety |
| CN108867855B (en) * | 2018-08-24 | 2024-05-28 | 三一筑工科技股份有限公司 | Vertical and horizontal integral laminated concrete frame structure and laminated molded body |
| RU221241U1 (en) * | 2023-07-26 | 2023-10-26 | Общество с ограниченной ответственностью Специализированный застройщик "ПСФ "КРОСТ" | Knot “column-transom-slab of permanent formwork” |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102808465B (en) | Assembly connecting structure and assembly connecting method of assembled concrete frame and shear wall combination | |
| TWI241374B (en) | Constructing the large-span self-braced buildings of composite load-bearing wall-panels and floors | |
| CN104060761B (en) | U-shaped steel concrete combination beam and construction method thereof | |
| CN202831296U (en) | Assembled spliced connecting structure of concrete frame-shear wall and structure constructed | |
| CN104264895A (en) | Prestressed concrete F slab and frame structure system | |
| CN108951955A (en) | An Assembled Integral Reinforced Concrete Combined Shear Wall Structure with Keyway | |
| CN108589971A (en) | A kind of closed-section steel deck combined concrete shear wall connecting node and production method | |
| JP2018520285A (en) | Prefabricated column and beam type construction | |
| JP6166560B2 (en) | Extension structure of seismic isolation building | |
| CN108571169B (en) | Construction method for factory prefabricated steel concrete superposed shear wall assembly type building | |
| CN103437493B (en) | Connection Nodes and Construction Methods of Prefabricated Reinforced Concrete Beams | |
| CN205024833U (en) | Reinforcing bar concrete combination prefabricated component | |
| CN203834738U (en) | T-shaped prefabricated mixed coupled wall | |
| CN203867067U (en) | U-shaped steel concrete compound section beam | |
| CN110656716B (en) | A building structure with dense rib connections of prefabricated wall panels and its construction method | |
| RU85174U1 (en) | COLUMN ASSEMBLY ASSEMBLY | |
| CN203440993U (en) | Connection joint of prefabricated reinforced concrete beam | |
| CN216007260U (en) | Rigid connection joint of steel beam and concrete column | |
| CN104878863B (en) | Construction method of light composite floor | |
| RU85511U1 (en) | MONOLITHIC COVERING ASSEMBLY ASSEMBLY ASSEMBLY | |
| RU128636U1 (en) | BASE ASSEMBLY JOINT REINFORCED CONCRETE COLUMN WITH FOUNDATION | |
| RU2411328C1 (en) | Prefabricated reinforced concrete frame of multistory building of higher fire resistance | |
| CN216195403U (en) | Run through hollow post of continuous precast concrete pipe of many floors | |
| CN104032862A (en) | Assembly-type steel beam joint L-shaped mixed coupled wall and construction method thereof | |
| CN104032859A (en) | Assembly-type L-shaped mixed coupled wall and construction method thereof |