Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
AU748919B2 - Piling system - Google Patents
[go: Go Back, main page]

AU748919B2 - Piling system - Google Patents

Piling system Download PDF

Info

Publication number
AU748919B2
AU748919B2 AU37622/97A AU3762297A AU748919B2 AU 748919 B2 AU748919 B2 AU 748919B2 AU 37622/97 A AU37622/97 A AU 37622/97A AU 3762297 A AU3762297 A AU 3762297A AU 748919 B2 AU748919 B2 AU 748919B2
Authority
AU
Australia
Prior art keywords
pile
core
grout
body member
cores
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
AU37622/97A
Other versions
AU3762297A (en
Inventor
Ian Grant Macdonald
Ian Robert Macdonald
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tristanagh Pty Ltd
Original Assignee
Tristanagh Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AUPO1614A external-priority patent/AUPO161496A0/en
Application filed by Tristanagh Pty Ltd filed Critical Tristanagh Pty Ltd
Priority to AU37622/97A priority Critical patent/AU748919B2/en
Publication of AU3762297A publication Critical patent/AU3762297A/en
Application granted granted Critical
Publication of AU748919B2 publication Critical patent/AU748919B2/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Description

WO 98/06906 PCT/AU97/00514
TITLE
PILING SYSTEM FIELD OF THE INVENTION THIS INVENTION relates to a piling system. The invention also relates to a land reclamation and/or protection system using the piles of the piling system.
The invention relates further to a method for underpinning structures.
BACKGROUND OF THE INVENTION Piles are commonly used to support and/or stabilise building structures, retaining walls, revetments and the like in soils which have low, or insufficient, structural strength. Examples of such soils include sandy coastal soils and reclaimed swamplands.
In many situations, conventional pile driving methods are not applicable, eg., due to lack of access or likelihood of damage to surrounding structures due to the transmitted vibrations from the piles.
It is an object of the present invention to provide a piling system where the piles can be formed in situ.
It is a preferred object of the present invention to provide a piling system where a structural core or body for the pile can be simply and inexpensively manufactured and can be assembled on site.
It is a further preferred object of the present invention to provide a piling system where the structural strength can be increased by the addition of additional reinforcing.
SUMMARY OF THE INVENTION It is also an object of the invention to provide an improved method for underpinning structures for reinforcement and/or stabilization purposes.
Other preferred objects of the present invention will become WO 98/06906 PCT/AU97/00514 2 apparent from the following description.
In one aspect, the present invention resides in a method of manufacturing a pile, including the steps of: forming a borehole a hole in a soil formation; at least substantially filling the borehole with grout; inserting a pile core into the grout, preferably centrally within the grout; and allowing the grout to set.
Preferably, the hole is drilled with its longitudinal axis directed substantially vertically, although the axis may be inclined to the vertical to increase the maximum shear strength of the pile in a given load direction or plane.
Preferably, the grout is a cementitious, structural grout.
(The mechanical strength of the grout may be varied to suit the particular intended application.) Preferably, the core is hollow, and is preferably of triangular cross-section. Alternative cross-sections include square, rectangular, hexagonal, circular, star or the like.
The core, when triangular, may be formed in two parts, ie, (I) a substantially V-shaped body member and (ii) a locking member having a web interconnecting a pair of inclined side flanges.
The core member may be formed from, eg., steel, aluminium, plastics (including fibre-reinforced plastic or carbon fibre) and/or any other suitable material, and may be formed from, eg., sheet or mesh material and, eg., folded or roll-formed to shape.
Additional reinforcement fabric rods, mesh) may be provided internally and/or externally of the core.
When the grout has set, a portion of the hole may be excavated, eg., to expose one side of the pile, to enable the pile to support structural member(s), eg., retaining wall panels.
In a second aspect, the present invention resides in a pile WO 98/06906 PCT/AU97/00514 3 manufactured by the above method.
In a third aspect, the present invention resides in a core for a pile, including: a substantially V-shaped body member; and a locking member having a web interconnecting a pair of inclined side flanges; so arranged that the opposed edges of the body member are respectively engaged in the junction of the web and one of the side flanges of the locking member to form a structural element.
Welds may be provided, eg., at spaced intervals to retain the body member and locking member together, as the core is inserted in the grout.
Alternatively the core may comprise an extruded hollow plastics member having a substantially triangular cross section.
While it is preferable that the core can be driven into the grout, the core may be placed in the hole before the grout is, eg., pumped or poured into the hole.
Formations may be formed into, or fixed to, the body member and locking member to increase their "keying" with the grout.
When one side of the borehole is to be excavated after the grout has set, it is preferable that the apex of the body member is directed towards the soil which will be undisturbed, ie., away from the direction of the excavated soil.
In a fourth aspect, the present invention resides in a method of manufacturing a pile, including the steps of forming a borehole in a soil foundation; inserting or drilling a hollow pile body into the hole, as or after the hole is drilled or formed; and filling the body with grout, soil or like material.
Preferably, the body has the cross-sections hereinbefore described and is formed of the same materials as hereinbefore described WO 98/06906 PCT/AU97/00514 4 for the core member.
A cap may be provided at the top of the body to enclose the material within the body.
In sand or like soil, the body may be "jet-drilled" to the desired depth.
In a fifth aspect, the present invention resides in a pile having a hollow (preferably triangular) body member filled with grout, soil or like filling material and optional reinforcing material.
In a sixth aspect, the present invention resides in a land reclamation and/or protection system wherein: a plurality of piles are arranged in an array or matrix, where piles in alternative rows are offset from the piles in the remaining rows.
Preferably, the piles are triangular in cross-section, and the apexes of the piles in a given row lie substantially at the intersection of lines defined by the side faces of the piles in the preceding row.
Preferably, the piles dissipate any wave energy in the waves washing on the beach or land protected by the piles.
In a seventh aspect, the invention resides in a method of underpinning a structure, said method comprising the steps of: forming a borehole in an earth formation adjacent a foundation for said structure, said borehole being inclined from the vertical and extending beneath the foundation; forming a cementitious pile in said borehole, said cementitious pile including a cap formation extending beneath the foundation; and, inserting in a cavity between said foundation and an upper surface of said cap support means to allow the building load to be transferred to said pile.
If required the borehole may include a casing liner.
Suitably a source of pressurised fluid is injected into said borehole to form an enlarged cavity at the base thereof, said cavity when WO 98/06906 PCT/AU97/00514 filled with cementitious material forming a support base for said pile.
Preferably said pile includes reinforcing means.
Suitably said reinforcing means comprises a pile core as hereinbefore described.
The pile may also include one or more steel reinforcing rods.
If required at least one of said reinforcing rods may have at a remote end thereof, retractable flukes which, in an extended position form a reinforced base for said pile.
Suitably said cap formation includes reinforcing means.
If required said cap may include a load bearing surface.
The load bearing surface may comprise a metal reinforcing member.
Suitably said support means comprises an extendable member.
Preferably said extendable member comprises a jacking means.
The cavity between said foundation and the upper surface of said cap formation may be filled with a cementitious material when said foundation is located in a desired position.
BRIEF DESCRIPTION OF THE DRAWINGS To enable the invention to be fully understood, preferred embodiments will now be described with reference to the accompanying drawings, in which: FIG 1 is a perspective view of the components of the pile core; FIG 2 is a perspective view of the pile core when assembled; FIG 3 is a top plan view of a completed pile; FIG 4 is a perspective view of an earth formation supported by a plurality of the piles in accordance with the present invention; and FIG 5 is a schematic plan view of a pile, in accordance with WO 98/06906 PCT/AU97/00514 6 a second embodiment, in use to support a sheet pile; FIG 6 is a schematic side cross sectional view of a beach protected by the reclamation system; and FIG 7 is a schematic plan view of the layout of the piles for the system of FIG 6.
FIG 7 shows schematically a method for underpinning a structure in accordance with the invention.
DETAILED DESCRIPTION OF THE DRAWINGS Referring to FIGS 1 and 2, the pile core 10 has a substantially V-shaped body member 20, eg., rolled from sheet steel, and a locking member 30 with a central web 31 interconnecting a pair of inwardly-inclined side flanges 32, 33 (also formed from sheet steel).
As shown in FIG 2, the locking member 30 is slid onto the body member 20 so that the opposed edges 21, 22 of the body member are engaged with the junction of the web 31 and the inclined side flanges 32, 33, respectively.
Welds 40 can be provided at spaced intervals along the core to lock the body member 20 and lock member 30 together when the core 10 is inserted into the grout in the hole.
Formations grooves, slots, deformations) may be roll formed or pressed into the body member 20 and/or the locking member or formations, eg., ribs, plates, may be welded to the body member and/or locking member 30; to increase the keying of the pile core 10 to the grout when the grout has set.
Referring to FIGS 3 and 4, a borehole 50 is drilled into the soil formation 60 and is substantially filled with a cementitious structural grout A pile core 10, as hereinbefore described, is driven into the grout 70 substantially centrally thereof and additional reinforcing rods may also be driven into the grout internally and/or externally of the pile core WO 98/06906 PCT/AU97/00514 7 When the grout has set, the resultant pile 100 may be used, eg., to support the foundations of a building structure.
Alternatively, as shown in FIG 4, a portion of the soil formation 60 may be excavated to leave an exposed face or wall 61 interconnecting adjacent piles 100. It will be noted that the pile core 10 is arranged in the pile 100 so that the apex 23 of the body member 20 is directed in the direction of arrow A in FIG 4 and that the locking member is adjacent the exposed side of the pile 100.
Structural formations, eg., retaining walls, may be mounted on and/or supported by, the piles 100.
The dimensions of the pile core 10, eg., length, metal thickness, height and base width may be varied to suit the particular intended application, eg., as indicated in dashed lines in FIG 3.
While the components 20, 30 of the pile core 10 may be formed from sheet steel, they may also be formed from steel mesh, plastics sheet or mesh (preferably being fibre-reinforced for increased strength) or a combination of two or more of these, eg., the body member may be formed from sheet material and the locking member 30 formed from mesh material or vice versa.
Referring now to FIG 5, the pile 200 has a hollow body 210, of triangular cross-section, extruded from PVC plastics (which may be fibre-reinforced).
The body 210 is driven into the ground using a jet-drill to form the hole in the sandy soil formation in which the pile 200 is placed.
Grout or sand 211 is used to fill the interior of the body 210 and a cap (not shown) can be placed to enclose the top of the body 210.
The pile 200 can be used to support a corrugated sheet pile 250, being bolted thereto using bolts 260 and reinforcement plates 261.
It will be readily apparent to the skilled addressee that the body 210 could be formed of steel or other suitable material, and that the wall thickness and included angles between the adjacent sides can be WO 98/06906 PCT/AU97/00514 8 varied to suit the particular intended applications for the piles.
Referring now to FIGS 6 and 7, a land reclamation and/or protection system 300 uses the piles 200 to protect, or reclaim, a beach 301 adjacent a building 302.
The piles 200 are arranged in alternating rows extending substantially parallel to the water line. The apex 211 of each pile 200 lies substantially on the intersection of the lines 212, 213 projected from the sides 214, 215 of the piles 200 in the preceding row of piles 200.
From preliminary tests with a model, it appears that the first row of piles 200 breaks up the wave action and "funnels" the wave towards the second row of piles, which further breaks up the wave action.
Each successive row of piles acts similarly. While the incoming waves moving towards the apices 211 of the piles will carry sand to the beach 301, the dissipation of the wave energy prevents, or minimises, the amount of sand drawn from the beach on the back flow of the waves. The sand progressively builds up behind, and then around, the piles and the beach is reclaimed.
To protect a beach from erosion, the piles can be installed as shown in FIG 6, just below ground level. While large waves in cyclonic conditions) may remove the top layer 303, the piles 200 will prevent further scavenging of the sand from the beach. When a beach has been reclaimed, the piles can be removed, eg., to a new site, or can be left in place to protect the reclaimed sand. The spacing between "adjacent piles in a row, and between adjacent rows", and the actual relationship between the rows, can be varied to suit the intended application.
It will be readily apparent to the skilled addressee that the present invention provides a method for manufacturing piles with good structural characteristics without the need for heavy pile-driving equipment and/or the likelihood of damage to surrounding structures due to generated vibrations in the soil. It further provides a range of applications WO 98/06906 PCT/AU97/00514 9 for the piles.
Various changes and modifications may be made to the embodiment described and illustrated without departing from the present invention.
FIG 8 illustrates a method of underpinning a building according to the invention.
Where for example due to soil subsidence the structural integrity of a building is at risk, it may be necessary to reinforce or elevate portions of a building's foundations.
In such circumstances, it is not possible to excavate large amounts of soil from underneath the building foundations or footings or to employ earth working machinery which induces vibratory forces into the earth mass as this can worsen the situation.
According to the present invention a borehole is drilled into an earth formation 510 by a rotary drill or the like, the borehole being inclined to the vertical and extending beneath the foundation or footings 520 of a building structure 530.
Depending upon the nature of the earth formation a steel casing (not shown) may be inserted into the borehole to prevent collapse of the bore wall.
When the borehole is formed to a desired depth, an enlarged cavity 540 may be formed at the base of the borehole 500 by compressed air or pressurized water.
A cementitious grout of say 70-80 Mpa is introduced into the borehole to fill the bore 500 and cavity 540.
Thereafter a triangular pile core 550 is inserted into the grout mass 560 while still fluid, the pile core extending to a region adjacent the base cavity 540.
If additional reinforcing is required, reinforcing bars and/or a steel rod 570 carrying a plurality of pivotally mounted flukes 580 is inserted down the middle of the pile core and when the flukes reach the WO 98/06906 PCT/AU97/00514 region of the cavity they are extended into the grout mass in cavity 540 to provide additional reinforcing therefor.
When the grout has set, a selected region 590 beside and beneath the footing structure 520 is excavated and any reinforcing bars 600 extending from the pile core are bent over the region beneath the footing 520.
A pile cap 610 is then formed by pouring a further mass of cementitious material into the lower portion of cavity 590 leaving a space 620 beneath the exposed portion of footing 520.
A screw jack 630 is then placed beneath footing 520 with its base 640 embedded in the cementitious cap 610.
When the cementitious grout has cured sufficiently the jack 630 and other similarly strategically placed jacks around the building can be extended to elevate the subsided portions of building to a sufficient level to restore the structural integrity to the building.
After the building has been aligned the remaining portion of the excavation 590 is filled with cementitious material and allowed to set thus providing full support for the building foundations.
It will be readily apparent to a skilled addressee that many modifications and variations may be made to the various aspects of the invention without departing from the spirit and scope thereof.

Claims (13)

1. A method of manufacturing a pile, the method including the steps of: forming a borehole in a soil formation; at least partially filling the borehole with grout; inserting a pile core, having a substantially V-shaped body member and a locking member extending between sides of the body member so that the pile core has a substantially triangular cross section, into the grout; and allowing the grout to set.
2. A method as claimed in claim 1 wherein additional reinforcing means is provided internally and/or externally of the core.
3. A method as claimed in claim 1 wherein a portion of the borehole is excavated to expose one side of the pile to enable the pile to support structural members.
4. A method as claimed in claim 1 wherein the pile core is placed in the borehole before the grout is admitted.
A pile core that includes a substantially V-shaped body member, and a locking member that extends between and interconnects sides of the body member so that the pile core has a substantially triangular cross section.
6. A pile core as claimed in claim 5, in which the locking member has a web that interconnects a pair of inclined side flanges so that opposed free edges of the body member are each engaged in a respective junction of the web and one of the side flanges of the locking member. 25/04/2002 14:49 FAX +61 7 55261896 ENB PATENT i06 12
7. A pile core as claimed in claim 6, wherein said body member and said locking member are secured at spaced intervals to retain the body member and the locking member together.
8. A pile core as claimed in claim 5 wherein formations are formed into, or fixed to, the body member and the locking member to increase their "keying" with the grout.
9. A pile core as claimed in claim 5 wherein a cap is provided at the top thereof to enclose material within the pile core.
A sand bench reclamation and/or protection system wherein: a plurality of pile cores as claimed in claim 5 are arranged in a sand base in an array or matrix, where pile cores in alternative rows are offset from the pile cores in the remaining rows.
11. A system as claimed in claim 10 wherein the apices of the pile cores in one row lie substantially at the intersection of lines defined by the side faces of the pile cores in an adjacent row whereby the pile cores dissipate any wave energy in the waves washing on the beach or land protected by the pile cores and reduce water velocity to permit sedimentation of entrained sand in the region of the pile cores.
12. A new method of manufacturing a pile, substantially as described herein, with reference to the accompanying drawings.
13. A new pile core, substantially as described herein, with reference to the accompanying drawings.
AU37622/97A 1996-08-13 1997-08-12 Piling system Ceased AU748919B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU37622/97A AU748919B2 (en) 1996-08-13 1997-08-12 Piling system

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
AUPO1614 1996-08-13
AUPO1614A AUPO161496A0 (en) 1996-08-13 1996-08-13 Piling system
PCT/AU1997/000514 WO1998006906A1 (en) 1996-08-13 1997-08-12 Piling system
AU37622/97A AU748919B2 (en) 1996-08-13 1997-08-12 Piling system

Publications (2)

Publication Number Publication Date
AU3762297A AU3762297A (en) 1998-03-06
AU748919B2 true AU748919B2 (en) 2002-06-13

Family

ID=25624035

Family Applications (1)

Application Number Title Priority Date Filing Date
AU37622/97A Ceased AU748919B2 (en) 1996-08-13 1997-08-12 Piling system

Country Status (1)

Country Link
AU (1) AU748919B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104746512B (en) * 2015-04-08 2017-03-01 南京工业大学 Cement soil stiffness composite pile and pile forming method thereof
CN114297742B (en) * 2021-11-22 2024-08-13 杰地设计集团有限公司 Liquefaction resistance treatment method based on average shock subsidence and differential shock subsidence

Also Published As

Publication number Publication date
AU3762297A (en) 1998-03-06

Similar Documents

Publication Publication Date Title
CA2809638C (en) Extensible shells and related methods for constructing a support pier
JP6166264B2 (en) How to build a retaining wall
US10513831B2 (en) Open-end extensible shells and related methods for constructing a support pier
US3250075A (en) Method of retaining wall construction and anchoring
CN112982431A (en) Construction method of foundation pit supporting structure
CN114108654A (en) Construction method for removing obstacles in foundation pit area invaded by pressure-bearing water dock
KR100289256B1 (en) Tunnel construction method in shallow toffee area
US20250179754A1 (en) Bioinspired skirted footing and its method of installation
AU748919B2 (en) Piling system
CN215052842U (en) Column hammer ramming method pore-forming reinforcement pile composite foundation structure
KR101765879B1 (en) Composite block for ground reinforcement and reinforceing method of the foundation bottom using the same
WO1998006906A1 (en) Piling system
CN112064649A (en) Construction method of pile-plate composite structure for foundation pit support
KR102535225B1 (en) Open Bottom Expandable Shells and Related Methods for Building Support Piers
CN211973510U (en) Steel sheet pile and root pile composite foundation pit supporting structure
Rabeler et al. High capacity drilled cast-in-place piles
Thasnanipan et al. Barrettes; A Versatile Foundation For Transmission Line Towers
JP2024012932A (en) Pile foundation with ground improvement and its construction method
KR20260030216A (en) Gravity retaining wall using extension blocks, and construction method for the same
JP2022108444A (en) Reinforcement method for existing bank
CN116180760A (en) Abduction enhancement technology and implementation method of rock-soil supporting structure
Doornbos Fundex techniques for forIIIing in-situ reinforced concrete piles
Launder Piles and piling
Dip ANALYSIS AND DESIGN OF SAND DRAINS AND PREFABRICATED VERTICAL DRAINS FOR THE RUNWAY OF KHAN JAHAN ALI AIRPORT AT BAGERHAT
Thasnanipan et al. GeoEng2000

Legal Events

Date Code Title Description
NB Applications allowed - extensions of time section 223(2)

Free format text: THE TIME IN WHICH TO REQUEST EXAMINATION HAS BEEN EXTENDED TO 17 DEC 1999.

FGA Letters patent sealed or granted (standard patent)