Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
CN103669379A - Island constructing caisson without leveling of foundation bed and construction method - Google Patents
[go: Go Back, main page]

CN103669379A - Island constructing caisson without leveling of foundation bed and construction method - Google Patents

Island constructing caisson without leveling of foundation bed and construction method Download PDF

Info

Publication number
CN103669379A
CN103669379A CN201310646717.9A CN201310646717A CN103669379A CN 103669379 A CN103669379 A CN 103669379A CN 201310646717 A CN201310646717 A CN 201310646717A CN 103669379 A CN103669379 A CN 103669379A
Authority
CN
China
Prior art keywords
caisson
island
slip casting
construction method
ballast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310646717.9A
Other languages
Chinese (zh)
Inventor
刘德进
冯海暴
张学俊
曲俐俐
李振国
冯甲鑫
付大伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN201310646717.9A priority Critical patent/CN103669379A/en
Publication of CN103669379A publication Critical patent/CN103669379A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The invention relates to an island constructing caisson without leveling of a foundation bed. The island constructing caisson without leveling of the foundation bed comprises a prefabricated caisson body, a grouting bag is arranged on a bottom plate of the caisson, and the grouting bag is connected with a grouting pipe. The invention further relates to a construction method of the island constructing caissons. The method includes the following steps that one caisson is positioned according to pre-determined design; the caisson is made to sink through ballast; when the caisson sinks to the pre-determined height, the caisson body is supported with a supporting device; binding material is injected to the grouting bag from the grouting pipe; after the binding material solidifies and reaches certain strength, the supporting device is taken out; sand and the ballast are injected to the bottom of the caisson, and pouring is performed; after the caisson is installed, a next caisson is installed according to the same steps. Due to the fact that grout is injected into the grouting bag after the caisson is placed well, concrete sets fast, the caisson body can be supported by the set concrete, setting is easy to control in the early stage of a caisson foundation, and setting and inclination in the construction period are not be caused easily.

Description

Without base bed flattening Zhu island caisson and construction method
Technical field
The present invention relates to a kind of caisset, and the construction method of this caisson.
Background technology
Generally build adopt of cofferdam, island flattens after processing bedding more, carry out again the installation of member, this member belongs to conventional dam structural shape, is widely used, but seldom adopts under the condition of environment Cha Zhu island in the dam constructions such as sand preventing dyke, mole, regulating structure, shore protection.Existingly without base bed flattening technique Zhu island member or caisson, be mainly gravity structure, dependence is built island member or caisson deadweight and backfill weight and is resisted wave, wind-force, water pressure and soil pressure effect, maintain structural entity stable, bear wave ability strong, dykes and dams are from great, and base pressure is large, not high to ground requirement for bearing capacity, conventionally need riprap foundation, and need to first flatten processing to bedding.Execution conditions more complicated in some cases, the construction conditions such as deep water, soft base, high wind, torrent, wave, macroseism are more complicated, and the design and installation of this structure are all considered above-mentioned bad working environments, can overcome above-mentioned problem.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of vertical and level of caisson that can effectively improve to the caisson of supporting capacity, control caisson sedimentation and horizontal movement, and the construction method of this caisson.
With regard to regard to the caisson of base bed flattening Zhu island, for solving the problems of the technologies described above, of the present inventionly without base bed flattening Zhu island caisson, comprise prefabricated caisson, described Bottom plate of sinkbox place arranges slip casting pouch, and slip casting pouch connects Grouting Pipe.
Described caisson comprises base plate, and base plate place reserves groove, and described slip casting pouch is arranged in groove, and note sand hole is set on base plate, and Grouting Pipe connects slip casting pouch by note sand hole.
The bottom margin of described caisson one end arranges protuberance, and the corresponding position of the other end arranges the recess matching.
The top of described caisson one end is provided with nose girder, and the top of the other end is provided with the guide groove matching with described nose girder.
With regard to the construction method without base bed flattening Zhu island caisson, this construction method without base bed flattening Zhu island caisson comprises the following steps, A, by caisson by predetermined design location; B, by ballast, make caisson sinking; When C, caisson sinking arrive predetermined altitude, with bracing or strutting arrangement, prop up casing; D, from Grouting Pipe, to slip casting pouch, inject cementitious material; E, when cementitious material, solidify after reaching some strength and withdraw from bracing or strutting arrangement; G, to caisson bottom note sand, ballast, builds; H, complete after the installation of first caisson, by same step, next caisson is installed.
When loading makes caisson sinking, caisson is aimed to the protuberance of previous already installed caisson with one end of recess, the recess of a rear caisson is placed on the protuberance of previous caisson, the other end of a rear caisson supports with bracing or strutting arrangement.
When the first casing is installed,, when next caisson is installed, one end that nose girder is set is aimed to the guide groove of previous caisson by one end that guide groove is set outwardly, ballast, makes caisson sinking, and nose girder enters guide groove.
The cementitious material of injecting to slip casting bag from Grouting Pipe is concrete.
Adopt after such structure, due to after placing caisson to slip casting in slip casting pouch, concrete rapid solidification, can, so that the concrete support casing after solidifying is easily controlled the sedimentation of laying foundation initial stage, be difficult for causing s Settlement in Construction Period and inclination.The bottom margin of caisson one end arranges protuberance, and the corresponding position of the other end arranges the recess matching, and during installation, the recess of a rear caisson can be placed on the protuberance of previous caisson, plays the effect of support.The top of caisson one end is provided with nose girder, and the top of the other end is provided with the guide groove matching with described nose girder, and during installation, the nose girder of a rear caisson enters in the guide groove of previous caisson, plays good positioning action.Caisson good stability of the present invention, easy construction, builds island fast, and speed of application is fast, and consumptive material is economized, and the duration is short, little to surrounding environment influence, and the dismounting workload in cofferdam is little, and construction costs is low.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation.
Fig. 1 is the left view of caisset of the present invention.
Fig. 2 is the front view of caisset of the present invention
Fig. 3 is the upward view of caisset of the present invention.
Fig. 4 is the scheme of installation of caisset of the present invention.
The specific embodiment
As shown in Figure 1 to Figure 3, of the present invention without base bed flattening Zhu island caisson, comprise prefabricated caisson, caisson comprises base plate 1, base plate 1 place reserves groove 2, the interior slip casting pouch 3 that arranges of groove 2, slip casting pouch 3 connects Grouting Pipe 4, note sand hole 5 is set on base plate 1, and Grouting Pipe 4 connects slip casting pouch 3 by note sand hole 5, and the bottom margin of caisson one end arranges protuberance 6, the corresponding position of the other end arranges the recess 7 matching, can form engagedly, the top of caisson one end is provided with nose girder 8, and the top of the other end is provided with the guide groove 9 matching with described nose girder.
As shown in Figure 4, the construction method without bedding caisson of the present invention, comprises the following steps, A, caisson is located by transportation by driving or stranded cable to predetermined design position; B, by ballast, make the caisson sinking of gaining in weight; When C, caisson sinking arrive predetermined altitude, with jack 10, prop up casing; D, by note sand hole 5, from Grouting Pipe 4, to slip casting pouch 3, inject concrete; E, when cementitious material, solidify after reaching some strength and withdraw from jack 10; G, to caisson bottom note sand, guarantee that caisson bottom is closely knit.Final ballast, builds top concrete structure; H, complete after the installation of first caisson, by same step, next caisson is installed.
When the first casing is installed, by one end that protuberance is set outwardly, second later caisson is installed, when loading makes caisson sinking, caisson is aimed to the protuberance of previous already installed caisson with one end of recess, the recess of a rear caisson is placed on the protuberance of previous caisson, the other end support jack of a rear caisson.
When the first casing is installed,, second later caisson is installed by one end that guide groove is set outwardly, when next caisson is installed, one end that nose girder is set is aimed to the guide groove of previous caisson, ballast, makes caisson sinking, and nose girder enters guide groove.
The above, be only to preferred embodiment of the present invention, not the present invention done to other forms of restriction, and any those skilled in the art may utilize the technology contents of above-mentioned announcement to be changed or be modified as the equivalent embodiment of equal variation.Every the present invention program's content that do not depart from,, all drops in protection scope of the present invention any simple modification made for any of the above embodiments, equivalent variations and remodeling according to technical spirit of the present invention.

Claims (8)

1. without a base bed flattening Zhu island caisson, comprise prefabricated caisson, it is characterized in that: described Bottom plate of sinkbox place arranges slip casting pouch, slip casting pouch connects Grouting Pipe.
2. according to claimed in claim 1, without base bed flattening Zhu island caisson, it is characterized in that: described caisson comprises base plate, base plate place reserves groove, and described slip casting pouch is arranged in groove, and note sand hole is set on base plate, and Grouting Pipe connects slip casting pouch by note sand hole.
According to claimed in claim 2 without base bed flattening Zhu island caisson, it is characterized in that: the bottom margin of described caisson one end arranges protuberance, the corresponding position of the other end arranges the recess matching.
According to described in claim 1,2 or 3 any one without base bed flattening Zhu island caisson, it is characterized in that: the top of described caisson one end is provided with nose girder, and the top of the other end is provided with the guide groove matching with described nose girder.
5. without a construction method for base bed flattening Zhu island caisson, it is characterized in that: comprise the following steps, A, by caisson by predetermined design location; B, by ballast, make caisson sinking; When C, caisson sinking arrive predetermined altitude, with bracing or strutting arrangement, prop up casing; D, from Grouting Pipe, to slip casting pouch, inject cementitious material; E, when cementitious material, solidify after reaching some strength and withdraw from bracing or strutting arrangement; G, to caisson bottom note sand, ballast, builds; H, complete after the installation of first caisson, by same step, next caisson is installed.
6. according to the construction method without bedding caisson claimed in claim 5, it is characterized in that: when loading makes caisson sinking, caisson is aimed to the protuberance of previous already installed caisson with one end of recess, the recess of a rear caisson is placed on the protuberance of previous caisson, and the other end of a rear caisson supports with bracing or strutting arrangement.
7. according to the construction method without bedding caisson described in claim 5 or 6, it is characterized in that: when the first casing is installed, by one end that guide groove is set outwardly, when next caisson is installed, one end that nose girder is set is aimed to the guide groove of previous caisson, ballast, make caisson sinking, nose girder enters guide groove.
8. according to the construction method without bedding caisson claimed in claim 7, it is characterized in that: the cementitious material of injecting to slip casting bag from Grouting Pipe is concrete.
CN201310646717.9A 2013-12-04 2013-12-04 Island constructing caisson without leveling of foundation bed and construction method Pending CN103669379A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310646717.9A CN103669379A (en) 2013-12-04 2013-12-04 Island constructing caisson without leveling of foundation bed and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310646717.9A CN103669379A (en) 2013-12-04 2013-12-04 Island constructing caisson without leveling of foundation bed and construction method

Publications (1)

Publication Number Publication Date
CN103669379A true CN103669379A (en) 2014-03-26

Family

ID=50308093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310646717.9A Pending CN103669379A (en) 2013-12-04 2013-12-04 Island constructing caisson without leveling of foundation bed and construction method

Country Status (1)

Country Link
CN (1) CN103669379A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105604078A (en) * 2016-01-15 2016-05-25 中交第一航务工程局有限公司 Installation method of caisson
CN116122326A (en) * 2022-09-09 2023-05-16 江苏久聚建设工程有限公司 Integrated street lamp base based on 3D prints

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5740009A (en) * 1980-08-22 1982-03-05 Mitsubishi Heavy Ind Ltd Embankment construction by hull caisson
JP2003041549A (en) * 2002-05-22 2003-02-13 Toyo Constr Co Ltd Joint repair construction method for caisson
CN101130991A (en) * 2006-08-24 2008-02-27 中船第九设计研究院 Caisson cofferdam based on prepacked foundation bed
CN102080364A (en) * 2010-12-17 2011-06-01 浙江海桐高新工程技术有限公司 Pile bearing caisson seawall and construction method thereof
EP2597206A1 (en) * 2011-11-22 2013-05-29 Ceteal Foundation and method of manufacture
CN203701121U (en) * 2013-12-04 2014-07-09 中交一航局第二工程有限公司 Island building caisson without leveling of foundation bed

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5740009A (en) * 1980-08-22 1982-03-05 Mitsubishi Heavy Ind Ltd Embankment construction by hull caisson
JP2003041549A (en) * 2002-05-22 2003-02-13 Toyo Constr Co Ltd Joint repair construction method for caisson
CN101130991A (en) * 2006-08-24 2008-02-27 中船第九设计研究院 Caisson cofferdam based on prepacked foundation bed
CN102080364A (en) * 2010-12-17 2011-06-01 浙江海桐高新工程技术有限公司 Pile bearing caisson seawall and construction method thereof
EP2597206A1 (en) * 2011-11-22 2013-05-29 Ceteal Foundation and method of manufacture
CN203701121U (en) * 2013-12-04 2014-07-09 中交一航局第二工程有限公司 Island building caisson without leveling of foundation bed

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105604078A (en) * 2016-01-15 2016-05-25 中交第一航务工程局有限公司 Installation method of caisson
CN116122326A (en) * 2022-09-09 2023-05-16 江苏久聚建设工程有限公司 Integrated street lamp base based on 3D prints

Similar Documents

Publication Publication Date Title
CN203701121U (en) Island building caisson without leveling of foundation bed
CN1837511B (en) A double-row cofferdam and its manufacturing method
CN103122636B (en) A kind of soft stratum diaphragm wall shallow-layer cell wall reinforcement means
CN105220703B (en) Enclosing type deepwater platform construction method based on condition of sand backfilling balance method
CN106930277A (en) A kind of construction of manual-excavation cast-in-place pile method
CN104988948A (en) Rib plate type retaining wall and construction method thereof
CN102071675A (en) Soft soil foundation consolidation method combining drainage pile loading prepressing and deep mixing piles
CN202187287U (en) Small-medium span suspension bridge anchorage structure under weak geological conditions
CN106013238B (en) A kind of big earthing open trench tunnel subsidence control method of soft stratum
CN102518147B (en) Anchoring and retaining structure for reducing support height of existing overhigh retaining wall
CN103669379A (en) Island constructing caisson without leveling of foundation bed and construction method
CN203729309U (en) Support system with combined double-row piles combined with vertical prestressed anchor bolts
CN215669631U (en) Deep overburden foundation structure
CN202416252U (en) L-shaped flood prevention retaining wall with high piles
CN204780991U (en) Floor formula retaining wall
CN201416177Y (en) T-shaped pile combined plank sinking pit bracing construction
CN104047273A (en) Energy dissipation anti-flushing wall for hydropower station and construction method thereof
CN201502065U (en) A type of composite foundation for bolt combined excavation
CN104612174B (en) A kind of ultra-soft cob brick loose tool assists the construction method of suspended deck structure
CN202830969U (en) Rectifying and reinforcing structure of cantilever retaining wall
CN201865118U (en) Grouting spiral anchor base
CN203238542U (en) Suspension bridge anchorage foundation with split-type open caissons adopted
CN208486286U (en) A kind of well foundation
CN102966074B (en) Artificial channel bank protection structure and method for constructing same
CN218508368U (en) Cofferdam structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140326