CN204940224U - Pre-buried steel sheet suitable for wood pattern - Google Patents
Pre-buried steel sheet suitable for wood pattern Download PDFInfo
- Publication number
- CN204940224U CN204940224U CN201520677513.6U CN201520677513U CN204940224U CN 204940224 U CN204940224 U CN 204940224U CN 201520677513 U CN201520677513 U CN 201520677513U CN 204940224 U CN204940224 U CN 204940224U
- Authority
- CN
- China
- Prior art keywords
- embedded steel
- steel plate
- wooden
- steel slab
- wooden formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
- Y02P70/50—Manufacturing or production processes characterised by the final manufactured product
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
本实用新型提供了一种适用于木模的预埋钢板,包括木模板、预埋钢板、拉筋、螺栓、方木、螺母;所述木模板和预埋钢板表面紧贴,螺栓穿过木模板和预埋钢板配合螺母将木模板和预埋钢板固定。本实用新型采用螺栓在预埋钢板与木模板之间施加一压力,使得预埋钢板和木模板表面可以紧紧相贴,并在螺母与木模板之间加设钢垫板、方木以使之受力均匀,避免了预埋钢板在混凝土浇筑振捣施工过程产生位移;进一步的,避免了因预埋钢板固定不牢不能紧贴模板表面产生的需要人工凿除预埋钢板表面混凝土的作业;更进一步的,人工凿除预埋钢板表面混凝土后,预埋钢板表面将与混凝土表面平整度不一致,对后期钢结构焊接造成困难,采用本实用新型后将避免这一问题的发生。
The utility model provides a pre-embedded steel plate suitable for wooden formwork, including wooden formwork, pre-embedded steel plates, tie bars, bolts, square wood, and nuts; The template and the pre-embedded steel plate cooperate with nuts to fix the wooden formwork and the pre-embedded steel plate. The utility model uses bolts to apply a pressure between the embedded steel plate and the wooden formwork, so that the surface of the embedded steel plate and the wooden formwork can be closely attached, and a steel backing plate and square wood are added between the nut and the wooden formwork to make The force is uniform, which avoids the displacement of the pre-embedded steel plate during the concrete pouring and vibrating construction process; furthermore, avoids the need to manually remove the concrete on the surface of the pre-embedded steel plate due to the inability of the pre-embedded steel plate to be firmly attached to the surface of the formwork Furthermore, after the concrete on the surface of the pre-embedded steel plate is manually chiseled out, the surface of the pre-embedded steel plate will be inconsistent with the flatness of the concrete surface, which will cause difficulties in the welding of the steel structure in the later stage. This problem will be avoided after the utility model is adopted.
Description
技术领域technical field
本实用新型涉及一种适用于木模的预埋钢板,属于水电工程技术领域。The utility model relates to a pre-embedded steel plate suitable for wooden formwork, which belongs to the technical field of hydropower engineering.
背景技术Background technique
在水电工程发电厂房、大坝、进水口等建筑物中,常常需要在混凝土结构浇筑时预埋钢板,作为后期电缆桥架、栏杆、门槽等钢结构的焊接点。传统的做法是在结构钢筋绑扎完毕后,将带有拉筋的预埋钢板与结构钢筋点焊连接,然后立模,再浇筑混凝土。由于立模在预埋钢板定位之后进行,常常因为预埋钢板定位不准、固定不牢的原因,预埋钢板表面难以贴紧模板,造成了混凝土浇筑完毕拆模后预埋钢板不能露出混凝土表面的问题,必须采用人工凿除混凝土,以使预埋钢板出露于混凝土表面,费时费力。且预埋钢板表面混凝土凿除后,混凝土表面与预埋钢板表面存在高差,给钢结构与预埋钢板之间焊接作业造成了困难。In buildings such as power plants, dams, and water inlets of hydropower projects, it is often necessary to pre-embed steel plates when pouring concrete structures, as welding points for steel structures such as cable bridges, railings, and door slots. The traditional method is to spot-weld the pre-embedded steel plates with tension bars to the structural steel bars after the structural steel bars are bound, then set up the formwork, and then pour concrete. Since the vertical formwork is carried out after the pre-embedded steel plate is positioned, it is often difficult for the surface of the pre-embedded steel plate to adhere to the formwork due to the inaccurate positioning of the pre-embedded steel plate and the inability to fix it firmly. As a result, the pre-embedded steel plate cannot be exposed to the concrete surface after the concrete is poured and the formwork is removed. In order to solve the problem, the concrete must be removed manually so that the embedded steel plate is exposed on the concrete surface, which is time-consuming and labor-intensive. Moreover, after the concrete on the surface of the pre-embedded steel plate is chiseled off, there is a height difference between the surface of the concrete and the surface of the pre-embedded steel plate, which causes difficulties in the welding operation between the steel structure and the pre-embedded steel plate.
实用新型内容Utility model content
为解决上述技术问题,本实用新型提供了一种适用于木模的预埋钢板,该适用于木模的预埋钢板通过螺栓紧固力将预埋钢板表面与木模表面紧贴的方式使预埋钢板在木模板上稳固精确的定位,且保证了预埋钢板能露出结构混凝土表面,省去了人工凿除预埋钢板表面混凝土的作业,并且降低了钢结构与预埋钢板焊接作业的难度。In order to solve the above-mentioned technical problems, the utility model provides a kind of pre-embedded steel plate suitable for wooden formwork, and the pre-embedded steel plate suitable for wooden formwork makes the surface of the pre-embedded steel plate close to the surface of wooden formwork through bolt fastening force. The pre-embedded steel plate is firmly and accurately positioned on the wooden formwork, and it ensures that the pre-embedded steel plate can expose the surface of the structural concrete, eliminating the need to manually chisel out the concrete on the surface of the pre-embedded steel plate, and reducing the welding work between the steel structure and the pre-embedded steel plate difficulty.
本实用新型通过以下技术方案得以实现。The utility model is realized through the following technical solutions.
本实用新型提供的一种适用于木模的预埋钢板,包括木模板、预埋钢板、拉筋、螺栓、方木、螺母;所述木模板和预埋钢板表面紧贴,螺栓穿过木模板和预埋钢板配合螺母将木模板和预埋钢板固定;所述拉筋端部焊接在预埋钢板相对于木模板的另一表面上;所述拉筋的数量为两根以上;所述木模板相对于预埋钢板的另一表面上、木模板和螺母之间还固定有方木。The utility model provides a pre-embedded steel plate suitable for wooden formwork, including wooden formwork, pre-embedded steel plate, tie bars, bolts, square wood, and nuts; The formwork and the pre-embedded steel plate cooperate with nuts to fix the wooden formwork and the pre-embedded steel plate; the ends of the tie bars are welded on the other surface of the pre-embedded steel plate relative to the wooden formwork; the number of the tie bars is more than two; On the other surface of the wooden form relative to the embedded steel plate, square timber is also fixed between the wooden form and the nut.
还包括钢垫板,钢垫板固定在螺母和方木之间;在钢垫板和方木的接触面上,钢垫板完全覆盖方木。It also includes a steel backing plate, which is fixed between the nut and the square wood; on the contact surface between the steel backing plate and the square wood, the steel backing plate completely covers the square wood.
所述方木长度大于等于木模板的宽度。The length of the square timber is greater than or equal to the width of the wooden formwork.
所述螺栓的直径为20mm,长度为20cm,型号为M16。The diameter of the bolt is 20mm, the length is 20cm, and the model is M16.
所述预埋钢板为Q235钢板,厚度20mm。The embedded steel plate is a Q235 steel plate with a thickness of 20mm.
所述拉筋的长度大于50cm,材料为螺纹钢,直径为20mm。The length of the tie bars is greater than 50cm, the material is rebar, and the diameter is 20mm.
所述木模板为木胶合板材质,厚度为1cm。The wood formwork is made of wood plywood with a thickness of 1 cm.
本实用新型的有益效果在于:采用螺栓在预埋钢板与木模板之间施加一压力,使得预埋钢板和木模板表面可以紧紧相贴,并在螺母与木模板之间加设钢垫板、方木以使之受力均匀,避免了预埋钢板在混凝土浇筑振捣施工过程产生位移;进一步的,避免了因预埋钢板固定不牢不能紧贴模板表面产生的需要人工凿除预埋钢板表面混凝土的作业;更进一步的,人工凿除预埋钢板表面混凝土后,预埋钢板表面将与混凝土表面平整度不一致,对后期钢结构焊接造成困难,采用本实用新型后将避免这一问题的发生。The beneficial effect of the utility model is that the bolts are used to apply a pressure between the embedded steel plate and the wooden formwork, so that the surface of the embedded steel plate and the wooden formwork can be closely attached, and a steel backing plate is added between the nut and the wooden formwork , square wood to make it evenly stressed, avoiding the displacement of the pre-embedded steel plate during the concrete pouring and vibrating construction process; further, avoiding the need to manually remove the pre-embedded steel plate due to the insecure fixation of the pre-embedded steel plate and the inability to cling to the surface of the formwork The operation of the concrete on the surface of the steel plate; further, after manually removing the concrete on the surface of the embedded steel plate, the surface of the embedded steel plate will be inconsistent with the flatness of the concrete surface, which will cause difficulties in the welding of the steel structure in the later stage. This problem will be avoided after the utility model is adopted happened.
附图说明Description of drawings
图1是本实用新型的横剖结构示意图,即图2中A-A面剖视图;Fig. 1 is a cross-sectional structure schematic diagram of the present utility model, namely A-A plane sectional view in Fig. 2;
图2是本实用新型的纵剖结构示意图,即图1中B-B面剖视图;Fig. 2 is the longitudinal sectional structure schematic diagram of the present utility model, promptly B-B plane sectional view among Fig. 1;
图3是本实用新型垂直于木适用于木模的预埋钢板表面的正视图,即图1和图2中C-C面剖视图。Fig. 3 is the front view of the utility model perpendicular to the surface of the pre-embedded steel plate suitable for wood formwork, that is, the C-C plane sectional view in Fig. 1 and Fig. 2 .
图中:1-木模板,2-预埋钢板,3-拉筋,4-螺栓,5-方木,6-钢垫板,7-螺母,8-结构混凝土。In the figure: 1-wood formwork, 2-embedded steel plate, 3-tension bar, 4-bolt, 5-square wood, 6-steel backing plate, 7-nut, 8-structural concrete.
具体实施方式detailed description
下面进一步描述本实用新型的技术方案,但要求保护的范围并不局限于所述。The technical solution of the utility model is further described below, but the scope of protection is not limited to the description.
如图1至图3所示的一种适用于木模的预埋钢板,包括木模板1、预埋钢板2、拉筋3、螺栓4、方木5、螺母7;所述木模板1和预埋钢板2表面紧贴,螺栓4穿过木模板1和预埋钢板2配合螺母7将木模板1和预埋钢板2固定;所述拉筋3端部焊接在预埋钢板2相对于木模板1的另一表面上;所述拉筋3的数量为两根以上;所述木模板1相对于预埋钢板2的另一表面上、木模板1和螺母7之间还固定有方木5。A kind of pre-embedded steel plate suitable for wooden formwork as shown in Fig. 1 to Fig. 3, comprises wooden formwork 1, pre-embedded steel plate 2, tension bar 3, bolt 4, square timber 5, nut 7; Described wooden formwork 1 and The surface of the pre-embedded steel plate 2 is close to the surface, and the bolt 4 passes through the wooden formwork 1 and the pre-embedded steel plate 2 and cooperates with the nut 7 to fix the wooden formwork 1 and the pre-embedded steel plate 2; On the other surface of the template 1; the number of the tie bars 3 is more than two; on the other surface of the wooden template 1 relative to the embedded steel plate 2, there is also a square wood fixed between the wooden template 1 and the nut 7 5.
还包括钢垫板6,钢垫板6固定在螺母7和方木5之间;在钢垫板6和方木5的接触面上,钢垫板6完全覆盖方木5。Also includes a steel backing plate 6, the steel backing plate 6 is fixed between the nut 7 and the square wood 5; on the contact surface between the steel backing plate 6 and the square wood 5, the steel backing plate 6 completely covers the square wood 5.
所述方木5长度大于等于木模板1的宽度。The length of the square timber 5 is greater than or equal to the width of the wooden template 1 .
所述螺栓4的直径为20mm,长度为20cm,型号为M16。The diameter of the bolt 4 is 20mm, the length is 20cm, and the model is M16.
所述预埋钢板2为Q235钢板,厚度20mm。The embedded steel plate 2 is a Q235 steel plate with a thickness of 20 mm.
所述拉筋3的长度大于50cm,材料为螺纹钢,直径为20mm。The length of the tie bar 3 is greater than 50cm, the material is rebar, and the diameter is 20mm.
所述木模板1为木胶合板材质,厚度为1cm,与方木在5组合承受浇筑结构混凝土8时的侧向力。The wooden formwork 1 is made of wood plywood, with a thickness of 1 cm, and is combined with the square wood at 5 to bear the lateral force when pouring the structural concrete 8 .
钢垫板6的设置的目的是为了使螺母7产生的压力均匀分布于方木5表面,防止螺母7下方受力集中导致方木5表面凹陷破坏,进而影响螺栓4产生的紧固力,导致预埋钢板2不能紧贴木模板1。The purpose of setting the steel backing plate 6 is to make the pressure generated by the nut 7 evenly distributed on the surface of the square wood 5, so as to prevent the concentration of force under the nut 7 from causing the surface of the square wood 5 to be sunken and damaged, thereby affecting the fastening force generated by the bolt 4, resulting in The embedded steel plate 2 cannot be close to the wooden formwork 1.
方木5设置的目的是为了扩大螺栓4产生的紧固力在木模板1上的作用面积,以免局部受力过大破坏木模板1结构。The purpose of square wood 5 setting is in order to enlarge the action area of the fastening force produced by bolt 4 on the wooden formwork 1, so as to avoid local damage to the structure of the wooden formwork 1 due to excessive force.
本实用新型采用如下方式安装:The utility model is installed in the following way:
第1步:将拉筋3与预埋钢板2焊接。Step 1: Weld the tie bar 3 and the embedded steel plate 2.
第2步:绑扎结构钢筋网,根据大致定位将预埋钢板2用细铅丝临时固定于结构钢筋网上。Step 2: Bind the structural steel mesh, and temporarily fix the pre-embedded steel plate 2 on the structural steel mesh with thin lead wires according to the approximate positioning.
第3步:立木模板1,并依据设计结构尺寸对木模板1进行测量定位并固定木模板1。Step 3: erect the wooden formwork 1, measure and position the wooden formwork 1 according to the design structure size and fix the wooden formwork 1.
第4步:测量放样预埋钢板2定位,并在木模板1的相应位置钻孔。Step 4: Measure the position of the lofted pre-embedded steel plate 2, and drill holes in the corresponding position of the wooden formwork 1.
第5步:将预埋钢板2、螺栓4、方木5、钢垫板6分别安装在木模板1两侧,拆除临时固定预埋钢板2的细铅丝,重新测量定位预埋钢板并上紧螺母7。Step 5: Install the pre-embedded steel plate 2, bolt 4, square wood 5, and steel backing plate 6 on both sides of the wooden formwork 1, remove the thin lead wire temporarily fixing the pre-embedded steel plate 2, re-measure and position the pre-embedded steel plate and tighten it Nut 7.
第6步:浇筑结构混凝土8。Step 6: Pour structural concrete8.
第7步:待结构混凝土8达到设计强度后,拆除木模板1,将预埋钢板2表面油污清理干净。Step 7: After the structural concrete 8 reaches the design strength, the wooden formwork 1 is removed, and the oil stain on the surface of the embedded steel plate 2 is cleaned.
第8步:将钢结构(电缆桥架、栏杆、门槽等)通过焊接连接到预埋钢板2上。Step 8: Connect the steel structure (cable tray, railing, door slot, etc.) to the pre-embedded steel plate 2 by welding.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520677513.6U CN204940224U (en) | 2015-09-01 | 2015-09-01 | Pre-buried steel sheet suitable for wood pattern |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520677513.6U CN204940224U (en) | 2015-09-01 | 2015-09-01 | Pre-buried steel sheet suitable for wood pattern |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204940224U true CN204940224U (en) | 2016-01-06 |
Family
ID=55007666
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520677513.6U Expired - Lifetime CN204940224U (en) | 2015-09-01 | 2015-09-01 | Pre-buried steel sheet suitable for wood pattern |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204940224U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105133556A (en) * | 2015-09-01 | 2015-12-09 | 中国电建集团贵阳勘测设计研究院有限公司 | Pre-buried steel sheet suitable for wood pattern |
-
2015
- 2015-09-01 CN CN201520677513.6U patent/CN204940224U/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105133556A (en) * | 2015-09-01 | 2015-12-09 | 中国电建集团贵阳勘测设计研究院有限公司 | Pre-buried steel sheet suitable for wood pattern |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102277959B (en) | Standard steel frame formwork system for concrete floor slabs and construction method thereof | |
| CN210887275U (en) | Concrete pile bearing platform template structure | |
| CN209228042U (en) | A kind of corner constructional column erecting device | |
| CN204418680U (en) | A kind of concrete wall template bracing reinforcement assembly | |
| CN204492187U (en) | A kind of for the sealing locating device bottom concrete wall template | |
| CN105952154B (en) | A kind of concrete-pouring template stent | |
| CN203487777U (en) | Reinforcing system, in which split screws do not penetrate through templates, for large shear wall | |
| CN108678193B (en) | Post-cast strip and construction method thereof | |
| CN204940224U (en) | Pre-buried steel sheet suitable for wood pattern | |
| CN109457960B (en) | Adjustable universal mold for integrally assembling cast-in-situ stair steps | |
| CN202831624U (en) | Template for deformation joint of shear wall | |
| CN204199687U (en) | A kind of bath is fallen plate-girder side shaping tool formula between defending and is hung die device | |
| CN106638617A (en) | Pouring method of concrete without template in lattice beam type slope support | |
| CN222771936U (en) | A reinforcement device for pre-buried U-shaped reinforced masonry structural column | |
| CN206158172U (en) | Entrance to a cave template | |
| CN105804396B (en) | A kind of non-type, template system precast stair bench and construction can be had enough to meet the need | |
| CN205171999U (en) | Narrow expansion joint of shear force wall template | |
| CN204186068U (en) | Scissors wall building iron wood gang form | |
| CN109441100B (en) | Reverse pulling supporting tool for PC laminated plate with bottom template | |
| CN108678368A (en) | Small-sized beam body fixing templates and construction method | |
| CN104453235B (en) | Current conversion station fire wall construction technology | |
| CN105133556A (en) | Pre-buried steel sheet suitable for wood pattern | |
| CN204609293U (en) | Portablely locate buttress casting mold | |
| CN203904785U (en) | Multifunctional pressing rod of track slab of CRTS III plate type ballastless track | |
| CN208329189U (en) | A kind of pre-buried wirerope |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20160106 |