DE2056064B2 - Underwater prospecting drill rig with buoyancy tanks - contains drill and rod magazine for radio control from mother ship - Google Patents
Underwater prospecting drill rig with buoyancy tanks - contains drill and rod magazine for radio control from mother shipInfo
- Publication number
- DE2056064B2 DE2056064B2 DE19702056064 DE2056064A DE2056064B2 DE 2056064 B2 DE2056064 B2 DE 2056064B2 DE 19702056064 DE19702056064 DE 19702056064 DE 2056064 A DE2056064 A DE 2056064A DE 2056064 B2 DE2056064 B2 DE 2056064B2
- Authority
- DE
- Germany
- Prior art keywords
- drill
- rig
- underwater
- drilling
- rod magazine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/12—Underwater drilling
- E21B7/124—Underwater drilling with underwater tool drive prime mover, e.g. portable drilling rigs for use on underwater floors
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/14—Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
- E21B19/143—Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole specially adapted for underwater drilling
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
Abstract
Description
Die Erfindung betrifft ein Unterwasserbohrgerät zum automatischen Niederbringen von Bohrungen in den Meeresboden für geologische Untersuchungen, Probennähme usw.The invention relates to an underwater drilling device for automatically drilling holes in the Seabed for geological surveys, sampling, etc.
Bei der Prospektion und Exploration von Bodenschätzen unter dem Meeresgrund benötigt man in der Regel als Ergänzung zu den seismischen, gravimetrischen und magnetischen Untersuchungen Bodenproben und Bohrlochmessungen. Sie erst geben endgültigen Aufschluß über die Schichtung, den Aufbau und die Zusammensetzung des Meeresbodens und damit über die Höffigkeit des untersuchten Gebietes.When prospecting and exploring mineral resources under the sea floor, one needs in the Usually as a supplement to the seismic, gravimetric and magnetic investigations of soil samples and borehole logging. Only they give final information about the stratification, the structure and the Composition of the seabed and thus the area under investigation.
Im Stadium der Prospektion genügen meistens vereinzelte weit auseinander liegende Bohrungen, während bei der qualitativen und quantitativen Exploration ein dichtes Netz von Bohrungen niedergebracht werden muß. Das ist zur Zeit — zumindest in Wassertiefen über 200 m - mit großem zeitlichem und technischem Aufwand (Einsatz von Bohrinseln und Bohrschiffen) verbunden und dadurch sehr teuer.In the prospecting stage, isolated wells that are far apart are usually sufficient, while in qualitative and quantitative exploration a dense network of wells was drilled must become. This is currently - at least in water depths over 200 m - with great temporal and technical effort (use of drilling rigs and drilling ships) and therefore very expensive.
Es sind bereits Bohrgeräte zur Durchführung derartiger Untersuchungen bekannt. Beispielsweise ist ein derartiges Bohrgerät bekannt, bei dem auf einem Rahmen mit drei verstellbaren Füßen ein Bohrmast mit einem Vorschubzylinder sowie ein Bohrgestängemagazin angeordnet sind. Der Vorschubzylinder ist mit einem Motor zum Antrieb des Bohrgestänges ausgerüstet. Ferner ist im Rahmen des Bohrgerätes eine Abfangvorrichtung für das Bohrgestänge vorgesehen.Drilling devices for carrying out such investigations are already known. For example is Such a drilling device is known in which a drill mast is mounted on a frame with three adjustable feet a feed cylinder and a drill rod magazine are arranged. The feed cylinder is with a Motor equipped to drive the drill pipe. Furthermore, an interception device is within the scope of the drilling device intended for the drill pipe.
Die Energieversorgung und Steuerung dieses Bohrgerätes erfolgt von einer schwimmenden Basis aus, die außer mit den erforderlichen Kabeln auch dauernd mit einem Führungsseil mit dem Bohrgerät verbunden ist. 6SThe power supply and control of this drilling rig is carried out from a floating base which, in addition to the necessary cables, is also permanently connected to the drilling rig with a guide rope. 6 p
Die Einsatztiefen dieser Geräte sind jedoch auf Wassertiefen beschränkt, die geringer als 200 m sind. Die Bohrtiefen der Geräte sind auf höchstens 100 m begrenzt. Ein wesentlicher Nachteil der bekannten Geräte besteht weiterhin darin, daß sie während der gesamten Einsatzdauer auf eine oder mehrere Kabeiverbindungen mit der über dem Bohrort stehenden Basis angewiesen sind, die die benötigte Energie, die Steuerkommandos usw. liefert. Dadurch entfällt die Möglichkeit, Bohrungen an verschiedenen Stellen des Meeresbodens schnell nacheinander durchzuführen.The operating depths of these devices are limited to water depths that are less than 200 m. The drilling depths of the devices are limited to a maximum of 100 m. A major disadvantage of the known Devices continue to be that they use one or more cable connections during the entire period of use are dependent on the base above the drilling location, the required energy, the Delivers control commands etc. This eliminates the possibility of drilling holes at different points in the Quickly one after the other.
Die Aufgabe der vorliegenden Erfindung ist es, den technischen und zeitlichen Aufwand, insbesondere für Bohrungsserien, mit Hilfe eines automatisierten Unterwasserbohrgeräts zu verringern und das gesamte Untersuchungsverfahren dadurch zu rationalisieren, daß ein Schilf mehrere dieser Geräte mitführt und relativ schnell an den gewünschten Stellen aussetzenThe object of the present invention is to reduce the technical and time expenditure, in particular for Series of holes, with the help of an automated underwater drilling rig to reduce and thereby streamline the entire investigation process, that a reed carries several of these devices and releases them relatively quickly in the desired places
kann.can.
Diese Aufgabe ist erfindungsgemäß bei einem fernbedienbaren Unterwasserbohrgerät, welches mit einer Energiequelle für die Antriebsaggregate und Schwimmkörpern zum Absenken und Auflassen des Gerätes versehen ist, dadurch gelöst, daß das Bohrgerät zusätzlich ein Bohrgestängemaga/in und ein vollautomatisches Kommandogerät aufweist, welches drahtlos fernbedienbar ist.This object is according to the invention in a remotely controllable underwater drilling device, which with an energy source for the drive units and floats for lowering and lowering the Device is provided, solved in that the drilling device additionally has a drill rod mag / in and a fully automatic command device, which is wireless is remotely controllable.
Es ist zweckmäßig, das Unterwasserbohrgerät mit einem lösbaren Bohrlochkopf zu versehen, der gegebenenfalls mit einem automatischen Signalgeber ausgerüstet ist. In einer besonders vorteilhaften Ausführung form ist das Bohrgestängemagazin als konischer Korb ausgebildet, der den Bohrmast konzentrisch umgibt und mit einen Schrittmotor gekuppelt ist.It is expedient to provide the underwater drilling device with a detachable borehole head, which if necessary is equipped with an automatic signal generator. In a particularly advantageous embodiment form, the drill rod magazine is designed as a conical basket that concentrically surrounds the drill mast and is coupled to a stepper motor.
Das Unterwasserbohrgerät nach der Erfindung hat den Vorteil, daß es nach dem Positionieren und Absenken auf dem Meeresboden von dem Haltekabel getrennt werden kann, das es mit dem aussetzenden Schiff verbindet, und von diesem Zeitpunkt an alle weiteren Funktionen mit Hilfe einer Programmsteuerung über das Kommandogerät selbsttätig ausführt.The underwater drilling device according to the invention has the advantage that it is after positioning and Lowering on the seabed can be separated from the support cable that connects it to the launching Ship connects, and from this point on all other functions with the help of a program control automatically via the command device.
Nach Beendigung des Bohrvorgangs erfolgt entweder selbsttätig oder aufgrund eines vom Schiff ausgesandten Signals das Abtrennen des Bohrlochkopfes und gegebenenfalls zusätzlicher Ballastgewichte und ein selbsttätiges Auftreiben zur Meeresoberfläche, wo das Unlerwasserbohrgerät wieder in Bord genommen werden kann. Die für das Auftreiben erforderlichen Schwimmkörper können während des Bohrvorgangs geflutet sein, wenn das Untewasserbohrgerät mit an sich bekannten Vorrichtungen zum Lenzen der Schwimmkörper versehen ist. Das hat den Vorteil, daß auf zusätzliche Ballastgewichte verzichtet werden kann.After completion of the drilling process takes place either automatically or on the basis of a from the ship transmitted signal, the separation of the wellhead and possibly additional ballast weights and an automatic buoyancy to the sea surface, where the Unler water drilling rig is taken back on board can be. The floating bodies required for the buoyancy can be used during the drilling process be flooded when the underwater drilling device with known devices for draining the floating body is provided. This has the advantage that additional ballast weights can be dispensed with.
Der vom Unterwasserbohrgerät trennbare Bohrlochkopf verbleibt als Bohrlochmarkierung am Meeresgrund. Eine Ausrüstung des Bohrlochkopfes mit einem Signalgeber erleichtert das spätere Wiederauffinden des Bohrloches.The borehole head, which can be separated from the underwater drilling rig, remains on the sea floor as a borehole marker. Equipping the wellhead with a signal transmitter makes it easier to find the later Borehole.
In den Zeichnungen ist schematisch ein Unterwasserbohrgerät nach der Erfindung dargestellt, und zwar zeigenIn the drawings is a schematic underwater drilling rig shown according to the invention, namely show
F i g. 1 eine Ansicht des Unterwasserbohrgeräts,F i g. 1 is a view of the underwater drilling rig,
F i g. 2 einen Schnitt durch das Bohrgestängemagazin undF i g. 2 shows a section through the drill rod magazine and
F i g. 3 eine Draufsicht auf das Bohrgestängemagazin.F i g. 3 is a plan view of the drill rod magazine.
Das Unterwasserbohrgerät 1 weist einen auf einer Plattform 2 angeordneten Rahmen aus drei rohrförmigen Ständern 3 auf, die an ihrem oberen Ende durch Querträger 4 miteinander verbunden sind. In den Ständern 3 sind höhenverstellbare Beine 5 gelagert, die an ihrem unteren Ende in sphärischen Lagern drehbareThe underwater drilling device 1 has a frame arranged on a platform 2 and consists of three tubular frames Stands 3 which are connected to one another at their upper end by cross members 4. In the Stands 3 are height-adjustable legs 5 which are rotatable at their lower end in spherical bearings
Füße 6 aufweisen. Auf der Plattform 2 ist ein Gestängemagazin 7. das als konischer Korb ausgebildet Lt, um eine vertikale Achse drehbar gelagert und über ein Zahnradgetriebe 8 mit einem Schrittmotor 9 gekuppelt.Have feet 6. On platform 2 is a Rod magazine 7. which is designed as a conical basket, rotatably mounted about a vertical axis and over a gear drive 8 is coupled to a stepping motor 9.
An einer im Rahmen befestigten Funrungsstange 10 ist der Bohrantrieb 11 axial verschiebbar und schwenkbar gelagert. Unterhalb der Plattform 2 ist der Bohrlochkopf 12 lösbar befestigt, der als konischer Trichter ausgebildet ist und an seinem unteren Ende eine Auffangvorrichtung 13 besitzt.The drill drive 11 is axially displaceable and pivotable on a foundation rod 10 fastened in the frame stored. Below the platform 2, the wellhead 12 is releasably attached, which is designed as a conical Funnel is formed and has a collecting device 13 at its lower end.
Am oberen Teil des Rahmens sind Schwimmkörper 14 angeordnet. Ferner ist der Rahmen mit einem Haltering 15 versehen. Auf der Plattform 2 sind eine Energiequelle 16 sowie das Kommandogerät 17 befestigt.Floating bodies 14 are arranged on the upper part of the frame. Furthermore, the frame is with a Retaining ring 15 provided. An energy source 16 and the command device 17 are located on the platform 2 attached.
In der F i g. 2 ist ein Schnitt durch das Gestängemagazin 7 dargestellt. Das Gestängemagazin 7 ist auf Wälzlagern 7a, Tb um seine Achse drehbar gelagert und über das Zahnradgetriebe 8 mit dem Schrittmotor 9 gekuppelt. Innerhalb des Gestängemagazins 7 ist die Führungsstange 10 für den Bohrantrieb 11 angeordnet, der an der Führungsstange 10 axial verschiebbar und schwenkbar befestigt ist. In dem Gestängemagazin 7 sind die Bohrgesiängeteile 18 gelagert, die durch eine (nicht dargestellte) Klemmvorrichtung gehalten werden können, die nach Durchführung einer Bohrung vor dem Auftreiben des Unterwasserbohrgeräts einschaltbar ist. Vor und während einer Bohrung ruhen die unteren Enden der Bohrgestängeteile 18 in einer im Bohrlochkopf 12 angeordneten Führungsleiste 19, die auf ihrem Umfang an einer vorgegebenen Stelle eine Unterbrechung 19a aufweist. Der Bohrantrieb 11 ist mit einem Aulnehmcrdorn 20 ausgerüstet. An seinem oberen Rand weist das Gestängemagazin 7 eine Halteleiste 21 auf, die an einer in bezug auf die Führungsstange 10 symmetrisch zur Unterbrechung 19a liegenden Stelle einen Ausbruch 21abesitzt.In FIG. 2 shows a section through the rod magazine 7. The rod magazine 7 is mounted on roller bearings 7a, Tb so that it can rotate about its axis and is coupled to the stepping motor 9 via the gear mechanism 8. The guide rod 10 for the drill drive 11, which is attached to the guide rod 10 so that it can be axially displaced and pivoted, is arranged within the rod magazine 7. The drill string parts 18 are stored in the rod magazine 7 and can be held by a clamping device (not shown) which can be switched on after drilling a hole before the underwater drilling device is driven up. Before and during a drilling, the lower ends of the drill rod parts 18 rest in a guide bar 19 which is arranged in the wellhead 12 and has an interruption 19a on its circumference at a predetermined point. The drill drive 11 is equipped with a take-up mandrel 20. At its upper edge, the rod magazine 7 has a retaining strip 21 which has an opening 21a at a point symmetrical to the interruption 19a with respect to the guide rod 10.
Die Arbeitsweise dieser Vorrichtung ist folgende:This device works as follows:
Nach dem Absenken des Unlerwasserbohrgeräts 1 auf den Meeresboden an der vorgegebenen Stelle, die durch eine Bohrung näher untersucht werden soll, wird das Gerät durch Verstellung der Beine 5 horizontal ausgerichtet und nach Lösen des Haltekabels von dem Haltering 15 der Steuerung durch das KommandogerätAfter lowering the Unlerwasserbohrgerät 1 on the seabed at the specified location, the is to be examined more closely through a hole, the device is horizontal by adjusting the legs 5 aligned and after loosening the retaining cable from the retaining ring 15 of the control by the command device
17 überlassen. Nach dem Niederbringen einer Bohrung bis auf eine Tiefe, die der Länge eines Bohrgestängeteils17 left. After drilling a hole to a depth equal to the length of a drill rod part
18 entspricht, wobei der Bohrantrieb 11 an dei Führungsstange 10 abwärts geglitten ist, wird der Bohrantrieb 11 wieder in seine Ausgangsstellung A zurückgeführt. Durch die Drehung des Bohrges'angemagazins 7 um einen Teilschritt gelangt ein Bohrgestängeteil 18 mit seinem unteren Ende an die Unterbrechung 19a der Führungsleiste 19 im Bohrlochkopf 12 und gleitet im Bohrlochkopf 12 nach unten in eine Stellung, die gestrichelt dargestellt und mit 18a bezeichnet ist. Durch Schwenken des Bohrantriebs 11 um die Führungsstange 10 in die Stellung B gelangt der Bohrantrieb 11 mit seinem Aufnehmerdorn 20 über das obere Ende des in der Stellung 18a befindlichen Bohrgestängeteils. Diese Stellung ödes Bohrantriebs 11 ist in der F i g. 2 gestrichelt dargestellt. Durch Absenken des Bohrantriebs 11 greift der Aufnehmerdorn 20 mit seinem konischen Ende in die obere Öffnung des Bohrgestängeteils 18 hinein. Durch Zurückschwenken des Bohrantriebs 11 in seine Ausgangsstellung A entsprechend den Pfeilen in F i g. 3 wird das Bohrgestärgeieil aufgerichtet und kann in dieser Stellung mit dem bereits im Bohrloch befindlichen Bohrgesiängeteil verriegelt werden. Danach wird der Bohrvorgang unter gleichzeitigem Absenken des Bohrantriebs 11 an der Führungsstange 10 fortgesetzt, bis das Nachsetzen eines weiteren Bohrgestängeteils erforderlich wird.18 corresponds, with the drill drive 11 having slid down on the guide rod 10, the drill drive 11 is returned to its starting position A. By rotating the Bohrges'angemagazins 7 by a partial step, a drill rod part 18 reaches the interruption 19a of the guide bar 19 in the wellhead 12 with its lower end and slides in the wellhead 12 down into a position shown in dashed lines and denoted by 18a. By pivoting the drill drive 11 around the guide rod 10 into position B , the drill drive 11 with its pick-up mandrel 20 passes over the upper end of the drill rod part located in position 18a. This position of the boring drive 11 is shown in FIG. 2 shown in dashed lines. By lowering the drill drive 11, the receiving mandrel 20 engages with its conical end into the upper opening of the drill rod part 18. By pivoting the drill drive 11 back into its starting position A according to the arrows in FIG. 3 the Bohrgestärgeieil is erected and can be locked in this position with the Bohrgesiängeteil already in the borehole. The drilling process is then continued with simultaneous lowering of the drill drive 11 on the guide rod 10 until it is necessary to readjust another drill rod part.
Beim Aufholen des Bohrgestänges nach Beendigung der Probebohrung wird das Rohrgestänge jeweils um die Länge eines Bohrgestängeteils 18 durch eine Aufwärtsbewegung des Bohrantriebs U an der Führungsstange 10 bis in die in F i g. 2 gezeigte Stellung A angehoben. Nach Einschalten der Auffangvorrichtung 13 wird jeweils das oberste Bohrgestängeteil von dem noch im Bohrloch befindlichen Gestänge entriegelt und durch eine weitere Aufwärtsbewegung des Bohrantriebs II angehoben. Durch eine Schwenkung des Bohrantriebs U um die l'ührungsstange 10 in die Stellung C wird sodann das Bohrgestängeteil 18 mit seinem oberen Ende an den Ausbruch 21a der Halteleiste 2J geführt, wobei es mit seinem unteren Ende an der Führung 22 entlanggleilet, bis es in die Führungsleiste 19 gelangt und nunmehr abgesct/t werden kann. Nach Rückführung des Bohrantriebs 11 in die Ausgangsstellung A wird dieser an der Führungsstange 10 abgesenkt und mit dem obersten noch im Bohrloch befindlichen Gestängeteil verriegelt, worauf sich der vorstehend geschilderte Vorgang wiederholt.When the drill rod is caught up after completion of the test drilling, the pipe rod is in each case moved by the length of a drill rod part 18 by an upward movement of the drill drive U on the guide rod 10 up to the position shown in FIG. Position A shown in 2 raised. After switching on the collecting device 13, the uppermost drill rod part is unlocked from the rod that is still in the borehole and raised by a further upward movement of the drill drive II. By pivoting the drill drive U around the guide rod 10 into position C , the drill rod part 18 is then guided with its upper end to the cutout 21a of the retaining bar 2J, with its lower end sliding along the guide 22 until it enters the Guide bar 19 arrives and can now be lowered / t. After the drill drive 11 has been returned to the starting position A , it is lowered on the guide rod 10 and locked to the uppermost rod part which is still in the borehole, whereupon the process described above is repeated.
Nach dem Absetzen sämtlicher Bohrgestängeteile 18 im Bohrgeatängemagazin 7 werden alle Bohrgestängeteile verriegelt und anschließend der Bohrlochkopf 12 vom Unterwasserbohrgerät 1 getrennt. Die Verriegelung der Bohrgestängeteile 18 verhindert beim Auftreiben des Unterwasserbohrgeräts 1 den Verlust des Bohrgestänges. Es ist aber auch möglich, die Führungsleiste 19 nicht im Bohrlochkopf 12, sondern am Unterwasserbohrgerät 1 selbst anzuordnen. Dadurch erübrigt sich eine Verriegelung der Bohrgestängeteile 18 vor dem Trennen des Bohrlochkopfes 12 vom Unterwasserbohrgerät 1.After all of the drill rod parts 18 have been deposited in the drill rod magazine 7, all of the drill rod parts are locked and then the wellhead 12 separated from the underwater drilling device 1. The lock the drill rod parts 18 prevents the underwater drilling rig 1 from being lost when the underwater drilling rig 1 is driven up Drill pipe. But it is also possible, the guide bar 19 not in the wellhead 12, but on the To arrange underwater drilling rig 1 itself. This eliminates the need to lock the drill rod parts 18 before separating the wellhead 12 from the underwater drilling device 1.
Die Untersuchung von Bohrproben durch das (nicht dargestellte) Auswertegerät an Ort und Stelle kann in an sich bekannter Weise erfolgen. Das gleiche gilt für die vorgesehene Datenübertragung der Unlersuchungsergebnisse. The investigation of drilling samples by the evaluation device (not shown) on site can be carried out in at be done in a known manner. The same applies to the intended data transmission of the examination results.
Nach dem Abtrennen des Bohrlochkopfes 12 vom Unterwasserbohrgeräi 1 kann entweder automatisch, gesteuert vom Kommandogerät, oder durch Signalgebung das Lenzen der Schwimmkörper 14 erfolgen, wodurch ein Auftreiben des Unterwasserbohrgeräls an die Waseroberfläche zur Aufnahme durch ein Schiff erfolgt.After the wellhead 12 has been separated from the underwater drill 1, either automatically, controlled by the command device, or by signaling the bilge of the floats 14 take place, thereby causing the subsea drill rig to float to the surface of the water for pickup by a ship he follows.
Ein besonderer Vorteil dieses automatischen Unterwasserbohrgeräts ist darin zu sehen, daß das Schiff, das das Unterwasserbohrgerät auf seine Position gebracht hat, während des eigentlichen Bohrvorgangs unabhängig manövrieren kann, beispielsweise weitere Unterwasserbohrgeräte aussetzen kann. Die Wartung und Neuausrüstung und insbesondere die Versorgung mit neuer Energie erfolgt an Bord des Schiffes.A particular advantage of this automatic underwater drilling rig is that the ship that has brought the underwater drilling rig into position independently during the actual drilling process can maneuver, for example, can expose further underwater drilling rigs. The maintenance and New equipment and, in particular, the supply of new energy takes place on board the ship.
Hierzu 2 Blatt ZeichnungenFor this purpose 2 sheets of drawings
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE19702056064 DE2056064C3 (en) | 1970-11-14 | Underwater drill |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE19702056064 DE2056064C3 (en) | 1970-11-14 | Underwater drill |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| DE2056064A1 DE2056064A1 (en) | 1972-05-18 |
| DE2056064B2 true DE2056064B2 (en) | 1977-02-24 |
| DE2056064C3 DE2056064C3 (en) | 1977-10-13 |
Family
ID=
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7584796B2 (en) * | 2002-04-30 | 2009-09-08 | Coupler Developments Limited | Drilling rig |
| US7600570B2 (en) * | 2005-07-05 | 2009-10-13 | Seabed Rig As | Drilling rig placed on the sea bed and equipped for drilling of oil and gas wells |
| US7644768B2 (en) * | 2006-03-20 | 2010-01-12 | Seabed Rig As | Separation device for material from a drilling rig situated on the seabed |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7584796B2 (en) * | 2002-04-30 | 2009-09-08 | Coupler Developments Limited | Drilling rig |
| US7600570B2 (en) * | 2005-07-05 | 2009-10-13 | Seabed Rig As | Drilling rig placed on the sea bed and equipped for drilling of oil and gas wells |
| US7644768B2 (en) * | 2006-03-20 | 2010-01-12 | Seabed Rig As | Separation device for material from a drilling rig situated on the seabed |
Also Published As
| Publication number | Publication date |
|---|---|
| DE2056064A1 (en) | 1972-05-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE69824738T2 (en) | CORE WINES IN THE SEA BOTTOM WITH THE HELP OF A PISTON | |
| DE3414032C2 (en) | Drilling jig for underwater drilling | |
| EP2295646B1 (en) | Drilling equipment and method | |
| DE1758280A1 (en) | Device for drilling and core drilling of soft, underwater soils | |
| DE4126919A1 (en) | METHOD AND DRILLING DEVICE FOR DRILLING HOLES IN EARTH OR ROCK, ESPECIALLY FOR THE PRODUCTION OF PRESSURE ANCHORS | |
| DE2801430A1 (en) | METHOD AND DEVICE FOR CONNECTING A FLEXIBLE CABLE TO AN UNDERWATER STATION | |
| DE2540590A1 (en) | METHOD AND DEVICE FOR MAKING A BORE UNDER AN OBSTACLE ALONG AN ARC-SHAPED TRACK | |
| DE102018006901B4 (en) | Device and method for carrying out geological investigations | |
| DE1284380B (en) | Device for cable work in submarine shallow and deep boreholes | |
| DE2609996C3 (en) | Device and protective piping for directional drilling and method for installing protective piping | |
| DE1811265A1 (en) | Apparatus for carrying out work on a subsea wellhead | |
| DE3606082C2 (en) | ||
| DE1925913A1 (en) | Device for establishing a connection between a watercraft or the like. and a subsea wellhead assembly | |
| DE3013169C2 (en) | ||
| DE1953733A1 (en) | Process for producing underwater boreholes | |
| DE2001060C3 (en) | Position indicator for the storage head of a storage device for pipe pulls arranged in a derrick | |
| EP0958446A2 (en) | Method and device for driving bore-holes, specially for prospection and extraction drillings | |
| DE1926137A1 (en) | A method of retrieving at least a portion of a subsea production wellhead assembly to the surface of the water | |
| DE2056064C3 (en) | Underwater drill | |
| DE2056064B2 (en) | Underwater prospecting drill rig with buoyancy tanks - contains drill and rod magazine for radio control from mother ship | |
| DE3020431A1 (en) | DEVICE FOR CARRYING PIPES HANGED ABOVE RECESSES IN THE SEA FLOOR, AND METHOD FOR ATTACHING THE DEVICE | |
| DE3149946A1 (en) | Device for lifting soil samples | |
| WO1998026151A2 (en) | Method and device for driving bore holes, specially exploring and extraction drillings in the sea bottom | |
| DE102007028886A1 (en) | Mobile ram probe device for soil analysis, has probe support, stroke device for recovering probe support, probe rod for guiding stroke device and units for pulling probe support | |
| DE3117203A1 (en) | "UNDERWATER CLUTCH UNIT" |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C3 | Grant after two publication steps (3rd publication) | ||
| E77 | Valid patent as to the heymanns-index 1977 | ||
| 8339 | Ceased/non-payment of the annual fee |