Info

Publication number
ES2562841B2
ES2562841B2 ES201500639A ES201500639A ES2562841B2 ES 2562841 B2 ES2562841 B2 ES 2562841B2 ES 201500639 A ES201500639 A ES 201500639A ES 201500639 A ES201500639 A ES 201500639A ES 2562841 B2 ES2562841 B2 ES 2562841B2
Authority
ES
Spain
Prior art keywords
soft ground
hollow element
hollow
geosynthetic
geored
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
ES201500639A
Other languages
Spanish (es)
Other versions
ES2562841A1 (en
Inventor
Jorge CASTRO GONZÁLEZ
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Universidad de Cantabria
Original Assignee
Universidad de Cantabria
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Universidad de Cantabria filed Critical Universidad de Cantabria
Priority to ES201500639A priority Critical patent/ES2562841B2/en
Publication of ES2562841A1 publication Critical patent/ES2562841A1/en
Application granted granted Critical
Publication of ES2562841B2 publication Critical patent/ES2562841B2/en
Priority to PCT/ES2016/000090 priority patent/WO2017037309A1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

Elemento hueco (10, 20, 30, 40, 50) configurado para introducir en terreno blando (38, 48, 58), y abierto al menos por su extremo inferior, tal que cuando dicho elemento hueco (10, 20, 30, 40, 50) se introduce en el terreno blando (38, 48, 58) su interior queda relleno de dicho terreno blando (38, 48, 58) existente, y que comprende una geored (11) de forma cilíndrica configurada para permitir la circulación de agua a su través; un geosintético (12) que cubre la superficie exterior de la geored (11) y que realiza una función de filtro, dejando pasar el agua pero no las partículas de terreno blando (38, 48, 58) existente; y al menos un geosintético (13) que cubre la superficie interior de la geored (11) y que realiza una doble función: por un lado deja pasar el agua pero no las partículas de terreno blando (38, 48, 58) -función filtro- y por otro lado dota al elemento hueco (10, 20, 30, 40, 50) de una rigidez radial —función resistencia-. Un método de mejora de terreno blando (38, 48, 58), utilizando el elemento hueco (10, 20, 30, 40, 50) definido.Hollow element (10, 20, 30, 40, 50) configured to enter soft ground (38, 48, 58), and open at least by its lower end, such that when said hollow element (10, 20, 30, 40 , 50) is introduced into the soft ground (38, 48, 58) its interior is filled with said existing soft ground (38, 48, 58), and comprising a geored (11) of cylindrical shape configured to allow the circulation of water through it; a geosynthetic (12) that covers the outer surface of the geored (11) and performs a filter function, allowing water to pass but not the existing soft ground particles (38, 48, 58); and at least one geosynthetic (13) that covers the interior surface of the geored (11) and that performs a double function: on the one hand it lets the water pass but not the soft ground particles (38, 48, 58) -function filter - and on the other hand it provides the hollow element (10, 20, 30, 40, 50) with a radial stiffness - resistance function. A soft ground improvement method (38, 48, 58), using the hollow element (10, 20, 30, 40, 50) defined.

Description

DISPOSITIVO Y MÉTODO DE MEJORA DE TERRENO BLANDO DEVICE AND METHOD OF IMPROVEMENT OF SOFT LAND

CAMPO DE LA INVENCIÓN FIELD OF THE INVENTION

5 La presente invención pertenece al campo de la Ingeniería del Terreno, Geotecnia y Cimentaciones, y más concretamente, al de las técnicas de Mejora del Terreno. 5 The present invention belongs to the field of Terrain Engineering, Geotechnics and Foundations, and more specifically, to the field improvement techniques.

ANTECEDENTES DE LA INVENCIÓN BACKGROUND OF THE INVENTION

10 Cualquier tipo de estructura (edificación, obra civil, etc.) debe apoyarse o cimentarse en el terreno, por lo que la resistencia y defonnabilidad del terreno deben de garantizar que la cimentación sea estable y que las defonnaciones sean admisibles. Cuando las características del terreno no son las adecuadas se debe recurrir a una 10 Any type of structure (building, civil works, etc.) must be supported or laid on the ground, so that the resistance and defonnability of the land must ensure that the foundation is stable and that the defonnaciones are admissible. When the characteristics of the land are not adequate, a

15 cimentación profunda tradicional o a mejorar el terreno. 15 traditional deep foundation or to improve the ground.

Las cimentaciones profundas tradicionales se realizan mediante pilotes, y tienen casi siempre un coste considerablemente más elevado que el de las técnicas de mejora del terreno (Wissman, K.J., Fax, N.S , y Mar/in, J.P. 2000. Rammed aggregale piers 20 defeat 75 1001 long driven piles. Performance confirmation 01 constructed geolechnicallacilities, Geotechnical Special Publication, Vol. 94, ASeE, Res/on, VA , 198-210). Además, las técnicas de mejora del terreno son de fonna general más respetuosas con el medio ambiente, debido a que requieren un menor uso de materiales constructivos como el acero o el honnigón (Rujikiatkamjorn, C. e 25 lndraralna, B. 2014. Environmental sustainability 01 soft soil improvement via vacuum and surcharge preloading. GEO-Congress 2014: Geo-Characterisation and Modeling for Suslainabiliry (pp. 3658-3665). (Uniled Slales: ASeE o Egan. D. y Slocombe B. C. 2010. Demonslrating environmental benefils 01ground improvement. Proc. ICE -Ground lmprovement 163 (1):63-69). Así, estos condicionantes 30 económicos y ambientales están provocando que las técnicas de mejora del terreno Traditional deep foundations are made using piles, and almost always have a considerably higher cost than that of ground improvement techniques (Wissman, KJ, Fax, NS, and Mar / in, JP 2000. Rammed aggregale piers 20 defeat 75 1001 long driven piles Performance confirmation 01 constructed geolechnicallacilities, Geotechnical Special Publication, Vol. 94, ASeE, Res / on, VA, 198-210). In addition, ground improvement techniques are generally more environmentally friendly, because they require less use of construction materials such as steel or honnigón (Rujikiatkamjorn, C. e 25 lndraralna, B. 2014. Environmental sustainability 01 soft soil improvement via vacuum and surcharge preloading GEO-Congress 2014: Geo-Characterization and Modeling for Suslainabiliry (pp. 3658-3665) (Uniled Slales: ASeE or Egan. D. and Slocombe BC 2010. Demonslrating environmental benefils 01ground improvement Proc. ICE -Ground lmprovement 163 (1): 63-69) Thus, these economic and environmental conditions are causing the ground improvement techniques

sean cada vez más populares. Be increasingly popular.

Estas técnicas son abundantes y diversas. Su objetivo es mejorar las propiedades (por ejemplo, resistencia, rigidez y/o penneabilidad) del terreno que se va a utilizar como cimentación de una estructura (terraplén, relleno, edificación, puente ...). Entre ellas, se encuadran técnicas de uso esporádico, como por ejemplo, la congelación del terreno, y técnicas más comunes y de amplia utilización como la precarga o sobrecarga del terreno, el uso de drenes verticales, las colwnnas de grava o la compactación dinámica. These techniques are abundant and diverse. Its objective is to improve the properties (for example, resistance, rigidity and / or pennability) of the land that will be used as the foundation of a structure (embankment, fill, building, bridge ...). Among them, sporadic use techniques are included, such as, for example, freezing of the land, and more common and widely used techniques such as preloading or overloading of the land, the use of vertical drains, gravel colwnnas or dynamic compaction.

La técnica de congelación del terreno consiste literalmente en congelar el terreno para incrementar su resistencia. Este incremento de resistencia es debido a la transfonnación del agua que se encuentra entre los poros del terreno en hielo. La técnica habitual de congelación del terreno consiste en hacer circular nitrógeno líquido por el mismo. Sin embargo, su coste es muy elevado y sólo se usa en circwlstancias muy particulares. The ground freezing technique literally consists of freezing the ground to increase its resistance. This increase in resistance is due to the transfonnación of the water that is between the pores of the ground in ice. The usual technique of freezing the ground consists in circulating liquid nitrogen through it. However, its cost is very high and is only used in very particular circumstances.

La precarga o sobrecarga del terreno es una de las técnicas de mejora del terreno más comunes. Está técnica consiste en aplicar una carga mayor de la carga a la que finalmente va a estar sometida el terreno, una vez se construya la estructura a cimentar. Es decir, con esta técnica el terreno queda sobreconsolidado, aumentando su resistencia y reduciendo las defonnaciones que sufrirá al cimentar la futura estructura. La sobreconsolidación del terreno se cuantifica a través de la razón de sobreconsolidación (RSC), que se define como el cociente entre la tensión efectiva máxima a la que ha estado sometido el terreno en toda su historia entre la tensión efectiva que tiene actualmente. Así, su valor siempre es igualo superior a l. La sobreconsolidación del terreno puede entenderse como que el terreno se "acostumbra" a un valor de carga mayor, siendo por 10 tanto positivo incrementar el valor de la RSC. Land preload or overload is one of the most common ground improvement techniques. This technique consists in applying a greater load of the load to which the land will finally be subjected, once the structure to be built is built. That is to say, with this technique the terrain is overconsolidated, increasing its resistance and reducing the defonnaciones that will suffer when cementing the future structure. The overconsolidation of the land is quantified through the ratio of overconsolidation (CSR), which is defined as the ratio between the maximum effective tension to which the land has been subjected throughout its history between the actual effective tension it has. Thus, its value is always equal to or greater than l. The overconsolidation of the land can be understood as that the land "gets used" to a higher load value, being therefore positive to increase the value of the CSR.

Los terrenos finos sobre los que se suele aplicar esta técnica de mejora no se defonnan instantáneamente al aplicar la carga, sino que sufren un proceso de defonnación diferida con el tiempo que se denomina consolidación. Este proceso consiste en la defonnación debido a la expulsión de parte del agua que ocupa los huecos entre las partículas o granos de suelo. Esta expulsión no es instantánea ya que se requiere un cierto tiempo para que el agua circule a lo largo del suelo y alcance un contorno drenante. Así, el tiempo de consolidación depende del camino de drenaje. The fine soils on which this improvement technique is usually applied are not instantaneously defonted when the load is applied, but rather undergoes a deferred defonation process over time, which is called consolidation. This process consists of the defonnación due to the expulsion of part of the water that occupies the hollows between the particles or grains of soil. This expulsion is not instantaneous since it takes some time for the water to circulate along the ground and reach a draining contour. Thus, the consolidation time depends on the drainage path.

La técnica de precarga o sobrecarga presenta el inconveniente del tiempo de consolidación del terreno el cual, en muchas ocasiones, no es compatible con el tiemJXl de ejecución de la estructura. The preload or overload technique has the inconvenience of the consolidation time of the land which, in many cases, is not compatible with the structure execution time.

Para acelerar la producción de asientos y reducir el tiempo de espera con sobrecargas To accelerate the production of seats and reduce the waiting time with overloads

o precargas, se suelen utilizar drenes verticales, Estos drenes verticales constituyen contornos drenantes que reducen el camino de drenaje del agua, acelerando la consolidación. En la actualidad, los drenes verticales son generalmente prefabricados de fonna plana y constan de una geored que l.Tea unos canales huecos por los que puede circular el agua, y están rodeados de un geotextil que realiza una función de filtro, es decir, deja pasar el agua pero no las partículas de suelo. or preloads, vertical drains are usually used. These vertical drains constitute draining contours that reduce the water drainage path, accelerating consolidation. At present, vertical drains are generally prefabricated with flat fonna and consist of a geored wall that has hollow channels through which water can circulate, and are surrounded by a geotextile that performs a filter function, that is, leaves pass the water but not the soil particles.

Sin embargo, ésta última técnica, aun acelerando la consolidación del terreno, no considera la inclusión de elementos resistentes que pennitan reforzar el terreno para mejorar directamente la estabilidad y capacidad portante del mismo. Para ello, se suele recurrir a soluciones tipo columna de grava o columna de grava encapsulada con geotextil. However, the latter technique, even accelerating the consolidation of the land, does not consider the inclusion of resistant elements that strengthen the terrain to directly improve its stability and bearing capacity. To do this, we usually resort to gravel column or gravel column solutions encapsulated with geotextile.

La técnica de mejora mediante columnas de grava, también denominada vibrosustituci6n o vibrodesplazamiento por la forma constructiva, consiste en realizar perforaciones verticales en el terreno a mejorar que se rellenan con grava compactada. Una ventaja de esta técnica respecto a los drenes verticales prefabricados es que no solo actúa como dren vertical acelerando la consolidación del terreno fino, sino que además refuerza el terreno debido a que se introduce un terreno The technique of improvement by gravel columns, also called vibrosubstitution or vibro-displacement due to the constructive form, consists of making vertical perforations in the ground to be improved that are filled with compacted gravel. An advantage of this technique with respect to prefabricated vertical drains is that it not only acts as a vertical drain accelerating the consolidation of the fine terrain, but also reinforces the terrain because a terrain is introduced

de mejores características como es la grava. De esta fonna, no sólo se aceleran los asientos, sino que además se reduce su valor total y se incrementa de fonna directa la resistencia del terreno. Existen algunas variantes de est3: técnica, como la presentada en la patente EP 11571 69 B 1 (Geopiers) donde se hace especial énfasis a la compactación de la grava mediante golpeo ("tampered or rarnmed columns"). No obstante, no existen evidencias experimentales que demuestren que está técnica de compactación de la grava mediante golpeo produce una mayor mejora que las columnas de grava convencionales construidas por vibrosustitución o vibrodesplazamiento (Sluedlein A. W y Ha/lz. R.D. Analysis 01 Foofing Load Test son Aggregate Pier Reinforced e/ay. Journal o/ Geotechnical and Geoenvironmental Engineering 138(9):J091-J/03). Otra variante similar se recoge en la patente EP 1273713 B 1, que a su vez presenta otra variante (EP 1609914 Al) con la inclusión de elementos de refuerzo (barras, anillos o placas de acero de refuerzo). La inclusión de elementos de refuerzo si que mejora el comportamiento de las columnas pero también incrementa su coste y dificulta su ejecución. of better characteristics such as gravel. In this way, not only are the seats accelerated, but also their total value is reduced and the ground resistance is directly increased. There are some variants of est3: technique, such as the one presented in patent EP 11571 69 B 1 (Geopiers) where special emphasis is placed on the compaction of gravel by tapping ("tampered or rarnmed columns"). However, there is no experimental evidence to show that this technique of compacting gravel by beating produces a greater improvement than conventional gravel columns constructed by vibrosubstitution or vibro-displacement (Sluedlein A. W and Ha / lz. RD Analysis 01 Foofing Load Test are Aggregate Pier Reinforced e / a and Journal o / Geotechnical and Geoenvironmental Engineering 138 (9): J091-J / 03). Another similar variant is set out in EP 1273713 B 1, which in turn presents another variant (EP 1609914 Al) with the inclusion of reinforcing elements (bars, rings or reinforcing steel plates). The inclusion of reinforcement elements does improve the behavior of the columns but also increases their cost and hinders their execution.

En cualquier caso, en terrenos muy blandos, las columnas de grava no tienen el suficiente confinamiento lateral como para funcionar adecuadamente. Por ello, existen modificaciones consistentes en añadir cemento a la grava (columnas de módulo controlado: Keller. Inclusiones Rígidas CSe". Catálogo 35-02 ES) o confinar lateralmente las columnas con un geosintético, generalmente un geotextil (columnas encapsuladas ° confinadas lateralmente con geotextil). Por ejemplo, la empresa Huesker utiliza el geotextil denominado RingtraC® para confinar las columnas lateralmente. El efecto del encapsulamiento o confinamiento lateral es un efecto tipo "corsé" que evita que la columna se expanda radialmente y falle. En concreto, Babu et al. (A Critical Review o/Construction, Analysis and Behaviour o/ Slone Columns. February 2013, Volume 31, Issue 1, pp 1-22) recoge el estado del arte sobre las columnas de grava, en donde se explican además las columnas ensacadas y nuevas variaciones como las columnas reforzadas internamente o las columnas con algún elemento ligante, como por ejemplo cemento (columnas de módulo controlado, CMS). También Jie Han {"Recenl research and development o/ In any case, on very soft terrain, gravel columns do not have enough lateral confinement to function properly. Therefore, there are modifications consisting of adding cement to the gravel (controlled module columns: Keller. Rigid Inclusions CSe ". Catalog 35-02 EN) or confining the columns laterally with a geosynthetic, usually a geotextile (encapsulated columns ° confined laterally with geotextile) For example, the company Huesker uses the geotextile called RingtraC® to confine the columns laterally.The effect of encapsulation or lateral confinement is a "corset" type effect that prevents the column from expanding radially and fails. Specifically, Babu et al. (A Critical Review o / Construction, Analysis and Behavior o / Slone Columns. February 2013, Volume 31, Issue 1, pp 1-22) collects the state of the art on gravel columns, which also explains the bagged columns and new variations such as internally reinforced columns or columns with some binding element, such as cement (controlled module columns, CMS). Jie Han {"Recenl research and development o /

ground column /echnologies ') recoge el estado del arte de las columnas de grava y técnicas den vadas de la misma. ground column / echnologies') collects the state of the art of gravel columns and vadas techniques.

En algunos casos se utilizan geomallas ("enrejado de plástico") en lugar de In some cases geogrids ("plastic lattice") are used instead of

5 geotextiles (tela penneable y flexible de fibras sintéticas, generalmente polipropileno y poliester), el inconveniente es que en esos casos no se suele tener la membrana cilíndrica hueca directamente y es necesario pegar o soldar las geomaJlas. Gniel y Bouazza (2009) proponen que no es necesario soldar sino que es suficiente con que exista solape ("Construclion o/ geogrid encased slone co/umns: A new proposal 5 geotextiles (pennable and flexible synthetic fiber fabric, usually polypropylene and polyester), the drawback is that in these cases the hollow cylindrical membrane is not usually used directly and it is necessary to glue or weld the geomaJlas. Gniel and Bouazza (2009) propose that it is not necessary to weld but that it is sufficient that there is an overlap ("Construclion o / geogrid encased slone co / umns: A new proposal

10 based on laboratory tesling"). Además, otros nuevos desarrollos apuestan por el uso del material de las botellas de plástico para encapsular las columnas de grava en lugar de utilizar geotextiles (Dulla S, Mandal JN. 20/3. Feasibility S/udy on Was/e Plas/ic Water BOllles as Encasemen/s ofS/one Co/umnsfor Ground improvemen/. in Design and Prac/ice ofGeosynthe/ic-Reinforeced Soil Strucfures: (H.I Ling, G Gottardi, D. 10 based on laboratory tesling "). In addition, other new developments are committed to the use of plastic bottle material to encapsulate gravel columns instead of using geotextiles (Dulla S, Mandal JN. 20/3. Feasibility S / udy on Was / e Plas / ic Water BOllles as Case / s of S / one Co / umnsfor Ground improvemen /. in Design and Prac / ice of Geosynthe / ic-Reinforeced Soil Strucfures: (HI Ling, G Gottardi, D.

15 Cazzujfi, J Han, F. Ta/suo/w (eds.)), Des/eeh Publica/ions, 14-16 Oc/ober 2013, Bologna. pp. 379-388). 15 Cazzujfi, J Han, F. Ta / suo / w (eds.)), Des / eeh Publica / ions, 14-16 Oc / ober 2013, Bologna. pp. 379-388).

Sin embargo, uno de los principales problemas constructivos de las columnas de grava es la necesidad de aportar grandes volúmenes de grava. Por ello, actualmente However, one of the main constructive problems of gravel columns is the need to provide large volumes of gravel. Therefore, currently

20 se trata de buscar soluciones o técnicas alternativas. Una de estas soluciones es utilizar hormigón reciclado u otros materiales reciclados para realizar ("rellenar") las columnas de grava o las colwnnas de grava encapsuladas. 20 is about finding alternative solutions or techniques. One of these solutions is to use recycled concrete or other recycled materials to make ("fill") the gravel columns or encapsulated gravel colwnnas.

En este sentido, existen diversas publicaciones científicas sobre el uso de materiales 25 reciclados para el uso en columnas de grava: In this sense, there are several scientific publications on the use of recycled materials for use in gravel columns:

Jefferson 1, Ga/erell M, Thomas AM, Serridge CJ. 2010. Procedings of/he Jefferson 1, Ga / erell M, Thomas AM, Serridge CJ. 2010. Procedings of / he

ICE -Ground lmprovemen/, Volame 163, ¡ssue 1, 71-77. ICE -Ground lmprovemen /, Volame 163, ¡ssue 1, 71-77.

Serridge CS 2005. Aehieving sus/ainability in vibro s/one column /echniques. Serridge CS 2005. Aehieving sus / ainability in vibro s / one column / echniques.

30 Proceedings of the ICE -Engineering Sus/ainability, Volume J58, Issue 4, 211-222. 30 Proceedings of the ICE -Engineering Sus / ainability, Volume J58, Issue 4, 211-222.

Serridge CS, Sarsby RW, 2010, Assessment ofthe use ofrecyc/ed aggregates in vibro-slone column ground improvement techniques. in Conslructionfor a Sustainable Environment (Sarsby & Meggyes (eds). Tay/or and Francis Group, London. pp 75 -89. Joe Persichetti, EIT Hayward Balcer ¡ne. Sustainability Seminar. Hollywood, CA. Oc/aber 12, 2010. Recycled Concrete as Vibro Slone Column Backjill. Serridge CS, Sarsby RW, 2010, Assessment of the use offers / ed aggregates in vibro-slone column ground improvement techniques. in Conslructionfor a Sustainable Environment (Sarsby & Meggyes (eds). Tay / or and Francis Group, London pp 75-89. Joe Persichetti, EIT Hayward Balcer ne. Sustainability Seminar. Hollywood, AC. Oc / Apr 12, 2010. Recycled Concrete as Vibro Slone Column Backjill.

No obstante, el uso de materiales reciclados no siempre es posible o económicamente viable, ya que el coste de estos materiales también puede ser elevado, pueden no estar disponibles o contener sustancias indeseables o contaminantes que no pennitan su uso. However, the use of recycled materials is not always possible or economically viable, since the cost of these materials may also be high, they may not be available or contain undesirable substances or contaminants that do not pennite their use.

Otra alternativa a la utilización de cargas estáticas (precarga o sobrecarga), es aplicar cargas dinámicas, como por ejemplo se realiza en la compactación dinámica. La compactación dinámica se utiliza en suelos fundamentalmente granulares y rellenos heterogéneos. Una descripción detalla de esta técnica se puede encontrar en Lukas RG. 1995. Dynamic Compaction -Geotechnical Engineering Circular No. l. USO Department ofTransportation, Federal Highway Administration, Washington D.C , FHWA-SA-95-03 7. Consiste en la densificación del terreno, es decir, la reducción del volumen de huecos, que mejora sus propiedades mecánicas (rigidez y resistencia). La densificación se consigue mediante el golpeo o impacto del terreno desde la superficie del mismo, dejando caer una maza o peso desde una altura determinada. Estos impactos se pueden realizar de forma repetida y se suelen ejecutar en una malla de puntos uniformemente repartida en la superficie del terreno a mejorar. Esta técnica fue inventada y desarrollada por Louis Menard (US 3898844 A). Algunas técnicas de mejora del terreno que usan conceptos similares son: US 1650827 A, US 5244311 A Y EP 1375753 A2. También, ex.istente patentes sobre el equipo utilizado para aplicar estos impactos (US 4580765 A, US 3067657 A). Another alternative to the use of static loads (preload or overload), is to apply dynamic loads, as for example is done in dynamic compaction. Dynamic compaction is used in fundamentally granular soils and heterogeneous landfills. A detailed description of this technique can be found in Lukas RG. 1995. Dynamic Compaction -Geotechnical Engineering Circular No. l. USO Department of Transportation, Federal Highway Administration, Washington D.C, FHWA-SA-95-03 7. It consists of the densification of the land, that is, the reduction of the volume of holes, which improves its mechanical properties (stiffness and resistance). Densification is achieved by striking or impacting the ground from its surface, dropping a club or weight from a certain height. These impacts can be carried out repeatedly and are usually executed in a mesh of points evenly distributed on the surface of the land to be improved. This technique was invented and developed by Louis Menard (US 3898844 A). Some terrain improvement techniques that use similar concepts are: US 1650827 A, US 5244311 A and EP 1375753 A2. Also, there are existing patents on the equipment used to apply these impacts (US 4580765 A, US 3067657 A).

Sin embargo, la compactación dinámica no es efectiva en terrenos finos (arcillosos However, dynamic compaction is not effective in fine (clay) soils.

y/o limosos) ya que su baja permeabilidad imposibilita la disipación de presiones intersticiales generada por los impactos en superficie. Así, para mejorar terrenos finos se suele añadir grava en el cráter generado por los impactos, formando una columna de grava de escasa longitud. Esta técnica se denomina sustitución dinámica and / or silty) since its low permeability makes it impossible to dissipate interstitial pressures generated by surface impacts. Thus, to improve fine terrain, gravel is usually added to the crater generated by the impacts, forming a gravel column of short length. This technique is called dynamic substitution.

Y. de forma similar a las columnas de grava, presenta el inconveniente del consumo de grava que es necesario y el coste asociado. Por otra parte, existen algunas experiencias en terrenos finos en las que la compactación dinámica se ha utilizado de forma combinada con drenes prefabricados o columnas de grava (Shenthan T, Nashed R, Thevanayagam S, Martin GR. 2004. Lique/ac/ion mitiga/ion in silty soils using composite slone columns and dynamic compaclion. J Earthquake Eng 3(1): 205-220). El uso combinado con columnas de grava sigue presentando el inconveniente del conswno de grava y consecuentemente aumenta el coste notablemente. La compactación dinámica combinada con drenes prefabricados mejora ligeramente los resultados logrados al golpear un terreno fino sin incluir ningún elemento adicional (compactación dinámica tradicional), en el sentido de que se consigue incrementar la razón de sobreconsolidación del terreno, ya que el dren prefabricado pennite acelerar la expulsión de agua del terreno. No obstante, el incremento producido no es importante. And, similar to gravel columns, it has the disadvantage of the gravel consumption that is necessary and the associated cost. On the other hand, there are some experiences in fine terrain in which dynamic compaction has been used in combination with prefabricated drains or gravel columns (Shenthan T, Nashed R, Thevanayagam S, Martin GR. 2004. Lichen / ac / mitiga ion / ion in silty soils using composite slone columns and dynamic compaclion. J Earthquake Eng 3 (1): 205-220). The combined use with gravel columns continues to present the disadvantage of gravel consumption and consequently increases the cost significantly. Dynamic compaction combined with prefabricated drains slightly improves the results achieved by hitting a fine ground without including any additional element (traditional dynamic compaction), in the sense that it is possible to increase the ratio of overconsolidation of the terrain, since the prefabricated drainage pennite accelerate the expulsion of water from the ground. However, the increase produced is not important.

RESUMEN DE LA INVENCIÓN SUMMARY OF THE INVENTION

La presente invención trata de resolver los inconvenientes mencionados anterionnente mediante un elemento hueco y un método de mejora del terreno gracias a dichos elementos huecos ya una sobrecarga puntuaJ, el cual engloba gran parte de las ventajas de las técnicas de colwnna de grava descritas anteriormente (acelera la consolidación y refuerza el terreno), y además evita el conswno de grava. The present invention seeks to solve the aforementioned drawbacks by means of a hollow element and a method of ground improvement thanks to said hollow elements and a punctual overload, which encompasses much of the advantages of gravel colwnna techniques described above (accelerates consolidation and reinforces the land), and also avoids the use of gravel.

Concretamente, en un primer aspecto de la presente invención, se proporciona un elemento hueco configurado para introducir en terreno blando, y abierto al menos por su extremo inferior, tal que cuando dicho elemento hueco se introduce en el terreno Specifically, in a first aspect of the present invention, there is provided a hollow element configured to enter soft ground, and open at least by its lower end, such that when said hollow element is introduced into the ground

blando su interior queda relleno de dicho terreno blando existente, y que comprende soft inside is filled with said existing soft ground, and comprising

una geored de forma cilíndrica configurada para permitir la circulación de agua a su través; un geosintético que cubre la superficie exterior de la geored y que realiza una a cylindrical geored configuration configured to allow the circulation of water through it; a geosynthetic that covers the outer surface of the geored and that performs a

función de filtro, dejando pasar el agua pero no las partículas de terreno blando filter function, allowing water to pass but not soft ground particles

existente; y al menos un geosintético que cubre la superficie interior de la geored y que realiza una doble función: por un lado deja pasar el agua pero no las partículas de existing; and at least one geosynthetic that covers the inner surface of the geored and that performs a double function: on the one hand it lets water through but not the particles of

terreno blando -función filtro-y por otro lado dota al elemento hueco de una rigidez soft ground - filter function - and on the other hand gives the hollow element a rigidity

radial -función resistencia-, radial -function resistance-, En una posible realización, el geosintético que cubre la superficie exterior de la In a possible embodiment, the geosynthetic covering the outer surface of the

geored es un geotextil. Geored is a geotextile.

En una posible realización, la superficie interior de la geored es cubierta por un único geosintético que realiza la doble función de filtro y de resistencia. Alternativamente, In a possible embodiment, the inner surface of the geored is covered by a single geosynthetic that performs the double function of filter and resistance. Alternatively,

la superficie interior de la geored es cubierta por dos geosintéticos tal que ambos the inner surface of the geored is covered by two geosynthetics such that both

fonnan un geocompuesto, y tal que uno de los geosintéticos, preferentemente un geotextil, realiza la función de filtro, y el geosintético restante. preferentemente una geomalla, realiza la función de resistencia They form a geocomposite, and such that one of the geosynthetics, preferably a geotextile, performs the filter function, and the remaining geosynthetic. preferably a geogrid, performs the resistance function

En una pOSible realización, el al menos un geosmtético que cubre la superficie interior de la geored y que realiza la función de resistencia impidiendo que el elemento hueco se defonne radialmente, presenta una rigidez en la dirección circunferencial de al menos 1000 kN/m. In a possible embodiment, the at least one geosmetic that covers the inner surface of the geored and that performs the resistance function preventing the hollow element from being radially defendant, has a stiffness in the circumferential direction of at least 1000 kN / m.

En una posible realización, el elemento hueco presenta un espesor cuyo orden está comprendido entre aproximadamente 5 milímetros y 10 centímetros, un radio cuyo orden está comprendido entre aproximadamente 10 centímetros y 5 metros, y una In a possible embodiment, the hollow element has a thickness whose order is between approximately 5 millimeters and 10 centimeters, a radius whose order is between approximately 10 centimeters and 5 meters, and a

longitud cuyo rango está comprendido entre aproximadamente 2 y 10 metros. length whose range is between approximately 2 and 10 meters.

En otro aspecto de la invención, se proporciona un método de mejora de terreno blando, utilizando el elemento hueco definido anterionnente. El método comprende las etapas de: In another aspect of the invention, a soft ground improvement method is provided, utilizing the hollow element defined above. The method comprises the steps of:

5 -introducir en el terreno blando al menos un elemento hueco desde la superficie, tal que el eje longitudinal de cada elemento hueco pennanece en posición sustancialmente vertical, y tal que al introducir el elemento en el terreno blando y al ser hueco por al menos el extremo inferior, su interior queda relleno de terreno blando existente, confinando así lateralmente la columna de suelo blando ex.istente. 5 -introduce at least one hollow element from the surface into the soft ground, such that the longitudinal axis of each hollow element remains substantially vertical, and such that when the element is introduced into the soft ground and being hollow by at least the lower end, its interior is filled with existing soft ground, thus laterally confining the existing soft ground column.

10 -realizar una sobrecarga puntual, tal que dicha sobrecarga está únicamente localizada sobre el terreno blando situado en el interior del elemento hueco, mejorando así las características de dicha colwnna de terreno blando existente. 10-make a point overload, such that said overload is only located on the soft ground located inside the hollow element, thus improving the characteristics of said existing soft ground colwnna.

En una ¡xlsible rea1ización, la introducción de los elementos huecos en el terreno 15 blando se realiza por hinca o desplazamiento, y por medio de cilindros huecos de doble pared, comprendiendo además el método las etapas de: In a possible rea1ization, the introduction of the hollow elements into the soft ground 15 is carried out by driving or displacement, and by means of double-walled hollow cylinders, the method also comprising the steps of:

--
como paso previo a introducir en el terreno blando el al menos WI elemento hueco, situar el elemento hueco entre las paredes de un cilindro hueco de doble pared; As a preliminary step to introduce the hollow element at least to the soft ground, place the hollow element between the walls of a double-walled hollow cylinder;

20 -a continuación, en la parte inferior del cilindro hueco, y unida al elemento hueco, situar una chapa configurada para anclar el elemento hueco a la profundidad deseada; -introducir en el terreno blando los elementos huecos, por medio de los cilindros huecos de doble pared, y una vez que el conjunto cilindro y elemento hueco se hinca en el terreno blando, extraer el cilindro, tal que el elemento hueco permanece 20-then, at the bottom of the hollow cylinder, and attached to the hollow element, place a sheet configured to anchor the hollow element to the desired depth; - Insert the hollow elements into the soft ground, by means of the double-walled hollow cylinders, and once the cylinder and hollow element assembly is driven into the soft ground, remove the cylinder, such that the hollow element remains

25 colocado en el terreno blando, y anclado en la parte inferior por la chapa. 25 placed on the soft ground, and anchored at the bottom by the sheet.

En una posible reaJización, dicha chapa es metálica y con forma de anillo. In a possible reset, said sheet is metallic and ring-shaped.

En WIa posible realizació~ para realizar esta sobrecarga puntuallocaJizada, se deja caer In the possible way to carry out this punctual overload, it is dropped

30 desde una altura determinada aJ menos un elemento pesado sobre cada columna de terreno blando existente rodeada °encapsulada por cada elemento hueco, tal que se 30 from a certain height aJ minus a heavy element on each column of existing soft ground surrounded ° encapsulated by each hollow element, such that

aplica W1a cierta energía al terreno blando que lo consolida y sobrecarga. En W1a posible realización, dicho elemento pesado es una maza y se utiliza una grúa para izar dicha maza y dejarla caer. W1a applies certain energy to the soft ground that consolidates and overloads it. In W1a possible embodiment, said heavy element is a mallet and a crane is used to lift said mallet and drop it.

5 Alternativamente. se introducen en el terreno blando una pluralidad de elementos huecos y para realizar esta sobrecarga puntual localizada, se utilizan elementos modulares con una disposición tal que se apoyan únicamente sobre la superficie de las columnas de terreno blando existente rodeadas o encapsuladas por los elementos huecos, y tal que forman una superficie sobre la que colocar un peso que constituye la 5 Alternatively. a plurality of hollow elements are introduced into the soft ground and to perform this localized point overload, modular elements are used with such an arrangement that they rest solely on the surface of the existing soft ground columns surrounded or encapsulated by the hollow elements, and such that they form a surface on which to place a weight that constitutes the

10 precarga o sobrecarga. En una posible realización, dichos elementos modulares son de plástico y dicho peso es un suelo como material de relleno. Además, y en el caso de utilizar elementos modulares, el método comprende las etapas de: 10 preload or overload. In a possible embodiment, said modular elements are made of plastic and said weight is a floor as a filling material. In addition, and in the case of using modular elements, the method comprises the steps of:

--
esperar el tiempo suficiente hasta la consolidación del terreno blando: 15 -eliminar la sobrecarga. Wait long enough to consolidate the soft ground: 15 - Remove the overload.

BREVE DESCRIPCIÓN DE LAS FIGURAS BRIEF DESCRIPTION OF THE FIGURES

Con objeto de ayudar a una mejor comprensión de las características de la invención, In order to help a better understanding of the features of the invention,

20 de acuerdo con un ejemplo preferente de realización práctica del mismo, y para complementar esta descripción, se acompaña como parte integrante de la misma, un juego de dibujos, cuyo carácter es ilustrativo y no limitativo. En estos dibujos: 20 according to a preferred example of practical realization thereof, and to complement this description, a set of drawings is attached as an integral part thereof, the character of which is illustrative and not limiting. In these drawings:

La figura l muestra un esquema de un corte transversal del elemento hueco, de 25 acuerdo con una realización de la invención. Figure 1 shows a diagram of a cross-section of the hollow element, according to an embodiment of the invention.

La figura 2 muestra un diagrama de la introducción del elemento hueco en el cilindro de doble pared, de acuerdo con una reali zación de la invención. Figure 2 shows a diagram of the introduction of the hollow element into the double-walled cylinder, in accordance with an embodiment of the invention.

30 La figura 3 muestra un diagrama de la introducción y extracción del cilindro de doble pared en el terreno, de acuerdo con una realización de la invención. Figure 3 shows a diagram of the introduction and removal of the double wall cylinder in the field, according to an embodiment of the invention.

La figura 4 muestra una perspectiva en alzado y en otra perspectiva en planta, de una sobrecarga puntual estática del terreno, de acuerdo con una realización de la invención. Figure 4 shows a perspective in elevation and in another perspective in plan, of a static point overload of the land, according to an embodiment of the invention.

La figura 5 muestra una sobrecarga puntual dinámica del terreno, de acuerdo con una realización de la invención. Figure 5 shows a dynamic point overload of the terrain, according to an embodiment of the invention.

La figura 6 muestra la razón de sobreconsolidación bajo el eje de la superficie golpeada, para diferentes métodos de mejora del terreno considerados. Figure 6 shows the ratio of overconsolidation under the axis of the hit surface, for different land improvement methods considered.

DESCRIPCIÓN DETALLADA DE LA INVENCIÓN DETAILED DESCRIPTION OF THE INVENTION

En este texto, el ténnino "comprende" y sus variantes no deben entenderse en un sentido excluyente, es decir, estos términos no pretenden excluir otras características técnicas, aditivos, componentes o pasos. In this text, the term "understands" and its variants should not be understood in an exclusive sense, that is, these terms are not intended to exclude other technical characteristics, additives, components or steps.

Además, los ténninos "aproximadamente", "sustancialmente", "alrededor de", "unos", etc. deben entenderse como indicando valores próximos a los que dichos términos acompañen, ya que por errores de cálculo o de medida, resulte imposible conseguir con total exactitud. In addition, the "approximately", "substantially", "around", "ones", etc. they should be understood as indicating values close to which these terms accompany, since due to calculation or measurement errors, it is impossible to achieve with total accuracy.

Los terrenos se clasifican en rocas o suelos, pudiendo ser estos últimos gruesos o finos. Los suelos finos, principalmente arcillosos y/o limosos, se clasifican a su vez en duros y blandos. En el contexto de la presente invención se entiende por suelos o terrenos, aquellos suelos o terrenos finos y de escasa capacidad portante, es decir blandos. The lands are classified in rocks or soils, being the latter thick or thin. Fine soils, mainly clayey and / or silty, are classified as hard and soft. In the context of the present invention it is understood as soils or terrains, those soils or fine soils and of low bearing capacity, that is soft.

Las siguientes realizaciones preferidas se proporcionan a modo de ilustración, y no se The following preferred embodiments are provided by way of illustration, and are not

pretende que sean limitativas de la presente invención. Además, la presente invención cubre todas las posibles combinaciones de realizaciones particulares y preferidas aquí indicadas. Para los expertos en la materia, otros objetos, ventajas y características de la invención se desprenderán en parte de la descripción y en parte de la práctica de la invención, It is intended to be limiting of the present invention. In addition, the present invention covers all possible combinations of particular and preferred embodiments indicated herein. For those skilled in the art, other objects, advantages and features of the invention will be derived partly from the description and partly from the practice of the invention,

A continuación se describe el elemento hueco y el método de mejora del terreno mediante dichos elementos huecos y sobrecarga puntual, el cual engloba gran parte de las ventajas de las técnicas de columna de grava descritas anteriormente (acelera la consolidación y refuerza el terreno), y además evita el consumo de grava. Next, the hollow element and the method of ground improvement are described by means of said hollow elements and point overload, which encompasses much of the advantages of gravel column techniques described above (accelerates consolidation and reinforces the ground), and It also prevents the consumption of gravel.

En primer lugar, y opciona1mente, se prepara la superficie del terreno. Esta preparación puede implicar la necesidad de excavar el terreno para conseguir una superficie horizontal, desbroce de la vegetación, eliminación de tierra vegetal (capa vegetal), etc. En algunos casos extremos, de suelos extremadamente finos, en los que no se puede garantizar un adecuado acceso de la maquinaria, puede ser necesario realizar algún tratamiento superficial, como por ejemplo realizar una costra de suelocemento. First, and optionally, the land surface is prepared. This preparation may imply the need to excavate the land to achieve a horizontal surface, clearing of vegetation, removal of topsoil (topsoil), etc. In some extreme cases, of extremely fine soils, in which an adequate access of the machinery cannot be guaranteed, it may be necessary to perform some surface treatment, such as for example a crust of ground cement.

A continuación se introduce en el terreno al menos un elemento hueco de fonna cilíndrica, y abierto al menos por su extremo inferior, tal que el eje longitudinal de cada elemento hueco se sitúa en posición sustancialmente vertical en el terreno. Por lo tanto, al introducir el elemento en el terreno y al ser hueco por al menos el extremo inferior, su interior queda relleno de terreno existente de tal fonna que dicho elemento hueco confina lateralmente la columna de suelo existente. Next, at least one hollow cylindrical shaped element is introduced into the ground, and opened at least by its lower end, such that the longitudinal axis of each hollow element is positioned substantially vertically in the ground. Therefore, by introducing the element into the ground and being hollow by at least the lower end, its interior is filled with existing ground in such a way that said hollow element laterally confines the existing floor column.

La composición del elemento hueco es novedosa, al no estar dicho elemento hueco comprendido en el estado de la técnica. En concreto, y como se muestra en la figura 1, cada elemento hueco 10 comprende: una geored 11 de forma cilíndrica configw-ada para pennitir la circulación de agua a su través; un geosintético 12, preferentemente un geotextil, que cubre la superficie exterior de la geored 11 y que realiza una función de filtro, es decir, deja pasar el agua pero no las partículas de terreno existente, consiguiendo así el drenaje y la consolidación del terreno; y al menos un geosintético 13 que cubre la superficie interior de la geored 11 y que realiza una doble función: por un lado deja pasar el agua pero no las partículas de The composition of the hollow element is novel, since said hollow element is not included in the state of the art. Specifically, and as shown in Figure 1, each hollow element 10 comprises: a cylindrical geored 11 configured to penetrate the circulation of water therethrough; a geosynthetic 12, preferably a geotextile, that covers the outer surface of the geored 11 and that performs a filter function, that is to say, lets the water pass but not the particles of existing terrain, thus achieving drainage and consolidation of the terrain; and at least one geosynthetic 13 that covers the inner surface of the geored 11 and that performs a double function: on the one hand it lets the water through but not the particles of

5 suelo fino (función filtro) y por otro lado dota al elemento hueco 10 de una rigidez radial (función resistencia). 5 fine soil (filter function) and on the other hand it gives the hollow element 10 a radial stiffness (resistance function).

En una posible realización, la superficie interior de la geored es cubierta por un único geosintético que realiza la doble función de filtro y de resistencia. En otra posible 10 realización, la superficie interior de la geored es cubierta por dos geosintéticos diferentes tal que ambos fonnan un geocompuesto. En este caso, uno de los geosintéticos, preferentemente un geotextil, realiza la función de filtro y el geosintético restante, preferentemente una geomalla, realiza la función de resistencia. In a possible embodiment, the inner surface of the geored is covered by a single geosynthetic that performs the double function of filter and resistance. In another possible embodiment, the inner surface of the geored is covered by two different geosynthetics such that both form a geocomposite. In this case, one of the geosynthetics, preferably a geotextile, performs the filter function and the remaining geosynthetic, preferably a geogrid, performs the resistance function.

15 Además, el geosintético que cubre la superficie interior de la geored y que realiza esta función de resistencia impidiendo que el elemento hueco se defonne radialmente. presenta una elevada rigidez en la dirección circunferencial (preferentemente, Jg> 1 000 kN/m) para confinar correctamente la columna de terreno, minimizando la expansión radial de la membrana, y por tanto los asientos del terreno In addition, the geosynthetic that covers the inner surface of the geored and that performs this resistance function preventing the hollow element from being deflated radially. it presents a high rigidity in the circumferential direction (preferably, Jg> 1 000 kN / m) to confine the ground column correctly, minimizing the radial expansion of the membrane, and therefore the ground seats

20 en superficie. 20 on the surface.

Este elemento hueco 10 tiene un espesor cuyo orden está comprendido entre This hollow element 10 has a thickness whose order is between

aproximadamente 5 milímetros y 10 centímetros, un radio cuyo orden está approximately 5 millimeters and 10 centimeters, a radius whose order is

comprendido entre aproximadamente 10 centímetros y 5 metros, y una longitud cuyo between approximately 10 centimeters and 5 meters, and a length whose

25 rango está comprendido entre aproximadamente 2 y 10 metros. 25 range is between approximately 2 and 10 meters.

La introducción del elemento hueco en el terreno se realiza desde la superficie y, preferentemente, por hinca o desplazamiento del terreno, sin necesidad de excavar el mismo. En una posible realización, como se muestra en la figura 2, para realizar la 30 hinca o desplazamiento del terreno se utiliza un cilindro 24 hueco de doble pared, entre cuyas paredes se sitúa el elemento hueco 20 descrito anterionnente. Además, en The introduction of the hollow element in the ground is carried out from the surface and, preferably, by driving or displacement of the land, without the need to dig it. In a possible embodiment, as shown in Figure 2, a hollow double-walled cylinder 24 is used to perform the driving or displacement of the terrain, between which walls the hollow element 20 described above is located. Also in

la parte inferior del cilindro 24 y unida al elemento hueco 20 se sitúa una chapa 25, preferentemente metálica y con fonna de anillo, configurada para anclar el elemento hueco 20 a la profundidad deseada Un experto en la materia entenderá que una vez que el conjunto cilindro 24 y elemento hueco 20 se hinque en el terreno, a 5 continuación es posible extraer ("recuperar") el cilindro 24, de tal forma que el elemento hueco 20 permanece colocado en el terreno, y anclado en la parte inferior por la chapa 25 anular. La figura 3 muestra un diagrama de la introducción del cilindro 34 de doble pared en el terreno blando 38, entre cuyas paredes se sitúa el elemento hueco 30, y con la chapa 35 situada en la parte inferior del cilindro 34 y the lower part of the cylinder 24 and attached to the hollow element 20 is placed a sheet 25, preferably metallic and with a ring shape, configured to anchor the hollow element 20 to the desired depth. One skilled in the art will understand that once the cylinder assembly 24 and hollow element 20 is driven into the ground, then it is possible to extract ("recover") the cylinder 24, so that the hollow element 20 remains placed in the ground, and anchored at the bottom by the plate 25 cancel. Figure 3 shows a diagram of the introduction of the double-walled cylinder 34 into the soft ground 38, between which walls the hollow element 30 is located, and with the sheet 35 located at the bottom of the cylinder 34 and

10 unida al elemento hueco 30. Además, la figura 3 muestra la extracción del cilindro 34 una vez alcanzada la profundidad deseada, de tal forma que el elemento hueco 30 pennanece colocado en el terreno blando 38, y anclado en la parte inferior por la chapa 35. 10 attached to the hollow element 30. In addition, Figure 3 shows the removal of the cylinder 34 once the desired depth has been reached, such that the hollow element 30 remains in the soft ground 38, and anchored at the bottom by the sheet 35

15 A continuación, y para mejorar las características de la columna de terreno existente que pennanece en el interior del elemento hueco, se realiza una sobrecarga puntual, localizada sobre el terreno situado en el interior del elemento hueco. 15 Next, and in order to improve the characteristics of the existing terrain column that hangs inside the hollow element, a point overload is performed, located on the ground located inside the hollow element.

Preferentemente, y como se muestra en la figura 5, para reaJizar esta sobrecarga puntual Preferably, and as shown in Figure 5, to reset this point overload

20 localizada se deja caer desde una altura determinada al menos un elemento pesado 59, como por ejemplo una maza, sobre cada columna 50 de terreno blando 58 existente rodeada o encapsulada por cada elemento hueco descrito anterionnente, taJ que se aplica una cierta energía al terreno blando 58 que lo consolida y sobrecarga. En una posible realización, se utiliza una grúa 60 para izar el elemento pesado 59 y dejarlo 20 located at least one heavy element 59, such as a hub, is dropped from a certain height onto each column 50 of existing soft ground 58 surrounded or encapsulated by each hollow element described above, so that a certain energy is applied to the terrain Soft 58 that consolidates and overloads it. In a possible embodiment, a crane 60 is used to lift the heavy element 59 and leave it

25 caer. Un experto en la materia entenderá que estos impactos del elemento pesado 59 en el terreno blando 58 se pueden realizar repetidamente, y que la huella que deja el elemento pesado 59 en el terreno blando 58 debe coincidir aproximadamente con el terreno circundado por cada elemento hueco. En esta realización, la sobrecarga es dinámica. 25 fall. One skilled in the art will understand that these impacts of the heavy element 59 on the soft ground 58 can be performed repeatedly, and that the footprint left by the heavy element 59 on the soft ground 58 should approximately coincide with the terrain surrounded by each hollow element. In this embodiment, the overhead is dynamic.

Un experto en la materia entenderá que en este caso, la invención se puede considerar One skilled in the art will understand that in this case, the invention can be considered

como una mejora de la eficiencia en la técnica de compactación dinámica en terrenos finos ya que se introduce un elemento cilíndrico que confina lateralmente el terreno y permite su rápida consolidación durante el impacto o golpeo desde la superficie. Además, con el método de la invención se reducen costes con respecto a la sustitución as an improvement of the efficiency in the technique of dynamic compaction in fine terrain since a cylindrical element is introduced that laterally confines the ground and allows its rapid consolidation during impact or striking from the surface. In addition, with the method of the invention, costs are reduced with respect to replacement

5 dinámica, ya que el aporte de grava es reemplazado por el elemento hueco. 5 dynamic, since the contribution of gravel is replaced by the hollow element.

En otra posible realización, para realizar esta sobrecarga puntual localizada se utilizan elementos modulares, preferentemente de plástico, que pennitan una rápida colocación y eliminación y que formen una superficie, sobre la que colocar un peso In another possible embodiment, to perform this localized point overload, modular elements are used, preferably made of plastic, which allow rapid placement and removal and form a surface, on which to place a weight.

10 que constituye la sobrecarga, preferentemente un suelo como material de relleno. En esta realización, la sobrecarga es estática. Un experto en la materia entenderá, que en este caso, y para la utilización de los elementos modulares, es necesario la utilización de una pluralidad de elementos huecos. 10 which constitutes the overload, preferably a soil as filler material. In this embodiment, the overload is static. One skilled in the art will understand that in this case, and for the use of modular elements, it is necessary to use a plurality of hollow elements.

15 El objetivo de los elementos modulares es transformar una sobrecarga uniforme, como por ejemplo un relleno de suelo ejeculado direclamenle sobre la superficie del terreno, en una sobrecarga puntual que actúe únicamente sobre las columnas de terreno a sobrecargar. Para ello, dichos elementos modulares deben presentar una disposición tal que únicamente se apoyen sobre la superficie de las columnas de 15 The objective of the modular elements is to transform a uniform overload, such as a landfill of ground driven directly on the surface of the land, into a point overload that acts only on the columns of land to be overloaded. To do this, these modular elements must have an arrangement such that they only rest on the surface of the columns of

20 terreno existentes, rodeadas o encapsuladas por los elementos huecos descritos anteriormente. 20 existing land, surrounded or encapsulated by the hollow elements described above.

Por ejemplo, en una posible realización, y como se muestra en la figura 4 en una perspectiva en alzado y en otra perspectiva en planta, los elementos huecos se 25 disponen en el terreno blando 48 fonnando una malla cuadrada, y cada elemento modular 46 comprende cuatro apoyos, tal que cada apoyo se sitúa únicamente sobre 'l.í de la columna de terreno blando 48 existente. De esta forma, sobre cada columna 40 de terreno blando 48 existente se apoyan cuatro apoyos pertenecientes a cuatro elementos modulares 46 diferentes. Además, cada elemento modular 46 presenta una 30 forma abovedada sobre la que colocar el peso 47 que constituye la sobrecarga. En esta posible realización, los extremos de la bóveda y/o los apoyos presentan unos For example, in one possible embodiment, and as shown in Figure 4 in an elevation perspective and in another perspective in plan, the hollow elements are arranged in the soft ground 48 by connecting a square mesh, and each modular element 46 comprises four supports, such that each support is placed only on 'l.í of the existing soft terrain column 48. In this way, on each column 40 of existing soft ground 48 four supports are supported belonging to four different modular elements 46. In addition, each modular element 46 has a domed shape on which to place the weight 47 that constitutes the overload. In this possible embodiment, the ends of the vault and / or the supports have some

salientes, tal que penniten una conexión rápida y continua de los elementos modulares 46. Un experto en la materia entenderá que existen tantos elementos modulares 46 como columnas de terreno blando 48 existente, rodeadas y encapsuladas por el elemento hueco. Posteriormente se coloca un material de relleno projections, such that they penniten a fast and continuous connection of the modular elements 46. One skilled in the art will understand that there are as many modular elements 46 as columns of existing soft terrain 48, surrounded and encapsulated by the hollow element. Subsequently a filling material is placed

5 o sobrecarga sobre los elementos modulares (figura 4, referencia 47). 5 or overload on the modular elements (figure 4, reference 47).

Además, un experto en la materia entenderá que los elementos modulares deben estar diseñados y tener un espesor tal que permita soportar las cargas aplicadas sobre los mismos, y que sus dimensiones son función de las características de los elementos In addition, a person skilled in the art will understand that the modular elements must be designed and have a thickness such that it can withstand the loads applied to them, and that their dimensions are a function of the characteristics of the elements.

10 huecos. Además, su altura puede ser variable y está condicionada por un diseño óptimo del elemento estructural que soporte las cargas, pudiendo variar entre aproximadamente 0.2 metros y 3 metros. 10 holes In addition, its height can be variable and is conditioned by an optimal design of the structural element that supports the loads, and can vary between approximately 0.2 meters and 3 meters.

El siguiente paso del método, yen el caso de haber utilizado una sobrecarga estática, The next step of the method, and in the case of having used a static overload,

15 es esperar el tiempo suficiente hasta que se produzca la consolidación del terreno. Este tiempo de espera puede variar entre unas horas y unos meses, y en general, no debiera de exceder los 3-5 meses. A continuación, una vez finalizado el tiempo de espera, se procede a la eliminación de la sobrecarga. En este momento, es posible recuperar los elementos modulares utilizados, los cuales podrán reutilizarse, incluso 15 is to wait long enough until the consolidation of the land occurs. This waiting time can vary between a few hours and a few months, and in general, it should not exceed 3-5 months. Then, once the waiting time is over, the overload is eliminated. At this time, it is possible to recover the modular elements used, which can be reused, even

20 dentro de la misma obra. 20 within the same work.

Finalmente, se ejecuta la estructura que se pretende cimentar. Finally, the structure that is intended to cement is executed.

El método de la invención pennite mejorar el terreno simplemente con la inclusión The method of the invention pennite improve the terrain simply with the inclusion

25 de elementos huecos, y la realización de una sobrecarga puntual, evitando el consumo de grava u otros materiales necesarios en las técnicas tipo columna, descritas en el estado de la técnica, lo que supone un abaratamiento en el proceso constructivo. 25 of hollow elements, and the realization of a punctual overload, avoiding the consumption of gravel or other necessary materials in the column-type techniques, described in the state of the art, which means a reduction in the construction process.

30 Además, la eliminación de grava implica que no sea necesario hacer un hueco en el terreno para introducir la misma, y por tanto que el proceso constructivo sea más rápido y más cómodo. La doble función que realiza la grava (elemento drenante y 30 In addition, the removal of gravel implies that it is not necessary to make a hole in the ground to introduce it, and therefore that the construction process is faster and more comfortable. The double function that the gravel performs (draining element and

refuerzo del terreno) en las técnicas tipo columna, es sustituido en el método de la invención por el geosintético, preferentemente una geored, (función elemento drenante) y por la sobrecarga y el al menos un geosintético de encapsulamiento radial ground reinforcement) in column type techniques, it is substituted in the method of the invention by the geosynthetic, preferably a geored, (draining element function) and by the overload and the at least one radial encapsulation geosynthetic

5 (función de refueno del terreno). 5 (land refurbishment function).

Ejemplo Example

Se presentan a continuación los resultados de simulaciones numéricas que Below are the results of numerical simulations that

10 demuestran la viabilidad técnica y la ventaja competitiva del método de mejora del terreno propuesto frente a otros métodos existentes, tomando a modo de ejemplo y sin que ello sea excluyente una de las realizaciones preferentes. En particular, se ha empleado el caso en el que la aplicación de la sobrecarga puntual se realiza de fonna dinámica mediante golpeo. Para simplificar las simulaciones numéricas, se ha 10 demonstrate the technical feasibility and the competitive advantage of the proposed land improvement method over other existing methods, taking as an example and without excluding one of the preferred embodiments. In particular, the case has been used in which the application of punctual overload is carried out in a dynamic way by striking. To simplify the numerical simulations, it has been

15 simulado únicamente un golpeo en un punto, aunque sea habitual que se golpee 15 simulated only one hit at one point, although it is usual to hit

repetidamente y en varios pwltos. repeatedly and in several pwltos.

Para simular el golpeo, se ha supuesto una carga dinámica con ex.tensión circular de 60 cm de diámetro y con una distribución en el tiempo de onda armónica con una 20 frecuencia de 20 Hz. Para modelar un golpe, se considera la mitad de una onda (180"). La amplitud de la carga dinámica se ha calibrado para que la huella que deja To simulate the striking, a dynamic load with a circular voltage of 60 cm in diameter and with a harmonic wave time distribution with a frequency of 20 Hz has been assumed. To model a stroke, half of a stroke is considered wave (180 "). The amplitude of the dynamic load has been calibrated so that the footprint it leaves

el golpeo en el terreno sea de 4 cm en cada uno de los casos analizados. Para simular el terreno blando ex.istente, se han tomado valores realistas habituales. the hit on the ground is 4 cm in each of the analyzed cases. To simulate the existing soft terrain, usual realistic values have been taken.

25 Para el método de mejora propuesto, se ha considerado un elemento hueco de 5 m de longitud, 60 cm de diámetro y una rigidez circunferencial de Jg=5000 kN/m. For the proposed improvement method, a hollow element of 5 m in length, 60 cm in diameter and a circumferential stiffness of Jg = 5000 kN / m has been considered.

La figura 6 muestra los resultados obtenidos: la razón de sobreconsolidación bajo el eje de la superficie gol peada para diferentes métodos de mejora del terreno 30 considerados. La razón de sobreconsolidación inicial del terreno era l en toda la profundidad. Para los drenes prefabricados y colwnnas de grava se han considerado Figure 6 shows the results obtained: the overconsolidation ratio under the axis of the surface hit for different land improvement methods considered. The reason for initial overconsolidation of the land was l in all depth. For prefabricated drains and gravel colwnnas have been considered

configuraciones y parámetros habituales. usual settings and parameters.

Los resultados reflejan que el método propuesto es el único que consigue incrementar The results reflect that the proposed method is the only one that manages to increase

notablemente la RSC del terreno, especialmente a partir de 3 m de profundidad. La notably the CSR of the land, especially from 3 m deep. The

5 compactación dinámica por si sola o con drenes verticales incrementa de fonna 5 dynamic compaction by itself or with vertical drains increases fonna

despreciable la RSC excepto en la superficie. La compactación dinámica con negligible CSR except on the surface. Dynamic compaction with

columnas de grava logra mejores resultados pero inferiores a los conseguidos con el gravel columns achieves better results but lower than those achieved with the

método propuesto. Para el caso de columnas de grava, cabe mencionar que se Proposed method. In the case of gravel columns, it should be mentioned that

produce una mejora importante al introducir grava, cosa que no ocurre con el método 10 propuesto. La mejora al introducir la grava no se cuantifica en el gráfico mostrado It produces an important improvement when introducing gravel, which does not happen with the proposed method 10. The improvement when entering the gravel is not quantified in the graph shown

pero también provoca un incremento de coste muy notable. but it also causes a very significant cost increase.

Claims (14)

REIVINDICACIONES l. Elemento hueco (10, 20, 30, 40, 50) configurado para introducir en terreno blando (38, 48, 58), Y abierto al menos por su extremo inferior, tal que cuando dicho l. Hollow element (10, 20, 30, 40, 50) configured to enter soft ground (38, 48, 58), and open at least by its lower end, such that when said 5 elemento hueco (10, 20, 30, 40, 50) se introduce en el terreno blando (38, 48, 58) su 5 hollow element (10, 20, 30, 40, 50) is introduced into the soft ground (38, 48, 58) its intenor queda relleno de dicho terreno blando (38, 48, 58) existente, y caracterizado por que comprende una geored (11) de fonna cilíndrica configurada para pennitir la circulación de agua a su través; un geosintético (12) que cubre la superficie exterior Intentor is filled with said existing soft ground (38, 48, 58), and characterized in that it comprises a geored (11) of cylindrical shape configured to penetrate the circulation of water through it; a geosynthetic (12) that covers the outer surface de la geored (11) Y que realiza una función de filtro, dejando pasar el agua pero no las 10 partículas de terreno blando (38, 48, 58) existente; y al menos un geosintético (13) of the geored (11) And that performs a filter function, letting the water pass but not the 10 soft ground particles (38, 48, 58) existing; and at least one geosynthetic (13) que cubre la superficie interior de la geored (11) y que realiza una doble función: por which covers the interior surface of the geored (11) and that performs a double function: un lado deja pasar el agua pero no las partículas de terreno blando (38, 48, 58) función filtro-y por otro lado dota al elemento hueco (10, 20, 30, 40, 50) de una one side lets the water pass but not the soft ground particles (38, 48, 58) filter function - and on the other hand it gives the hollow element (10, 20, 30, 40, 50) a rigidez radial -función resistencia-o  radial stiffness -function resistance-o 2. El elemento hueco de la reivindicación 1, donde el geosintético (12) que cubre la 2. The hollow element of claim 1, wherein the geosynthetic (12) covering the superficie exterior de la geored (11) es un geotexti\. outer surface of the geored (11) is a geotexti \. 3. El elemento hueco de cualquiera de las reivindicaciones anteriores, donde la 3. The hollow element of any of the preceding claims, wherein the 20 superficie interior de la geored (11) es cubierta por un único geosintético (13) que realiza la doble función de filtro y de resistencia. The inner surface of the geored (11) is covered by a single geosynthetic (13) that performs the double function of filter and resistance. 4. El elemento hueco de cualquiera de las reivindicaciones 1 a 2, donde la superficie interior de la geored ( 11 ) es cubierta por dos geosintéticos (13) tal que ambos fonnan 4. The hollow element of any one of claims 1 to 2, wherein the inner surface of the geored (11) is covered by two geosynthetics (13) such that both form 25 un geocompuesto, y tal que uno de los geosintéticos realiza la función de filtro, y el geosintético restante realiza la función de resistencia. 25 a geocomposite, and such that one of the geosynthetics performs the filter function, and the remaining geosynthetic performs the resistance function. 5. El elemento hueco de la reivindicación 4, donde el geosintético que realiza la 5. The hollow element of claim 4, wherein the geosynthetic that performs the función de filtro es un geotextil. y el geosintético que realiza la función de resistencia 30 es una geomalla. Filter function is a geotextile. and the geosynthetic that performs the resistance function 30 is a geogrid. 6. El elemento hueco de cualquiera de las reivindicaciones anteriores, donde el al 6. The hollow element of any of the preceding claims, wherein the al menos un geosintético (13) que cubre la superficie interior de la geored (11) Y que minus a geosynthetic (13) that covers the inner surface of the geored (11) and that realiza la función de resistencia impidiendo que el elemento hueco (10, 20, 30, 40, 50) se defonne radialmente, presenta una rigidez en la dirección circunferencial de al It performs the function of resistance preventing the hollow element (10, 20, 30, 40, 50) from being radially defonated, presenting a stiffness in the circumferential direction of the 5 menos 1000 kN/m. 5 minus 1000 kN / m. 7. El elemento hueco de cualquiera de las reivindicaciones anteriores, que presenta un espesor cuyo orden está comprendido entre aproximadamente 5 milímetros y 10 7. The hollow element of any of the preceding claims, which has a thickness whose order is between approximately 5 millimeters and 10 centímetros, un radio cuyo orden está comprendido entre aproximadamente 10 10 centímetros y 5 metros, y una longitud cuyo rango está comprendido entre aproximadamente 2 y 10 metros. centimeters, a radius whose order is between approximately 10 10 centimeters and 5 meters, and a length whose range is between approximately 2 and 10 meters. 8. Método de mejora de terreno blando (38, 48, 58), utilizando el elemento hueco (10, 8. Soft ground improvement method (38, 48, 58), using the hollow element (10, 20, 3D, 40, 50) de acuerdo con cualquiera de las reivindicaciones anteriores, 20, 3D, 40, 50) according to any of the preceding claims, 15 caracterizado por que comprende las etapas de: 15 characterized in that it comprises the steps of:
--
introducir en el terreno blando (38, 48, 58) al menos un elemento hueco (1O, 20, 30, 40, 50) desde la superficie, tal que el eje longitudinal de cada elemento hueco (10, introduce into the soft ground (38, 48, 58) at least one hollow element (1O, 20, 30, 40, 50) from the surface, such that the longitudinal axis of each hollow element (10,
20, 30, 40, 50) permanece en posición sustancialmente vertical, y tal que al introducir 20, 30, 40, 50) remains in a substantially vertical position, and such that when entering 20 el elemento en el terreno blando (38, 48, 58) Yal ser hueco por al menos el extremo inferior, su interior queda relleno de terreno blando (38, 48, 58) existente, confinando así lateralmente la columna de suelo blando existente. -realizar una sobrecarga puntual, tal que dicha sobrecarga está únicamente localizada sobre el terreno blando (38, 48, 58) situado en el interior del elemento hueco (1O, 20, 20 the element in the soft ground (38, 48, 58) And being hollow by at least the lower end, its interior is filled with existing soft ground (38, 48, 58), thus laterally confining the existing soft ground column. - make a point overload, such that said overload is only located on the soft ground (38, 48, 58) located inside the hollow element (1O, 20, 25 30, 40, 50), mejorando así las caracteristicas de dicha columna de terreno blando (38, 48, 58) existente. 25 30, 40, 50), thus improving the characteristics of said existing soft terrain column (38, 48, 58).
9. Método de la reivindicación 8, donde la introducción de los elementos huecos (10, 9. Method of claim 8, wherein the introduction of the hollow elements (10, 20, 30, 40, 50) en el terreno blando (38, 48, 58) se realiza por hinca o desplazamiento, 30 y por medio de cilindros huecos (24, 34) de doble pared, comprendiendo las etapas de: 20, 30, 40, 50) in the soft ground (38, 48, 58) is carried out by driving or moving, 30 and by means of hollow cylinders (24, 34) of double wall, comprising the stages of:
--
como paso previo a introducir en el terreno blando (38, 48, 58) el al menos un elemento hueco (10, 20, 30, 40, 50), situar el elemento hueco (10, 20, 30, 40, 50) entre las paredes de un cilindro hueco (24, 34) de doble pared; -a continuación, en la parte inferior del cilindro hueco (24, 34), Y unida al elemento hueco (10, 20, 30, 40, 50), situar una chapa (25, 35) configurada para anclar el elemento hueco (10, 20, 30,40, 50) a la profundidad deseada; -introducir en el terreno blando (38, 48, 58) los elementos huecos (10, 20, 30, 40, 50), por medio de los cilindros huecos (24, 34) de doble pared, y una vez que el conjunto cilindro (24, 34) Y elemento hueco (10, 20, 30, 40, 50) se hinca en el terreno blando (38, 48, 58), extraer el cilindro (24, 34), ta! que el elemento hueco (10, 20, 30, 40, 50) permanece colocado en el terreno blando (38, 48, 58), Y anclado en la parte inferior por la chapa (25, 35). As a preliminary step to introduce the hollow element (10, 20, 30, 40, 50) into the soft ground (38, 48, 58), place the hollow element (10, 20, 30, 40, 50) between the walls of a hollow cylinder (24, 34) of double wall; - then, at the bottom of the hollow cylinder (24, 34), and attached to the hollow element (10, 20, 30, 40, 50), place a sheet (25, 35) configured to anchor the hollow element (10 , 20, 30,40, 50) at the desired depth; - insert the hollow elements (10, 20, 30, 40, 50) into the soft ground (38, 48, 58), by means of the double-walled hollow cylinders (24, 34), and once the cylinder assembly (24, 34) And hollow element (10, 20, 30, 40, 50) is driven into the soft ground (38, 48, 58), remove the cylinder (24, 34), ta! that the hollow element (10, 20, 30, 40, 50) remains placed in the soft ground (38, 48, 58), and anchored at the bottom by the sheet (25, 35).
10. Método de la reivindicación 9, donde dicha chapa (25, 35) es metálica y con 10. The method of claim 9, wherein said sheet (25, 35) is metallic and with forma de anillo. ring shape 11. Método de cualquiera de las reivindicaciones 8 a 10, donde para realizar esta sobrecarga puntual localizada, se deja caer desde una altura detenninada al menOS un elemento pesado (59) sobre cada columna (50) de terreno blando (38, 48, 58) existente rodeada o encapsulada por cada elemento hueco (10, 20, 30, 40, 50), ta! que se aplica una cierta energía a! terreno blando (38, 48, 58) que lo consolida y sobrecarga. 11. The method of any one of claims 8 to 10, wherein to carry out this localized point overload, a heavy element (59) is dropped from a fixed height at least on each column (50) of soft ground (38, 48, 58 ) existing surrounded or encapsulated by each hollow element (10, 20, 30, 40, 50), ta! that a certain energy is applied to! soft ground (38, 48, 58) that consolidates and overloads it. 12. Método de la reivindicación 11 , donde dicho elemento pesado (59) es una maza y 12. The method of claim 11, wherein said heavy element (59) is a hub and donde se utiliza una grúa (60) para izar dicha maza y dejarla caer. where a crane (60) is used to lift said club and drop it. 13. Método de cualquiera de las reivindicaciones 8 a 10, donde se introducen en el 13. Method of any of claims 8 to 10, wherein they are introduced into the terreno blando (38, 48, 58) una pluralidad de elementos huecos (10, 20, 30, 40, 50) Y donde para realizar esta sobrecarga puntua!localizada, se utilizan elementos modulares (4ó) con una disposición ta! que se apoyan únicamente sobre la superficie de las soft ground (38, 48, 58) a plurality of hollow elements (10, 20, 30, 40, 50) And where to perform this localized punctual overload, modular elements (4ó) are used with an arrangement ta! that rest solely on the surface of the columnas de terreno blando (38, 48, 58) existente rodeadas o encapsuladas por los  existing soft terrain columns (38, 48, 58) surrounded or encapsulated by elementos huecos (10, 20, 30, 40, 50), Y ta! que forman una superficie sobre la que hollow elements (10, 20, 30, 40, 50), and ta! that form a surface on which colocar un peso (47) que constituye la sobrecarga. place a weight (47) that constitutes the overload. 14, Método de la reivindicación 13, donde dichos elementos modulares (46) son de plástico y donde dicho peso (47) es un suelo como material de relleno. 5 14, Method of claim 13, wherein said modular elements (46) are made of plastic and wherein said weight (47) is a floor as filler material. 5 15. Método de las reivindicaciones 13 a 14, que comprende además las etapas de: 15. The method of claims 13 to 14, further comprising the steps of:
--
esperar el tiempo suficiente hasta la consolidación del terreno blando (38, 48, 58); -eliminar la sobrecarga. wait long enough to consolidate the soft ground (38, 48, 58); -Delete the overload.
ES201500639A 2015-09-01 2015-09-01 Soft terrain improvement device and method Active ES2562841B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
ES201500639A ES2562841B2 (en) 2015-09-01 2015-09-01 Soft terrain improvement device and method
PCT/ES2016/000090 WO2017037309A1 (en) 2015-09-01 2016-08-31 Device and method for soft soil improvement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ES201500639A ES2562841B2 (en) 2015-09-01 2015-09-01 Soft terrain improvement device and method

Publications (2)

Publication Number Publication Date
ES2562841A1 ES2562841A1 (en) 2016-03-08
ES2562841B2 true ES2562841B2 (en) 2016-07-12

Family

ID=55411071

Family Applications (1)

Application Number Title Priority Date Filing Date
ES201500639A Active ES2562841B2 (en) 2015-09-01 2015-09-01 Soft terrain improvement device and method

Country Status (2)

Country Link
ES (1) ES2562841B2 (en)
WO (1) WO2017037309A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114508011A (en) * 2022-01-13 2022-05-17 中国水利水电第七工程局有限公司 Pile-supported soft soil roadbed reinforcing structure and method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS605730B2 (en) * 1981-04-15 1985-02-13 守夫 菅野 Soft ground improvement method
TW303408B (en) * 1995-04-15 1997-04-21 Kim Jong Chun
JP4080264B2 (en) * 2002-07-11 2008-04-23 西松建設株式会社 Multipurpose drain placement method
US20050025582A1 (en) * 2003-04-04 2005-02-03 Ianniello Peter J. Multiple zone, high-capacity geo-composite drainage structures and methods suitable for high friction angle applications
JP6283485B2 (en) * 2013-09-09 2018-02-21 株式会社アイ・シー・ジー Ground improvement / pile structure for liquefaction countermeasures and ground improvement / liquefaction countermeasure construction method

Also Published As

Publication number Publication date
WO2017037309A1 (en) 2017-03-09
ES2562841A1 (en) 2016-03-08

Similar Documents

Publication Publication Date Title
CN109403341A (en) A kind of compound gravity retaining wall structure of soft clay area ultra-deep foundation pit and its engineering method
CN217354388U (en) Combined retaining type tunnel portal structure suitable for bias steep slope terrain
CN205152982U (en) Barricade and structure of filling suitable for height is filled
CN101463599A (en) Bidirectional reinforcing and water drainage reinforcing means for highway soft soil foundation
Pinto et al. Ground improvement with jet grouting solutions at the new cruise terminal in Lisbon, Portugal
ES2949569T3 (en) Apparatus and method for land improvement
ES2562841B2 (en) Soft terrain improvement device and method
CN202730796U (en) Existing retaining wall rib plate type unloading reinforcing structure
CN216689341U (en) Composite foundation treatment structure with combined effect of soil compaction piles and CFG piles
CN206448285U (en) Without bottom concrete combined type cofferdam under the conditions of formation geology
CN212052780U (en) Oblique supporting type deep foundation pit supporting structure
CN113062300A (en) Construction method of gravel soil compaction pile composite foundation of collapsible stratum
CN206844135U (en) A kind of cofferdam
CN214783873U (en) A rigid-flexible composite pile structure to eliminate negative friction in formation
CN102561374A (en) Method for reducing settlement of deep soft soil foundation by use of retaining wall
Ali Effect of encasement length on geosynthetic reinforced stone columns
CN109898531A (en) Gravity type assembles concrete retaining wall
CN208251137U (en) It is a kind of for communicating the screw anchor composite foundation of shaft tower
CN208907225U (en) An arch-arranged double-row pile foundation pit enclosure structure
CN209243733U (en) A kind of compound gravity retaining wall structure of soft clay area ultra-deep foundation pit
CN114753412A (en) A construction method for differential settlement control of bent frame factory buildings in excavation and filling areas
CN207419517U (en) Composite foundation reinforcement rockfill barrier wall structure
JP4183137B2 (en) Seismic structure
KR102853413B1 (en) Construction method of underground solids foundation structure and underground solids foundation structure
CN217810929U (en) Long-pile short-pier composite foundation treatment structure for high-fill site

Legal Events

Date Code Title Description
FG2A Definitive protection

Ref document number: 2562841

Country of ref document: ES

Kind code of ref document: B2

Effective date: 20160712