Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP2500531B2 - Refrigeration system operation controller - Google Patents
[go: Go Back, main page]

JP2500531B2 - Refrigeration system operation controller - Google Patents

Refrigeration system operation controller

Info

Publication number
JP2500531B2
JP2500531B2 JP2206091A JP2206091A JP2500531B2 JP 2500531 B2 JP2500531 B2 JP 2500531B2 JP 2206091 A JP2206091 A JP 2206091A JP 2206091 A JP2206091 A JP 2206091A JP 2500531 B2 JP2500531 B2 JP 2500531B2
Authority
JP
Japan
Prior art keywords
capacity
compressor
refrigerant
pump down
hot gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2206091A
Other languages
Japanese (ja)
Other versions
JPH04332360A (en
Inventor
滋人 田中
紀育 川勝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daikin Industries Ltd
Original Assignee
Daikin Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daikin Industries Ltd filed Critical Daikin Industries Ltd
Priority to JP2206091A priority Critical patent/JP2500531B2/en
Publication of JPH04332360A publication Critical patent/JPH04332360A/en
Application granted granted Critical
Publication of JP2500531B2 publication Critical patent/JP2500531B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Defrosting Systems (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、冷凍装置の運転制御装
置に関し、特に、デフロスト運転前の圧縮機容量制御対
策に係るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a refrigeration system operation control device, and more particularly to a compressor capacity control measure before defrost operation.

【0002】[0002]

【従来の技術】一般に、この種の冷凍装置には、特開昭
59−197764号公報に開示されているように、圧
縮機と、凝縮器と、レシーバと、膨張弁と、蒸発器とが
順に冷媒配管によって接続されると共に、凝縮器、レシ
ーバ及び膨脹弁をバイパスするホットガスバイパス路が
接続されて構成されているものがある。そして、この冷
凍装置において、エアプレッシャスイッチやタイマ等で
蒸発器のフロストを検出すると、ホットガスを圧縮機よ
りホットガスバイパス路を介して蒸発器に流してデフロ
スト運転を行う一方、圧縮機の吸入ガス温度が所定温度
になると、上記デフロスト運転を終了し、このデフロス
ト運転によって蒸発器のフロストを除去し、冷凍能力の
低下を防止するようにしている。
2. Description of the Related Art Generally, a refrigerating apparatus of this type includes a compressor, a condenser, a receiver, an expansion valve, and an evaporator, as disclosed in JP-A-59-197764. There is a structure in which a refrigerant gas line is connected in order and a hot gas bypass path that bypasses the condenser, the receiver, and the expansion valve is connected. Then, in this refrigeration system, when the frost of the evaporator is detected by an air pressure switch, a timer, etc., hot gas is made to flow from the compressor to the evaporator through the hot gas bypass passage to perform defrost operation, while suction of the compressor is taken. When the gas temperature reaches a predetermined temperature, the defrosting operation is terminated, and the defrosting operation removes the frost from the evaporator to prevent the refrigeration capacity from decreasing.

【0003】[0003]

【発明が解決しようとする課題】上述した冷凍装置にお
いて、デフロスト運転を行う前に冷媒を計量して一定量
の冷媒でデフロスト運転を行う、所謂計量デフロストを
行っている。つまり、デフロスト運転の前にポンプダウ
ン運転を行い、冷媒をレシーバ等に一旦回収し、この回
収した冷媒の一部を利用してデフロスト運転を行うよう
にしている。
In the above refrigerating apparatus, so-called metering defrosting is performed in which the refrigerant is metered before the defrosting operation and the defrosting operation is performed with a constant amount of the refrigerant. That is, the pump down operation is performed before the defrost operation, the refrigerant is once collected in the receiver or the like, and the defrost operation is performed by using a part of the collected refrigerant.

【0004】しかしながら、従来、上記ポンプダウン運
転は、圧縮機の容量を最大容量に設定して行っているた
め、図4に示すように、ポンプダウン運転前の定常運転
時に圧縮機の容量が低容量(A1)の場合、ポンプダウン運
転(A2)になると、圧縮機吐出側の高圧冷媒圧力が一時的
に急上昇し、高圧カット(HPSカット)を生じるとい
う問題があった(A3)。特に、レシーバの容量が小さく、
しかも、外気温度が高い場合に生じ易くなる。つまり、
圧縮機が低容量の場合、レシーバに冷媒液が多く溜って
おり、この状態から圧縮機の容量が最大容量に切替わる
ので、吐出した冷媒ガスが圧縮され、高圧カットにな
る。この高圧カットが生じると、圧縮機が停止するの
で、再起動操作を要し、円滑な連続運転を行うことがで
きないという問題があった。
However, in the conventional pump down operation, since the capacity of the compressor is set to the maximum capacity, as shown in FIG. 4, the capacity of the compressor is low during the steady operation before the pump down operation. In the case of the capacity (A1), when the pump down operation (A2) is performed, the high-pressure refrigerant pressure on the compressor discharge side suddenly rises, which causes a high-pressure cut (HPS cut) (A3). Especially, the capacity of the receiver is small,
Moreover, it tends to occur when the outside air temperature is high. That is,
When the compressor has a low capacity, a large amount of the refrigerant liquid is accumulated in the receiver, and the capacity of the compressor is switched from this state to the maximum capacity, so that the discharged refrigerant gas is compressed and the high pressure is cut. When this high-pressure cut occurs, the compressor stops, so a restart operation is required, and there is a problem that smooth continuous operation cannot be performed.

【0005】本発明は、斯かる点に鑑みてなされたもの
で、ポンプダウン運転時に高圧カットが生じないように
して円滑な連続運転を可能にすると共に、レシーバ等の
小型化を図ることを目的とするものである。
The present invention has been made in view of the above circumstances, and an object thereof is to enable smooth continuous operation without causing a high pressure cut during pump down operation and to miniaturize a receiver and the like. It is what

【0006】[0006]

【課題を解決するための手段】上記の目的を達成するた
めに、本発明が講じた手段は、ポンプダウン運転の開始
時に圧縮機容量を低容量にし、その後、圧縮機容量を高
容量にするようにしたものである。
[Means for Solving the Problems] In order to achieve the above object, the means taken by the present invention is to reduce the capacity of the compressor at the start of the pump down operation, and thereafter to increase the capacity of the compressor. It was done like this.

【0007】具体的に、図1に示すように、請求項1に
係る発明が講じた手段は、先ず、容量可変の圧縮機(1
1)と、凝縮器(12)と、膨張機構(EV)と、蒸発
器(14)とが順に接続されて成る冷媒循環回路(1)
と、上記圧縮機(11)より吐出したホットガスを少な
くとも凝縮器(12)をバイパスして蒸発器(14)に
供給するホットガスバイパス路(17)と、該ホットガ
スバイパス路(17)がバイパスする上記冷媒循環回路
(1)の一部に設けられ、冷媒を閉込める液溜め手段
(18)とを備えた冷凍装置を前提としている。
Specifically, as shown in FIG. 1, the means taken by the invention according to claim 1 is as follows.
1), a condenser (12), an expansion mechanism (EV), and an evaporator (14) are sequentially connected to each other, a refrigerant circulation circuit (1).
A hot gas bypass passage (17) for supplying hot gas discharged from the compressor (11) to the evaporator (14) by bypassing at least the condenser (12), and the hot gas bypass passage (17). It is premised on a refrigeration system provided with a part of the refrigerant circulation circuit (1) that bypasses, and a liquid storage means (18) for confining the refrigerant.

【0008】そして、上記圧縮機(11)の容量を負荷
に応じて制御する容量制御手段(21)と、上記蒸発器
(14)のフロスト時に冷媒を上記液溜め手段(18)
に回収するようにポンプダウン運転を行うポンプダウン
制御手段(23)とが設けられている。更に、該ポンプ
ダウン制御手段(23)のポンプダウン運転において運
転開始時に圧縮機(11)の容量を低容量に設定し、所
定時間後に高容量に変更する容量変更手段(24)が設
けられている。加えて、上記ポンプダウン制御手段(2
3)によるポンプダウン運転の終了後に液溜め手段(1
8)の冷媒の一部を利用し、ホットガスを圧縮機(1
1)からホットガスバイパス路(17)に流してデフロ
スト運転を行うデフロスト制御手段(22)が設けられ
た構成としている。
A capacity control means (21) for controlling the capacity of the compressor (11) according to the load, and a liquid storage means (18) for the refrigerant when the evaporator (14) is frosted.
And a pump down control means (23) for performing a pump down operation so as to recover it. Further, there is provided a capacity changing means (24) for setting the capacity of the compressor (11) to a low capacity at the start of operation in the pump down operation of the pump down control means (23) and changing it to a high capacity after a predetermined time. There is. In addition, the pump down control means (2
After the pump down operation by 3) is completed, the liquid storage means (1
Using a part of the refrigerant of 8), the hot gas is compressed by the compressor (1
The defrost control means (22) for defrosting the hot gas bypass passage (17) is provided.

【0009】また、請求項2に係る発明が講じた手段
は、請求項1記載の発明における容量変更手段(24)
が、圧縮機(11)の容量をポンプダウン運転の開始時
に最低容量に設定し、所定時間後に最大容量に変更する
ように構成されたものである。
The means taken by the invention according to claim 2 is the capacity changing means (24) in the invention according to claim 1.
However, the capacity of the compressor (11) is set to the minimum capacity at the start of the pump-down operation, and is changed to the maximum capacity after a predetermined time.

【0010】[0010]

【作用】上記の構成により、請求項1に係る発明では、
冷媒は冷媒循環回路(1)を循環し、蒸発器(14)に
おいて吸込んだ空気を冷却して該冷却空気を吹出してい
る。そして、容量制御手段(21)は負荷に応じて圧縮
機(11)の容量を制御している。
With the above construction, in the invention according to claim 1,
The refrigerant circulates in the refrigerant circulation circuit (1), cools the air sucked in the evaporator (14), and blows out the cooling air. The capacity control means (21) controls the capacity of the compressor (11) according to the load.

【0011】一方、上記蒸発器(14)がフロストする
と、まず、ポンプダウン制御手段(23)がポンプダウ
ン運転を開始すると共に、該ポンプダウン制御手段(2
3)の運転信号を受けて、容量変更手段(24)が圧縮
機(11)の容量を低容量に設定し、所定時間後に高容
量に変更する。具体的に、請求項2に係る発明では、ポ
ンプダウン運転の初期は圧縮機(11)の容量を最低容
量にし、その後、最大容量に変更する。そして、このポ
ンプダウン運転によって冷媒を液溜め手段(18)に閉
込める。
On the other hand, when the evaporator (14) is frosted, first, the pump down control means (23) starts the pump down operation and the pump down control means (2).
In response to the operation signal of 3), the capacity changing means (24) sets the capacity of the compressor (11) to a low capacity, and changes it to a high capacity after a predetermined time. Specifically, in the invention according to claim 2, the capacity of the compressor (11) is set to the minimum capacity in the initial stage of the pump down operation, and then changed to the maximum capacity. Then, this pump-down operation allows the refrigerant to be contained in the liquid storage means (18).

【0012】その後、デフロスト制御手段(22)が上
記液溜め手段(18)に閉込められた冷媒の一部を利用
して、ホットガスを圧縮機(11)からホットガスバイ
パス路(17)を介して蒸発器(14)に供給し、デフ
ロスト運転を制御して蒸発器(14)のフロストを除去
する。
Thereafter, the defrost control means (22) utilizes a part of the refrigerant confined in the liquid storage means (18) to transfer hot gas from the compressor (11) to the hot gas bypass passage (17). To the evaporator (14) and control the defrosting operation to remove the frost from the evaporator (14).

【0013】[0013]

【効果】従って、請求項1に係る発明によれば、ポンプ
ダウン運転の開始時は圧縮機(11)の容量を低容量に
設定し、その後、圧縮機(11)の容量を高容量に変更
するようにしたために、圧縮機(11)が低容量である
定常運転状態からポンプダウン運転に切替わった際、圧
縮機(11)より高圧冷媒ガスが多量に吐出されないの
で、高圧カットを防止することができる。特に、外気温
度が高い場合においても高圧カットを防止することがで
きることから、再起動操作を要することがなく、円滑な
連続運転を行うことができる。
Therefore, according to the first aspect of the invention, the capacity of the compressor (11) is set to a low capacity at the start of the pump down operation, and then the capacity of the compressor (11) is changed to a high capacity. Therefore, when the compressor (11) is switched from the low capacity steady operation state to the pump down operation, a large amount of high pressure refrigerant gas is not discharged from the compressor (11), so high pressure cut is prevented. be able to. In particular, even when the outside air temperature is high, the high pressure cut can be prevented, so that a restart operation is not required and a smooth continuous operation can be performed.

【0014】また、液溜め手段(18)の冷媒貯溜容量
が小さい場合においても高圧カットを防止することがで
きるので、例えば、レシーバの容量を小さくでき、装置
全体の小型化を図ることができる。
Further, even when the refrigerant storage capacity of the liquid storage means (18) is small, the high pressure cut can be prevented, so that, for example, the capacity of the receiver can be reduced and the overall size of the apparatus can be reduced.

【0015】また、請求項2に係る発明によれば、ポン
プダウン運転の初期は圧縮機(11)の容量を最低容量
に設定するので、高圧カットをより確実に行うことがで
きると共に、よりレシーバ等の小型化を図ることができ
る。
Further, according to the second aspect of the invention, since the capacity of the compressor (11) is set to the minimum capacity in the initial stage of the pump down operation, the high pressure cut can be performed more reliably and the receiver can be more reliable. It is possible to reduce the size.

【0016】[0016]

【実施例】以下、本発明の構成を図面に基づいて詳細に
説明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The structure of the present invention will be described in detail below with reference to the drawings.

【0017】図2に示すように、(1)は冷凍コンテナ
に設けられる冷凍装置の冷媒循環回路であって、図示し
ないコンテナ本体の庫内を冷却するものである。
As shown in FIG. 2, (1) is a refrigerant circulation circuit of a refrigerating apparatus provided in a refrigerating container, which cools the inside of a container body (not shown).

【0018】該冷媒循環回路(1)は、容量を100%
の最大容量と、67%の中容量と、33%の最低容量と
に可変な圧縮機(11)と、凝縮器(12)と、レシー
バ(13)と、膨張機構である電動膨張弁(EV)と、
蒸発器(14)と、アキュームレータ(15)と、ブリ
ードポートを有する吸入電磁弁(SV)とが順に冷媒配
管(16)によって接続されて閉回路に構成されてい
る。そして、上記凝縮器(12)には庫外ファン(12
a)が、蒸発器(14)には庫内ファン(14a)がそ
れぞれ付設される一方、上記圧縮機(11)と凝縮器
(12)との間には3方電磁弁(TV)が介設されてい
る。該3方電磁弁(TV)にはホットガスバイパス路
(17)の一端が接続され、該ホットガスバイパス路
(17)は他端が上記電動膨張弁(EV)と蒸発器(1
4)との間に接続されると共に、ドレンパンヒータ(1
7a)が形成されている。そして、上記ホットガスバイ
パス路(17)はデフロスト運転時にホットガスを圧縮
機(11)から蒸発器(14)に供給し、該蒸発器(1
4)及びドレンパン(図示省略)のフロストを融解する
ように構成されている。
The refrigerant circulation circuit (1) has a capacity of 100%.
Of maximum capacity, 67% of medium capacity, and 33% of minimum capacity, a compressor (11), a condenser (12), a receiver (13), and an electric expansion valve (EV) that is an expansion mechanism. )When,
An evaporator (14), an accumulator (15), and a suction solenoid valve (SV) having a bleed port are sequentially connected by a refrigerant pipe (16) to form a closed circuit. Then, the outside fan (12) is installed in the condenser (12).
a), the inside fan (14a) is attached to the evaporator (14), and the three-way solenoid valve (TV) is interposed between the compressor (11) and the condenser (12). It is set up. One end of a hot gas bypass passage (17) is connected to the three-way solenoid valve (TV), and the other end of the hot gas bypass passage (17) is connected to the electric expansion valve (EV) and the evaporator (1).
4) and the drain pan heater (1
7a) has been formed. The hot gas bypass passage (17) supplies hot gas from the compressor (11) to the evaporator (14) during the defrost operation, and the hot gas bypass passage (17) is supplied to the evaporator (1).
4) and the frost of the drain pan (not shown) are melted.

【0019】更に、上記凝縮器(12)と電動膨張弁
(EV)との間には液溜め手段(18)が設けられてお
り、上記レシーバ(13)と電動膨張弁(EV)との間
に開閉弁(WV)と液溜め部(19)をが介設され、該
液溜め部(19)とレシーバ(13)とで上記液溜め手
段(18)が構成されている。そして、デフロスト運転
を行う前にポンプダウン運転を行い冷媒をレシーバ(1
3)及び液溜め部(19)に回収するようにしている。
Further, a liquid storage means (18) is provided between the condenser (12) and the electric expansion valve (EV), and between the receiver (13) and the electric expansion valve (EV). An on-off valve (WV) and a liquid reservoir (19) are provided in the container, and the liquid reservoir (19) and the receiver (13) constitute the liquid reservoir (18). Then, the pump down operation is performed before the defrost operation is performed, and the refrigerant is received by the receiver (1
3) and the liquid reservoir (19).

【0020】また、上記冷凍装置には各種のセンサが設
けられており、(HPS)は圧縮機(11)の吐出側の
高圧冷媒圧力を検出する高圧センサ、(Th1)は蒸発
器(14)の入口側の液管温度を検出する液管温度セン
サ、(Th2)は蒸発器(14)の出口側のガス管温度
を検出するガス管温度センサ、(Th3)は蒸発器(1
4)の空気吸込側の吸込空気温度を検出する吸込温度セ
ンサ、(Th4)は蒸発器(14)の空気吹出側の吹出
空気温度を検出する吹出温度センサ、(Th5)は圧縮
機(11)の吸入側の吸入ガス温度を検出する吸入管温
度センサである。
Further, various sensors are provided in the refrigerating apparatus, (HPS) is a high pressure sensor for detecting the high pressure refrigerant pressure on the discharge side of the compressor (11), and (Th1) is an evaporator (14). , A liquid pipe temperature sensor for detecting the liquid pipe temperature on the inlet side, (Th2) is a gas pipe temperature sensor for detecting the gas pipe temperature on the outlet side of the evaporator (14), and (Th3) is the evaporator (1
4) Suction temperature sensor for detecting the suction air temperature on the air suction side, (Th4) is a discharge temperature sensor for detecting the discharge air temperature on the air discharge side of the evaporator (14), and (Th5) is the compressor (11). Is a suction pipe temperature sensor that detects a suction gas temperature on the suction side of the.

【0021】そして、上記各センサ(HPS),(Th
1)〜(Th5)の検出信号はコントローラ(2)に入
力される一方、該コントローラ(2)は上記圧縮機(1
1)、電動膨張弁(EV)、吸入電磁弁(SV)、3方
電磁弁(TV)及び開閉弁(WV)等を制御するように
構成されている。すなわち、上記コントローラ(2)
は、電動膨張弁(EV)を冷凍モード時には液管温度セ
ンサ(Th1)とガス管温度センサ(Th2)との検出
信号に基づく過熱度によってPID制御すると共に、冷
蔵モード時には吹出温度センサ(Th4)の検出信号に
基づく吹出空気温度によってPID制御する一方、吸入
電磁弁(SV)を蒸発温度が低下すると、例えば、電動
膨張弁(EV)の所定開度が一定時間継続すると閉動す
るように制御している。
The sensors (HPS), (Th
The detection signals of (1) to (Th5) are input to the controller (2), while the controller (2) is connected to the compressor (1).
1), an electric expansion valve (EV), a suction solenoid valve (SV), a three-way solenoid valve (TV), an opening / closing valve (WV), etc. are controlled. That is, the controller (2)
Performs PID control of the electric expansion valve (EV) by the degree of superheat based on the detection signals of the liquid pipe temperature sensor (Th1) and the gas pipe temperature sensor (Th2) in the refrigerating mode, and the outlet temperature sensor (Th4) in the refrigerating mode. PID control is performed according to the temperature of the blown air based on the detection signal, while the intake solenoid valve (SV) is controlled to close when the evaporation temperature decreases, for example, when the predetermined opening of the electric expansion valve (EV) continues for a certain period of time. are doing.

【0022】また、上記コントローラ(2)には、圧縮
機(11)の容量制御手段(21)が設けられると共
に、デフロスト制御手段(22)と、ポンプダウン制御
手段(23)と、容量変更手段(24)とが設けられて
いる。該容量制御手段(21)は、冷凍モード時におい
て、庫内温度、つまり、吸込温度センサ(Th3)が検
出する吸込空気温度が設定温度になるように圧縮機(1
1)をON・OFF制御する一方、冷蔵モード時におい
て、吹出温度センサ(Th4)が検出する吹出空気温度
が設定温度になるように圧縮機(11)の容量を制御す
るように構成されている。
Further, the controller (2) is provided with a capacity control means (21) for the compressor (11), a defrost control means (22), a pump down control means (23), and a capacity changing means. (24) and are provided. In the refrigerating mode, the capacity control means (21) controls the compressor (1) so that the temperature inside the refrigerator, that is, the suction air temperature detected by the suction temperature sensor (Th3) becomes the set temperature.
While controlling 1) ON / OFF, in the refrigerating mode, the capacity of the compressor (11) is controlled so that the blown air temperature detected by the blowout temperature sensor (Th4) becomes a set temperature. .

【0023】また、上記ポンプダウン制御手段(23)
は、蒸発器(14)のフロスト時にポンプダウン運転を
行うもので、電動膨張弁(EV)を閉弁し、開閉弁(W
V)を開弁して冷媒を液溜め部(19)及びレシーバ
(13)に回収するように構成されている。また、上記
容量変更手段(24)は、ポンプダウン運転時に圧縮機
(11)の容量を変更するもので、第1タイマ(T1)
と第2タイマ(T2)とを備えている。そして、該容量
変更手段(24)は、ポンプダウン運転の開始時に第1
タイマ(T1)がカウントアップするまで圧縮機(1
1)の容量を最低容量に設定し、その後、第2タイマ
(T2)がカウントアップするまで圧縮機(11)の容
量を最大容量に設定するように構成されている。
The pump down control means (23)
Is a pump-down operation at the time of frost of the evaporator (14). The electric expansion valve (EV) is closed and the opening / closing valve (W
V) is opened to collect the refrigerant in the liquid reservoir (19) and the receiver (13). The capacity changing means (24) changes the capacity of the compressor (11) during pump down operation, and the first timer (T1).
And a second timer (T2). Then, the capacity changing means (24) is configured to have the first capacity when the pump down operation is started.
Until the timer (T1) counts up, the compressor (1
The capacity of 1) is set to the minimum capacity, and then the capacity of the compressor (11) is set to the maximum capacity until the second timer (T2) counts up.

【0024】一方、上記デフロスト制御手段(22)
は、ポンプダウン制御手段(23)のポンプダウン運転
が終了すると、上記電動膨張弁(EV)を開弁し、開閉
弁(WV)を閉弁すると共に、3方電磁弁(TV)を切
換え、液溜め部(19)に溜った冷媒を利用し、ホット
ガスを上記圧縮機(11)からホットガスバイパス路
(17)を介して蒸発器(14)に供給し、デフロスト
運転を制御するように構成されている。
On the other hand, the defrost control means (22)
When the pump down operation of the pump down control means (23) ends, the electric expansion valve (EV) is opened, the opening / closing valve (WV) is closed, and the three-way solenoid valve (TV) is switched, The refrigerant accumulated in the liquid reservoir (19) is used to supply hot gas from the compressor (11) to the evaporator (14) via the hot gas bypass passage (17) to control the defrost operation. It is configured.

【0025】次に、上記冷凍装置における運転動作につ
いて図3の制御フローに基づき説明する。
Next, the operation of the refrigeration system will be described based on the control flow of FIG.

【0026】先ず、定常運転時においては、圧縮機(1
1)より吐出した冷媒は凝縮器(12)で凝縮し、電動
膨張弁(EV)で膨張した後、蒸発器(14)で蒸発し
て圧縮機(11)に戻り、コンテナ本体内である庫内を
冷却している。そして、この定常運転時において、容量
制御手段(21)は圧縮機(11)の容量を制御してお
り、冷凍モード時は、吸込温度センサ(Th3)が検出
する吸込空気温度が設定温度になるように圧縮機(1
1)をON・OFF制御する一方、冷蔵モード時は、吹
出温度センサ(Th4)が検出する吹出空気温度が設定
温度になるように圧縮機(11)の容量を100%と6
7%と33%との何れかに制御している。この冷蔵モー
ドの定常運転時において、蒸発器(14)がフロストす
ると、タイマ等でフロストが検出され、ステップST1
の動作が行われてポンプダウン運転が開始される。つま
り、ポンプダウン制御手段(23)が電動膨張弁(E
V)を全閉にし、開閉弁(WV)を開弁する一方、容量
変更手段(24)が第1タイマ(T1)をカウントさせ
ると共に、圧縮機(11)の容量を最低容量(33%)
に設定する。そして、この第1タイマ(T1)は圧縮機
(11)の最低容量の運転時間と電動膨張弁(EV)の
閉弁時間とに設定されており、例えば、10秒に設定さ
れている。
First, during steady operation, the compressor (1
The refrigerant discharged from 1) is condensed in the condenser (12), expanded by the electric expansion valve (EV), evaporated in the evaporator (14) and returned to the compressor (11), and is stored in the container body. The inside is cooled. Then, during this steady operation, the capacity control means (21) controls the capacity of the compressor (11), and during the refrigerating mode, the suction air temperature detected by the suction temperature sensor (Th3) becomes the set temperature. Compressor (1
While controlling 1) ON / OFF, in the refrigerating mode, the capacity of the compressor (11) is set to 100% and 6% so that the blown air temperature detected by the blowout temperature sensor (Th4) becomes the set temperature.
It is controlled to either 7% or 33%. When the evaporator (14) frosts during the steady operation in the refrigerating mode, the frost is detected by a timer or the like, and step ST1
And the pump down operation is started. That is, the pump down control means (23) causes the electric expansion valve (E
V) is fully closed and the open / close valve (WV) is opened, while the capacity changing means (24) causes the first timer (T1) to count and the capacity of the compressor (11) to be the minimum capacity (33%).
Set to. The first timer (T1) is set to the minimum capacity operating time of the compressor (11) and the valve closing time of the electric expansion valve (EV), for example, 10 seconds.

【0027】その後、ステップST2に移り、第1タイ
マ(T1)がカウントアップしたか否かを判定し、カウ
ントアップするまでステップST2に待機して、圧縮機
(11)を最低容量で運転する。
After that, the process proceeds to step ST2, it is determined whether or not the first timer (T1) has counted up, and the process waits at step ST2 until the count up, and the compressor (11) is operated at the minimum capacity.

【0028】続いて、上記第1タイマ(T1)がカウン
トアップすると、ステップST3に移り、容量変更手段
(24)が圧縮機(11)の容量を最低容量から最大容
量に変更すると共に、第2タイマ(T2)をカウントさ
せる。そして、ステップST4に移り、第2タイマ(T
2)がカウントアップしたか否かを判定し、第2タイマ
(T2)がカウントアップするまでステップST4に待
機する。
Subsequently, when the first timer (T1) counts up, the process proceeds to step ST3, where the capacity changing means (24) changes the capacity of the compressor (11) from the minimum capacity to the maximum capacity, and the second The timer (T2) is counted. Then, the process proceeds to step ST4 and the second timer (T
It is determined whether or not 2) has counted up, and the process waits at step ST4 until the second timer (T2) counts up.

【0029】その後、上記第2タイマ(T2)がカウン
トアップすると、例えば、25秒経過すると、ステップ
ST5に移り、上記ポンプダウン制御手段(23)が電
動膨張弁(EV)を全開にすると共に、開閉弁(WV)
を閉弁する一方、圧縮機(11)を停止する。これによ
り、液溜め部(19)に溜った冷媒のみが蒸発器(1
4)に流れることになる。
After that, when the second timer (T2) counts up, for example, when 25 seconds elapse, the process proceeds to step ST5, where the pump down control means (23) fully opens the electric expansion valve (EV) and Open / close valve (WV)
While the valve is closed, the compressor (11) is stopped. As a result, only the refrigerant accumulated in the liquid reservoir (19) is stored in the evaporator (1
It will flow to 4).

【0030】次いで、ステップST5からステップST
6に移り、デフロスト制御手段(22)が圧縮機(1
1)を起動して、デフロスト運転を開始し、3方電磁弁
(TV)を切換え、上記液溜め部(19)に溜った冷媒
を利用してホットガスを圧縮機(11)からホットガス
バイパス路(17)に流し、蒸発器(14)に供給して
デフロストを行うことになる。
Then, from step ST5 to step ST
6, the defrost control means (22) causes the compressor (1
1) is started to start defrost operation, the three-way solenoid valve (TV) is switched, and hot gas is bypassed from the compressor (11) using the refrigerant accumulated in the liquid reservoir (19). It will flow to the path (17) and will be fed to the evaporator (14) for defrosting.

【0031】従って、上記ポンプダウン運転の開始時は
圧縮機(11)の容量を最低容量に設定し、その後、圧
縮機(11)の容量を最高容量に変更するようにしたた
めに、圧縮機(11)が低容量の定常運転状態からポン
プダウン運転に切替わった際、圧縮機(11)より高圧
冷媒ガスが多量に吐出されないので、高圧カットを防止
することができる。特に、外気温度が高い場合において
も高圧カットを防止することができることから、再起動
操作を要することがなく、円滑な連続運転を行うことが
できる。
Therefore, at the start of the pump down operation, the capacity of the compressor (11) is set to the minimum capacity, and then the capacity of the compressor (11) is changed to the maximum capacity. When 11) is switched from the low capacity steady operation state to the pump down operation, a large amount of high pressure refrigerant gas is not discharged from the compressor (11), so high pressure cut can be prevented. In particular, even when the outside air temperature is high, the high pressure cut can be prevented, so that a restart operation is not required and a smooth continuous operation can be performed.

【0032】また、液溜め手段(18)におけるレシー
バ(13)の冷媒貯溜容量が小さい場合においても高圧
カットを防止することができるので、該レシーバ(1
3)の容量を小さくでき、装置全体の小型化を図ること
ができる。
Further, even when the refrigerant storage capacity of the receiver (13) in the liquid storage means (18) is small, high pressure cut can be prevented, so that the receiver (1)
The capacity of 3) can be reduced, and the overall size of the device can be reduced.

【0033】尚、上記実施例において、容量変更手段
(24)は圧縮機(11)の容量を最低容量と最高容量
に設定するようにしたが、図3に示すように、ポンプダ
ウン運転の初期は圧縮機(11)の容量をポンプダウン
運転の前の容量に設定するようにし、その後、最高容量
に変更するようにしてもよい。
In the above embodiment, the capacity changing means (24) sets the capacity of the compressor (11) to the minimum capacity and the maximum capacity, but as shown in FIG. The capacity of the compressor (11) may be set to the capacity before the pump-down operation, and then changed to the maximum capacity.

【0034】また、液溜め部(19)は、高圧液菅側に
設けたが、低圧液菅側に設けてもよい。
Although the liquid reservoir (19) is provided on the high pressure liquid pipe side, it may be provided on the low pressure liquid pipe side.

【0035】また、本発明は、実施例の冷媒循環回路
(1)に限られるものではなく、また、冷凍コンテナに
設けられるものに限られるものではない。
The present invention is not limited to the refrigerant circulation circuit (1) of the embodiment, and is not limited to the one provided in the refrigerating container.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の構成を示すブロック図である。FIG. 1 is a block diagram showing a configuration of the present invention.

【図2】冷媒回路図である。FIG. 2 is a refrigerant circuit diagram.

【図3】ポンプダウン運転の制御フロー図である。FIG. 3 is a control flow chart of pump down operation.

【図4】従来例を示し、時間に対する圧縮機の吐出冷媒
ガス圧力の特性図である。
FIG. 4 is a characteristic diagram of a discharge refrigerant gas pressure of a compressor with respect to time, showing a conventional example.

【符号の説明】[Explanation of symbols]

1 冷媒循環回路 2 コントローラ 11 圧縮機 12 凝縮器 14 蒸発器 17 ホットガスバイパス路 18 液溜め手段 21 容量制御手段 22 デフロスト制御手段 23 ポンプダウン制御手段 24 容量変更手段 EV 電動膨脹弁(膨脹機構) 1 Refrigerant Circulation Circuit 2 Controller 11 Compressor 12 Condenser 14 Evaporator 17 Hot Gas Bypass Path 18 Liquid Storage Means 21 Capacity Control Means 22 Defrost Control Means 23 Pump Down Control Means 24 Capacity Change Means EV Electric Expansion Valve (Expansion Mechanism)

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 容量可変の圧縮機(11)と、凝縮器
(12)と、膨張機構(EV)と、蒸発器(14)とが
順に接続されて成る冷媒循環回路(1)と、上記圧縮機
(11)より吐出したホットガスを少なくとも凝縮器
(12)をバイパスして蒸発器(14)に供給するホッ
トガスバイパス路(17)と、該ホットガスバイパス路
(17)がバイパスする上記冷媒循環回路(1)の一部
に設けられ、冷媒を閉込めるる液溜め手段(18)とを
備えた冷凍装置において、上記圧縮機(11)の容量を
負荷に応じて制御する容量制御手段(21)と、上記蒸
発器(14)のフロスト時に冷媒を上記液溜め手段(1
8)に回収するようにポンプダウン運転を行うポンプダ
ウン制御手段(23)と、該ポンプダウン制御手段(2
3)のポンプダウン運転において運転開始時に圧縮機
(11)の容量を低容量に設定し、所定時間後に高容量
に変更する容量変更手段(24)と、上記ポンプダウン
制御手段(23)によるポンプダウン運転の終了後に液
溜め手段(18)の冷媒の一部を利用し、ホットガスを
圧縮機(11)からホットガスバイパス路(17)に流
してデフロスト運転を行うデフロスト制御手段(22)
とを備えていることを特徴とする冷凍装置の運転制御装
置。
1. A refrigerant circulation circuit (1) comprising: a variable capacity compressor (11), a condenser (12), an expansion mechanism (EV), and an evaporator (14), which are connected in order; A hot gas bypass passage (17) for supplying the hot gas discharged from the compressor (11) to the evaporator (14) by bypassing at least the condenser (12), and the hot gas bypass passage (17) bypassing the hot gas bypass passage (17). In a refrigerating device provided in a part of a refrigerant circulation circuit (1) and having a liquid storage means (18) for confining a refrigerant, a capacity control means for controlling the capacity of the compressor (11) according to a load. (21) and the refrigerant (1) when the evaporator (14) is frosted.
8), a pump down control means (23) for performing a pump down operation so as to be collected, and the pump down control means (2)
In the pump down operation of 3), the capacity of the compressor (11) is set to a low capacity at the start of operation, and a capacity changing means (24) for changing the capacity to a high capacity after a predetermined time, and a pump by the pump down control means (23). A defrost control means (22) for performing a defrost operation by flowing a hot gas from the compressor (11) to the hot gas bypass passage (17) by utilizing a part of the refrigerant of the liquid storage means (18) after the completion of the down operation.
An operation control device for a refrigeration system, comprising:
【請求項2】 請求項1記載の冷凍装置の運転制御装置
において、容量変更手段(24)は、圧縮機(11)の
容量をポンプダウン運転の開始時に最低容量に設定し、
所定時間後に最大容量に変更するように構成されている
ことを特徴とする冷凍装置の運転制御装置。
2. The operation control device for a refrigerating apparatus according to claim 1, wherein the capacity changing means (24) sets the capacity of the compressor (11) to the minimum capacity at the start of the pump down operation,
An operation control device for a refrigeration system, which is configured to change to a maximum capacity after a predetermined time.
JP2206091A 1991-02-15 1991-02-15 Refrigeration system operation controller Expired - Lifetime JP2500531B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2206091A JP2500531B2 (en) 1991-02-15 1991-02-15 Refrigeration system operation controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2206091A JP2500531B2 (en) 1991-02-15 1991-02-15 Refrigeration system operation controller

Publications (2)

Publication Number Publication Date
JPH04332360A JPH04332360A (en) 1992-11-19
JP2500531B2 true JP2500531B2 (en) 1996-05-29

Family

ID=12072367

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2206091A Expired - Lifetime JP2500531B2 (en) 1991-02-15 1991-02-15 Refrigeration system operation controller

Country Status (1)

Country Link
JP (1) JP2500531B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6073588B2 (en) * 2012-07-13 2017-02-01 サンデンホールディングス株式会社 Air conditioner for vehicles
JP6073587B2 (en) * 2012-07-13 2017-02-01 サンデンホールディングス株式会社 Air conditioner for vehicles

Also Published As

Publication number Publication date
JPH04332360A (en) 1992-11-19

Similar Documents

Publication Publication Date Title
JPH07120121A (en) Operation control device for air conditioner
US20090120113A1 (en) Refrigeration system
JP3341404B2 (en) Operation control device for air conditioner
JPH06337174A (en) Operation controller for air-conditioner
EP4300004A1 (en) Refrigeration cycle device
JP4427310B2 (en) Refrigeration apparatus and operation control method thereof
JP2745836B2 (en) Operation control device for refrigeration equipment
JP2500531B2 (en) Refrigeration system operation controller
JP3993540B2 (en) Refrigeration equipment
JPH09210515A (en) Refrigeration equipment
JPH09318205A (en) Refrigerating device
JP3158787B2 (en) Operation control device for refrigeration equipment
JP3303689B2 (en) Binary refrigeration equipment
JP2541177B2 (en) Refrigeration system operation controller
JP3349251B2 (en) Refrigeration equipment
JP2526435B2 (en) Refrigeration system operation controller
JP3107001B2 (en) Refrigeration equipment for refrigeration containers
JP2003139459A (en) refrigerator
JP3033260B2 (en) Defrosting control device for refrigeration equipment
JP2555779B2 (en) Operation control device for air conditioner
JPH01179876A (en) Refrigerating device
JPH04366365A (en) Controlling device for operation of refrigerating plant
JP2927230B2 (en) Binary refrigeration equipment
JPH0579712A (en) Operation controller of refrigerator
JPH07324849A (en) Refrigerator