Earth retaining method for deep excavation

Info

Publication number
JP2536701B2
JP2536701B2 JP3303349A JP30334991A JP2536701B2 JP 2536701 B2 JP2536701 B2 JP 2536701B2 JP 3303349 A JP3303349 A JP 3303349A JP 30334991 A JP30334991 A JP 30334991A JP 2536701 B2 JP2536701 B2 JP 2536701B2
Authority
JP
Japan
Prior art keywords
earth retaining
vertical hole
stage
ground
retaining wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP3303349A
Other languages
Japanese (ja)
Other versions
JPH05140940A (en
Inventor
信行 松井
等 武内
行規 三善
正 吉川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP3303349A priority Critical patent/JP2536701B2/en
Publication of JPH05140940A publication Critical patent/JPH05140940A/en
Application granted granted Critical
Publication of JP2536701B2 publication Critical patent/JP2536701B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、大深度掘削に伴う土
留め工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a soil retaining method for deep excavation.

【0002】[0002]

【従来の技術】一般に、土留め(山留め)工は地下構造
物の構築などに際し、掘削した切り取り面の土砂の崩壊
を防ぐ目的で施工されるが、従来、この種の土留め工と
して、土砂を堰き止める仕切りに鋼矢板や横矢板などを
使用する矢板工法が知られ、最も一般的に実施されてい
る。
2. Description of the Related Art Generally, earth retaining works are used for the purpose of preventing collapse of the excavated earth and sand when constructing an underground structure. Conventionally, earth retaining works have been used as earth retaining works of this type. A sheet pile construction method using steel sheet piles or horizontal sheet piles for partitioning to block the is known and is most commonly practiced.

【0003】[0003]

【発明が解決しようとする課題】しかし、この矢板工法
は矢板を多くの腹起しや切り梁などからなる支保工で支
持する必要があるため、多くの支保工材を必要とし、ま
た、支保工の組み立てのために多くの人手を要し、工事
が煩雑になりやすいという課題があった。
However, this sheet pile method requires a large number of supporting materials because the sheet piles need to be supported by a large number of uprights and supports made of cut beams. There is a problem that a lot of manpower is required for assembling the work, and the work tends to be complicated.

【0004】また、鋼矢板や横矢板を立て込む親杭の長
さは限られているめ、これに伴い、施工可能な土留め壁
の深さにも自ずと限界があり、大深度の地下構造物の施
工には対応できないという課題があった。
In addition, the length of the parent pile into which the steel sheet pile or the horizontal sheet pile is put is limited, and accordingly, the depth of the retaining wall which can be constructed is naturally limited, and the deep underground structure has a large depth. There was a problem that it was not possible to deal with the construction of objects.

【0005】この発明はこのような前記従来の課題を解
決するために提案されたもので、大深度土留め壁の施工
を可能とした大深度掘削に伴う土留め工法を提供するこ
とを目的とするものである。
The present invention has been proposed in order to solve the above-mentioned conventional problems, and an object thereof is to provide a soil retaining method for deep excavation which enables construction of a deep retaining wall. To do.

【0006】[0006]

【課題を解決するための手段】この発明にかかる大深度
土留め工法は、構築しようとする土留め壁を上下方向に
複数段のエレメントに分割し、(A)地盤への狭幅縦
穴の掘削、内側地盤側に離型材を介在させての縦穴内
部での補強コンクリート造り土留め壁の形成、土留め
壁内側地盤の掘削、ロックボルトによる該土留め壁の
地山への固定の順で第1段(最上段)エレメントを構築
する工程、(B)第1段エレメント内側地盤を該エレメ
ントの下端を超えて更に掘削し、ついで、第1段エレメ
ントの直下に第2段目の狭幅縦穴を掘削し、上記(A)
工程と同様にして第2段エレメントを構築する工程、
(C)第1段エレメント下端と第2段エレメント上端と
の間隙に鉄筋コンクートを充填して両エレメントを連結
する工程、(D)(B)工程および(C)工程を繰り返
して更に下段のエレメントを構築・連結する工程、とか
らなり、各段のエレメントの上下端を連結しながら深さ
方向に順次下段エレメントを構築して土留め壁全体を構
築することによって前記目的を達成するものである。
According to the deep soil retaining method of the present invention, an earth retaining wall to be constructed is vertically divided into a plurality of stages of elements, and (A) excavation of a narrow vertical hole in the ground. First, in order of formation of a reinforced concrete earth retaining wall inside the vertical hole with a release material on the inside ground side, excavation of the soil inside the retaining wall, and fixing of the retaining wall to the ground with a rock bolt. A step of constructing a first-stage (uppermost) element, (B) further excavating the inner ground of the first-stage element beyond the lower end of the element, and then, immediately below the first-stage element, a second-stage narrow vertical hole Excavate the above (A)
Constructing a second stage element in the same manner as the process,
(C) A step of filling the gap between the lower end of the first-stage element and the upper end of the second-stage element with a reinforcing bar concrete to connect both elements, and (D), (B) and (C) steps are repeated to further lower element The above-mentioned object is achieved by constructing / connecting the whole of the earth retaining wall by sequentially constructing lower elements in the depth direction while connecting the upper and lower ends of the elements of each step. .

【0007】[0007]

【実施例】以下、この発明に係る大深度土留め工法を図
1〜図24に基づいて順を追って説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A deep soil retaining method according to the present invention will be described below in order with reference to FIGS.

【0008】(1) まず、地盤中に縦穴1を一定幅の溝状
に掘削する(図1参照)。縦穴1は地下構造物の形状に
よっても異なるが、所定の深さを保持しつつ横方向に連
続する溝状に掘削し、円形状乃至矩形状の環状に連続さ
せる(図9,10参照)。
(1) First, the vertical hole 1 is excavated in the ground in the shape of a groove having a constant width (see FIG. 1). Although the vertical hole 1 varies depending on the shape of the underground structure, the vertical hole 1 is excavated in a groove shape that is continuous in the lateral direction while maintaining a predetermined depth, and is continuous in a circular or rectangular annular shape (see FIGS. 9 and 10).

【0009】なお、縦穴1の掘削には図20及び21に図示
するようなチェンソウ掘削機のほか、ディスクカッタ
ー、油圧ショベル、あるいはクラムシェルなど、縦穴1
を溝状に連続して掘削できる掘削機を使用する。
For excavation of the vertical hole 1, a chain saw excavator as shown in FIGS. 20 and 21 may be used, as well as a disc cutter, a hydraulic excavator, or a clam shell.
Use an excavator that can continuously excavate in a groove shape.

【0010】(2) 縦穴1の中に補強筋2を挿入し、縦穴
1の中央部に固定する(図2参照)。補強筋2として
は、例えば、格子鉄筋やラス金網などの剛性の大きいも
の、あるいは金網などの剛性の比較的小さいものを使用
する。
(2) The reinforcing bar 2 is inserted into the vertical hole 1 and fixed to the central portion of the vertical hole 1 (see FIG. 2). As the reinforcing bar 2, for example, a material having high rigidity such as a lattice reinforcing bar or a lath wire mesh, or a material having relatively low rigidity such as a wire mesh is used.

【0011】補強筋2として剛性の高いもの、例えば、
格子鉄筋を使用するときは隣合う格子鉄筋の縁端部をオ
ーバーラップさせるか(図11,12 参照)、もしくは縁端
部に互いに係合し合うT形鋼などからなる雄継手3と鋼
管などからなる雌継手4を設けることなど、地中連続壁
工事における鉄筋の通常のジョイント方法により格子鉄
筋どうしを連続させ( 図13,14)、何れの場合にも格子鉄
筋には、後述するコンクリートのかぶり厚を確保できる
ようにスペーサー(図示せず)を取付けておく。
The reinforcing bar 2 has a high rigidity, for example,
When using lattice reinforcements, either overlap the edges of adjacent lattice reinforcements (see Figures 11 and 12), or make a male joint 3 and a steel pipe made of T-shaped steel that engage each other at the edges. The lattice joints are made continuous by the ordinary joint method of the reinforcement in the underground continuous wall construction such as by providing the female joint 4 (Figs. 13 and 14). Install a spacer (not shown) so that the cover thickness can be secured.

【0012】また、補強筋2として剛性の比較的小さい
もの、例えば、金網を使用するときは、縦穴1の中にH
形鋼などからなる支柱6を所定間隔おきに建て付け、こ
の支柱6に緊結するなどして支持させる(図15参照)。
When a reinforcing bar 2 having a relatively small rigidity, for example, a wire net is used, H is placed in the vertical hole 1.
Pillars 6 made of shaped steel or the like are built at predetermined intervals, and tightly bound to the pillars 6 to support them (see FIG. 15).

【0013】補強筋2の内側には、これと一緒にアスフ
ァルトルーフィングなどの離型材7を挿入する( 図23参
照) 。この離型材7は、後で打設されるコンクリート8
とその内側の土との付着を切るもので、内側地盤の掘削
時にエレメント14に内側向きの力が掛かることを防止す
るためのものである。
A mold release material 7 such as asphalt roofing is inserted inside the reinforcing bar 2 together with the reinforcing bar 2 (see FIG. 23). This mold release material 7 is a concrete 8 to be placed later.
This is to cut off the adhesion between the soil and the soil inside thereof and to prevent the element 14 from being applied with an inward force during excavation of the inner ground.

【0014】縦穴1は補強筋2および離型材7の挿入
後、少し埋め戻しておく。
After inserting the reinforcing bar 2 and the release material 7, the vertical hole 1 is slightly backfilled.

【0015】(3) 縦穴1の中にコンクリート8を打設
し、十分な強度を発現するまで養生する( 図2参照)。
(3) Concrete 8 is poured into the vertical hole 1 and cured until sufficient strength is developed (see FIG. 2).

【0016】コンクリート8を縦穴1全体に一度に打設
するときは、コンクリートポンプ9によって分離しない
ように注意しながら連続的に打設する( 図24参照) 。
When the concrete 8 is poured all over the vertical hole 1 at a time, it is poured continuously while being careful not to separate it by the concrete pump 9 (see FIG. 24).

【0017】また、複数部分に区画して打設するとき
は、補強筋2をチューブ状のパッカー10と反力受け11と
によって両側より縦穴1の中央に固定するとともに、縦
穴1を複数部分に区画し、各区画ごとにコンクリート8
を打設する( 図17,18,19参照) 。
When a plurality of parts are divided and driven, the reinforcing bar 2 is fixed to the center of the vertical hole 1 from both sides by a tubular packer 10 and a reaction force receiver 11, and the vertical hole 1 is divided into plural parts. Partition and concrete 8 for each section
(See Figures 17, 18, and 19).

【0018】なお、パッカー10および反力受け11は補強
筋2に予めセットしておき、補強筋2と一緒に縦穴1の
中に建て込むものとし、また、パッカー10はその中にコ
ンクリート8を充填することにより膨張させる(図18,1
9 参照) 。
It should be noted that the packer 10 and the reaction force receiver 11 are set in advance in the reinforcing bar 2 and built in the vertical hole 1 together with the reinforcing bar 2, and the packer 10 is filled with concrete 8 therein. To expand (Fig. 18,1
9).

【0019】縦穴1を区画する方法として、左右補強筋
2の連結部に縦穴1の横幅と略同径のロッキングパイプ
12を建て込む方法もある(図16参照)。
As a method of partitioning the vertical hole 1, a rocking pipe having a diameter substantially equal to the lateral width of the vertical hole 1 is formed at the connecting portion of the left and right reinforcing bars 2.
There is also a way to build 12 (see Figure 16).

【0020】かかる場合、縦穴1の中に補強筋2を固定
するには、ロッキングパイプ12の側部に連結筋13を突設
し、この連結筋13に補強鉄筋2の端部を緊結又はオーバ
ーラップする。
In this case, in order to fix the reinforcing bar 2 in the vertical hole 1, a connecting bar 13 is projected on the side of the locking pipe 12, and the end of the reinforcing bar 2 is tightly connected to or over the connecting bar 13. Wrap.

【0021】なお、コンクリート8としてファイバーコ
ンクリートを使用する場合は、補強筋2を省略すること
ができる。
When fiber concrete is used as the concrete 8, the reinforcing bar 2 can be omitted.

【0022】(4) コンクリート8が十分な強度を発現し
たら、コンクリート8の内側、即ち、コンクリート壁体
14(以下、単に「エレメント14」という) の内側を掘削
する(図3参照)。掘削には従来一般に使用されている
掘削機を使用する。
(4) When the concrete 8 develops sufficient strength, the inside of the concrete 8, that is, the concrete wall body
Excavate the inside of 14 (hereinafter simply referred to as "element 14") (see Fig. 3). For excavation, a conventionally used excavator is used.

【0023】(5) ある程度掘削したら掘削を一時中止
し、エレメント14の表側よりその裏側の周辺地盤中に複
数本のロックボルト15を施工して、エレメント14の上端
部を周辺の地盤中に強固に固定し、その後の地盤の掘削
に備える(図4参照)。エレメント14の上端部を固定し
たら、地盤の掘削を再開し、エレメント14の下端部まで
掘り下げ、そこでまた、掘削を一時中止する。そして、
エレメント14の下端部もロックボルト15によって地盤に
強固に固定する。
(5) After excavating to some extent, the excavation is temporarily stopped, and a plurality of lock bolts 15 are installed in the surrounding ground on the back side of the element 14 from the front side to firmly secure the upper end of the element 14 in the surrounding ground. To prepare for the subsequent excavation of the ground (see Fig. 4). When the upper end of the element 14 is fixed, the excavation of the ground is restarted and the excavation is performed down to the lower end of the element 14, and then the excavation is temporarily stopped. And
The lower end of the element 14 is also firmly fixed to the ground by the lock bolt 15.

【0024】以上で第1段のエレメント14の構築が完了
する。
This completes the construction of the first-stage element 14.

【0025】(6) さらに、地盤を掘り下げ、エレメント
14の下端より1m程度下まで掘り下げておく。(図6参
照)。構築したばかりのエレメント14の真下に、第2段
目の縦穴1を掘削する(図5参照)。縦穴1の掘削は
(1) の場合と同様の方法で行う( 図20,21 参照) 。な
お、第2段目の縦穴1の掘削当初、真上のエレメント14
が邪魔になってチェンソウ掘削機のカッターヘッドをエ
レメント14の真下にセットできないことが時折あるが、
その場合にはエレメント14の内側よりから掘削を開始
し、徐々にエレメント14の真下に掘り進めるものとする
( 図22参照) 。(7) (2) の場合と同じ方法で縦穴1の中
に補強筋2を建て込み、その内側に離型材7を挿入す
る。
(6) Furthermore, the ground is dug down and the element
Drill down to 1m below the bottom edge of 14. (See Figure 6). The second vertical hole 1 is excavated just below the element 14 just constructed (see FIG. 5). Excavation of vertical hole 1
The procedure is the same as in (1) (see Figures 20 and 21). At the beginning of excavation of the vertical hole 1 in the second stage, the element 14 directly above
Occasionally, it becomes impossible to set the cutter head of the Chen Saw excavator directly under the element 14, but
In that case, excavation will be started from the inside of the element 14 and gradually proceeded directly below the element 14.
(See Figure 22). (7) Build the reinforcing bar 2 in the vertical hole 1 in the same manner as in the case of (2), and insert the release material 7 inside the reinforcing bar 2.

【0026】(8) (3) の場合と同じ方法で縦穴1の中に
コンクリート8を充填し、十分に養生する。
(8) Concrete 8 is filled in the vertical hole 1 by the same method as in the case of (3) and fully cured.

【0027】(9) 上下エレメント14,14 間の間隙部Aを
鉄筋コンクリートによって覆工し、上下エレメント14,1
4 を連続させる(図7参照)。間隙部Aの覆工は間隙部
Aに補強筋2を上エレメント14の下端および下エレメン
ト14の上端から突出している補強筋2と接合しながら配
筋し、間隙部Aの表面に型枠16をセットし、型枠16内に
コンクリート8を打設することにより行う。
(9) The gap A between the upper and lower elements 14 and 14 is lined with reinforced concrete to form the upper and lower elements 14 and 1.
Repeat 4 (see Figure 7). In the lining of the gap A, the reinforcing bars 2 are arranged in the gap A while being joined to the reinforcing bars 2 protruding from the lower end of the upper element 14 and the upper end of the lower element 14, and the form 16 is formed on the surface of the gap A. Is set and the concrete 8 is placed in the form 16.

【0028】(10) (4) の場合と同じ方法でコンクリー
ト8、即ち、第2段エレメント14の内側を掘削する。
(10) Excavate the concrete 8, that is, the inside of the second stage element 14 in the same manner as in the case of (4).

【0029】(11) (5) の場合と同じ方法でエレメント
14を周辺地盤に固定する。
(11) In the same way as in (5), the element
Fix 14 to the surrounding ground.

【0030】以下、同様にして、(6) 〜(11)の工程を繰
り返し行って深さ方向に第3段、第4段のエレメント14
を順次構築・連結することにより、土留め壁全体を構築
する(図6〜図8参照) 。
In the same manner, the steps (6) to (11) are repeated in the same manner, and the elements 14 of the third and fourth stages are arranged in the depth direction.
The whole earth retaining wall is constructed by sequentially constructing and connecting (see FIGS. 6 to 8).

【0031】[0031]

【発明の効果】この発明は以上説明したように構成され
ているため、以下に記載するような効果を有する。
Since the present invention is configured as described above, it has the following effects.

【0032】 土留め壁は、当初より全長にわたって
施工するのではなく、深さ方向に複数のエレメントに分
割し、分割した各エレメントを深さ方向に、順次構築・
連結して土留め壁全体を構築するため、各エレメントを
構築するための縦穴は比較的浅くてよく、深くする必要
がない。したがって、掘削機は取り扱い容易な小型のも
のでよく、また、縦穴の掘削状況、コンクリートの打ち
込み状況などの各施工状況を確認しながら作業を進める
ことができるため、安全施工および確実な施工が可能で
ある。
The earth retaining wall is not constructed over the entire length from the beginning, but is divided into a plurality of elements in the depth direction, and the divided elements are sequentially constructed in the depth direction.
The vertical holes for building each element may be relatively shallow and do not need to be deep as they are connected to build the entire earth retaining wall. Therefore, the excavator can be a small one that is easy to handle, and it is possible to proceed with the work while checking the construction status such as the excavation status of the vertical hole and the concrete pouring condition, thus enabling safe and reliable construction. It is.

【0033】 また、エレメントを、深さ方向に必要
な数だけ継ぎ足していくことにより、任意深さの土留め
壁を施工することができ、大深度の地下構造物の施工に
も十分対応できる。
Further, by adding a required number of elements in the depth direction, it is possible to construct an earth retaining wall of an arbitrary depth, and it is possible to sufficiently cope with the construction of deep underground structures.

【0034】 各段エレメントを鉛直に構築し、上下
のエレメントを連結して全体として一体化した鉛直な土
留め壁を構築するので、掘削面積に無駄がなく、かつ、
機械的強度も高く土留め壁の薄肉化を図ることができ
る。
Since each stage element is constructed vertically and the vertical earth retaining wall in which the upper and lower elements are connected and integrated as a whole is constructed, there is no waste in the excavation area, and
The mechanical strength is also high, and the earth retaining wall can be made thinner.

【図面の簡単な説明】[Brief description of drawings]

【図1】チェンソウ掘削機による縦穴の掘削方法を示す
地盤の断面図である。
FIG. 1 is a sectional view of the ground showing a method of excavating a vertical hole by a chain saw excavator.

【図2】コンクリートの打設方法を示す地盤の断面図で
ある。
FIG. 2 is a sectional view of the ground showing a concrete pouring method.

【図3】地盤の掘削方法を示す地盤の断面図である。FIG. 3 is a sectional view of the ground showing a method of excavating the ground.

【図4】ロックボルトの施工方法を示す地盤の断面図で
ある。
FIG. 4 is a cross-sectional view of the ground showing a method of installing a lock bolt.

【図5】縦穴の掘削方法を示す地盤の断面図である。FIG. 5 is a sectional view of the ground showing a method of excavating a vertical hole.

【図6】施工途中のエレメントを示す地盤の断面図であ
る。
FIG. 6 is a cross-sectional view of the ground showing an element under construction.

【図7】施工途中のエレメントを示す地盤の断面図であ
る。
FIG. 7 is a sectional view of the ground showing an element in the middle of construction.

【図8】施工途中のエレメントを示す地盤の断面図であ
る。
FIG. 8 is a cross-sectional view of the ground showing an element under construction.

【図9】円形状に施工された施工途中の土留め壁の一部
を示す斜視図である。
FIG. 9 is a perspective view showing a part of the earth retaining wall which is circularly constructed and is being constructed.

【図10】施工途中の土留め壁の一部を示す斜視図であ
る。
FIG. 10 is a perspective view showing a part of the earth retaining wall during construction.

【図11】補強筋の配筋方法を示す補強筋の正面図であ
る。
FIG. 11 is a front view of a reinforcing bar showing a reinforcing bar arrangement method.

【図12】補強筋の配筋方法を示す補強筋の平面図であ
る。
FIG. 12 is a plan view of a reinforcing bar showing a reinforcing bar arrangement method.

【図13】補強筋の配筋方法を示す補強筋の正面図であ
る。
FIG. 13 is a front view of a reinforcing bar showing a reinforcing bar arrangement method.

【図14】補強筋の配筋方法を示す補強筋の平面図であ
る。
FIG. 14 is a plan view of a reinforcing bar showing a reinforcing bar arrangement method.

【図15】補強筋の配筋方法を示す補強筋の一部斜視図
である。
FIG. 15 is a partial perspective view of a reinforcing bar showing a reinforcing bar arrangement method.

【図16】補強筋の配筋方法を示す補強筋の一部斜視図
である。
FIG. 16 is a partial perspective view of a reinforcing bar showing a reinforcing bar arrangement method.

【図17】分割式コンクリートの打設方法を示す縦穴の
一部平面図である。
FIG. 17 is a partial plan view of a vertical hole showing a method for placing split concrete.

【図18】分割式コンクリートの打設方法を示す縦穴の
一部平面図である。
FIG. 18 is a partial plan view of a vertical hole showing a method for placing split concrete.

【図19】分割式コンクリートの打設方法を示す縦穴の
一部平面図である。
FIG. 19 is a partial plan view of a vertical hole showing a method for placing split concrete.

【図20】チェンソウ掘削機による縦穴の掘削方法を示
す斜視図である。
FIG. 20 is a perspective view showing a method of excavating a vertical hole by using a chain saw excavator.

【図21】チェンソウ掘削機による縦穴の掘削方法を示
す断面図である。
FIG. 21 is a cross-sectional view showing a method of excavating a vertical hole by using a chainsaw excavator.

【図22】チェンソウ掘削機による縦穴の掘削方法を示
す平面図である。
FIG. 22 is a plan view showing a method for excavating a vertical hole by a Chen Saw excavator.

【図23】補強筋の配筋方法を示す土留め壁の一部斜視
図である。
FIG. 23 is a partial perspective view of an earth retaining wall showing a reinforcing bar reinforcing method.

【図24】コンクリートポンプによるコンクリートの打
設方法を示す土留め壁の一部斜視図である。
FIG. 24 is a partial perspective view of an earth retaining wall showing a concrete pouring method using a concrete pump.

【符号の説明】[Explanation of symbols]

1…縦穴、2…補強筋、3…雄継手、4…雌継手、6…
支柱、7…離型材、8…コンクリート、9…コンクリー
トポンプ、10…パッカー、11…反力受け、12…ロッキン
グパイプ、13…連結筋、14…コンクリート壁体(エレメ
ント) 、15…ロックボルト、16…型枠。
1 ... Vertical hole, 2 ... Reinforcing bar, 3 ... Male joint, 4 ... Female joint, 6 ...
Prop, 7 ... Release material, 8 ... Concrete, 9 ... Concrete pump, 10 ... Packer, 11 ... Reaction force receiving, 12 ... Rocking pipe, 13 ... Connecting bar, 14 ... Concrete wall body (element), 15 ... Rock bolt, 16… Formwork.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 吉川 正 東京都港区元赤坂1丁目2番7号 鹿島 建設株式会社内 (56)参考文献 特開 平3−206213(JP,A) ─────────────────────────────────────────────────── ─── Continuation of front page (72) Inventor Tadashi Yoshikawa 1-2-7 Moto-Akasaka, Minato-ku, Tokyo Kashima Construction Co., Ltd. (56) Reference JP-A-3-206213 (JP, A)

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 構築しようとする土留め壁を上下方向に
複数段のエレメントに分割し、(A)地盤への狭幅縦
穴の掘削、内側地盤側に離型材を介在させての縦穴内
部での補強コンクリート造り土留め壁の形成、土留め
壁内側地盤の掘削、ロックボルトによる該土留め壁の
地山への固定の順で第1段(最上段)エレメントを構築
する工程、(B)第1段エレメント内側地盤を該エレメ
ントの下端を超えて更に掘削し、ついで、第1段エレメ
ントの直下に第2段目の狭幅縦穴を掘削し、上記(A)
工程と同様にして第2段エレメントを構築する工程、
(C)第1段エレメント下端と第2段エレメント上端と
の間隙に鉄筋コンクートを充填して両エレメントを連結
する工程、(D)(B)工程および(C)工程を繰り返
して更に下段のエレメントを構築・連結する工程、とか
らなり、各段のエレメントの上下端を連結しながら深さ
方向に順次下段エレメントを構築して土留め壁全体を構
築することを特徴とする大深度掘削に伴う土留め工法。
1. An earth retaining wall to be constructed is vertically divided into a plurality of stages of elements, and (A) excavation of a narrow vertical hole in the ground, inside a vertical hole with a release material interposed on the inner ground side. Of the first reinforced (top) element in the order of forming a reinforced concrete earth retaining wall, excavating the ground inside the earth retaining wall, and fixing the earth retaining wall to the ground by rock bolts, (B) The ground inside the first-stage element is further excavated beyond the lower end of the element, and then the narrow vertical hole of the second stage is excavated just below the first-stage element,
Constructing a second stage element in the same manner as the process,
(C) A step of filling the gap between the lower end of the first-stage element and the upper end of the second-stage element with a reinforcing bar concrete to connect both elements, and (D), (B) and (C) steps are repeated to further lower element The process of constructing / connecting the elements, and, in connection with the deep and deep excavation, which is characterized in that the upper and lower ends of the elements of each stage are connected and the lower stage elements are sequentially constructed in the depth direction to construct the whole earth retaining wall. Earth retaining method.
JP3303349A 1991-11-19 1991-11-19 Earth retaining method for deep excavation Expired - Fee Related JP2536701B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3303349A JP2536701B2 (en) 1991-11-19 1991-11-19 Earth retaining method for deep excavation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3303349A JP2536701B2 (en) 1991-11-19 1991-11-19 Earth retaining method for deep excavation

Publications (2)

Publication Number Publication Date
JPH05140940A JPH05140940A (en) 1993-06-08
JP2536701B2 true JP2536701B2 (en) 1996-09-18

Family

ID=17919910

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3303349A Expired - Fee Related JP2536701B2 (en) 1991-11-19 1991-11-19 Earth retaining method for deep excavation

Country Status (1)

Country Link
JP (1) JP2536701B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5154850B2 (en) * 2007-07-04 2013-02-27 オリエンタル白石株式会社 External reinforcement method for underground structures
JP5280150B2 (en) * 2008-10-29 2013-09-04 旭化成ホームズ株式会社 Yamadome retaining wall and method of forming Yamadome retaining wall
JP5184393B2 (en) * 2009-01-23 2013-04-17 旭化成ホームズ株式会社 Protective wall and protective wall forming method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03206213A (en) * 1989-12-29 1991-09-09 Mitsui Constr Co Ltd Construction method of earth support
JP2561971B2 (en) * 1990-08-31 1996-12-11 東京瓦斯株式会社 Construction method of earth retaining wall for underground structure

Also Published As

Publication number Publication date
JPH05140940A (en) 1993-06-08

Similar Documents

Publication Publication Date Title
KR102129608B1 (en) Semi open cut type tunnel construction method at low overburden
KR20180124795A (en) An Earth Retaining Wall with Underground Buttresses and A Method of Constructing the same
KR102208236B1 (en) Semi Open Cut Type Supporting System of Tunnel and the Construction Method of Tunnel Using by Same
KR101587062B1 (en) Steel composite underground earth retaining wall structure and it's construction method
JP2536701B2 (en) Earth retaining method for deep excavation
KR100831332B1 (en) Underground wall for civil engineering and construction method
KR101047257B1 (en) Construction method of earth wall using composite sheet pile
KR20190142492A (en) PHC pile to facilitate soil guard and construction method of soil guard structure using the same
JPS5829922A (en) Constructing method for underground outer wall
JP2658692B2 (en) Earth retaining method for deep excavation
KR102110080B1 (en) H-type steel wall And Open cut method for constructing an underground structure using H-type steel wall
JP3135495B2 (en) Construction method of avalanche and rock fall protection fence and avalanche and rock fall protection fence
KR102078794B1 (en) An Earth Retaining Wall with Underground Buttresses and A Method of Constructing the same
JP2023121248A (en) Well head foot protection member for liner plate earth-retaining wall, and well head foot protection method of liner plate earth-retaining wall
KR100322623B1 (en) An accessory for concrete block attachment
JP3156025B2 (en) Independent open cut method for large scale and large depth
JPS63280153A (en) Reverse construction method for underground framework
JPH11190024A (en) Earth retaining work
JPS5851092B2 (en) Earth retaining installation method using advance shoring frame
JPH0663235B2 (en) Soil retaining method
JPH04185816A (en) Construction of beam in underground wall
JP4146250B2 (en) Open caisson bottom plate construction method
JPS6018769B2 (en) Construction method of underground structure
KR102638676B1 (en) Construction method of earth retaining wall without wale
JP3900684B2 (en) Construction method for underground structures

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19960521

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080708

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110708

Year of fee payment: 15

LAPS Cancellation because of no payment of annual fees