JP2552997B2 - Bridge girder construction method and its equipment - Google Patents
Bridge girder construction method and its equipmentInfo
- Publication number
- JP2552997B2 JP2552997B2 JP4334493A JP33449392A JP2552997B2 JP 2552997 B2 JP2552997 B2 JP 2552997B2 JP 4334493 A JP4334493 A JP 4334493A JP 33449392 A JP33449392 A JP 33449392A JP 2552997 B2 JP2552997 B2 JP 2552997B2
- Authority
- JP
- Japan
- Prior art keywords
- bridge
- girder
- erection
- pier
- rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000010276 construction Methods 0.000 title description 8
- 239000000725 suspension Substances 0.000 claims description 26
- 238000000034 method Methods 0.000 claims description 14
- 238000001890 transfection Methods 0.000 claims 1
- 229910000831 Steel Inorganic materials 0.000 description 7
- 239000010959 steel Substances 0.000 description 7
- 238000009434 installation Methods 0.000 description 5
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 241000743339 Agrostis Species 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Description
【0001】[0001]
【発明の利用分野】本発明は、橋桁架設工法およびその
装置、特に比較的簡素化された手順で橋桁を架設するこ
とができる橋桁架設工法およびその装置に関するもので
ある。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a bridge girder construction method and an apparatus thereof, and more particularly to a bridge girder construction method and an apparatus thereof capable of constructing a bridge girder by a relatively simplified procedure.
【0002】[0002]
【従来の技術】橋桁の架設工法には、エレクションガー
ダーによる架設工法があるが、この架設工法の一従来例
を図8に示す。この橋桁架設工法は、エレクションガー
ダーをあらかじめ橋脚間、すなわち架設径間に仮設し、
橋桁を吊り装置で吊り下げて引き出し架設する吊り下げ
式架設法と呼ばれる方法である。2. Description of the Related Art A bridge girder erection method includes an erection girder erection method, and a conventional example of this erection method is shown in FIG. In this bridge girder construction method, the erection girder is temporarily installed between the piers, that is, between the piers,
A method called hanging erection method for drawer construction hung in suspended Ri device girder.
【0003】図8において、符号1は所定の径間で河川
の中に建設された橋脚で、前方の橋脚1a、後方の橋脚
1bというように河川の幅方向に複数個並べられる。2
は橋桁で、後方の橋脚1bまで既に架設された状態であ
る。3は先方の橋脚1aの上に組み立てられた鋼製の前
方ベント、4は後方の橋脚1b部分において既設の橋桁
2の先端近くの上に組み立てられた鋼製の後方ベント、
5は前方ベント3と後方ベント4の間に架設され且つ支
持されたエレクションガーダー、6はエレクションガー
ダー5の上に設置されこのエレクションガーダー5に沿
って移動する吊り装置、7は径間へ橋桁2を引き出すた
めの引き出し軌道、8は前方および後方ベント3、4を
支持するためにこれらのベントと橋脚1との間に張設さ
れたワイヤロープである。In FIG. 8, reference numeral 1 is a pier constructed in a river with a predetermined span, and a plurality of piers are arranged in the width direction of the river such as a front pier 1a and a rear pier 1b. Two
Is a bridge girder, and has already been installed up to the rear pier 1b. 3 is a steel front vent assembled on the front pier 1a, 4 is a steel rear vent assembled on the rear pier 1b near the tip of the existing bridge girder 2,
5 is an erection girder that is installed and supported between the front vent 3 and the rear vent 4, 6 is a lifting device that is installed on the erection girder 5 and moves along the erection girder 5, and 7 is a span girder 2 A pulling track for pulling out the front and rear vents 8 is a wire rope stretched between these vents and the pier 1 to support the front and rear vents 3, 4.
【0004】かかる構成において、橋桁2を架設しよう
とするときは、前方の橋脚1aに前方ベント3を、後方
の橋脚1bに後方ベント4を組み立て、エレクションガ
ーダー5を前方ベント3まで延長させると共に、後方の
橋脚1bの既設の橋桁2の上に引き出し軌道を敷設す
る。そして吊り装置6によって新しい橋桁2を吊り、引
き出し軌道に沿って引き出し径間に設置する。橋桁2は
一つの径間で複数本が並べて設置されるため、前記橋桁
2が一本設置されたなら前方、および後方ベントを各橋
脚1a、1b上で幅方向へずらし、次の橋桁2を先の橋
桁2と同様に設置する。こうして、一方の橋台から他方
の橋台まで各径間に橋桁2を設置することにより橋桁2
の架設が行なわれる。In this construction, when the bridge girder 2 is to be erected, the front vent 3 is assembled to the front pier 1a, the rear vent 4 is assembled to the rear pier 1b, and the erection girder 5 is extended to the front vent 3. A drawer track is laid on the existing bridge girder 2 on the rear pier 1b. Then, the suspension device 6 suspends the new bridge girder 2 and installs it along the drawer track between the drawer spans. Since a plurality of bridge girders 2 are installed side by side with one span, if one bridge girder 2 is installed, the front and rear vents are shifted in the width direction on each pier 1a, 1b, and the next bridge girder 2 is moved. It will be installed in the same way as the previous bridge girder 2. In this way, by installing bridge girder 2 in each span from one abutment to the other abutment, bridge girder 2
Is erected.
【0005】[0005]
【発明が解決しようとする課題】しかしながら、このよ
うな従来の橋桁架設工法においては、一つの径間におい
て橋桁2を順次設置したり、さらに一つ前方の径間へ橋
桁2を設置して行くには前方および後方ベントを前方の
橋脚1a、後方の橋脚1b上で新たに組み立てたり或い
は各橋脚1a、1b上で幅方向へずらしたりし、その度
にワイヤーを張り替えなければならないため、作業が繁
雑になるという問題があった。However, in such a conventional bridge girder construction method, the bridge girders 2 are sequentially installed in one span, or the bridge girder 2 is installed one more in the front span. For this reason, the front and rear vents must be newly assembled on the front pier 1a and the rear pier 1b, or they must be shifted in the width direction on each pier 1a, 1b. There was a problem of becoming complicated.
【0006】本発明は前記問題点に鑑みてなされたもの
で、その目的は、比較的簡素化された手順で橋桁を架設
することができる橋桁架設工法およびその装置を提供す
ることを目的とする。The present invention has been made in view of the above problems, and an object of the present invention is to provide a bridge girder erection method and an apparatus therefor capable of erection a bridge girder by a relatively simplified procedure. .
【0007】[0007]
【課題を解決するための手段】上記目的を達成するため
に、本発明は、橋梁アプローチ部、橋台、橋脚、および
橋桁上にレールを横方向に延びて敷設し、それぞれのレ
ール上に前方支柱および後方支柱をレールに沿って移動
可能に橋桁の架設に先立ってその都度運搬して載置し、
さらに前記後方支柱よりもさらに後方の橋梁アプローチ
部上に第3の支柱を設置し、上記前方支柱および後方支
柱を所望のレール上に運搬し得ると共に、橋桁を所望の
径間に運搬し得る第1および第2の吊り装置を備えたエ
レクションガーダーを前方支柱、後方支柱、および第3
の支柱間に架設して成る橋桁架設装置、およびこれによ
る橋桁架設工法を要旨とする。In order to achieve the above object, the present invention provides a bridge approach section, abutment, pier, and
Rails are laid laterally on the bridge girder , and front and rear columns are movably mounted on each rail prior to erection of the bridge girder so that they can be moved along the rail.
Furthermore, a bridge approach that is further rearward than the rear support
Install a third support on the section , and use the front support and rear support.
The columns can be carried on the desired rails and the bridge girders can be
An erection girder having first and second suspension devices capable of being carried in a span is provided in a front strut, a rear strut, and a third strut.
The gist is a bridge girder erection device that is installed between the columns of the bridge and the bridge girder erection method using it.
【0008】[0008]
【作用】エレクションガーダーを前方支柱が載置されて
いる橋脚より先方の既設の橋脚へほぼ1径間分だけ繰り
出し、エレクションガーダーを前方支柱と第3の支柱に
よって支持した状態で後方支柱をほぼ1径間分だけ既設
の橋桁の先端部分まで第2の吊り装置によって運搬前進
させ、次いでエレクションガーダーを後方支柱と第3の
支柱によって支持した状態で前方支柱を1径間分だけ先
方の橋脚上まで第1の吊り装置によって運搬前進させ、
前方支柱および後方支柱が新たに設置された橋脚間に、
これら前方支柱および後方支柱を橋脚上で横方向に移動
させながら順次橋桁を架設する。[ Function ] With the erection girder mounted on the front column
Almost one span to the existing pier ahead of the existing pier.
With the erection girder supported by the front struts and the third struts, the rear struts are moved forward by approximately one span to the tip of the existing bridge girder by the second suspension device, and then the erection girder is moved to the rear struts. While being supported by the third support pillar, the front support pillar is transported forward by one span by the first suspension device to the pier ahead,
Between the piers where the front and rear columns are newly installed ,
Bridge girders will be installed sequentially while moving these front and rear columns laterally on the pier.
【0009】[0009]
【実施例】以下、本発明の実施例について説明する。図
1乃至図5は本発明による橋桁架設装置の一実施例およ
びこの装置を使った橋桁架設工法の実行手順を示す図で
ある。Embodiments of the present invention will be described below. 1 to 5 are diagrams showing an embodiment of a bridge girder erection device according to the present invention and an execution procedure of a bridge girder erection method using this device.
【0010】これらの図において、符号10は堤防など
に相当する橋梁アプローチ部、11は橋梁アプローチ部
10の先端部分をコンクリートなどで固めて設けられ橋
梁建設の出発点になる橋台、12は所定の径間で河川の
中に建設された橋脚で、橋台11から前方に第1径間だ
け隔てて設けられた第1の橋脚12aから始まって、第
2の橋脚12b、第3の橋脚12c………、というよう
に河川の幅方向に複数個並べて建設される。13は橋台
11の上面に、この橋台11の長手方向(以下、これを
横方向とし、橋梁が延びる方向を縦方向とする)に敷設
されたレール、14は同じく第1の橋脚12aの上面で
横方向に敷設されたレール、15は橋台11上の先端近
くに組み立てられた後方支柱、16は、橋架設方向先方
側の橋脚(図1では第1の橋脚12a)のレール14上
にこのレールに沿って移動可能に載置される前方支柱、
17は橋台11上の後方部分に組み立てられた第3の支
柱としての鋼製のベント、18は前方支柱16、後方支
柱15およびベント17の間に架設され且つ支持される
エレクションガーダー、19および20はエレクション
ガーダー18の上に、当該エレクションガーダー18に
沿って移動可能に設けられた第1および第2の吊り装
置、21は橋桁で、後方の各橋脚12の径間に架設され
る。In these drawings, reference numeral 10 is a bridge approach portion corresponding to a dike, 11 is an abutment provided with the tip end portion of the bridge approach portion 10 solidified with concrete, etc. It is a pier constructed in a river with a span, starting from a first pier 12a provided at a distance of a first span in front of the abutment 11, a second pier 12b, a third pier 12c .... … And so on, a number of them will be constructed side by side in the width direction of the river. 13 is a rail laid on the upper surface of the abutment 11 in the longitudinal direction of the abutment 11 (hereinafter, this is the horizontal direction, and the direction in which the bridge extends is the vertical direction), and 14 is the upper surface of the first pier 12a. A rail laid in the lateral direction, 15 is a rear strut assembled near the tip on the abutment 11, and 16 is a rail 14 on the pier (the first pier 12a in FIG. 1) on the forward side in the bridge erection direction. A front column that is movably mounted along
Reference numeral 17 is a steel vent as a third support post assembled in the rear part on the abutment 11, 18 is an erection girder installed and supported between the front support post 16, the rear support post 15 and the vent 17, 19 and 20 Is a first and second suspension device provided on the erection girder 18 so as to be movable along the erection girder 18, and 21 is a bridge girder, which is installed between the diameters of the rear piers 12.
【0011】後方支柱15は、図6に示すように、一定
の間隔をおいて対にして配置される2台の移動体22、
23と、これらの移動体22、23の間に架け渡される
ガーダー受け梁24とから成る。移動体22、23はロ
ーラー25を有し、設置面に置かれた土台26上に枕木
27を横方向に並べその上に敷設したレール28の上に
載置される。ガーダー受け梁24の上には縦移動用コロ
29が配置され、この縦移動用コロの上に支持鉄板30
を敷いてエレクションガーダー18を支持するようにな
っている。As shown in FIG. 6, the rear column 15 is composed of two moving bodies 22, which are arranged in pairs at a fixed interval.
23 and a girder receiving beam 24 bridged between these moving bodies 22, 23. The moving bodies 22 and 23 have rollers 25, and sleepers 27 are arranged laterally on a base 26 placed on the installation surface and are placed on rails 28 laid thereon. A roller for vertical movement is placed on the girder receiving beam 24.
29 is arranged , and a supporting iron plate 30 is placed on the vertical movement roller.
Is laid to support the erection girder 18.
【0012】レール28は移動体22と移動体23との
間の部分を取り外しが可能になっている。そして、両移
動体22、23の間において、設置面の上には引き出し
軌道31が縦方向に敷設され、この引き出し軌道31の
上には橋桁21を搬送するための重量トロ台車32が設
置されている。A portion of the rail 28 between the moving body 22 and the moving body 23 can be removed. A drawer track 31 is laid vertically on the installation surface between the two moving bodies 22 and 23, and a heavy-weight trolley truck 32 for transporting the bridge girder 21 is installed on the drawer track 31. ing.
【0013】前方支柱16は、図7に示すように、単一
の移動体33と、移動体33の上に載置されたガーダー
受け梁34とから成る。移動体33は、橋脚12上にお
いて設置面の上に置かれた横移動用レール13または1
4の上に横移動用コロ36を設置し、この横移動用コロ
36の上に載置される。ガーダー受け梁34は移動体3
3の上に複数個重ねて載置され前方支柱16の高さ寸法
を調節できるようになっている。また、最上部のガーダ
ー受け梁34aの上面には縦方向移動を行なうように回
転する送り出しローラー37が設けられ、この送り出し
ローラー37の上にエレクションガーダー18を支持す
るようになっている。また、移動体33の上端部分に
は、足場用デッキプレート38が横方向に張り出して設
けられており、また移動体33の側面には足場用デッキ
プレートへ作業者が登るためのステップ39が複数個設
けられている。As shown in FIG. 7, the front support column 16 comprises a single moving body 33 and a girder receiving beam 34 mounted on the moving body 33. The moving body 33 is a rail 13 or 1 for lateral movement placed on the installation surface on the pier 12.
The lateral movement roller 36 is installed on the No. 4 and is placed on the lateral movement roller 36. The girder receiving beam 34 is the moving body 3
A plurality of them are placed on top of each other on top of each other so that the height dimension of the front support column 16 can be adjusted. Further, a delivery roller 37 that rotates so as to move in the vertical direction is provided on the upper surface of the uppermost girder receiving beam 34a, and the erection girder 18 is supported on the delivery roller 37. Further, a scaffolding deck plate 38 is provided on the upper end portion of the moving body 33 so as to project in the lateral direction, and a plurality of steps 39 for an operator to climb to the scaffolding deck plate are provided on the side surface of the moving body 33. It is provided individually.
【0014】エレクションガーダー18は、図6および
図7から明らかなように、断面矩形の枠構造に成形さ
れ、図8に示したエレクションガーダー5とほぼ同様な
トラス構造体から成っている。このエレクションガーダ
ー18に設置された第1および第2の吊り装置19、2
0は、図6に示すように、吊り装置台車40と、吊り装
置台車40の上に設けられた上側吊り梁41と、上側吊
り梁41上の両端部に対にして取り付けられたセンター
ホールジャッキ42と、センターホールジャッキ42か
ら垂直方向に延びて取り付けられこのセンターホールジ
ャッキ42によって昇降せしめられる吊り鋼棒43と、
吊り鋼棒43の下端に取り付けられた下側吊り梁44
と、下側吊り梁44に結合されて橋桁21を吊り下げる
支持鋼棒45とから成る。そして、支持鋼棒45に橋桁
21等の貨物を結合しセンターホールジャッキ42を作
動させることにより、前記橋桁21等を下側吊り梁44
と共に吊り上げることができる。なお、本発明において
は第1吊り装置19または第2吊り装置20は橋桁21
のみならず前方支柱16および後方支柱15も吊り下げ
て搬送するようになっている。As is apparent from FIGS. 6 and 7, the erection girder 18 is formed into a frame structure having a rectangular cross section, and is composed of a truss structure substantially similar to the erection girder 5 shown in FIG. The first and second suspension devices 19 and 2 installed on the erection girder 18
As shown in FIG. 6, the reference numeral 0 designates a suspension device carriage 40, an upper suspension beam 41 provided on the suspension device carrier 40, and center hole jacks attached to both ends of the upper suspension beam 41 in pairs. 42, and a hanging steel rod 43 which extends vertically from the center hole jack 42 and which is attached and lifted up and down by the center hole jack 42,
Lower suspension beam 44 attached to the lower end of the suspended steel rod 43
And a supporting steel rod 45 which is connected to the lower suspension beam 44 and suspends the bridge girder 21. Then, a cargo such as the bridge girder 21 is coupled to the supporting steel rod 45 and the center hole jack 42 is operated to move the bridge girder 21 and the like to the lower suspension beam 44.
Can be hoisted with. In the present invention, the first suspension device 19 or the second suspension device 20 is the bridge girder 21.
Not only the front pillar 16 and the rear pillar 15 are also hung and conveyed.
【0015】かかる構成を有する橋桁架設装置の動作に
ついて、以下図1乃至図5を参照して説明する。図1は
橋台11から第1の橋脚12aまでの第1径間に最初の
橋桁を架設する場合の、前作業を説明する図である。こ
の場合、先ず橋台11の先端近くの場所に後方支柱15
を設置し、この後方支柱15よりも所定の距離後方の橋
梁アプローチ部10上にはベント17を設置すると共
に、橋台11の上に前方支柱16を設置する。これらの
支柱15、16およびベント17は最初の段階ではいず
れも組み立てによって構築される。そして両支柱15、
16およびベント17が構築されると、次に後方支柱1
5とベント17との間にエレクションガーダー18を架
設し、さらにこのエレクションガーダー18の上には第
1吊り装置19および第2吊り装置20を設置する。そ
してエレクションガーダー18を橋台11よりも前方に
徐々に繰り出して第1の橋脚12aまで到達せしめる。
このエレクションガーダー18の繰り出しに際して、エ
レクションガーダー18が不安定になって最後尾が浮き
上がらないようにするため、各支柱15、16およびベ
ント17には浮き上がり防止装置が取り付けられ、それ
ぞれをレール28、14または設置面に固定するように
なっている。そして、エレクションガーダー18が第1
の橋脚12aまで到達したなら、第1吊り装置19によ
り前方支柱16を吊り支持して第1の橋脚12aまで運
搬前進させ、この第1の橋脚12a上に敷設してあるレ
ール14上に横移動用コロ36と共に載置する。The operation of the bridge girder erection device having such a configuration will be described below with reference to FIGS. 1 to 5. FIG. 1 is a diagram for explaining a pre-work when the first bridge girder is installed in the first span from the abutment 11 to the first bridge pier 12a. In this case, first place the rear support 15 at a location near the tip of the abutment 11.
The vent 17 is installed on the bridge approach section 10 behind the rear support 15 by a predetermined distance, and the front support 16 is installed on the abutment 11. These stanchions 15, 16 and vents 17 are all constructed by assembling in the initial stage. And both columns 15,
Once the 16 and vent 17 have been constructed, then the rear strut 1
An erection girder 18 is installed between the 5 and the vent 17, and a first suspending device 19 and a second suspending device 20 are installed on the erection girder 18. Then, the erection girder 18 is gradually extended forward of the abutment 11 to reach the first pier 12a.
When the erection girder 18 is extended, in order to prevent the erection girder 18 from becoming unstable and the rearmost part from rising, a lifting prevention device is attached to each of the columns 15 and 16 and the vent 17, and each of the rails 28 and 14 is attached. Alternatively, it is fixed on the installation surface . And the erection girder 18 is the first
When reaching the first pier 12a, the first supporting device 19 suspends and supports the front support column 16 to carry and advance to the first pier 12a, and laterally moves on the rail 14 laid on the first pier 12a. Place it with the roller 36.
【0016】次に、第1吊り装置19をエレクションガ
ーダー18上を橋台11の所まで戻し、図2に示すよう
に、一本目の橋桁21を第1吊り装置19と第2吊り装
置20によって吊り下げて橋台11から第1径間へ搬出
し、図3に示すように橋台11と第1の橋脚12aとの
間に架設する。一本目の橋桁21の架設が終わったら、
次に後方支柱15および前方支柱16をそれぞれの場所
で横方向へ移動させ、2本目の橋桁21の設置場所に位
置決めする。その後、前記1本目の橋桁21の場合と同
様に2本目の橋桁21を搬出して橋台11と第1の橋脚
12aとの間に架設する。以下、同様にして次々と橋桁
21を橋台11と第1の橋脚12aとの間に架設する。Next, the first suspension device 19 is returned to the abutment 11 on the erection girder 18, and the first bridge girder 21 is suspended by the first suspension device 19 and the second suspension device 20, as shown in FIG. It is lowered and carried out from the abutment 11 to the first span, and installed between the abutment 11 and the first pier 12a as shown in FIG. Once the first bridge girder 21 has been erected,
Next, the rear strut 15 and the front strut 16 are moved laterally at their respective positions and positioned at the installation location of the second bridge girder 21. Then, similarly to the case of the first bridge girder 21, the second bridge girder 21 is carried out and installed between the abutment 11 and the first bridge pier 12a. Hereinafter, similarly, bridge girders 21 are erected one after another between the abutment 11 and the first pier 12a.
【0017】第1径間への橋桁21の架設が終了した
ら、図4に示すように、ベント17aを後方支柱15の
近辺に設置し、エレクションガーダー18を前方支柱1
6とベント17aによって支持した状態で、第1吊り装
置19によって後方支柱をほぼ1径間分だけ、既設の橋
桁21の先端部分まで運搬前進させその位置に敷設され
たレール28の上に設置する。そして、エレクションガ
ーダー18を第1の橋脚12aよりも前方に徐々に繰り
出して第2の橋脚12bまで到達せしめる。そして、エ
レクションガーダー18が第2の橋脚12bまで到達し
たなら、図5に示すように、エレクションガーダー18
を後方支柱15とベント17aによって支持した状態
で、第1吊り装置19により前方支柱16を吊り支持し
て第1の橋脚12aから第2の橋脚12bまで運搬前進
させ、この第2の橋脚12b上に敷設されたレール14
a上に横移動用コロ36と共に載置する。これで先の第
1径間へ橋桁21を架設するときと同じ状態が第2径間
に作られる。したがって、第2径間以降にも、先の第1
径間の場合と同様に橋桁21の架設が行なわれる。When the bridge girder 21 has been installed over the first span, the vent 17a is installed near the rear support column 15 and the erection girder 18 is installed on the front support column 1 as shown in FIG.
In the state of being supported by the 6 and the vent 17a, the rear supporting column is transported by the first suspension device 19 by about one span to the tip portion of the existing bridge girder 21 and installed on the rail 28 laid at that position. . Then, the erection girder 18 is gradually extended forward of the first pier 12a to reach the second pier 12b. Then, when the erection girder 18 reaches the second pier 12b, as shown in FIG.
Is supported by the rear support column 15 and the vent 17a, the front support column 16 is suspended and supported by the first suspension device 19 to be transported and advanced from the first pier 12a to the second pier 12b. Rail 14 laid on
It is placed together with the lateral movement roller 36 on a . Same state as when bridging the at which this bridge beam 21 to the previous first span is made in the second span. Therefore, even after the second span, the first
The bridge girder 21 is erected in the same manner as in the span.
【0018】[0018]
【発明の効果】以上説明したように本発明によれば、橋
梁アプローチ部、橋台、橋脚、および橋桁上にレールを
横方向に延びて敷設し、それぞれのレール上に前方およ
び後方支柱をレールに沿って移動可能に橋桁の架設に先
立ってその都度運搬して載置し、さらに前記後方支柱よ
りもさらに後方の橋梁アプローチ部上に第3の支柱を設
置し、上記前方支柱および後方支柱を所望のレール上に
運搬し得ると共に、橋桁を所望の径間に運搬し得る第1
および第2の吊り装置を備えたエレクションガーダーを
前方支柱、後方支柱、および第3の支柱間に架設して橋
桁架設装置を構成し、橋脚上で横方向に移動しながら順
次橋桁を架設し、これを更に先方の1径間分の橋桁を架
設するために繰り返して行なうようにしたので、橋桁の
架設作業が簡素化され、しかも無駄な設備をなくすと共
に、支柱の組み立て解体を繰り返す必要がないため設備
構成を単純化することができる等、種々の効果が得られ
る。As described above, according to the present invention, rails are laid so as to extend laterally on the bridge approach section, abutment, pier, and bridge girder, and the front and rear columns are provided on the rails. Prior to the construction of the bridge girder so that it can move along it, it is carried and placed on each occasion, and a third strut is installed on the bridge approach part further rearward than the rear strut, and the front strut and the rear strut are desired. First, the bridge girder can be carried on the rails and the bridge girder can be carried on a desired span.
And the erection girder equipped with the second suspension device is installed between the front column, the rear column, and the third column to form a bridge girder erection device, and the bridge girders are sequentially erected while moving laterally on the pier, since this was further to perform repeatedly in order to erection the first span worth girder of other party, erection work girder is simplified, yet with eliminating wasteful equipment, there is no need to repeat the assembly disassembly of the strut Therefore, various effects can be obtained such that the facility configuration can be simplified.
【図1】本発明が適用される橋桁架設装置の一実施例お
よびこれを使って橋桁の架設を行なう場合の第1工程を
示す正面図である。FIG. 1 is a front view showing an embodiment of a bridge girder erection apparatus to which the present invention is applied and a first step in the case of erection of a bridge girder using the same.
【図2】前記実施例の橋桁架設装置を使って橋桁の架設
を行なう場合の第2工程を示す正面図である。FIG. 2 is a front view showing a second step when the bridge girder is erected using the bridge girder erection device of the embodiment.
【図3】前記実施例の橋桁架設装置を使って橋桁の架設
を行なう場合の第3工程を示す正面図である。FIG. 3 is a front view showing a third step of constructing a bridge girder using the bridge girder erection device of the embodiment.
【図4】前記実施例の橋桁架設装置を使って橋桁の架設
を行なう場合の第4工程を示す正面図である。FIG. 4 is a front view showing a fourth step of erection of a bridge girder using the bridge girder erection device of the embodiment.
【図5】前記実施例の橋桁架設装置を使って橋桁の架設
を行なう場合の第5工程を示す正面図である。FIG. 5 is a front view showing a fifth step of constructing a bridge girder by using the bridge girder erection device of the embodiment.
【図6】前記実施例において用いられる後方支柱の構成
を示す正面図である。FIG. 6 is a front view showing a configuration of a rear strut used in the embodiment.
【図7】前記実施例において用いられる前方支柱の構成
を示す正面図である。FIG. 7 is a front view showing a configuration of a front support column used in the embodiment.
【図8】従来の橋桁架設装置およびその動作状況を示す
正面図である。FIG. 8 is a front view showing a conventional bridge girder erection device and its operation state.
11 橋台 12 橋脚 13 レール 14 レール 15 後方支柱 16 前方支柱 17 ベント(第3の支柱) 18 エレクションガーダー 19 第1吊り装置 20 第2吊り装置 21 橋桁 22、23 移動体 28 レール 11 Abutments 12 Bridge Piers 13 Rails 14 Rails 15 Rear Struts 16 Front Struts 17 Bents (Third Struts) 18 Erection Girders 19 First Suspension Device 20 Second Suspension Device 21 Bridge Girders 22, 23 Mobiles 28 Rails
Claims (2)
橋桁上において横方向に延びて敷設されたレールと、橋
架設方向先方側の橋台或いは橋脚上に敷設された上記レ
ール上にこのレールに沿って移動可能に橋桁の架設に先
立ってその都度運搬され載置される前方支柱と、橋架設
方向後方側の橋梁アプローチ部或いは橋桁上に敷設され
た上記レール上にこのレールに沿って移動可能に橋桁の
架設に先立ってその都度運搬され載置される後方支柱
と、後方支柱よりもさらに後方において橋梁アプローチ
部上に設置される第3の支柱と、前方支柱、後方支柱、
および第3の支柱間に前方へ繰り出し可能に架設される
エレクションガーダーと、エレクションガーダーの上
に、当該エレクションガーダーに沿って移動可能に設け
られ、上記前方支柱および後方支柱を所望のレール上に
運搬し得ると共に、橋桁を所望の径間に運搬し載置し得
る第1および第2の吊り装置とから橋桁架設装置を構成
し、エレクションガーダーを前方支柱が載置されている橋脚
より先方の既設の橋脚へほぼ1径間分だけ繰り出す工程
と、 エ レクションガーダーを前方支柱と第3の支柱によって
支持した状態で後方支柱をほぼ1径間分だけ既設の橋桁
の先端部分まで上記第2の吊り装置によって運搬前進さ
せる工程、 エ レクションガーダーを後方支柱と第3の支柱によって
支持した状態で前方支柱を1径間分だけ先方の橋台或い
は橋脚上まで上記第1の吊り装置によって運搬前進させ
る工程、 前 方支柱および後方支柱が新たに設置された橋脚間に、
これら前方支柱および後方支柱を橋脚上で横方向に移動
させながら順次橋桁を架設する工程、 以上の工程を、更に先方の1径間分の橋桁を架設するた
めに繰り返して行なう ことを特徴とする橋桁架設工法。1. A bridge approach section, abutment, pier, and
A rail that is laid horizontally extending on the bridge girder and a rail that is laid on the abutment or pier on the side ahead in the bridge erection direction so that the bridge girder can be movably moved along this rail. Destination
It is laid on the front pillar, which is stood and transported each time, and placed on the bridge approach section or bridge girder on the rear side in the bridge erection direction.
And movable bridge girder along the rails on the rail
A rear strut that is transported and placed each time before erection, and a bridge approach behind the rear strut
The third support pillar installed on the section , the front support pillar, the rear support pillar,
And an erection girder that is erected so as to be able to extend forward between the third stanchions, and is movably provided along the erection girder on the erection girder.
The front and rear struts above the desired rail.
It can be transported and can be transported and placed in the desired span.
That first and configure the bridge girder erection device and a second suspension device, piers and erection girder forward strut is placed
Almost one span is extended to the existing pier ahead
When, that allowed <br/> carrying forward of the said second suspension device to the tip portion of substantially only one span component existing bridge girder backward strut while supporting et les transfection girder by the front strut and the third strut process, only one span component forward strut et les transfected girder while supporting the rear strut and a third strut other party of abutments certain had
Is transported and advanced to the pier by the first suspension device.
That step, before uprights and rear struts between newly installed piers,
The process of constructing bridge girders sequentially while moving these front and rear columns laterally on the bridge pier , the above steps, and further constructing the bridge girder for the preceding one span
Bridge girder erection method characterized by being repeatedly performed for
橋桁上において横方向に延びて敷設されたレールと、橋
架設方向先方側の橋台或いは橋脚上に敷設された上記レ
ール上にこのレールに沿って移動可能に橋桁の架設に先
立ってその都度運搬され載置される前方支柱と、橋架設
方向後方側の橋梁アプローチ部或いは 橋桁上に敷設され
た上記レール上にこのレールに沿って移動可能に橋桁の
架設に先立ってその都度運搬され載置される後方支柱
と、後方支柱よりもさらに後方において橋梁アプローチ
部上に設置される第3の支柱と、前方支柱、後方支柱、
および第3の支柱間に前方へ繰り出し可能に架設される
エレクションガーダーと、エレクションガーダーの上
に、当該エレクションガーダーに沿って移動可能に設け
られ、上記前方支柱および後方支柱を所望のレール上に
運搬し載置し得ると共に、橋桁を所望の径間に運搬し得
る第1および第2の吊り装置とから成ることを特徴とす
る橋桁架設装置。2. A bridge approach section, abutment, pier, and
A rail that is laid horizontally extending on the bridge girder and a rail that is laid on the abutment or pier on the side ahead in the bridge erection direction so that the bridge girder can be movably moved along this rail. Destination
It is laid on the front pillar, which is stood and transported each time, and placed on the bridge approach section or bridge girder on the rear side in the bridge erection direction.
It is possible to move along this rail on the above rail.
A rear strut that is transported and placed each time before erection, and a bridge approach behind the rear strut
The third support pillar installed on the section , the front support pillar, the rear support pillar,
And an erection girder that is erected so as to be able to extend forward between the third stanchions, and is movably provided along the erection girder on the erection girder.
The front and rear struts above the desired rail.
It can be transported and placed, and the bridge girder can be transported to the desired span.
Bridge girder erection apparatus characterized by comprising a first and second hanger tool that.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP4334493A JP2552997B2 (en) | 1992-12-15 | 1992-12-15 | Bridge girder construction method and its equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP4334493A JP2552997B2 (en) | 1992-12-15 | 1992-12-15 | Bridge girder construction method and its equipment |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH06185017A JPH06185017A (en) | 1994-07-05 |
| JP2552997B2 true JP2552997B2 (en) | 1996-11-13 |
Family
ID=18278022
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP4334493A Expired - Lifetime JP2552997B2 (en) | 1992-12-15 | 1992-12-15 | Bridge girder construction method and its equipment |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2552997B2 (en) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2809990B2 (en) * | 1994-08-01 | 1998-10-15 | 株式会社ピー・エス | Bridge girder erection equipment |
| KR100719305B1 (en) * | 2005-01-21 | 2007-05-18 | 박순근 | Prestressed concrete beam construction method of bridge |
| CN110424273B (en) * | 2019-08-30 | 2024-01-12 | 深圳空铁科技股份有限公司 | How to erect track beams |
| JP7785505B2 (en) * | 2021-11-05 | 2025-12-15 | 三井住友建設株式会社 | Deck replacement method for composite girder bridges |
| CN114250711B (en) * | 2021-12-31 | 2024-06-04 | 史托克(天津)工程技术有限公司 | Highway bridge girder erection machine and hole passing method |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| IT1139150B (en) * | 1981-09-11 | 1986-09-17 | Antonio Zambon | IMPROVED TYPE EQUIPMENT FOR LAUNCHING AND LAYING OF PREFABRICATED BEAMS ON BRIDGES, VIADUCTS, CAVALCAVIA AND SIMILARS |
-
1992
- 1992-12-15 JP JP4334493A patent/JP2552997B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH06185017A (en) | 1994-07-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6902184B2 (en) | Work equipment and overhang erection method | |
| JPS6024247B2 (en) | Equipment for cantilevering a multi-span bridge structure made of reinforced concrete or prestressed concrete into sections. | |
| JPH0814092B2 (en) | Bridge girder erection device | |
| JP3177904B2 (en) | Mobile work vehicle for PC cable-stayed bridge | |
| EP1111135A2 (en) | Method of building viaducts | |
| JP3110985B2 (en) | Construction method of column capital of overhang girder bridge | |
| JP4361775B2 (en) | Bridge erection method and bridge erection device | |
| JP2894226B2 (en) | Bridge construction method | |
| JP2539150B2 (en) | Bridge erection equipment | |
| JP2552997B2 (en) | Bridge girder construction method and its equipment | |
| JP4489872B2 (en) | Bridge erection method and apparatus | |
| JP2768282B2 (en) | Bridge construction method | |
| JP2005023623A (en) | Suspension device for suspension scaffold for bridge and suspension scaffold assembling construction method using this device | |
| JPH09256323A (en) | Bridge girder erection device | |
| CN216515141U (en) | Novel cantilever construction creeping formwork device | |
| JPH11147690A (en) | Low head rebar construction equipment | |
| JP5032787B2 (en) | Heavy equipment installation equipment | |
| JPH06235208A (en) | Method for building upper structure in high structure | |
| JPH11222819A (en) | Construction method of elevated structure using building girder | |
| JP3326724B2 (en) | Construction method of concrete cable-stayed bridge and form support trolley used for it | |
| JP3032477B2 (en) | Moving scaffold for floor slab assembly | |
| JP2000170122A (en) | Construction method and equipment for concrete bridge girder | |
| JP2942054B2 (en) | How to build a building | |
| JPS60258311A (en) | Construction of high structure | |
| CN213389729U (en) | Steel box arch rib segment splicing pedestal |