JP2564909B2 - Data maintenance method - Google Patents
Data maintenance methodInfo
- Publication number
- JP2564909B2 JP2564909B2 JP63216681A JP21668188A JP2564909B2 JP 2564909 B2 JP2564909 B2 JP 2564909B2 JP 63216681 A JP63216681 A JP 63216681A JP 21668188 A JP21668188 A JP 21668188A JP 2564909 B2 JP2564909 B2 JP 2564909B2
- Authority
- JP
- Japan
- Prior art keywords
- data
- equipment
- database
- transfer
- time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 title claims description 7
- 238000012423 maintenance Methods 0.000 title claims description 5
- 238000012546 transfer Methods 0.000 claims description 45
- 238000010586 diagram Methods 0.000 claims description 17
- 238000012360 testing method Methods 0.000 claims description 15
- 238000012544 monitoring process Methods 0.000 claims description 7
- 238000012545 processing Methods 0.000 claims description 4
- 238000003672 processing method Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 19
- 230000015654 memory Effects 0.000 description 17
- 238000004088 simulation Methods 0.000 description 3
- 230000006870 function Effects 0.000 description 2
- 238000007634 remodeling Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/30—State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
Landscapes
- Testing And Monitoring For Control Systems (AREA)
- Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Maintenance And Management Of Digital Transmission (AREA)
- Selective Calling Equipment (AREA)
Description
【発明の詳細な説明】 A.産業上の利用分野 本発明は、例えば電力集中監視制御システムにおいて
監視制御対象設備に係るデータをメンテナンスする方法
に関するものである。DETAILED DESCRIPTION OF THE INVENTION A. Field of Industrial Application The present invention relates to a method for maintaining data relating to equipment to be monitored and controlled in, for example, a centralized power monitoring and control system.
B.発明の概要 本発明は監視・制御を行うコンピュータシステムのデ
ータベースにおいて、監視・制御の対象となる機器等の
定義,処理方法の指定,CRT画面フォーマット,帳票フォ
ーマット等の設備データに対するデータメンテナンス方
法において、 将来異動予定のある設備に関するデータを例えばCRT
の画面単位で保存し、これらデータを現在のオンライン
設備データベースに組み入れることにより異動予定時の
擬似設備データベースを作成し、これを用いて予めソフ
トウェアのテストを実施し、その後、系統図フォーマッ
トおよび帳票フォーマットの変更予定時の擬似設備デー
タのテストを上記と同様に実施しておくことによって、 監視制御対象機器の改造時期よりも前に又は運用変更
による帳票フォーマット等の変更時期以前に設備データ
の異動及びデータメンテナンスを実施することができ、
しかもデータ保存用のメモリの容量が小さくて済むよう
にしたものである。B. Summary of the Invention The present invention is a data maintenance method for facility data such as definition of devices to be monitored and controlled, specification of processing method, CRT screen format, form format, etc. in a database of a computer system for monitoring and controlling. In the case of CRT
The screen is saved as a screen unit and the data is incorporated into the current online facility database to create a simulated facility database at the time of the planned transfer. Using this, the software is tested in advance, and then the system diagram format and report format are used. By performing the test of the simulated equipment data at the time of the change of the same as above, the change of the equipment data before the time of remodeling of the equipment to be monitored and controlled or before the time of changing the form format due to the operation change and Data maintenance can be carried out,
In addition, the capacity of the memory for storing data is small.
C.従来の技術 例えば電力集中監視制御システムにおいて、監視制御
対象の設備を異動すること(追加,変更または削除する
こと)がある。この場合設備の異動に伴って設備データ
についても異動を行い、差に異動後のCRT画面には所定
の事項が正しく表示されているか、あるいは帳票フォー
マットが正しく印字されるか、といったことをテストす
る必要がある。従来ではデータベースがオンライン用の
もののみであったことから、設備データの異動を予め行
うことができず、また実行されているオンライン業務を
止めて設備データのテストを実施するということを避け
るために、監視制御対象機器の改造に合わせて、それに
対する異動後の設備データのテストを同時期に行ってい
た。C. Conventional technology For example, in a centralized power monitoring and control system, the equipment to be monitored and controlled may be moved (added, changed, or deleted). In this case, the equipment data is also changed due to the equipment change, and it is tested whether the specified items are correctly displayed on the CRT screen after the change or whether the form format is printed correctly. There is a need. In the past, since the database was only for online, it is not possible to transfer the equipment data in advance, and to avoid stopping the online work being executed and testing the equipment data. In parallel with the modification of the equipment subject to monitoring and control, the equipment data after the transfer was tested for it at the same time.
D.発明が解決しようとする課題 しかしながら従来のように設備データの異動及びテス
トを行う時期が設備の異動時期に同期しなければならな
いという制約は作業者の割り当てに苦労することがあ
り、しかもその改造及びテストの時間が制約されている
から作業者の負担が大きいという問題があった。またユ
ーザーの要求する画面の表示内容等を実際に使用してい
るコンピュータシステムで事前にチェックすることがで
きないため、図面等により確認しかできず、不便であっ
た。D. Problems to be Solved by the Invention However, the constraint that the time for changing and testing equipment data must be synchronized with the time for changing equipment, as in the past, may cause labor allocation to workers, and There is a problem that the burden on the operator is heavy because the time for remodeling and testing is limited. In addition, the display contents of the screen requested by the user cannot be checked in advance by the computer system that is actually used, so that it can only be confirmed by the drawings and the like, which is inconvenient.
本発明は上記の事情に鑑みてなされたもので、設備デ
ータの異動およびテストを行う時期を事前に擬似的に行
っておき、実際の異動時期が到来したときに自動的に擬
似手なデータを使用するようにして作業者の負担を軽減
できるようにしたことを目的とする。The present invention has been made in view of the above circumstances, in which the time for performing equipment data transfer and test is simulated in advance, and pseudo manual data is automatically generated when the actual transfer time comes. The purpose is to reduce the burden on the operator by using it.
E.課題を解決するための手段 本発明は監視・制御を行うコンピュータシステムのデ
ータベースにおいて、監視・制御の対象となる機器等の
定義,処理方法の指定,CRT画面フォーマット,帳票フォ
ーマット等の設備データに対するデータメンテナンス方
法において、 将来の異動(変更)の対象となる設備に関する異動デ
ータを異動予定時刻にかつ設備の処理単位別に分けて予
め作成して保存すると共に、各異動データを用いて異動
予定時における設備データベースを擬似的に作成し、こ
の擬似設備データベースを用いて予めソフトウェアのテ
ストを実施しておき、異動が実際に行われたときにその
ときの設備データベースに当該異動に係る異動データを
組み入れ、異動予定時がTnである異動データは、先ず異
動予定時がTnよりも前である総ての異動データと現在の
設備データベースとを用いてTnの直前の擬似的な設備デ
ータベースを作成し、次いでこの擬似的な設備データベ
ースにTnにて実施される異動情報を作用させることによ
って作成された異動データを用いてCRT系統図または帳
票の変更情報の擬似的な設備データベースを作成し、そ
の後、この系統図および帳票の擬似的な設備データベー
スに変更予定時にて実施される変更情報を作用させるこ
とによって作成されるものである。E. Means for Solving the Problem In the database of a computer system for monitoring / controlling, the present invention defines equipment such as equipment to be monitored / controlled, designation of processing method, equipment data such as CRT screen format, form format, etc. In the data maintenance method for, the transfer data related to the equipment to be transferred (changed) in the future is created and saved in advance at the scheduled transfer time and by the processing unit of the equipment, and the transfer data is used to schedule the transfer. Create a pseudo equipment database in the above, test the software in advance using this pseudo equipment database, and when the change is actually made, incorporate the change data related to the change into the equipment database at that time. The transfer data for which the planned transfer time is Tn is the first for all the transferred data whose transfer time is before Tn. Using the data and the current equipment database, create a pseudo equipment database immediately before Tn, and then transfer the transfer data created by applying the transfer information implemented in Tn to this pseudo equipment database. It is created by using the CRT system diagram or a pseudo equipment database of the change information of the form, and then applying the change information to be executed at the time of the change to this pseudo equipment database of the system diagram and the form. It is something.
F.実施例 第1図は本発明方法を実施する電力集中監視制御シス
テムのハードウェアの一例を示す構成図である。同図中
1,2は互いに2重化されたコンピュータであり、一方の
コンピュータ1はオンライン業務を実行している主系に
属し、他方のコンピュータ2は擬似的な設備データベー
スを用いてテストを行う等の業務を受け持つ従系に属す
る。3はシステム管理装置であり、設備データ管理やコ
ンピュータ1,2の主系,従系等の認識切り替えといった
機能を有する。このシステム管理装置3は、監視制御対
象である各設備,CRT系統図および帳票に関するデータを
設備データベースとして第1のメモリ4に保存し、コン
ピュータ1はこの設備データベースをコンピュータ1の
メモリ10にコピーしこれを用いて所定のオンラインリア
ルタイムのデータ処理を行う。なおこの設備データベー
スにはソースデータとオブジェクトデータが含まれる。F. Embodiment FIG. 1 is a configuration diagram showing an example of hardware of a centralized power monitoring and control system for implementing the method of the present invention. In the figure
1 and 2 are computers that are duplicated with each other. One computer 1 belongs to the main system that executes online tasks, and the other computer 2 performs tasks such as performing tests using a pseudo equipment database. Belongs to the subordinate responsible. Reference numeral 3 denotes a system management device, which has a function of managing equipment data and switching recognition of the main and sub systems of the computers 1 and 2. This system management device 3 saves data relating to each facility to be monitored and controlled, the CRT system diagram and the form as a facility database in the first memory 4, and the computer 1 copies this facility database to the memory 10 of the computer 1. Using this, predetermined online real-time data processing is performed. The equipment database includes source data and object data.
5,6は夫々第2のメモリ及び第3のメモリであり、第
2のメモリ5には、将来の異動の対象となる設備,CRT系
統図および帳票に関する異動データが異動予定時刻にか
つ設備,CRT系統図および帳票の処理単位別に分けて予め
作成して保存されている。前記異動データは異動の対象
部分のみを含むデータであって、異動に係る工事件名
称,件名ナンバー,作業予定日時及び異動の対象部分を
含むCRT表示用画面のナンバー等が含まれる。この例で
は異動データを画面毎に作成しているが、これに限らず
例えば設計図1枚毎に作成してもよい。Reference numerals 5 and 6 are a second memory and a third memory, respectively. In the second memory 5, the equipment to be changed in the future, the CRT system diagram, and the change data related to the form are stored at the scheduled change time and the equipment, It is created and saved separately for each processing unit of CRT system diagram and form. The transfer data is data including only the target part of the transfer, and includes the construction case name, the subject number, the scheduled work date and time relating to the transfer, the number of the CRT display screen including the target part of the transfer, and the like. In this example, the transfer data is created for each screen, but the present invention is not limited to this, and may be created for each design drawing, for example.
第2のメモリ6は、予め工事の前に行う設備データの
テストに用いる擬似オンライン設備データベースを保存
するためのものである。例えば現在以降に実施予定とな
っている工事件数がn件あるとすると、時系列的にn番
目の工事が行われたときの擬似設備データベースは、シ
ステム管理装置3内のデータ展開部7によって現在の設
備データベースと1番目からn番目の工事に係る各異動
データとを組み合わせて作成され、具体的には異動部分
を含む画面等のデータが差し替えられていく。この擬似
データベースについてもソースデータ及びオブシェクト
データが展開される。なおソースデータはオブジェクト
データに先がけて展開される。The second memory 6 is for storing in advance a pseudo online facility database used for testing facility data performed before construction. For example, assuming that the number of constructions scheduled to be performed since then is n, the simulated equipment database when the nth construction is performed in time series is currently performed by the data expansion unit 7 in the system management device 3. Is created by combining the equipment database and the transfer data for each of the first to nth constructions, and specifically, the data such as the screen including the transfer portion is replaced. Source data and object data are also developed for this pseudo database. The source data is expanded before the object data.
前記異動設備データのテストは対応する工事が実施さ
れる前に次のようにして行われる。例えばn番目の工事
に伴うテストは、先述したように現在のデータベースと
1番目からn番目の工事に係る各異動データとを組み合
わせることによりその将来時のデータベースを擬似的に
作成して第2のメモリ6に格納し、これをコンピュータ
2のメモリ11へコピーしてこのデータベースを用いてコ
ンピュータ2内のシミュレーション実行部8により実施
される。例えばCRTの画面表示を行い、正しく表示され
ているか、見やすいか否か等を調べることによって実施
される。そして実際に予定時にn番目の工事が行われた
とき、当該工事に係る異動データとそのときの設備デー
タベースとにもとずきデータ展開部7により異動後の設
備データベースを作って第1のメモリ4に格納し、以降
このデータベースをコンピュータ1,2のメモリ10,11にコ
ピーすることによりオンライン業務が行われる。このこ
とは予め実施したテストの際の擬似設備データベースが
工事終了後には実際のオンラインデータベースとして使
用できることを意味するが、そのためには当該n番目の
工事よりも前の工事に係る異動データの総てに対して、
同様なテストが行われていることが必要である。その理
由については、その前の工事に係る異動データに対して
テストが行われていないとすると、n番目の工事に係る
異動データを作用させるべきデータベースそのもののテ
ストが終っていないので、結局n番目の工事時点を予想
して作成した擬似設備データベースについてもテストが
行われていないことになるからである。The test of the transfer equipment data is performed as follows before the corresponding construction is performed. For example, in the test associated with the n-th construction, as described above, the database for the future is artificially created by combining the current database and each transfer data relating to the 1st to the n-th construction to create the second database. The simulation is executed by the simulation execution unit 8 in the computer 2 by storing it in the memory 6, copying it to the memory 11 of the computer 2, and using this database. For example, it is carried out by displaying the screen of a CRT and checking whether the display is correct or not, and whether or not it is easy to see. When the n-th construction is actually performed at the scheduled time, the data expansion unit 7 creates the equipment database after the movement based on the movement data relating to the construction and the equipment database at that time, and creates the first memory. 4 and thereafter, this database is copied to the memories 10 and 11 of the computers 1 and 2 to perform online business. This means that the simulated equipment database at the time of the test carried out in advance can be used as an actual online database after the construction is completed. For that purpose, all the movement data related to the construction before the n-th construction is required. Against
It is necessary that similar tests be performed. The reason for this is that if the transfer data related to the previous work has not been tested, the test of the database itself on which the transfer data related to the nth work should be applied has not been completed, so the nth This is because the simulated equipment database created by anticipating the construction time of No. has not been tested.
次にn番目の工事に係る設備,系統図および帳票の異
動データ(n)の作成方法について第2図を参照しなが
ら説明する。先ずデータ展開部7により、1番目からn
−1番目の工事に係る各異動データ(1)〜(n−1)
と現在の設備データベースとにもとずいてn−1番目の
工事が終了した時点における擬似オンラインデータベー
ス(n−1)を作成し、次いで図示しないマンマシン装
置を用いてn番目の工事対象である設備の異動情報をメ
モリ5内に入力する。この結果データ作成部9により、
入力された異動情報と前記擬似データベースとにもとず
いて設備に関する異動データ(n)が作成される。Next, a method of creating equipment (n) -th equipment, system diagram, and form transfer data (n) will be described with reference to FIG. First, the data expansion unit 7 starts from the first to n.
-Change data (1) to (n-1) for the 1st construction
A pseudo-online database (n-1) at the time when the n-1th construction work is completed based on the current equipment database and the current equipment database, and is the nth construction target using a man-machine device (not shown). Equipment transfer information is input into the memory 5. With this result data creation unit 9,
Based on the input transfer information and the pseudo database, transfer data (n) relating to the equipment is created.
以上において異動データと現在の設備データベースと
を用いて擬似設備データベースを展開したときに不正な
異動データが入力されていないかをチェックする。この
ようなチェックの結果、例えば複数の工事件名中に同一
の設備についての撤去の指示がされているデータが複数
存在すれば、最初の異動データ以外のデータは誤りであ
るとして排除される。上記のように作成された設備に関
する異動データ(n)を再びデータ展開部7により、1
番目からn−1番目の変更に係る系統図および帳票に関
する各異動データ(1)〜(n−1)と現在のオンライ
ンデータベースとにもとずいてn−1番目の変更が終了
した時点における擬似データベース(n−1)を作成す
る。次いで再び、図示しないマンマシン装置を用いてn
番目の変更対象である系統図および帳方に関する異動デ
ータを入力する。この結果、データ作成部により、入力
された系統図および帳票に関す異動データと前記擬似デ
ータベースとにもとずいて系統図および帳票に関する異
動データ(n)が作成される。このようにして作成され
た異動データと現在の設備データベースとを用いて擬似
設備データベースを展開したときに前述と同様に不正な
異動データが入力されていないかをチェックする。この
ようなチェックを行って前述と同様に最初の異動データ
以外のデータは誤りであるとして排除する。In the above, when the pseudo equipment database is expanded by using the movement data and the current equipment database, it is checked whether or not the illegal movement data is input. As a result of such a check, for example, if there are a plurality of data instructing the removal of the same equipment in a plurality of construction subjects, the data other than the first transfer data is excluded as an error. The transfer data (n) relating to the equipment created as described above is again set to 1 by the data expansion unit 7.
Pseudograph at the time when the (n-1) th change is completed based on the change diagrams (1) to (n-1) related to the system diagram and the form related to the (n-1) th change and the current online database. Create a database (n-1). Next, again using a man-machine device (not shown),
Enter the change data related to the system diagram and book that is the second change target. As a result, the data creation unit creates the change data (n) regarding the system diagram and the form based on the input change data regarding the system diagram and the form and the pseudo database. When the pseudo equipment database is developed by using the movement data created in this way and the current equipment database, it is checked whether or not the illegal movement data is input as described above. By performing such a check, data other than the first transfer data is excluded as an error, as described above.
なおメモリ4,5,6,データ展開部7,データ作成部9はコ
ンピュータ1又はコンピュータ2の機能として扱うこと
も出来る。The memories 4, 5 and 6, the data expansion unit 7, and the data creation unit 9 can be handled as the functions of the computer 1 or the computer 2.
又、コンピュータ1には主系,従系が入れ替わること
があるので、オンライン設備データベース格納用メモリ
10,擬似オンライン設備データベース格納用メモリ11
を、各々のコンピュータ1,2にそれぞれ設置することに
より、テストの効率を更に向上させることができる。In addition, since the primary system and the secondary system may be exchanged in the computer 1, the online facility database storage memory
10, Pseudo online facility database storage memory 11
The test efficiency can be further improved by installing the computer in each of the computers 1 and 2.
G.発明の効果 本発明は、将来異動予定のある設備,系統図および帳
票に関するデータを例えばCRTの画面単位で保存し、こ
れらデータを現在の設備データベースに組み入れること
により異動予定時の擬似設備データベースを作成し、こ
れを用いて予め設備データのテストを実施しておくよう
にしているため、設備データの異動及びテストを行う時
期をハードウェアの工事時期に合わせることなく自由に
選択することができると共にその時間も制約されること
がないから、作業者の割り当てに苦労することもない
し、作業者の負担も小さい。更にユーザーの要求する画
面の表示内容等を事前にチェックすることができるので
トラブルの発生を抑えることができる。しかも設備異動
に対応したデータは、例えば異動部分を含む画面単位で
保存しているから、メモリ容積が小さくて済む。G. Effect of the Invention The present invention saves data relating to facilities, system diagrams, and forms that are scheduled to be transferred in the future, for example, in units of CRT screens, and incorporates these data into the current facility database to create a simulated facility database at the time of planned transfer. Since the equipment data is created and the equipment data is tested in advance using this, it is possible to freely select the time when the equipment data is changed and tested without matching the hardware construction time. At the same time, there is no restriction on the time, so there is no difficulty in assigning workers, and the burden on workers is small. Further, since the display contents of the screen requested by the user can be checked in advance, occurrence of trouble can be suppressed. Moreover, since the data corresponding to the equipment change is stored for each screen including the changed part, the memory capacity can be small.
第1図は本発明の一実施例を示す構成図、第2図は本発
明の実施例のデータフロー説明図である。 1,2……コンピュータ、3……システム管理装置、4,5,6
……第1〜第3メモリ、7……データ展開部、8……シ
ミュレーション実行部、9……データ作成部。FIG. 1 is a configuration diagram showing an embodiment of the present invention, and FIG. 2 is a data flow explanatory diagram of the embodiment of the present invention. 1,2 ... Computer, 3 ... System management device, 4, 5, 6
...... First to third memories, 7 ... Data expansion unit, 8 ... Simulation execution unit, 9 ... Data creation unit.
───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.6 識別記号 庁内整理番号 FI 技術表示箇所 H04Q 9/00 311 H04L 13/00 315Z (72)発明者 若杉 直人 東京都品川区大崎2丁目1番17号 株式 会社明電舎内 (72)発明者 島田 敏行 東京都品川区大崎2丁目1番17号 株式 会社明電舎内─────────────────────────────────────────────────── ─── Continuation of the front page (51) Int.Cl. 6 Identification number Reference number within the agency FI Technical indication location H04Q 9/00 311 H04L 13/00 315Z (72) Inventor Naoto Wakasugi 2-1, Osaki, Shinagawa-ku, Tokyo No.17 Inside Meidensha Co., Ltd. (72) Inventor Toshiyuki Shimada 2-1-1-17 Osaki, Shinagawa-ku, Tokyo Inside Meidensha Co., Ltd.
Claims (1)
データベースにおいて、監視・制御の対象となる機器等
の定義,処理方法の指定,CRT画面フォーマット,帳票フ
ォーマット等の設備データに対するデータメンナタンス
方法において、 将来の異動(変更)の対象となる設備に関する異動デー
タを異動予定時刻にかつ設備の処理単位別に分けて予め
作成して保存すると共に、各異動データを用いて異動予
定時における設備データベースを擬似的に作成し、この
擬似設備データベースを用いて予めソフトウェアのテス
トを実施しておき、異動が実際に行われたときにそのと
きの設備データベースに当該異動に係る異動データを組
み入れ、異動予定時がTnである異動データは、先ず異動
予定時がTnよりも前である総ての異動データと現在の設
備データベースとを用いてTnの直前の擬似的な設備デー
タベースを作成し、次いでこの擬似的な設備データベー
スにTnにて実施される異動情報を作用させることによっ
て作成された異動データを用いてCRT系統図または帳票
の変更情報の擬似的な設備データベースを作成し、その
後、この系統図および帳票の擬似的な設備データベース
の変更予定時にて実施される変更情報を作用させること
によって作成されることを特徴とするデータメンテナン
ス方法。1. A data maintenance method for equipment data such as definition of equipment to be monitored and controlled, specification of processing method, CRT screen format, form format, etc. in a database of a computer system for monitoring and controlling. , The transfer data related to the equipment to be transferred (changed) in the future is created and saved in advance at the scheduled transfer time and for each processing unit of the equipment, and the equipment database at the time of the scheduled transfer is simulated using each transfer data. Created in advance, test the software using this pseudo equipment database in advance, and when the transfer is actually performed, incorporate the transfer data related to the transfer into the equipment database at that time, and The transfer data, which is Tn, consists of all the transfer data whose transfer is scheduled before Tn and the current equipment data. Database is used to create a pseudo equipment database immediately before Tn, and then the transfer data created by applying the change information implemented in Tn to this pseudo equipment database is used to create a CRT system diagram. Alternatively, it is created by creating a pseudo equipment database of the change information of the form and then applying the change information to be executed at the time when the pseudo equipment database of the form is scheduled to be changed. How to maintain data.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP63216681A JP2564909B2 (en) | 1988-08-31 | 1988-08-31 | Data maintenance method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP63216681A JP2564909B2 (en) | 1988-08-31 | 1988-08-31 | Data maintenance method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0265497A JPH0265497A (en) | 1990-03-06 |
| JP2564909B2 true JP2564909B2 (en) | 1996-12-18 |
Family
ID=16692259
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP63216681A Expired - Lifetime JP2564909B2 (en) | 1988-08-31 | 1988-08-31 | Data maintenance method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2564909B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003259550A (en) * | 2002-03-01 | 2003-09-12 | Mitsubishi Electric Corp | Work blackout adjustment device |
| JP4731300B2 (en) * | 2005-12-02 | 2011-07-20 | 中国電力株式会社 | Monitoring control method and its monitoring control system when replacing remote monitoring control device in electric station |
| CN101944778B (en) * | 2010-10-09 | 2012-07-04 | 华北电网有限公司 | Isolation debugging system and debugging method of transformer substation monitoring system |
-
1988
- 1988-08-31 JP JP63216681A patent/JP2564909B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0265497A (en) | 1990-03-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Sutcliffe | Scenario-based requirements analysis | |
| US7212987B2 (en) | System and method for planning a design project, coordinating project resources and tools and monitoring project progress | |
| JP2564909B2 (en) | Data maintenance method | |
| Retik et al. | The use of computer graphics as a scheduling tool | |
| JP2600844B2 (en) | Equipment data maintenance method | |
| Cowan et al. | Validation of the laboratory information system | |
| Robertson et al. | Effective management of software development | |
| JPH0281265A (en) | Data maintenance method | |
| RU2639932C2 (en) | Individual controller simulator for training of operative-controller staff of main oil pipelines | |
| RU2834350C1 (en) | Distributed system for testing embedded software of electronic devices | |
| JPH0281266A (en) | Data maintenance method | |
| JP7783784B2 (en) | Production planning system and production planning method | |
| US20260111321A1 (en) | Cloud failure remediation | |
| Eckstrand et al. | Human resources engineering: A new challenge | |
| Humphrey | CASE (Computer-Aided Software Engineering) Planning and the Software Process | |
| US20070294065A1 (en) | Method, apparatus, and computer program product for implementing plans for logical partition (lpar) systems | |
| Paster | Experience with application of modern software management controls | |
| WO2025238647A1 (en) | Interactive, intelligent production and maintenance execution agent | |
| Alley | Computer-aided design/drafting management within the united states air force logistics command civil engineering organization | |
| Takahashi et al. | DR for Electronics and Telecommunications:(Complex Systems) | |
| CN119904213A (en) | A conflict checking method and system based on time axis | |
| Pokorney et al. | A systems approach to computer programs | |
| Barkley | Test Readiness: Be Ready to Test When the Software Is Ready to Be Tested | |
| Edwards | Plan for the Design, Development, Implemenation, and Operation of the National Water Information System | |
| JPH0750668A (en) | Network management system |