Bed horizontal reference adjustment method

Info

Publication number
JP2579667B2
JP2579667B2 JP63214480A JP21448088A JP2579667B2 JP 2579667 B2 JP2579667 B2 JP 2579667B2 JP 63214480 A JP63214480 A JP 63214480A JP 21448088 A JP21448088 A JP 21448088A JP 2579667 B2 JP2579667 B2 JP 2579667B2
Authority
JP
Japan
Prior art keywords
bed
transport
jack
carrier
transport vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP63214480A
Other languages
Japanese (ja)
Other versions
JPH0265942A (en
Inventor
憲一 宗方
哲郎 山蔭
茂 山宮
浩 横沢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyoda Koki KK
Original Assignee
Toyoda Koki KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyoda Koki KK filed Critical Toyoda Koki KK
Priority to JP63214480A priority Critical patent/JP2579667B2/en
Publication of JPH0265942A publication Critical patent/JPH0265942A/en
Application granted granted Critical
Publication of JP2579667B2 publication Critical patent/JP2579667B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Feeding Of Workpieces (AREA)

Description

【発明の詳細な説明】 <産業上の利用分野> 本発明は、搬送台車に載せられたベッドの水平基準調
整方法に関する。
Description: TECHNICAL FIELD The present invention relates to a method of adjusting the horizontal reference of a bed placed on a transport trolley.

<従来の技術> 従来、研削盤をライン流しで組み付けるため、搬送台
車にベッドを載せ、搬送台車とともにベッドを移動させ
ることによって、各ステーションで、ベッドの摺動面の
仕上げ作業、ボールネジの組み付け作業、テーブルの摺
り合わせ作業、送り台の摺り合わせ作業、テーブルに主
軸台と心押台を設置する作業等を行っている。
<Conventional technology> Conventionally, in order to assemble a grinder in a line sink, a bed is placed on a transport trolley, and the bed is moved together with the transport trolley. At each station, finishing work of the sliding surface of the bed, assembling work of a ball screw. , A work of rubbing a table, a work of rubbing a feed bar, and a work of installing a headstock and a tailstock on a table.

<発明が解決しようとする課題> これらの作業を行うためには、ベッドの上面が水平に
なっている必要があり、このために従来は、各ステーシ
ョンに搬送台車の下面を支持してベッドの上面が水平に
なるように調整する搬送台車用ジャッキを設け、複数の
搬送台車を次のステーションに移動させる毎に、搬送台
車用ジャッキを調整していた。このため、搬送台車用ジ
ャッキの調整に手間と時間がかかっていた。
<Problems to be Solved by the Invention> In order to perform these operations, the upper surface of the bed needs to be horizontal. For this reason, conventionally, the lower surface of the carrier is supported by each station. A transport trolley jack for adjusting the upper surface to be horizontal is provided, and the transport trolley jack is adjusted each time a plurality of transport trolleys are moved to the next station. For this reason, it took time and effort to adjust the jack for the transport trolley.

<課題を解決するための手段> 本発明はこのような問題を解決するためになされたも
ので、工作機械のベッドをベッド用ジャッキを介して支
持する複数の搬送台車を設け、これらの搬送台車をベッ
ドとともに複数のステーションに渡って順次移動させる
搬送装置を設け、各ステーションに搬送台車の下面を支
持してベッドの上面が水平になるように調整する搬送台
車用ジャッキを設けたベッド搬送装置において、前記複
数の搬送台車の内1つの上面に水準器が設置されるマス
タ用搬送台車とし、このマスタ用搬送台車を各ステーシ
ョンへ移動させて各ステーションにおいてマスタ用搬送
台車の上面が水平になるように前記水準器で確認しなが
ら搬送台車用ジャッキを調整し、各ステーションにおけ
る搬送台車用ジャッキの調整が完了したのち、移動開始
位置にある搬送台車に工作機械のベッドを載置し、移動
開始位置でベッドの上面が水平になるように水準器で確
認しながらベッド用ジャッキを調整するようにした。
<Means for Solving the Problems> The present invention has been made to solve such a problem, and a plurality of transport vehicles for supporting a bed of a machine tool via a bed jack are provided. The bed transfer device is provided with a transfer device for sequentially moving the plurality of stations together with the bed, and at each station, a transfer truck jack for supporting the lower surface of the transfer truck and adjusting the upper surface of the bed to be horizontal. A master carrier on which a level is installed on one of the plurality of carrier vehicles, and moving the master carrier to each station so that the upper surface of the master carrier is horizontal at each station. Adjust the transport trolley jacks while checking with the level, and after the adjustment of the transport trolley jacks at each station is completed. The bed of the machine tool is placed on the transport trolley at the movement start position, and the bed jack is adjusted while checking with a level so that the upper surface of the bed is horizontal at the movement start position.

<作用> マスタ用搬送台車を各ステーションへ移動させて各ス
テーションにおいてマスタ用搬送台車の上面が水平にな
るように水準器で確認しながら搬送台車用ジャッキを調
整し、移動開始位置にある搬送台車に工作機械のベッド
を載置し、移動開始位置でベッドの上面が水平になるよ
うに水準器で確認しながらベッド用ジャッキを調整し、
移動開始位置での作業が完了すると、移動台車毎ベッド
を次にステーションへ移動させ、搬送台車用ジャッキと
ベッド用ジャッキを調整することなしに組み付け作業を
行う。
<Operation> The transport vehicle at the movement start position is adjusted by moving the master transport vehicle to each station and adjusting the jack for the transport vehicle while checking with a level so that the upper surface of the master transport vehicle is horizontal at each station. Place the machine tool bed on the bed and adjust the bed jack while checking with a level that the top of the bed is horizontal at the movement start position.
When the work at the movement start position is completed, the bed of the movable cart is moved to the next station, and the assembling work is performed without adjusting the jack for the transport cart and the jack for the bed.

<実施例> 以下本発明の実施例を図面に基づいて説明する。第1
図において、10は搬送台車であり、11はこれらの搬送台
車10を搬送方向Aに案内する一対のガイドであり、12は
複数の搬送台車10を同時に牽引して搬送方向Aに移動さ
せる搬送装置であり、13はホース巻き取り器である。
<Example> Hereinafter, an example of the present invention will be described with reference to the drawings. First
In the drawing, reference numeral 10 denotes a transport vehicle, 11 denotes a pair of guides for guiding the transport vehicles 10 in the transport direction A, and 12 denotes a transport device for simultaneously pulling a plurality of transport vehicles 10 and moving them in the transport direction A. And 13 is a hose winder.

複数の搬送台車10の内、1つは9カ所に塗装されてい
ない基準面10aを形成したマスタ用搬送台車10bであり、
各基準面10aにはマスタ用搬送台車10bの上面の水平状態
を見る水準器14が着脱可能に設置される。前記搬送装置
12はワイヤー15とこのワイヤー15を巻き取るウインチ16
とこのウインチ16を回転駆動するモータ17とからなって
いる。
One of the plurality of transport vehicles 10 is a master transport vehicle 10b having a reference surface 10a that is not painted at nine locations,
On each of the reference surfaces 10a, a level 14 for monitoring the horizontal state of the upper surface of the master carrier 10b is detachably installed. The transfer device
12 is a wire 15 and a winch 16 for winding the wire 15
And a motor 17 for rotating the winch 16.

各搬送台車10には、第1図、第2図及び第3図におい
て、左端に第1の牽引部20が、右端に第2の牽引部21が
取り付けられている。第1の牽引部20には一対のローラ
22と前記ワイヤー15の一端に取付けられたフックが係合
するピン部23が設けられている。第2の牽引部21には右
側の搬送台車10の前記ローラ22に上下方向に挿通し、搬
送方向Aに係合する係合溝24が形成されている。2つの
搬送台車10間には圧縮空気を供給するホース25が着脱可
能に接続されており、左端の搬送台車10のホース25はホ
ース巻き取り器13に巻き取られ、図略の開閉弁を介して
圧縮空気供給源に接続されている。
In FIGS. 1, 2 and 3, a first traction unit 20 is attached to the left end of the transport carriage 10, and a second traction unit 21 is attached to the right end in FIGS. The first pulling unit 20 has a pair of rollers
A pin portion 23 is provided for engaging a hook 22 attached to one end of the wire 15 with the wire 22. An engaging groove 24 is formed in the second pulling portion 21 so as to be vertically inserted into the roller 22 of the right carrier 10 and engage in the carrying direction A. A hose 25 for supplying compressed air is detachably connected between the two transport carts 10, and the hose 25 of the transport cart 10 on the left end is wound up by the hose winder 13, and is connected via an open / close valve (not shown). Connected to a compressed air supply.

また各搬送台車10には、四隅に浮力発生部26が設けら
れ、これらの浮力発生部26に前記圧縮空気供給源からの
圧縮空気が供給されることによって搬送台車10が浮上す
るようになっている。各搬送台車10には左側のホース25
からの圧縮空気を浮力発生部26へ導くとともに右側のホ
ース25へ導く図略の供給通路が形成されている。右端の
搬送台車10はホース25を右側に接続する代わりに供給通
路内の圧縮空気が外へ漏出しないように図略の詰め栓が
取付けられる。
In addition, each carrier 10 is provided with buoyancy generators 26 at four corners, and the carrier 10 is floated by supplying compressed air from the compressed air supply source to these buoyancy generators 26. I have. Each carrier 10 has a hose 25 on the left
A supply passage (not shown) is formed to guide the compressed air to the buoyancy generator 26 and to the right hose 25. Instead of connecting the hose 25 to the right side, the right end carriage 10 is provided with a filling plug (not shown) so that the compressed air in the supply passage does not leak outside.

さらに各搬送台車10には左端へ移動した搬送台車10を
クレーンを使って右端へ移動させるために、4本のフッ
ク27が設けられている。各搬送台車10には四辺の8ケ所
で後述する搬送台車用ジャッキが当接する基準板28が取
付けられている。
Further, each carrier 10 is provided with four hooks 27 for moving the carrier 10 moved to the left end to the right end using a crane. At each of the transport vehicles 10, reference plates 28 are attached at eight locations on four sides with which a transport vehicle jack described later abuts.

各ステーションには、地面に前記基準板28に対応する
位置で搬送台車用ジャッキ30が設けられ、この搬送台車
用ジャッキ30はノブ31とこのノブ31の回転により上下す
る当接部32とからなっている。
Each station is provided with a transport truck jack 30 at a position corresponding to the reference plate 28 on the ground, and the transport truck jack 30 includes a knob 31 and a contact portion 32 that moves up and down by rotation of the knob 31. ing.

搬送台車10には研削盤のベッド40が載置され、このベ
ッド40と搬送台車10の上面間にはベッド40の上面が水平
になるように調整する複数のベッド用ジャッキ41が設け
られている。このベッド用ジャッキ41は第4図に示すよ
うに、上面に半円球状の突起42を形成した支持板43と、
前記突起42に係合する円錐溝44を持ちベッド40に螺合さ
れる調整用ボルト45と、この調整用ボルト45に螺合され
調整用ボルト45の回転を拘束するナット46とからなって
いる。ベッド40には、調整用ボルト45の頭部47およびナ
ット46に図略のレンチが係合してレンチを回し易いよう
に凹み48,49が形成されている。
A bed 40 of a grinding machine is placed on the transport trolley 10, and a plurality of bed jacks 41 for adjusting the upper surface of the bed 40 to be horizontal are provided between the bed 40 and the upper surface of the transport trolley 10. . As shown in FIG. 4, the bed jack 41 has a support plate 43 having a semi-spherical projection 42 formed on an upper surface thereof.
An adjusting bolt 45 having a conical groove 44 engaged with the projection 42 and screwed to the bed 40, and a nut 46 screwed to the adjusting bolt 45 to restrain the rotation of the adjusting bolt 45. . The bed 40 has recesses 48 and 49 formed therein so that a wrench (not shown) can be engaged with the head 47 and the nut 46 of the adjusting bolt 45 to easily turn the wrench.

次に上述した構成に基づいて動作を説明する。各ステ
ーションに搬送台車10を設置し、各搬送台車10は第1の
牽引部21と第2の牽引部22を介して隣の搬送台車10に連
結する。この状態で隣同士の搬送台車10をホース25を介
して接続し、左端の搬送台車10にホース巻き取り器13に
巻かれたホース25を接続する。ウインチ16に巻かれたワ
イヤー15のフックの第1の牽引部20のピン部23に引っ掛
ける。
Next, the operation will be described based on the above configuration. A transport vehicle 10 is installed at each station, and each transport vehicle 10 is connected to an adjacent transport vehicle 10 via a first traction unit 21 and a second traction unit 22. In this state, the adjacent transport vehicles 10 are connected via the hose 25, and the hose 25 wound around the hose winder 13 is connected to the leftmost transport vehicle 10. The hook of the wire 15 wound around the winch 16 is hooked on the pin portion 23 of the first pulling portion 20.

マスタ用搬送台車10bが移動開始位置又は組み付け開
始位置である右端にある状態で、マスタ用搬送台車10b
の基準面10aに水準器14を設置し、これらの水準器14を
見ながらマスタ用搬送台車10bの上面が水平になるよう
に搬送台車用ジャッキ30のノブ31を回す。移動開始位置
にある搬送台車用ジャッキ30の調整が完了すると、左端
の搬送台車10からホース25を取り外し、ワイヤー15のフ
ックを外す。左端の搬送台車10をクレーンによって持ち
上げ、左端から2番目の搬送台車10にホース25を取付け
るとともにワイヤー15のフックを引っ掛ける。この状態
で各搬送台車10の浮力発生部26に圧縮空気を供給し、各
搬送台車10を搬送台車用ジャッキ30から離れる方向に浮
上させ、搬送装置12によって各搬送台車10を搬送方向A
に搬送台車10の1台だけ移動させる。続いて、浮力発生
部26へ圧縮空気の供給を停止し、各搬送台車10を搬送台
車用ジャッキ30の上に載せ、右端の移動開始位置である
ステーションに先ほどクレーンによって吊り上げられた
搬送台車10を降ろす。マスタ用搬送台車10bが右端から
2番目にある状態で水準器14を見ながらマスタ用搬送台
車10bの上面が水平になるように搬送台車用ジャッキ30
のノブ31を回す。上述した動作を繰り返し行うことによ
って、各ステーションにおける搬送台車用ジャッキ30に
支持されたマスタ用搬送台車10bの上面が水平になる。
In a state where the master carrier 10b is at the right end that is the movement start position or the assembly start position, the master carrier 10b
The level 14 is set on the reference surface 10a, and the knob 31 of the jack 30 for the transport vehicle is turned so that the upper surface of the transport vehicle 10b for the master is horizontal while watching the level 14. When the adjustment of the transport vehicle jack 30 at the movement start position is completed, the hose 25 is removed from the transport vehicle 10 at the left end, and the hook of the wire 15 is removed. The leftmost carrier 10 is lifted by a crane, the hose 25 is attached to the second carrier 10 from the left end, and the hook of the wire 15 is hooked. In this state, compressed air is supplied to the buoyancy generator 26 of each carrier 10 to lift each carrier 10 away from the carrier jack 30, and the carrier 12 moves each carrier 10 in the transport direction A.
Then, only one of the transport vehicles 10 is moved. Subsequently, the supply of the compressed air to the buoyancy generator 26 is stopped, and each of the transport vehicles 10 is placed on the transport vehicle jack 30, and the transport vehicle 10 lifted by the crane to the station at the rightmost movement start position is moved. take down. While the master carrier 10b is located at the second position from the right end, the carrier carrier jack 30 is positioned so that the upper surface of the master carrier 10b is horizontal while looking at the level 14.
Turn the knob 31 of. By repeating the above-described operation, the upper surface of the master carrier 10b supported by the carrier jack 30 at each station becomes horizontal.

かかる状態で、移動開始位置である右端の搬送台車10
にクレーンによって吊り上げられた研削盤のベッド40を
載せ、ベッド40の上面に水準器14を載せる。次に水準器
14を見ながらベッド40の上面が水平になるようにレンチ
を使ってベッド用ジャッキ41を調整する。右端のステー
ションでの組み付け作業が完了すると、左端の搬送台車
10をクレーンによって吊り上げ、複数の搬送台車10を圧
縮空気によって浮上させ、搬送方向Aへ搬送台車1台分
だけ移動させる。クレーンによって吊り上げられた搬送
台車10を右端の移動開始位置に降ろす。右端から2番目
のステーションには搬送台車10がベッド40毎に移動さ
れ、搬送台車用ジャッキ30の当接部32の高さ位置はどの
ステーションにおいても同じであるため、ベッド40の上
面は、搬送台車用ジャッキ30とベッド用ジャッキ41を調
整することなしに、水平となる。右端から2番目のステ
ーションでベッド40の摺動面40a,40bの仕上げ作業を行
う。上述した動作を繰り返し行うことによって、右端の
搬送台車10には新しいベッド40が載置され、すでに載置
されたベッド40はボールネジの組み付け作業、テーブル
の摺り合わせ作業、送り台の摺り合わせ作業、テーブル
に主軸台と心押台を設置する作業が順次行われ、左端の
ステーションで組み付けが完了した研削盤は、クレーン
によって吊り上げられ、搬送台車10以外の地面に載置さ
れる。空になった左端の搬送台車10はクレーンによって
右端のステーションに運ばれる。
In this state, the rightmost transfer vehicle 10 which is the movement start position
The bed 40 of the grinding machine lifted by the crane is placed on the bed, and the level 14 is placed on the upper surface of the bed 40. Next, level
While watching 14, adjust the bed jack 41 using a wrench so that the upper surface of the bed 40 is horizontal. When the assembling work at the right end station is completed,
10 is lifted by a crane, the plurality of transport vehicles 10 are lifted by compressed air, and are moved in the transport direction A by one transport vehicle. The carrier 10 lifted by the crane is lowered to the rightmost movement start position. In the second station from the right end, the transport vehicle 10 is moved for each bed 40, and the height position of the contact portion 32 of the transport vehicle jack 30 is the same at any station. It becomes horizontal without adjusting the trolley jack 30 and the bed jack 41. At the second station from the right end, finishing work of the sliding surfaces 40a and 40b of the bed 40 is performed. By repeatedly performing the above-described operation, a new bed 40 is placed on the rightmost transport trolley 10, and the already placed bed 40 is assembled with a ball screw, rubbing the table, rubbing the feed plate, The work of installing the headstock and tailstock on the table is sequentially performed, and the grinding machine, which has been assembled at the left end station, is lifted by a crane and placed on the ground other than the carrier 10. The empty leftmost carrier 10 is transported by the crane to the rightmost station.

一定の期間毎にマスタ用搬送台車10bを空にし、水準
器14を設置した状態で、マスタ用搬送台車10bの上面の
水平状態をチェックし、くるいが生じている場合は、搬
送台車用ジャッキ41を調整する。このチェックは、マス
タ用搬送台車10bを次にステーションに移動させる毎に
行う。マスタ用搬送台車10bにも他の搬送台車10と同様
にベッド40を載置するため、マスタ用搬送台車10bも他
の搬送台車10と同様に傷み、この傷みによる搬送台車10
の上面のくるいは、マスタ用搬送台車10bの上面を基準
にして搬送台車用ジャッキ30で調整する。
With the master carrier 10b emptied at regular intervals and the level 14 installed, check the horizontal state of the upper surface of the master carrier 10b. Adjust 41. This check is performed each time the master carrier 10b is moved to the next station. Since the bed 40 is placed on the master carrier 10b in the same manner as the other carriers 10, the master carrier 10b is also damaged like the other carriers 10 and the carrier 10
Is adjusted with the transport vehicle jack 30 based on the upper surface of the master transport vehicle 10b.

各搬送台車10は、上面が水平になるように加工される
が、搬送台車10の間で数十μm程度の加工誤差がある。
この加工誤差は、搬送開始位置でベッド用ジャッキ41を
調整することによって吸収される。
Each carrier 10 is machined so that the upper surface is horizontal, but there is a machining error of about several tens μm between the carriers 10.
This processing error is absorbed by adjusting the bed jack 41 at the transfer start position.

<発明の効果> 以上述べたように本発明は、マスタ用搬送台車を各ス
テーションへ移動させて各ステーションにおいてマスタ
用搬送台車の上面が水平になるように水準器で確認しな
がら搬送台車用ジャッキを調整し、移動開始位置にある
搬送台車に工作機械のベッドを載置し、移動開始位置で
ベッドの上面が水平になるように水準器で確認しながら
ベッド用ジャッキを調整し、移動開始位置での作業が完
了すると、搬送台車毎ベッドを次にステーションへ移動
させるようにしたので、他のステーションでベッドの上
面が水平になるように、搬送台車用ジャッキ及びベッド
用ジャッキを調整する必要がない。このため、ベッド水
平基準調整が短時間で簡単に行える効果が得られる。
<Effect of the Invention> As described above, the present invention provides a jack for a transport vehicle while moving the master transport vehicle to each station and checking with a level so that the upper surface of the master transport vehicle is horizontal at each station. Adjust the bed, place the machine tool bed on the transport trolley at the movement start position, adjust the bed jack while checking with a level that the top of the bed is horizontal at the movement start position, and move the bed jack. When the work in step 2 was completed, the bed for each carrier was moved to the next station, so it was necessary to adjust the jack for the carrier and the jack for the bed so that the upper surface of the bed would be horizontal at other stations. Absent. Therefore, an effect that the bed horizontal reference adjustment can be easily performed in a short time is obtained.

【図面の簡単な説明】[Brief description of the drawings]

図面は本発明の実施例を示すもので、第1図は全体平面
図、第2図は搬送台車の平面図、第3図は第2図におい
てIII方向から矢視図、第4図はベッド用ジャッキを示
す正面図。 10……搬送台車、10a……基準面、10b……マスタ用搬送
台車、12……搬送装置、14……水準器、28……基準板、
30……搬送台車用ジャッキ、40……ベッド、41……ベッ
ド用ジャッキ。
1 is an overall plan view, FIG. 2 is a plan view of a carrier, FIG. 3 is a view from arrow III in FIG. 2, and FIG. 4 is a bed. FIG. 10… Transfer trolley, 10a …… Reference plane, 10b …… Master transport trolley, 12 …… Transfer device, 14 …… Level, 28 …… Reference plate,
30: Jack for transport carriage, 40: Bed, 41: Jack for bed.

フロントページの続き (56)参考文献 特公 昭39−25612(JP,B1) 特公 昭42−12744(JP,B1)Continuation of the front page (56) References JP-B 39-25612 (JP, B1) JP-B 42-12744 (JP, B1)

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】工作機械のベッドをベッド用ジャッキを介
して支持する複数の搬送台車を設け、これらの搬送台車
をベッドとともに複数のステーションに渡って順次移動
させる搬送装置を設け、各ステーションに搬送台車の下
面を支持してベッドの上面が水平になるように調整する
搬送台車用ジャッキを設けたベッド搬送装置において、
前記複数の搬送台車の内1つを上面に水準器が設置され
るマスタ用搬送台車とし、このマスタ用搬送台車を各ス
テーションへ移動させて各ステーションにおいてマスタ
用搬送台車の上面が水平になるように前記水準器で確認
しながら搬送台車用ジャッキを調整し、各ステーション
における搬送台車用ジャッキの調整が完了したのち、移
動開始位置にある搬送台車に工作機械のベッドを載置
し、移動開始位置でベッドの上面が水平によるように水
準器で確認しながらベッド用ジャッキを調整するように
したベッドの水平基準調整方法。
1. A plurality of transport vehicles for supporting a bed of a machine tool via a jack for a bed are provided, and a transport device for sequentially moving these transport vehicles along with the bed over a plurality of stations is provided. In a bed transport device provided with a transport truck jack for supporting the lower surface of the truck and adjusting the upper surface of the bed to be horizontal,
One of the plurality of transport vehicles is a master transport vehicle on which a level is installed on the upper surface, and the master transport vehicle is moved to each station so that the upper surface of the master transport vehicle is horizontal at each station. After adjusting the jack for the transport vehicle while checking with the level, the adjustment of the jack for the transport vehicle at each station is completed, and then the bed of the machine tool is placed on the transport vehicle at the movement start position, and the movement start position is set. A bed horizontal reference adjustment method that adjusts the bed jack while checking with a level so that the top of the bed is horizontal.
JP63214480A 1988-08-29 1988-08-29 Bed horizontal reference adjustment method Expired - Fee Related JP2579667B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63214480A JP2579667B2 (en) 1988-08-29 1988-08-29 Bed horizontal reference adjustment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63214480A JP2579667B2 (en) 1988-08-29 1988-08-29 Bed horizontal reference adjustment method

Publications (2)

Publication Number Publication Date
JPH0265942A JPH0265942A (en) 1990-03-06
JP2579667B2 true JP2579667B2 (en) 1997-02-05

Family

ID=16656413

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63214480A Expired - Fee Related JP2579667B2 (en) 1988-08-29 1988-08-29 Bed horizontal reference adjustment method

Country Status (1)

Country Link
JP (1) JP2579667B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10109254A (en) * 1996-10-01 1998-04-28 Takata Kogyosho:Kk Product processing system by means of moving surface plate
JP2018108611A (en) * 2016-12-28 2018-07-12 オークマ株式会社 Positioning method and positioning structure for machine tool

Also Published As

Publication number Publication date
JPH0265942A (en) 1990-03-06

Similar Documents

Publication Publication Date Title
JP2853284B2 (en) Transport carriage
US20110011222A1 (en) Mobile CNC cutting machine
CN110155751A (en) A kind of aluminium ingot full-automation is got on the bus system and method
JP3333169B2 (en) Wheel axle depressurizing device, wheel axle press-in device and wheel axle attaching / detaching device
JP2579667B2 (en) Bed horizontal reference adjustment method
JP2006144302A (en) Traveling rail grinding device
CN209728298U (en) A kind of regulating device of laser scanning device
CN218856501U (en) Intelligent integrated equipment of angle valve one-stop sand light wire drawing
JPH11278603A (en) Die storage system
JP3754871B2 (en) Workpiece supply device
JP2577176Y2 (en) Pallet loading / unloading device for machine tools
JP2571841Y2 (en) Mold changing device for press machine
JPH0134747B2 (en)
JP2569802Y2 (en) Coil exchange equipment
KR20020049171A (en) Apparatus for transfer guide of coiling sleeve
CN118055830A (en) Movable clay model milling machine and moving method
JP2605572Y2 (en) Pallet handling equipment
JP3005662B2 (en) Mold changing method of injection molding machine
JPH0524074A (en) Exchange method of mold of injection molding machine
CN218320535U (en) Bogie maintenance platform
CN223057619U (en) Auxiliary installation device for wagon carriage production
JPH0810875A (en) Die holder transfer device for die of press machine
CN217194679U (en) Bottom mounting equipment for grinding plate machining
JP3006869B2 (en) Feeding web to web press
JPS60232357A (en) Apparatus for supplying coil winding spool

Legal Events

Date Code Title Description
S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees