JP2581750B2 - Propulsion method of tunnel lining element - Google Patents
[go: Go Back, main page]

JP2581750B2 - Propulsion method of tunnel lining element - Google Patents

Propulsion method of tunnel lining element

Info

Publication number
JP2581750B2
JP2581750B2 JP63104790A JP10479088A JP2581750B2 JP 2581750 B2 JP2581750 B2 JP 2581750B2 JP 63104790 A JP63104790 A JP 63104790A JP 10479088 A JP10479088 A JP 10479088A JP 2581750 B2 JP2581750 B2 JP 2581750B2
Authority
JP
Japan
Prior art keywords
jack
press
fitted
existing
attached
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP63104790A
Other languages
Japanese (ja)
Other versions
JPH01278689A (en
Inventor
明彦 美浦
勝 牟田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Railway Technical Research Institute
Ishikawajima Kenzai Kogyo Co Ltd
Original Assignee
Railway Technical Research Institute
Ishikawajima Kenzai Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Railway Technical Research Institute, Ishikawajima Kenzai Kogyo Co Ltd filed Critical Railway Technical Research Institute
Priority to JP63104790A priority Critical patent/JP2581750B2/en
Publication of JPH01278689A publication Critical patent/JPH01278689A/en
Application granted granted Critical
Publication of JP2581750B2 publication Critical patent/JP2581750B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

「産業上の利用分野」 この発明は、線路や道路等の下にこれらを横断するト
ンネルを掘削する場合に使用されるトンネル覆工用エレ
メントの推進工法に関するもである。 「従来の技術」 線路や道路の下にこれらを横断するトンネルを構築す
る方法として、従来から現場打ち施工法に代え、断面形
状が矩形のエレメントを用いて施工する工法が知られて
いる。このような工法は、エレメントの内側に、カッタ
ーヘッド、スクリューコンベア等を収納した掘削機で、
切羽面を掘削しながら水平方向に掘進し、土中にエレメ
ントを順次門型に貫入させて、トンネル覆工体を構築
後、覆工体内側の土を掘削除去するものであり、具体的
には、たとえば第7図に示すようにして行なわれる。す
なわち、発進立坑1にガイドフレーム2を介してエレメ
ントEの推進装置3をセットし、当該推進装置3によ
り、エレメントEを水平方向に押し出しながら、エレメ
ント先端のカッターヘッド4により矩形断面に切羽面を
掘削しつつ、掘削された土砂をスクリューコンベア5に
よりトラフパイプ6の先端側から基端側に排出するもの
である。 ここで、前記推進装置3は、第8図に示すように、エ
レメントEを圧入するとともにカッターヘッド4を回転
させるように構成されており、具体的にはジャッキおよ
びコンベア用モータ内蔵の本体部3aと、ガイドフレーム
2に係合してジャッキの推力を受ける支圧部3bとを主体
として構成されている。 そして、前記支圧部3bは、その両側面にガイドフレー
ム2の係止孔2aに係合する出没自在の突起3cを備えてお
り、また、前記カッターヘッド4は、前記スクリューコ
ンペア5の先端に連結されたウォームギア4aを介して2
組のカッターアーム4bを回転させるようにした構造とな
っている。 「発明が解決しようとする課題」 この発明は前記した従来技術における次のような問題
点を解決せんとするものである。 第1に、前記した技術では、エレメントEを圧入する
ために、エレメントEの後端側にエレメントEの推進距
離分の長さを確保して推進装置3を設ける構造上、狭隘
な現地特性にそぐわず、現場での地形に制約を受けると
いった問題点があることである。特に、推進装置3をセ
ットするガイドフレーム2は、エレメントEの種々の姿
勢に対応させるため余裕をもった寸法とする必要がある
ため、特に大きなブロックとなってしまい、これを据え
付けるための発進立坑1を大きくしなければならなかっ
た。しかも、このような従来の推進装置を用いた工法に
あっては、エレメントE内に装備したカッターヘッド4
とスクリューコンベア5とを駆動して、推進装置3側に
土砂を導き、推進装置3の下へこの土砂を排出する構造
上、推進装置3の下には排土を溜めるスペースが必要と
なるため、発進立坑1の大きさを大きくしなければなら
ないといった問題点もあった。 第2に、エレメントEの推進装置3は、第7図に示す
ように、エレメントEの推進のみならず、スクリューコ
ンベア5をも回転させる構成であるため、装置全体が大
型化し、また補強のための肉付も必要となるなど、その
重量が増すといった問題点もあった。このため、これら
機材を現場に搬入するために、大型トレーラ、大型クレ
ーン等が必要となり、その施工に費用がかかるといった
不満もある。 第3に、前記推進装置3では、屋根、手摺、梯子、足
場等その付帯設備が多いため、その機動性に欠け、さら
に、装置の作動の為の仮設工事も多くなるといった問題
点があった。特に発進立坑1の四方の山留壁を立坑内に
切梁を架け渡して支保した場合、推進装置を上部より繰
り下げっっ鉛直方向にエレメントを配置するには、切梁
を盛り替えて推進装置を下げる必要があるなど、現場で
の作業性が悪いといった問題点もある。 なお、前記のような問題点とは別に、従来では、エレ
メントを圧入する際は、発進立抗1の後方壁に該掘削機
のガイドフレーム2の後端を押し付け、推進反力を得て
いたが、このために発進立抗1の後方壁は、掘削機とな
じみ良く接触しかつ推進反力に対して耐えうるよう特別
の補強加工が必要である等の問題点もあった。 本発明は前記事情に鑑みて提案されたもので、その目
的とするところは、エレメントの圧入機構と、掘削土砂
の排土機構とを分離することによって、装置を小型化
し、また狭隘な現場での適用性を向上することのできる
トンネル覆工用エレメントの推進工法を提供することに
ある。 「課題を解決するための手段」 かかる目的を達成するため本発明は、中空箱型のトン
ネル覆工用エレメントを土中に水平に圧入しながらエレ
メント内部に備えた掘削機によりエレメント先端部の土
砂を掘削しつつエレメントをひとつづつ推進させ、当該
エレメントをトンネルの覆工断面に沿って連結した状態
に構築する方法において、隣接する既設のエレメントの
発進側先端に、エレメトの長手方向に伸縮するロッドを
備えたジャッキを取り付けておき、当該既設のエレメン
トに隣接する位置にエレメントを圧入する際に、この圧
入すべきエレメントと前記ジャッキのロッドとを連結
し、このジャッキによりエレメントを土中に圧入するこ
とを特徴とするのである。 また、同様の目的を達成するため本発明は、既設のエ
レメントの発進側先端に取り付けたジャッキに代えて、
圧入すべきエレメントの後端に鋼棒の牽引装置を取り付
けておき、当該既設のエレメントに隣接する位置に前記
エレメントを圧入する際に、前記牽引装置と既設のエレ
メントの発進側先端とを鋼棒により連結し、該鋼棒を牽
引装置により牽引してエレメントを土中に圧入すること
を特徴とするものである。 「作用」 前記の構成によれば、エレメントの圧入が圧入すべき
エレメントに隣接する既設のエレメントに取り付けたジ
ャッキもしくは圧入すべきエレメントの後端に取り付け
た牽引装置により行なわれ、土砂の掘削・排土はエレメ
ント内部に備えられた掘削機により行なわれるもので、
エレメントの圧入と、掘削土砂の排土とを分離して実施
することが可能になる。 なお、エレメント圧入時、その反力は既設エレメント
により取られるので、その反力を取るための特別な設備
を必要とせず、装置全体の小型化を容易に達成すること
が可能になる。 「実施例」 以下、本発明の一実施例を図面を参照して説明する。 本発明にかかるエレメントの推進工法も基本的には、
エレメントE内にカッターヘッド4およびスクリューコ
ンペア5等の掘削機を挿入し、前記エレメントEを土中
に水平に圧入しながら前記カッターヘッド4により土砂
を掘削し、掘削された土砂をスクリューコンベア5によ
りトラフパイプ6の先端側(第1図左側)から基端側に
排出する機成としている。 しかし本発明においては、エレメントEを土中に圧入
させる手段として、第1図に示すように、隣接する既設
のエレメントEの発進側先端に、エレメントEの長手方
向に伸縮するロッド10aを備えたジャッキ10を取り付け
ておき、当該既設のエレメントEに隣接する位置にエレ
メントEを圧入する際に、この圧入すべきエレメントE
と前記ジャッキ10のロッド10aとを連結し、このジャッ
キ10によりエレメントEを土中に圧入することを最大の
特徴とするものである。 まず、この推進工法を実施する際に用いられて好適な
ジャッキ10について説明すると、これは、第3図に示す
ように、エレメントEの発進側先端の端部に一体に連結
されるケーシング内20に収納されており、そのロッド10
aの先端には、エレメントEとジャッキ10とを結合する
ための結合手段21が備えられている。 前記ケーシング20はエレメントEと同様な断面矩形の
中空箱型に形成されており、既設エレメントEとの結合
操作を容易にするためにジャッキ10の収納部20aを残し
てから先端から側面にかけて一部が切り欠かれた形状に
形成されている。また、ケーシング20の収納部20aは、
ジャッキ10のロッド10aの伸縮距離を考慮してその大き
さが設定されており、また、ケーシング20の連結側の各
側面には等間隔で2列に並んだボルト孔20bが形成され
て、後述する継手板25をケーシング20の周囲のいかなる
位置においても容易に取り付けることができるように配
慮されている。 一方、前記結合手段21は、図示例では、ジャッキ10の
ロッド10aに取り付けられかつケーシング20の収納部20a
に収まる大きさの4角箱状の摺動部材21a、この摺動部
材21aに着脱自在に設けられた連結ピン21bとを主体とし
て構成されている。 なお、前記ケーシング20とエレメントEとは、それら
の内側から継手板25を介して取付ピン26によりピン結合
されるものであり、継手板25にはケーシング20のボルト
孔20bと同一ピッチのボルト孔25aが形成されるととも
に、取付ピン26が挿入される挿入孔25bが設けられてい
る。また、圧入すべきエレメントEには、その側面にジ
ャッキ10の連結ピン21bに係合する係止孔40が所定間隔
を開けて等間隔に形成されており、さらにその端部側面
には前記取付ピン26が挿入される取付孔41が設けられて
いる(第3図参照)。 次に、エレメントE内に取り付けられる掘削機につい
て説明を補足しておくと、この掘削機は、基本的には、
エレメントE先端に配置されるカッターヘッド4と、エ
レメントE内に設置されるスクリューコンベア5とを主
体として構成されており、またこれらは、第1図に示す
ように、エレメントEの発進側に位置する駆動モータ30
により回転駆動されるようになっている。 なお、前記ジャッキ10および掘削機の駆動モータ30
は、第1図に示すように、コントロールユニット35に備
えられた操作盤35Aによりそれぞれ操作されるように構
成されている。 以下、前記構成のジャッキ10および掘削機を用いて実
際にトンネルを施工する際におけるエレメントの推進工
法についてトンネルの構築手順にしたがって説明する。
TECHNICAL FIELD The present invention relates to a method for propelling an element for tunnel lining used when excavating a tunnel crossing a track, a road, or the like below. 2. Description of the Related Art Conventionally, as a method of constructing a tunnel that crosses under a track or a road, a construction method using an element having a rectangular cross section instead of a cast-in-place method has been known. Such a construction method is an excavator that houses a cutter head, screw conveyor, etc. inside the element,
It excavates in the horizontal direction while excavating the face, and the elements are sequentially penetrated into the soil in the form of a gate. After constructing the tunnel lining, the soil inside the lining is excavated and removed. Is performed, for example, as shown in FIG. That is, the propulsion device 3 of the element E is set in the starting shaft 1 via the guide frame 2, and the propulsion device 3 pushes the element E in the horizontal direction while the cutter head 4 at the tip of the element cuts the cutting face into a rectangular cross section. While excavating, the excavated earth and sand is discharged from the distal end side of the trough pipe 6 to the proximal end side by the screw conveyor 5. Here, as shown in FIG. 8, the propulsion device 3 is configured to press-fit the element E and rotate the cutter head 4, and specifically, a main body 3a with a built-in jack and a motor for a conveyor. And a supporting portion 3b which engages with the guide frame 2 and receives the thrust of the jack. The supporting portion 3b has projections 3c on both sides thereof which can be inserted into and retracted from the engaging holes 2a of the guide frame 2, and the cutter head 4 is provided at the tip of the screw compare 5. 2 via the connected worm gear 4a
The structure is such that the set of cutter arms 4b is rotated. "Problem to be Solved by the Invention" The present invention is to solve the following problems in the above-described conventional technology. First, in the above-described technology, in order to press-fit the element E, the propulsion device 3 is provided at the rear end side of the element E with a length corresponding to the propulsion distance of the element E, so that narrow local characteristics are required. There is a problem that the terrain at the site is restricted. In particular, since the guide frame 2 on which the propulsion device 3 is set needs to have a sufficient size to cope with various postures of the element E, the guide frame 2 becomes a particularly large block. I had to make 1 bigger. In addition, in the method using such a conventional propulsion device, the cutter head 4 provided in the element E is required.
And the screw conveyor 5 are driven to guide the earth and sand to the propulsion device 3 side, and the structure for discharging the earth and sand under the propulsion device 3 requires a space under the propulsion device 3 for collecting the soil. However, there is also a problem that the size of the starting shaft 1 must be increased. Secondly, as shown in FIG. 7, the propulsion device 3 for the element E is configured to rotate not only the propulsion of the element E but also the screw conveyor 5, so that the entire device becomes large, and for reinforcement. There is also a problem that the weight increases, such as the necessity of adding flesh. For this reason, a large trailer, a large crane, and the like are required to carry these equipment to the site, and there is also a dissatisfaction that the construction is costly. Third, the propulsion device 3 has many problems such as roofs, handrails, ladders, scaffolds, and the like, and thus lacks mobility, and furthermore, there is a problem that the number of temporary works for operating the device increases. . In particular, in the case where the retaining walls on all four sides of the starting shaft 1 are supported by bridging the cutting beams in the shaft, the propulsion device is lowered from the upper portion to arrange the elements in the vertical direction. There is also a problem that workability on site is poor, such as the need to lower In addition, apart from the above-described problems, conventionally, when the element is press-fitted, the rear end of the guide frame 2 of the excavator is pressed against the rear wall of the starting counter 1 to obtain a propulsion reaction force. However, for this reason, there was also a problem that the rear wall of the starting pier 1 required special reinforcement processing so as to be in good contact with the excavator and to withstand the propulsion reaction force. The present invention has been proposed in view of the above-mentioned circumstances, and an object thereof is to separate an element press-fitting mechanism and an excavating mechanism for excavated earth and sand to reduce the size of the device and to reduce the size of a narrow site. It is an object of the present invention to provide a method for propelling a tunnel lining element capable of improving the applicability of the element. Means for Solving the Problems In order to achieve the above object, the present invention provides an earth excavator equipped inside a hollow box-type tunnel lining element while horizontally pressing the element into the soil. In a method in which the elements are propelled one by one while excavating, and the elements are connected along the lining section of the tunnel, a rod that expands and contracts in the longitudinal direction of the elemet is provided at the starting end of the adjacent existing element. When an element is press-fitted to a position adjacent to the existing element, the element to be press-fitted is connected to the rod of the jack, and the element is pressed into the soil by the jack. It is characterized by the following. In addition, in order to achieve the same object, the present invention replaces the jack attached to the starting end of the existing element,
A traction device for a steel rod is attached to the rear end of the element to be press-fitted, and when the element is pressed into a position adjacent to the existing element, the traction device and the starting end of the existing element are connected to the steel rod. And the element is pressed into the soil by pulling the steel rod by a pulling device. [Operation] According to the above-described configuration, the element is press-fitted by the jack attached to the existing element adjacent to the element to be press-fitted or by the traction device attached to the rear end of the element to be press-fitted. The soil is produced by an excavator provided inside the element,
It becomes possible to separate the press-fitting of the element and the discharging of the excavated earth and sand. At the time of press-fitting the element, the reaction force is taken by the existing element, so that special equipment for taking the reaction force is not required, and the size of the entire apparatus can be easily reduced. Hereinafter, an embodiment of the present invention will be described with reference to the drawings. Basically, the element propulsion method according to the present invention also includes:
An excavator such as a cutter head 4 and a screw compare 5 is inserted into the element E, and soil is excavated by the cutter head 4 while the element E is pressed horizontally into the soil. The trough pipe 6 is discharged from the distal end side (left side in FIG. 1) to the proximal end side. However, in the present invention, as means for press-fitting the element E into the soil, as shown in FIG. 1, a rod 10a which expands and contracts in the longitudinal direction of the element E is provided at the leading end of the adjacent existing element E on the starting side. When the jack 10 is attached and the element E is press-fitted to a position adjacent to the existing element E, the element E to be press-fitted is
And the rod 10a of the jack 10 and the jack 10 presses the element E into the ground. First, a jack 10 suitable for use in carrying out this propulsion method will be described. As shown in FIG. 3, the jack 10 is a casing 20 integrally connected to the end of the starting end of the element E. The rod 10
A connecting means 21 for connecting the element E and the jack 10 is provided at the tip of a. The casing 20 is formed in the shape of a hollow box having a rectangular cross section similar to that of the element E. In order to facilitate the connection operation with the existing element E, the casing 20 is left partially from the tip to the side, leaving the storage portion 20a of the jack 10. Is formed in a notched shape. The storage section 20a of the casing 20 is
The size is set in consideration of the expansion and contraction distance of the rod 10a of the jack 10, and two rows of bolt holes 20b are formed at equal intervals on each side surface of the connection side of the casing 20. The joint plate 25 is designed so that it can be easily attached at any position around the casing 20. On the other hand, in the illustrated example, the coupling means 21 is attached to the rod 10a of the jack 10 and the storage portion 20a of the casing 20.
The sliding member 21a has a rectangular box shape and a connection pin 21b detachably provided on the sliding member 21a. The casing 20 and the element E are connected to each other by a mounting pin 26 via a joint plate 25 from the inside thereof, and the joint plate 25 has bolt holes 20b having the same pitch as the bolt holes 20b of the casing 20. 25a is formed, and an insertion hole 25b into which the mounting pin 26 is inserted is provided. The element E to be press-fitted has locking holes 40 formed on its side surface at regular intervals at predetermined intervals to engage with the connecting pins 21b of the jack 10. A mounting hole 41 into which the pin 26 is inserted is provided (see FIG. 3). Next, to supplement the description of the excavator mounted in the element E, this excavator basically includes:
It is mainly composed of a cutter head 4 arranged at the tip of the element E and a screw conveyor 5 installed in the element E, and these are located on the starting side of the element E as shown in FIG. Drive motor 30
Is driven to rotate. The jack 10 and the drive motor 30 of the excavator
Are configured to be respectively operated by an operation panel 35A provided in the control unit 35, as shown in FIG. Hereinafter, an element propulsion method when actually constructing a tunnel using the jack 10 and the excavator having the above-described configuration will be described according to a tunnel construction procedure.

【最初のエレメントの推進】[Promotion of the first element]

最初のエレメントを圧入する場合には、またジャッキ
10を取り付ける既設エレメントEがないため、まず、こ
のジャッキ10を取り付けるための支持材を発進立坑と到
達立坑との間の地山中に水平に配設する。この支持材と
してはH型鋼などのジャッキ10を取り付けるのに好適な
ものが適用される。 この支持材の取り付けは、タイロッド、アースアンカ
ー等のボーリングと同様、まず細径のボーリングで発進
立坑1より到達立坑へワイヤーを貫通させ、このワイヤ
ーによってH型鋼を引き込むことにより実施する。そし
て、この支持材にケーシング20を介してジャッキ10を固
定し、エレメントEの圧入準備を完了する。 なお、本発明工法にあっては、圧入すべきエレメント
Eの側面に、あらかじめジャッキ10の連結ピン21bを係
合させる係止孔40を形成しておくことは言うまでもな
い。 支持材へのジャッキ10の固定が終了したならば、最初
に圧入するエレメントEを発進立坑内において水平にセ
ットし、ジャッキ10とエレメントEとを結合手段21を介
して連結するとともに、エレメントE内にカッターヘッ
ド4、スクリューコンベア5等を挿入する。次いで、コ
ントロールユニット35により、駆動モータ30およびジャ
ッキオー10を操作して、カッターアームとスクリューコ
ンベア5とを回転させて切羽を掘削しつつ掘削した土砂
を後方へ排出するとともに、ジャッキ10によりエレメン
トEを水平に圧入しながら、エレメントEを推進してい
くという動作を繰り返し実行し、エレメントEを到達坑
との間に配設する。
When press-fitting the first element,
Since there is no existing element E to which the jack 10 is attached, first, a support member for attaching the jack 10 is horizontally arranged in the ground between the starting shaft and the reaching shaft. As the support material, a material suitable for attaching the jack 10 such as H-shaped steel is applied. The mounting of the support material is performed by first passing a wire from the starting shaft 1 to the reaching shaft by a small-diameter boring, and drawing in the H-shaped steel with the wire, similarly to the boring of a tie rod, an earth anchor, or the like. Then, the jack 10 is fixed to the supporting member via the casing 20, and the preparation for press-fitting the element E is completed. In the method of the present invention, it goes without saying that a locking hole 40 for engaging the connecting pin 21b of the jack 10 is formed on the side surface of the element E to be press-fitted. When the fixing of the jack 10 to the support material is completed, the element E to be first press-fitted is set horizontally in the starting shaft, and the jack 10 and the element E are connected via the connecting means 21 and the inside of the element E The cutter head 4, the screw conveyor 5 and the like are inserted into the apparatus. Next, the drive motor 30 and the jack o 10 are operated by the control unit 35 to rotate the cutter arm and the screw conveyor 5 so as to excavate the face while excavating the cutting face and discharge the excavated earth and sand backward. The operation of propelling the element E while pressing horizontally is repeatedly executed, and the element E is disposed between the element E and the reaching shaft.

【他のエレメントの推進】 以上の手順により最初のエレメントEを地山中に押し
込めたならば、このエレメントEの発進側先端にジャッ
キ10を取り付ける。この取り付けは、第1図に示すよう
に、ジャッキ10を組み込んだケーシング20を、既設のエ
レメントEの先端に、継手板25を介して取付ピン26によ
りピン結合すれば良い。 このケーシング20の取付操作は、まず、ケーシング20
の内面に継手板25をボルト止めしておき、この継手板25
をエレメントE内に挿入し、継手板25の挿入孔25bをエ
レメントEの取付孔41に合わせて、これらの孔に取付ピ
ン26を挿入する単純作業であり、また、ジャッキ10を組
み込んだケーシング20の自身の大きさも小型であるた
め、現場での作業性を向上することができる。なお、前
記継手板25をケーシング20に取り付ける位置は、圧入す
べきエレメントEの形状や構築姿勢(縦、横の姿勢)等
を考慮して適宣の位置を設定すれば良く、また、ケーシ
ング20にはこの点を考慮してケーシング20の周囲に複数
のボルト孔20bが形成されているので、継手板25の取付
位置を任意に変更することができるものである。 そして、既設のエレメントEへのジャッキ10の取り付
けが終了したならば、最初のエレメントEと同様に、圧
入推進すべきエレメントEを発進立坑1内に水平にセッ
トし、ジャッキ10とエレメントEとを結合手段21を介し
て連結するとともに、エレメントE内にカッターヘッド
4、スクリューコンベア5等を挿入する。 なお、圧入すべきエレメントEとジャッキ10との結合
作業は、これらの結合手段21が摺動部材21aと連結ピン2
1bとにより構成されているため、結合ピン21bをエレメ
ントEの係止孔40に挿入する操作によって、容易に行う
ことができ、現場での作業性を向上することができるも
のである。 ところで、エレメントEを推進させるには、コントロ
ールユニット35により、駆動モータ30およびジャッキ10
を操作し、カッターアームとスクリューコンベア5を回
転させて切羽面を掘削しつつ掘削した土砂を後方へ排出
し、ジャッキ10によりエレメントEを水平に圧入してい
けば良い。なお、ジャッキ10によるエレメントEの圧入
操作は、ロッド10aの伸張操作を繰り返すことにより実
施されるので、ロッド10aを伸張させる毎に連結ピン21b
によるエレメントEの係止孔40の位置を変えていく操作
が、この場合必要になることは言うまでもない。 なお、前記エレメントEの推進操作では、既設のエレ
メントEにジャッキ10を取り付けて、ジャッキ10の反力
をエレメントEに取っているので、エレメントEの反力
が耐え切れず、エレメントE自身が地山から抜け出すお
それがある場合には、第4図に示すようにエレメントE
の到達側にチャンネル材等からなる受梁42を溶接止めし
ておき、エレメントEの抜け止めをなすように配慮して
おく。 なお、前記エレメントEの推進操作において、エレメ
ントEの圧入方向を制御するため、第2図に示すよう
に、圧入すべきエレメントの下側に予めH型鋼36を配慮
しておき、エレメントEの下面に取り付けたガイド突起
37で、このH型鋼36をガイドするようにすれば、エレメ
ントEの方向が安定するので好ましい。
[Propulsion of Another Element] When the first element E is pushed into the ground by the above procedure, the jack 10 is attached to the starting end of this element E. For this attachment, as shown in FIG. 1, the casing 20 incorporating the jack 10 may be pin-connected to the tip of the existing element E via the joint plate 25 with the attachment pin 26. First, the mounting operation of the casing 20 is performed.
Bolt the joint plate 25 to the inner surface of the
Is inserted into the element E, the insertion holes 25b of the joint plate 25 are aligned with the mounting holes 41 of the element E, and the mounting pins 26 are inserted into these holes. Since the size of the device itself is also small, workability at the site can be improved. The position where the joint plate 25 is attached to the casing 20 may be set at an appropriate position in consideration of the shape of the element E to be press-fitted, the construction posture (vertical and horizontal postures), and the like. In consideration of this point, since a plurality of bolt holes 20b are formed around the casing 20, the mounting position of the joint plate 25 can be arbitrarily changed. Then, when the attachment of the jack 10 to the existing element E is completed, the element E to be press-propelled is set horizontally in the starting shaft 1 like the first element E, and the jack 10 and the element E are connected to each other. The cutter head 4 and the screw conveyor 5 are inserted into the element E while being connected via the connecting means 21. The connecting operation between the element E to be press-fitted and the jack 10 is performed by the connecting means 21 using the sliding member 21 a and the connecting pin 2.
1b, the operation can be easily performed by the operation of inserting the coupling pin 21b into the locking hole 40 of the element E, and the workability in the field can be improved. Incidentally, in order to propel the element E, the drive motor 30 and the jack 10 are controlled by the control unit 35.
Is operated, the cutter arm and the screw conveyor 5 are rotated to excavate the face while excavating the face, and the jack E is used to press the element E horizontally by the jack 10. The press-fitting operation of the element E by the jack 10 is performed by repeating the extending operation of the rod 10a, so that each time the rod 10a is extended, the connecting pin 21b is extended.
Needless to say, in this case, an operation of changing the position of the locking hole 40 of the element E is necessary in this case. In the propulsion operation of the element E, the jack 10 is attached to the existing element E, and the reaction force of the jack 10 is applied to the element E. Therefore, the reaction force of the element E cannot withstand, and the element E itself is grounded. When there is a risk of getting out of the mountain, as shown in FIG.
The receiving beam 42 made of a channel material or the like is welded to the reaching side of the element E so that the element E is prevented from coming off. In order to control the direction of press-fitting of the element E in the propulsion operation of the element E, as shown in FIG. Guide projection attached to
It is preferable to guide the H-shaped steel 36 at 37 because the direction of the element E is stabilized.

【トンネルの構築】[Construction of tunnel]

以上のような手順によって、次々にエレメントEを推
進して、全エレメントEを地山中に門型に押し込んだな
らば、エレメントの両端に受桁を取り付け、エレメント
E内にコンクリートを充填し、エレメントによって構築
された覆工体内部の土砂を掘削し、必要に応じ2次覆工
を行いトンネルを完成させる。 しかして、このようなエレメントEの推進工法によれ
ば、エレメントEの圧入操作を既設のエレメントEに取
り付けたジャッキ10により行い、またエレメントE先端
の切羽の切削をエレメントE内にセットしたカッターヘ
ッド4およびスクリューコンベア5等の掘削機により行
うので、掘削された土砂をジャッキ10の下に導くような
ことがなく、発進立坑1の深さを深くする必要がない。 また、エレメントEの圧入と地山の掘削をそれぞれ別
の機械(実施例ではジャッキ10とカッターヘッド4)に
より分離して行うので、これら機械の小型化を達成する
ことが可能になり、現場での地形に制約を受けることが
なくなり、特に狭隘な現地での適用性を向上することが
可能になる。また、これにより、掘削機械、圧入機械等
の装置の輸送コストを低減することができ、また現場で
の取り扱いも簡単なため、その作業性を向上することが
できる。 さらに、このエレメントの推進工法によれば、掘削機
構と圧入機構とをそれぞれ別体のものとして構成するこ
とができるので、切羽において大径の玉石など掘削機が
処理できない障害物が発生した場合にあっても、エレメ
ントE内より掘削機を容易に引き出すことができ、エレ
メント内部へ作業者が入り、入力によって障害物を除去
する作業を作業性良く行うことができる。したがって、
頻繁に前記障害物が出現する地層に至った場合などで
は、入力による掘削を行いながら推進を続けることが可
能であり、いわゆる機械掘削と入力掘削の切り替えを極
めて円滑に行うことができるものである。 第5図は請求項2にかかる推進工法の一実施例を示す
もので、この工法にあっては、前述したジャッキ10によ
るエレメントEの圧入に代えて、圧入すべきエレメント
Eの後端に、鋼棒Wの牽引装置45を取り付けておき、当
該既設のエレメントEに隣接する位置に前記エレメント
Eを圧入する際に、前記牽引装置45と既設のエレメント
Eの発進側先端とを鋼棒Wにより連結し、該鋼棒Wを牽
引装置45により牽引してエレメントEを土中に圧入する
ことを最大の特徴とするものである。 ここで、牽引装置45は、第5図に示すように、エレメ
ントEの後端に取り付けられる固定枠45aと、この固定
枠45aにセットされるロッドWを牽引するセンターホー
ルジャッキ45bとを主体として構成されており、また、
鋼棒WとエレメントEとの連結は、鋼棒Wの先端に一体
に取り付けた継手板46を連結ピン47を介してピン結合す
る手段などが適用される。 なお、前記固定枠45aはエレメントEの後端にボルト
止め等の手段によって一体に連結されるように構成され
ており、またその中央部にはエレメントE内の掘削機を
挿入するための四角形状をした開口部45cが形成されて
いる。 しかして、このようなエレメントEの推進工法によれ
ば、センターホールジャッキ45bの操作によって鋼棒W
を連続して牽引することができるので、ジャッキとエレ
メントEとの連結操作が一度ですみ、その作業性をさら
に向上させることができる。 また、第6図は請求項2にかかる推進工法の他の実施
例を示すもので、2つのセンターホールジャッキ45bに
よって圧入すべきエレメントEの両側に配した鋼棒Wを
牽引するようにしたものである。すなわち、この実施例
では、既設のエレメントEの発進側先端に2本の鋼棒W
の先端が一体に連結された取付枠48を固定し、圧入すべ
きエレメントEの後端に、エレメントEの開口部に嵌合
した状態で連結される固定枠45dを取り付け、この固定
枠45dに支持された2つのセンターホールジャッキ4aに
よってエレメントEを土中に圧入するようにしたもので
ある。なお、前記固定枠45dにもエレメントE内に掘削
機等を挿入するための開口部45cが形成されていること
を言うまでもない。 なお、このような構成の牽引装置45を用いたエレメン
トEの推進工法によれば、圧入すべきエレメントEの左
右両側に配した鋼棒Wを2つのセンターホールジャッキ
45aによって連続的に牽引してエレメントEを圧入する
ことができるので、牽引力のかたよりを防止することが
でき、作業時の信頼性を向上することができる。 なお、前述した各実施例においてはトンネル覆工用エ
レメントとして断面矩形のエレメントを用いた例を示し
ているが、本発明はこのものに限定されるものではな
く、類似の目的で水平に掘削圧入される円筒型鋼管等に
ついても適用し得ることは勿論である。 「発明の効果」 以上説明したように本発明によれば、次のような優れ
た効果を奏する。 請求項1記載のトンネル覆工用エレメントの推進工
法は、中空箱型のトンネル覆工用エレメントを土中に水
平に圧入しながらエレメント内部に備えた掘削機により
エレメント先端部の土砂を掘削しつつエレメントをひと
つづつ推進させ、当該エレメントをトンネルの覆工断面
に沿って連結した状態に構築する方法において、隣接す
る既設のエレメントの発信側先端に、エレメントの長手
方向に伸縮するロッドを備えたジャキを取り付けてお
き、当該既設のエレメントに隣接する位置にエレメント
を圧入する際に、この圧入すべきエレメントと前記ジャ
ッキとを連結し、このジャッキによりエレメントを土中
に圧入することを特徴とするものであるから、エメレン
トの圧入機構と、掘削土砂の排土機構とを分離し得て、
装置の小型化を達成することができ、また、狭隘な現場
でのトンネル構築作業の適用性を向上することができ
る。 さらに、前記により、装置の輸送コストの低減を図る
ことができるとともに、発進立坑の寸法を小さくするこ
とができ、また排土処理が楽になり、装置のメンテナン
スを良好にすることができる。 請求項2記載のトンネル覆工用エレメントの推進工
法は、既設エレメントの発進側先端に取り付けたジャッ
キに代えて、圧入すべきエレメントの後端に鋼棒の牽引
装置を取り付けておき、前記既設のエレメントに隣接ず
る位置に前記エレメントを圧入する際に、前記牽引装置
と既節のエレメント発進側先端とを鋼棒により連結し、
該鋼棒を牽引装置により牽引してエレメントを土中に圧
入することを特徴とするものであるから、請求項1の工
法と同様の効果を達成することが可能になり、また、本
工法では、圧入すべきエレメントに取り付けた牽引装置
の作用により連結的にエレメントを圧入し得て、現場作
業の作業性を向上することができる。
When the elements E are propelled one after another by the above-described procedure and all the elements E are pushed into the ground in the form of a gate, a girder is attached to both ends of the element, and concrete is filled in the element E. Excavates the earth and sand inside the lining body constructed as described above, and performs secondary lining as necessary to complete the tunnel. According to such a method of propelling the element E, the press-fitting operation of the element E is performed by the jack 10 attached to the existing element E, and the cutting head at the tip of the element E is set in the element E. Since the excavation is performed by the excavator 4 and the screw conveyor 5, there is no need to guide the excavated earth and sand under the jack 10, and it is not necessary to increase the depth of the starting shaft 1. Further, since the press-fitting of the element E and the excavation of the ground are separately performed by different machines (in the embodiment, the jack 10 and the cutter head 4), it is possible to achieve downsizing of these machines. It is no longer restricted by the terrain, and it is possible to improve the applicability especially in a narrow site. In addition, this makes it possible to reduce the transportation cost of equipment such as an excavating machine, a press-fitting machine, and the like, and also to improve the workability since the handling on site is simple. Furthermore, according to this element propulsion method, the excavating mechanism and the press-fitting mechanism can be configured as separate bodies, respectively. Even if there is, the excavator can be easily pulled out from the inside of the element E, and a worker enters the inside of the element E, and the work of removing an obstacle by input can be performed with good workability. Therefore,
In the case where the obstacle frequently appears in a stratum where the obstacle appears, for example, it is possible to continue propulsion while performing excavation by input, and it is possible to switch between so-called mechanical excavation and input excavation extremely smoothly. . FIG. 5 shows an embodiment of the propulsion method according to claim 2. In this method, instead of press-fitting the element E by the jack 10, the rear end of the element E to be press-fitted is provided. A traction device 45 for the steel rod W is attached, and when the element E is press-fitted to a position adjacent to the existing element E, the traction device 45 and the starting end of the existing element E are connected by the steel rod W. The greatest feature is that the steel bar W is connected with the pulling device 45 and the element E is pressed into the soil. Here, as shown in FIG. 5, the towing device 45 mainly includes a fixed frame 45a attached to the rear end of the element E and a center hole jack 45b for towing the rod W set in the fixed frame 45a. Is composed of
For the connection between the steel bar W and the element E, means for pin-connecting a joint plate 46 integrally attached to the tip of the steel bar W via a connection pin 47 is applied. The fixing frame 45a is configured to be integrally connected to the rear end of the element E by means such as bolting, and has a square shape for inserting an excavator in the element E at the center thereof. An opening 45c is formed. According to the method of propelling the element E, the steel rod W is operated by the operation of the center hole jack 45b.
Can be continuously towed, so that the connection operation between the jack and the element E can be performed only once, and the workability can be further improved. FIG. 6 shows another embodiment of the propulsion method according to claim 2, wherein two center hole jacks 45b are used to pull steel rods W arranged on both sides of an element E to be press-fitted. It is. That is, in this embodiment, two steel rods W
Is fixed to a mounting frame 48 to which the tip of the element E is integrally connected, and a fixing frame 45d which is connected to the rear end of the element E to be press-fitted while being fitted to the opening of the element E is attached to the fixing frame 45d. The element E is pressed into the soil by two supported center hole jacks 4a. Needless to say, the fixed frame 45d is also formed with an opening 45c for inserting an excavator or the like into the element E. According to the propulsion method of the element E using the traction device 45 having such a configuration, the steel rods W arranged on the left and right sides of the element E to be press-fitted are inserted into two center hole jacks.
Since the element E can be continuously pulled by the 45a to press-fit the element E, it is possible to prevent the traction force from being raised, and to improve the reliability during work. In each of the above-described embodiments, an example in which a rectangular section element is used as the tunnel lining element is shown. However, the present invention is not limited to this. Of course, the present invention can also be applied to a cylindrical steel pipe or the like to be used. “Effects of the Invention” As described above, according to the present invention, the following excellent effects can be obtained. In the method for propelling an element for tunnel lining according to claim 1, the excavator provided inside the element excavates earth and sand at the tip of the element while pressing the hollow box-shaped element for tunnel lining horizontally into the soil. In a method of propelling elements one by one and connecting the elements along a tunnel lining cross section, a jack having a rod extending and contracting in a longitudinal direction of the element at a transmitting end of an adjacent existing element. When the element is press-fitted at a position adjacent to the existing element, the element to be press-fitted is connected to the jack, and the element is pressed into the soil by the jack. Therefore, the press-fitting mechanism of Emerent and the discharging mechanism of excavated sediment can be separated,
The apparatus can be reduced in size, and the applicability of tunnel construction work in a narrow site can be improved. Further, the above-mentioned structure can reduce the transportation cost of the apparatus, reduce the size of the starting shaft, facilitate the earth removal process, and improve the maintenance of the apparatus. In the method of propelling an element for tunnel lining according to claim 2, instead of the jack attached to the leading end of the existing element, a traction device for a steel rod is attached to the rear end of the element to be press-fitted. When press-fitting the element at a position adjacent to the element, the traction device and the already-started element start-side tip are connected by a steel rod,
Since the steel rod is pulled by a pulling device and the element is pressed into the soil, it is possible to achieve the same effect as the method of claim 1. The element can be press-fitted in a connected manner by the action of the traction device attached to the element to be press-fitted, and the workability of field work can be improved.

【図面の簡単な説明】[Brief description of the drawings]

第1図ないし第4図は請求項1にかかるトンネル覆工用
エレメントの推進工法の一実施例を説明するために示し
たもので、第1図はエレメントを推進している状態を示
す斜視図、第2図はH型鋼をガイドしてエレメントを推
進している状態を示す斜視図、第3図はこの推進工法に
使用されて好適なジャッキの分解斜視図、第4図はエレ
メントの到達側に受梁を取り付けてエレメントの抜け止
めを図った状態を示す断面図、第5図は請求項2にかか
るトンネル覆工用エレメントの推進工法の実施例を説明
するために示した斜視図、第6図は請求項2にかかるト
ンネル覆工用エレメントの推進工法の他の実施例を説明
するために示した斜視図、第7図および第8図は従来の
推進工法を説明するために示したもので、第7図はその
概略を示す断面図、第8図は推進装置の構造を示す断面
図である。 E……エレメント、1……発進立坑、4……カッターヘ
ッド、5……スクリューコンベア、10……ジャッキ、10
a……ロッド、20……ケーシング、21……結合手段、25
……継手板、25a……ボルト孔、26……取付ピン、30…
…駆動モータ、35……コントロールユニット、40……係
止孔、41……取付孔、45……牽引装置、46……継手板、
47……連結ピン。
1 to 4 are views for explaining an embodiment of a method for propelling an element for tunnel lining according to claim 1, and FIG. 1 is a perspective view showing a state in which the element is being propelled. FIG. 2 is a perspective view showing a state in which the element is being propelled by guiding the H-shaped steel, FIG. 3 is an exploded perspective view of a jack suitable for use in this propulsion method, and FIG. FIG. 5 is a cross-sectional view showing a state in which a receiving beam is attached to the element to prevent the element from coming off. FIG. 5 is a perspective view showing an embodiment of the method for propelling a tunnel lining element according to claim 2; FIG. 6 is a perspective view showing another embodiment of the method for propelling a tunnel lining element according to claim 2, and FIGS. 7 and 8 are shown for explaining a conventional propulsion method. Fig. 7 is a schematic cross-sectional view FIG. 8 is a sectional view showing the structure of a propulsion unit. E: Element, 1: Starting shaft, 4: Cutter head, 5: Screw conveyor, 10: Jack, 10
a ... rod, 20 ... casing, 21 ... connecting means, 25
... Joint plate, 25a ... Bolt hole, 26 ... Mounting pin, 30 ...
… Drive motor, 35… control unit, 40… locking hole, 41… mounting hole, 45… traction device, 46… joint plate,
47 ... Connecting pin.

フロントページの続き (72)発明者 牟田 勝 東京都中央区八重洲2丁目6番21号 ロ ーズベイ八重洲ビル 石川島建材工業株 式会社内 (56)参考文献 特開 昭55−16125(JP,A) 特開 昭54−156324(JP,A)Continuation of front page (72) Inventor Masaru Muta 2-6-21 Yaesu, Chuo-ku, Tokyo Rose Bay Yaesu Building Ishikawajima Building Materials Industry Co., Ltd. (56) References JP-A-55-16125 (JP, A) 54-156324 (JP, A)

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】中空箱型のトンネル覆工用エレメントを土
中に水平に圧入しながらエレメント内部に備えた掘削機
によりエレメント先端部の土砂を掘削しつつエレメント
をひとつづつ推進させ、当該エレメントをトンネルの覆
工断面に沿って連結した状態に構築する方法において、
隣接する既設のエレメントの発進側先端に、エレメトの
長手方向に伸縮するロッドを備えたジャッキを取り付け
ておき、当該既設のエレメントに隣接する位置にエレメ
ントを圧入する際に、この圧入すべきエレメントと前記
ジャッキのロッドとを連結し、このジャッキによりエレ
メントを土中に圧入することを特徴とするトンネル覆工
用エレメントの推進工法。
1. An element for tunnel lining of a hollow box type is horizontally pressed into the soil while excavating the earth and sand at the tip of the element by an excavator provided inside the element, and the elements are propelled one by one. In the method of building in a state of being connected along the lining section of the tunnel,
A jack equipped with a rod that expands and contracts in the longitudinal direction of the element is attached to the starting end of the adjacent existing element, and when the element is pressed into a position adjacent to the existing element, the element to be press-fitted is A method of propelling an element for tunnel lining, comprising connecting a rod of the jack and pressing the element into the soil with the jack.
【請求項2】第1項記載のトンネル覆工用エレメントの
推進工法において、既設のエレメントの発進側先端に取
り付けたジャッキに代えて、圧入すべきエレメントの後
端に鋼棒の牽引装置を取り付けておき、既設のエレメン
トに隣接する位置に前記エレメントを圧入する際に、前
記牽引装置と既設のエレメントの発進側先端とを鋼棒に
より連結し、該鋼棒を牽引装置により牽引してエレメン
トを土中に圧入することを特徴とするトンネル覆工用エ
レメントの推進工法。
2. A method for propelling a tunnel lining element according to claim 1, wherein a pulling device for a steel rod is attached to the rear end of the element to be press-fitted, instead of the jack attached to the starting end of the existing element. In addition, when the element is press-fitted to a position adjacent to the existing element, the towing device and the starting end of the existing element are connected by a steel rod, and the steel rod is towed by the towing device to remove the element. A method for propelling elements for tunnel lining, characterized by being pressed into the soil.
JP63104790A 1988-04-27 1988-04-27 Propulsion method of tunnel lining element Expired - Fee Related JP2581750B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63104790A JP2581750B2 (en) 1988-04-27 1988-04-27 Propulsion method of tunnel lining element

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63104790A JP2581750B2 (en) 1988-04-27 1988-04-27 Propulsion method of tunnel lining element

Publications (2)

Publication Number Publication Date
JPH01278689A JPH01278689A (en) 1989-11-09
JP2581750B2 true JP2581750B2 (en) 1997-02-12

Family

ID=14390255

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63104790A Expired - Fee Related JP2581750B2 (en) 1988-04-27 1988-04-27 Propulsion method of tunnel lining element

Country Status (1)

Country Link
JP (1) JP2581750B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5135145B2 (en) * 2008-09-24 2013-01-30 東日本旅客鉄道株式会社 Steel element construction method
JP6055219B2 (en) * 2012-07-25 2016-12-27 株式会社熊谷組 Propulsion transmission device

Also Published As

Publication number Publication date
JPH01278689A (en) 1989-11-09

Similar Documents

Publication Publication Date Title
JP3382183B2 (en) Construction method for underground structure and roof cylinder used therefor
KR101269597B1 (en) Underground structure construction method
JP2581750B2 (en) Propulsion method of tunnel lining element
KR101351784B1 (en) Underground structure construction method using the cutting channel
JP2628587B2 (en) Propulsion method of tunnel lining element
KR0181965B1 (en) Construction method of underground structure
KR100218015B1 (en) Method for constructing tunnel
JP2835418B2 (en) Pipe roof propulsion method and apparatus
JPH0440519B2 (en)
KR100800029B1 (en) Method for constructing underground structures
KR20220149288A (en) Construction method of underground structure
JP4021978B2 (en) Construction method of underground excavator and branch shield tunnel
JP7835814B1 (en) Propulsion box and method for manufacturing the same
KR102888213B1 (en) Shield machine and method for underground excavation using the same
JP4134089B2 (en) Construction method for underground structures
WO2025248612A1 (en) Method for constructing underground structure
JP4705467B2 (en) Construction method of underground structure
JP2516582B2 (en) Tunnel construction method
JP7464662B2 (en) Construction method for underground structures using an open shield machine
JP3122357B2 (en) Connection method of hollow segment and this hollow segment
JP3131118B2 (en) Shell construction method for underground structures
JP2969371B2 (en) Box tunnel excavation method and drilling equipment
JP3162947B2 (en) Hollow segment for forming underground wall and method of connecting hollow segment
JPH0663420B2 (en) How to build an underground structure
JP2024143680A (en) Tow-type underpass construction method

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees