Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP2583738B2 - Fence - Google Patents
[go: Go Back, main page]

JP2583738B2 - Fence - Google Patents

Fence

Info

Publication number
JP2583738B2
JP2583738B2 JP6000403A JP40394A JP2583738B2 JP 2583738 B2 JP2583738 B2 JP 2583738B2 JP 6000403 A JP6000403 A JP 6000403A JP 40394 A JP40394 A JP 40394A JP 2583738 B2 JP2583738 B2 JP 2583738B2
Authority
JP
Japan
Prior art keywords
concrete plate
bolt
column
hole
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP6000403A
Other languages
Japanese (ja)
Other versions
JPH07197698A (en
Inventor
勝美 横山
哲也 木村
和寿 永田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
National House Industrial Co Ltd
Original Assignee
National House Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by National House Industrial Co Ltd filed Critical National House Industrial Co Ltd
Priority to JP6000403A priority Critical patent/JP2583738B2/en
Publication of JPH07197698A publication Critical patent/JPH07197698A/en
Application granted granted Critical
Publication of JP2583738B2 publication Critical patent/JP2583738B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Fencing (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、塀に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a fence.

【0002】[0002]

【従来の技術】従来、一対の支柱の間にコンクリート板
を配設して構成した塀においては、コンクリート板に直
接孔を開けその孔にナットを埋設することにより、コン
クリート板と支柱のボルト固定を行えるようにしてい
た。
2. Description of the Related Art Conventionally, in a fence constructed by arranging a concrete plate between a pair of columns, a hole is directly formed in the concrete plate and a nut is buried in the hole to fix the bolt between the concrete plate and the column. Was able to do.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、工場あ
るいは現場においてコンクリート板に孔を開ける工程を
要するためその作業に手間がかかっていた。また、コン
クリート板に孔を開ける加工精度にはばらつきがあり、
この加工精度が悪いと、コンクリート板が一対の支柱の
間に収まらない場合があり、また収まっても左右のずれ
が大きく仕上がりが悪くなるという問題点があった。
However, since a step of making a hole in a concrete plate is required in a factory or a site, the operation is troublesome. In addition, the processing accuracy of drilling holes in concrete plates varies.
If the processing accuracy is poor, the concrete plate may not fit between the pair of columns, and even if it fits, there is a problem that the left and right shifts are large and the finish is deteriorated.

【0004】したがって、この発明の目的は、作業性の
向上を図ることができ仕上がりが良好な塀を提供するこ
とである。
Accordingly, an object of the present invention is to provide a fence with improved workability and a good finish.

【0005】[0005]

【課題を解決するための手段】この発明の塀は、所定間
隔をおいて立設された一対の支柱と、これらの支柱の間
に配設され側端面から長手方向にかけて既存の孔を有す
るコンクリート板とを備え、前記孔に埋め込みナットを
埋設し、前記支柱を貫通したボルトに、前記支柱と前記
コンクリート板の間に介在するように調整ナットを螺合
するとともに前記ボルトの先端部を前記埋め込みナット
に螺合したことを特徴とするものである。
SUMMARY OF THE INVENTION A fence according to the present invention comprises a pair of columns which are erected at a predetermined interval, and a concrete which is disposed between the columns and has an existing hole from a side end face in a longitudinal direction. Board, and a buried nut is buried in the hole, and an adjusting nut is screwed into a bolt penetrating the support so as to be interposed between the support and the concrete plate, and a tip end of the bolt is connected to the buried nut. It is characterized by being screwed.

【0006】[0006]

【作用】この発明の構成によれば、コンクリート板にあ
る軽量化のための既存の孔を利用して埋め込みナットを
埋設したので、従来のようにコンクリート板に孔を開け
る加工工程がなくなり、生産性または施工性が向上す
る。また、上記既存の孔は、コンクリート板が硬化して
から加工する孔に比べて精度が良いため、コンクリート
板は一対の支柱の間の所定位置に収まり仕上がりが良好
となる。また、ボルトおよび調整ナットを操作すること
により、コンクリート板と支柱の間隙が両側において均
等となるように調整でき、かつコンクリート板はボルト
を介して支柱に強固に固定される。
According to the structure of the present invention, the embedded nut is buried using the existing hole for reducing the weight of the concrete plate, so that there is no need for the conventional process of making a hole in the concrete plate, and the production is reduced. The workability or workability is improved. In addition, since the existing hole has higher accuracy than the hole processed after the concrete plate is hardened, the concrete plate fits in a predetermined position between the pair of columns, and the finish is good. Further, by operating the bolt and the adjusting nut, the gap between the concrete plate and the column can be adjusted to be uniform on both sides, and the concrete plate is firmly fixed to the column via the bolt.

【0007】[0007]

【実施例】この発明の一実施例の塀を図1ないし図7に
基づいて説明する。この塀は門塀の場合について示して
いる。1…は所定間隔をおいて立設された支柱であり、
対向する一対の支柱1,1の間に複数のコンクリート板
2…が配設される。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A fence according to an embodiment of the present invention will be described with reference to FIGS. This wall shows the case of a gate wall. Reference numerals 1 ... stand up at predetermined intervals,
A plurality of concrete plates 2 are arranged between a pair of columns 1, 1 facing each other.

【0008】支柱1は、図4に示すように、コーナ部以
外は溝形鋼で形成され対向するウエブにボルト挿通孔が
設けられる。このボルト挿通孔に挿通されるボルト6に
は調整ナット5が支柱1とコンクリート板2の間に介在
するように螺合してある。また、コーナ部の支柱1′は
L形鋼で形成され、この支柱1′とコンクリート板2は
同様にボルト6で固定される。また、コーナ部において
調整ナット5はないが設けてもよい。
As shown in FIG. 4, the column 1 is formed of a channel steel except for the corner portion, and a bolt insertion hole is provided in an opposing web. An adjusting nut 5 is screwed into the bolt 6 inserted into the bolt insertion hole so as to be interposed between the column 1 and the concrete plate 2. The column 1 'at the corner is made of L-shaped steel, and the column 1' and the concrete plate 2 are similarly fixed with bolts 6. Further, the adjustment nut 5 is not provided in the corner portion but may be provided.

【0009】コンクリート板2は、図3に示すように、
軽量化のため側端面から長手方向にかけて複数の既存の
孔3…を有する。また、これらの孔3…の全てまたは適
当な孔3に埋め込みナット4を埋設しモルタルセメント
を充填して固定している。なお、図6に示すように、所
定のコンクリート板2にはサインポスト7が組込まれて
いる。このサインポスト7への配線8は、一点鎖線で示
すように支柱1の内部から既存の孔3に通して配線して
いる。9は門灯配線である。また、図5ないし図7にお
いて、●はボルト固定位置を示し、10は基礎の上面の
レベルを示している。また、基礎に埋設したアンカーボ
ルト(図示せず)に支柱1のベースプレート11が固定
される。また、一対の支柱1,1の下端の間に支柱連結
材12が介在し、一対の支柱1,1の強度向上を図ると
ともに間隔出し作用を兼ねている。
[0009] As shown in FIG.
It has a plurality of existing holes 3 from the side end face to the longitudinal direction for weight reduction. An embedded nut 4 is buried in all of the holes 3 or an appropriate hole 3 and filled with mortar cement to be fixed. As shown in FIG. 6, a sign post 7 is incorporated in a predetermined concrete plate 2. The wiring 8 to the sign post 7 is wired from the inside of the column 1 to the existing hole 3 as shown by a dashed line. 9 is a gate light wiring. In FIGS. 5 to 7, ● indicates the bolt fixing position, and 10 indicates the level of the upper surface of the foundation. Further, the base plate 11 of the column 1 is fixed to anchor bolts (not shown) embedded in the foundation. In addition, a strut connecting member 12 is interposed between the lower ends of the pair of struts 1, 1 to improve the strength of the pair of struts 1, 1 and also serves as a spacing function.

【0010】施工時には、対向する一対の支柱1,1の
間にコンクリート板2を配置する。ボルト挿通孔に通し
て支柱1を貫通したボルト6に調整ナット5を螺合する
とともに、ボルト6の先端部をコンクリート板2に埋設
した埋め込みナット4に螺合する。この作業をコンクリ
ート板2の両側縁部において同様に行う。このとき、図
2に示すように、コンクリート板2と支柱1の間隙が両
側において均等となるように、ボルト6および調整ナッ
ト5を操作して調整する。以上の作業を繰り返し行い、
コンクリート板2を下段から順次積み上げて門塀を完成
する。なお、埋め込みナット4を既存の孔3に埋設する
作業は工場、現場の何れで行ってもよい。
At the time of construction, a concrete plate 2 is arranged between a pair of columns 1, 1 facing each other. The adjusting nut 5 is screwed into the bolt 6 that has passed through the column 1 through the bolt insertion hole, and the tip of the bolt 6 is screwed into the embedded nut 4 embedded in the concrete plate 2. This operation is similarly performed on both side edges of the concrete plate 2. At this time, as shown in FIG. 2, the bolt 6 and the adjustment nut 5 are operated and adjusted so that the gap between the concrete plate 2 and the column 1 is equal on both sides. Repeat the above work,
Concrete plates 2 are sequentially stacked from the bottom to complete the gate wall. The work of embedding the embedding nut 4 in the existing hole 3 may be performed at a factory or on site.

【0011】この実施例では、コンクリート板2にある
軽量化のための既存の孔3を利用して埋め込みナット4
を埋設したので、従来のようにコンクリート板2に孔を
開ける加工工程がなくなり、生産性または施工性が向上
する。また、上記既存の孔3は、コンクリート板2が硬
化してから加工する孔に比べて精度が良いため、コンク
リート板2は一対の支柱1,1の間の所定位置に収まり
仕上がりが良好となる。また、ボルト6および調整ナッ
ト5を操作することにより、コンクリート板2と支柱1
の間隙が両側において均等となるように調整でき、かつ
調整ナット5によりコンクリート板2はボルト6を介し
て支柱1に強固に固定される。なお、実施例では門塀と
したがこれ以外の塀でもよい。
In this embodiment, the existing nut 3 for reducing the weight is used in the concrete plate 2 to embed the nut 4.
Is embedded, so that there is no need for a processing step for making a hole in the concrete plate 2 as in the prior art, thereby improving productivity or workability. In addition, since the existing hole 3 has higher accuracy than a hole processed after the concrete plate 2 is hardened, the concrete plate 2 fits in a predetermined position between the pair of pillars 1 and 1, and the finish is good. . By operating the bolt 6 and the adjusting nut 5, the concrete plate 2 and the support 1
The concrete plate 2 is firmly fixed to the column 1 via the bolt 6 by the adjusting nut 5. In the embodiment, the gate wall is used, but another wall may be used.

【0012】[0012]

【発明の効果】この発明の塀によれば、コンクリート板
にある軽量化のための既存の孔を利用して埋め込みナッ
トを埋設したので、従来のようにコンクリート板に孔を
開ける加工工程がなくなり、生産性または施工性が向上
する。また、上記既存の孔は、コンクリート板が硬化し
てから加工する孔に比べて精度が良いため、コンクリー
ト板は一対の支柱の間の所定位置に収まり仕上がりが良
好となる。また、ボルトおよび調整ナットを操作するこ
とにより、コンクリート板と支柱の間隙が両側において
均等となるように調整でき、かつコンクリート板はボル
トを介して支柱に強固に固定される。
According to the fence of the present invention, since the embedded nut is buried using the existing hole for reducing the weight of the concrete plate, there is no need for the conventional process of making a hole in the concrete plate. , Productivity or workability is improved. In addition, since the existing hole has higher accuracy than the hole processed after the concrete plate is hardened, the concrete plate fits in a predetermined position between the pair of columns, and the finish is good. Further, by operating the bolt and the adjusting nut, the gap between the concrete plate and the column can be adjusted to be uniform on both sides, and the concrete plate is firmly fixed to the column via the bolt.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明の一実施例の塀の平面図である。FIG. 1 is a plan view of a wall according to an embodiment of the present invention.

【図2】その一部省略正面図である。FIG. 2 is a front view partially omitted.

【図3】コンクリート板の側面図である。FIG. 3 is a side view of a concrete plate.

【図4】門塀全体の平面図である。FIG. 4 is a plan view of the entire gate wall.

【図5】図4のA方向矢視図である。FIG. 5 is a view in the direction of arrow A in FIG. 4;

【図6】図4のB方向矢視図である。FIG. 6 is a view in the direction of arrow B in FIG. 4;

【図7】図4のC方向矢視図である。FIG. 7 is a view as viewed in the direction of arrow C in FIG. 4;

【符号の説明】[Explanation of symbols]

1 支柱 2 コンクリート板 3 既存の孔 4 埋め込みナット 5 調整ナット 6 ボルト DESCRIPTION OF SYMBOLS 1 Prop 2 Concrete plate 3 Existing hole 4 Embedded nut 5 Adjustment nut 6 Bolt

フロントページの続き (56)参考文献 実開 昭56−176935(JP,U) 実開 昭48−2334(JP,U) 実開 昭50−20418(JP,U) 実公 昭48−25002(JP,Y1)Continuation of the front page (56) References Japanese Utility Model Showa 56-176935 (JP, U) Japanese Utility Model Showa 48-2334 (JP, U) Japanese Utility Model Showa 50-20418 (JP, U) Japanese Utility Model Showa 48-25002 (JP, U.S.A.) , Y1)

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 所定間隔をおいて立設された一対の支柱
と、これらの支柱の間に配設され側端面から長手方向に
かけて既存の孔を有するコンクリート板とを備え、前記
孔に埋め込みナットを埋設し、前記支柱を貫通したボル
トに、前記支柱と前記コンクリート板の間に介在するよ
うに調整ナットを螺合するとともに前記ボルトの先端部
を前記埋め込みナットに螺合したことを特徴とする塀。
1. A method comprising: a pair of columns standing upright at a predetermined interval; and a concrete plate having an existing hole disposed between the columns and extending from a side end face in a longitudinal direction. A fence characterized in that an adjusting nut is screwed into a bolt penetrating the column and inserted between the column and the concrete plate, and a tip end of the bolt is screwed into the embedded nut.
JP6000403A 1994-01-07 1994-01-07 Fence Expired - Fee Related JP2583738B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6000403A JP2583738B2 (en) 1994-01-07 1994-01-07 Fence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6000403A JP2583738B2 (en) 1994-01-07 1994-01-07 Fence

Publications (2)

Publication Number Publication Date
JPH07197698A JPH07197698A (en) 1995-08-01
JP2583738B2 true JP2583738B2 (en) 1997-02-19

Family

ID=11472841

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6000403A Expired - Fee Related JP2583738B2 (en) 1994-01-07 1994-01-07 Fence

Country Status (1)

Country Link
JP (1) JP2583738B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836963A (en) * 2017-03-24 2017-06-13 江苏固耐特围栏系统股份有限公司 a grid fence

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002299929A (en) * 2001-03-29 2002-10-11 Maspro Denkoh Corp Antenna mounting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836963A (en) * 2017-03-24 2017-06-13 江苏固耐特围栏系统股份有限公司 a grid fence

Also Published As

Publication number Publication date
JPH07197698A (en) 1995-08-01

Similar Documents

Publication Publication Date Title
JP2000008483A (en) Baseplate fixing device
JP2583738B2 (en) Fence
CN102817482A (en) Steel column correcting device and correcting construction method thereof
JP2630623B2 (en) Anchor bolt installation method and anchor bolt support device used for it
JP2567631Y2 (en) Level adjuster for steel foundation beams
US7621088B2 (en) Shear-wall structure and method employing laterally bounding columns
JP2002097818A (en) Installation method of building base isolation base
JPS61233131A (en) Foundation structure of pole
JPS5920489Y2 (en) Anchor bolt mounting structure
JP2832708B2 (en) Anchor frame
JPH1018639A (en) Building reinforcement structure
CN219059775U (en) Supporting system for bent cap construction
JP2583739B2 (en) Fence
JP2002327533A (en) Form for l-type concrete structure, and application method of form for l-type concrete structure
JP2951289B2 (en) Beam mounting level adjustment structure in building structure using pile as pillar
JP2616963B2 (en) Foundation construction method
JP2745238B2 (en) Temporary support for slab half PCa board erection
JPS6340579Y2 (en)
JPH0220778B2 (en)
KR20230130975A (en) Concrete foundation
JP2649216B2 (en) Anchor frame
JPH07197700A (en) Fence
KR200242422Y1 (en) A Sectional T Type Retaining Wall
JPS61106830A (en) Control panel foundation installation method
JPH0410540B2 (en)

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19961015

LAPS Cancellation because of no payment of annual fees