JP2593076B2 - Industrial process control method - Google Patents
Industrial process control methodInfo
- Publication number
- JP2593076B2 JP2593076B2 JP20423787A JP20423787A JP2593076B2 JP 2593076 B2 JP2593076 B2 JP 2593076B2 JP 20423787 A JP20423787 A JP 20423787A JP 20423787 A JP20423787 A JP 20423787A JP 2593076 B2 JP2593076 B2 JP 2593076B2
- Authority
- JP
- Japan
- Prior art keywords
- control
- control amount
- variable
- controlled
- amount
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Feedback Control In General (AREA)
Description
【発明の詳細な説明】 [産業上の利用分野] 本発明は、石油精製工場の流動接触分解装置または鉄
鉱精錬所の高炉排ガス処理装置等に設けたタービンによ
る動力回収プロセス、もしくはガス圧縮機によるガス移
送プロセス等の工業プロセスの制御方法に関する。DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] The present invention relates to a power recovery process using a turbine provided in a fluid catalytic cracking device at an oil refinery or a blast furnace exhaust gas treatment device at an iron ore smelter, or a gas compressor. The present invention relates to a method for controlling an industrial process such as a gas transfer process.
[従来の技術] 一般的な制御の方法について説明する。[Prior Art] A general control method will be described.
ごく一般的な制御系、一つの制御変数に対し、それを
制御する操作端は一つである。これを図で示すと第6図
(A)のようになる。For a very general control system, one control variable has one operating terminal to control it. This is shown in FIG. 6 (A).
まれに、一つの制御変数に対し、それを制御する操作
端が二つの場合がある。それを図示すると第6図(B)
のようになるが、これは単にの変形であり、制御の都
合上(流路を分けるとか、低流量域においても制御が必
要な場合等)、操作端が二つになったに過ぎない。In rare cases, one control variable may be controlled by two operation terminals. Fig. 6 (B)
However, this is merely a modification, and for the sake of control (for example, when the flow path is divided or control is required even in a low flow rate region), only two operation ends are provided.
つまり、操作端AとBは連続性を持っており(この連
続性が重要)、操作端Aで制御仕切れない場合は操作端
Bを使うという制御系になっている。That is, the operation ends A and B have continuity (this continuity is important), and the control system uses the operation end B if the operation end A cannot be controlled.
さて、本発明が適用されるケースは非常に特殊な制御
系である。The case to which the present invention is applied is a very special control system.
これは、二つの制御数p、qの二つの操作端A,Bを持
つ場合であるが、それぞれは独立しておらず、操作端A
は制御変数p、q両方を制御する事ができる。ただし、
一つの操作端に異なる制御信号が同時に来た場合には、
制御は不可能なので、この信号は操作端Aに入る前に、
セレクターにより選択される制御系になっている。(こ
のケースでは、低い値を選択するローセレクターが付加
されており、制御系px、qxの小さい方が操作端Aを操作
する事ができる。)また、操作端Bは制御変数pだけを
制御する事ができる。これを前項同様、図示すると第7
図(A)のようになる。This is a case in which two control terminals p and q have two operating terminals A and B, but they are not independent and the operating terminals A and B are not independent.
Can control both control variables p and q. However,
If different control signals come to one operation terminal at the same time,
Since control is not possible, this signal is
The control system is selected by the selector. (In this case, a low selector for selecting a low value is added, and the smaller one of the control systems px and qx can operate the operation terminal A.) Also, the operation terminal B controls only the control variable p. You can do it. This is illustrated in the same manner as in the previous section.
The result is as shown in FIG.
制御の問題を分かりやすくするために、具体的に説明
する。The control problem will be specifically described to make it easier to understand.
例えば、操作端Aが制御変数qを制御しており、その
制御量は40%であったとする。同時に制御変数pは、操
作端Bにより制御されており、その制御量は60%であっ
たとする。For example, suppose that the operation terminal A controls the control variable q, and the control amount is 40%. At the same time, it is assumed that the control variable p is controlled by the operation terminal B, and the control amount is 60%.
さて、制御量px、qxは、調節器の設定値と測定値の偏
差により決まるが、その大きさと持続性等は比例帯や積
分時間、微分時間といったものにより、プロセスに見合
ったものに調整されている。そのため、プロセスの変動
に対し、操作端A、Bを微妙に制御し、変動を吸収する
のである。Now, the control amounts px and qx are determined by the deviation between the set value and the measured value of the controller, and the magnitude and the sustainability are adjusted to those suitable for the process by the proportional band, the integration time, and the differentiation time. ing. Therefore, the operation ends A and B are delicately controlled in response to the process fluctuation, and the fluctuation is absorbed.
上記工業プロセスとしては、例えば特開昭56−88920
号公報に記載されるような流動接触分解装置において、
ガス供給源としての再生塔とタービンとを含む動力回収
プロセスガ挙げられる。この動力回収プロセスにあって
は、前述の制御変数pがガス供給圧、制御変数qがター
ビン負荷、操作端Aがタービン入口流路に設けられる入
口弁、操作端Bがタービンバイパス流路に設けられるバ
イパス弁となり、 (1)操作端Aは圧力調節器が出力するガス供給圧制御
量pxと負荷調節器が出力するタービン負荷制御量qxのう
ちのより低い制御量にて駆動され、かつ (2)操作端Aは制御量pxが0%〜50%の範囲にある状
態下で作動し、操作端Bは制御量pxが50%〜100%の範
囲にある状態下が作動する(操作端切換レベルp0が50%
に設定されている例)。As the above-mentioned industrial process, for example, JP-A-56-88920
In a fluid catalytic cracking device as described in
A power recovery process includes a regeneration tower and a turbine as a gas supply source. In this power recovery process, the control variable p is the gas supply pressure, the control variable q is the turbine load, the operation end A is an inlet valve provided in the turbine inlet flow path, and the operation end B is provided in the turbine bypass flow path. (1) The operation end A is driven by a lower control amount of the gas supply pressure control amount px output by the pressure controller and the turbine load control amount qx output by the load controller, and 2) The operation end A operates under the condition that the control amount px is in the range of 0% to 50%, and the operation end B operates under the condition that the control amount px is within the range of 50% to 100% (the operation end). Switching level p 0 is 50%
Example).
なお、操作端Aは圧力調節器の出力pxが0%〜50%に
変化する時に全閉から全開となり、操作端Bは圧力調節
器の出力pxが50%〜100%に変化する時に全閉から全開
となる。The operating end A is fully closed when the output px of the pressure regulator changes from 0% to 50%, and is fully open. The operating end B is fully closed when the output px of the pressure regulator changes from 50% to 100%. It becomes fully open from.
[発明が解決しようとする問題点] ところで、上記従来の工業プロセスの制御方法いあっ
ては、例えば上記動力回路プロセスを例として説明する
と、通常の運転状態は、 操作端Aにてタービン負荷qを制御し、操作端Bにて
ガス供給圧pを制御している状態と、 操作端Aにてガス供給圧pを制御し、タービン負荷q
は許容負荷の設定範囲内で変動している状態の2つの状
態のいずれかとなる。[Problems to be Solved by the Invention] By the way, in the control method of the conventional industrial process, for example, the power circuit process will be described as an example. And controlling the gas supply pressure p at the operation end B, and controlling the gas supply pressure p at the operation end A to control the turbine load q.
Is one of two states, which are fluctuating within the set range of the allowable load.
(の状態での問題点) 上記の状態では、ガス供給圧pが操作端Bにて制御
され、圧力調節器の出力pxは50%以上となっており、タ
ービン負荷qは操作端Aにて制御され、負荷調節器の出
力qxは50%以下となっている。この状態下で、プロセス
変化により再生塔の排ガスが減少した場合に、圧力調節
器の出力pxを50%まで低下させて操作端Bを全閉として
もなお圧力制御できない時には、直ちに操作端Aを絞っ
て圧力制御しなければならない。しかしながら、操作端
Aにて圧力制御するためには、圧力調節器の出力pxを負
荷調節器の出力qxよりも低い値にしなければならなら
ず、従来の制御法方法では、上記pxを50%かqxの値以下
に変更するのに時間遅れをともない、結果としてガス供
給圧の大幅な低下を招いてしまう。即ち、操作端Aは、
制御量qxにより図のように40%近辺で制御されており、
この時、操作端Bは、制御量pxにより60%近辺で制御さ
れていた。ところが、プロセスが変動し、圧力が下がっ
たとしよう。まず、調節器は、設定値を維持するための
制御動作として、制御量pxを下げる。これにより、操作
端Bが閉止の方向に動きだしたが、操作端Bが全閉とな
っても圧力が回復しない。そこでさらに制御量を下げ、
操作端Aを閉止する事になるが、操作端Aは既に40%の
状態であるので、ここまで制御量が下がるまで操作端A
は動かす事ができない(時間遅れ)。つまり、先ほどか
ら述べているように連続性が保たれていない事なにな
る。この場合は、制御量が40〜50%の間は制御変数pxに
対しては制御不能領域となる。この間プロセスは大きく
変動していることも予想される。In the above state, the gas supply pressure p is controlled at the operation end B, the output px of the pressure regulator is 50% or more, and the turbine load q is set at the operation end A. It is controlled and the output qx of the load regulator is less than 50%. Under this condition, when the exhaust gas from the regenerator is reduced due to a process change, if the pressure px cannot be controlled even if the output px of the pressure regulator is reduced to 50% and the operation terminal B is fully closed, the operation terminal A is immediately turned off. Pressure must be controlled by squeezing. However, in order to control the pressure at the operating end A, the output px of the pressure regulator must be lower than the output qx of the load regulator. In the conventional control method, the above px is reduced by 50%. It takes a time delay to change the value to less than or equal to the value of qx, and as a result, the gas supply pressure is greatly reduced. That is, the operation end A is
It is controlled around 40% by the control amount qx as shown in the figure.
At this time, the operation end B was controlled at around 60% by the control amount px. However, suppose the process fluctuates and the pressure drops. First, the controller lowers the control amount px as a control operation for maintaining the set value. As a result, the operation end B starts to move in the closing direction, but the pressure does not recover even if the operation end B is fully closed. Therefore, further reduce the control amount,
The operation end A is to be closed. However, since the operation end A is already in the 40% state, the operation end A is kept until the control amount decreases.
Cannot be moved (time delay). That is, continuity is not maintained as described above. In this case, when the control amount is between 40% and 50%, the control variable px becomes an uncontrollable region. During this time, the process is expected to fluctuate greatly.
(の状態での問題点) また、上記の状態では、ガス供給圧pが操作端Aに
て制御され、圧力調節器の出力pxは50%以下となってお
り、タービン負荷qは許容負荷の範囲内で変動してい
る。この状態下で、プロセス変化により再生塔の排ガス
が急増した場合に、圧力調節器の出力pxが上昇し操作端
Aを開いていくものの、それとともにタービン負荷qも
増大化するため、タービン負荷qが許容設定値に達する
と負荷調節器の出力qxが圧力調整器の出力pxに優先して
操作端Aを駆動することとなり、操作端Aを一定の低開
度に保持してしまう。この時には、直ちに操作端Bを開
いて圧力制御しなければならない。しかしながら、操作
端Bを開いて圧力制御するためには、圧力調節器の出力
pxを50%以上にしなければならず、従来の制御方法で
は、上記pxをqxが優先となった時の状態から50%以上に
変更するのに時間遅れをともない、結果としてガス供給
圧の大幅な上昇を招いてしまう。即ち、制御量pxにより
操作端Aが制御されており、30%であったとしよう(制
御変数qの制御量を40%とする)。この後、だんだんと
圧力が上がり操作端Aは開いていくが、40%の達する
と、操作端の制御権は制御量qxに移る事になる(小さい
方が選ばれる)。そうなると、操作端をBを制御する必
要が生じる訳であるが、先ほどのように40〜50%の間で
は操作端AもBも操作する事ができず(時間遅れ)、制
御不能領域ができる事になる。 さらに、上記の状態
下で、発電機等の負荷遮断を生じた場合には、安全保護
機構の作動により、負荷調節器の出力qxが強制的に0%
となり、操作端Aを全閉にする。この場合には、圧力調
節器は直ちに操作端Bを開いて圧力制御しなければなら
ない。しかしながら、この場合にも、上述したと同様
に、圧力調節器の出力pxを50%以上に上昇させるのに時
間遅れがあり、結果としてガス供給圧の大幅を上昇を招
いてしまう。(Problems in state (2)) In the above state, the gas supply pressure p is controlled at the operation end A, the output px of the pressure regulator is 50% or less, and the turbine load q is the allowable load. It fluctuates within the range. Under this condition, when the exhaust gas from the regeneration tower suddenly increases due to a process change, the output px of the pressure regulator increases and the operating end A is opened, but the turbine load q also increases. Reaches a permissible set value, the output qx of the load controller drives the operation terminal A prior to the output px of the pressure regulator, and the operation terminal A is maintained at a constant low opening. At this time, the operating end B must be opened immediately to control the pressure. However, in order to control the pressure by opening the operation terminal B, the output of the pressure regulator is required.
px must be set to 50% or more, and in the conventional control method, it takes time to change the above-mentioned px from the state where qx was prioritized to 50% or more, resulting in a large increase in gas supply pressure. Would lead to a significant rise. That is, it is assumed that the operation terminal A is controlled by the control amount px and is 30% (the control amount of the control variable q is 40%). Thereafter, the pressure gradually increases and the operation end A opens, but when the pressure reaches 40%, the control right of the operation end is transferred to the control amount qx (the smaller one is selected). In this case, it is necessary to control the operating end B. However, as described above, the operating ends A and B cannot be operated between 40% and 50% (time delay), and an uncontrollable area is created. Will be. Further, when the load of the generator or the like is interrupted in the above state, the output qx of the load adjuster is forcibly reduced to 0% by the operation of the safety protection mechanism.
And the operation end A is fully closed. In this case, the pressure regulator must immediately open the operating end B to control the pressure. However, also in this case, as described above, there is a time delay in increasing the output px of the pressure regulator to 50% or more, and as a result, a large increase in gas supply pressure is caused.
すなわち、従来の工場プロセスの制御方法にあって
は、操作端Aによる制御と操作端Bによる制御とをプロ
セス変化に対応して相互に切換えるのに時間遅れがあ
り、制御変数pを迅速かつ高精度に制御できない。That is, in the control method of the conventional factory process, there is a time delay in switching between the control by the operation terminal A and the control by the operation terminal B in accordance with the process change, and the control variable p is quickly and highly controlled. Cannot control to accuracy.
本発明は、プロセス変化に対し、操作端Aによる制御
と操作端Bによる制御とを相互に直ちに切換えできるよ
うにし、制御変数pを迅速かつ高精度に制御可能にする
ことを目的とする。An object of the present invention is to enable the control by the operation terminal A and the control by the operation terminal B to be immediately switched to each other in response to a process change, and to enable the control variable p to be controlled quickly and with high accuracy.
[問題点を解決するための手段] 本発明は、2つの制御変数p、qを制御対象とし、両
制御変数p、qを制御する操作端Aを備えるとともに、
制御変数pのみを制御する操作端Bを備え、操作端Aを
制御変数pのための制御量pxと制御変数qのための制御
量qxのうちのより低い制御量にて駆動し、かつ制御変数
pのための制御量pxが予め定めた操作端切換レベルp0よ
り低レベル側にある時には操作端Aのみにて該制御変数
pを制御し、制御変数pのための制御量pxが予め定めた
操作切換レベルp0より高レベル側にある時には操作端B
にても該制御変数pを制御する工業プロセスの制御方法
において、制御変数pのための制御量pxと制御変数qの
ための制御量qxとを常に比較し、操作端Bの作動状態
下で制御量pxが操作端切換レベルp0未満になる場合に
は、制御量pxを強制的に制御量qx以下に変更して、制御
変数pを直ちに操作端Aにて制御できるようにし、操
作端Aのみの作動状態下で制御量pxが相対的に制御量qx
を越えた場合には、制御量pxを強制的に操作端切換レベ
ルp0以上に変更して、制御変数pを直ちに操作端Bにて
制御できるようにしたものである。[Means for Solving the Problems] The present invention has two control variables p and q as control targets, and has an operation terminal A for controlling both control variables p and q.
An operation terminal B for controlling only the control variable p is provided, and the operation terminal A is driven by a lower control amount of the control amount px for the control variable p and the control amount qx for the control variable q, and control amount px is controls the control variable p at only operating end a when in the predetermined low-level side than the operation terminal switching level p 0 for variable p, the control amount px for control variables p in advance When the operation switching level p 0 is higher than the operation switching level p 0 , the operation terminal B
In the industrial process control method for controlling the control variable p, the control variable px for the control variable p and the control variable qx for the control variable q are always compared, If the control amount px is below the operating end switching level p 0 is the controlled variable px forcibly changed to control the amount qx below, so as to control the variable p can be immediately controlled by the operation terminal a, the operating end Under the operation state of only A, the control amount px is relatively controlled by the control amount qx.
When exceeded, change in the control amount px force the operation end switch level p 0 or more, which was to be controlled control variables p immediately at the operating end B.
[作用] 本発明は第1図に示す如くの制御回路にて実施され
る。1は工業プロセス、2は第1調節器であり制御変数
pのための制御量pxを出力し、3は第2調節器である制
御変数qのための制御量qxを出力する。4は比較演算器
であり、制御量pxと制御量qxとを比較し、より低い制御
量pxまたはqxを操作端Aのための制御量として出力す
る。[Operation] The present invention is implemented by a control circuit as shown in FIG. 1 is an industrial process, 2 is a first regulator, which outputs a control variable px for a control variable p, and 3 is a second regulator, which outputs a control variable qx for a control variable q. Reference numeral 4 denotes a comparison operation unit which compares the control amount px with the control amount qx and outputs a lower control amount px or qx as a control amount for the operation terminal A.
本発明が適用された工業プロセスの通常の運転状態
は、 操作端Aにて制御変数qを制御し、操作端Bにて制御
変数pを制御している状態と、 操作端Aにて制御変数pを制御し、制御変数qは設定
された許容範囲内にある状態の2つの状態のいずれかと
なる。The normal operation state of the industrial process to which the present invention is applied is a state in which the control variable q is controlled at the operation end A and a control variable p is controlled at the operation end B, p is controlled, and the control variable q becomes one of two states within a set allowable range.
上記の状態では、制御変数pが操作端Bにて制御さ
れ、第1調節器の出力pxは操作端切換レベルp0以上とな
っており、制御変数qは操作端Aにて制御され、第2調
節器の出力qxは操作端切換レベルp0以下となっている。
この状態下で、プロセス変化により第1調節器の出力px
が操作端切換レベルp0未満になる場合には、直ちに操作
端Aにて制御変数pの制御をしなければならない。しか
るに、本発明にあっては、そのモードにより、上記制
御量pxが第2図に示すギャップ領域Cを飛越える如く
(第2図実線矢印参照)にて強制的に上記制御量qx以下
に変更せしめられるため、制御変数pを時間遅れなく直
ちに操作端Aにて制御できることとなる。In the above state, the control variable p is controlled by the operation terminal B, the output px of the first controller is at or above the operation terminal switching level p 0 , the control variable q is controlled by the operation terminal A, output qx 2 regulator has a less controlled element switching level p 0.
Under this condition, the output px of the first controller is changed due to a process change.
Is less than the operating end switching level p 0 , the operating end A must immediately control the control variable p. However, in the present invention, the control amount px is forcibly changed to be equal to or less than the control amount qx according to the mode so that the control amount px jumps over the gap region C shown in FIG. 2 (see the solid line arrow in FIG. 2). As a result, the control variable p can be immediately controlled at the operation terminal A without a time delay.
また、上記の状態では、制御変数がpが操作端Aに
て制御され、第1調節器の内力pxは操作端切換レベルp0
以下となっており、制御変数qは許容範囲内で変動して
いる。この状態下で、プロセス変化により第1調節器の
出力pxが相対的に第2調節器の出力qxを越えた場合に
は、直ちに操作端Bにて制御変数pの制御をしなければ
ならない。しかるに、本発明にあっては、そのモード
により、上記制御量pxが第2図に示すギャップ領域Cを
飛び越える如く(第2図破線矢印参照)にて強制的に操
作端切換レベルp0以上に変更しせめられるため、制御変
数pを時間遅れなく直ちに操作端Bにて制御できること
となる。In the above state, the control variable p is controlled by the operation terminal A, and the internal force px of the first regulator is controlled by the operation terminal switching level p 0.
Here, the control variable q fluctuates within an allowable range. In this state, if the output px of the first controller relatively exceeds the output qx of the second controller due to a process change, the control variable p must be immediately controlled at the operation terminal B. However, according to the present invention, the control amount px is forcibly set to the operating end switching level p 0 or more by the mode so that the control amount px jumps over the gap region C shown in FIG. 2 (see the broken line arrow in FIG. 2). Since it is changed, the control variable p can be immediately controlled by the operation terminal B without time delay.
すなわち、本発明によれば、プロセス変化に対し、操
作端Aによる制御と操作端Bによる制御とを相互に直ち
に切換えできるようにし、制御変数pを迅速かつ高精度
に制御できる。That is, according to the present invention, the control by the operation terminal A and the control by the operation terminal B can be immediately switched to each other with respect to the process change, and the control variable p can be quickly and accurately controlled.
[実施例] 第3図は本発明の第1実施例に係る動力回収プロセス
を示す制御回路図、第4図は操作端A、Bの操作量と制
御量pxとの関係を示す線図である。[Embodiment] FIG. 3 is a control circuit diagram showing a power recovery process according to a first embodiment of the present invention, and FIG. 4 is a diagram showing a relationship between operation amounts of operation terminals A and B and a control amount px. is there.
この動力回収プロセス10は、流動接触分解装置におい
て、ガス供給源としての再生塔11の一部ないし全部の排
ガスをタービン12を通して排出し、その残部の排ガスを
タービン12に対しバイパスさせている。タービ12にはタ
ービン負荷としての例えば発電機13が直結している。こ
の動力回収プロセス10にあっては、本発明の制御変数p
がガス供給圧(再生塔と反応塔の差圧でもよい)、制御
変数qがタービン負荷、操作端Aがタービン入口流路に
設けられる入口弁、操作端Bがタービンバイパス流路に
設けられるバイパス弁となり、 (1)操作端Aは圧力調節器14が出力するガス供給圧制
御量pxと負荷調節器15が出力するタービン負荷制御量qx
を比較演算器16にて比較し、比較演算器16が出力するよ
り低い制御量にて駆動され、かつ (2)操作端Aは制御量pxが0%〜50%の範囲にある状
態下で作動し、操作端Bは制御量pxが50%〜100%の範
囲になる状態下で作動する(操作端切換レベルp0が50%
に設定されている例)。In the power recovery process 10, in a fluidized catalytic cracking apparatus, part or all of exhaust gas of a regeneration tower 11 as a gas supply source is discharged through a turbine 12, and the remaining exhaust gas is bypassed to the turbine 12. For example, a generator 13 as a turbine load is directly connected to the turbine 12. In the power recovery process 10, the control variable p of the present invention is used.
Is a gas supply pressure (may be a pressure difference between a regeneration tower and a reaction tower), a control variable q is a turbine load, an operation end A is an inlet valve provided in a turbine inlet flow path, and an operation end B is a bypass provided in a turbine bypass flow path. (1) The operating end A is a gas supply pressure control amount px output by the pressure controller 14 and a turbine load control amount qx output by the load controller 15
Are compared with each other in the comparison computing unit 16 and are driven with a lower control amount than the comparison computing unit 16 outputs. actuated, the operating end B control amount px is operated in a state where the range of 50% to 100% (operating end switching level p 0 50%
Example).
すなわち、上記プロセスで再生塔11の圧力が上昇する
と、まず操作端Aを開いて圧力制御する。操作端Aのみ
でう圧力制御できずなお圧力が上昇する場合には、引続
いて操作端Bを開いて圧力制御する。操作端Aは圧力調
節器14の出力pxが0%〜50%に変化する時に全閉から全
開となり、操作端Bは圧力調節器14の出力pxが50%〜10
0%に変化する時に全閉から全開となる。負荷調節器15
のタービン負荷(またはタービン回転速度)を許容範囲
内に抑えるべく操作端Aを操作する。なお、17は圧力検
出器、18は負荷検出器である。That is, when the pressure in the regeneration tower 11 increases in the above process, the operation end A is first opened to control the pressure. When the pressure cannot be controlled only by the operation end A and the pressure still rises, the operation end B is subsequently opened to control the pressure. When the output px of the pressure regulator 14 changes from 0% to 50%, the operation end A is fully closed to fully open, and the operation end B is when the output px of the pressure regulator 14 is 50% to 10%.
When it changes to 0%, it changes from fully closed to fully open. Load controller 15
The operating end A is operated to keep the turbine load (or turbine rotation speed) within an allowable range. In addition, 17 is a pressure detector and 18 is a load detector.
しかして、この動力回収プロセス10は、圧力調節器14
が、負荷調節器15の出力qxを取込み、制御量pxと制御量
qxとを常に比較し、操作端Bの作動状態下で制御量px
が操作端切換レベルp0(50%)未満になる場合には、制
御量pxを強制的に制御量qx以下に変更して、ガス供給圧
pを直ちに操作端Aにて制御できるようにし、操作端
Aのみの作動状態下で制御量pxが相対的に制御量qxを越
えた場合には、制御量pxを強制的に操作端切換レベルp0
(50%)以上に変更して、ガス供給圧pを直ちに操作端
Bにて制御できるようにしている。Thus, the power recovery process 10 includes a pressure regulator 14
Takes the output qx of the load controller 15, and controls the control amount px and the control amount.
qx is constantly compared with the control amount px
Is less than the operation end switching level p 0 (50%), the control amount px is forcibly changed to the control amount qx or less so that the gas supply pressure p can be immediately controlled at the operation end A, When the control amount px relatively exceeds the control amount qx under the operation state of only the operation end A, the control amount px is forcibly changed to the operation end switching level p 0.
(50%) or more so that the gas supply pressure p can be immediately controlled at the operation end B.
以下、上記構成からなる動力回収プロセス10の作用に
ついて説明する。Hereinafter, the operation of the power recovery process 10 having the above configuration will be described.
上記動力回収プロセス10の通常の運転状態は、 操作端Aにてタービン負荷qを制御し、操作端Bにて
ガス供給圧pを制御している状態と、 操作端Aにてガス供給圧pを制御し、タービン負荷q
は許容負荷の設定範囲内で変動している状態の2つの状
態のいずれかとなる。The normal operation state of the power recovery process 10 includes a state in which the turbine load q is controlled at the operation end A, a gas supply pressure p is controlled at the operation end B, and a gas supply pressure p at the operation end A. And the turbine load q
Is one of two states, which are fluctuating within the set range of the allowable load.
上記の状態では、ガス供給圧pが操作端Bにて制御
され、圧力調節器14の出力pxは50%以上となっており、
タービン負荷qは操作端Aにて制御され、負荷調節器15
の出力qxは50%以下となっている。この状態下で、プロ
セス変化により再生塔11の排ガスが減少した場合に、圧
力統制器14の出力qxを50%まで低下させて操作端Bを全
閉としてもなお圧力制御できない時には、直ちに操作端
Aを絞って圧力制御しなければならない。しかるに、こ
の動力回収プロセス10にあっては、そのモードによ
り、上記制御量pxが第4図に示すギャップ領域Cを飛び
越える如く(第4図実線矢印参照)にて強制的に上記制
御量qx以下に変更せしめられるため、ガス供給圧pを時
間遅れなく直ちに操作端Aにて制御できることとなる。In the above state, the gas supply pressure p is controlled at the operation end B, and the output px of the pressure regulator 14 is 50% or more.
The turbine load q is controlled by the operation terminal A, and the load controller 15
Is less than 50%. Under this condition, if the exhaust gas of the regeneration tower 11 decreases due to a process change, and if the output qx of the pressure regulator 14 is reduced to 50% and the operation end B cannot be fully controlled even when the operation end B is fully closed, the operation end immediately The pressure must be controlled by restricting A. However, in the power recovery process 10, depending on the mode, the control amount px is forcibly set below the control amount qx so as to jump over the gap region C shown in FIG. 4 (see the solid line arrow in FIG. 4). Therefore, the gas supply pressure p can be immediately controlled at the operating end A without a time delay.
また、上記の状態では、ガス供給圧pが操作端Aに
て制御され、圧力調節器14の出力pxは50%以下となって
おり、タービン負荷qは許容負荷の範囲内で変動してい
る。この状態下で、プロセス変化により再生塔11の排ガ
スが急増した場合に、圧力調節器14の出力pxが上昇し操
作端Aを開いていくものの、それとともにタービン負荷
qも増大化するため、タービン負荷qが許容設定値に達
すると負荷調節器15の出力qxが圧力調節器14の出力pxに
優先して操作端Aを駆動することとなり、操作端Aを一
定の低開度の保持してしまう。この時には、直ちに操作
端Bを開いて圧力制御しなければならない。しかるに、
この動力回収プロセス10にあっては、そのモードによ
り、上記制御量pxが第2図に示すギャップ領域Cを飛び
越える如く(第2図破線矢印参照)にて強制的に操作端
切換レベルp0(50%)以上に変更せしめられるため、ガ
ス供給pを時間遅れなく直ちに操作端Bにて制御できる
こととなる。In the above state, the gas supply pressure p is controlled at the operating end A, the output px of the pressure regulator 14 is 50% or less, and the turbine load q fluctuates within the allowable load range. . Under this condition, when the exhaust gas of the regenerator 11 increases rapidly due to a process change, the output px of the pressure regulator 14 increases and the operating end A is opened, but the turbine load q also increases. When the load q reaches the allowable set value, the output qx of the load controller 15 drives the operation terminal A in preference to the output px of the pressure controller 14, and the operation terminal A is maintained at a constant low opening. I will. At this time, the operating end B must be opened immediately to control the pressure. However,
In the this power recovery process 10, by that mode, the control amount px is as jump the gap region C shown in FIG. 2 forcibly operating end switching level p 0 in (second see FIG dotted arrow) ( 50%) or more, the gas supply p can be immediately controlled at the operating end B without time delay.
さらに、上記の状態下で、発電機13の負荷遮断を生
じた場合には、安全保護機構の作動により、負荷調器15
の出力qxが強制的に0%となり操作端Aを全閉にする。
この場合には、圧力調節器14は直ちに操作端Bを開いて
圧力制御しなければならない。しかるに、この動力回収
プロセス10にあっては上述したと同様に、上記制御量px
を強制的に操作端切換レベルp0(50%)以上に変更せし
めるため、ガス供給圧pを時間遅れなく直ちに操作端B
にて制御できることとなる。Further, when the load of the generator 13 is interrupted in the above state, the operation of the safety protection mechanism causes the load controller 15 to operate.
Is forced to 0%, and the operation terminal A is fully closed.
In this case, the pressure regulator 14 must immediately open the operating end B to control the pressure. However, in the power recovery process 10, the control amount px
To the operating terminal switching level p 0 (50%) or more, the gas supply pressure p is immediately changed to the operating terminal B without time delay.
Can be controlled.
すなわち、上記動力回収プロセス10によれば、プロセ
ス変化に対し、操作端Aにのよる制御と操作端Bによる
制御とを相互に直ちに切換えできるようにし、ガス供給
圧pを迅速かつ高精度に制御することができる。したが
って、ガス供給源における急激な圧力変動も迅速に制御
でき、再生塔11の排ガスが少ない場合にも操作端Bを開
くことなく運転継続でき、常に最大量の動力を回収し、
多大な発電量の増加が期待できる。That is, according to the power recovery process 10, the control by the operation end A and the control by the operation end B can be immediately switched to each other in response to the process change, and the gas supply pressure p can be quickly and accurately controlled. can do. Therefore, rapid pressure fluctuations in the gas supply source can be quickly controlled, and even when the exhaust gas from the regeneration tower 11 is small, the operation can be continued without opening the operation end B, and the maximum amount of power is always recovered,
A large increase in power generation can be expected.
第5図は本発明の第2実施例に係るガス移送プロセス
を示す制御回路図である。FIG. 5 is a control circuit diagram showing a gas transfer process according to a second embodiment of the present invention.
このガス移送プロセス20は、ガス供給源21のガスを一
定回転の遠心力圧縮機22で移送するものである。このガ
ス移送プロセス20にあっては、本発明の制御変数pが圧
縮機22の吸入圧、制御変数qが圧縮機22の出力流量、操
作端Aが圧縮機22の入口と出口の間のガスリサイクル流
路に設けられるリサイクル弁、操作端Bが圧縮機バイパ
ス流路に設けられるバイパス弁であり、 (1)操作端Aは圧力調節機23が出力する吸入圧制御量
pxと流量調節器24が出力する流量制御量qxを比較演算器
25にて比較し、比較演算器25が出力するより低い制御量
にて駆動され、かつ (2)操作端Aは吸入圧制御量pxが0%〜50%の範囲に
ある状態下で作動し、操作端Bは吸入圧制御量pxが50%
〜100%の範囲にある状態下で作動する(操作端切換レ
ベルp0が50%に設定されている例)。なお、26は圧力検
出器、27は流量検出器である。すなわち、上記プロセス
で吸入圧pが上昇すると操作端Aを閉じ、引続いて操作
端Bを開いて吸入圧pを一定に制御する。操作端Aは圧
力調節器23の出力である制御量pxが0%〜50%に変化す
る時の全開から全閉となり、操作端Bは圧力調節器23の
出力である制御量pxが50%〜100%に変換する時に全閉
から全開となる。流量調節器24は圧縮機22のサージ防止
用であり、ガス移送先での弁閉止等による流量低下の場
合に操作端Aを開いて、流量を許容設定値より下げない
ようにしてサージを防止する。In the gas transfer process 20, a gas from a gas supply source 21 is transferred by a centrifugal compressor 22 having a constant rotation. In the gas transfer process 20, the control variable p of the present invention is the suction pressure of the compressor 22, the control variable q is the output flow rate of the compressor 22, and the operating end A is the gas between the inlet and the outlet of the compressor 22. The recycle valve provided in the recycle flow passage, the operation end B is a bypass valve provided in the compressor bypass flow passage, (1) The operation end A is a suction pressure control amount output by the pressure regulator 23
Comparator for comparing px with flow control amount qx output by flow controller 24
25, the operation is performed with a control amount lower than the output of the comparison arithmetic unit 25, and (2) the operation terminal A operates under the condition that the suction pressure control amount px is in the range of 0% to 50%. , The operation end B has a suction pressure control amount px of 50%
Operating under conditions in the range of 100% (example operating end switching level p 0 is set to 50%). 26 is a pressure detector and 27 is a flow rate detector. That is, when the suction pressure p rises in the above process, the operation end A is closed, and subsequently the operation end B is opened to control the suction pressure p to be constant. The operation end A is fully closed from the fully open state when the control amount px output from the pressure regulator 23 changes from 0% to 50%, and the operation end B is 50% when the control amount px output from the pressure regulator 23 is 50%. It changes from fully closed to fully open when converting to ~ 100%. The flow regulator 24 is for preventing surge of the compressor 22. In case of a decrease in flow due to closing of the valve at the gas transfer destination, the operation end A is opened to prevent surge by preventing the flow from dropping below the allowable set value. I do.
しかして、このガス移送プロセス20は、圧力調節機23
が、負荷調節機24の出力qxを取込み、制御量pxと制御量
qxとを常に比較し、 操作端Bの作動状態下で制御量pxが操作端切換レベル
p0(50%)未満になる場合には、制御量pxを強制的に制
御量qx以下に変更して、吸入圧pを直ちに操作端Aにて
制御できるようにし、 操作端Aのみの作動状態下で制御量pxが相対的に制御
量qxを越えた場合には、制御量pxを強制的に操作端切換
レベルp0(50%)以上に変更して、吸入圧pを直ちに操
作端Bにて制御できるようにしている。Thus, this gas transfer process 20 is
Takes the output qx of the load adjuster 24, and controls the control amount px and the control amount.
qx and the control variable px under the operating state of the operating end B
If it becomes less than p 0 (50%), the control amount px is forcibly changed to the control amount qx or less so that the suction pressure p can be immediately controlled at the operation end A. When the control amount px relatively exceeds the control amount qx under the state, the control amount px is forcibly changed to the operating end switching level p 0 (50%) or more, and the suction pressure p is immediately changed to the operating end switching level. B can be controlled.
以下、上記構成からなるガス移送プロセス20の作用に
ついて説明する。Hereinafter, the operation of the gas transfer process 20 having the above configuration will be described.
上記ガス移送プロセス20の通常の運転状態は、 圧縮機22の出口流量がサージ流量より十分に大きく、
許容設定値より大きな値で変動しており、流量調節機24
の出力qxは100%にある。また、圧力調節機23の出力px
は50%以下であり、したがって、操作端Aを開くことに
て、ガスの一部をリサイクルさせながら圧力制御を行な
っている。In the normal operation state of the gas transfer process 20, the outlet flow rate of the compressor 22 is sufficiently larger than the surge flow rate,
The value fluctuates at a value larger than the allowable set value.
Output qx is at 100%. Also, the output px of the pressure regulator 23
Is not more than 50%. Therefore, by opening the operation end A, the pressure is controlled while a part of the gas is recycled.
上記の状態にある時、ガス移送先での弁閉止等によ
り圧縮機22の出口流量が低下してくると、流量調節機24
の出力qxは100%から急に低下し、この出力qxが圧力調
節機23の出力pxに優先して操作端Aを駆動することとな
り、操作端Aを開いて圧縮機22の出口流量qをサージ発
生点以上の流量に保つ。この時には、圧縮機22に必要以
上のガスがリサイクルし、吸入圧pが上昇するから、操
作端Bを直ちに開いて圧力制御しなければならない。し
かるに、このガス移送プロセス20にあっては、そのモー
ドにより、上記制御量pxが強制的に操作端切換レベル
p0(50%)以上に変更せしめられるため、吸入圧pを時
間遅れなく直ちに操作端Bにて制御できることとなる。In the above state, if the outlet flow rate of the compressor 22 decreases due to closing of the valve at the gas transfer destination, etc.
The output qx suddenly drops from 100%, and this output qx drives the operating end A in preference to the output px of the pressure regulator 23. The operating end A is opened to reduce the outlet flow q of the compressor 22. Maintain the flow rate at or above the surge generation point. At this time, since more gas than necessary is recycled to the compressor 22 and the suction pressure p rises, the operating end B must be immediately opened to control the pressure. However, in the gas transfer process 20, depending on the mode, the control amount px is forcibly set to the operating end switching level.
Since the pressure is changed to p 0 (50%) or more, the suction pressure p can be immediately controlled at the operation end B without time delay.
また、上述の如く、サージ防止のために操作端Aにて
圧縮機22の出口流量qを制御し、操作端Bにて圧縮機22
の吸入圧pを制御している状態下で、プロセス変化によ
りガス供給源21の供給ガス量が減少した場合には、圧力
調節器23の出力pxを50%まで低下させて操作端Bを全閉
としてもなお圧力制御できない時には、直ちに操作端A
にて圧力制御しなければならない。しかるに、このガス
移送プロセス20にあっては、そのモードにより、上記
制御量pxが強制的に流量調節器24の出力qx以下に変更せ
しめられるため、吸入圧pを時間遅れなく直ちに操作端
Aにて制御できることとなる。Also, as described above, the outlet flow rate q of the compressor 22 is controlled at the operation end A to prevent surge, and the compressor 22 is controlled at the operation end B.
When the amount of gas supplied from the gas supply source 21 is reduced due to a process change while controlling the suction pressure p of the gas supply, the output px of the pressure regulator 23 is reduced to 50%, and If the pressure cannot be controlled even after closing, the operating end A
The pressure must be controlled at. However, in the gas transfer process 20, the control amount px is forcibly changed to be equal to or less than the output qx of the flow rate regulator 24 by the mode, so that the suction pressure p is immediately transmitted to the operation terminal A without time delay. Control.
すなわち、上記ガス移送プロセス20によればプロセス
変化に対し、操作端Aによる制御と操作端Bによる制御
とを相互に直ちに切換えできるようにし、圧縮機22の吸
入圧pを迅速かつ高精度に制御することができる。That is, according to the gas transfer process 20, the control by the operation end A and the control by the operation end B can be immediately switched to each other in response to a process change, and the suction pressure p of the compressor 22 can be quickly and accurately controlled. can do.
以上、本発明をガス供給源からのガスをタービンまた
は圧縮機によりエネルギー回収もしくは移送する工業プ
ロセスについて例示したが、本発明はこれらに限定され
ず高圧水を用いるエネルギー発生装置など広く一般の工
業プロセスに適用できる。As described above, the present invention has been described with respect to an industrial process for recovering or transferring gas from a gas supply source by a turbine or a compressor. However, the present invention is not limited to these, and is widely used in general industrial processes such as an energy generator using high-pressure water. Applicable to
[発明の効果] 以上のように、本発明によれば、プロセス変化に対
し、操作端Aによる制御と操作端Bによる制御とを相互
に直ちに切換えできるようにし、制御変数pを迅速かつ
高精度に制御することができる。[Effects of the Invention] As described above, according to the present invention, the control by the operation terminal A and the control by the operation terminal B can be immediately switched to each other in response to a process change, and the control variable p can be quickly and accurately adjusted. Can be controlled.
第1図は本発明に係る工業プロセスを示す制御回路図、
第2図は操作端A、Bの操作量と制御量pxとの関係を示
す線図、第3図は本発明の第1実施例に係る動力回収プ
ロセスを示す制御回路図、第4図は操作端A、Bの操作
量と制御量pxとの関係を示す線図、第5図は本発明の第
2実施例に係るガス移送プロセスを示す制御回路図、第
6図は従来の制御方法における操作量と制御量との関係
を示す線図、第7図は本発明の制御方法における操作量
と制御量との関係を示す線図である。 1……工業プロセス、 2……第1調節器、 3……第2調節器、 4……比較演算器、 10……動力回収プロセス、 11……再生塔(ガス供給源)、 12……タービン、 13……発電機、 14……圧力調節器、 15……負荷調節器、 16……比較演算器、 20……ガス移送プロセス、 21……ガス供給源、 22……圧縮機、 23……圧力調節器、 24……流量調節器、 25……比較演算器。FIG. 1 is a control circuit diagram showing an industrial process according to the present invention,
FIG. 2 is a diagram showing the relationship between the operation amounts of the operation terminals A and B and the control amount px, FIG. 3 is a control circuit diagram showing a power recovery process according to the first embodiment of the present invention, and FIG. FIG. 5 is a diagram showing the relationship between the operation amounts of the operation ends A and B and the control amount px, FIG. 5 is a control circuit diagram showing a gas transfer process according to a second embodiment of the present invention, and FIG. FIG. 7 is a diagram showing the relationship between the operation amount and the control amount in the control method of the present invention. 1 ... industrial process, 2 ... first regulator, 3 ... second regulator, 4 ... comparator, 10 ... power recovery process, 11 ... regeneration tower (gas supply source), 12 ... Turbine, 13 Generator, 14 Pressure regulator, 15 Load regulator, 16 Comparator, 20 Gas transfer process, 21 Gas supply source, 22 Compressor, 23 …… Pressure controller, 24 …… Flow controller, 25 …… Comparator.
Claims (3)
制御変数p、qを制御する操作端Aを備えるとともに、
制御変数pのみを制御する操作端Bを備え、操作端Aを
制御変数pのための制御量pxと制御変数qのための制御
量qxのうちのより低い制御量にて駆動し、かつ制御変数
pのための制御量pxが予め定めた操作端切換レベルp0よ
り低レベル側にある時には操作端Aのみにて該制御変数
pを制御し、制御変数pのための制御量pxが予め定めた
操作端切換レベルp0より高レベル側にある時には操作端
Bにても該制御変数pを制御する工業プロセスの制御方
法において、制御変数pのための制御量pxと制御変数q
のための制御量qxとを常に比較し、操作端Bの作動状
態下で制御量pxが操作端切換レベルp0未満になる場合に
は、制御量pxを強制的に制御量qx以下に変更して、制御
変数pを直ちに操作端Aにて制御できるようにし、操
作端Aのみの作動状態下で制御量pxが相対的に制御量qx
を越えた場合には、制御量pxを強制的に操作端切換レベ
ルp0以上に変更して、制御変数pを直ちに操作端Bにて
制御できるようにすることを特徴とする工業プロセスの
制御方法。1. An operation terminal A for controlling two control variables p and q with two control variables p and q as control objects, and
An operation terminal B for controlling only the control variable p is provided, and the operation terminal A is driven by a lower control amount of the control amount px for the control variable p and the control amount qx for the control variable q, and control amount px is controls the control variable p at only operating end a when in the predetermined low-level side than the operation terminal switching level p 0 for variable p, the control amount px for control variables p in advance In the industrial process control method in which the control variable p is controlled even at the control terminal B when the control terminal switching level p 0 is on the higher level side, the control variable px and the control variable q for the control variable p
The control amount px is always compared with the control amount qx, and if the control amount px becomes less than the operation end switching level p 0 under the operating state of the operation end B, the control amount px is forcibly changed to the control amount qx or less. Then, the control variable p can be immediately controlled by the operation end A, and the control amount px is relatively controlled by the control amount qx under the operation state of only the operation end A.
If it exceeds, the control amount px forcibly changed to the operation end switch level p 0 or more, the control of industrial processes, characterized in that to allow controlled by immediately operating end B of the control variables p Method.
セスがガス供給源タービンとを含み、制御変数pがガス
供給圧、制御変数qがタービン負荷、操作端Aがタービ
ン入口流路に設けられる入口弁、操作端Bがタービンバ
イパス流路に設けられるバイパス弁である工業プロセス
の制御方法。2. The method according to claim 1, wherein the industrial process includes a gas supply turbine, the control variable p is a gas supply pressure, the control variable q is a turbine load, and the operating end A is provided in a turbine inlet flow path. The method for controlling an industrial process, wherein the inlet valve to be operated and the operation end B are bypass valves provided in the turbine bypass flow path.
セスがガス供給源と圧縮機をを含み、制御変数pが圧縮
機の吸入圧、制御変数qが圧縮機の出口流量、操作端A
が圧縮機の入口と出口の間のガスリサイクル流路に設け
られるリサイクル弁、操作端Bが圧縮機バイパス流路に
設けられるバイパス弁である工業プロセスの制御方法。3. The method according to claim 1, wherein the industrial process includes a gas supply source and a compressor, wherein a control variable p is a suction pressure of the compressor, a control variable q is an outlet flow rate of the compressor,
Is a recycle valve provided in a gas recycle channel between the inlet and the outlet of the compressor, and a control valve for an industrial process in which the operating end B is a bypass valve provided in a compressor bypass channel.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP20423787A JP2593076B2 (en) | 1987-08-19 | 1987-08-19 | Industrial process control method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP20423787A JP2593076B2 (en) | 1987-08-19 | 1987-08-19 | Industrial process control method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6448102A JPS6448102A (en) | 1989-02-22 |
| JP2593076B2 true JP2593076B2 (en) | 1997-03-19 |
Family
ID=16487120
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP20423787A Expired - Lifetime JP2593076B2 (en) | 1987-08-19 | 1987-08-19 | Industrial process control method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2593076B2 (en) |
-
1987
- 1987-08-19 JP JP20423787A patent/JP2593076B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPS6448102A (en) | 1989-02-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5879133A (en) | Prevention of parameter excursions during process compressor surge in gas turbines | |
| US5953902A (en) | Control system for controlling the rotational speed of a turbine, and method for controlling the rotational speed of a turbine during load shedding | |
| US4298310A (en) | Process and apparatus for prevention of surging in turbocompressors | |
| EP0320718A1 (en) | Variable speed pumping-up system | |
| JP2593076B2 (en) | Industrial process control method | |
| US4255078A (en) | Method of controlling operation of multistage hydraulic machines | |
| JPH073185B2 (en) | Exhaust gas pressure recovery turbine bypass valve control method | |
| JPS6239655B2 (en) | ||
| JP2000249305A (en) | Stem temperature controller for boiler | |
| JP2537529Y2 (en) | Transient response prevention hydraulic supply device | |
| JPH01142220A (en) | Fuel controller for gas turbine | |
| JPH03267512A (en) | Steam turbine controller | |
| SU1079568A1 (en) | Apparatus for automatic monitoring and matching the operation duties of multistage pumping and hydraulic conveying units | |
| JPS6357802A (en) | Control device for expansion turbine | |
| JPS62157219A (en) | Waste heat turbine pre-pressure controller | |
| JPS5818506A (en) | Method of controlling operation of boiler turbine under variable pressure | |
| JPH11182808A (en) | Steam temperature control device for boiler | |
| JPS6124522B2 (en) | ||
| JPS5951654B2 (en) | Fluid catalytic cracker combustion waste gas power recovery device | |
| JPS63131908A (en) | Method of controlling recirculation of feed pump | |
| JPS6283928A (en) | Powder feed controller | |
| JPH01269093A (en) | Feed water controller for nuclear reactor | |
| JPS63259108A (en) | Bypass valve control device for steam turbine | |
| JPS5947601A (en) | Automatic bumpless transfer device | |
| JPH0491303A (en) | Turbine controller |