JP2599071B2 - Structure of crosswalk for dam embankment construction - Google Patents
Structure of crosswalk for dam embankment constructionInfo
- Publication number
- JP2599071B2 JP2599071B2 JP15287592A JP15287592A JP2599071B2 JP 2599071 B2 JP2599071 B2 JP 2599071B2 JP 15287592 A JP15287592 A JP 15287592A JP 15287592 A JP15287592 A JP 15287592A JP 2599071 B2 JP2599071 B2 JP 2599071B2
- Authority
- JP
- Japan
- Prior art keywords
- passage
- dam embankment
- fixed
- work
- elevating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims description 17
- 238000009415 formwork Methods 0.000 claims description 39
- 230000003028 elevating effect Effects 0.000 claims description 29
- 230000001174 ascending effect Effects 0.000 description 8
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 239000000463 material Substances 0.000 description 3
- 229910052742 iron Inorganic materials 0.000 description 2
- 230000032258 transport Effects 0.000 description 2
- 238000005266 casting Methods 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Movable Scaffolding (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は移動足場から固定階段へ
と渡るための通路、特に、ダム堤体の築造工事におい
て、ダム堤体の傾斜面に沿って昇降する昇降式型枠装置
に取付けられて作業員の移動や資材、機材の運搬、コン
クリート工事の型枠組立作業等に使用される作業足場か
ら、ダム堤体の斜面に沿って仮設された固定階段へと渡
るための渡り通路の構造に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a passage for moving from a movable scaffold to a fixed staircase, and more particularly to an ascending and descending formwork device which moves up and down along an inclined surface of a dam embankment in construction work of the dam embankment. It is used as a walkway for workers to move, to transport materials and equipment, and to assemble formwork for concrete work from a work platform to a temporary fixed staircase along the slope of the dam embankment. It is about structure.
【0002】[0002]
【従来の技術】従来から、コンクリートダムの築造工事
において、築造中のダム堤体の斜面に沿って昇降させる
昇降式型枠装置の下端に一体に設けられた作業足場か
ら、ダム堤体の斜面に配設された固定階段へと渡るに
は、図5に示すように、昇降式型枠装置32の縦端太材42
の下端に水平方向に架設された作業足場33の幅方向の突
出端適所から梯子35を垂設し、該梯子35の下端を固定階
段34の上端に衝合させて該梯子35を通じて行っている。
なお、この梯子35は適宜な固定部材36或いは鉄線等の緊
結材によって作業足場33に固定されて昇降式型枠装置32
と一体的に昇降するものである。2. Description of the Related Art Conventionally, in the construction work of a concrete dam, a work scaffolding integrally provided at a lower end of an elevating formwork device which moves up and down along a slope of a dam embankment under construction is used to construct a slope of the dam embankment. As shown in FIG. 5, to reach the fixed stairs provided in the vertical
A ladder 35 is erected from an appropriate place in the width direction of the working scaffold 33 horizontally erected at the lower end of the ladder 35, and the lower end of the ladder 35 is brought into contact with the upper end of the fixed stairs 34 to perform the ladder 35. .
The ladder 35 is fixed to the work platform 33 by an appropriate fixing member 36 or a binding material such as an iron wire, and
It goes up and down integrally with
【0003】[0003]
【発明が解決しようとする課題】しかしながら、このよ
うな梯子35による作業足場33から固定階段34への渡り通
路の構造では、ダム堤体31の築造に伴って昇降式型枠装
置32を上昇させると、作業足場33から垂設している梯子
35が固定階段34から離れてしまい、移動した梯子35の下
端に向かって固定階段34の延長作業が完了するまで通路
としての使用が行えないという問題点があった。このよ
うな問題点は、前もって昇降式型枠装置32の上昇ピッチ
分だけ固定階段34を接続延長させておけば解消し得る
が、梯子35が固定階段34の延長作業の妨げとなっている
ために該梯子35を外さなければ固定階段34を延長させる
ことができなく、その間は通路として使用できないとい
う不都合が生じるものである。However, in the structure of such a crossing path from the work scaffold 33 to the fixed stairs 34 by the ladder 35, the elevating formwork device 32 is raised with the construction of the dam embankment 31. And the ladder hanging from the work scaffold 33
There has been a problem that the fixed stairs 35 cannot be used as a passage until the extension of the fixed stairs 34 toward the lower end of the moved ladder 35 is completed. Such a problem can be solved by connecting and extending the fixed stairs 34 by the rising pitch of the elevating formwork device 32 in advance, but the ladder 35 hinders the extension work of the fixed stairs 34. If the ladder 35 is not removed, the fixed stairs 34 cannot be extended, and during that time, there is a disadvantage that the fixed stairs 34 cannot be used as a passage.
【0004】本発明は、このような問題点を解消するた
めに提案されたものであって、ダム堤体の築造に伴って
上昇させる昇降式型枠装置に取付けられた作業足場が移
動しても、該作業足場からダム堤体の傾斜面に配設され
た固定階段への通路が途切れることなく確保し得ると共
に、固定階段の継ぎ足し作業中においても使用できるダ
ム堤体築造用渡り通路の構造の提供を目的とするもので
ある。The present invention has been proposed in order to solve such a problem, and a work scaffold attached to an elevating formwork device which is raised with the construction of a dam embankment moves. In addition, a passage from the work scaffold to the fixed stairs provided on the inclined surface of the dam embankment can be secured without interruption, and the structure of the crossing passage for dam embankment construction that can be used even during the work of adding the fixed stairs. The purpose is to provide.
【0005】[0005]
【課題を解決するための手段】上記目的を達成するため
に、本発明のダム堤体築造用渡り通路の構造は、築造中
のダム堤体の斜面に沿って昇降する昇降式型枠装置の下
端に一体的に設けられた作業足場から、ダム堤体の斜面
に沿ってダム堤体の築造に従って延設される固定階段へ
渡るための渡り通路であって、該渡り通路は階段状に形
成されていてその上端を前記作業足場の適所に固定させ
ていると共に下端を前記固定階段の一側面に沿って前記
昇降式型枠装置の昇降に伴って移動可能とし、さらに、
該渡り通路の下端と前記昇降式型枠装置の下端間の距離
がダム堤体の築造に従って段階的に上昇させる昇降式型
枠装置の一段階移動ピッチ以上となるように渡り通路の
長さを設定していることを特徴とするものである。SUMMARY OF THE INVENTION In order to achieve the above object, a structure of a crossing passage for building a dam embankment of the present invention comprises a lift-type formwork apparatus which moves up and down along a slope of a dam embankment being built. A crossover passage from a work scaffold integrally provided at the lower end to a fixed staircase extending along the slope of the dam embankment according to the construction of the dam embankment, and the crossover passage is formed in a step shape. The upper end is fixed in place of the work scaffold and the lower end is movable along the side surface of the fixed stairs as the elevating type form device is moved up and down.
The length of the transfer passage is set so that the distance between the lower end of the transfer passage and the lower end of the lift-type form device is equal to or greater than a one-step movement pitch of the lift-type form device that rises stepwise according to the construction of the dam embankment. It is characterized by having been set.
【0006】[0006]
【作用】ダム堤体の築造に伴って昇降式型枠装置と一体
的に上昇する作業足場の適所に取付けられた階段状の渡
り通路は、その下端をダム堤体の斜面に架設された固定
階段の一側面に沿わせているので、固定階段の継ぎ足し
延長作業の妨げになることはなく、その作業中において
も渡り通路として使用できる。さらに、この渡り通路の
下端から昇降式型枠装置の下端までの間隔が、昇降式型
枠装置の一段階分の移動距離以上となるように渡り通路
の長さを設定しているので、昇降式型枠装置の上昇前に
該昇降式型枠装置の次の上昇距離以上の長さに相当する
固定階段の継ぎ足しが行え、従って、昇降式型枠装置を
次のコンクリート打設位置まで移動させても、直ちに作
業足場から固定階段へと渡り通路を使用して作業を遂行
し得るものである。[Function] A stair-like cross-passage installed at a suitable place on a work scaffold that rises integrally with the elevating formwork device with the construction of the dam embankment, with its lower end fixed to the slope of the dam embankment Since it extends along one side of the stairs, it does not hinder the extension and extension work of the fixed stairs, and can be used as a crossing passage even during the work. Furthermore, since the length of the transfer passage is set so that the distance from the lower end of the transfer passage to the lower end of the lift-type form device is equal to or greater than the movement distance of one step of the lift-type form device, Before ascending the formwork apparatus, the fixed stairs corresponding to the length equal to or longer than the next ascending distance of the elevating formwork apparatus can be added, and therefore, the elevating formwork apparatus is moved to the next concrete placing position. However, the work can be immediately performed using the passage from the work platform to the fixed stairs.
【0007】[0007]
【実施例】本発明の実施例を図面について説明すると、
図1はコンクリートダム堤体1の斜面に沿って昇降する
昇降式型枠装置2に一体的に架設された作業足場3から
ダム堤体1の斜面に沿って架設された固定階段4へ渡る
ために設けられている渡り通路5を示すもので、ダム堤
体1を築造する型枠装置は型枠パネル2aと、該型枠パネ
ル2aを押さえるために一定間隔毎に設けられた複数本の
横端太材2b及び縦端太材2cとからなり、この型枠装置に
該型枠装置をダム堤体1の斜面方向に昇降させる適宜な
昇降装置(図示せず)を付設することによって昇降式型
枠装置2を構成しているものである。そして、型枠装置
の縦端太材2cはアンカーボルト等の固定具によって築造
中のダム堤体1に固定され、昇降時にはこの固定具を外
して昇降できる構造となっている。BRIEF DESCRIPTION OF THE DRAWINGS FIG.
FIG. 1 shows a cross-section from a working scaffold 3 erected integrally with an elevating formwork device 2 which rises and lowers along a slope of a concrete dam embankment 1 to a fixed staircase 4 erected along the slope of the dam embankment 1. FIG. 1 shows a crossover passage 5 provided in a vehicle. A formwork device for constructing a dam embankment body 1 includes a formwork panel 2a and a plurality of horizontal members provided at regular intervals to hold the formwork panel 2a. It is composed of a thick end member 2b and a vertical end thick member 2c, and is provided with a suitable lifting device (not shown) for raising and lowering the form device in the slope direction of the dam embankment body 1 by means of this form device. This constitutes the formwork device 2. The vertical end thick member 2c of the formwork device is fixed to the dam embankment 1 under construction by a fixing device such as an anchor bolt, and has a structure in which the fixing device is detached when ascending and descending and can be moved up and down.
【0008】上記昇降式型枠装置2の下傾端縁に沿って
略全長に亘って配設されている作業足場3は、その足場
板13の長手方向の一端縁を昇降式型枠装置2の縦端太材
2cの下端に架設状態で固定してダム堤体1の斜面上に向
かって水平に張り出し、その張出端である他端縁に適宜
高さの手すり3aを立設してある。一方、固定階段4はダ
ム堤体1の築造に伴って該ダム堤体1の底部から堤体斜
面上に延設され、アンカーボルト等の固定具によってダ
ム堤体1の斜面上に固定されてあり、ダム堤体1の所定
高さ部分の築造毎にその上端に階段部分を接続、延長さ
せるように構成している。The work scaffold 3 which is disposed along the lower end edge of the elevating form device 2 over substantially the entire length thereof is provided with one end edge of the scaffold plate 13 in the longitudinal direction of the elevating form device 2. Vertical end thick wood
It is fixed to the lower end of 2c in a erected state and horizontally extends toward the slope of the dam embankment 1, and a handrail 3a having an appropriate height is erected on the other end edge of the projecting end. On the other hand, the fixed stairs 4 are extended from the bottom of the dam embankment 1 on the slope of the embankment along with the construction of the dam embankment 1, and are fixed on the slope of the dam embankment 1 by fixing tools such as anchor bolts. In addition, a step portion is connected to and extended from the upper end of the dam embankment body 1 every time a predetermined height portion is constructed.
【0009】上記作業足場3と固定階段4間に配設され
た渡り通路5は、階段状に形成されている通路部5aと、
該通路部5aを支持する支持枠5bと、この支持枠5bを昇降
式型枠装置2に固定するための支持枠固定部材5cと、通
路部5aの両側縁に立設した適高さの手すり5dとからな
り、階段状通路部5aは支持枠5b上に固定、支持されてい
と共に、支持枠固定部材5cは昇降式型枠装置2の並設縦
端太材2cのうちの2本の縦端太材2c、2cの下端部にその
上端をボルトナット等の固着部材によって一体的に固着
してあり、これらの固定部材5c、5c間上に支持枠5bの下
端が立設状態で固定されている。The crossing passage 5 provided between the work scaffold 3 and the fixed staircase 4 includes a passage portion 5a formed in a step shape,
A support frame 5b for supporting the passage portion 5a, a support frame fixing member 5c for fixing the support frame 5b to the elevating mold device 2, and a handrail of an appropriate height standing on both side edges of the passage portion 5a 5d, the stepped passage portion 5a is fixed and supported on a support frame 5b, and the support frame fixing member 5c is provided with two vertical ends 2c of the vertical end thick members 2c of the vertically movable form device 2. The upper ends of the end members 2c and 2c are integrally fixed to the lower ends thereof by fixing members such as bolts and nuts, and the lower ends of the support frames 5b are fixed in an upright state between these fixing members 5c and 5c. ing.
【0010】さらに、渡り通路5の通路部5aにおける最
下段の踏板15は、上記固定階段4の一側面に近接状態で
対向して配設されてあり、該渡り通路5が昇降式型枠装
置2と共に上昇時には、踏板15が固定階段4の一側面に
沿って移動させるように構成している。又、渡り通路5
の最上段の踏板25は、作業足場3の適所の足場板13上に
連通してあり、該踏板25と足場板13間に連結板6が掛け
渡されている。この連結板6はその一端を足場板13に、
他端を踏板25に夫々ボルトナット或いは鉄線等の連結部
材によって取り外し可能に連結してある。なお、連結板
6は、作業足場3の足場板13と渡り通路5の最上段の踏
板25間の隙間の大きさに応じて使用するものであり、隙
間がなければ足場板13と踏板25とを直接連結しておいて
もよい。[0010] Further, the lowermost tread plate 15 in the passage portion 5a of the transfer passage 5 is disposed so as to be opposed to one side surface of the fixed stairs 4 in a close state, and the transfer passage 5 is moved up and down. At the time of ascent with the step 2, the tread plate 15 is configured to move along one side surface of the fixed staircase 4. In addition, migration passage 5
The uppermost tread plate 25 communicates with the scaffold plate 13 at an appropriate position of the work scaffold 3, and the connecting plate 6 is bridged between the tread plate 25 and the scaffold plate 13. One end of the connecting plate 6 is connected to the scaffold plate 13,
The other end is detachably connected to the tread plate 25 by a connecting member such as a bolt and a nut or an iron wire. The connecting plate 6 is used in accordance with the size of the gap between the scaffold plate 13 of the work scaffold 3 and the uppermost tread plate 25 of the cross passage 5. If there is no gap, the scaffold plate 13 and the tread plate 25 are used. May be directly connected.
【0011】又、第2図に示すように、渡り通路5の上
記最下段の踏板15と上記昇降式型枠装置2の縦端太材2c
の下端間の間隔Lが、ダム堤体1の築造に従って上昇さ
せる昇降式型枠装置2の一段階分の移動距離以上となる
ように渡り通路5の長さを設定してある。なお、昇降式
型枠装置2の縦端太材2cの下端部に対する渡り通路5の
支持枠固定部材5cの上記取付構造は、縦端太材2cの長さ
方向に適宜間隔毎に複数のボルト取付孔を設けておく
か、或いは該ボルト取付孔を長孔に形成して縦端太材2c
の長さ方向に対する支持枠固定部材5cの取付位置を調整
可能に構成してあり、従って、上記間隔Lの調整が可能
となっている。As shown in FIG. 2, the lowermost tread plate 15 of the crossing passage 5 and the vertical end thick member 2c of the elevating formwork device 2 are used.
The length of the crossover passage 5 is set so that the distance L between the lower ends is equal to or greater than the moving distance of one step of the elevating formwork device 2 that is raised according to the construction of the dam embankment 1. The mounting structure of the supporting frame fixing member 5c of the crossover passage 5 with respect to the lower end of the vertical end thick member 2c of the elevating type frame device 2 includes a plurality of bolts at appropriate intervals in the longitudinal direction of the vertical end thick member 2c. A mounting hole is provided, or the bolt mounting hole is formed as a long hole and
The mounting position of the support frame fixing member 5c with respect to the length direction is configured to be adjustable, so that the distance L can be adjusted.
【0012】このように構成した渡り通路の構造では、
昇降式型枠装置2を斜め上方に所定のピッチ毎に移動さ
せながらコンクリートを打設してダム堤体1を築造して
いく工事において、該昇降式型枠装置2に取付けられて
いる作業足場3からダム堤体1の斜面上に架設された固
定階段4へと渡り通路5を通じて作業員の移動や資材及
び機材の運搬等を行う。この際、作業足場3を利用して
の型枠組立作業や或いは組立てた型枠装置へのコンクリ
ート打設作業と並行して、固定階段4の上傾端に、図2
に示すように上記間隔Lに相当する長さを有する階段部
14の継ぎ足し作業を行う。In the structure of the cross passage constructed as described above,
A work scaffold attached to the up-and-down formwork device 2 in the construction of the dam embankment 1 by casting concrete while moving the up-and-down formwork device 2 diagonally upward at a predetermined pitch. From 3, a worker moves and transports materials and equipment through a passage 5 to a fixed staircase 4 erected on the slope of the dam body 1. At this time, in parallel with the formwork assembling work using the work scaffold 3 or the concrete placing work on the assembled formwork apparatus, the fixed stairs 4 are inclined upwardly as shown in FIG.
As shown in the figure, a step portion having a length corresponding to the interval L
Perform 14 additional work.
【0013】この階段部14の継ぎ足し作業は、昇降式型
枠装置2の次段階への移動前に完了しており、次いで昇
降式型枠装置2を次のダム堤体部分の築造位置まで所定
距離上昇移動させると、該昇降式型枠装置2に一体的に
固設されている渡り通路5もその最下段の踏板15が継ぎ
足された階段部14の一側面に沿って上昇移動し、図3に
示すように、該階段部14の最上段の一歩手前の位置で停
止する。この状態から再び上記と同様にして昇降式型枠
装置2にコンクリートを打設してダム堤体部分を築造
し、その間に階段部14の上端に次の階段部を継ぎ足し、
これを繰り返してダム堤体1を築造していくものであ
る。The work of adding the stairs 14 has been completed before the elevating form device 2 is moved to the next stage, and then the elevating form device 2 is moved to the next dam embankment portion at a predetermined position. When the distance is increased, the crossover passage 5 integrally fixed to the elevating formwork device 2 also moves upward along one side surface of the stair portion 14 to which the lowermost tread plate 15 is added. As shown in FIG. 3, the vehicle stops at a position one step before the uppermost step of the staircase section 14. From this state, concrete is poured into the elevating formwork device 2 again in the same manner as above to build a dam embankment portion, and the next stair portion is added to the upper end of the stair portion 14 during that time.
This is repeated to build the dam body 1.
【0014】以上の実施例においては、渡り通路5を固
定階段4に対して交差する方向に配設しているが、図4
に示すように固定階段4の一側面に階段形状の渡り通路
5を並行状態に配設してもよい。即ち、該渡り通路5の
最下段の踏板15と上記昇降式型枠装置2の縦端太材2cの
下端間の間隔Lが昇降式型枠装置2の一段階分の移動距
離以上となるような一定の長さを有する渡り通路5を、
既に築造されたダム堤体部分の斜面上に沿ってその斜面
傾斜方向に配設し、該渡り通路5の上端を昇降式型枠装
置2の下端に架設されている作業足場3の適所に固定す
ると共に下端部を固定階段4の一側面に並行に沿わせて
いるものである。従って、この実施例においては、渡り
通路5の下面をダム堤体1の斜面に摺接、受止させてお
くことができるから、上記実施例で示した支持枠5bや支
持枠固定部材5cを必要としない。その他の構造並びに階
段部14の継ぎ足し態様は上記実施例と同様である。In the above embodiment, the crossing passage 5 is arranged in a direction intersecting the fixed staircase 4.
As shown in (1), a staircase-shaped crossing passage 5 may be arranged on one side surface of the fixed staircase 4 in parallel. That is, the distance L between the lowermost tread plate 15 of the crossing passage 5 and the lower end of the vertical end thick member 2c of the elevating formwork device 2 is equal to or more than the moving distance for one step of the elevating formwork device 2. A transfer path 5 having a certain length
It is disposed along the slope of the already built dam embankment in the slope direction, and the upper end of the crossing passage 5 is fixed to a proper position of the work scaffold 3 erected at the lower end of the elevating formwork device 2. At the same time, the lower end is parallel to one side surface of the fixed staircase 4. Therefore, in this embodiment, the lower surface of the crossover passage 5 can be slid and received on the slope of the dam embankment 1, so that the support frame 5b and the support frame fixing member 5c shown in the above embodiment can be used. do not need. The rest of the structure and the manner in which the steps 14 are added are the same as in the above embodiment.
【0015】[0015]
【発明の効果】以上のように本発明のダム堤体築造用渡
り通路によれば、築造中のダム堤体の斜面に沿って昇降
する昇降式型枠装置と一体の作業足場から、ダム堤体の
斜面に沿って延設された固定階段へと渡るための渡り通
路を階段状に形成し、その上端を前記作業足場枠の適所
に固定すると共に下端を前記固定階段の一側面に沿って
前記昇降式型枠装置の昇降に伴って移動可能としている
ので、渡り通路は固定階段の継ぎ足し方向から外れた位
置に配設されているから、固定階段の継ぎ足し延長作業
の妨げになることはなく、従って、その作業中において
も渡り通路として使用できるものである。As described above, according to the crossing passage for building a dam embankment of the present invention, the dam embankment can be moved from the working scaffolding integrated with the elevating formwork device that moves up and down along the slope of the dam embankment being built. A stairway is formed in a stair-like passage for crossing to a fixed staircase extending along the slope of the body, and an upper end thereof is fixed to an appropriate position of the work scaffold frame, and a lower end thereof is formed along one side of the fixed staircase. Since the movable form is movable along with the elevation of the elevating formwork device, the crossing passage is arranged at a position deviating from the direction of replenishment of the fixed stairs, so that the extension of the fixed stairs is not hindered. Therefore, it can be used as a crossing passage even during the work.
【0016】さらに、この渡り通路の下端から昇降式型
枠装置の下端までの間隔が、昇降式型枠装置の一段階分
の移動距離以上となるように渡り通路の長さを設定して
いるので、昇降式型枠装置の上昇前に該昇降式型枠装置
の次の上昇距離以上の長さに相当する固定階段の継ぎ足
しが行え、従って、昇降式型枠装置を次のコンクリート
打設位置まで移動させても、直ちに作業足場から固定階
段へと渡り通路を使用でき、ダム堤体築造工事を能率良
く行えるものである。Further, the length of the transfer passage is set such that the distance from the lower end of the transfer passage to the lower end of the lift-type form device is equal to or greater than the moving distance of one step of the lift-type form device. Therefore, before the ascending and descending formwork apparatus is lifted, the fixed stairs corresponding to the length equal to or longer than the next ascending distance of the ascending and descending formwork apparatus can be added. Therefore, the ascending and descending formwork apparatus is moved to the next concrete placing position. Even if it is moved to a location, it is possible to use the passage immediately from the work scaffold to the fixed stairs, and it is possible to efficiently construct the dam embankment.
【図1】本発明の一実施例の斜視図、FIG. 1 is a perspective view of one embodiment of the present invention;
【図2】固定階段を継ぎ足した状態の側面図、FIG. 2 is a side view showing a state where fixed stairs are added.
【図3】昇降式型枠装置を一段階上昇させた状態の側面
図、FIG. 3 is a side view of a state in which the elevating formwork device is raised by one stage;
【図4】本発明の別な実施例を示す斜視図、FIG. 4 is a perspective view showing another embodiment of the present invention;
【図5】従来例を示す斜視図。FIG. 5 is a perspective view showing a conventional example.
1 ダム堤体 2 昇降式型枠装置 3 作業足場 4 固定階段 5 渡り通路 1 Dam embankment 2 Elevating formwork device 3 Work scaffold 4 Fixed stairs 5 Crossing passage
Claims (1)
る昇降式型枠装置の下端に一体的に設けられた作業足場
から、ダム堤体の斜面に沿ってダム堤体の築造に従って
延設される固定階段へ渡るための渡り通路であって、該
渡り通路は階段状に形成されていてその上端を前記作業
足場の適所に固定させていると共に下端を前記固定階段
の一側面に沿って前記昇降式型枠装置の昇降に伴って移
動可能とし、さらに、該渡り通路の下端と前記昇降式型
枠装置の下端間の距離がダム堤体の築造に従って段階的
に上昇させる昇降式型枠装置の一段階移動ピッチ以上と
なるように渡り通路の長さを設定していることを特徴と
するダム堤体築造用渡り通路の構造。1. A work scaffolding integrally provided at a lower end of an elevating formwork device which rises and falls along a slope of a dam embankment under construction according to the construction of the dam embankment along the slope of the dam embankment. A crossing passage for crossing to a fixed stair to be extended, the crossing passage being formed in a step shape, and having an upper end fixed to an appropriate position of the work scaffold and a lower end to one side surface of the fixed stair. Along with the lifting and lowering of the elevating formwork device, and furthermore, the distance between the lower end of the crossing passage and the lower end of the elevating formwork device is raised stepwise according to the construction of the dam embankment. A structure of a cross passage for building a dam embankment, wherein a length of the cross passage is set so as to be equal to or more than a one-step movement pitch of the formwork device.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP15287592A JP2599071B2 (en) | 1992-05-19 | 1992-05-19 | Structure of crosswalk for dam embankment construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP15287592A JP2599071B2 (en) | 1992-05-19 | 1992-05-19 | Structure of crosswalk for dam embankment construction |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH05321230A JPH05321230A (en) | 1993-12-07 |
| JP2599071B2 true JP2599071B2 (en) | 1997-04-09 |
Family
ID=15550032
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP15287592A Expired - Fee Related JP2599071B2 (en) | 1992-05-19 | 1992-05-19 | Structure of crosswalk for dam embankment construction |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2599071B2 (en) |
-
1992
- 1992-05-19 JP JP15287592A patent/JP2599071B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH05321230A (en) | 1993-12-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2022252829A1 (en) | Liftable scaffold, lifting and installation methods thereof, and construction method for prefabricated building | |
| JP2009541612A (en) | Construction site stairs | |
| JP2650820B2 (en) | All-weather concrete column construction slide formwork device | |
| KR940007319A (en) | How to Build Stairs and Stairs, How to Build Stairs and Stair Members | |
| JP2647016B2 (en) | Construction method of stairs | |
| JP2599071B2 (en) | Structure of crosswalk for dam embankment construction | |
| JP3732888B2 (en) | Temporary staircase with landing | |
| JP2874576B2 (en) | Moving scaffold for retaining wall construction | |
| KR102298233B1 (en) | Movable Safety Footboard for High Place Work and Inspection Road Constructing Method Using the Same | |
| JP4011722B2 (en) | Hanging stairs | |
| KR102786972B1 (en) | Form auto climbing system having form setting frame, and concrete wall construction method using the same | |
| JP2807776B2 (en) | Baseboard for temporary railing | |
| JPH06323003A (en) | Temporarily installed staircase | |
| JP2944998B1 (en) | Scaffolding equipment for building tower structures | |
| JP3984247B2 (en) | Temporary staircase with landing | |
| CN214996342U (en) | Integrated protection channel for stairwell | |
| JP3087196B2 (en) | How to build stairs | |
| CN216142461U (en) | Prefabricated staircase passageway integral lifting protection support body | |
| JP2503042Y2 (en) | Mobile work scaffolding | |
| JPH04309651A (en) | Construction method for stairs | |
| JPH0318580Y2 (en) | ||
| JP3626242B2 (en) | Multi-stage construction method of temporary staircase with landing in shaft | |
| JP3115908B2 (en) | How to build steel stairs | |
| JPS61191763A (en) | Construction of pc panel for balcony using large beam floor mold frame | |
| JPH0518443Y2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |