Crane lifting equipment

Info

Publication number
JP2626366B2
JP2626366B2 JP29768091A JP29768091A JP2626366B2 JP 2626366 B2 JP2626366 B2 JP 2626366B2 JP 29768091 A JP29768091 A JP 29768091A JP 29768091 A JP29768091 A JP 29768091A JP 2626366 B2 JP2626366 B2 JP 2626366B2
Authority
JP
Japan
Prior art keywords
arm
suspended
balance
load
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP29768091A
Other languages
Japanese (ja)
Other versions
JPH05105388A (en
Inventor
章次 玉記
実 加藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP29768091A priority Critical patent/JP2626366B2/en
Publication of JPH05105388A publication Critical patent/JPH05105388A/en
Application granted granted Critical
Publication of JP2626366B2 publication Critical patent/JP2626366B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、建物の外側から内部の
入り込んだ場所に吊荷を移動させるのに好適な構造のク
レーン用吊荷装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a crane lifting device suitable for moving a load from the outside of a building to a place where the inside has entered.

【0002】[0002]

【従来の技術】高層ビルなどの建物の外壁には、一般に
PCカーテンウオールが使用されている。このカーテン
ウオールを外壁として取り付けるにはタワークレーンが
用いられているが、建物側への引き寄せと取り付けのた
めに前記クレーンのフックブロックにチェーンブロック
などを介してカーテンウオールを吊下し、チェーンブロ
ックの調整によりその取付け位置の微調整していた。し
かしながら、この作業は非能率であるし、安全上の問題
もあった。
2. Description of the Related Art Generally, PC curtain walls are used on the outer walls of buildings such as high-rise buildings. A tower crane is used to attach this curtain wall as an outer wall.However, the curtain wall is suspended from a hook block of the crane via a chain block or the like for drawing and attaching to the building side, and the chain block is attached to the crane. The mounting position was finely adjusted by adjustment. However, this operation was inefficient and had safety issues.

【0003】そこで、タワークレーンを用いて吊荷を建
物内部の入り込んだ場所に取り込む場合や、吊荷の位置
を微調整しようとする場合には、従来平衡ビームを用い
ることが行われている。
[0003] Therefore, when a suspended load is taken into a place where a suspended load is entered by using a tower crane or when the position of the suspended load is to be finely adjusted, a balanced beam is conventionally used.

【0004】この平衡ビームは、水平ビームの一端側に
バランスウエイトを配置し、他端側に吊荷を配置したも
ので、両者の重さと支点に対する距離の積によって水平
状態を保つとともに、もっぱらビームの支点から吊荷ま
での距離分だけ外壁側から建物内部に向けて吊荷を移動
できる。
This balanced beam has a balance weight disposed at one end of a horizontal beam and a suspended load disposed at the other end. The balanced beam is maintained horizontally by the product of the weight of the two and the distance to the fulcrum, and the beam is maintained exclusively. The suspended load can be moved from the outer wall side toward the interior of the building by the distance from the fulcrum to the suspended load.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、この場
合にはバランスウエイトの重量と吊荷の重量が完全に釣
り合った状態でなければ平衡が崩れ、安全上問題があっ
た。
However, in this case, if the weight of the balance weight and the weight of the suspended load are not perfectly balanced, the balance is lost, and there is a problem in safety.

【0006】この種の欠点を除去するため、例えば実開
昭60−19107号公報に示すようにバランスウエイ
トの位置が吊荷の荷重変化に応じて移動し、平衡状態を
保持する構造のものも開発されているが、移動は依然と
してクレーンの移動によっているため、移動時の微調整
をする際にクレーンの操作が難しかった。
In order to eliminate this kind of defect, for example, as shown in Japanese Utility Model Application Laid-Open No. 19107/1985, a structure in which the position of a balance weight moves in accordance with a change in the load of a suspended load to maintain an equilibrium state is known. Although it has been developed, the movement is still dependent on the movement of the crane, making it difficult to operate the crane when making fine adjustments during movement.

【0007】この発明は以上の問題を解決するものであ
って、その目的は、吊荷の吊下時における安全性がより
高く、また最終受け渡し地点で位置の微調整操作を簡単
に行えるクレーンの吊荷装置を提供するものである。
SUMMARY OF THE INVENTION The object of the present invention is to solve the above-mentioned problems, and an object of the present invention is to provide a crane which has higher safety when suspending a suspended load and can easily perform a fine adjustment operation of a position at a final delivery point. A hoisting device is provided.

【0008】[0008]

【課題を解決するための手段】かかる目的を達成するた
めに本発明は、クレーンのフックブロックに吊下される
支点ブロックと、該支点ブロックに基端を揺動可能に枢
支され、かつ先端に吊荷の吊下部を設けた吊荷アーム
と、前記支点ブロックに基端を揺動可能に枢支され、か
つ前記吊荷アームと対称位置に配置されたバランスアー
ムと、前記支点ブロックの下部中央に垂下された駆動シ
リンダと、該駆動シリンダのプランジャ先端に一端を枢
支され、かつ他端を前記各アームに連結された一対のリ
ンクレバ―と、前記バランスアームの先端に吊下された
バランスウエイトとを備えたものである。
In order to achieve the above object, the present invention provides a fulcrum block suspended from a hook block of a crane, a pivotally rotatable base end of the fulcrum block, and a distal end. A suspension arm provided with a suspension portion for a suspended load, a balance arm pivotally supported at a base end by the fulcrum block, and arranged at a position symmetrical to the suspension arm, and a lower portion of the fulcrum block A drive cylinder suspended at the center, a pair of link levers having one end pivotally supported at the tip of a plunger of the drive cylinder and the other end connected to each of the arms, and a balance suspended at the tip of the balance arm With weights.

【0009】[0009]

【作用】以上の構成による本発明のクレーン用吊荷装置
にあっては、駆動シリンダのプランジャの進退動作によ
って各アームの開き角度が調整され、その開き角度に応
じて、吊荷の横位置を変える。空荷状態で各アームを閉
じることでバランスウエイトは装置の重心近傍に移動す
る。
In the lifting device for a crane according to the present invention having the above-described structure, the opening angle of each arm is adjusted by the forward / backward movement of the plunger of the drive cylinder, and the horizontal position of the suspended load is adjusted according to the opening angle. Change. By closing each arm in the unloaded state, the balance weight moves near the center of gravity of the device.

【0010】[0010]

【実施例】以下、本発明の実施例を図面を用いて詳細に
説明する。図1は本発明の第一実施例を示すものであ
る。図において、図示しないタワークレーンの吊下ワイ
ヤの下端にはフックブロック1が配置されている。吊荷
装置2は、フックブロック1に吊下される支点ブロック
3と、支点ブロック3に支点ピン4を介して揺動可能に
枢支された吊荷アーム5およびバランスアーム6と、前
記支点ブロック3の下部中央に垂下された駆動用油圧シ
リンダ7と、油圧シリンダ7の下部に進退可能に突出す
るプランジャ8に一端をピン9を介して連結され、他端
を前記各アーム5,6にピン10を介して連結された一
対のリンクレバ―11,12とを備え、前記プランジャ
8の進退動作に伴いリンクレバ―11,12が移動し、
前記各アーム5,6はデバイダ状に開閉する。
Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 shows a first embodiment of the present invention. In the figure, a hook block 1 is arranged at a lower end of a hanging wire of a tower crane (not shown). The lifting device 2 includes a fulcrum block 3 suspended from the hook block 1, a lifting arm 5 and a balance arm 6 pivotally supported by the fulcrum block 3 via a fulcrum pin 4, and the fulcrum block. One end is connected via a pin 9 to a drive hydraulic cylinder 7 suspended at the center of the lower part of the lower part 3 and a plunger 8 protruding from the lower part of the hydraulic cylinder 7 so as to be able to advance and retreat. And a pair of link levers 11 and 12 connected through a link 10.
The arms 5 and 6 open and close in a divider shape.

【0011】前記吊荷アーム5の先端には吊荷W1 を吊
下するためのフック部13が設けられている。また、バ
ランスアーム6の長さは吊荷アーム5の長さより長く、
その先端にバランスウエイトW2 を吊下している。
A hook portion 13 for suspending the suspended load W1 is provided at the end of the suspended load arm 5. Also, the length of the balance arm 6 is longer than the length of the suspended load arm 5,
A balance weight W2 is suspended from the tip.

【0012】以上の構成において、吊荷装置2の荷重バ
ランスは各アーム5,6の長さL1,L2 の水平投影分
の長さと吊荷W1 およびバランスウエイトW2 のそれぞ
れの積によるモーメントの釣合いで定まる。
In the above construction, the load balance of the lifting device 2 is balanced by the horizontal projection of the lengths L1 and L2 of the arms 5 and 6 and the moment by the product of each of the suspended load W1 and the balance weight W2. Is determined.

【0013】この荷重バランスが釣り合った状態は、前
記油圧シリンダ7が垂直位置を保つことによって確認で
き、この確認のために油圧シリンダ7には傾斜計14が
配置されている。したがって、この傾斜計14のデータ
を読み取りつつ荷重調整し、その調整後はクレーンによ
って安定した状態で吊上げることができる。
The state in which the load balance is balanced can be confirmed by keeping the hydraulic cylinder 7 in a vertical position, and an inclinometer 14 is arranged in the hydraulic cylinder 7 for this confirmation. Accordingly, the load can be adjusted while reading the data of the inclinometer 14, and after the adjustment, the crane can be lifted in a stable state.

【0014】また、プランジャ8を進退操作することに
より、均衡が破れ、各アーム5,6はそれに応じた開き
角度に拡開縮小するので吊荷W1 の最終受け渡し地点に
おける位置の微調整操作が出来ることになる。
By moving the plunger 8 forward and backward, the balance is broken, and the arms 5 and 6 expand and contract to the corresponding opening angles, so that the position of the suspended load W1 at the final transfer point can be finely adjusted. Will be.

【0015】吊荷W1 を受渡した後油圧シリンダ7を駆
動して各アーム5,6を図中想像線のごとく閉じれば、
バランスウエイトw2 は装置2の重心近傍に移動するの
で、空荷状態でも装置2は安定した姿勢でフックブロッ
ク1に吊下される。
After the delivery of the suspended load W1, the hydraulic cylinder 7 is driven to close the arms 5, 6 as indicated by the imaginary lines in the figure.
Since the balance weight w2 moves to the vicinity of the center of gravity of the device 2, the device 2 is hung on the hook block 1 in a stable posture even in an empty state.

【0016】図2はこの発明の第二実施例を示すもので
ある。なお、図における要部以外の箇所は第一実施例と
同様なので要部のみについて説明し、その他の部分を省
略する。図において、バランスアーム6の先端側にはそ
の長手方向に沿って複数の荷重調整穴6aが一列に開口
され、各荷重調整穴6aを選択して前記バランスウエイ
トW2 の取付けが可能となっている。この実施例では吊
下げようとする吊荷W1 の荷重が頻繁に変わるような場
合に好適である。
FIG. 2 shows a second embodiment of the present invention. In addition, the parts other than the main part in the figure are the same as those of the first embodiment, so only the main part will be described, and other parts will be omitted. In the figure, a plurality of load adjusting holes 6a are opened in a line at the tip side of the balance arm 6 along the longitudinal direction thereof, and the balance weight W2 can be mounted by selecting each of the load adjusting holes 6a. . This embodiment is suitable for the case where the load of the suspended load W1 to be suspended frequently changes.

【0017】図3はこの発明の第三実施例を示すもので
ある。図において、吊荷アーム5の先端側にはこれに沿
って移動可能な補助アーム20が配置され、この補助ア
ーム20の先端には吊下げ用フック部13が設けられて
いる。
FIG. 3 shows a third embodiment of the present invention. In the figure, an auxiliary arm 20 movable along the leading end of the suspended load arm 5 is provided, and a suspended hook portion 13 is provided at the distal end of the auxiliary arm 20.

【0018】吊荷アーム5の外側には補助油圧シリンダ
21が平行に固定配置され、そのプランジャ22の先端
を補助アーム20に連結し、補助油圧シリンダの21の
駆動により補助アーム20を吊荷アーム5の先端より出
没させ、前記バランスアーム6に対する吊荷アーム5の
レバ―比を変更可能としている。この実施例では、吊荷
W1 とバランスウエイトW2 のバランス調整を補助油圧
シリンダ21によって行い、吊荷装置2の横移動時の調
整を油圧シリンダ7で行うことができる。なお、バラン
スアーム6側にこの種の機構を持った補助アームを設け
ても効果は同じである。
An auxiliary hydraulic cylinder 21 is fixedly disposed parallel to the outside of the lifting arm 5. The tip of a plunger 22 is connected to the auxiliary arm 20, and the auxiliary arm 20 is driven by the auxiliary hydraulic cylinder 21. 5 to make it possible to change the lever ratio of the suspended load arm 5 to the balance arm 6. In this embodiment, the balance between the suspended load W1 and the balance weight W2 can be adjusted by the auxiliary hydraulic cylinder 21, and the adjustment during the lateral movement of the lifting device 2 can be performed by the hydraulic cylinder 7. The same effect can be obtained by providing an auxiliary arm having this type of mechanism on the balance arm 6 side.

【0019】[0019]

【発明の効果】以上各実施例によって詳細に説明したよ
うに、本発明にかかるクレーン用吊荷装置にあっては、
駆動シリンダのプランジャの進退動作によって各アーム
の開き角度が調整され、横位置を変えるため、クレーン
の操作によって最終位置まで移動させる場合に比べて最
終受け渡し地点での微調整が極めて容易である。
As described in detail in the above embodiments, the crane lifting device according to the present invention has:
Since the opening angle of each arm is adjusted by the reciprocating operation of the plunger of the drive cylinder and the lateral position is changed, fine adjustment at the final delivery point is extremely easy as compared with the case where the arm is moved to the final position by operating the crane.

【0020】また各アームを閉じることでバランスウエ
イトは装置の重心近傍に移動するため、空荷状態であっ
ても安定した吊下姿勢に保持することができる。
When each arm is closed, the balance weight moves to the vicinity of the center of gravity of the apparatus, so that a stable hanging posture can be maintained even in an empty state.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の第一実施例によるクレーン用吊荷装置
の正面図である。
FIG. 1 is a front view of a crane lifting device according to a first embodiment of the present invention.

【図2】本発明の第二実施例による部分拡大図である。FIG. 2 is a partially enlarged view according to a second embodiment of the present invention.

【図3】本発明の第三実施例による部分拡大図である。FIG. 3 is a partially enlarged view according to a third embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 フックブロック 2 吊荷装置 3 支点ブロック 5 吊荷アーム 6 バランスアーム 7 駆動用油圧シリンダ 8 プランジャ 11,12 リンクレバ― 13 フック部(吊下部) W1 吊荷 W2 バランスウエイト DESCRIPTION OF SYMBOLS 1 Hook block 2 Lifting device 3 Support block 5 Lifting arm 6 Balance arm 7 Hydraulic cylinder for driving 8 Plunger 11, 12 Link lever 13 Hook part (hanging lower part) W1 Hanging load W2 Balance weight

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 クレーンのフックブロックに吊下される
支点ブロックと、該支点ブロックに基端を揺動可能に枢
支され、かつ先端に吊荷の吊下部を設けた吊荷アーム
と、前記支点ブロックに基端を揺動可能に枢支され、か
つ前記吊荷アームと対称位置に配置されたバランスアー
ムと、前記支点ブロックの下部中央に垂下された駆動シ
リンダと、該駆動シリンダのプランジャ先端に一端を枢
支され、かつ他端を前記各アームに連結された一対のリ
ンクレバ―と、前記バランスアームの先端に吊下された
バランスウエイトとを備えたことを特徴とするクレーン
用吊荷装置。
1. A fulcrum block suspended from a hook block of a crane, a lifting arm pivotally supported at a base end of the fulcrum block and having a hanging portion for hanging a load at a tip thereof, A balance arm pivotally supported at a base end by a fulcrum block and arranged symmetrically with the load arm; a drive cylinder suspended at the lower center of the fulcrum block; and a plunger tip of the drive cylinder A pair of link levers, one end of which is pivotally supported and the other end of which is connected to each of the arms, and a balance weight suspended from the tip of the balance arm. .
JP29768091A 1991-10-18 1991-10-18 Crane lifting equipment Expired - Lifetime JP2626366B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP29768091A JP2626366B2 (en) 1991-10-18 1991-10-18 Crane lifting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP29768091A JP2626366B2 (en) 1991-10-18 1991-10-18 Crane lifting equipment

Publications (2)

Publication Number Publication Date
JPH05105388A JPH05105388A (en) 1993-04-27
JP2626366B2 true JP2626366B2 (en) 1997-07-02

Family

ID=17849756

Family Applications (1)

Application Number Title Priority Date Filing Date
JP29768091A Expired - Lifetime JP2626366B2 (en) 1991-10-18 1991-10-18 Crane lifting equipment

Country Status (1)

Country Link
JP (1) JP2626366B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102888998B (en) * 2012-04-19 2015-01-07 中国建筑第四工程局有限公司 Method and structure for lifting supporting steel column
CN108560932A (en) * 2018-05-11 2018-09-21 桐城市永锦建筑工程有限公司 A kind of construction material simple lifting appliance

Also Published As

Publication number Publication date
JPH05105388A (en) 1993-04-27

Similar Documents

Publication Publication Date Title
CN109335949A (en) The method of scale beam type counter-jib suspender and its hoisting steel beam component
JP2626366B2 (en) Crane lifting equipment
JPH06345377A (en) Cargo hoist device for crane
JPH07227791A (en) Robot equipment
JPH05132283A (en) Anti-rotation device of lifting jig for crane
CN217867661U (en) Lifting appliance
US4155463A (en) Hoisting assembly
JPH0537869U (en) Lifting device for crane
JP2001097662A (en) Hoisting device for ship cargo handling
JP2539895Y2 (en) Crane lifting equipment
JP2646891B2 (en) Crane suspension beam device
JP3652857B2 (en) Hanging bracket
JP2539902Y2 (en) Swing prevention device for hanging jig for crane
CN214692981U (en) Crane counterweight adjusting mechanism
JP2527200Y2 (en) Universal hanging tool
CN209306810U (en) Scale beam type counter-jib suspender
JPH07144876A (en) Load hoisting device for crane
JPS5876655A (en) Apparatus for hanging up outer wall material
CN220811677U (en) Hoisting device for tower crane
JPS63160994A (en) Load handling arm mechanism
JPH05139682A (en) Load hoisting device for crane
JP2528749Y2 (en) Vehicle suspension device
JPH0142633Y2 (en)
JPH0546882U (en) Anti-sway device for crane
JPH0213471Y2 (en)