JP2642837B2 - How to fix steel frame - Google Patents
How to fix steel frameInfo
- Publication number
- JP2642837B2 JP2642837B2 JP4246105A JP24610592A JP2642837B2 JP 2642837 B2 JP2642837 B2 JP 2642837B2 JP 4246105 A JP4246105 A JP 4246105A JP 24610592 A JP24610592 A JP 24610592A JP 2642837 B2 JP2642837 B2 JP 2642837B2
- Authority
- JP
- Japan
- Prior art keywords
- axis
- correction
- computer
- beams
- cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION
【0001】[0001]
【産業上の利用分野】本発明は、鉄骨構造の建物建築工
事における鉄骨建て入れ修正方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for repairing a steel frame in a building construction work of a steel structure.
【0002】[0002]
【従来の技術】鉄骨構造の建物の建築工事において、鉄
骨を組立ててその建ち精度を確認し、規定の精度内に修
正したのち、ボルトの本締めや柱、梁の溶接を行う必要
がある。2. Description of the Related Art In the construction of a steel-framed building, it is necessary to assemble a steel frame, check its construction accuracy, correct it to a specified accuracy, and then perform full tightening of bolts and welding of columns and beams.
【0003】従来の修正方法は図4に示すように、柱
a、b、及びc、dの対角線上にブレースワイヤ20又
はブレースチェーン21を張設し、レバーホイスト22
を用い人力で張力を発生させて行っていた。As shown in FIG. 4, a conventional correction method is to stretch a brace wire 20 or a brace chain 21 on a diagonal line of columns a, b and c, d,
The tension was generated manually by using the force.
【0004】修正作業は、修正したい柱に水平力を掛け
て柱頂部を移動させ、建ち精度を確保するのが好まし
い。これに対し従来の方法は、ブレースワイヤ20又は
ブレースチェーン21を斜め方向に張っている。このた
め、必要な力の1.5〜2.0倍の張力が必要になって
いる。[0004] In the repair work, it is preferable to apply horizontal force to the pillar to be repaired and to move the top of the pillar to secure the building accuracy. In contrast, the conventional method stretches the brace wire 20 or the brace chain 21 in an oblique direction. For this reason, a tension 1.5 to 2.0 times the required force is required.
【0005】その張力の発生は、レバーホイスト22や
ターンバックルによっているが、1.5トン程度の定格
張力に対し、張力が不足するため過張力を掛けるので、
ブレースワイヤ20やレバーホイスト22などの破損が
多く発生している。[0005] The tension is generated by the lever hoist 22 or the turnbuckle. However, the tension is insufficient, and the tension is insufficient.
Many breakages of the brace wire 20 and the lever hoist 22 have occurred.
【0006】また、ブレースワイヤ20やレバーホイス
ト22などの取付け、取外しは手作業であり、修正作業
時は床が未設置のため、高所作業となる。また、ブレー
スワイヤ20の緩み取りは、人力作業で、作業性が悪
く、かつ危険である。さらに、建て入れ精度の計測は、
柱に沿って下げたピアノ線付き振り下げと、鋼製巻き尺
などを用いて行っているので、計測の精度は悪い。更
に、計測の記録も、メモ帳に書き込む程度で、保管に問
題がある。[0006] The attachment and removal of the brace wire 20 and the lever hoist 22 and the like are manual operations, and the repair work is performed at a high place because the floor is not installed. In addition, the loosening of the brace wire 20 is a manual operation, and the workability is poor and dangerous. In addition, the measurement of the installation accuracy,
The accuracy of the measurement is poor because it is performed using a piano wire with a piano wire lowered along a pillar and a steel tape measure. Further, the record of the measurement is only written in the memo pad, and there is a problem in storage.
【0007】そして、特開昭50−79355号公報に
はジンバル機構にX軸およびY軸のセルシン発信器を取
付けて柱状体の垂直度を監視する技術が開示されてい
る。しかしなから、この公知技術は地中掘削孔内の柱状
体を振止装置で補正するものであり、地上の鉄骨の建込
みに適用できない。また、特開昭59−102061号
公報には、柱の側面に小型ジャッキと角度検出器とを設
けて柱を正しく建込む技術が開示されている。しかしな
がら、かかる公知技術では、ジャッキの反力を充分に支
持することができず、修正作業を充分かつ確実に行うこ
とができない。さらに特開昭62−13659号公報に
はスパン調整をするために柱にガゼットプレートを取付
け、そのガゼットプレートと梁との間に柱の垂直度を保
持するためのジャッキを設ける技術が開示されている。
この公知技術では、柱はすでに垂直に建込まれているの
で、垂直度を修正する必要はまったくない。Japanese Patent Laid-Open Publication No. 50-79355 discloses a technique for monitoring the verticality of a column by attaching X-axis and Y-axis selcin oscillators to a gimbal mechanism. However, this known technique corrects a columnar body in an underground excavation hole with a vibration isolator and cannot be applied to the construction of a steel frame on the ground. Japanese Patent Laid-Open Publication No. Sho 59-102061 discloses a technique in which a small jack and an angle detector are provided on the side surface of a pillar to correctly build the pillar. However, according to this known technique, the reaction force of the jack cannot be sufficiently supported, and the correction operation cannot be performed sufficiently and reliably. Further, Japanese Patent Application Laid-Open No. 62-13659 discloses a technique in which a gusset plate is attached to a pillar for span adjustment, and a jack for maintaining the verticality of the pillar is provided between the gusset plate and the beam. I have.
In this known technique, there is no need to modify the verticality, since the columns are already erected vertically.
【0008】[0008]
【発明が解決しようとする課題】したがって本発明はワ
イヤやチェーンの張設や振り上げの設置等の人力を必要
とする作業がなく、高精度で、作業性よく建ち精度を確
保できる鉄骨建て入れ修正方法を提供することを目的と
している。Therefore, according to the present invention, there is no work requiring human power, such as the installation of a wire or a chain or a swing-up operation. It is intended to provide a way.
【0009】[0009]
【課題を解決するための手段】本発明によれば、固定済
みの躯体材の頂部に新設の躯体材を立設する鉄骨建て入
れ修正方法において、新設の躯体材の2つに直交する両
梁部の躯体材の中心線から一定距離離れた位置にそれぞ
れ2軸傾斜センサを載置し、それらの2軸傾斜センサを
コンピュータに接続し、前記の両梁部とそれらの下方の
固定済みの躯体材に設けた梁部との間に修正用シリンダ
よりなる結合体でそれぞれ連結し、コンピュータのX
軸、Y軸による表示画面には新設の躯体材の中心線の傾
斜による原点からの変化を表示し、コンピュータの表示
画面に基づいてそれらの2つの修正用シリンダを作動し
て新設の躯体材のS軸およびY軸を原点に一致させてい
る。According to the present invention, in a method of correcting a steel frame erection in which a new frame is erected on the top of a fixed frame, both beams orthogonal to two of the new frames are provided. A two-axis tilt sensor is placed at a certain distance from the center line of the frame material of the part, and these two-axis tilt sensors are connected to a computer, and the beams and the fixed frame below them are connected. Connected with a beam part provided on the material by a connecting body consisting of a correction cylinder, and
The display from the origin by the inclination of the center line of the new building material is displayed on the display screen by the axis and the Y axis, and those two correction cylinders are operated based on the display screen of the computer to display the new building material. The S axis and the Y axis are matched with the origin.
【0010】上記修正用シリンダは、階高調整用ロック
付シリンダと結合し、その結合体の2個を吊環を備えた
角度固定又は可動型の直交アームで連結し、吊環を介し
クレーンにより移動するのが好ましい。[0010] The correction cylinder is connected to a cylinder with a lock for adjusting the floor height, two of which are connected by an angle fixed or movable orthogonal arm having a suspension ring, and moved by a crane via the suspension ring. Is preferred.
【0011】[0011]
【作用】したがって、新設の躯体材の2つの直交する両
梁部に取付けた2つの2軸傾斜センサが新設の躯体材の
X軸、Y軸のずれをコンピョータに表示する。そこで修
正用シリンダを作動して原点に位置させるようにすれば
よい。このように本発明によれば、躯体材を鉛直に確実
かつ容易に修正できる。そして梁間に修正用シリンダを
設けたので、反力を充分にとることができ、修正に要す
るモーメントも梁上の設置位置により充分に大きくとれ
る。したがって、修正用シリンダをそれだけ小型化でき
る。さらにコンピュータと修正用シリンダとを関連させ
ることにより、自動修正を行うことができ、かつ記録を
カードディスクに蓄積することもできる。Therefore, the two biaxial tilt sensors attached to the two orthogonal beams of the newly-installed skeleton material indicate the deviation of the X-axis and the Y-axis of the newly-installed skeleton material on the computer. Therefore, the correction cylinder may be operated to be positioned at the origin. As described above, according to the present invention, it is possible to reliably and easily correct the skeleton material vertically. Since the correction cylinder is provided between the beams, the reaction force can be sufficiently obtained, and the moment required for the correction can be sufficiently increased depending on the installation position on the beam. Therefore, the correction cylinder can be reduced in size accordingly. Further, by associating the computer with the correction cylinder, automatic correction can be performed and records can be stored on a card disk.
【0012】[0012]
【実施例】以下図面を参照して本発明の実施例を説明す
る。Embodiments of the present invention will be described below with reference to the drawings.
【0013】図1及び図2において、固定済みの躯体材
1Aの柱部2Aには、直交する3個の梁部3A〜5Aが
突設され、それぞれ梁材6〜8が連結されている。In FIG. 1 and FIG. 2, three orthogonal beam portions 3A to 5A protrude from a column portion 2A of a fixed frame member 1A, and are connected to beam members 6 to 8, respectively.
【0014】この固定済みの躯体材1Aの頂部には、新
設の躯体材1が立てられ、エレクションピース9で連結
されており、3個の梁部3〜5が突設されている。な
お、符号2aは溶接用開先である。At the top of the fixed frame member 1A, a new frame member 1 is erected, connected by an erection piece 9, and three beam portions 3 to 5 are protruded. Reference numeral 2a is a groove for welding.
【0015】躯体材1の柱中心線Cの修正に際し、梁部
3、4の中心線から一定距離Lだけ離れた位置に、2軸
小型傾斜センサ10をそれぞれ載置し、図示しないパー
ソナルコンピュータにそれぞれ接続する。In correcting the column center line C of the frame material 1, the two-axis small tilt sensors 10 are respectively mounted at positions separated from the center lines of the beam portions 3 and 4 by a fixed distance L, and are mounted on a personal computer (not shown). Connect each.
【0016】次いで、梁部3側を例に説明すると、固定
済みの躯体材1Aの梁部3Aと梁部3との間を、上下に
階高調整用ロック付シリンダ12と修正シリンダ13と
を一体に結合した結合体11aで連結し、図示しない操
作弁を介して油圧ポンプに接続する。なお、この結合体
11aは梁部4側の結合体11bと吊環14の直交する
アーム15で連結一体化されている。Next, taking the beam portion 3 as an example, a cylinder 12 with a lock for adjusting the floor height and a correction cylinder 13 are vertically arranged between the beam portions 3A and 3 of the fixed frame member 1A. They are connected by a united body 11a integrally connected, and connected to a hydraulic pump via an operation valve (not shown). The joint 11a and the joint 11b on the side of the beam 4 are connected and integrated by an arm 15 orthogonal to the suspension ring 14.
【0017】パーソナルコンピュータのX軸、Y軸によ
る表示画面16には、中心線Cの傾斜による原点0(鉛
直線V)からの変化x、y(点P)が表示される。な
お、柱部2と梁部3、4との取付け精度は、鉄骨工場で
製作時に測定し、その補正値をコンピュータに入力して
おく。又コンピュータを使用せず、原点0(鉛直線V)
からの変化量(角度)をデジタル表示させることも可能
である。On the display screen 16 on the X and Y axes of the personal computer, changes x and y (points P) from the origin 0 (vertical line V) due to the inclination of the center line C are displayed. The mounting accuracy of the column 2 and the beams 3, 4 is measured at the time of manufacturing at a steel frame factory, and the correction value is input to a computer. Origin 0 (vertical line V) without using a computer
It is also possible to digitally display the amount of change (angle) from.
【0018】次いで、図示の例では、結合体11aの修
正シリンダ13を収縮して点PをX軸上に移し、かつ、
他方の結合体11bの修正シリンダ13を伸長し、Y軸
上の点Pを原点0に一致させる。これにより、柱部2の
中心線Cの倒れを修正し、許容建ち精度内に収める。そ
こで、溶接用開先2aにより溶接し、躯体材1を固定済
み躯体材1Aに固定する。Next, in the illustrated example, the correction cylinder 13 of the combined body 11a is contracted to move the point P on the X axis, and
The correction cylinder 13 of the other combined body 11b is extended so that the point P on the Y axis coincides with the origin 0. Thereby, the inclination of the center line C of the pillar portion 2 is corrected, and is set within the allowable building accuracy. Therefore, the frame member 1 is fixed to the fixed frame member 1A by welding with the welding groove 2a.
【0019】なお、階高が階高調整用ロック付シリンダ
12等の調整範囲を越える場合や、そのシリンダ12を
使用しない場合は、固定済みの躯体材1Aの柱部2Aの
途中に図示しない仮受け梁を溶接により取付け、反力受
けとすることができる。If the floor height exceeds the adjustment range of the cylinder 12 with a lock for floor height adjustment, or if the cylinder 12 is not used, a temporary unillustrated temporary part is provided in the middle of the pillar 2A of the fixed frame member 1A. The receiving beam can be attached by welding to be a reaction force receiving.
【0020】また、修正用シリンダ13をパーソナルコ
ンピュータの信号により伸縮し、自動修正を行うことが
できる。更に修正前後の傾斜角度データをコンピュータ
のハードディスク等に蓄積し、記録として容易に残すこ
とができ、記録の信頼性を向上させることができる。ま
た、吊環14により両結合体11a、11bを人手によ
らないで移動、セットすることができる。Further, the correction cylinder 13 can be expanded and contracted by a signal from a personal computer to perform automatic correction. Further, the inclination angle data before and after the correction can be stored in a hard disk of a computer or the like, and can be easily left as a record, thereby improving the reliability of the record. Further, both the joints 11a and 11b can be moved and set by the suspension ring 14 without manual operation.
【0021】[0021]
【発明の効果】以上の通り本発明によれば、下記のすぐ
れた効果を奏する。 (a) 修正用シリンダの反力を充分にとることがで
き、大きいモーメントを得ることができる。 (b) コンピュータの表示により修正用シリンダを作
動させればよく、作業が簡単でかつ正確である。また記
録ができる。 (c) 人力によらずに作業性がよく、高精度を確保で
きる。 (d) 梁に2軸傾斜センサを設けたので、躯体材のね
じれの影響がない。As described above, according to the present invention, the following excellent effects can be obtained. (A) The reaction force of the correction cylinder can be sufficiently obtained, and a large moment can be obtained. (B) The correction cylinder can be operated by the display of the computer, and the operation is simple and accurate. You can also record. (C) Workability is good and high accuracy can be ensured regardless of human power. (D) Since the biaxial tilt sensor is provided on the beam, there is no influence of the torsion of the frame material.
【図1】本発明の一実施態様を説明する斜視図。FIG. 1 is a perspective view illustrating one embodiment of the present invention.
【図2】図1の上面図。FIG. 2 is a top view of FIG. 1;
【図3】表示画面の表示の一例を示す図面。FIG. 3 is a view showing an example of a display on a display screen.
【図4】従来方法を説明する正面図。FIG. 4 is a front view illustrating a conventional method.
C・・・中心線 V・・・鉛直線 1、1A・・・躯体材 2、2A・・・柱部 2a・・・溶接用開先 3〜5、3A〜5A・・・梁部 6〜8・・・梁材 9・・・エレクションピース 10・・・2軸小型傾斜センサ 11a、11b・・・結合体 12・・・階高調整用ロック付シリンダ 13・・・修正用シリンダ 14・・・吊環 15・・・アーム 16・・・表示画面 20・・・ブレースワイヤ 21・・・ブレースチェーン 22・・・レバーホイスト C: Center line V: Vertical line 1, 1A: Frame material 2, 2A: Column portion 2a: Groove for welding 3-5, 3A-5A: Beam portion 6- Reference Signs List 8 beam member 9 erection piece 10 biaxial small-sized tilt sensor 11a, 11b combined body 12 cylinder with lock for floor height adjustment 13 cylinder for correction 14.・ Hanging ring 15 ・ ・ ・ Arm 16 ・ ・ ・ Display screen 20 ・ ・ ・ Brace wire 21 ・ ・ ・ Brace chain 22 ・ ・ ・ Lever hoist
───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭59−102061(JP,A) 特開 昭62−13659(JP,A) 特開 平2−13661(JP,A) ────────────────────────────────────────────────── ─── Continuation of front page (56) References JP-A-59-102061 (JP, A) JP-A-62-113659 (JP, A) JP-A-2-13661 (JP, A)
Claims (1)
を立設する鉄骨建て入れ修正方法において、新設の躯体
材の2つに直交する両梁部の躯体材の中心線から一定距
離離れた位置にそれぞれ2軸傾斜センサを載置し、それ
らの2軸傾斜センサをコンピュータに接続し、前記の両
梁部とそれらの下方の固定済みの躯体材に設けた梁部と
の間に修正用シリンダよりなる結合体でそれぞれ連結
し、コンピュータのX軸、Y軸による表示画面には新設
の躯体材の中心線の傾斜による原点からの変化を表示
し、コンピュータの表示画面に基づいてそれらの2つの
修正用シリンダを作動して新設の躯体材のS軸およびY
軸を原点に一致させることを特徴とする鉄骨建て入れ修
正方法。1. A steel frame erection correction method in which a new skeleton material is erected on the top of a fixed skeleton material, a fixed distance from a center line of the skeleton material of both beams orthogonal to two of the new skeleton materials. A two-axis tilt sensor is placed at a distance from each other, and these two-axis tilt sensors are connected to a computer. Between the two beams and the beams provided on the fixed frame member below them. It is connected by a joint consisting of a cylinder for correction, and the display screen on the X-axis and Y-axis of the computer displays the change from the origin due to the inclination of the center line of the newly-built frame material, and based on the display screen of the computer By operating the two correction cylinders, the S axis and the Y
A method of correcting steel-frame building, characterized by aligning the axis with the origin.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP4246105A JP2642837B2 (en) | 1992-09-16 | 1992-09-16 | How to fix steel frame |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP4246105A JP2642837B2 (en) | 1992-09-16 | 1992-09-16 | How to fix steel frame |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH06101349A JPH06101349A (en) | 1994-04-12 |
| JP2642837B2 true JP2642837B2 (en) | 1997-08-20 |
Family
ID=17143560
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP4246105A Expired - Lifetime JP2642837B2 (en) | 1992-09-16 | 1992-09-16 | How to fix steel frame |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2642837B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPWO2024010024A1 (en) * | 2022-07-08 | 2024-01-11 |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0680270B2 (en) * | 1982-11-30 | 1994-10-12 | 大成建設 株式会社 | Pillar erection equipment |
| JPS6213659A (en) * | 1985-07-12 | 1987-01-22 | 株式会社竹中工務店 | Steel bar construction method of building |
-
1992
- 1992-09-16 JP JP4246105A patent/JP2642837B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH06101349A (en) | 1994-04-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3015910B2 (en) | Adjustment method for steel columns | |
| JPWO2019012650A1 (en) | Calibration method for measuring jig and hydraulic excavator | |
| JP2642837B2 (en) | How to fix steel frame | |
| JP2000291262A (en) | Erection piece for column construction and column construction method | |
| JP3238277B2 (en) | Method and apparatus for measuring differential settlement amount of structures | |
| CN120193522A (en) | A pre-buried lattice column dynamic straightening device and construction method thereof | |
| US20240310408A1 (en) | Calibration routine for imu mounting alignments | |
| JP3491116B2 (en) | Pillar and pile joints | |
| JPH09189132A (en) | Fixing method of column base for steel frame column | |
| JPH03295931A (en) | Construction method for frame straight pillar | |
| JP2533317B2 (en) | Displacement automatic detection system | |
| JP2747896B2 (en) | Earth strength test equipment | |
| Baker | TESTS ON FULL-SCALE PORTAL FRAMES. | |
| JP2572847B2 (en) | Construction method of steel structure | |
| JPS59102061A (en) | Pillar building method and apparatus | |
| JPH07243263A (en) | Method of constructing beam in process of dead-locking preceding column | |
| CN1143704A (en) | Construction method and device of upside-down steel column | |
| JP3081495U (en) | Surveying instrument support device and surveying device | |
| JPH08284180A (en) | Foundation bolt embedding method | |
| JP3595022B2 (en) | Vertical beam measurement system using laser beam | |
| JPH0893231A (en) | Method and device for building pillar of structure | |
| RU2820441C2 (en) | Machine for geotechnical works and manipulator control method thereof | |
| JPS6314959A (en) | Automatic building system of construction material | |
| JP2887085B2 (en) | Pillar installation system and fine adjustment jack | |
| JP3212548B2 (en) | Ladder mounting device |