JP2673153B2 - Earth bolt reinforcement method - Google Patents

Earth bolt reinforcement method

Info

Publication number
JP2673153B2
JP2673153B2 JP1037680A JP3768089A JP2673153B2 JP 2673153 B2 JP2673153 B2 JP 2673153B2 JP 1037680 A JP1037680 A JP 1037680A JP 3768089 A JP3768089 A JP 3768089A JP 2673153 B2 JP2673153 B2 JP 2673153B2
Authority
JP
Japan
Prior art keywords
ground
cut
slope
earth
earth bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1037680A
Other languages
Japanese (ja)
Other versions
JPH02217518A (en
Inventor
衛 河辺
泰法 町田
謙蔵 関島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP1037680A priority Critical patent/JP2673153B2/en
Publication of JPH02217518A publication Critical patent/JPH02217518A/en
Application granted granted Critical
Publication of JP2673153B2 publication Critical patent/JP2673153B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

【発明の詳細な説明】 「産業上の利用分野」 この発明は、宅地造成や法面造成など、地山切土施工
を行う前に、予め地山を補強するようにしたアースボル
ト補強工法に関する。
[Detailed Description of the Invention] [Industrial field of application] The present invention relates to a ground bolt reinforcing method for reinforced ground in advance before ground cutting work such as residential land preparation and slope preparation. .

「従来の技術」 通常、地山の斜面を切山して形成される切山法面の勾
配は、原地盤の土質条件によりほぼ決定されている。た
とえば、地山の土質が粘性土の場合には法面勾配は1:1
〜1:1.2程度である。したがって、切土法面を急勾配に
造成する場合には、1:1の勾配で切土を行った後、切土
表面にブロック擁壁、もたれ式擁壁等の保護手段を設け
ることにより、切土法面の急勾配を確保する方法がとら
れている。
"Prior Art" Normally, the slope of a cut slope formed by cutting a slope of a natural ground is almost determined by the soil condition of the original ground. For example, if the soil is clayey, the slope is 1: 1.
It is about 1: 1.2. Therefore, when constructing the cut slope with a steep slope, after cutting at a slope of 1: 1, by providing protective means such as a block retaining wall and a leaning retaining wall on the cut surface, The method of securing the steep slope of the cut slope is adopted.

また、地土が十分な強度を有する場合には、切土表面
に擁壁等の保護手段を設ける代わりに、モルタル吹き付
け等を行って急勾配の切土法面を保護する方法がとられ
ている。さらには、地土が十分な強度を有する場合であ
っても切土高さの寸法をより高くとる場合には、モルタ
ル吹き付けのみでは、斜面のすべり等、地土全体の安定
性を確実に保証することは難しいので、地土内に鉄筋を
挿入して地土の安定性を確保するいわゆるアンカー工法
がとられている。
If the ground soil has sufficient strength, a method of protecting the steep cut slope by mortar spraying is used instead of providing a retaining wall or other protective means on the cut surface. There is. Furthermore, even if the soil has sufficient strength, if the cut height is to be made higher, spraying the mortar alone will ensure the stability of the soil as a whole, such as slippage of slopes. Since it is difficult to do so, the so-called anchor construction method is used to secure the stability of the soil by inserting reinforcing bars into the soil.

「発明が解決しようとする課題」 しかしながら、前者の方法にあっては、ブロック積み
費用あるいは擁壁の施工費用、裏込め費用などの経費が
上積みされるため、工事の手間および経費がかかり経済
的な施工ではなかった。また、後者のアンカー工法にあ
っては、地下水等による鉄筋腐食の問題があるため、現
状では上記したような他の工法(ブロック積み、もたれ
擁壁、コンクリート枠工)と併用する必要があり、結局
施工コストの上昇をもたらすものであった。
"Problems to be solved by the invention" However, in the former method, costs such as block loading costs, retaining wall construction costs, backfilling costs, etc. are added, which makes the construction labor and cost consuming and economical. It was not a good construction. Also, in the latter anchor construction method, there is a problem of reinforcing bar corrosion due to groundwater, so at present it is necessary to use it in combination with other construction methods (block stacking, leaning retaining wall, concrete frame construction) as described above. In the end, it caused an increase in construction cost.

この発明は、上記事情に鑑みてなされたもので、地土
の強度の安定性を確保しながら、特に急勾配の切土を容
易かつ安価な費用で行うことのできるアースボルト補強
工法を提供することを目的としている。
The present invention has been made in view of the above circumstances, and provides a ground bolt reinforcing method capable of easily cutting steep slopes easily and at low cost while ensuring stability of strength of the ground. Is intended.

「課題を解決するための手段」 この発明に係るアースボルト補強工法は、切土すべき
地山内に、予め繊維強化プラスチック製の複数のアース
ボルトを挿入固定して地土を補強しておき、しかる後
に、補強した前記地山を掘削して切土を行い、切土が完
了した後に、地山から露出した前記アースボルトを切断
するものである。
"Means for Solving the Problem" The earth bolt reinforcing method according to the present invention, in the ground to be cut, a plurality of ground bolts made of fiber reinforced plastic are previously inserted and fixed to reinforce the earth, Thereafter, the reinforced ground is excavated to cut the soil, and after the cutting is completed, the earth bolt exposed from the ground is cut.

「作用」 この発明によれば、地土内にアースボルトを打設する
ことで地土の強度特性が向上する。また、地土のすべり
に対してはアースボルトがすべりに抵抗し、掘削後の切
土法面のはらみ出しに対してはアースボルトの引抜き抵
抗によりこれを抑止する。さらにはアースボルトが繊維
強化プラスチックで構成されているので、地下水等によ
る腐食の恐れが全くない。
[Operation] According to the present invention, the strength characteristics of the soil are improved by driving the earth bolts into the soil. In addition, the earth bolt resists the slip of the ground and prevents the protrusion of the cut slope after excavation by the pull-out resistance of the earth bolt. Furthermore, since the earth bolt is made of fiber reinforced plastic, there is no risk of corrosion due to groundwater or the like.

「実施例」 以下、この発明の実施例について図面を参照して説明
する。
Hereinafter, embodiments of the present invention will be described with reference to the drawings.

第1図はこの発明によって切土造成された地山の断面
図を示している。この図において、符号Gで表されるの
は地山であり、その断面構造を先に概略説明すると、地
山Gには点線で示す斜面1を切土してできた切土法面2
およびその下端部の造成地3が形成されている。そして
地山Gの内部には、切土法面2から地山Gの内部へ向け
て延びる複数のアースボルト4が埋設されている。これ
らアースボルト4は上下に等間隔でかつ左右に等間隔に
配置されている。さらに切土法面2の表面には表面剥離
を防護するファイバーグリッド5が敷設され、その上に
は切土法面2を保護するモルタル6が吹き付けられてい
る。
FIG. 1 shows a cross-sectional view of a natural ground cut by the present invention. In this figure, a ground is represented by a symbol G, and its cross-sectional structure will be briefly described first. A cut slope 2 formed by cutting a slope 1 shown by a dotted line in the ground G
And the land for construction 3 at the lower end thereof is formed. A plurality of earth bolts 4 extending from the cut slope 2 toward the inside of the natural ground G are embedded in the natural ground G. These earth bolts 4 are arranged at equal intervals in the vertical direction and at equal intervals in the left and right. Further, a fiber grid 5 for protecting the cut slope 2 is laid on the surface of the cut slope 2, and a mortar 6 for protecting the cut slope 2 is sprayed on the fiber grid 5.

アースボルト4は、第3図および第4図に示すよう
に、繊維強化プラスチック(以下、単にFRPと称する)
からなる棒状のケーブル4aと、ケーブル4aの外面に全面
に亙って形成された螺旋状の突起4bとから構成されてい
る。
The earth bolt 4 is a fiber reinforced plastic (hereinafter simply referred to as FRP) as shown in FIGS. 3 and 4.
A rod-shaped cable (4a) and a spiral projection (4b) formed on the entire outer surface of the cable (4a).

ケーブル4aは、紙パイプ、塩ビパイプ等の芯材7の周
囲に樹脂材料8が巻かれ、さらにこの樹脂材料8内に、
芯材7の長手方向に延在する連続繊維9・・・が周方向
に間隔をおいて複数本埋設された状態で配設されて構成
されている。この連続繊維9としては、軽量でかつ高強
度なガラス繊維やカーボン繊維等の長繊維からなる連続
繊維束が好適に用いられるが、必要に応じ、合成樹脂繊
維やセラミック繊維、金属繊維等と組み合わせて用いて
もよい。同様に前記樹脂材料8としては、連続繊維9に
対する接着性が良好であり、かつ自身が十分な強度特性
を有する樹脂、例えばビニルエステル樹脂等が好適に用
いられる。また、使用する繊維9の材質に対応して他の
材料を用いてもかまわない。他の樹脂材料としては、不
飽和ポリエステル樹脂、エポキシ樹脂、フェノール樹脂
等が挙げられる。
In the cable 4a, a resin material 8 is wound around a core material 7 such as a paper pipe or a vinyl chloride pipe, and further, in the resin material 8,
A plurality of continuous fibers 9 ... Which extend in the longitudinal direction of the core material 7 are arranged so as to be embedded in the circumferential direction at intervals. As the continuous fibers 9, continuous fiber bundles made of long fibers such as lightweight and high-strength glass fibers and carbon fibers are preferably used, but if necessary, they may be combined with synthetic resin fibers, ceramic fibers, metal fibers or the like. You may use it. Similarly, as the resin material 8, a resin having good adhesiveness to the continuous fibers 9 and having sufficient strength characteristics by itself, such as vinyl ester resin, is preferably used. Further, other materials may be used depending on the material of the fiber 9 used. Examples of other resin materials include unsaturated polyester resins, epoxy resins, and phenol resins.

突起4bは、ケーブル4aの地山Gに対する付着特性を改
善するためのもので、前記連続繊維9により構成されて
いる。
The protrusion 4b is for improving the adhesion property of the cable 4a to the natural ground G, and is composed of the continuous fiber 9.

前記ファイバーグリッド5は、アースボルト4同様の
材質を有し、高強度のガラス繊維、炭素繊維、アラミド
繊維等の連続繊維を多層に亙ってメッシュ状に交差させ
るとともに、これに樹脂を含浸させて一体成形したもの
である。
The fiber grid 5 is made of the same material as the earth bolt 4 and has a structure in which continuous fibers such as high-strength glass fibers, carbon fibers, and aramid fibers are crossed in a mesh shape in multiple layers and impregnated with a resin. It is integrally molded.

次に、以上のような構成の切土法面の造成手順を第2
図(イ)〜(ニ)を参照しながら説明する。
Next, the procedure for creating the cut slope with the above configuration is
A description will be given with reference to FIGS.

(1)切土すべき地山Gの斜面1に削孔機、穿孔機等の
穿設手段により所定数の穿孔Hを穿設して、各穿孔H内
部にアースボルト4を挿入する。
(1) A predetermined number of perforations H are bored on the slope 1 of the ground G to be cut by a boring machine, a boring machine or the like, and the earth bolt 4 is inserted into each of the perforations H.

(第2図(イ)(ロ)参照) (2)グラウド注入機または、カプセル等により穿孔H
内部に固化剤11を全体にゆきわたらさせて、各アースボ
ルト4(のケーブル4a)を穿孔H内に固定する。これに
より地山Gの安定性を確保しておく、この際に、穿孔H
に位置するケーブル4aの表面には螺旋状の突起4bが形成
されているので、固化剤10とケーブル4aとの付着強度が
十分強化されている。(第4図参照) (3)地山Gの斜面1から掘削機等により掘削を開始
し、法面2が所定の勾配(1:0.6〜1:1.2)に至るまで切
土を行う。排土はトラック等の運搬手段により所定場所
へ運んで処分するか造成地3の敷き均し土に使用する。
(第2図(ハ)参照) (4)地山Gの掘削および切土が終了したら、切土法面
2から突出している各アースボルト4・・・の余長部分
をそれぞれ切断する。
(Refer to Fig. 2 (a) and (b)) (2) Perforation H with a grout injection machine or a capsule
The solidifying agent 11 is spread throughout the inside, and (the cable 4a of) each ground bolt 4 is fixed in the hole H. As a result, the stability of the natural ground G is ensured, and at this time, the perforation H
Since the spiral protrusion 4b is formed on the surface of the cable 4a located at, the adhesion strength between the solidifying agent 10 and the cable 4a is sufficiently enhanced. (Refer to FIG. 4) (3) Excavation is started from the slope 1 of the ground G by an excavator or the like, and cutting is performed until the slope 2 reaches a predetermined slope (1: 0.6 to 1: 1.2). The discharged soil is transported to a predetermined place by a transportation means such as a truck and disposed of, or is used as a leveled soil on the land for construction 3.
(Refer to FIG. 2C) (4) After excavation and cutting of the ground G are completed, the surplus portions of the earth bolts 4 protruding from the cut slope 2 are cut.

(5)地山Gが粘性土であったり、切土法面3が急勾配
であるなど、切土法面3の表面が剥離する恐れがある場
合または後述する吹付けモルタル6が剥離する恐れがあ
る場合には、法面の表面に全面にわたってファイバーグ
リッド5を敷設する。このファイバーグリッド5はアー
スボルト4の先端に接合する。これにより切土法面2の
はらみ出し等をも抑止することができる。
(5) If the ground G is cohesive soil or the cut slope 3 is steep, the surface of the cut slope 3 may peel off, or the spray mortar 6 described below may peel off. When there is, the fiber grid 5 is laid over the entire surface of the slope. The fiber grid 5 is joined to the tip of the earth bolt 4. As a result, it is possible to prevent the cut slope 2 from protruding.

(6)最後に、切土法面2にモルタル6を全面にわたっ
て10〜15cmの厚さに吹き付けて切土法面2の保護を行う
とともに、その下端の造成地3の敷き均し等の後作業を
行って法面造成の施工を完了する。(第2図(ニ)参
照) なお、この発明に係るアースボルト4は、その形状、
寸法等が前記実施例に限定されず、種々の変形例が可能
である。たとえば、アースボルト4の端部のみに突起4b
を設けて穿孔H内底部に固定し、他端部を切土法面2に
定着させることで緊張力を導入するようにしてもよい。
(6) Finally, the mortar 6 is sprayed over the entire cut slope 2 to a thickness of 10 to 15 cm to protect the cut slope 2 and, after laying the land 3 at the lower end thereof, etc. Work is done to complete the slope construction. (See FIG. 2D) The ground bolt 4 according to the present invention has a shape,
The dimensions and the like are not limited to those in the above embodiment, and various modifications are possible. For example, only the end of the earth bolt 4 has a protrusion 4b.
Alternatively, the tension force may be introduced by fixing it to the inner bottom of the perforation H and fixing the other end to the cut slope 2.

この実施例によれば、以下に示すような優れた効果を
奏する。
According to this embodiment, the following excellent effects can be obtained.

地山Gに予めアースボルト4を打設して補強すること
で、地山Gの強度特性が向上する。また、地震等の外力
により地山Gに生じるすべりに対しては、アースボルト
4がすべりに抵抗する。さらに掘削後の切土法面2のは
らみ出しに対しては、アースボルト4の引き抜き抵抗に
より抑止することができる。
The strength characteristics of the natural ground G are improved by driving the ground bolt 4 in advance and reinforcing the natural ground G. Further, the earth bolt 4 resists the slip caused on the natural ground G due to an external force such as an earthquake. Further, the protrusion of the cut slope 2 after excavation can be suppressed by the pull-out resistance of the earth bolt 4.

上記に示したようなアースボルト4の作用により、
地山Gに対する切土高さを上げることができる。さらに
は地山Gが粘性土壌であっても急勾配の掘削切土が可能
である。すなわち、切土法面2の勾配を地山Gの土質条
件によらずに決定することができる。
By the action of the earth bolt 4 as shown above,
It is possible to increase the cut height for the natural ground G. Furthermore, even if the ground G is cohesive soil, steep excavation cutting is possible. That is, the slope of the cut slope 2 can be determined regardless of the soil condition of the natural ground G.

切土施工中に地山Gのすべり等の緩みが認められた場
合は、ただちにアースボルト4を打設して地山Gを補強
することができる。
If slippage of the natural ground G is found during the cutting work, the ground bolt 4 can be immediately struck to reinforce the natural ground G.

アースボルト4はFRP製であるから、従来の鋼製アン
カーに比較して地山掘削後の切断が容易である。また、
地下水等による腐食の心配が全くない。したがって、地
山G内へアースボルト4の永久的設置が可能であり、ア
ースボルト4を仮設構造物としてではなく、本設・永久
構造物として取り扱うことができる。
Since the earth bolt 4 is made of FRP, it is easier to cut after excavating the ground than the conventional steel anchor. Also,
There is no concern about corrosion due to groundwater. Therefore, the earth bolt 4 can be permanently installed in the natural ground G, and the earth bolt 4 can be handled not as a temporary structure but as a permanent / permanent structure.

地山Gの土質条件に関係なく急勾配切土が可能である
から、特に宅地造成地などでは平地面積をより広くとる
ことができ、土地の有効利用を図ることができる。
Since steep slope cutting is possible irrespective of the soil condition of the natural ground G, the flat land area can be made wider and the land can be effectively used, especially in a residential land development area.

粘性土等地盤のあまり良くない場所に急勾配法面が必
要とされる場合、従来公報では緩勾配切土後に石積み・
もたれ擁壁の必要がなく、掘削土量も減少させることが
できる。したがって、経済的に極めて有利な施工工法で
あるばかりでなく、工期短縮ならびに施工の簡素化を図
ることができる。
When a steep slope is required in a place where the ground is not so good, such as cohesive soil, in the conventional publication, masonry after gentle slope cutting
The amount of excavated soil can be reduced because there is no need for a leaning retaining wall. Therefore, not only is the construction method extremely economically advantageous, but the construction period can be shortened and the construction can be simplified.

切土法面2をモルタル6の吹付けにより保護するの
で、雨水等による侵食の心配がない。吹付けモルタル6
が剥離する恐れがある場合には、ファイバーグリッド5
を法面表面に敷設してアースボルト4の端部に固定して
からモルタル6を吹付けるようにすれば、その剥離を防
止することができる。
Since the cut slope 2 is protected by spraying the mortar 6, there is no fear of erosion due to rainwater or the like. Spraying mortar 6
If there is a risk of peeling, the fiber grid 5
If the mortar 6 is sprayed after being laid on the slope surface and fixed to the end of the earth bolt 4, the peeling can be prevented.

「発明の効果」 以上詳細に説明したように、この発明によれば、切土
すべき地山内に、予め繊維強化プラスチックから構成さ
れる複数のアースボルトを挿入固定して地山を補強して
おき、しかる後に、補強した前記地山を掘削して切土を
行い、切土が完了した後に地山から露出した前記アース
ボルトを切断するようにしたので、地山の切土高さを高
くとることができると共に、粘性土質の地山であっても
急勾配の切土が可能であり、切土法面の勾配を土質条件
によらずに決定することができる。これにより、経済的
な施工を可能とする他、工期の短縮ならびに施工簡易化
を図ることができる。
"Effects of the Invention" As described in detail above, according to the present invention, a plurality of earth bolts made of fiber-reinforced plastic are previously inserted and fixed in the ground to be cut to reinforce the ground. After that, after excavating the reinforced ground, cutting it, and cutting the earth bolt exposed from the ground after the cutting is completed, the cut height of the ground is increased. In addition to being able to take, it is possible to cut steep slopes even in the case of cohesive soil, and it is possible to determine the slope of the cut slope regardless of soil conditions. This enables not only economical construction but also shortening of construction period and simplification of construction.

また、上記アースボルトを繊維強化プラスチックで構
成したので、地山内へのアースボルトの永久的設置が可
能となり、切土法面に対する補修工事等の削減に寄与す
る。
Further, since the earth bolt is made of fiber reinforced plastic, it becomes possible to permanently install the earth bolt in the ground, which contributes to reduction of repair work for the cut slope.

【図面の簡単な説明】[Brief description of the drawings]

第1図はこの発明に係るアースボルト補強工法によって
切土造成された地山の断面図、第2図(イ)〜(ニ)は
それぞれ切土造成の手順を示す説明図、第3図は第1図
における鎖線IVの拡大図、第4図はアースボルトの正断
面図である。 2……切土法面、4……アースボルト、G……地山。
FIG. 1 is a cross-sectional view of a natural ground cut by the earth bolt reinforcing method according to the present invention, FIGS. 2 (a) to 2 (d) are explanatory views showing the procedure of cutting ground, and FIG. An enlarged view of the chain line IV in FIG. 1 and FIG. 4 are front sectional views of the earth bolt. 2 ... Cut slope, 4 ... Earth bolt, G ... Ground.

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭62−72817(JP,A) 特開 平1−310017(JP,A) 特開 昭61−229024(JP,A) 特開 昭64−29521(JP,A) ─────────────────────────────────────────────────── --- Continuation of the front page (56) Reference JP 62-72817 (JP, A) JP 1-310017 (JP, A) JP 61-229024 (JP, A) JP 64-64- 29521 (JP, A)

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】切土すべき地山内に、予め繊維強化プレス
チックから構成される複数のアースボルトを挿入固定し
て地山を補強しておき、しかる後に、補強した前記地山
を掘削して切土を行い、切土が完了した後に、地山から
露出した前記アースボルトを切断することを特徴とする
アースボルト補強工法。
1. A plurality of earth bolts made of fiber reinforced plastic are inserted and fixed in advance in the ground to be cut to reinforce the ground, and then the reinforced ground is excavated. The earth bolt reinforcing method is characterized in that the earth bolt exposed from the ground is cut after the soil is cut and cut.
JP1037680A 1989-02-17 1989-02-17 Earth bolt reinforcement method Expired - Lifetime JP2673153B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1037680A JP2673153B2 (en) 1989-02-17 1989-02-17 Earth bolt reinforcement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1037680A JP2673153B2 (en) 1989-02-17 1989-02-17 Earth bolt reinforcement method

Publications (2)

Publication Number Publication Date
JPH02217518A JPH02217518A (en) 1990-08-30
JP2673153B2 true JP2673153B2 (en) 1997-11-05

Family

ID=12504326

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1037680A Expired - Lifetime JP2673153B2 (en) 1989-02-17 1989-02-17 Earth bolt reinforcement method

Country Status (1)

Country Link
JP (1) JP2673153B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITMI20032154A1 (en) * 2003-11-07 2005-05-08 Uretek Srl PROCEDURE TO INCREASE THE RESISTANCE OF A VOLUME
JP7319108B2 (en) * 2019-07-03 2023-08-01 矢作建設工業株式会社 Slope protection retaining wall and its formation method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6272817A (en) * 1985-09-27 1987-04-03 Hazama Gumi Ltd Construction of retaining wall concurrently serving as sheathing
JPS6429521A (en) * 1987-07-25 1989-01-31 Shimizu Construction Co Ltd Ground anchor and its fixing device

Also Published As

Publication number Publication date
JPH02217518A (en) 1990-08-30

Similar Documents

Publication Publication Date Title
KR100910576B1 (en) Embedded anchor and composite retaining wall construction method
KR101394235B1 (en) Method for constructing complex pile for great soft ground
JP6872231B2 (en) Reinforcement structure of rock slope with long-term durability and its construction method
JP2576932B2 (en) Construction method of independent mountain retaining wall
JP3840331B2 (en) Retaining wall using corrosion-resistant structural anchor
JP2673153B2 (en) Earth bolt reinforcement method
JP6866980B2 (en) Joining cap and pile head joining structure
WO2005064088A1 (en) Round rod-type and bundle-type soil nails
JP3068757B2 (en) Slope protection method
JP3609657B2 (en) Structural underground wall and its construction method
KR20090078687A (en) Composite wall using a support pile with thumb piles in the form of a U-shaped steel and its construction method
JP2885899B2 (en) How to fix ground reinforcement
JPH07180157A (en) Slope protection method
KR200188122Y1 (en) Reinforcement for precast concrete facing panel
KR100266391B1 (en) Nail removal type nailling method in digging work
JP4351846B2 (en) Structure of mountain retaining wall for shield excavation
JP4236361B2 (en) Wall head reinforcement underground continuous wall, seismic building, and wall head reinforcement method for underground continuous wall
KR20100081676A (en) Soil nail including a plurality of foldable scales
JP3096660B2 (en) Pile head structure of cast-in-place steel pipe concrete pile and its construction method
JPH06146296A (en) Stabilizing method for cutting down of slope face
JP2979118B2 (en) Retaining wall structure
JP7829459B2 (en) Reinforcement anchors, methods for reinforcing retaining walls
JPH0771032A (en) Prefabricated pile and installation method thereof
JPH0316450B2 (en)
JP2004251072A (en) Slope stabilization method