JP2678048B2 - How to construct a lining ring for a shield tunnel - Google Patents
[go: Go Back, main page]

JP2678048B2 - How to construct a lining ring for a shield tunnel - Google Patents

How to construct a lining ring for a shield tunnel

Info

Publication number
JP2678048B2
JP2678048B2 JP1041844A JP4184489A JP2678048B2 JP 2678048 B2 JP2678048 B2 JP 2678048B2 JP 1041844 A JP1041844 A JP 1041844A JP 4184489 A JP4184489 A JP 4184489A JP 2678048 B2 JP2678048 B2 JP 2678048B2
Authority
JP
Japan
Prior art keywords
segment
erector
temporary
shield
lining ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP1041844A
Other languages
Japanese (ja)
Other versions
JPH02221598A (en
Inventor
隆三郎 大塚
清 土屋
英嗣 山崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP1041844A priority Critical patent/JP2678048B2/en
Publication of JPH02221598A publication Critical patent/JPH02221598A/en
Application granted granted Critical
Publication of JP2678048B2 publication Critical patent/JP2678048B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、擬似円形部を垂直方向に複数段連接した形
状にセグメントを組立てて立形多連シールドトンネルの
覆工リングを構築する方法に関する。
The present invention relates to a method for constructing a lining ring of a vertical multiple shield tunnel by assembling segments into a shape in which a plurality of pseudo circular portions are vertically connected in multiple stages. .

〔従来の技術〕[Conventional technology]

従来知られている多連シールドトンネルは、第18図に
示すように、擬似円形部を横方向に複数列連接した形状
にセグメント(A,B,K)を組立てて覆工リングを構築し
たものであり、このような横形多連シールドトンネルに
おいては、シールド掘進機のスキンプレート内底部をセ
グメント置場および作業用床として、機内に並列に設置
したエレクタ50,50′を独立に作動させることにより、
各列のセグメントの組立を行うことができた。
As shown in Fig. 18, the conventionally known multiple shield tunnel has a lining ring constructed by assembling segments (A, B, K) in a shape in which multiple rows of pseudo-circular parts are connected in the horizontal direction. In such a horizontal multiple shield tunnel, the inner bottom of the skin plate of the shield machine is used as a segment storage and work floor, and by independently operating the erectors 50, 50 'installed in parallel in the machine,
The assembly of the segments in each row could be performed.

立形多連シールドトンネルは、横形多連シールドトン
ネルに比べトンネル占用幅の小さい点が有利とされてい
るが、施工技術に関しては目下検討中の段階で、公表さ
れたものはない。
It is said that the vertical multiple shield tunnel is advantageous in that the tunnel occupation width is smaller than that of the horizontal multiple shield tunnel, but no construction technology has been announced at this stage.

〔発明が解決しようとする課題〕[Problems to be solved by the invention]

立形多連シールドトンネルでは、例えば2連形の場
合、第17図に示すように、上下2段の擬似円形部を分割
する円弧状のAセグメントと、上の段の床板となるBセ
グメントおよび段間を接合するほぼV形断面のK1,K2
グメントにより1つの覆工リングが形成される。セグメ
ントの組立は、各段の擬似円形部に対応させてシールド
掘進機の後部に設置した上下2段のエレクタを用いて行
うことができるが、上の段の床板となるBセグメントは
セグメント組立工程の最後に挿入されるため、上段エレ
クタによるセグメント組立時にセグメント置場および作
業用床となる仮床板を段間に別に設けなくてはならな
い。しかも、この仮床板は、セグメント組立中にセグメ
ントと干渉しない位置に移動可能でなければならず、こ
のような移動式仮床板をシールド掘進機の内部に設けよ
うとすると、本体構造が複雑になり、スペースの面でも
制約を受ける。
In a vertical multiple shield tunnel, for example, in the case of a double tunnel type, as shown in FIG. 17, an arc-shaped A segment that divides the upper and lower two stages of the pseudo-circular portion, and a B segment that serves as the floor plate of the upper stage and One lining ring is formed by the K 1 and K 2 segments of substantially V-shaped cross section joining the steps. The segments can be assembled using the upper and lower two-stage erectors installed at the rear of the shield machine corresponding to the pseudo-circular parts of each stage, but the B segment that is the floor plate of the upper stage is the segment assembly process. Since it is inserted at the end of the above, it is necessary to separately provide a temporary floor board serving as a segment storage space and a working floor during the segment assembly by the upper erector between the stages. Moreover, this temporary floor plate must be movable to a position where it does not interfere with the segment during segment assembly, and if such a movable temporary floor plate is to be provided inside the shield machine, the structure of the main body becomes complicated. However, there are restrictions in terms of space.

本発明の目的は、上記課題を解決し、立形多連シール
ドトンネルの覆工リングを構築するセグメント組立作業
を安全に、かつ効率的に遂行できる方法を提供すること
にある。
An object of the present invention is to solve the above-mentioned problems and to provide a method capable of safely and efficiently performing a segment assembling operation for constructing a lining ring of a vertical multiple shield tunnel.

〔課題を解決しようとするための手段〕[Means for solving the problem]

上記目的を達成するために請求項1記載の発明では、
擬似円形部を垂直方向に複数段連接した形状にセグメン
トを組立てて立形多連シールドトンネルの覆工リングを
構築する際、前記複数段の擬似円形部に対応させてシー
ルド掘進機の後部に設置した複数段のエレクタを用いて
セグメントの組立を行い、その上段エレクタによるセグ
メント組立時に、セグメント置場および作業用床となる
べき仮床板を下段エレクタに保持させることを特徴とす
る。
In order to achieve the above object, in the invention according to claim 1,
When constructing a lining ring for a vertical multiple shield tunnel by assembling segments into a shape in which multiple pseudo-circular sections are vertically connected, install it at the rear of the shield machine corresponding to the multiple pseudo-circular sections. It is characterized in that the segment is assembled by using the above-mentioned plurality of stages of erectors, and when the segment is assembled by the upper stage erector, the lower stage erector holds a temporary floor board to serve as a segment storage space and a work floor.

さらに請求項2記載の発明では、下段エレクタによる
セグメント組立時に、前記仮床板を下段エレクタに代わ
って上段エレクタに保持させることを特徴とする。
Further, in the invention according to claim 2, when the segment is assembled by the lower erector, the temporary floor board is held by the upper erector instead of the lower erector.

〔作用〕[Action]

シールド掘進機に装備された複数段のエレクタは、そ
れぞれアームの旋回、伸縮およびグリップの前後動によ
りセグメントを吊り上げ所定位置に運搬する機能を有し
ている。したがって、下段エレクタに仮床板を保持さ
せ、段間の所定位置に押し上げれば、この仮床板を上段
エレクタに対するセグメント置場および作業用床として
使用することができ、かつ上段エレクタによるセグメン
ト組立中に仮床板を下段エレクタに保持させたまま、セ
グメントと干渉しない位置に移動させることができる。
The multiple stages of erectors equipped in the shield machine have the functions of hoisting and transporting the segment to a predetermined position by turning, expanding and contracting the arm, and moving the grip forward and backward. Therefore, if the lower floor erector holds the temporary floorboard and pushes it up to a predetermined position between the floors, this temporary floorboard can be used as a segment storage space and work floor for the upper level erector, and can be temporarily used during segment assembly by the upper level erector. The floor plate can be moved to a position where it does not interfere with the segment while being held by the lower erector.

また、仮床板を必要としない下段エレクタによるセグ
メント組立時には、仮床板を上段エレクタに保持させる
ようにすれば、仮床板を上段エレクタと下段エレクタの
間でやりとりするだけでよく、仮床板を別の場所に搬出
したり、使用時に再搬入したりする手間が省ける。
Also, when segment assembly is performed by the lower erector that does not require a temporary floorboard, if the temporary floorboard is held by the upper erector, it is only necessary to exchange the temporary floorboard between the upper and lower erectors, and the temporary floorboard is separated. Eliminates the hassle of taking it out to a place or reloading it when using it.

〔実施例〕〔Example〕

以下、図示の実施例について説明する。 Hereinafter, the illustrated embodiment will be described.

第2図は本実施例において使用される立形2連シール
ド掘進機の縦断面図、第3図はその左側面図、第4図は
右側面のエレクタ部拡大図である。
FIG. 2 is a vertical sectional view of a vertical double shield excavator used in the present embodiment, FIG. 3 is a left side view thereof, and FIG. 4 is an enlarged view of an erector part on the right side.

シールド断面は第17図に示すセグメント組立形状と相
似形で、上下2段の擬似円形部と逆円弧状の接合部とか
らなっている。シールド本体1の前面には、シールド断
面の各段の擬似円形部と同一中心を持つ2基の回転カッ
タ2,2′が同一平面内に配置されており、これら回転カ
ッタは、各々の掘削範囲が部分的に重なり合い、かつカ
ッタスポークが互いに干渉しないように反対方向に同期
駆動される。隔壁3により切羽から隔離された機内に
は、カッタ駆動モータ4,排土用スクリューコンベア5,推
進用シールドジャッキ6などが設置され、さらにシール
ド本体1の後部には、上下2段のセグメント組立用エレ
クタ7,8が設置されている。
The cross section of the shield is similar to the segment assembly shape shown in FIG. 17, and is composed of two upper and lower pseudo-circular portions and an inverted arc-shaped joint portion. On the front surface of the shield main body 1, two rotary cutters 2, 2 'having the same center as the pseudo-circular portions of the respective sections of the shield cross section are arranged in the same plane. Are partially overlapped and are synchronously driven in opposite directions so that the cut spokes do not interfere with each other. A cutter drive motor 4, an earth-moving screw conveyor 5, a propulsion shield jack 6 and the like are installed in the machine separated from the face by the partition wall 3, and further, in the rear part of the shield body 1 for assembling two upper and lower stages. Erectors 7 and 8 are installed.

第5図は上段エレクタ7の側面図、第6図は第5図の
A−A断面図、第7図は第5図のB−B断面図、第8図
は第4図のC矢視図である。
5 is a side view of the upper erector 7, FIG. 6 is a sectional view taken along line AA of FIG. 5, FIG. 7 is a sectional view taken along line BB of FIG. 5, and FIG. FIG.

これらの図に示すように、上段エレクタは、旋回用モ
ータ9によって駆動される同一旋回リング10上に、一端
が上記旋回リング10の軸対象位置に固定された1対のア
ーム12,12′と、上記アーム12,12′のガイド部13,13′
によって案内され、シールド軸方向と直角の方向に平行
移動可能な1対の吊上げ部14,14′と、アーム12,12′に
固定され、吊上げ部14,14′をシールド軸方向と直角の
方向に伸縮動作させる押付けジャッキ15,15′と、各々
の吊上げ部14,14′にガイドロッド16,16′を介して支持
され、シールド軸方向に前後動可能なスライダ17,17′
と、各々の吊上げ部14,14′に固定され、スライダ17,1
7′およびこれに結合されたグリップ18,18′を前後動さ
せるスライドジャッキ19,19′と、吊上げ部14,14′の側
面に配置されたセグメント振れ止め具20,20′と、吊上
げ部14,14′に固定され、セグメント振れ止め具20,20′
を伸縮動作させる振れ止めジャッキ21,21′とからなる
左右1対の独立した吊上げ装置11,11′を装備したもの
で、その1対の吊上げ装置11,11′の間には各々の吊り
位置にセグメントを搬入するための空間22を設け、各々
の吊上げ装置11,11′にセグメントの把持,押付け,前
後動,振れ止めの機能を持たせて、単独および同時操作
のいずれをも選択できるようにしてある。
As shown in these figures, the upper erector comprises a pair of arms 12, 12 'each having one end fixed to an axially symmetric position of the above-mentioned turning ring 10 on the same turning ring 10 driven by a turning motor 9. , Guide portions 13, 13 'of the arms 12, 12'
Is fixed by a pair of hoisting parts 14 and 14 'that are guided by the shield and can move in parallel to the shield axial direction and the arms 12 and 12', and the hoisting parts 14 and 14 'are perpendicular to the shield axial direction. Pushing jacks 15 and 15 'for expanding and contracting, and sliders 17 and 17' supported by respective hoisting portions 14 and 14 'via guide rods 16 and 16' and movable back and forth in the shield axial direction.
And the sliders 17, 1
7'and the slide jacks 19 and 19 'for moving the grips 18 and 18' coupled thereto back and forth, the segment steady rests 20 and 20 'arranged on the side surfaces of the lifting portions 14 and 14', and the lifting portion 14 , 14 ', segment steady rest 20, 20'
Equipped with a pair of left and right independent lifting devices 11 and 11 'consisting of steady rest jacks 21 and 21' for expanding and contracting, and between each pair of lifting devices 11 and 11 ' A space 22 for loading a segment is provided in each of the hoisting devices 11, 11 ′, and each lifting device 11, 11 ′ has a function of gripping, pushing, moving back and forth, and a steady rest so that either single operation or simultaneous operation can be selected. I am doing it.

第9図は下段エレクタ8の側面図、第10図は第9図の
D−D断面図、第11図は第4図のE矢視図である。
9 is a side view of the lower erector 8, FIG. 10 is a sectional view taken along the line DD in FIG. 9, and FIG. 11 is a view taken in the direction of the arrow E in FIG.

これらの図に示すように、下段エレクタ8は、旋回用
モータ9′によって駆動される旋回リング23上に、一端
が上記旋回リング23の軸対象位置に固定された1対のア
ーム24,24′と、上記アーム24,24′のガイド部25,25′
によって案内され、シールド軸方向と直角の方向に移動
可能な一体形の吊りビーム26と、アーム24,24′に固定
され、吊りビーム26を伸縮動作させる押付ジャッキ27,2
7′と、吊りビーム26にガイドロッド28,28′を介して支
持され、シールド軸方向に前後動可能なスライダ29と、
吊りビーム26に固定され、スライダ29とこれに結合され
たグリップ30を前後動させるスライドジャッキ31と、吊
りビーム26の両端に配置されたセグメント振れ止め具3
2,32′と、吊りビーム26に固定され、セグメント振れ止
め具32,32′を伸縮動作させる振れ止めジャッキ33,33′
とからなる単一の吊上げ装置を装備し、この吊上げ装置
にセグメントの把持,押付け,前後動,振れ止めの機能
を持たせたもので、その吊りビーム26には、セグメント
吊り上げ用グリップ30のほかに、仮床板34を保持させる
ための1対の仮床板取付部35,35′および仮床板受部36,
36′を設けてある。
As shown in these drawings, the lower-stage erector 8 has a pair of arms 24, 24 ', one end of which is fixed to an axially symmetrical position of the swivel ring 23 on a swivel ring 23 driven by a swivel motor 9'. And the guide portions 25, 25 'of the arms 24, 24'
The suspension beam 26 that is guided by the shield beam and is movable in the direction perpendicular to the shield axis direction, and the pressing jacks 27 and 2 that are fixed to the arms 24 and 24 ′ and that extend and retract the suspension beam 26.
7 ', a slider 29 supported by the suspension beam 26 via guide rods 28, 28', and movable back and forth in the shield axial direction,
A slide jack 31 fixed to the suspension beam 26 and for moving a slider 29 and a grip 30 coupled thereto back and forth, and a segment steady rest 3 arranged at both ends of the suspension beam 26.
2, 32 'and steady rest jacks 33, 33' which are fixed to the suspension beam 26 and expand and contract the segment steady rests 32, 32 '.
It is equipped with a single lifting device consisting of and, and this lifting device is provided with the functions of gripping, pushing, moving back and forth, and steadying the segment. , A pair of temporary floor board mounting portions 35, 35 'for holding the temporary floor board 34 and a temporary floor board receiving portion 36,
36 'is provided.

第12図は仮床板34の平面図、第13図はその部分拡大
図、第14図は第13図のF−F断面図、第15図は第13図の
G−G断面図、第16図(a),(b)は仮床板吊上げ用
リンク39,39′の正面図および側面図である。
12 is a plan view of the temporary floor board 34, FIG. 13 is a partially enlarged view thereof, FIG. 14 is a sectional view taken along line FF of FIG. 13, FIG. 15 is a sectional view taken along line GG of FIG. 13, and FIG. Figures (a) and (b) are a front view and a side view of the temporary floor board lifting links 39, 39 '.

これらの図に示すように、仮床板34は鋼材を長方形に
枠組みして作られ、前述した下段エレクタ8の吊りビー
ム26に設けられた仮床板取付部35,35′と対応する位置
に下方に突出した1対の継手金具37,37′が固着されて
おり、仮床板取付部35,35′と継手金具37,37′下部のピ
ン穴にピン38を挿通することにより、仮床板34を下段エ
レクタ8に保持させることができる。また、前記継手金
具37,37′の上部ピン穴には1対のリンク39,39′をピン
40で連結してあり、その1対のリンク39,39′を垂直に
起こし、各々のリンクと上段エレクタ7の1対のグリッ
プ18,18′のピン穴にピン41を挿通することにより、仮
床板34を上段エレクタ7に保持させることもできる。な
お、仮床板34を下段エレクタ8に保持させた場合には、
リンク39,39′を第14図の二点鎖線で示すように水平に
倒すことにより、これらリンクが床面から引込み、上段
エレクタ7に対するセグメント置場および作業用床とし
て使用する上で、障害にならないようにしている。
As shown in these figures, the temporary floor board 34 is made by frame-forming steel material, and is provided downward at a position corresponding to the temporary floor board mounting portions 35, 35 'provided on the suspension beam 26 of the lower erector 8 described above. A pair of projecting fittings 37, 37 'are fixedly attached, and the temporary floorboard 34 is lowered by inserting the pins 38 into the temporary floorboard mounting portions 35, 35' and the pin holes at the bottom of the fittings 37, 37 '. It can be held by the erector 8. Also, a pair of links 39, 39 'are pinned in the upper pin holes of the fittings 37, 37'.
They are connected by 40, and the pair of links 39, 39 'are raised vertically, and the pins 41 are inserted into the pin holes of each link and the pair of grips 18, 18' of the upper erector 7 to temporarily The floor plate 34 can be held by the upper erector 7. When the temporary floor board 34 is held by the lower erector 8,
By tilting the links 39, 39 'horizontally as shown by the chain double-dashed line in Fig. 14, these links are pulled in from the floor, and there is no obstacle in using them as a segment storage space and work floor for the upper erector 7. I am trying.

仮床板34の縦寸法aは第17図のL寸法(セグメント組
立工程の最後に段間に挿入されるBセグメントの長さ)
より若干小さくし、横寸法bはセグメント幅Wとほぼ同
等とする。
The vertical dimension a of the temporary floor board 34 is the L dimension in FIG. 17 (the length of the B segment inserted between the steps at the end of the segment assembly process).
The width b is made slightly smaller, and the lateral dimension b is substantially equal to the segment width W.

次に、セグメント組立手順を第1図により説明する。
セグメントは、第17図に示すようにA,B,K1,K2の4種類
のセグメントからなり、両翼部の長いK1セグメントと両
翼部の短いK2セグメントを1リングごとに左右入れ換え
ることにより、AセグメントとK1,K2セグメントの継目
位置をずらしてシールド軸方向に千鳥形配列とする。
Next, the segment assembling procedure will be described with reference to FIG.
As shown in Fig. 17, the segment consists of four kinds of segments, A, B, K 1 and K 2 , and the long K 1 segment of both wings and the short K 2 segment of both wings are interchanged for each ring. Thus, the joint positions of the A segment and the K 1 and K 2 segments are shifted to form a staggered arrangement in the shield axis direction.

第1図において、セグメントのハッチングを施した部
分は組立完了部分、ハッチングを施してない部分は組立
未完成部分を示し、(a)から(m)へと組立が進行す
るものとする。
In FIG. 1, a hatched portion of a segment indicates an assembling completed portion, and a non-hatched portion indicates an incompletely assembled portion, and the assembly proceeds from (a) to (m).

(a)は下段エレクタ8を用いて下段Aセグメントの
組立を行っている状態を示し、このとき、仮床板34は上
段エレクタ7に保持させている。
(A) shows a state in which the lower stage A segment is assembled using the lower stage erector 8, and at this time, the temporary floor board 34 is held by the upper stage erector 7.

下段Aセグメントの組立完了後、(b)に示すように
仮床板34を上段エレクタ7から下段エレクタ8に移し換
える。
After the assembly of the lower stage A segment is completed, the temporary floor board 34 is transferred from the upper stage erector 7 to the lower stage erector 8 as shown in (b).

(c)は下段エレクタ8に保持させた仮床板34を段間
の所定位置まで押し上げ、その上にK1セグメントを搬入
した状態を示す。
(C) shows a state in which the temporary floor board 34 held by the lower erector 8 is pushed up to a predetermined position between the steps, and the K 1 segment is loaded on it.

(d),(e)は上段エレクタの左側吊上げ装置11を
単独操作してK1セグメントの組立を行っている状態を示
し、それに合せて下段エレクタ8の押付けジャッキ27,2
7′の引込み操作とアーム24,24′の旋回操作を行い、組
立中のK1セグメントと干渉しない位置に仮床板34を移動
させる。
(D) and (e) show a state in which the left lifting device 11 of the upper erector is independently operated to assemble the K 1 segment, and the pressing jacks 27, 2 of the lower erector 8 are adjusted accordingly.
The temporary floor plate 34 is moved to a position where it does not interfere with the K 1 segment being assembled by performing the pulling-in operation of 7 ′ and the pivoting operation of the arms 24, 24 ′.

(f)はK1セグメントの組立完了状態を示す。(F) shows the completed assembly state of K 1 segment.

(g)は仮床板34を段間の所定位置に戻し、その上に
上段Aセグメントを搬入した状態を示す。
(G) shows a state in which the temporary floor board 34 is returned to a predetermined position between steps and the upper A segment is carried on the temporary floor board 34.

(h)は上段エレクタ7の右側吊上げ装置11′を単独
操作して上段Aセグメントの組立を行っている状態を示
し、このときも下段エレクタ8の押付けジャッキ27,2
7′を引込み操作し、組立中のAセグメントと干渉しな
い位置に仮床板34を移動させる。
(H) shows a state in which the upper-stage A segment is assembled by independently operating the right-side lifting device 11 ′ of the upper-stage erector 7. At this time, the pressing jacks 27, 2 of the lower-stage erector 8 are also assembled.
The temporary floor plate 34 is moved to a position where it does not interfere with the A segment being assembled by pulling in 7 '.

上段Aセグメントの組立完了後、(i)に示すように
仮床板34を段間の所定位置に戻し、その上にK2セグメン
トを搬入する。
After the assembly of the upper A segment is completed, as shown in (i), the temporary floor board 34 is returned to the predetermined position between the stages, and the K 2 segment is loaded on it.

(j),(k)は上段エレクタ7の左側吊り上げ装置
11を単独操作してK2セグメントの組立を行っている状態
を示し、それに合せて下段エレクタ8の押付けジャッキ
引込み操作とアーム旋回操作を行い、組立中のK2セグメ
ントと干渉しない位置に仮床板34を移動させる。
(J) and (k) are left-side lifting devices for the upper erector 7.
11 shows a state in which K 2 segment is being operated by operating it independently, and in accordance with that, the pressing jack retraction operation and arm turning operation of the lower erector 8 are performed, and the temporary floor board is placed at a position that does not interfere with the K 2 segment being assembled. Move 34.

K2セグメントの組立完了後、(1)に示すように仮床
板34を段間の所定位置に戻し、その上にBセグメントを
搬入する。
After the assembly of the K 2 segment is completed, as shown in (1), the temporary floor board 34 is returned to a predetermined position between the steps, and the B segment is carried on it.

(m)は上段エレクタ7の左右の吊上げ装置11,11′
を同時操作してBセグメントを吊り、下段エレクタ8の
押付けジャッキ27,27′を引込み操作してBセグメント
の組立を完了した状態を示す。
(M): Left and right lifting devices 11, 11 'of the upper erector 7
Is operated simultaneously to suspend the B segment, and the pressing jacks 27, 27 'of the lower erector 8 are retracted to complete the assembly of the B segment.

以上で1リング分のセグメント組立を完了し、シール
ド推進後、仮床板34を下段エレクタ8から上段エレクタ
7に移し換えて次のセグメント組立を行う。
As described above, the segment assembly for one ring is completed, and after the shield is propelled, the temporary floor plate 34 is transferred from the lower stage erector 8 to the upper stage erector 7 to perform the next segment assembly.

第1図から明らかなように、下段エレクタに保持され
た仮床板をセグメント置場およびセグメント継手部のボ
ルト締結などの作業用床として上段エレクタによるセグ
メント組立を行い、下段エレクタによるセグメント組立
時には仮床板を上段エレクタに保持させることによっ
て、一連のセグメント組立作業を安全に、かつ効率的に
遂行することができる。
As is apparent from FIG. 1, the temporary floorboard held by the lower erector is used as a floor for work such as fastening the bolts at the segment storage and the segment joint, and segment assembly is performed by the upper erector. By holding the upper erector, a series of segment assembly work can be safely and efficiently performed.

上記実施例は覆工リングの擬似円形部が上下2段の場
合であるが、3段,4段と段数がふえても上記と同様の方
法を適用することができる。
In the above embodiment, the quasi-circular portion of the lining ring has two upper and lower tiers, but the same method as above can be applied even if the number of tiers is three or four.

また、不発明は、図示のような特定の分割方式のセグ
メントを対象とする場合に限らず、セグメント分割方式
には関係なく適用できることも上記説明から明らかであ
る。
It is also clear from the above description that the non-invention is not limited to the case of the segment of the specific division method as shown in the drawing, and can be applied regardless of the segment division method.

〔発明の効果〕〔The invention's effect〕

本発明によれば、上段エレクタによるセグメント組立
時にそのセグメント置場および作業用床となるべき仮床
板をシールド掘進機の本体構造を複雑にすることなく簡
単に設けることができ、かつ上段エレクタによるセグメ
ント組立中、下段エレクタの押付けジャッキ伸縮操作と
アーム旋回操作によりセグメントと干渉しない位置に仮
床板を移動させることも容易にできる。また、上段エレ
クタと下段エレクタの間で仮床板のやりとりを行い、下
段エレクタによるセグメント組立時には上段エレクタに
仮床板を保持させるようにすれば、仮床板を搬入,搬出
する手間も省けるので、立形多連シールドトンネルにお
ける覆工リングの構築を安全に、かつ効率的に遂行する
ことができる。
ADVANTAGE OF THE INVENTION According to this invention, the temporary floor board which should become the said segment storage and a work floor at the time of segment assembly by an upper stage erector can be easily provided without complicating the main body structure of a shield machine, and the segment assembly by an upper stage erector can be carried out. It is also possible to easily move the temporary floorboard to a position where it does not interfere with the segment by the pressing jack extension / contraction operation of the middle and lower erectors and the arm turning operation. In addition, if the temporary floorboards are exchanged between the upper and lower erectors and the upper erectors hold the temporary floorboards during segment assembly by the lower erectors, it is possible to save the labor of loading and unloading the temporary floorboards. Construction of a lining ring in a multiple shield tunnel can be performed safely and efficiently.

【図面の簡単な説明】[Brief description of the drawings]

第1図(a)〜(m)は本発明の一実施例におけるセグ
メント組立工程図、第2図は本実施例に用いるシールド
掘進機の縦断面図、第3図はその左側面図、第4図は右
側面のエレクタ部拡大図、第5図は上段エレクタの切断
側面図、第6図は第5図のA−A断面図、第7図は第5
図のB−B断面図、第8図は第4図のC矢視図、第9図
は下段エレクタの切断側面図、第10図は第9図のD−D
断面図、第11図は第4図のE矢視図、第12図は仮床板の
平面図、第13図はその部分拡大図、第14図は第13図のF
−F断面図、第15図は第13図のG−G断面図、第16図
(a),(b)は仮床板板吊上げ用リンクの正面図およ
び側面図、第17図は本実施例のセグメント組立形状を示
す図、第18図は従来の横形多連シールドトンネルにおけ
るセグメント組立要領図である。 1……シールド本体、7……上段エレクタ、8……下段
エレクタ、34……仮床板、A,B,K1,K2……セグメント
1 (a) to 1 (m) are diagrams of a segment assembling process in one embodiment of the present invention, FIG. 2 is a longitudinal sectional view of a shield machine used in the present embodiment, FIG. 4 is an enlarged view of the erector part on the right side, FIG. 5 is a cut-away side view of the upper erector, FIG. 6 is a sectional view taken along line AA of FIG. 5, and FIG.
FIG. 8 is a sectional view taken along line C-B of FIG. 4, FIG. 9 is a cut-away side view of the lower erector, and FIG. 10 is DD of FIG.
Sectional view, FIG. 11 is a view taken in the direction of arrow E in FIG. 4, FIG. 12 is a plan view of the temporary floorboard, FIG. 13 is a partially enlarged view thereof, and FIG. 14 is F of FIG.
-F sectional view, FIG. 15 is a sectional view taken along line GG of FIG. 13, FIGS. 16 (a) and 16 (b) are a front view and a side view of a temporary floor board lifting link, and FIG. 17 is this embodiment. FIG. 18 is a diagram showing the segment assembly shape of FIG. 18, and FIG. 18 is a segment assembly procedure diagram in a conventional horizontal multiple shield tunnel. 1 ... Shield body, 7 ... Upper erector, 8 ... Lower erector, 34 ... Temporary floorboard, A, B, K 1 , K 2 ...... Segment

───────────────────────────────────────────────────── フロントページの続き (72)発明者 山崎 英嗣 茨城県土浦市神立町650番地 日立建機 株式会社土浦工場内 (56)参考文献 特開 平1−187299(JP,A) ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Hidetsugu Yamazaki 650 Jinrachi-cho, Tsuchiura-shi, Ibaraki Hitachi Construction Machinery Co., Ltd. Tsuchiura factory (56) Reference JP-A-1-187299 (JP, A)

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】擬似円形部を垂直方向に複数段連接した形
状にセグメントを組立てて立形多連シールドトンネルの
覆工リングを構築する際、前記複数段の擬似円形部に対
応させてシールド掘進機の後部に設置した複数段のエレ
クタを用いてセグメントの組立を行い、その上段エレク
タによるセグメント組立時に、セグメント置場および作
業用床となるべき仮床板を下段エレクタに保持させるこ
とを特徴とするシールドトンネルの覆工リング構築方
法。
1. When constructing a lining ring of a vertical multiple shield tunnel by assembling segments in a shape in which a plurality of pseudo circular portions are connected in a vertical direction, shield digging is performed corresponding to the plurality of pseudo circular portions. A segment is assembled using multiple stages of erectors installed at the rear of the machine, and when the upper stage erector is assembled, the lower floor erector holds the temporary floorboard that should serve as the segment storage space and work floor. Tunnel lining ring construction method.
【請求項2】下段エレクタによるセグメント組立時に
は、前記仮床板を下段エレクタに代わって上段エレクタ
に保持させることを特徴とする請求項1記載のシールド
トンネルの覆工リング構築方法。
2. The method for constructing a lining ring for a shield tunnel according to claim 1, wherein the temporary floor board is held by the upper erector instead of the lower erector when the segment is assembled by the lower erector.
JP1041844A 1989-02-23 1989-02-23 How to construct a lining ring for a shield tunnel Expired - Fee Related JP2678048B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1041844A JP2678048B2 (en) 1989-02-23 1989-02-23 How to construct a lining ring for a shield tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1041844A JP2678048B2 (en) 1989-02-23 1989-02-23 How to construct a lining ring for a shield tunnel

Publications (2)

Publication Number Publication Date
JPH02221598A JPH02221598A (en) 1990-09-04
JP2678048B2 true JP2678048B2 (en) 1997-11-17

Family

ID=12619566

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1041844A Expired - Fee Related JP2678048B2 (en) 1989-02-23 1989-02-23 How to construct a lining ring for a shield tunnel

Country Status (1)

Country Link
JP (1) JP2678048B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH086876Y2 (en) * 1990-05-16 1996-02-28 石川島播磨重工業株式会社 Horizontal double type shield machine

Also Published As

Publication number Publication date
JPH02221598A (en) 1990-09-04

Similar Documents

Publication Publication Date Title
JP3899676B2 (en) Tunnel excavator
AU2021242898B2 (en) Tunnel excavation device
JP2678048B2 (en) How to construct a lining ring for a shield tunnel
JP2675608B2 (en) Erector device for vertical multiple shield machine
JP2714180B2 (en) Method and apparatus for constructing shield tunnel lining ring
JP2003155889A (en) Parent-child shield excavator and its excavation method
JPH0925789A (en) Tunnel excavator and tunnel excavating method
JPH0768877B2 (en) Construction method and removal method of earth retaining frame in lateral construction
JP4261043B2 (en) Tunnel machine
JPH0622000Y2 (en) Vertical multiple shield machine
JP4347462B2 (en) Tunnel excavator body structure
JP4198289B2 (en) Continuous drilling method between horizontal and inclined shafts
JP2676005B2 (en) Formwork equipment for concrete primary lining in tunnel construction
JP3106267B2 (en) Assembling method of shield machine and shield tunnel
JP3215093B2 (en) Multiple shield excavator
US3656810A (en) Tunneling shield
JP3215091B2 (en) Segment shape holding device
US4957327A (en) Methods of translating a face support
JP3468938B2 (en) Tunnel excavator and excavation method
JP3487416B2 (en) Construction method of underground structure and concrete box used for it
JP2557452B2 (en) Shield machine
JPH0325195A (en) Segment assembling method and shield machine in multi-connected shield method
JPH0545670Y2 (en)
JPH02147797A (en) Shield tunnel lining method
JPH03122396A (en) Reaction supporting structure in inclined shaft drilling machine

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees