Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP2684938B2 - Control method of cable crane - Google Patents
[go: Go Back, main page]

JP2684938B2 - Control method of cable crane - Google Patents

Control method of cable crane

Info

Publication number
JP2684938B2
JP2684938B2 JP4267487A JP26748792A JP2684938B2 JP 2684938 B2 JP2684938 B2 JP 2684938B2 JP 4267487 A JP4267487 A JP 4267487A JP 26748792 A JP26748792 A JP 26748792A JP 2684938 B2 JP2684938 B2 JP 2684938B2
Authority
JP
Japan
Prior art keywords
bucket
trolley
rope
cable crane
main rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP4267487A
Other languages
Japanese (ja)
Other versions
JPH06115875A (en
Inventor
慶三 風間
暉一郎 田中
栄次 高橋
通夫 中尾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP4267487A priority Critical patent/JP2684938B2/en
Priority to US08/105,979 priority patent/US5392935A/en
Priority to DE4329174A priority patent/DE4329174A1/en
Priority to SE9302787A priority patent/SE9302787L/en
Priority to FR9310385A priority patent/FR2696435B1/en
Priority to KR1019930017125A priority patent/KR940009050A/en
Publication of JPH06115875A publication Critical patent/JPH06115875A/en
Application granted granted Critical
Publication of JP2684938B2 publication Critical patent/JP2684938B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Control And Safety Of Cranes (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、例えばダムの構築現
場などにコンクリートを供給するためのケーブルクレー
ンにおいて、フィードフォワード制御による自動運転に
より搬送時間の短縮化を図ったケーブルクレーンの制御
システムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a cable crane control system for supplying concrete to a dam construction site, etc., in which the transfer time is shortened by automatic operation by feedforward control.

【0002】[0002]

【従来の技術】周知のように、ダムの構築現場におい
て、コンクリートを製造現場から打設現場まで搬送する
ための手段の一つとしてケーブルクレーンが用いられて
いる。
2. Description of the Related Art As is well known, a cable crane is used as one of means for transporting concrete from a manufacturing site to a casting site at a dam construction site.

【0003】このケーブルクレーンは、従来図6に示す
ように、山間に構築されるダム1上にその長手方向に沿
って張設された主索2と、主索2に懸垂され、これに沿
って走行可能なトロリー3と、トロリー牽引用の牽索4
と、トロリー3の下部に吊索5を介して吊下されたコン
クリートバケット6と、前記牽索4を牽引して前記トロ
リー3を山側に設けた搬送開始位置Aとダム1の底部任
意位置に設定された搬送終了位置B間を往復移動させる
横行ウインチ7と、前記吊索5を巻取,巻き下げしてバ
ケット6を昇降させる縦行ウインチ8と、トロリー3の
位置およびバケット6の位置を監視するとともに、前記
各ウインチ7,8を駆動制御する操作室9を備えてい
る。
As shown in FIG. 6, a conventional cable crane has a main rope 2 stretched on a dam 1 constructed in a mountain along its longitudinal direction and a main rope 2 suspended from the main rope 2. Trolley 3 that can be driven as a trolley, and checker 4 for towing the trolley
A concrete bucket 6 that is hung from the bottom of the trolley 3 via suspension lines 5, and a transport start position A where the trolley 3 is installed on the mountain side by pulling the check rope 4 and an arbitrary bottom position of the dam 1. The traverse winch 7 that reciprocates between the set transport end positions B, the vertical winch 8 that winds up and down the hanging rope 5 to move the bucket 6 up and down, the position of the trolley 3 and the position of the bucket 6 are set. An operation room 9 is provided for monitoring and for driving and controlling the winches 7 and 8.

【0004】そして、搬送開始位置Aの側方上部には、
紙面と直交する方向に図示しないバッチャープラントで
作られたコンクリートを搬送するトランスファーカー1
0が走行し、また搬送終了位置Bにはコンクリートホッ
パー11が配置されており、操作室9からの制御信号に
基づき、トロリー3を横移動させつつバケット6を昇降
させ、各位置A,Bにバケット6を位置決めして、コン
クリートの供給と排出を行う。
Then, on the upper side of the transport start position A,
A transfer car 1 that conveys concrete made by a batcher plant (not shown) in a direction orthogonal to the paper surface.
0 travels, and a concrete hopper 11 is arranged at the transfer end position B. Based on a control signal from the operation room 9, the trolley 3 is moved laterally and the bucket 6 is moved up and down to the respective positions A and B. The bucket 6 is positioned to supply and discharge concrete.

【0005】この種の構築物には多量のコンクリートを
必要とするところから、工費の採算上からはバケット6
の一回あたりの搬送時間を可及的に短縮する必要があ
り、このための好適な制御モードは図示のごとく斜めの
軌跡で搬送することである。
Since a large amount of concrete is required for this type of structure, the bucket 6 is used in consideration of the cost of construction.
It is necessary to shorten the transfer time per time as much as possible, and a suitable control mode for this purpose is to transfer on an oblique trajectory as shown in the figure.

【0006】また前記ケーブルクレーンにあっては、搬
送開始位置Aから搬送終了位置Bまでのトロリーの往復
運動およびバケット6の上下運動は各索4,5の繰り出
し量や荷重に応じた主索2の撓み度合い等によって位置
を検出でき、また、これに応じて自動的に座標を演算
し、この演算結果によって各ウインチ7,8の駆動用制
御装置に正逆回転,減速,停止を指令することができる
ため、前記斜めの軌跡に沿ったバケット6の自動搬送が
可能である。
Further, in the cable crane, the reciprocating motion of the trolley from the transport start position A to the transport end position B and the vertical motion of the bucket 6 cause the main rope 2 depending on the feeding amount and load of each rope 4, 5. The position can be detected by the degree of flexure, etc., and the coordinates are automatically calculated according to this, and the drive control device for each winch 7, 8 can be instructed to perform normal / reverse rotation, deceleration, and stop based on this calculation result. Therefore, the bucket 6 can be automatically conveyed along the oblique trajectory.

【0007】[0007]

【発明が解決しようとする課題】ところが、実際には加
速または減速時においてバケット6の速度に応答遅れが
生ずることから、振り子現象を生じ、この振れを止める
制御も必要である。
However, in actuality, a response delay occurs in the speed of the bucket 6 at the time of acceleration or deceleration, so that a pendulum phenomenon occurs and it is also necessary to control the shake.

【0008】しかしながら、前記制御方式では種々の測
定要素により現在位置を測定し、これに基づいて予め設
定された最適移動軌跡に制御する方法のため、制御に時
間遅れが生じ、作業員とオペレータが連絡を取り合いな
がら手動操作によって制御するよりも時間がかかるもの
となっていた。
However, in the above control method, since the present position is measured by various measuring elements and the optimal movement path is controlled on the basis of the present position, there is a time delay in the control, which causes the operator and the operator to lose control. It took longer than controlling by manual operation while keeping in touch.

【0009】したがって従来では、出発地点から各位置
A,Bの近傍に到達するまでは自動制御による搬送を行
い、ここからは手動操作に切り替え、各位置A,Bに配
置された監視員と、操作室9に配置されたオペレータ同
士が無線で連絡を取り合い、監視員の指示に基づくオペ
レータの手動操作によって振れ止めを行い、微調整によ
る横付け、位置決め作業を行っていた。
Therefore, in the prior art, conveyance is performed by automatic control from the starting point until reaching the vicinity of each of the positions A and B, and from here, the operation is switched to the manual operation, and the monitoring staff arranged at each of the positions A and B, The operators arranged in the operation room 9 wirelessly communicate with each other, and the steady operation is performed by the operator's manual operation based on the instruction of the observer, and the horizontal adjustment by fine adjustment and the positioning work are performed.

【0010】しかし、この方法だと各位置A,Bに熟練
の監視員を配備しなければならず、情報伝達から実際の
修正,微調整操作までの時間遅れが大きく、制御方向,
制御量も曖昧になりがちであることから、必ずしも短い
時間内で作業が完了するとは限らず、作業員の熟練に左
右されていた。
However, with this method, a skilled observer must be provided at each of the positions A and B, and there is a large time delay from the transmission of information to the actual correction and fine adjustment operation.
Since the control amount also tends to be ambiguous, the work is not always completed in a short time, and depends on the skill of the worker.

【0011】また、作業員の頭上でバケットが振り回さ
れ危険であることから、作業員の待ち時間や退避時間も
長くなるため、作業能率が悪く採算上問題となってい
た。
Further, since it is dangerous that the bucket is swung over the worker's head, the waiting time and the evacuation time of the worker become long, resulting in poor work efficiency and a problem in profitability.

【0012】この発明は以上の問題を解決するもので、
その目的は出発地点から到達地点に至るまでの主索,ト
ロリー,バケットの挙動をモデル化し、このモデル化さ
れたパターンに基づきコンクリートを迅速かつ精度よく
自動搬送できるようにしたケーブルクレーンの制御方法
を提供するものである
The present invention solves the above problems.
Main rope to the object reaches the point reached from the starting point, the trolley, and model the behavior of the bucket, the control method of a cable crane as concrete based on the modeled pattern can quickly and accurately auto-conveying < br />

【0013】[0013]

【課題を解決するための手段】前記目的を達成するた
め、この発明は、二点間に張設された主索と、該主索に
沿って走行可能な横行トロリーと、該トロリー牽引用の
牽索と、前記トロリーの下部に吊索を介して吊下された
バケットと、前記牽索を巻取,巻き戻しして前記トロリ
ーを前記主索に沿って往復移動させる横行ウインチと、
前記吊索を巻取,巻き戻ししてバケットを昇降させる縦
行ウインチおよび各ウインチの駆動制御装置とを備えた
ケーブルクレーンにおいて、前記バケットを搬送開始位
置から搬送終了位置まで移動させる際に使用するケーブ
ルクレーンの制御方法であって、前記搬送開始位置及び
搬送終了位置に応じ、前記主策の撓み度合い、前記牽索
の繰り出し長さ、前記吊索の繰り出し長さを算定要素と
して、予め前記主策、前記トロリー及び前記バケットの
挙動を解析して運転パターンをモデル化し、前記ケーブ
ルクレーンを運転する際に、設定条件に応じて前記モデ
ル化された運転パターンを選択して、この運転パターン
に従ってケーブルクレーンを自動制御することを特徴と
するものである。
In order to achieve the above object, the present invention is directed to a main rope stretched between two points, a traverse trolley capable of traveling along the main rope, and a trolley for towing the trolley. Stretching, a bucket hung at the bottom of the trolley via a suspension line, and a traverse winch that winds the retraction line and rewinds the trolley to reciprocate along the main line.
In a cable crane equipped with a longitudinal winch for lifting and lowering a bucket by winding and unwinding the suspension line and a drive control device for each winch, it is used when moving the bucket from a transport start position to a transport end position. A method for controlling a cable crane, wherein the degree of deflection of the main measure, the length of the check rope, and the length of the suspension rope are calculated according to the transport start position and the transport end position.
Then, the behavior of the main measure, the trolley, and the bucket is analyzed in advance to model the operation pattern, and when the cable crane is operated, the modeled operation pattern is selected according to the setting conditions. The feature is that the cable crane is automatically controlled according to this operation pattern.

【0014】[0014]

【作用】以上の構成によれば、バケットはスタート座標
から目標位置座標までモデル化された加速度−定速度−
減速及び振れ止め用行き足のパタ―ンによるプログラム
内容に沿って走行及び昇降制御されることで振れが防止
されつつ目標位置まで自動搬送される。
According to the above construction, the bucket is modeled from the start coordinate to the target position coordinated acceleration-constant velocity-.
By controlling traveling and lifting according to the program contents by the foot pattern for deceleration and steady rest, shake is prevented and automatically conveyed to the target position.

【0015】[0015]

【実施例】以下、この発明の一実施例を図面を用いて詳
細に説明する。なお、実施例において、従来と同様また
は相当する箇所は同一符号を援用し、異なる箇所または
新たに付加する箇所に新たな符号を付して説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below in detail with reference to the drawings. In the embodiments, the same reference numerals will be used for the same or corresponding parts as in the related art, and different parts or parts to be newly added will be described with new signs.

【0016】図1は、この発明の全体構成を示す概略
図、図2はシステム構成を示すブロック図である。
FIG. 1 is a schematic diagram showing the overall configuration of the present invention, and FIG. 2 is a block diagram showing the system configuration.

【0017】図において、このケーブルクレーンは、基
本的には従来とほぼ同様に、山間に構築されるダム1の
上部にその長手方向に沿って張設された主索2と、主索
2に懸垂され、これに沿って走行可能なトロリー3と、
トロリー牽引用の牽索4と、トロリー3の下部に吊索5
を介して吊下されたコンクリートバケット6と、前記牽
索4を牽引して前記トロリー3を山側に設けた搬送開始
位置Aとダム1の底部任意位置に設定された搬送終了位
置B間を往復移動させる横行ウインチ7と、前記吊索5
を巻取,巻き下げしてバケット6を昇降させる縦行ウイ
ンチ8と、トロリー3の位置およびバケット6の位置を
監視するとともに、前記各ウインチ7,8を駆動制御す
るための操作室9とを備えている。
In the figure, this cable crane is basically similar to the conventional one, and a main rope 2 stretched along the longitudinal direction on the upper part of a dam 1 constructed in a mountain, and a main rope 2. A trolley 3 that can be suspended and run along it,
Checking rope 4 for towing the trolley and hanging rope 5 under the trolley 3.
Reciprocating between a concrete bucket 6 hung via a trolley, a transport start position A in which the trolley 3 is provided on the mountain side by pulling the check rope 4 and a transport end position B set at an arbitrary bottom portion of the dam 1. The traverse winch 7 to be moved and the hanging rope 5
A longitudinal winch 8 for winding and lowering the bucket 6 to raise and lower the bucket 6, and an operation chamber 9 for monitoring the position of the trolley 3 and the position of the bucket 6 and for driving and controlling the winches 7, 8. I have it.

【0018】搬送開始位置Aには、紙面と直交する方向
には図示しないバッチャープラントで作られたコンクリ
ートを搬送するトランスファーカー10が走行し、搬送
終了位置Bにはコンクリートホッパー11が配置されて
いる。
At the carrying start position A, a transfer car 10 for carrying concrete made of a batcher plant (not shown) travels in a direction orthogonal to the paper surface, and at the carrying end position B, a concrete hopper 11 is arranged. There is.

【0019】操作室9には、各ウインチ7,8の運転用
操作卓20、前記各ウインチ7,8に各種駆動モードを
指令する制御部22,トロリー3の最適走行パターン及
びバケット6の最適昇降パターンを演算し、そのパター
ンを制御部22に与える演算部24及び無線機26など
を備えている。
[0019] Operation chamber 9, the operation for console 20 for each winch 7,8, the control unit 22 for commanding the various driving modes in each winch 7,8, optimum elevation of the optimal running pattern and the bucket 6 of the trolley 3 A calculation unit 24 and a wireless device 26 that calculate a pattern and give the pattern to the control unit 22 are provided.

【0020】前記主索4の付根部には傾斜角度検出装置
28が設けられているとともに、光波測距計30が配置
されている。
A tilt angle detecting device 28 is provided at the root of the main rope 4, and a light wave range finder 30 is provided.

【0021】傾斜角度検出装置28はトロリー3の搬送
開始位置Aの直上における停止位置で主索4の傾斜度合
いを検出し、光波測距計30はトロリー3の出発座標を
検出するものであり、それぞれ前記制御部22に接続さ
れている。なお、光波測距計30に対応してトロリー3
には光波測距計30の照射範囲をカバーする縦長の反射
板30aが設けられている。
The inclination angle detecting device 28 detects the inclination degree of the main rope 4 at the stop position immediately above the transport start position A of the trolley 3, and the optical distance meter 30 detects the starting coordinate of the trolley 3. Each is connected to the control unit 22. In addition, the trolley 3 corresponding to the light wave range finder 30
Is provided with a vertically long reflection plate 30a that covers the irradiation range of the lightwave distance meter 30.

【0022】前記横行ウインチ7および縦行ウインチ8
は、主索2の近傍の機械室32に配置されるもので、図
2に示すように、駆動制御装置34,36により正逆回
転及び加減速駆動される。これら駆動制御装置34,3
6は前記制御部22に接続され、制御部22からの指令
によって駆動される。
The transverse winch 7 and the longitudinal winch 8
Is intended to be placed in the machine room 32 in the vicinity of the main rope 2, as shown in FIG. 2, it is driven forward and reverse rotation and acceleration and deceleration by the drive control device 34, 36. These drive control devices 34, 3
Reference numeral 6 is connected to the control unit 22 and driven by a command from the control unit 22.

【0023】各ウインチ7,8はより詳しくは、それぞ
れモータ7a,8aにブレーキ7b,8b、減速機7
c,8cを介して回転可能に連動し、牽索4,吊索5を
巻取および繰り出しするドラム7d,8dを有してい
る。なお、前記横行ウインチ7はエンドレス式に牽索4
を巻き取るもので、図1に示すように中間ドラム7d−
1及びドラム7dに巻き付けた状態で牽索4の両端を巻
き付け巻き戻ししている。
More specifically, each winch 7, 8 has a motor 7a, 8a, a brake 7b, 8b, and a speed reducer 7, respectively.
It has drums 7d and 8d which are rotatably interlocked with each other via c and 8c, and which wind and unwind the check rope 4 and the suspension rope 5. The traverse winch 7 is an endless type checker 4
The intermediate drum 7d-
Both ends of the check rope 4 are wound around and unwound around the drum 1 and the drum 7d.

【0024】各モ―タ7a,8aには速度検出器7e,
8eが設けられ、これらの検出値を前記駆動制御装置3
4,36にフィードバックすることで、前記制御部22
からの走行指令に応じた適性回転方向および速度に制御
される。
Each motor 7a, 8a has a speed detector 7e,
8e is provided, and the detected values are detected by the drive controller 3
By feeding back to the control unit 4, 36,
It is controlled to an appropriate rotation direction and speed according to the traveling command from.

【0025】また、各ドラム7d,8dにはそれぞれエ
ンコーダX,Zが設けられている。このうちのエンコー
ダXはトロリー3の横行き量検出用、エンコーダZはバ
ケット6の下降量検出用であり、それぞれのデータは前
記制御部22に入力される。なお、横行量検出値は、前
記中間ドラム7d−1での牽索4のスリップによって誤
差が生ずるため、トロリー30の到着毎に前記光波測距
計30による測定値に補正される。
Further, encoders X and Z are provided on the drums 7d and 8d, respectively. Of these, the encoder X is for detecting the lateral travel amount of the trolley 3, and the encoder Z is for detecting the lowering amount of the bucket 6, and the respective data are input to the control unit 22. An error in the detected amount of traverse occurs due to slip of the rope 4 on the intermediate drum 7d-1, and is therefore corrected to the value measured by the lightwave distance meter 30 each time the trolley 30 arrives.

【0026】搬送開始位置Aであるバンカー線上には着
底確認スイッチ42が設けられているとともに、これの
近傍にはエリアセンサ44が配置され、さらには制御盤
46が配置されている。
A bottom confirmation switch 42 is provided on the bunker line at the transport start position A, an area sensor 44 is arranged in the vicinity of the switch 42, and a control board 46 is arranged.

【0027】前記着底確認スイッチ42はバケット6の
着底を検出するもの、エリアセンサー44はバケット6
の着底時における制御用のセンサーであり、このセンサ
ー44の検出範囲であれば着底できる。さらに制御盤4
6はトランスファーカー10からバケット6に対するコ
ンクリート放出時における制御を行うものである。
The bottom confirmation switch 42 is for detecting the bottom of the bucket 6, and the area sensor 44 is for the bucket 6.
It is a sensor for controlling the bottom of the sensor, and the sensor 44 can reach the bottom within the detection range. Control panel 4
Reference numeral 6 is for performing control when concrete is discharged from the transfer car 10 to the bucket 6.

【0028】バケット6の下部には、図示しない油圧シ
リンダによって開閉されるゲート及び開閉検出用リミッ
トスイッチ48と、超音波エリアセンサー50が設けら
れている。また、このバケット6の上部には無線機5
2,ジャイロ式振れ角検出計54,制御盤56及びこれ
らの可動部を駆動するためのバッテリ58,ソーラ式充
電装置60が配置され、これら各センサーの検出値は無
線機52,26を通じて操作室9側の制御部22に転送
される。
Below the bucket 6, there are provided a gate and an open / close detection limit switch 48 which are opened and closed by a hydraulic cylinder (not shown), and an ultrasonic area sensor 50. In addition, the wireless device 5 is provided above the bucket 6.
2, a gyro-type deflection angle detector 54, a control panel 56, a battery 58 for driving these movable parts, and a solar-type charging device 60 are arranged. The detection values of these sensors are transmitted through the radios 52 and 26 to the operation room. It is transferred to the control unit 22 on the 9 side.

【0029】ホッパー11は、支持架台62に支持され
たものであり、その下部には図示しない油圧シリンダに
よって開閉するゲート及び開閉検出用リミットスイッチ
64が設けられている。また支持架台62の脚部にはホ
ッパー11の下部に停止するダンプトラック66の運転
席の見えやすい位置及び操作しやすい位置にコンクリー
ト放出用手動スイッチ68,表示装置70,制御盤72
等が配置されている。また、架台62の上部には無線機
74及び前記バケット6の停止位置を検出するための超
音波エリアセンサー76が配置され、各センサーの検出
値は無線機74,26を通じて操作室9側の制御部22
に転送される。
The hopper 11 is supported by a support base 62, and a gate and an open / close detection limit switch 64 which are opened and closed by a hydraulic cylinder (not shown) are provided below the hopper 11. In addition, a concrete discharging manual switch 68, a display device 70, and a control panel 72 are provided on the legs of the support base 62 at a position where the driver's seat of the dump truck 66 stopped below the hopper 11 can be easily seen and operated.
Etc. are arranged. In addition, a wireless device 74 and an ultrasonic area sensor 76 for detecting the stop position of the bucket 6 are arranged above the pedestal 62, and the detection values of the sensors are controlled by the wireless devices 74 and 26 on the operation room 9 side. Part 22
Is forwarded to

【0030】演算部24には、説明は省略するが、搬送
開始位置及び搬送終了位置に応じ、主策2の撓み度合
い、牽索4の繰り出し長さ、吊索5の繰り出し長さを算
定要素として、予め主索4、トロリー3びバケット6の
挙動を解析して運転パターンをモデル化し、このモデル
化された、振れ止めを考慮した最短時間の運転パターン
のプログラムが内蔵されている。
[0030] calculation unit 24, calculation explanation is omitted, according to the transport start position and the transport end position, the deflection degree of Omosaku 2, feeding a length of牽索4, the feeding length of the slings 5
As a constant element, the behavior of the main rope 4, the trolley 3 and the bucket 6 is analyzed in advance to model a driving pattern, and a program of the modeled driving pattern of the shortest time in consideration of steady rest is built in.

【0031】このプログラム内容は、図3(a)に示す
ように、ダム1の対象領域を幾つかの小ブロックに分割
し、各ブロック毎に振れ止めを考慮してトロリー3の運
転の速度、バケット6の昇降速度を定め、最短時間での
運転パタ―ンを算定したもので、トロリーの運転速度V
xは図3(b)に示すようにスタート座標から階段的に
加速し、次いで一定速度となり、次いで階段的な減速に
より目標座標で0となる運転パタ―ンが設定されてい
る。
As shown in FIG. 3A, the contents of this program are such that the target area of the dam 1 is divided into several small blocks, and the operation speed of the trolley 3 in consideration of steady rest for each block, The operating speed V of the trolley is calculated by setting the lifting speed of the bucket 6 and calculating the operating pattern in the shortest time.
As shown in FIG. 3 (b), x is set to a driving pattern in which acceleration is performed stepwise from the start coordinate, then a constant speed is obtained, and then stepwise deceleration causes 0 at the target coordinate.

【0032】またバケット6の吊索5の昇降速度Vzも
図3(c)に示すようにトロリー3の運転パタ―ンに準
じた運転パタ―ンが設定されている。
As for the ascending / descending speed Vz of the suspension rope 5 of the bucket 6, as shown in FIG. 3 (c), an operation pattern according to the operation pattern of the trolley 3 is set.

【0033】なお、加減速時に階段状となるのは加減速
による加速度に応じてバケット6が振れるからであり、
この振れを相殺するために階段的な加減速を行い、目標
位置では完全に振れを止めるプログラムとなっている。
The step-like shape during acceleration / deceleration is because the bucket 6 swings in accordance with the acceleration due to acceleration / deceleration.
In order to offset this shake, a stepwise acceleration / deceleration is performed to completely stop the shake at the target position.

【0034】この運転モ―ドにおいて、主索2の撓み度
合いは、主索2の張力と主索2に加わる全荷重によって
異なる。主索2の張力は既知の値で一定とすれば、変数
として荷重を入力することによって、前記プログラムに
よる運転時間,運転パタ―ンが定まる。主索2,トロリ
ー3,バケット6の荷重も既知の値であり、バケット内
に投入されるコンクリートの重量に応じて定まる。
In this operation mode, the degree of deflection of the main rope 2 differs depending on the tension of the main rope 2 and the total load applied to the main rope 2. If the tension of the main rope 2 is constant at a known value, the operating time and operating pattern according to the program are determined by inputting the load as a variable. The loads on the main rope 2, trolley 3, and bucket 6 are also known values, and are determined according to the weight of concrete put into the bucket.

【0035】このコンクリートは、打設場所及び工種に
応じてモルタル,中練りコンクリート,固練りコンクリ
ートであり、バケット6の容量を一定とするとその比重
に応じて異なってくる。バッチャープラントで製造され
たコンクリートは搬送台車10によってバンカー線上に
運ばれるとともに、その品種情報も操作室9側及びバケ
ット6側にもたらされる。
This concrete is mortar, medium-mixed concrete, or solid-mixed concrete depending on the place of casting and the type of work. When the capacity of the bucket 6 is constant, it varies depending on its specific gravity. The concrete manufactured in the batcher plant is carried on the bunker line by the carrier 10 and the product type information is also provided to the operation room 9 side and the bucket 6 side.

【0036】したがって、制御部22はこの品種情報を
受け取った後に前記演算部24に記憶されたプログラム
内容により、駆動制御装置34,36を動作させるべ
く、以下の制御を行う。
Therefore, the control unit 22 carries out the following control in order to operate the drive control devices 34 and 36 by the program contents stored in the arithmetic unit 24 after receiving the product type information.

【0037】図4は往路における処理手順を示すもの
で、往路においては、搬送開始位置Aにバケット6が着
底している状態で、バケット6にコンクリートが投入さ
れると同時に品種が指定されると、主索4に加わる全荷
重が指定され、次いで光波測距計30及び傾斜角検出装
置28の検出結果に応じてトロリー3のスタート座標及
び到達座標が定まると、主索4の撓みの軌跡が算出され
る(ステップ101〜103)。
FIG. 4 shows the processing procedure on the outward path. In the outward path, with the bucket 6 bottomed at the transport start position A, the concrete type is specified at the same time when the concrete is put into the bucket 6. When the total load applied to the main rope 4 is specified, and then the start coordinates and the arrival coordinates of the trolley 3 are determined according to the detection results of the lightwave range finder 30 and the tilt angle detection device 28, the trajectory of the deflection of the main rope 4 Is calculated (steps 101 to 103).

【0038】次いで、バケット6の搬送準備が完了し、
運転OK信号をバンカー線上の制御盤46から受けとる
と、吊索5は僅かに巻上げされ、この状態でのトロリー
3の位置もずれることから、原点座標がセットされ、前
記設定モ―ドに基づく運転パタ―ンが選択された後各ウ
インチ7,8の運転が開始される(ステップ104〜1
08)。
Next, the bucket 6 is ready for transportation,
When the operation OK signal is received from the control board 46 on the bunker line, the suspension rope 5 is slightly wound up, and the position of the trolley 3 in this state also shifts, so that the origin coordinates are set and the operation based on the setting mode is performed. After the pattern is selected, the operation of each winch 7, 8 is started (steps 104-1).
08).

【0039】運転中制御部22は常時トロリー3の横行
量,及び吊索5の繰出し長さ及び速度をエンコーダX,
Zにより監視し、これによって予めプログラムされた速
度変更点に到達したなら、これに応じてウインチ7,8
に対する制御電圧をプログラム内容に一致させる作業を
繰返し(ステップ109,110)、ステップ102に
よって設定した到達座標に一致した時点(ステップ11
1)で運転を終了する。
During operation, the control unit 22 constantly controls the traverse amount of the trolley 3 and the feeding length and speed of the suspension line 5 by the encoder X,
If a pre-programmed speed change point is reached by monitoring with Z, the winch 7, 8 will be responded accordingly.
The operation of matching the control voltage with respect to the program content is repeated (steps 109 and 110), and when the reaching coordinates set in step 102 are matched (step 11).
The operation ends in 1).

【0040】この運転終了状態ではバケット6はホッパ
ー11の直上に至り、その後はバケット6及びホッパー
11に備えられた超音波エリアセンサ50,76の検出
値に応じた縦横の自動微調整作業の後にホッパー11上
方の所定位置に停止してゲートを開いてコンクリートを
放出し、往路における全作業を終了する。
In this operation completed state, the bucket 6 reaches directly above the hopper 11, and after that, after the automatic fine adjustment operation in the vertical and horizontal directions according to the detection values of the ultrasonic area sensors 50 and 76 provided in the bucket 6 and the hopper 11. The work is stopped at a predetermined position above the hopper 11, the gate is opened, the concrete is discharged, and all the work on the outward path is completed.

【0041】また、復路においては、往路とほぼ同様で
あるが、図5に示すように、無線機52,26を通じて
運転開始準備完了の信号を受けとると、スタート座標及
び到着目標座標がセットされ、空荷状態における運転パ
タ―ンが選択された後トロリー3の現在位置座標が計測
された後、運転が開始される(ステップ201〜20
6)。
Also, on the return path, although it is almost the same as the outward path, as shown in FIG. 5, when a signal for preparation for start of operation is received through the radios 52 and 26, the start coordinates and the arrival target coordinates are set, After the operation pattern in the empty state is selected and the current position coordinates of the trolley 3 are measured, the operation is started (steps 201 to 20).
6).

【0042】運転開始後は制御部22は常時トロリー3
の横行量,及び吊索5の繰出し長さ及び速度をエンコー
ダX,Z、速度検出器7e,8eにより監視し、これに
よって復路における予めプログラムされた速度変更点に
到達したなら、これに応じてウインチ7,8に対する制
御電圧をプログラム内容に一致させる作業を繰返し(ス
テップ207〜208)、ステップ202によって設定
した到達座標に一致した時点(ステップ209)で運転
を終了する。
After the operation is started, the control unit 22 keeps the trolley 3 at all times.
The amount of traverse and the length and speed of the suspension cable 5 are monitored by the encoders X and Z and the speed detectors 7e and 8e, and if a preprogrammed speed change point on the return path is reached, the speed change point can be responded accordingly. The operation of matching the control voltage for the winches 7 and 8 with the program content is repeated (steps 207 to 208), and the operation is terminated at the time when the arrival coordinates set in step 202 match (step 209).

【0043】この運転終了状態ではバケット6はバンカ
ー線の直上に至り、その後はバケット6及びバンカー線
に備えられた超音波エリアセンサ50,44の検出値に
応じた縦横の自動微調整作業の後にバンカー線上に着底
し、スイッチ42により確認されると再びコンクリート
受け入れ待機状態となる。
In this operation completed state, the bucket 6 reaches directly above the bunker line, and thereafter, after the vertical and horizontal automatic fine adjustment work according to the detection values of the ultrasonic area sensors 50 and 44 provided on the bucket 6 and the bunker line. When it reaches the bottom of the bunker line and is confirmed by the switch 42, the concrete receiving standby state is resumed.

【0044】[0044]

【発明の効果】以上実施例によって詳細に説明したよう
に、この発明によるケーブルクレーンの制御方法にあっ
ては、バケットがスタート座標から目標位置座標までモ
デル化された加速度−定速度−減速及び振れ止め用行き
足のパターンによるプログラム内容に沿って走行及び昇
降制御されることで振れが防止されつつ目標位置まで自
動搬送され、短時間で迅速な移動が可能となる。
As described above in detail with reference to the embodiments, in the cable crane control method according to the present invention, the bucket is modeled from start coordinates to target position coordinates: acceleration-constant speed-deceleration and deflection. By controlling the traveling and lifting according to the program content according to the stopping foot pattern, the shake is prevented and the robot is automatically conveyed to the target position, which enables rapid movement in a short time.

【0045】また、これにより到達位置での監視員が不
要となり、コンクリート搬送の完全自動化と打設現場に
おける作業員の退避時間や待ち時間などを含む作業の短
縮を図ることができ、しかも安全性も向上する。
Further, this eliminates the need for a supervisor at the arrival position, makes it possible to fully automate concrete transportation and shorten the work including the evacuation time and waiting time of the worker at the pouring site, and the safety is also improved. Also improves.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明によるケーブルクレーンの全体説明図
である。
FIG. 1 is an overall explanatory view of a cable crane according to the present invention.

【図2】システム構成を示すブロック図である。FIG. 2 is a block diagram showing a system configuration.

【図3】(a),(b),(c)はプログラム内容を示
す模式図である。
3A, 3B, and 3C are schematic diagrams showing program contents.

【図4】バケットの往路における処理手順を示すフロー
チャートである。
FIG. 4 is a flowchart showing a processing procedure on the outward path of the bucket.

【図5】バケットの復路における処理手順を示すフロー
チャートである。
FIG. 5 is a flowchart showing a processing procedure on the return path of the bucket.

【図6】従来のケーブルクレーンの一般的構成を示す説
明図である。
FIG. 6 is an explanatory diagram showing a general configuration of a conventional cable crane.

【符号の説明】[Explanation of symbols]

2 主索 3 トロリー 4 牽索 5 吊索 6 コンクリートバケット 7 横行ウインチ 8 縦行ウインチ 7e,8e 速度検出器 9 操作室 10 トランスファーカー 11 ホッパー 22 制御部 24 演算部 34,36 駆動制御装置 38,40 速度制御装置 A 搬送開始位置 B 搬送終点位置 X,Z エンコーダ 2 Main rope 3 Trolley 4 Stretching rope 5 Suspension rope 6 Concrete bucket 7 Traverse winch 8 Traverse winch 7e, 8e Speed detector 9 Operating room 10 Transfer car 11 Hopper 22 Control unit 24 Computing unit 34, 36 Drive control device 38, 40 Speed controller A Transport start position B Transport end position X, Z encoder

フロントページの続き (72)発明者 中尾 通夫 東京都千代田区神田司町2丁目3番地 株式会社大林組東京本社内 (56)参考文献 特開 昭62−185695(JP,A)Front page continuation (72) Inventor Michio Nakao 2-3 Kandaji-cho, Chiyoda-ku, Tokyo Obayashi Corporation Tokyo head office (56) Reference JP 62-185695 (JP, A)

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 二点間に張設された主索と、該主索に沿
って走行可能な横行トロリーと、該トロリー牽引用の牽
索と、前記トロリーの下部に吊索を介して吊下されたバ
ケットと、前記牽索を巻取,巻き戻しして前記トロリー
を前記主索に沿って往復移動させる横行ウインチと、前
記吊索を巻取,巻き戻ししてバケットを昇降させる縦行
ウインチおよび各ウインチの駆動制御装置とを備えたケ
ーブルクレーンにおいて、前記バケットを搬送開始位置
から搬送終了位置まで移動させる際に使用するケーブル
クレーンの制御方法であって、前記搬送開始位置及び搬
送終了位置に応じ、前記主索の撓み度合い、前記牽索の
繰り出し長さ、前記吊索の繰り出し長さを算定要素とし
て、予め前記主索、前記トロリー及び前記バケットの挙
動を解析して運転パターンをモデル化し、前記ケーブル
クレーンを運転する際に、設定条件に応じて前記モデル
化された運転パターンを選択して、この運転パターンに
従ってケーブルクレーンを自動制御することを特徴とす
るケーブルクレーンの制御方法。
1. A main rope stretched between two points, a traverse trolley capable of traveling along the main rope, a check rope for towing the trolley, and a suspension rope suspended below the trolley. A lowered bucket, a traverse winch that winds and unwinds the check rope to reciprocate the trolley along the main rope, and a vertical movement that winds and unwinds the suspension rope to move the bucket up and down. In a cable crane including a winch and a drive control device for each winch, a method of controlling a cable crane used when moving the bucket from a transport start position to a transport end position, the transport start position and the transport end position According to the above, the degree of bending of the main rope, the payout length of the check rope, and the payout length of the suspension rope are used as calculation factors.
In advance , the behavior of the main rope, the trolley, and the bucket is analyzed to model an operation pattern, and when the cable crane is operated, the modeled operation pattern is selected according to setting conditions, A method for controlling a cable crane, which is characterized by automatically controlling the cable crane according to this operation pattern.
JP4267487A 1992-10-06 1992-10-06 Control method of cable crane Expired - Fee Related JP2684938B2 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
JP4267487A JP2684938B2 (en) 1992-10-06 1992-10-06 Control method of cable crane
US08/105,979 US5392935A (en) 1992-10-06 1993-08-13 Control system for cable crane
DE4329174A DE4329174A1 (en) 1992-10-06 1993-08-30 Automatic control system for cable crane - has trolley moving transversely along main cable operated by hauling rope and container is suspended by rope below trolley driven respectively by two capstans
SE9302787A SE9302787L (en) 1992-10-06 1993-08-30 Cable crane control system
FR9310385A FR2696435B1 (en) 1992-10-06 1993-08-31 CONTROL SYSTEM FOR CABLE CRANE.
KR1019930017125A KR940009050A (en) 1992-10-06 1993-08-31 Cable Crane Control System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4267487A JP2684938B2 (en) 1992-10-06 1992-10-06 Control method of cable crane

Publications (2)

Publication Number Publication Date
JPH06115875A JPH06115875A (en) 1994-04-26
JP2684938B2 true JP2684938B2 (en) 1997-12-03

Family

ID=17445535

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4267487A Expired - Fee Related JP2684938B2 (en) 1992-10-06 1992-10-06 Control method of cable crane

Country Status (1)

Country Link
JP (1) JP2684938B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110468712A (en) * 2019-07-30 2019-11-19 中铁大桥局集团第六工程有限公司 Main rope of suspension bridge trailer system and method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7673598B2 (en) * 2021-09-03 2025-05-09 株式会社大林組 Soil loading system
JP7708402B1 (en) * 2024-07-29 2025-07-15 西松建設株式会社 Method for constructing concrete structure and cable crane system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62185695A (en) * 1986-02-08 1987-08-14 株式会社 間組 Automatic bracing method of crane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110468712A (en) * 2019-07-30 2019-11-19 中铁大桥局集团第六工程有限公司 Main rope of suspension bridge trailer system and method

Also Published As

Publication number Publication date
JPH06115875A (en) 1994-04-26

Similar Documents

Publication Publication Date Title
US6880712B2 (en) Crane and method for controlling the crane
JP3669242B2 (en) Cable crane control system
JP2512854B2 (en) Control system for the cavern lane
JP2684938B2 (en) Control method of cable crane
JP2684939B2 (en) Control method of cable crane
JP2001080881A (en) Tower crane equipment
CN103669447B (en) Automatic lifting bucket control method, control system and control device of continuous wall groove forming machine
JPH1036074A (en) Automatic operation system of cable crane
JP2684940B2 (en) Control method of cable crane
JP2577122B2 (en) Cable crane
JP4131092B2 (en) Cable crane automatic control method and program
JP2577127B2 (en) Bucket for cable crane
JP7634851B2 (en) Cable crane, transportation method and construction method
JP2556244B2 (en) Coordinate correction method of trolley in cable crane
JP2626212B2 (en) Bucket steadying method for cable crane
JPH09278359A (en) Crane control method and drive control device
JP2020059579A (en) Bridge cargo handling apparatus
JPH1160159A (en) Control method of parallel running type cable crane
JP3242633B2 (en) How to set operation pattern of suspended load suspended by cable crane
JPH1135280A (en) Control method of rail rope cable crane
JP2560568B2 (en) Cable crane
JPH1135281A (en) Control method of rail rope cable crane
JPH09124273A (en) Track type cable crane
CN121773068A (en) System and method for handling a load to a raised position
JPH1160158A (en) Control method of parallel running type cable crane

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080815

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090815

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100815

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100815

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110815

Year of fee payment: 14

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110815

Year of fee payment: 14

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110815

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120815

Year of fee payment: 15

LAPS Cancellation because of no payment of annual fees