JP2693064B2 - Positioning and mounting device for precast concrete slab for tunnel lining - Google Patents
[go: Go Back, main page]

JP2693064B2 - Positioning and mounting device for precast concrete slab for tunnel lining - Google Patents

Positioning and mounting device for precast concrete slab for tunnel lining

Info

Publication number
JP2693064B2
JP2693064B2 JP3277828A JP27782891A JP2693064B2 JP 2693064 B2 JP2693064 B2 JP 2693064B2 JP 3277828 A JP3277828 A JP 3277828A JP 27782891 A JP27782891 A JP 27782891A JP 2693064 B2 JP2693064 B2 JP 2693064B2
Authority
JP
Japan
Prior art keywords
main boom
tunnel
jack
holding frame
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP3277828A
Other languages
Japanese (ja)
Other versions
JPH05113100A (en
Inventor
重利 古賀
芳夫 細川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP3277828A priority Critical patent/JP2693064B2/en
Publication of JPH05113100A publication Critical patent/JPH05113100A/en
Application granted granted Critical
Publication of JP2693064B2 publication Critical patent/JP2693064B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明はプレキヤストコンクリー
ト版を用いたトンネル覆工方法に適用される位置決め及
び取付装置に係るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a positioning and mounting device applied to a tunnel lining method using a precast concrete slab.

【0002】[0002]

【従来の技術】本発明者等は特願平3−262102号
において、トンネル覆工長を複数分割した長さを有する
枠状主体の地山対向面にはコンクリート充填部が開口
し、反対面には前記枠状主体全面を俺覆する堰板部が配
された型枠兼用プレキヤストコンクリート版(以下PC
版と呼称する)を地山に建込み、同PC版と地山との間
に流動性がよい急硬化コンクリートを注入、充填するト
ンネル覆工構築法を提案した。
2. Description of the Related Art In Japanese Patent Application No. 3-262102, the present inventors have found that a concrete-filled portion has an opening on the opposite surface of a rock-shaped main body having a frame-shaped main body having a length obtained by dividing a tunnel lining length into plural parts. Is a formcasting precast concrete plate (hereinafter PC
We proposed a tunnel lining construction method in which rapid hardening concrete with good fluidity is injected and filled between the PC plate and the ground.

【0003】[0003]

【発明が解決しようとする課題】トンネル覆工作業をP
C化する場合は、PC版の建て込み、及び建て込み機械
の位置決めは困難な作業となる。本発明はこのような問
題点に鑑みて提案されたもので、その目的とする処は、
制御システムによって覆工コンクリート型枠を兼用する
PC版を地山の所定位置に設置することができるトンネ
ル覆工用PC版の位置決め取付装置を提供する点にあ
る。
[Problems to be Solved by the Invention]
When converting to C, it is difficult to mount the PC plate and position the mounting machine. The present invention has been proposed in view of such problems, and the purpose thereof is to:
It is a point to provide a positioning and mounting device for a PC plate for tunnel lining that can install a PC plate that also serves as a lining concrete formwork at a predetermined position on the ground by a control system.

【0004】[0004]

【課題を解決するための手段】前記の目的を達成するた
め、本発明に係るトンネル覆工用プレキヤストコンクリ
ート版の位置決め装置は、ベースマシンにメインブーム
旋回アクチユエータ及び伸縮ジヤツキを介して搭載され
たメインブーム、同メインブームの先端に傾斜調整ジヤ
ツキ及び旋回アクチユエータを介して傾動並に旋回自在
に支持されたプレキヤストコンクリート型枠版保持枠、
同保持枠に装架されたPC型枠版吸着装置、前記ベース
マシンのトンネル内における位置計測データを入力して
トンネル設計断面の軌道を演算して、前記旋回アクチユ
エータと伸縮ジヤツキ及び傾斜調整ジヤツキを制御する
制御装置から構成されている。
In order to achieve the above object, a positioning device for a precast concrete slab for tunnel lining according to the present invention is mounted on a base machine via a main boom turning actuator and a telescopic jack. A main boom, a precast concrete formwork plate holding frame supported at the tip of the main boom via a tilt adjustment jack and a swing actuator so as to be tiltable and swingable.
The PC form plate suction device mounted on the holding frame, the position measurement data in the tunnel of the base machine is input to calculate the trajectory of the tunnel design cross section, and the turning actuator, the expansion / contraction jack, and the inclination adjustment jack are calculated. It is composed of a control device for controlling.

【0005】[0005]

【作用】トンネル中心付近の任意の位置に前記ベースマ
シンを設置し、同設置位置の座標を計測してトンネル設
計時の断面と、前記メインブームの先端位置を設計心に
対して演算し、これらのデータを制御装置を入力して前
記メインブームの旋回アクチユエータ、伸縮ジヤツキ及
びPC型枠版の傾斜調整ジヤツキ、旋回アクチユエータ
を制御して、PC型枠版を所定位置に設置する。
[Operation] The base machine is installed at an arbitrary position near the center of the tunnel, the coordinates of the installation position are measured, the cross section at the time of tunnel design and the tip position of the main boom are calculated with respect to the design point, and The data of the above is input to the control device to control the swing actuator of the main boom, the expansion / contraction jack, the tilt adjustment jack of the PC form plate, and the swing actuator to set the PC form plate at a predetermined position.

【0006】[0006]

【実施例】以下本発明を図示の実施例について説明す
る。Aはトンネル地山Bの覆工部、Cはトンネル覆工
機、Dはトンネル設計断面である。1はトンネル覆工機
Cにおけるベースマシンで、同ベースマシン1上に配設
されたメインブーム旋回アクチユエータ2上にメインブ
ーム伸縮ジヤツキ3を介してメインブーム4が旋回、及
び伸縮自在に搭載され、同メインブーム4にはPC型枠
版保持枠5が同保持枠旋回アクチユエータ6を介して旋
回自在に支持され、前記保持枠5とメインブーム4との
間にはPC型枠版保持枠傾斜調整ジヤツキ7が介装され
ている。前記PC型枠版保持枠5にはPC型枠版吸着装
置8が装着されている。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. A is a lining portion of the tunnel ground B, C is a tunnel lining machine, and D is a tunnel design cross section. Reference numeral 1 is a base machine of the tunnel lining machine C. A main boom 4 is swingably and telescopically mounted on a main boom swing actuator 2 disposed on the base machine 1 via a main boom telescopic jack 3. A PC form plate holding frame 5 is rotatably supported on the main boom 4 via a holding frame turning actuator 6, and a PC form plate holding frame tilt adjustment is provided between the holding frame 5 and the main boom 4. The jack 7 is installed. A PC mold plate suction device 8 is mounted on the PC mold plate holding frame 5.

【0007】図2は制御装置を示し、11は油圧バルブ
コントローラ、12は油圧ユニツト、13はメインブー
ム伸縮ジヤツキ3の制御油圧シリンダ、14は同ジヤツ
キ3の伸縮長を計測するリニアエンコーダ、15はメイ
ンブーム旋回アクチユエータ6の旋回角を計測するロー
タリエンコーダ、16はPC型枠片保持枠5の傾斜角を
計測するリニアエンコーダで、前記各エンコーダ14,
15,16の計測値は計測器(A/D変換器)17を介
してコンピユータ18に入力される。図中19は覆工コ
ンクリート型枠を兼用するPC型枠版である。
FIG. 2 shows a control device, 11 is a hydraulic valve controller, 12 is a hydraulic unit, 13 is a control hydraulic cylinder for the main boom telescopic jack 3, 14 is a linear encoder for measuring the telescopic length of the jack 3, and 15 is a hydraulic encoder. A rotary encoder that measures the turning angle of the main boom turning actuator 6, and 16 is a linear encoder that measures the tilt angle of the PC frame holding frame 5, and each of the encoders 14,
The measured values of 15 and 16 are input to a computer 18 via a measuring device (A / D converter) 17. In the figure, 19 is a PC form plate that also serves as a lining concrete form.

【0008】而してトンネル中心近傍の任意の位置P
(x,y)にベースマシン1を設置し、P点の座標を計
測してトンネル設計時の断面と、メインブーム4の先端
Qの位置(X,Y)をトンネル中心の設計心(0,0)
に対して下記のトンネル設計断面制御データ基本式によ
って演算し、前記メインブーム伸縮ジヤツキ3及びPC
型枠版保持枠傾斜調整ジヤツキ7の制御データとする。
Thus, an arbitrary position P near the center of the tunnel
The base machine 1 is installed at (x, y), the coordinates of the point P are measured, and the cross section at the time of tunnel design and the position (X, Y) of the tip Q of the main boom 4 are set at the design center (0, 0)
Computed by the following tunnel design section control data basic formula for the main boom telescopic jack 3 and PC
It is used as the control data for the form plate holding frame tilt adjustment jack 7.

【0009】トンネル設計断面制御データ基本式 原点:設計心 (x,y):メインブームの中心座標 α:設計心回りのコンクリート打設点までの角度 スプリングラインを基線として左回りが正 (0≦α≦360°) θ1 :ブームの回転角 鉛直線を基線として右回りが正 (〜180°≦θ1 ≦180°) θ2 :(X,Y)における接線とブームのなす角 ブーム軸を基線として右回りが正 L :ブーム長 Q(X,Y):PC型枠版の位置 (x,y)=(Rcosα ,Rsinα) L =(X−x)2 +(Y−y)2 θ1 =Cos-1・Y−y/L,(X−x≧0) θ1 = −Cos-1・Y−y/L,(X−x<0) θ2 =π−θ1 −α,(θ1 +α≦π) θ2 =3π−θ1 −α,(θ1 +α>π) となる。Tunnel design cross-section control data basic formula Origin: Design center (x, y): Center coordinate of main boom α: Angle to the concrete placing point around the design center Counterclockwise with spring line as the base line is positive (0 ≦ α ≤ 360 °) θ 1 : Boom rotation angle Positive clockwise with the vertical line as the base line (up to 180 ° ≤ θ 1 ≤ 180 °) θ 2 : Angle between the tangent line at (X, Y) and the boom axis A clockwise direction as the base line is positive L: boom length Q (X, Y): position of PC form plate (x, y) = (Rcosα, Rsinα) L = (X−x) 2 + (Y−y) 2 θ 1 = Cos −1 · Y−y / L, (X−x ≧ 0) θ 1 = −Cos −1 · Y−y / L, (X−x <0) θ 2 = π−θ 1 −α, (Θ 1 + α ≦ π) θ 2 = 3π−θ 1 −α, (θ 1 + α> π).

【0010】制御データが求められると図2の制御装置
によって制御コンピユータ18を作動させて、PC型枠
版19を所定の覆工位置に設置し、流動性コンクリート
を地山B面とPC型枠版19との間に注入、充填し、同
コンクリートの硬化をまって順次、次位の断面へ移行し
てトンネルの覆工を完了する。
When the control data is obtained, the control device of FIG. 2 operates the control computer 18 to set the PC form plate 19 at a predetermined lining position, and to put the fluid concrete in the ground B surface and the PC form. After pouring and filling between the plate 19 and hardening of the concrete, the structure moves to the next cross section and the lining of the tunnel is completed.

【0011】[0011]

【発明の効果】本発明によれば前記したように、トンネ
ル内の任意の位置から制御装置によって、ベースマシン
上に伸縮並に旋回自在に搭載されたメインブーム、及び
同メインブーム先端に配設された傾斜調整ジヤツキを制
御して、メインブーム先端に支持された型枠を兼用する
PC版を正確に所定位置に配置し、トンネル覆工工法の
施工性及び施工精度を向上するものである。
According to the present invention, as described above, the main boom mounted on the base machine so as to be able to extend and contract and swing freely from any position in the tunnel, and the main boom is provided at the tip of the main boom. By controlling the tilt adjustment jerk that has been performed, the PC plate that also serves as the form supported by the tip of the main boom is accurately placed at a predetermined position, and the workability and the work accuracy of the tunnel lining method are improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係るトンネル覆工用プレキヤストコン
クリート版の位置決め取付装置の一実施例を示す縦断面
図である。
FIG. 1 is a vertical cross-sectional view showing an embodiment of a positioning attachment device for a precast concrete slab for tunnel lining according to the present invention.

【図2】前記位置決め取付装置の制御系統図である。FIG. 2 is a control system diagram of the positioning attachment device.

【図3】本発明による軌道計算の基本式の説明図であ
る。
FIG. 3 is an explanatory diagram of a basic equation for trajectory calculation according to the present invention.

【符号の説明】[Explanation of symbols]

A 覆工部 B 地山 C トンネル覆工機 D トンネル設計断面 1 ベースマシン 2 メインブーム旋回アクチユエータ 3 メインブーム伸縮ジヤツキ 4 メインブーム 5 PC型枠版保持枠 6 PC型枠版保持枠旋回アクチユエータ 7 PC型枠版保持枠傾斜調整ジヤツキ 8 PC型枠版吸着装置 11 油圧バルブコントローラ 12 油圧ユニツト 13 メインブーム伸縮ジヤツキの制御油圧シリンダ 14 リニアエンコーダ 15 ロータリエンコーダ 16 リニアエンコーダ 17 計測器(A/D変換器) 18 コンピユータ 19 PC型枠版 A Lining department B Ground C Tunnel lining machine D Tunnel design section 1 Base machine 2 Main boom turning actuator 3 Main boom telescopic jack 4 Main boom 5 PC form plate holding frame 6 PC form plate holding frame Swing actuator 7 PC Form plate holding frame Inclination adjustment jack 8 PC form plate suction device 11 Hydraulic valve controller 12 Hydraulic unit 13 Main boom extension / extend jack control hydraulic cylinder 14 Linear encoder 15 Rotary encoder 16 Linear encoder 17 Measuring instrument (A / D converter) 18 Computer 19 PC formwork version

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 ベースマシンにメインブーム旋回アクチ
ユエータ及び伸縮ジヤツキを介して搭載されたメインブ
ーム、同メインブームの先端に傾斜調整ジヤツキ及び旋
回アクチユエータを介して傾動並に旋回自在に支持され
たプレキヤストコンクリート型枠版保持枠、同保持枠に
装架されたPC型枠版吸着装置、前記ベースマシンのト
ンネル内における位置計測データを入力してトンネル設
計断面の軌道を演算して、前記旋回アクチユエータと伸
縮ジヤツキ及び傾斜調整ジヤツキを制御する制御装置か
らなることを特徴とするトンネル覆工用プレキヤストコ
ンクリート版の位置決め取付装置。
1. A main boom mounted on a base machine via a main boom swing actuator and a telescopic jack, and a precast supported at the tip of the main boom so as to be able to swing in a tilting manner via a tilt adjusting jack and a swing actuator. A concrete form plate holding frame, a PC form plate adsorbing device mounted on the holding frame, position measurement data in the tunnel of the base machine are input to calculate the trajectory of the tunnel design cross section, and the turning actuator and A positioning and mounting device for a precast concrete slab for tunnel lining, comprising a control device for controlling expansion / contraction jack and tilt adjustment jack.
JP3277828A 1991-10-24 1991-10-24 Positioning and mounting device for precast concrete slab for tunnel lining Expired - Fee Related JP2693064B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3277828A JP2693064B2 (en) 1991-10-24 1991-10-24 Positioning and mounting device for precast concrete slab for tunnel lining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3277828A JP2693064B2 (en) 1991-10-24 1991-10-24 Positioning and mounting device for precast concrete slab for tunnel lining

Publications (2)

Publication Number Publication Date
JPH05113100A JPH05113100A (en) 1993-05-07
JP2693064B2 true JP2693064B2 (en) 1997-12-17

Family

ID=17588837

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3277828A Expired - Fee Related JP2693064B2 (en) 1991-10-24 1991-10-24 Positioning and mounting device for precast concrete slab for tunnel lining

Country Status (1)

Country Link
JP (1) JP2693064B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113431633A (en) * 2021-06-29 2021-09-24 上海隧道工程有限公司 Method for mounting full-prefabricated intermediate wall in ultra-large diameter tunnel

Also Published As

Publication number Publication date
JPH05113100A (en) 1993-05-07

Similar Documents

Publication Publication Date Title
CN110409317B (en) A swivel spherical hinge and its installation method
WO2023043924A1 (en) Articulated structural three-dimensional printing machine
JP2693064B2 (en) Positioning and mounting device for precast concrete slab for tunnel lining
JPS5944474B2 (en) Mobile concrete formwork equipment
JP2589566B2 (en) Automatic control system for tunnel lining machine
CN103365301B (en) Boom mobility control method and device and concrete pump truck
CN114809093A (en) Manhole cover positioning and mounting device and mounting construction method
JP2006192841A (en) Vibration compaction device and vibration compaction method for concrete in enclosed space
CN210530147U (en) Positioning fixture of steerable reinforcing bar protective layer
CN210151761U (en) Steel protects a positioner
CN220113682U (en) Drilling structure for bar planting for concrete beam reinforcement pouring
CN217352606U (en) Fixed plastering unit of well lid for municipal administration
CN117231016A (en) Device and method for accurately fixing embedded part on concrete member
JP2527385B2 (en) Tunnel Lining Form Positioning Method
CN210507417U (en) A kind of reinforcement cage positioning device of cast-in-place pile
CN222379059U (en) Copper point device for settlement monitoring
JP2511557B2 (en) Concrete distribution device
CN119352421B (en) Installation device for assisting multi-degree-of-freedom adjustment of rubber support
JPS60326Y2 (en) Concrete layer joint cutting device
JP2876263B2 (en) Drilling rig for underground continuous wall method
JPS63161226A (en) Shovel working vehicle
CN222122819U (en) Measure distribution bracket in underground tunnel
JPS6340609Y2 (en)
JP7224947B2 (en) Compaction device and compaction method
JP3933471B2 (en) How to install concrete blocks

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees