JP2702778B2 - How to build a steel staircase - Google Patents
How to build a steel staircaseInfo
- Publication number
- JP2702778B2 JP2702778B2 JP1144391A JP14439189A JP2702778B2 JP 2702778 B2 JP2702778 B2 JP 2702778B2 JP 1144391 A JP1144391 A JP 1144391A JP 14439189 A JP14439189 A JP 14439189A JP 2702778 B2 JP2702778 B2 JP 2702778B2
- Authority
- JP
- Japan
- Prior art keywords
- stairs
- steel
- steel frame
- rope
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims description 30
- 239000010959 steel Substances 0.000 title claims description 30
- 239000004567 concrete Substances 0.000 claims description 23
- 238000005192 partition Methods 0.000 claims description 8
- 239000000463 material Substances 0.000 claims description 6
- 238000000034 method Methods 0.000 claims description 6
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 238000010276 construction Methods 0.000 description 12
- 239000011150 reinforced concrete Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000009415 formwork Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Landscapes
- Steps, Ramps, And Handrails (AREA)
Description
【発明の詳細な説明】 「産業上の利用分野」 本発明は、中央仕切壁を有した鉄筋コンクリート壁で
囲まれた態様で本設される場合に於ける鉄骨階段の構築
方法に関する。Description: TECHNICAL FIELD The present invention relates to a method of constructing a steel frame staircase when it is erected in a form surrounded by a reinforced concrete wall having a central partition wall.
「従来の技術」 従来、鉄骨鉄筋構造の建物内に設けられる鉄骨階段の
仮設の場合、一般に該囲繞空間に支持用の仮設の小梁又
は大梁を架け渡し、各階毎に支持するか若しくは特公昭
58−51104号,特公昭58−36142号の如く階段構築エリア
内に支持用の仮設の柱を立設して支持させる方法のいず
れかが採られ、当該仮設鉄骨階段は本設に至るまでは作
業通路として使用される。Conventional technology Conventionally, in the case of temporary construction of steel stairs provided in a steel-framed building, a temporary beam or girder for support is generally bridged over the surrounding space to support each floor, or to support each floor, or
One of the methods of erecting and supporting temporary pillars for support in the stair construction area as in Japanese Patent Publication No. 58-51104 and Japanese Patent Publication No. 58-36142 is adopted. Used as a work passage.
「発明が解決しようとする課題」 しかし、鉄骨階段が中央仕切壁を含む外周鉄筋コンク
リート壁で囲まれた態様で構築される場合、叙上の従来
の手段では、階段の周囲に鉄筋コンクリートの壁があ
り、本設時には階段荷重をこれらの壁にもたせる事がで
きるため、これを利用することなく仮設のためにわざわ
ざ鉄骨の梁や柱を設ける事は、外周コンクリート壁構築
の際の干渉体の処理の煩雑さ、鉄骨量の増大、必要スペ
ース増大につながるという問題がある。However, in the case where the steel stairs are constructed in a manner surrounded by the outer reinforced concrete walls including the central partition wall, the above-mentioned conventional means has a reinforced concrete wall around the stairs. However, since a stair load can be applied to these walls at the time of main construction, it is not necessary to provide steel beams and columns for temporary construction without using this structure. There is a problem that it leads to complexity, an increase in the amount of steel frames, and an increase in required space.
本発明は、上述の如く問題を有する各階毎に仮設の小
梁又は大梁を架け渡すことや仮設の柱を立設する必要無
く仮設支持を果たすことの出来る構築方法を提供するこ
とを目的としている。An object of the present invention is to provide a construction method capable of bridging temporary small beams or girders for each floor having a problem as described above and performing temporary support without having to erect temporary columns. .
「課題を解決するための手段」 上記目的を達成するために、本発明の鉄骨階段の構築
方法においては、本体の所定単位階の鉄骨建て方後、最
上階の階段構築エリアの大梁から大梁に、階段中央の仕
切りコンクリート壁の位置に合わせて仮設梁材を架け渡
たし、当該仮設梁材より索材を吊り降ろし、当該索材を
介して鉄骨階段を吊り下げると共に各階の梁骨材に肩持
ち取合いさせて仮設支持し、次いで、本体コンクリート
打設と同時になされる階段外周コンクリート打設に際し
ては該索材を埋め殺して鉄骨階段荷重を該階段外周コン
クリート壁に支持させ本設するとしたものである。"Means for Solving the Problems" In order to achieve the above object, in the method for constructing a steel staircase of the present invention, after a steel frame is built on a predetermined unit floor of the main body, the beam is changed from a girder of a stair building area on the top floor to a girder. The temporary beam is suspended over the partition concrete wall at the center of the stairs, the rope is suspended from the temporary beam, the steel stairs are suspended via the rope, and the beam Shoulder holding and temporary support, then, when placing concrete around the stairs at the same time as placing the concrete in the body, burying the rope and supporting the steel frame stair load on the concrete wall around the stairs It is.
上記索材としてはターンバックル付の鉄筋としても良
い。The rope may be a reinforcing bar with a turnbuckle.
「作用」 上記のように構成された構築方法では、階段外周コン
クリート壁に対して仮設,本設時に鉄骨階段を支持させ
得て合理的であるうえ、鉄骨階段の仮設支持部材(索
材)は、階段中央の仕切りコンクリート壁に位置して吊
下するものであるので、当該コンクリート壁構築に何ん
ら干渉せず、又、鉄骨量の増大を伴うこともなく、さら
に仮設支持のために必要スペースを増大させることもな
く、さらに、階段外周コンクリート打設による本設に際
しては撤去を要することなく埋め殺しすればよいので、
作業がし易すい。[Operation] In the construction method configured as described above, the steel stairs can be supported temporarily on the concrete wall around the stairs at the time of temporary or permanent construction, which is reasonable. Since it is suspended on the concrete wall at the center of the stairs, it does not interfere with the construction of the concrete wall, does not increase the amount of steel frames, and is necessary for temporary support. Because it does not increase the space, and furthermore, in the case of permanent construction by placing concrete around the stairs, it is sufficient to bury and kill without removing it,
Easy to work.
又、索材がターンバックル付の鉄筋の場合には、レベ
ル微調整が簡易になし得るので便利である。When the rope is a rebar with a turn buckle, it is convenient because the level can be finely adjusted easily.
「実施例」 実施例について図面を参照して説明すると、第1図に
おいて、鉄骨鉄筋構造の建物の本体の鉄骨1の所定単位
階の建て方後(通常、3層ごとに建方はなされる)、第
2図に示す如く、鉄骨階段を囲繞する区画の最上階の大
梁2から大梁2にH鋼等の仮設梁材3を架け渡たす。"Example" An example will be described with reference to the drawings. In Fig. 1, after a predetermined unit floor of a steel frame 1 of a main body of a building with a steel reinforced structure is constructed (normally, the building is performed every three layers). As shown in FIG. 2, a temporary beam member 3 such as H steel is laid over the large beam 2 from the large beam 2 on the top floor of the section surrounding the steel stairs.
当該仮設梁材3の架け渡たし位置は、鉄骨階段中央の
仕切りコンクリート壁に一致させる。The bridging position of the temporary beam 3 is made to coincide with the partition concrete wall at the center of the steel frame stairs.
当該梁材3からは、第3図に示す如くターンバックル
付の鉄筋,チェーン,ワイヤー等の索材4,…が吊り降ろ
され、これに鉄筋段階5の中央が止着されて吊り下げら
れる。From the beam member 3, as shown in FIG. 3, a rope member 4, such as a reinforcing bar with a turn buckle, a chain, a wire, etc., is suspended, and the center of the reinforcing bar stage 5 is fixed to the suspension.
一方、鉄骨階段5の周縁は階段構築エリアを囲む各階
の梁骨材6,…並びに介装支承部材7,…に肩持ちさせる。On the other hand, the periphery of the steel staircase 5 is shouldered by the beam aggregates 6,... And the interposition support members 7,.
しかして、安定仮設が果たされ、作業用に供し得る。
尚、b図中8は中央仕切りコンクリート壁の型枠を示
す。Thus, a stable temporary construction is achieved and the work can be performed.
In Fig. B, reference numeral 8 denotes a formwork of a concrete partition wall at the center.
索材4としては、アジャスト機能を有するものがレベ
ル調整上好適であり、図示のターンバックル付の鉄筋が
好ましい。As the cord material 4, one having an adjusting function is suitable for level adjustment, and a rebar with a turnbuckle shown in the figure is preferable.
次いで、第4図に示す如く本体コンクリート打設と同
時に中央仕切りコンクリート壁9aを含む階段外周コンク
リート壁9のコンクリート打設がなされ、この際、該索
材4はコンクリート壁9a内に埋め殺しされる。Next, as shown in FIG. 4, simultaneously with the concrete placement of the main body, the concrete placement of the outer peripheral concrete wall 9 including the central partition concrete wall 9a is carried out, and at this time, the rope 4 is buried in the concrete wall 9a. .
叙上施工手順でもって、第5図に示す如く、建物10内
に中央仕切壁9aを有した外周コンクリート壁9で囲れた
鉄骨階段5を付けることができる。According to the above construction procedure, as shown in FIG. 5, a steel staircase 5 surrounded by an outer concrete wall 9 having a central partition wall 9a can be provided in a building 10.
「発明の効果」 本発明は、以上説明したように構成されているので、
以下に記載されるような効果を奏する。[Effect of the Invention] Since the present invention is configured as described above,
The following effects are obtained.
(1)階段構築エリア内に干渉する梁材や自立性の支持
柱を設ける必要がなくして既成の鉄骨階段はほとんど単
に吊り下げにて設置され得るため、作業が簡易である。(1) There is no need to provide beams or self-supporting supporting columns that interfere in the stair building area, and the existing steel stairs can be almost simply installed by hanging, so that the work is simple.
(2)上記の梁,柱としての鉄骨材が不要となるため、
コストダウンになる。(2) Since the above-mentioned steel members as beams and columns are not required,
Cost reduction.
(3)鉄骨階段を仮設支持する索材を壁の中に埋め殺し
され、収まりが簡単である。(3) The rope material for temporarily supporting the steel frame stairs is buried in the wall and is easily settled.
第1図は建物の鉄骨建て方説明図、第2図は本発明に於
ける階段構築エリアについての仮設梁材の架設説明図、
第3図a〜cは本発明に於ける仮設時の鉄骨階段の平面
図、a図中b−b矢視図、c−c矢視図、第4図は本発
明に於ける階段外周コンクリート壁のコンクリート打設
説明図、第5図は建物完成時の平面図である。 1……鉄骨、2……大梁、3……仮設梁材、4……索
材、5……鉄筋階段、6……梁骨材、7……介装支承部
材、8……型枠、9……階段外周コンクリート壁、9a…
…中央仕切りコンクリート壁、10……建物。FIG. 1 is an explanatory view of how to build a steel frame of a building, FIG. 2 is an explanatory view of erection of temporary beams in a stair building area in the present invention,
3a to 3c are plan views of a steel frame staircase at the time of temporary construction according to the present invention, FIG. 3a is a view taken along arrow bb and cc, and FIG. FIG. 5 is an explanatory view of concrete placement of a wall, and FIG. 5 is a plan view when a building is completed. DESCRIPTION OF SYMBOLS 1 ... steel frame, 2 ... giant beam, 3 ... temporary beam material, 4 ... rope material, 5 ... reinforced stairs, 6 ... beam aggregate material, 7 ... interposition support member, 8 ... formwork, 9 …… Concrete wall around the stairs, 9a…
… Center concrete wall, 10 …… Building.
Claims (2)
の階段構築エリアの大梁から大梁に、階段中央の仕切り
コンクリート壁の位置に合わせて仮設梁材を架け渡た
し、当該仮設梁材より索材を吊り降ろし、当該索材を介
して鉄骨階段を吊り下げると共に各階の梁骨材に肩持ち
取合いさせて仮設支持し、次いで、本体コンクリート打
設と同時になされる階段外周コンクリート打設に際して
は該索材を埋め殺して鉄骨階段荷重を該階段外周コンク
リート壁に支持させ本設するとしたことを特徴とする鉄
骨階段の構築方法。After a steel frame is built on a predetermined unit floor of a main body, a temporary beam is laid over a large beam in a stair building area on the top floor in accordance with the position of a partition concrete wall at the center of the stairs. Hanging the rope from the beam, suspending the steel stairs via the rope, holding the beam on each floor by shoulders and temporarily supporting it, and then placing the concrete around the stairs at the same time as placing the concrete in the main body A method of constructing a steel frame staircase, comprising: burying the cable material and supporting the steel frame stair load on the concrete wall around the staircase when installing the steel frame staircase.
項1記載の鉄骨階段の構築方法。2. The method according to claim 1, wherein the rope is a reinforcing bar with a turnbuckle.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1144391A JP2702778B2 (en) | 1989-06-07 | 1989-06-07 | How to build a steel staircase |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1144391A JP2702778B2 (en) | 1989-06-07 | 1989-06-07 | How to build a steel staircase |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH038963A JPH038963A (en) | 1991-01-16 |
| JP2702778B2 true JP2702778B2 (en) | 1998-01-26 |
Family
ID=15361057
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1144391A Expired - Fee Related JP2702778B2 (en) | 1989-06-07 | 1989-06-07 | How to build a steel staircase |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2702778B2 (en) |
-
1989
- 1989-06-07 JP JP1144391A patent/JP2702778B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH038963A (en) | 1991-01-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3569861B2 (en) | Construction method of stairs and staircase, staircase support device, and staircase structure | |
| JP2750368B2 (en) | Construction method of reactor containment top slab | |
| JPH0959932A (en) | Construction method of stilts of overhanging girder bridge | |
| JPH05287901A (en) | Construction of stairs | |
| JP7500408B2 (en) | Pre-construction method for interior stairs of buildings | |
| JP2702778B2 (en) | How to build a steel staircase | |
| JPH0633627B2 (en) | New construction method on existing facility | |
| JP2897663B2 (en) | How to build underground structures | |
| JP3087195B2 (en) | How to build stairs | |
| JP2817591B2 (en) | Construction method of steel reinforced concrete building | |
| JPH07217230A (en) | Suspended stairs and temporary construction method | |
| JP2584418B2 (en) | Overhang construction method and stress improvement device for synthetic cable-stayed bridge | |
| JP3187618B2 (en) | How to assemble beam reinforcement | |
| JPH04166562A (en) | Construction of pc building by portal crane | |
| JPS63312437A (en) | Construction of underground structure | |
| JPH0447737B2 (en) | ||
| JPH06101268A (en) | Hollow precast rigid-frame structure | |
| JPH1181679A (en) | Construction for building | |
| JP2001240340A (en) | Method of execution for elevator tower | |
| JPS61113965A (en) | Construction of wall type building and construction apparatus used therein | |
| JP2581248B2 (en) | Building construction method | |
| JP2001032376A (en) | Floor slab frame and construction method for skeleton | |
| JPH05311749A (en) | Construction method of building | |
| JPH0460062A (en) | Steel structure building method | |
| JPH0762875A (en) | Floor construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |