Diagonal permanent ground anchor, its construction method and construction stand

Info

Publication number
JP2714632B2
JP2714632B2 JP13769689A JP13769689A JP2714632B2 JP 2714632 B2 JP2714632 B2 JP 2714632B2 JP 13769689 A JP13769689 A JP 13769689A JP 13769689 A JP13769689 A JP 13769689A JP 2714632 B2 JP2714632 B2 JP 2714632B2
Authority
JP
Japan
Prior art keywords
load
anchor
oblique
bearing body
tip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP13769689A
Other languages
Japanese (ja)
Other versions
JPH032416A (en
Inventor
正夫 丸岡
悠康 幾田
雅路 青木
修 尾崎
則雄 渡辺
利弘 森
庸夫 小粥
豊 桂
英之 真野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Suzuki Metal Industry Co Ltd
Tokyo Rope Manufacturing Co Ltd
Kumagai Gumi Co Ltd
Nittoc Constructions Co Ltd
Shimizu Corp
Original Assignee
Takenaka Corp
Suzuki Metal Industry Co Ltd
Tokyo Rope Manufacturing Co Ltd
Kumagai Gumi Co Ltd
Nittoc Constructions Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp, Suzuki Metal Industry Co Ltd, Tokyo Rope Manufacturing Co Ltd, Kumagai Gumi Co Ltd, Nittoc Constructions Co Ltd, Shimizu Corp filed Critical Takenaka Corp
Priority to JP13769689A priority Critical patent/JP2714632B2/en
Publication of JPH032416A publication Critical patent/JPH032416A/en
Application granted granted Critical
Publication of JP2714632B2 publication Critical patent/JP2714632B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

【発明の詳細な説明】 産業上の利用分野 この発明は、例えば第18図のように傾斜地に建てられ
た建物Aの転倒防止用として、又は第19図のように擁壁
Bの転倒防止用などとしてそれぞれ半永久的に使用され
る斜め永久地盤アンカーとその施工法及び施工用架台に
関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for preventing a building A built on a slope as shown in FIG. 18 from overturning, or a method for preventing a retaining wall B from overturning as shown in FIG. The present invention relates to a diagonal permanent ground anchor which is used semi-permanently as such, a construction method thereof, and a construction stand.

従来の技術 従来、半永久的に使用するべく開発された本設用の永
久地盤アンカー及びその施工法は公知に属する(例えば
特開昭62−228521号、特開昭62−228522号公報参照)。
それは第20図に例示したように、引張鋼材aの先端部に
支圧板bを取り付け、その取付部は防錆油cを収容した
先端キャップで保護されている。前記支圧板bの引き抜
き側に前記引張鋼材aの外周を包囲する配置で管状の耐
荷体eが当接され、この耐荷体eのさらに引き抜き側に
は同じく前記引張鋼材aの外周を包囲する配置で管状の
自由長部シースfが当接されている。耐荷体e及び自由
長部シースfの外周には注入材gが充填され、前記引張
鋼材aには所定大きさのプレストレスが導入され、同引
張鋼材aの上端部は躯体h上に定着されている。引張鋼
材aの上端部も、防錆用のグリースiを充填した頭部キ
ャップjで保護されており、かくして100年ぐらいの耐
用寿命は発揮する構成とされている。
2. Description of the Related Art Conventionally, permanent ground anchors for permanent construction which have been developed for semi-permanent use and methods of construction thereof are well known (see, for example, JP-A-62-228521 and JP-A-62-228522).
As shown in FIG. 20, a supporting plate b is attached to the tip of a tensile steel material a, and the attachment is protected by a tip cap containing rust-preventive oil c. A tubular load-bearing body e is abutted on the drawing side of the support plate b so as to surround the outer periphery of the tensile steel material a, and further arranged on the drawing-out side of the load-bearing body e to surround the outer periphery of the tensile steel material a. , A tubular free-length portion sheath f is in contact. The outer periphery of the load-bearing body e and the free-length portion sheath f is filled with an injection material g, a prestress of a predetermined size is introduced into the tensile steel material a, and the upper end of the tensile steel material a is fixed on the frame h. ing. The upper end portion of the tensile steel material a is also protected by a head cap j filled with grease i for rust prevention, and thus has a configuration in which a useful life of about 100 years is exhibited.

本発明が解決しようとする課題 従来の永久地盤アンカーは、第20図のように地盤中に
垂直下向きに設置されている。しかし、永久地盤アンカ
ーの用途、機能は垂直下向きの使用態様には限らない。
と云うよりもむしろ第18図のように傾斜地盤に建てられ
た建物Aの転倒防止、又は第19図のような土留め用擁壁
Bの転倒防止用としては、垂直下向きのアンカーでは効
きが悪い。土圧の合力の方向に対して適正な角度をもっ
て斜め下向きに設置した斜め永久地盤アンカーでなくて
はならないし、むしろアンカーとしてはこのような用
途、使用態様が多い。
Problems to be Solved by the Present Invention Conventional permanent ground anchors are installed vertically downward in the ground as shown in FIG. However, the use and function of the permanent ground anchor are not limited to the vertically downward use mode.
Rather than to prevent the falling of the building A built on the sloping ground as shown in FIG. 18 or the falling of the retaining wall B for retaining the earth as shown in FIG. bad. The diagonal permanent ground anchor must be installed obliquely downward at an appropriate angle to the direction of the resultant force of the earth pressure. Rather, the anchor has many such uses and uses.

ところが、上記従来公知の垂直は永久地盤アンカーの
構成では、そのまま斜めアンカーとして実施することは
出来ない。その理由は、永久地盤アンカーの構造上、特
に耐荷体eに対するその外周の注入材gの被り厚は、ア
ンカー荷重を地盤へ伝達する機構(耐力)上最重要の条
件である。しかし、斜めアンカーの施工においては、重
力作用の故にアンカー中身が沈んで斜め削孔の下底面に
接触してしまう。従って、この接触部位においては耐荷
体eの外周に注入材の被り厚を確保し得ず、よって永久
地盤アンカーとしての所定の品質、機能、耐力を確保し
得ないのである。
However, in the configuration of the conventionally known vertical permanent ground anchor, it cannot be implemented as a diagonal anchor as it is. The reason for this is that, in terms of the structure of the permanent ground anchor, particularly, the thickness of the injected material g on the outer periphery of the load bearing body e is the most important condition in the mechanism (proof strength) for transmitting the anchor load to the ground. However, in the construction of the diagonal anchor, the content of the anchor sinks due to the gravitational action and comes into contact with the lower bottom surface of the diagonal hole. Therefore, in this contact portion, it is impossible to secure the covering thickness of the injected material on the outer periphery of the load-bearing body e, and therefore, it is impossible to secure the predetermined quality, function, and strength as the permanent ground anchor.

したがって、本発明の目的は、重力の作用を受けて
も、アンカー中身を斜め削孔の下底面から注入材の被り
厚相当の間隔だけ確実に持ち上げて施工された斜め永久
地盤アンカーとその施工法及び施工用架台を提供するこ
とである。
Accordingly, an object of the present invention is to provide a diagonal permanent ground anchor constructed by reliably lifting the anchor contents from the lower bottom surface of the diagonal drilling by an interval equivalent to the thickness of the injected material even under the action of gravity, and a method of constructing the same. And a mounting stand.

課題を解決するための手段 (第1の発明) 上記従来技術の課題を解決するための手段として、第
1の発明に係る斜め永久地盤アンカーは、図面の第1
図、第11図、第16,17図に実施例を示したとおり、 耐荷体1の先端部(先端キャップ2の先)に先端支持
具を設置し、同耐荷体1の後端部には上端スペーサーを
設置し、これら先端支持具と上端スペーサーとにより斜
め削孔3の中で耐荷体1を注入材4の被り厚相当の高さ
持ち上げて支持せしめた構成を特徴とする。
Means for Solving the Problems (First Invention) As means for solving the above-mentioned problems of the prior art, a diagonal permanent ground anchor according to the first invention is described in the first aspect of the drawings.
As shown in FIG. 11, FIG. 11, FIG. 16 and FIG. 17, an end support is installed at the front end of the load-bearing body 1 (the end of the tip cap 2), and at the rear end of the load-bearing body 1. An upper end spacer is provided, and the load-bearing body 1 is supported by being raised by a height corresponding to the covering thickness of the injection material 4 in the oblique hole 3 by means of the front end support and the upper end spacer.

作用 耐荷体1は、その両端部を先端支持具と上端スペーサ
ーとにより斜めの削孔3の下底面の上に一定の高さ持ち
上げた形に支持されているため、その高さ分が耐荷体1
と斜め削孔3の下底面との間の注入材4の被り厚とな
る。
Since the load-bearing body 1 is supported at both ends by a predetermined height above the lower bottom surface of the oblique drilled hole 3 by the tip support and the upper end spacer, the height is equal to the load-bearing body. 1
And the lower thickness of the injection material 4 between the oblique hole 3 and the lower bottom surface.

(第2の発明) 同上の課題を解決するための手段として、第2の発明
に係る斜め永久地盤アンカーの施工法は、図面の第2
図、第3図又は第6,7図、又は第12,13図に実施例を示し
たとおり、 イ) 地盤5中に斜め削孔3を掘削し、削孔水と注入材
4とを置換する段階と、 ロ) 地上にて予め耐荷体1の先端部に先端支持具を設
置し、同耐荷体1の後端部には上端スペーサーを設置し
て組立てられたアンカー中身9を前記斜め削孔3の中へ
挿入し、先端支持具と上端スペーサーとを働かせて耐荷
体1を斜め削孔3の下底面の上に中で注入材4の被り厚
相当の高さ持ち上げて支持せしめる段階と、 ハ) 斜め削孔3中の少なくとも耐荷体1の長さの範囲
にわたり、耐荷体1の外周部分に注入材4を圧入し充填
する段階と、 より成ることを特徴とする。
(Second Invention) As a means for solving the above-mentioned problem, a method for constructing an oblique permanent ground anchor according to a second invention is described in the second method in the drawing.
As shown in the embodiment in FIG. 3, FIG. 3 or FIG. 6, 7, or FIG. 12, 13, a) Diagonal drilling 3 is excavated in the ground 5 and the drilling water is replaced with the injection material 4. B) installing a tip support at the front end of the load-bearing body 1 on the ground in advance and installing an upper end spacer at the rear end of the load-bearing body 1 to diagonally cut the assembled anchor contents 9; Inserting into the hole 3 and operating the tip support and the upper end spacer to lift and support the load-bearing body 1 on the lower bottom surface of the oblique drilling hole 3 by a height corresponding to the covering thickness of the injection material 4; (C) a step of press-fitting and filling the injection material 4 into the outer peripheral portion of the load bearing body 1 over at least the range of the length of the load bearing body 1 in the oblique drilling 3.

なお、上記斜め永久地盤アンカーの施工法において、
斜め削孔3の中へアンカー中身9を挿入する工程は、同
削孔3の外に据え付けた施工用架台6の上にアンカー中
身9を吊り込み、アンカー中身9を斜め削孔3と略同心
に、かつ略平行に支持せしめた上で行なうことも特徴と
する。
In addition, in the construction method of the diagonal permanent ground anchor,
In the step of inserting the anchor contents 9 into the oblique drilling holes 3, the anchor contents 9 are suspended on the mounting base 6 installed outside the drilling holes 3, and the anchor contents 9 are substantially concentric with the oblique drilling holes 3. It is also characterized in that it is carried out while being supported substantially parallel.

作用 アンカー中身9を斜め削孔3の中へ挿入する際、先端
支持具と上端スペーサーは、削孔3の孔径よりも十分に
小さく縮めて(縮径して)、挿入作業に支障ないものと
される。
When inserting the anchor contents 9 into the oblique drilling hole 3, the tip support and the upper end spacer are sufficiently reduced (reduced in diameter) to a diameter smaller than the hole diameter of the drilling hole 3 so as not to hinder the insertion operation. Is done.

斜め削孔3の中へアンカー中身9を完全に挿入した段
階で先端支持具と上端スペーサーを働かせ(拡径して)
耐荷体1を斜め削孔3の下底面の上に一定の高さ持ち上
げて支持させる。
At the stage when the anchor contents 9 are completely inserted into the oblique hole 3, the tip support and the upper end spacer are operated (expanded in diameter).
The load-bearing body 1 is lifted and supported at a certain height above the lower bottom surface of the oblique drilling 3.

したがって、この後で斜め削孔3の中へ圧入充填され
た注入材4は、耐荷体1と斜め削孔3の下底面との間に
も十分に廻り込み、前記高さ分相当の被り厚が達成され
るのである。
Therefore, the injection material 4 press-fitted into the oblique drilling hole 3 thereafter sufficiently spills between the load-bearing body 1 and the lower bottom surface of the oblique drilling hole 3, and the covering thickness corresponding to the height is provided. Is achieved.

(第3の発明) 同上の課題を解決するための手段として、第3の発明
に係る斜め永久地盤アンカーの施工用架台は、図面の第
3図〜第6図及び第13図に実施例を示したとおり、 ベース枠61の上に一対の支柱62,62を垂直に、かつ平
行に相対峙させて立設し、前記一対の支柱62,62の間に
ローラーコンベア63を配置し、該ローラーコンベア63の
枠64の前部及び後部を支柱62,62に対して傾斜角の調整
が可能に支持せしめたことを特徴とする。
(Third invention) As a means for solving the above-mentioned problem, a mounting base for a diagonal permanent ground anchor according to a third invention has an embodiment shown in Figs. 3 to 6 and Fig. 13 of the drawings. As shown, a pair of columns 62, 62 are vertically and parallelly opposed to each other on a base frame 61, and a roller conveyor 63 is disposed between the pair of columns 62, 62. It is characterized in that the front and rear portions of the frame 64 of the conveyor 63 are supported with respect to the columns 62, 62 so that the inclination angle can be adjusted.

作用 ローラーコンベア63の角度を斜め削孔3と同心で、か
つ平行な配置に調整して支柱62,62に支持せしめる。し
たがって、クレーン等で吊り込んだ重いアンカー中身9
を前記ローラーコンベア63の上に乗せると、そのまま斜
め削孔3の中へ無理なく送り込めて楽な挿入作業が出来
る。
Function The angle of the roller conveyor 63 is adjusted to be concentric with and parallel to the oblique hole 3, and is supported by the columns 62,62. Therefore, the content of the heavy anchor suspended by a crane or the like 9
Is placed on the roller conveyor 63, and can be easily sent into the oblique drilling hole 3 without any difficulty, and an easy insertion operation can be performed.

実 施 例 次に、図示した本発明の実施例を説明する。Embodiment Next, the illustrated embodiment of the present invention will be described.

まず、第1図は、耐荷体1の先端部に先端支持具とし
てのパイロットキャップ7を設置し、同耐荷体1の後端
部には拡径、縮径の操作が可能な上端スペーサー8を設
置し、これらにより斜め削孔3下底面の上に持ち上げて
支持された耐荷体1の全周にわたり注入材4を一定以上
の被り厚で形成された斜め永久地盤アンカーを示してい
る。
First, FIG. 1 shows a state in which a pilot cap 7 as a tip support is installed at the front end of the load-bearing body 1 and an upper end spacer 8 capable of expanding and reducing the diameter is provided at the rear end of the load-bearing body 1. The diagonal permanent ground anchor is shown in which the injecting material 4 is formed with a certain thickness or more over the entire circumference of the load-bearing body 1 which is installed and lifted above the lower bottom surface of the diagonal drilling 3 by these.

第2図は、前記斜め永久地盤アンカーの施工の第1段
階として、地盤5中に斜め削孔3を穿孔した状態を示し
ている。
FIG. 2 shows a state in which a diagonal hole 3 has been drilled in the ground 5 as a first stage of construction of the diagonal permanent ground anchor.

第3図は、地上で予め組み立てられた耐荷体、自由長
部シース、引張鋼材等のアンカー要素(第20図参照)か
ら成るアンカー中身9が、施工用架台6を使用して前記
斜め削孔3の中へ挿入される作業要領を示している。
FIG. 3 shows that the anchor contents 9 composed of anchor elements (see FIG. 20) such as a load-bearing body, a free-length sheath, and a tensile steel material which have been pre-assembled on the ground are obliquely drilled by using a construction stand 6. 3 shows a work procedure to be inserted into the apparatus 3.

斜め削孔3の穿孔は、山留め壁10で囲まれた根切り底
にボーリングマシン11を据え付け、山留め壁10を貫通す
る形で行なわれる。斜め削孔3の穿孔には、例えば先端
ビットをもつ口径がφ170位のケーシングパイプ(内外
2重管)を使用し、当該地盤アンカーの用途及び機能に
応じて、例えば水平に対して最小で15゜ぐらいの下り傾
斜角度で所望の深さまで穿孔されている。しかも斜め削
孔3の最深部には、インナーパイプによる先行掘りを行
ない、パイロットキャップ7の最大径より少し大きい口
径のパイロット孔13が斜め削孔3と同心配置で、かつパ
イロットキャップ7の長さ相当の深さに掘削されてい
る。斜め削孔3中の削孔水は、削孔後にインナーパイプ
を引き抜いてから注入材たるセメントミルク4と置換さ
れる。
Drilling of the oblique drill hole 3 is performed by mounting a boring machine 11 on a root bottom surrounded by a retaining wall 10 and penetrating the retaining wall 10. For the drilling of the oblique drill hole 3, for example, a casing pipe (inner and outer double pipe) having a tip bit and having a diameter of about φ170 is used. The hole is drilled to a desired depth at a descent angle of about ゜. In addition, at the deepest part of the oblique drilling hole 3, a pre-drilling by an inner pipe is performed, and a pilot hole 13 having a diameter slightly larger than the maximum diameter of the pilot cap 7 is arranged concentrically with the oblique drilling hole 3 and the length of the pilot cap 7 It is excavated to a considerable depth. The drilling water in the oblique drilling 3 is replaced with cement milk 4 as an injecting material after the inner pipe is pulled out after drilling.

その後、地上で予め組立てられたアンカー中身9が小
形クレーン等で施工用架台6の上へ吊り込まれ、斜め削
孔3の中へ挿入する作業を行なう(第3図)。
Thereafter, the anchor contents 9 pre-assembled on the ground are suspended on the construction stand 6 by a small crane or the like, and inserted into the oblique drilling holes 3 (FIG. 3).

施工用架台6は、第4図と第5図に詳示したように、
斜め削孔3の外の地面上に水平に置かれるベース枠61の
上に、側面(第4図)の方向に見るとおよそ山形をなす
一対の支柱62,62がおよそ270mm位の間隔をあけて平行
に、かつ対称的な配置で相対峙するように立設されてい
る。この一対の支柱62,62の間に、長さが3500mm位のロ
ーラーコンベア63が設置されている。ローラーコンベア
63は、その両側の側枠64の前部がピン65で支柱62の前部
枠66へ回動可能に支持されている。同側枠64の後部は、
やはり支柱62の後部傾斜枠67に50mmぐらいのピッチで多
数設けられたピン孔68のいずれかへ差しピン69を通すこ
とによって支持されている。ローラーコンベア63の側枠
64の方には、前記差しピン69を通す長孔60が設けられて
いる。したがって、差しピン69を通す支柱62のピン孔68
の位置を選ぶことにより、ローラーコンベア63は、水平
に対して15゜ぐらいから50゜ぐらいまでの範囲でその傾
斜角度を自由に設定することができ、もって斜め削孔3
の傾斜角度と同一に調整できる。従って、この施工用架
台6のローラーコンベア63の上へアンカー中身9をクレ
ーン等で吊り込むと、単にローラーコンベア63に沿って
送るだけの作業で重くて長いアンカー中身9を斜め削孔
3の中のケーシングパイプに沿って楽に円滑に能率良く
挿入することができる。
As shown in FIGS. 4 and 5 in detail,
On a base frame 61 placed horizontally on the ground outside the diagonal hole 3, a pair of columns 62, 62 having a substantially mountain shape when viewed from the side (FIG. 4) is spaced apart by about 270 mm. Are erected so as to face each other in a parallel and symmetrical arrangement. A roller conveyor 63 having a length of about 3500 mm is provided between the pair of columns 62. Roller conveyor
The front portion of the side frame 64 on both sides of the column 63 is rotatably supported on the front frame 66 of the support column 62 by pins 65. The rear part of the same side frame 64,
Similarly, the support 62 is supported by passing an insertion pin 69 into one of a large number of pin holes 68 provided at a pitch of about 50 mm in a rear inclined frame 67 of the support 62. Roller conveyor 63 side frame
The slot 64 is provided with a slot 60 through which the insertion pin 69 passes. Therefore, the pin hole 68 of the post 62 through which the insertion pin 69 passes
By selecting the position of the roller conveyor 63, the inclination angle of the roller conveyor 63 can be freely set in a range from about 15 ° to about 50 ° with respect to the horizontal, so that the oblique drilling 3
Can be adjusted to be equal to the inclination angle of Therefore, when the anchor contents 9 are suspended by a crane or the like onto the roller conveyor 63 of the construction stand 6, the heavy and long anchor contents 9 are simply sent along the roller conveyor 63, and the slant holes 3 are formed. Can be inserted easily, smoothly and efficiently along the casing pipe.

アンカー中身9の先端の先端キャップ2の先に設置さ
れた先細円すい形状のパイロットキャップ7は、挿入作
業の最終段階で斜め削孔3の最深部のパイロット孔13の
中へ挿入される(第1図)。従って、斜め削孔3とパイ
ロット孔13との口径差の分だけ耐荷体1は斜め削孔3の
下底面から持ち上げられた形に支持される。
The tapered cone-shaped pilot cap 7 installed at the tip of the tip cap 2 at the tip of the anchor content 9 is inserted into the pilot hole 13 at the deepest part of the oblique drilling hole 3 at the final stage of the insertion work (first). Figure). Accordingly, the load-carrying body 1 is supported by being lifted from the lower bottom surface of the oblique hole 3 by the difference in diameter between the oblique hole 3 and the pilot hole 13.

なお、第6図から第8図に示したくさび押込型(拡径
型)のパイロットキャップ14を使用して施工することも
できる。このパイロットキャップ14は均等直径の円柱状
をなすものであり、第8図のように直径線に沿って二つ
割型に構成されている。このパイロットキャップ14は、
アンカー中身を構成する先端キャップ2の先端に形成さ
れたくさび部2aと同一傾斜角度の圧接面15を有する。こ
のパイロットキャップ14は、第6図のように先端キャッ
プ2のくさび部2aの圧接面15を密着させた最小径状態で
装着したアンカー中身9の挿入作業に供される。そし
て、挿入作業の最終段階でパイロットキャップ14をパイ
ロット孔13の中へ挿入し、同パイロット孔13の奥端面に
押し付けた上でアンカー中身9をもう一段階強く押し込
む。くさび部2aは圧接面15に沿って滑り込み、パイロッ
トキャップ14を第7図のように拡径させてパイロット孔
13の内面に密着させ、もって耐荷体1を斜め削孔3の下
底面から持ち上げて支持する。
In addition, it is also possible to use the pilot cap 14 of the wedge pushing type (expanded diameter type) shown in FIGS. The pilot cap 14 has a cylindrical shape with a uniform diameter, and is divided into two along the diameter line as shown in FIG. This pilot cap 14,
It has a pressure contact surface 15 having the same inclination angle as the wedge portion 2a formed at the distal end of the distal end cap 2 constituting the anchor content. As shown in FIG. 6, the pilot cap 14 is used for inserting the anchor contents 9 mounted in a minimum diameter state in which the pressure contact surface 15 of the wedge portion 2a of the tip cap 2 is in close contact. Then, at the final stage of the insertion operation, the pilot cap 14 is inserted into the pilot hole 13, pressed against the inner end face of the pilot hole 13, and then the anchor contents 9 are further strongly pushed. The wedge portion 2a slides along the pressure contact surface 15, and the pilot cap 14 is expanded in diameter as shown in FIG.
The load-bearing body 1 is lifted up from the lower bottom surface of the oblique drilling hole 3 and supported.

次に、アンカー中身9における耐荷体1の後端部に設
置された上端スペーサー8は、具体的には第9図と第10
図に示しているとおり、自由長部シースと耐荷体との中
間に接合される管体80の外周に可動板81が管軸方向へ移
動可能に設置されている。該可動板81と、第9図中左方
の段部に固着されたブラケット83との間が、2個ずつを
一組とする等長のリンク84,84で一連に連結されてい
る。2個のリンク84,84は、これを連結した中央の連結
ピン85の位置が少し外方へ突き出たくの字形状を平常状
態(縮小径rの状態)とする構成とされ、2個のリンク
84,84は連結ピン85の位置で屈折自在とされている。斜
め削孔3の外から導かれた長いロープ86は、ブラケット
83の側の連結ピン87で支持された回転自在なローラー88
を折り返され、その先端部が可動板81に止着されてい
る。
Next, the upper end spacer 8 installed at the rear end of the load-bearing body 1 in the anchor contents 9 is specifically shown in FIGS.
As shown in the figure, a movable plate 81 is provided on the outer periphery of a tube 80 joined between the free-length sheath and the load-bearing body so as to be movable in the tube axis direction. The movable plate 81 and the bracket 83 fixed to the left step in FIG. 9 are connected in series by two equal-length links 84, 84 each having a pair. The two links 84, 84 are configured such that the position of the central connecting pin 85 connecting them is in a normal state (reduced diameter r state) in the shape of a letter that protrudes slightly outward.
84, 84 can be bent freely at the position of the connecting pin 85. The long rope 86 guided from the outside of the oblique hole 3 is a bracket
A rotatable roller 88 supported by a connecting pin 87 on the side of 83
Is folded back, and the distal end is fixed to the movable plate 81.

したがって、斜め削孔3の中へアンカー中身9を挿入
し終えた段階でロープ86を強く引くと、可動板81が第9
図の左方へ引き寄せられ、これに伴なって2個のリンク
84,84は外方へ屈折運動をし、拡径Rの状態となる。こ
の拡径状態のリンク84が斜め削孔3の下底面で突張る形
となるため耐荷体1は斜め削孔3の下底面から持ち上げ
られた形に支持されるのである。
Therefore, when the rope 86 is strongly pulled at the stage when the anchor contents 9 have been inserted into the oblique drill hole 3, the movable plate 81
It is drawn to the left of the figure, and accordingly two links
Numerals 84 and 84 perform a refracting movement outward, and are in a state of an enlarged diameter R. Since the link 84 in the expanded state protrudes from the lower bottom surface of the oblique drilling hole 3, the load bearing body 1 is supported by being lifted from the lower bottom surface of the oblique drilling hole 3.

なお、アンカー中身9の挿入作業の際などに可動板81
がブラブラ移動する不具合を防止するため、管体80の外
周面の管軸方向に、ドーナツ形状をなす可動板81の中空
部内面に圧接される板ばね89が数枚設置されている。こ
の板ばね89による摩擦力で可動板81の有害なずり動きが
防止されている。
Note that the movable plate 81 is used when inserting the contents 9 of the anchor.
A plurality of leaf springs 89 are pressed against the inner surface of the hollow portion of the donut-shaped movable plate 81 in the tube axis direction on the outer peripheral surface of the tube body 80 in order to prevent the problem of the wobble moving. Harmful shear movement of the movable plate 81 is prevented by the frictional force of the plate spring 89.

第2の実施例 次に、第11図は、耐荷体1の先端部に先端支持具とし
て拡径操作が可能な先端スペーサー15が設置され、同耐
荷体1の後端部にも拡径操作が可能な先端スペーサー8
が設置され、これらにより斜め削孔3の中で耐荷体1の
全周にわたり注入材4が一定以上の被り厚で形成される
ように支持された構成の斜め永久地盤アンカーを示して
いる。
Second Embodiment Next, FIG. 11 shows that a tip spacer 15 capable of expanding the diameter is installed as a tip support at the tip of the load-bearing body 1, and the diameter-expanding operation is also performed at the rear end of the load-bearing body 1. -Capable tip spacer 8
Are shown, and the diagonal permanent ground anchor having a configuration in which the injection material 4 is supported so as to be formed with a covering thickness of a certain value or more over the entire circumference of the load-bearing body 1 in the diagonal hole 3 is shown.

第12図は、前記斜め永久地盤アンカーの施工の第一段
階として、地盤5に斜め削孔3を穿孔した状態を示して
いる。
FIG. 12 shows a state in which a diagonal hole 3 has been drilled in the ground 5 as a first stage of construction of the diagonal permanent ground anchor.

第13図は、地上で予め組立てられた耐荷体、自由長部
シース、引張鋼材等のアンカー要素から成るアンカー中
身9を、施工用架台6を使用して前記斜め削孔3の中へ
挿入する要領を示している。
FIG. 13 shows that an anchor content 9 composed of an anchor element such as a load-bearing body, a free-length sheath, and a tensile steel material pre-assembled on the ground is inserted into the diagonal drilling hole 3 using a construction stand 6. The point is shown.

斜め削孔3の施工及び施工用架台6を使ってアンカー
中身9を斜め削孔3の中へ挿入する作業の要領は、上記
第1実施例と同じである。但し、パイロット孔は必要が
ないので穿孔されない。
The procedure of the oblique drilling 3 and the operation of inserting the anchor contents 9 into the oblique drilling 3 using the construction stand 6 are the same as those in the first embodiment. However, since the pilot hole is not necessary, it is not drilled.

先端スペーサー15の構成は、具体的には第14図と第15
図に示しているとおり、アンカー中身9の先端キャップ
2先に溶接等の方法で第14図中の右端が接合される管体
150の外周に、固定板153と可動板151が管軸方向に110mm
位の間隔をあけて設置されている。固定板153は管体150
に溶接で固着され、可動板151は管軸方向へ移動可能と
されている。そして、固定板153と可動板81との間が、
2個ずつを一組とする等長のリンク154,154で一連に連
結されている。2個のリンク154,154は、これを連結し
た中央の連結ピン155の位置が少し外方へ突き出たくの
字形状を平常状態(縮小径rの状態)とする構成とさ
れ、該連結ピン155の位置で屈折自在とされている。リ
ンク154は、第15図のように、管体150の円周を6等分し
た配置で放射状に設置されている。斜め削孔3の外から
導かれた長いロープ156は、固定板153の側の連結ピン15
7で支持された回転自在なローラー158を折り返され、そ
の先端部が可動板151に止着されている。
The configuration of the tip spacer 15 is specifically described in FIG. 14 and FIG.
As shown in the figure, a tube whose right end in FIG. 14 is joined to the tip of the cap 2 of the anchor contents 9 by welding or the like.
On the outer periphery of 150, fixed plate 153 and movable plate 151 are 110 mm in the tube axis direction.
It is installed at intervals of place. Fixing plate 153 is tube 150
The movable plate 151 is movable in the tube axis direction. And, between the fixed plate 153 and the movable plate 81,
They are connected in series by isometric links 154, 154, each pair being two. The two links 154, 154 are configured such that the central connecting pin 155 connecting the two links 154 is in a normal state (a state of a reduced diameter r) in which the position of the connecting pin 155 protrudes slightly outward. It can be refracted by. As shown in FIG. 15, the links 154 are provided radially in an arrangement in which the circumference of the tube 150 is equally divided into six. The long rope 156 guided from the outside of the oblique hole 3 is connected to the connecting pin 15 on the side of the fixing plate 153.
The rotatable roller 158 supported by 7 is folded back, and the tip is fixed to the movable plate 151.

したがって、斜め削孔3の中へアンカー中身9を挿入
し終えた段階でロープ156を強く引くと、可動板151が第
14図の左方へ引き寄せられ、これに伴なって2枚のリン
ク154,154が外方へ屈折運動をして拡径Rの状態とな
る。よって、このリンク154が斜め削孔3の下底面の上
に耐荷体1を持ち上げて支持する。
Therefore, when the rope 156 is strongly pulled at the stage when the anchor contents 9 have been inserted into the oblique hole 3, the movable plate 151
14 is pulled to the left in FIG. 14, and the two links 154, 154 are refracted outwardly, and are in a state of an enlarged diameter R. Therefore, the link 154 lifts and supports the load-bearing body 1 above the lower bottom surface of the oblique drilling 3.

なお、アンカー中身9の挿入作業の際などに可動板15
1がブラブラ移動する不具合を防止するため、管体150の
外周面の管軸方向に、ドーナツ形状をなす可動板151の
中空部内面に内側から圧接される板ばね159が数枚設置
されている。この板ばね159による摩擦力で可動板81の
有害なずり動きが防止されている。
In addition, when inserting the anchor contents 9, the movable plate 15
In order to prevent the trouble that the 1 moves wobble, several leaf springs 159 that are pressed from the inside to the inner surface of the hollow portion of the donut-shaped movable plate 151 are provided in the tube axis direction on the outer peripheral surface of the tube 150. . Harmful shear movement of the movable plate 81 is prevented by the frictional force of the plate spring 159.

第14図中の符号16はアンカー中身9の挿入作業時に注
入材4による抵抗を小さくするために管体150の先端に
取り付けた減摩フードである。
Reference numeral 16 in FIG. 14 denotes an anti-friction hood attached to the distal end of the tube 150 in order to reduce the resistance due to the injection material 4 during the operation of inserting the anchor contents 9.

その他の実施例 (その1) 第16図は、拡径型ではあるが、構成が異な
る先端スペーサー17を使用した斜め永久地盤アンカーを
示している。この先端スペーサー17の場合も、先端キャ
ップ2の先に接合された管体170の前部外周に可動板171
が管軸方向へ移動可能に設置されている。該可動板171
から後ろ向き(図中右向き)に拡径板172がピンにより
放射方向へ回動自在に取り付けられている。一方、管体
170の後方の段部には、前記拡径板172を拡径させたい角
度のテーパー面173が形成されている。そして、斜め削
孔3の外から導いたロープ174が可動板171に止着されて
いる。
Other Embodiments (Part 1) FIG. 16 shows a diagonal permanent ground anchor using a tip spacer 17 which is an enlarged diameter type but has a different configuration. In the case of the tip spacer 17 also, the movable plate 171 is attached to the outer periphery of the front part of the tube 170 joined to the tip of the tip cap 2.
Is installed so as to be movable in the pipe axis direction. The movable plate 171
From the rear, a large-diameter plate 172 is attached so as to be rotatable in a radial direction by pins. Meanwhile, the tube
A tapered surface 173 at an angle at which the diameter of the large-diameter plate 172 is to be increased is formed in a step portion behind the 170. A rope 174 guided from outside the oblique hole 3 is fixed to the movable plate 171.

この先端スペーサー17の場合は、拡径板172を管体170
に沿って寝かせた状態(縮径状態)で斜め削孔3の中へ
アンカー中身9を挿入し、挿入が完了した段階でロープ
174を強く引く。すると、可動板171が引き寄せられ、こ
れに伴って拡径板172がテーパー面173に沿って外方へ放
射状に起立するように回動して拡径状態となり、耐荷体
1を斜め削孔3の下底面から持ち上げた形に支持するの
である。
In the case of this tip spacer 17, the expanded plate 172 is connected to the tube 170
The anchor content 9 is inserted into the oblique drilling hole 3 while being laid down (diameter reduced state) along the
Pull 174 strongly. Then, the movable plate 171 is attracted, and accordingly, the large-diameter plate 172 is rotated to rise radially outward along the tapered surface 173 to be in the large-diameter state. It is supported in a form lifted from the lower bottom.

(その2) 第17図は、先端支持具及び上端スペーサー
として膨張、収縮が可能なパッカー18,19を使用した構
成の斜め永久地盤アンカーを示している。パッカー18と
19はゴム等で製作されており、各々に空気又は液体など
を注入するための注入ホース20,21が接続されている。
(Part 2) FIG. 17 shows an oblique permanent ground anchor having a configuration using packers 18 and 19 which can expand and contract as a tip support and an upper end spacer. Packer 18 and
Numeral 19 is made of rubber or the like, and each is connected to injection hoses 20, 21 for injecting air, liquid, or the like.

二つのパッカー18,19収縮させた縮径状態でアンカー
中身9が斜め削孔3の中へ挿入される。挿入を完了した
段階で注入ホース20,21を通じて圧縮空気又は水又はセ
メントミルクの如き注入材を加圧注入して二つのパッカ
ー18,19は十分に膨張させた拡径状態となし、もって耐
荷体1を斜め削孔3の下底面から持ち上げた形に支持せ
しめるのである。
The anchor contents 9 are inserted into the oblique hole 3 in a reduced diameter state in which the two packers 18 and 19 are contracted. When the insertion is completed, the injection material such as compressed air or water or cement milk is injected under pressure through the injection hoses 20 and 21 so that the two packers 18 and 19 are in a fully expanded and expanded state. 1 is supported by being lifted from the lower bottom surface of the oblique hole 3.

本発明が奏する効果 以上に実施例と併せて詳述したとおりであって、この
発明に係る斜め永久地盤アンカーによれば、被アンカー
構造物に応じて最も効きの良い角度で実施でき、アンカ
ー機能を最大限に発揮させられる。しかも耐荷体1の外
周の注入材4の被り厚も十分に確保されて耐力の十分に
大きいものとされる。
Advantageous effects of the present invention As described in detail in conjunction with the embodiment above, according to the oblique permanent ground anchor according to the present invention, it can be implemented at the most effective angle according to the structure to be anchored, the anchor function Can be maximized. In addition, the thickness of the filling material 4 on the outer periphery of the load-bearing body 1 is sufficiently ensured, and the proof strength is sufficiently large.

また、この発明に係る斜め永久地盤アンカーの施工法
によれば、品質、機能に優れた斜めアンカーを高い信頼
性のもとに確実に実施できる。
Further, according to the method for constructing an oblique permanent ground anchor according to the present invention, an oblique anchor excellent in quality and function can be reliably implemented with high reliability.

さらに、この発明に係る施工用架台によれば、重いア
ンカー中身9を人手に頼ることなく楽に迅速に斜め削孔
3の中へ挿入することができ、労力の軽減、重労働から
の解放と、挿入作業の能率向上に寄与するのである。
Further, according to the construction stand according to the present invention, the heavy anchor contents 9 can be easily and quickly inserted into the oblique drilling hole 3 without relying on humans, thereby reducing labor, releasing from heavy labor, and inserting. This contributes to improving work efficiency.

【図面の簡単な説明】[Brief description of the drawings]

第1図はこの発明に係る斜め永久地盤アンカーの第1実
施例を示した断面図、第2図と第3図は前記アンカーを
設置する施工要領図、第4図と第5図は施工用架台の側
面図と正面図、第6図と第7図はパイロットキャップの
縮径状態と拡径状態を示した施工断面図、第8図は前記
パイロットキャップの左側面図、第9図と第10図は上端
スペーサーの正面図と左側面図、第11図は斜め永久地盤
アンカーの第2実施例を示した断面図、第12図と第13図
は前記アンカーを設置する施工要領図、第14図と第15図
は先端スペーサーの正面図と左側面図、第16図と第17図
は第3、第4実施例の斜め永久地盤アンカーの主要部を
示した施工断面図、第18図と第19図は斜め永久地盤アン
カーの使用例を示した断面図、第20図は従来の垂直型永
久地盤アンカーの断面図である。 1……耐荷体 7,14……パイロットキャップ(先端支持具) 15……先端スペーサー(先端支持具) 8……上端スペーサー、3……斜め削孔 4……注入材、9……アンカー中身 6……施工用架台、61……ベース枠 62……支柱、63……ローラーコンベア 64……枠
FIG. 1 is a cross-sectional view showing a first embodiment of an oblique permanent ground anchor according to the present invention, FIGS. 2 and 3 are construction procedures for installing the anchor, and FIGS. FIGS. 6 and 7 are construction sectional views showing the reduced and expanded diameters of the pilot cap, FIG. 8 is a left side view of the pilot cap, FIGS. 9 and 10 is a front view and a left side view of the upper end spacer, FIG. 11 is a cross-sectional view showing a second embodiment of the oblique permanent ground anchor, FIGS. 12 and 13 are construction procedures for installing the anchor, FIG. 14 and 15 are a front view and a left side view of the tip spacer, and FIGS. 16 and 17 are construction sectional views showing main parts of the diagonal permanent ground anchors of the third and fourth embodiments, and FIG. Fig. 19 and Fig. 19 are cross-sectional views showing examples of the use of diagonal permanent ground anchors, and Fig. 20 is a cross-sectional view of a conventional vertical permanent ground anchor. is there. 1 ... load-bearing body 7,14 ... pilot cap (tip support) 15 ... tip spacer (tip support) 8 ... top spacer, 3 ... oblique drilling 4 ... injection material, 9 ... anchor contents 6 ... Construction stand, 61 ... Base frame 62 ... Post, 63 ... Roller conveyor 64 ... Frame

───────────────────────────────────────────────────── フロントページの続き (73)特許権者 999999999 鈴木金属工業株式会社 東京都千代田区丸の内1丁目8番2号 (73)特許権者 999999999 東京製綱株式会社 東京都中央区日本橋室町2丁目3番14号 (73)特許権者 999999999 日特建設株式会社 東京都中央区銀座8丁目14番14号 (73)特許権者 999999999 ライト工業株式会社 東京都千代田区九段北4丁目2番35号 (72)発明者 丸岡 正夫 東京都江東区南砂2丁目5番14号 株式 会社竹中工務店技術研究所内 (72)発明者 幾田 悠康 東京都江東区南砂2丁目5番14号 株式 会社竹中工務店技術研究所内 (72)発明者 青木 雅路 東京都江東区南砂2丁目5番14号 株式 会社竹中工務店技術研究所内 (72)発明者 尾崎 修 千葉県柏市豊四季251番地―12 ベルシ エ柏103号 (72)発明者 渡辺 則雄 千葉県千葉市宮野木町1286―18 (72)発明者 森 利弘 茨城県つくば市吾妻1―4―3―602― 208 (72)発明者 小粥 庸夫 東京都中央区京橋2丁目16番1号 清水 建設株式会社内 (72)発明者 桂 豊 東京都中央区京橋2丁目16番1号 清水 建設株式会社内 (72)発明者 真野 英之 東京都中央区京橋2丁目16番1号 清水 建設株式会社内 ──────────────────────────────────────────────────続 き Continuing on the front page (73) Patent holder 999999999 Suzuki Metal Industry Co., Ltd. 1-8-2, Marunouchi, Chiyoda-ku, Tokyo (73) Patent holder 999999999 Tokyo Seizo Co., Ltd. 2-chome, Nihonbashi Muromachi, Chuo-ku, Tokyo No. 3-14 (73) Patent holder 999999999 Nittoku Construction Co., Ltd. 8-14-14 Ginza, Chuo-ku, Tokyo (73) Patent holder 999999999 Light Industrial Co., Ltd. 4-35 Kudankita, Chiyoda-ku, Tokyo (72) Inventor Masao Maruoka 2-5-114 Minamisuna, Koto-ku, Tokyo Inside Takenaka Corporation Technical Research Institute (72) Inventor Yuyasu Ikuta 2-5-114 Minamisuna, Koto-ku, Tokyo Takenaka Corporation Inside the Technical Research Institute (72) Inventor Masaji Aoki 2-5-1-14 Minamisuna, Koto-ku, Tokyo Inside the Technical Research Center Takenaka Corporation (72) Inventor Osamu Ozaki No. 251-12, Bercy Kashiwa 103, Toyoshiki, Kashiwa City, Japan (72) Norio Watanabe, Inventor 1286-18-18 Miyanogicho, Chiba City, Chiba Prefecture 208 (72) Inventor Yasuo Kogei 2-16-1, Kyobashi, Chuo-ku, Tokyo Inside Shimizu Construction Co., Ltd. (72) Inventor Yutaka Katsura 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Construction Corporation (72) Inventor Hideyuki Mano 2-16-1 Kyobashi, Chuo-ku, Tokyo Shimizu Corporation

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】耐荷体の先端部に先端支持具が設置され、
同耐荷体の後端部には上端スペーサーが設置され、先端
支持具と上端スペーサーとにより斜め削孔中で耐荷体が
注入材の被り厚相当の高さ持ち上げて支持されているこ
とを特徴とする斜め永久地盤アンカー。
1. A tip support is provided at a tip of a load-bearing body,
An upper end spacer is installed at the rear end of the load-bearing body, and the load-bearing body is lifted and supported at a height equivalent to the covering thickness of the injection material in the oblique drilling by the front end support and the upper end spacer. Diagonal permanent ground anchor.
【請求項2】イ) 地盤中に斜め削孔を掘削し、削孔水
と注入材とを置換する段階と、 ロ) 地上にて予め耐荷体の先端部に先端支持具を設置
し、同耐荷体の後端部には上端スペーサーを設置して組
立てられたアンカー中身を前記斜め削孔の中へ挿入し、
先端支持具と上端スペーサーとを働かせて耐荷体を斜め
削孔の下底面の上に中で注入材の被り厚相当の高さ持ち
上げて支持せしめる段階と、 ハ) 斜め削孔中の少なくとも耐荷体の長さの範囲にわ
たり、耐荷体の外周部分に注入材を圧入し充填する段階
と、 より成ることを特徴とする斜め永久地盤アンカーの施工
法。
(2) a) excavating diagonal holes in the ground and replacing the drilling water with the injection material; and (b) installing a tip support at the tip of the load-bearing body in advance on the ground. At the rear end of the load-bearing body, insert the anchor contents assembled by installing the upper end spacer into the oblique drilling,
(C) lifting and supporting the load-bearing body on the lower bottom surface of the oblique drilling by a height corresponding to the thickness of the injected material by using the tip support and the upper end spacer; Press-fitting and filling the outer periphery of the load-bearing material over the range of the length of the load-carrying body.
【請求項3】斜め削孔の中へアンカー中身を挿入する工
程は、同削孔の外に据え付けた施工用架台の上にアンカ
ー中身を吊り込み、アンカー中身を斜め削孔と略同心
に、かつ略平行に支持せしめた上で行なうことを特徴と
する特許請求の範囲第2項に記載した斜め永久地盤アン
カーの施工法。
3. The step of inserting the contents of the anchor into the oblique drilling includes suspending the contents of the anchor on a construction stand installed outside the hole, and making the anchor substantially concentric with the oblique hole. 3. The method for constructing an oblique permanent ground anchor according to claim 2, wherein the method is performed after being supported substantially in parallel.
【請求項4】ベース枠の上に一対の支柱を垂直に、かつ
平行に相対峙させて立設し、前記一対の支柱の間にロー
ラーコンベアを配置し、該ローラーコンベアの枠の前部
及び後部を支柱に対して傾斜角の調整が可能に支持せし
めていることを特徴とする永久地盤アンカーの施工用架
台。
4. A pair of pillars are erected vertically and parallel on a base frame, and a roller conveyor is arranged between the pair of pillars. A mounting base for permanent ground anchors, characterized in that the rear portion is supported so that the inclination angle can be adjusted with respect to the column.
JP13769689A 1989-05-31 1989-05-31 Diagonal permanent ground anchor, its construction method and construction stand Expired - Lifetime JP2714632B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13769689A JP2714632B2 (en) 1989-05-31 1989-05-31 Diagonal permanent ground anchor, its construction method and construction stand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13769689A JP2714632B2 (en) 1989-05-31 1989-05-31 Diagonal permanent ground anchor, its construction method and construction stand

Publications (2)

Publication Number Publication Date
JPH032416A JPH032416A (en) 1991-01-08
JP2714632B2 true JP2714632B2 (en) 1998-02-16

Family

ID=15204672

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13769689A Expired - Lifetime JP2714632B2 (en) 1989-05-31 1989-05-31 Diagonal permanent ground anchor, its construction method and construction stand

Country Status (1)

Country Link
JP (1) JP2714632B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005038279A1 (en) * 2003-10-20 2005-04-28 Tokue Inc. Universal joint boot

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005038279A1 (en) * 2003-10-20 2005-04-28 Tokue Inc. Universal joint boot

Also Published As

Publication number Publication date
JPH032416A (en) 1991-01-08

Similar Documents

Publication Publication Date Title
US6047505A (en) Expandable base bearing pile and method of bearing pile installation
CN114182935A (en) Construction Method of Integral Scaffolding for Ultra-high Steep Rock Slope
US8353132B1 (en) Method and apparatus for erection and disassembly of a sectional mast assembly
US4102143A (en) Anchoring of structures
CN113863297A (en) A segmented displacement multi-level control negative Poisson self-expanding bolt device
US4012915A (en) Driving tips for forming cast-in-place caseless concrete piles
JP6063714B2 (en) Method for creating expandable steel pipe pile and pile structure
JP2004239057A (en) Expandable boring rod mechanism
JP2714632B2 (en) Diagonal permanent ground anchor, its construction method and construction stand
US6684577B2 (en) Support system for lifting and leveling existing buildings that utilizes non-cylindrical support sections and a vertically-adjustable cap that enables the building to be easily raised or lowered to a desired height
US6763636B2 (en) Method and apparatus for stabilizing a support system utilized for lifting and leveling existing buildings
JP6047257B1 (en) Pile hole penetration testing machine and pile construction management method
JP2011149163A (en) Overhaul facility for steel tower support structure and method for overhauling the same
CN110080236B (en) But device is transferred to cyclic utilization steel reinforcement cage who hangs muscle
CN212026275U (en) Pile beam structure for foundation pit support
CN111088805B (en) Integrated assembly type supporting device and supporting method thereof
CN220203895U (en) A propulsion mechanism for vertical excavation heads
KR102811662B1 (en) Retaining wall for civil engineering
CN1068084C (en) Boring jig and method for producing pile in borehole
US3962837A (en) Apparatus for expandably engaging the walls of an earthen hole
JP2005061171A (en) Pile head structure of pile foundation and construction method of pile head of pile foundation
JP2007126934A (en) Rope anchor device for civil engineering facilities
CN223607841U (en) Separable embedded rock uplift pile
CN113969579A (en) Multistage expansion utricule stock device
CN221119258U (en) Pre-buried hoist and mount strutting arrangement of railway cylindricality prefabricated component

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081107

Year of fee payment: 11

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091107

Year of fee payment: 12

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091107

Year of fee payment: 12