JP2720765B2 - Butt welding method of reinforcing steel - Google Patents
Butt welding method of reinforcing steelInfo
- Publication number
- JP2720765B2 JP2720765B2 JP24769193A JP24769193A JP2720765B2 JP 2720765 B2 JP2720765 B2 JP 2720765B2 JP 24769193 A JP24769193 A JP 24769193A JP 24769193 A JP24769193 A JP 24769193A JP 2720765 B2 JP2720765 B2 JP 2720765B2
- Authority
- JP
- Japan
- Prior art keywords
- reinforcing bar
- rebar
- butt welding
- rebars
- jig
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Reinforcement Elements For Buildings (AREA)
- Butt Welding And Welding Of Specific Article (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、一端がコンクリートに
より拘束されている2本の鉄筋の未拘束末端相互の突合
せ溶接方法に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of butt welding two unrestricted ends of two reinforcing bars whose ends are restrained by concrete.
【0002】[0002]
【従来の技術】継手による接合では性能的に不十分であ
り、圧接による接合ができない箇所の鉄筋相互の接合法
として、従来より突合せ溶接による接合が広く採用され
ている。2. Description of the Related Art Butt welding has been widely used as a method of joining rebars at locations where joining by pressure welding is not possible because joining by joints is insufficient in performance.
【0003】[0003]
【発明が解決しようとする課題】従来は突合せ溶接の場
合、溶接による鉄筋の収縮の影響については余り考慮さ
れていないが、溶接後鉄筋が十分に収縮しきれないと当
然収縮歪みが鉄筋内の内部応力として残留することとな
り、鉄筋には初期内部応力は存在しないという設計の前
提を狂わせることになる。この収縮歪みは鉄筋端部の拘
束が大きいほど大となり、未拘束部分の鉄筋が短いほど
大となる。従来は、収縮歪みはそれほど大きくないとし
て無視しているか収縮歪みを見込んでその分配筋数を増
して対処しているのが実状である。しかし、逆打ち工法
などで鉄筋端部が完全に拘束され、かつ、未拘束部分の
鉄筋が短い場合には、この収縮歪みは無視し得ない大き
さとなる。Conventionally, in the case of butt welding, the effect of the shrinkage of the reinforcing bar due to welding has not been taken into account. It will remain as internal stress, upsetting the design assumption that there is no initial internal stress in the reinforcing bar. This shrinkage strain increases as the constraint at the end of the reinforcing bar increases, and increases as the reinforcing bar at the unconstrained portion becomes shorter. Conventionally, contraction distortion is ignored as not so large, or the number of distribution muscles is increased in anticipation of contraction distortion to cope with it. However, when the rebar ends are completely constrained by the reverse striking method or the like and the rebars in the unconstrained portions are short, the shrinkage strain becomes a size that cannot be ignored.
【0004】本発明は、収縮歪みを残さない突合せ溶接
方法を提供することを目的とする。An object of the present invention is to provide a butt welding method that does not leave shrinkage strain.
【0005】[0005]
【課題を解決するための手段】本発明は、一端がコンク
リートにより拘束されている2本の鉄筋の未拘束末端相
互の突合せ溶接において、(A)鉄筋の末端を所定の長
さに切り揃え、2本の鉄筋の末端に跨がるようにリング
状裏当て金を嵌着する工程、(B)複数のターンバック
ルの両端にそれぞれ1個の鉄筋把持部を溶接した緊張治
具を一方もしくは双方の鉄筋に取りつけ、緊張治具を締
めつけて一方もしくは双方の鉄筋を縮めて2本の鉄筋末
端の間隙を拡げた状態で突合せ溶接する工程、(C)溶
接部が冷却したのち緊張治具を鉄筋より取り外す工程、
よりなる鉄筋の突合せ溶接方法である。SUMMARY OF THE INVENTION According to the present invention, in a butt welding of unconstrained ends of two rebars whose ends are constrained by concrete, (A) the ends of the rebars are trimmed to a predetermined length, A step of fitting a ring-shaped backing metal so as to straddle the ends of two rebars, and (B) one or both of tensioning jigs in which one rebar grip is welded to each end of a plurality of turnbuckles. And tightening the tensioning jig to shrink one or both reinforcements and widen the gap between the ends of the two reinforcements. (C) The welding jig is cooled after the weld is cooled. More removing process,
Butt welding method for reinforcing bars.
【0006】本発明の最大の要点は、特別な緊張治具を
一方もしくは双方の鉄筋に取りつけ、緊張治具を締めつ
けて一方もしくは双方の鉄筋を縮めて2本の鉄筋末端の
間隙を拡げた状態で突合せ溶接する点である。緊張治具
により縮められた長さが溶接により鉄筋が収縮する長さ
に見合う長さである。従って溶接後溶接部が冷却し緊張
治具を鉄筋より取り外すと鉄筋の収縮は未拘束部で吸収
される。The most important point of the present invention is that a special tensioning jig is attached to one or both rebars, and the tensioning jig is tightened to shrink one or both rebars to widen the gap between the two rebar ends. Is the point of butt welding. The length reduced by the tension jig is a length corresponding to the length of the rebar contracted by welding. Therefore, when the weld is cooled after welding and the tension jig is removed from the reinforcing bar, the contraction of the reinforcing bar is absorbed by the unconstrained portion.
【0007】本発明においては鉄筋の未拘束部分を縮め
るために特別な緊張治具が使用される。この治具は複数
のターンバックルの両端にそれぞれ1個の鉄筋把持部を
溶接したものであり、両端の鉄筋把持部によりパッキン
を介してボルトにより鉄筋の未拘束部分に固着され各タ
ーンバックルは各ターンバックル鉄筋の未拘束部分を包
囲するように配置されている。使用するターンバックル
は通常4個もしくは6個でありこの各ターンバックルが
鉄筋の周りにバランスよく配置される。緊張治具は突合
せ溶接される双方の鉄筋に取りつけるのが好ましいが、
未拘束部分の長さの長い一方の鉄筋にのみ取りつけても
よい。In the present invention, a special tensioning jig is used to shrink the unrestricted portion of the reinforcing bar. This jig is obtained by welding one rebar gripping portion to each of both ends of a plurality of turnbuckles. It is arranged so as to surround the unconstrained portion of the turnbuckle rebar. Usually, four or six turnbuckles are used, and each of these turnbuckles is arranged around the rebar in a well-balanced manner. The tensioning jig is preferably attached to both reinforcing bars to be butt-welded,
It may be attached to only one reinforcing bar having a long unconstrained portion.
【0008】[0008]
【実施例】以下図面を参照しながら本発明を説明する。DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to the drawings.
【0009】図1は本発明で使用する緊張治具を突合せ
溶接する鉄筋に取り付けた状態を示し、(a)は立面
図、(b)は鉄筋把持部の平面図である。FIG. 1 shows a state in which a tension jig used in the present invention is attached to a reinforcing bar to be butt-welded, (a) is an elevation view, and (b) is a plan view of a reinforcing bar gripping portion.
【0010】この例では緊張治具は4個のターンバック
ル2A、2B、2C、2Dで構成される。各ターンバッ
クルのスクリュウロッド3A、3B、3C、3Dの上端
および下端はそれぞれ鉄筋把持部4に溶接される。鉄筋
把持部4は2枚の一部湾曲した鉄板6、6とパッキン5
と2枚の鉄板6、6を締めつけるボルト7で構成され
る。この緊張治具は鉄筋1Aの縦方向から挿入するか、
2つに分離しておいて横方向から鉄筋1Aを挟むかして
鉄筋1Aに取りつけパッキン5を介してボルト7を締め
つけて鉄筋1Aに固着される。In this example, the tension jig is composed of four turnbuckles 2A, 2B, 2C and 2D. The upper and lower ends of the screw rods 3A, 3B, 3C, 3D of each turnbuckle are welded to the reinforcing bar gripping part 4, respectively. The rebar gripping portion 4 includes two partially curved iron plates 6 and 6 and a packing 5.
And two bolts 7 for tightening the two iron plates 6. Insert this tension jig from the longitudinal direction of the reinforcing bar 1A,
After being separated into two parts, the reinforcing bar 1A is sandwiched from the lateral direction or attached to the reinforcing bar 1A, and the bolt 7 is tightened via the packing 5 to be fixed to the reinforcing bar 1A.
【0011】次に図2を参照して本発明の実施の一例を
説明する。図2は一端がコンクリートにより拘束されて
いる鉛直方向の2本の鉄筋の未拘束末端相互の突合せ溶
接についての縦断面図である。Next, an embodiment of the present invention will be described with reference to FIG. FIG. 2 is a longitudinal sectional view of butt welding of unconstrained ends of two vertical reinforcing bars whose ends are constrained by concrete.
【0012】(1)上端がコンクリートにより拘束され
ている鉄筋1Aと下端がコンクリートにより拘束されて
いる鉄筋1Bの先端を切り揃え先端間の間隙を数mm程度
とし、先端間に跨がるようにリング状裏当て金8を嵌着
する。(1) The ends of the reinforcing bar 1A whose upper end is constrained by concrete and the reinforcing bar 1B whose lower end is constrained by concrete are trimmed, the gap between the front ends is set to about several mm, and the reinforcing bars are straddled between the front ends. A ring-shaped backing metal 8 is fitted.
【0013】(2)鉄筋1Aと鉄筋1Bの両方に緊張治
具の取り付けが可能な場合には、鉄筋1Aと鉄筋1Bの
両方に緊張治具を鉄筋把持部4により固着する。(図2
(a)) 鉄筋1Bが極端に短く緊張治具の取り付けが困難な場合
は鉄筋1Aにのみ緊張治具を鉄筋把持部4により固着す
る。(図2(b)) (3)ターンバックル2A、2B、2C、2Dを回転し
て、スクリュウロッド3A、3B、3C、3Dを引張
り、図2(a)の場合は鉄筋1Aと鉄筋1Bとを縮め、
図2(b)の場合は鉄筋1Aを縮める。(2) When a tension jig can be attached to both the reinforcing bar 1A and the reinforcing bar 1B, the tension jig is fixed to both the reinforcing bar 1A and the reinforcing bar 1B by the reinforcing bar gripping portion 4. (Figure 2
(A) When the reinforcing bar 1B is extremely short and it is difficult to attach the tensioning jig, the tensioning jig is fixed to only the reinforcing bar 1A by the reinforcing bar gripping portion 4. (FIG. 2 (b)) (3) The turnbuckles 2A, 2B, 2C, 2D are rotated to pull the screw rods 3A, 3B, 3C, 3D. In the case of FIG. 2 (a), the reinforcing bar 1A and the reinforcing bar 1B are connected. Shrink,
In the case of FIG. 2B, the reinforcing bar 1A is contracted.
【0014】(4)鉄筋1Aと鉄筋1Bとの先端間の間
隙を溶接金属により溶接し、溶接部が冷却した後ボルト
7を緩めて緊張治具を鉄筋1Aもしくは鉄筋1Aと鉄筋
1Bとら取り外し作業は完了する。(4) The gap between the tip of the reinforcing bar 1A and the reinforcing bar 1B is welded with a weld metal, and after the weld is cooled, the bolt 7 is loosened and the tension jig is removed from the reinforcing bar 1A or the reinforcing bar 1A and the reinforcing bar 1B. Is completed.
【0015】なお、図2(a)の場合には、鉄筋1Aに
取りつけたターンバックルの中2A、2Bを締めて鉄筋
1Aを湾曲気味に縮め、鉄筋1Bに取りつけたターンバ
ックルの中2C、2Dを締めて鉄筋1Bを鉄筋1Aと反
対方向に湾曲気味に縮めておいて溶接すると収縮歪みは
湾曲部で完全に吸収されて直線状に溶接される。In the case of FIG. 2 (a), the inside of the turnbuckle 2A, 2B attached to the reinforcing bar 1A is tightened to shrink the reinforcing bar 1A slightly, and the inside of the turnbuckle 2C, 2D attached to the reinforcing bar 1B. When the reinforcing bar 1B is contracted in a slightly curved manner in the direction opposite to that of the reinforcing bar 1A and welded, the contraction strain is completely absorbed by the curved portion and the bar is welded linearly.
【0016】湾曲気味に縮めておいて溶接する方が操作
上は容易である。It is easier to operate when it is welded while being slightly curved.
【0017】図1、図2においては鉄筋1A、鉄筋1B
が鉛直方向に配置されている例について説明したが鉄筋
1A、鉄筋1Bは水平方向に配置されている場合にも本
発明は全く同様に実施される。FIGS. 1 and 2 show a reinforcing bar 1A and a reinforcing bar 1B.
Has been described in the vertical direction, but the present invention can be implemented in exactly the same manner when the reinforcing bars 1A and 1B are arranged in the horizontal direction.
【0018】[0018]
【発明の効果】本発明では2本の鉄筋の未拘束部分を予
め縮めておき鉄筋末端の間隙を少し拡げた状態で突合せ
溶接しているので、溶接による収縮は縮めておいた未拘
束部分で吸収され鉄筋に収縮歪みが残留しない。According to the present invention, the unconstrained portions of the two rebars are contracted in advance, and the butt welding is performed with the gap between the ends of the rebars slightly widened. Shrinkage strain does not remain in the rebar due to absorption.
【図1】本発明で使用する緊張治具を突合せ溶接する鉄
筋に取り付けた状態を示し、(a)は立面図、(b)は
鉄筋把持部の平面図である。FIG. 1 shows a state in which a tension jig used in the present invention is attached to a reinforcing bar to be butt-welded, (a) is an elevation view, and (b) is a plan view of a reinforcing-bar gripping portion.
【図2】一端がコンクリートにより拘束されている鉛直
方向の2本の鉄筋の未拘束末端相互の突合せ溶接につい
ての縦断面図である。FIG. 2 is a longitudinal sectional view of butt welding of unconstrained ends of two vertical reinforcing bars whose ends are constrained by concrete.
1A・・上部被溶接鉄筋、1B・・下部被溶接鉄筋、2
A、2B、2C、2D・・ターンバックル、3A、3
B、3C、3D・・スクリュウロッド、4・・鉄筋把持
部、5・・パッキン、6・・鉄筋把持鉄板、7・・ボル
ト、8・・リング状裏当て金。1A ... upper welded reinforcing bar, 1B ... lower welded reinforcing bar, 2
A, 2B, 2C, 2D, turnbuckle, 3A, 3
B, 3C, 3D Screw screw, 4 Rebar gripping part, 5 Packing, 6 Rebar gripping iron plate, 7 Bolt, 8 Ring backing metal.
Claims (1)
る2本の鉄筋の未拘束末端相互の突合せ溶接において、
(A)鉄筋の末端を所定の長さに切り揃え、2本の鉄筋
の末端に跨がるようにリング状裏当て金を嵌着する工
程、(B)複数のターンバックルの両端にそれぞれ1個
の鉄筋把持部を溶接した緊張治具を一方もしくは双方の
鉄筋に取りつけ、緊張治具を締めつけて一方もしくは双
方の鉄筋を縮めて2本の鉄筋末端の間隙を拡げた状態で
突合せ溶接する工程、(C)溶接部が冷却したのち緊張
治具を鉄筋より取り外す工程、よりなる鉄筋の突合せ溶
接方法。In a butt welding of unconstrained ends of two rebars, one ends of which are constrained by concrete,
(A) a step of trimming the ends of the rebar to a predetermined length and fitting a ring-shaped backing metal over the ends of the two rebars; (B) one step at each end of a plurality of turnbuckles. A step of attaching a tension jig to which one of the rebar gripping portions is welded to one or both rebars, tightening the tension jig to shrink one or both rebars, and performing a butt welding in a state where a gap between two rebar ends is widened. (C) a step of removing the tension jig from the rebar after the weld is cooled;
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP24769193A JP2720765B2 (en) | 1993-10-04 | 1993-10-04 | Butt welding method of reinforcing steel |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP24769193A JP2720765B2 (en) | 1993-10-04 | 1993-10-04 | Butt welding method of reinforcing steel |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH07102777A JPH07102777A (en) | 1995-04-18 |
| JP2720765B2 true JP2720765B2 (en) | 1998-03-04 |
Family
ID=17167213
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP24769193A Expired - Lifetime JP2720765B2 (en) | 1993-10-04 | 1993-10-04 | Butt welding method of reinforcing steel |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2720765B2 (en) |
-
1993
- 1993-10-04 JP JP24769193A patent/JP2720765B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH07102777A (en) | 1995-04-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4469465A (en) | Rebar coupler | |
| JP2001214574A (en) | Connector for self-connection bar steel | |
| JP6501219B2 (en) | Brace with tension adjustment | |
| JP2720765B2 (en) | Butt welding method of reinforcing steel | |
| CN112681727A (en) | Template structure of special-shaped column in limited space and construction method thereof | |
| CN207714747U (en) | A kind of reinforced column formwork reinforcement fixture | |
| JP2746072B2 (en) | Butt welding method of reinforcing steel | |
| JPH0449328A (en) | Pedestal construction of steel frame column | |
| JPH071425A (en) | Fixture for concrete form | |
| JP7160575B2 (en) | Structure and construction method of structure | |
| JP7722953B2 (en) | Temporary joining method for pre-assembled rebar | |
| SU979103A1 (en) | Connection-rod timber-sawing frame | |
| JP2017150265A (en) | Reinforcement cage and assembly method of this reinforcement cage | |
| JP4029342B2 (en) | Mechanical rebar joint | |
| JPH0246313B2 (en) | ||
| CN111305886B (en) | A mortar anchor support connection device and a support connection method | |
| JP2660902B2 (en) | Method of forming mold for concrete and fastener used therefor | |
| JPH09228644A (en) | Pillar erection equipment | |
| CN216787150U (en) | A kind of protection and reinforcement mechanism for foundation pit slope | |
| JPH11148129A (en) | Connection device of mutual pc concrete piles and steel frame beam and pc concrete pile | |
| JP2711572B2 (en) | Formwork construction method | |
| JP2674460B2 (en) | Joint structure between rectangular steel tube concrete column and H-shaped steel beam | |
| JPH09228556A (en) | Joint for bar like body | |
| JP2557135B2 (en) | How to repair concrete structures after a fire | |
| JPH10280683A (en) | Hardware as level fitting, separator bolt fitting and spacer fitting in common |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 19971021 |