JP2732009B2 - Construction method of underground continuous wall - Google Patents
Construction method of underground continuous wallInfo
- Publication number
- JP2732009B2 JP2732009B2 JP5111538A JP11153893A JP2732009B2 JP 2732009 B2 JP2732009 B2 JP 2732009B2 JP 5111538 A JP5111538 A JP 5111538A JP 11153893 A JP11153893 A JP 11153893A JP 2732009 B2 JP2732009 B2 JP 2732009B2
- Authority
- JP
- Japan
- Prior art keywords
- underground continuous
- continuous wall
- concrete
- water
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、地下連続壁の施工法に
関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing an underground continuous wall.
【0002】[0002]
【従来の技術】鉄筋コンクリート製の連続パネルとして
造成される地下連続壁は、周知のごとく、地下連続壁用
掘削機械により安定液を用いて横長の掘削孔を所定の寸
法に掘削し、この掘削孔内に鉄筋カゴを挿入し、次い
で、コンクリートを掘削孔内に打設して鉄筋コンクリー
ト製のパネルを先行エレメントとして地中に造成し、こ
のコンクリート製の単独パネルを単位エレメントとして
これに後行エレメントを接続していくものである。2. Description of the Related Art As is well known, an underground continuous wall formed as a continuous panel made of reinforced concrete is formed by excavating a horizontally long excavation hole to a predetermined size using a stable liquid by an excavation machine for an underground continuous wall. A reinforced concrete basket is inserted into the inside, and then concrete is poured into the excavation hole to create a reinforced concrete panel in the ground as a preceding element, and the concrete single panel is used as a unit element and a following element is added thereto. It is something that connects.
【0003】そしてかかる地下連続壁は、土留壁や地下
室、地下貯蔵槽等などの地下構造物に利用できるが、通
常、施工が完了した地下連続壁の一方の面側は根切りを
行う掘削側となり、他の一方は土圧を受ける地山側とな
る。[0003] Such underground continuous walls can be used for underground structures such as earth retaining walls, basements, underground storage tanks, etc. Usually, one side of the completed underground continuous wall is an excavation side for excision. And the other is on the ground side under earth pressure.
【0004】従来、このような地下連続壁の止水対策
は、先行エレメントと後行エレメントの境目(壁間)で
はここに止水鋼材を設ける等の対策が取られており、一
応の効果は得られている。Conventionally, such countermeasures against water blocking of the underground continuous wall have been taken at the boundary between the preceding element and the following element (between the walls), for example, by providing a water stopping steel material here. Have been obtained.
【0005】[0005]
【発明が解決しようとする課題】しかし、壁間以外の一
般部分からの漏水には、積極的な対策は取られておら
ず、漏水が生じた場合は掘削側から樹脂注入等による漏
水処置を行うか、地山側に高圧噴射注入による地盤改良
を施すことによる対処を行っているが、費用の割合には
効果が上がらないものである。However, no active countermeasures have been taken against water leakage from general parts other than between the walls, and if water leakage occurs, water leakage treatment such as resin injection from the digging side must be taken. However, although measures are taken to improve the ground by injecting high pressure into the ground side, the cost ratio is not effective.
【0006】このようにして漏水量の多少は、地下連続
壁施工の良否による面が多く、完全な止水は期待できな
いため、なかなか地下連続壁の本設利用が進まないのが
現状である。[0006] As described above, the amount of water leakage largely depends on the quality of the construction of the underground continuous wall, and it is not possible to expect complete water stoppage.
【0007】本発明の目的は前記従来例の不都合を解消
し、遮水効果を飛躍的に向上させることができ、その結
果として止水注入などの補修作業をほとんどなくすこと
ができる地下連続壁の施工法を提供することにある。SUMMARY OF THE INVENTION An object of the present invention is to solve the above-mentioned disadvantages of the prior art, to dramatically improve the water shielding effect, and as a result, it is possible to substantially eliminate repair work such as injection of water stoppage. To provide a construction method.
【0008】[0008]
【課題を解決するための手段】本発明は前記目的を達成
するため、地下連続壁用掘削機械により安定液を用いて
所定の寸法に掘削し、孔内に鉄筋カゴを吊降ろし、コン
クリートを打設して鉄筋コンクリート製のパネルを形成
する地下連続壁の施工法において、仕切板間で鉄筋カゴ
の地山側面を不透水性シートで覆い、また、掘削側面を
透水性シートで覆い、この内側にコンクリートを打設す
ること、または、地下連続壁用掘削機械により安定液を
用いて所定の寸法に掘削し、孔内に鉄筋カゴを吊降ろ
し、コンクリートを打設して鉄筋コンクリート製のパネ
ルを形成する地下連続壁の施工法において、仕切板間で
鉄筋カゴの少なくとも地山側面を鋼板で覆い、この鋼板
の内側にコンクリートを打設すること、もしくは、これ
らの構成に加えて、鋼板には窓孔を適宜に設けること、
あるいは、鉄筋カゴを構成する掘削孔の幅方向での組立
部材に、止水板をこの組立部材が貫通するように鍔状に
設けたことを要旨とするものである。According to the present invention, in order to achieve the above object, an excavating machine for an underground continuous wall is used to excavate to a predetermined size using a stabilizing solution, a reinforcing cage is hung in a hole, and concrete is cast. In the construction method of the underground continuous wall to form a reinforced concrete panel, the ground side of the reinforced basket is covered with an impermeable sheet between the partition plates, and the excavated side is covered with a permeable sheet, Casting concrete, or excavating to a predetermined size using a stabilizing solution with an excavating machine for underground continuous wall, hanging a reinforced cage in the hole, casting concrete, and forming a reinforced concrete panel In the construction method of the underground continuous wall, at least the ground side of the reinforcing bar between the partition plates is covered with a steel plate, and concrete is cast inside the steel plate, or in addition to these configurations, Suitably providing the window opening in the plate,
Alternatively, the gist of the invention is that a water stop plate is provided in a flange shape so that the assembly member penetrates the assembly member in the width direction of the excavation hole constituting the rebar cage.
【0009】[0009]
【作用】請求項1記載の本発明によれば、地山側に不透
水性シートを配置することで、従来部分的に発生してい
た漏水個所はその連続性を絶たれるため、壁面全体とし
ての漏水は非常に少なくなり、止水性が大幅に向上する
ことができる。According to the first aspect of the present invention, by arranging the water-impermeable sheet on the ground side, the continuity of the water leakage point which has been generated partially in the past is cut off, so that the entire wall surface is formed. Water leakage is very small, and water stoppage can be greatly improved.
【0010】これに加えて、仕切板間で鉄筋カゴの掘削
側面においても透水性シートまたは鋼板で囲むことでコ
ンクリートが掘削壁面に直接接触しないようにすること
ができ、掘削側の地下連続壁表面のコンクリートが平滑
となり、かつ、強度も増すので、壁面の「はつり」や洗
浄作業が大幅に省力化できる。なお、掘削面側について
透水性シートを採用することで、打設したコンクリート
の水分を掘削面側に逃がすことができる。In addition to this, concrete can be prevented from directly contacting the digging wall by surrounding the digging side of the reinforcing bar with a permeable sheet or a steel plate between the partition plates, and the surface of the underground continuous wall on the digging side can be prevented. As the concrete becomes smooth and the strength increases, the work of "hanging" and cleaning the wall can be greatly reduced. In addition, by adopting a water-permeable sheet on the excavation surface side, the moisture of the poured concrete can be released to the excavation surface side.
【0011】請求項2記載の本発明によれば、地山側に
配置する部材が鋼板なので、掘削壁面の崩壊を防止でき
るとともに、壁面全体としての漏水を完全になくすこと
ができ止水性をより一層向上することができる。According to the second aspect of the present invention, since the member disposed on the ground side is a steel plate, collapse of the excavated wall surface can be prevented, and water leakage as a whole wall surface can be completely eliminated, so that water stopping performance can be further improved. Can be improved.
【0012】請求項3記載の本発明によれば、前記作用
に加えて、窓孔からコンクリートが地山と鋼板の間に充
填され、その間に空隙が生じないようになる。According to the third aspect of the present invention, in addition to the above-described operation, concrete is filled between the ground and the steel plate from the window hole, so that no void is formed therebetween.
【0013】請求項4記載の本発明によれば、前記作用
に加えて、地山側から掘削側へは鉄筋カゴを構成する掘
削孔の幅方向での組立部材に沿っての漏水が発生し易い
が、止水板をこの組立部材が貫通するように鍔状に設け
てこれを完全に阻止することができる。According to the fourth aspect of the present invention, in addition to the above-described effects, water leakage easily occurs from the ground side to the excavation side along the assembly member in the width direction of the excavation hole constituting the rebar cage. However, it is possible to completely prevent the water stop plate by providing the water stop plate in a flange shape so that the assembly member penetrates.
【0014】[0014]
【実施例】以下、図面について本発明の実施例を詳細に
説明する。図1は本発明の地下連続壁の施工法の第1実
施例を示す平面図で、図中1は先行エレメント、2は後
行エレメントで、これらはいずれも、地下連続壁用掘削
機械により安定液を用いて所定の寸法に掘削孔6を造成
し、この掘削孔6内に鉄筋カゴ3を吊降ろし、コンクリ
ート5を打設して鉄筋コンクリート製のパネルを形成す
るものである。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 is a plan view showing a first embodiment of a method for constructing an underground continuous wall according to the present invention, in which 1 is a leading element, 2 is a following element, all of which are stabilized by an underground continuous wall excavating machine. An excavation hole 6 is formed to a predetermined size using the liquid, a reinforced cage 3 is suspended in the excavation hole 6, and concrete 5 is cast to form a reinforced concrete panel.
【0015】本発明は例えば先行エレメント1におい
て、鉄筋カゴ3は両端に仕切板9を有するものである
が、この鉄筋カゴ3の仕切板9間で地山側Aの面を不透
水性シート12で、掘削側Bの面を透水性シート4でそ
れぞれ囲み、この内側にコンクリート5を打設するもの
とする。In the present invention, for example, in the preceding element 1, the reinforcing bar 3 has partition plates 9 at both ends, and the surface on the ground side A between the partition plates 9 of the reinforcing bar 3 is impermeable by a water-impermeable sheet 12. The surface of the excavation side B is surrounded by the water permeable sheet 4 and concrete 5 is cast inside the surface.
【0016】また、鉄筋カゴ3は縦筋と横筋の格子体を
並列させ、掘削孔6の幅方向で組立部材7で連結してな
るが、この組立部材7にはアングル材を使用するとし
て、図4に示すように止水ゴム板等の止水板8をこの組
立部材7が貫通するように鍔状に設けた。The reinforcing bar 3 is formed by arranging grids of vertical bars and horizontal bars and connecting them by an assembling member 7 in the width direction of the excavation hole 6. As shown in FIG. 4, a water-stop plate 8 such as a water-stop rubber plate is provided in a flange shape so that the assembly member 7 penetrates.
【0017】図示の例では止水板8は一本の組立部材7
にしか取り付けたものを示していないが、すべての組立
部材7に取り付けるものとする。さらに、一本の組立部
材7に取り付ける止水板8の数も間隔を存して複数あっ
てもよい。In the illustrated example, the water stop plate 8 is a single assembly member 7.
Although it is not shown, only it is attached to all the assembly members 7. Further, the number of the water stop plates 8 attached to one assembly member 7 may be plural at intervals.
【0018】このようにして、前記仕切板9と不透水性
シート12および透水性シート4で囲われた部分の内側
にコンクリート5を打設すれば鉄筋コンクリート製のパ
ネルが形成される。なお、この不透水性シート12は鋼
板等の硬質なものとは異なりコンクリート5の側圧によ
り掘削壁面(地山)に密着するので、地山との間に空隙
を生じるおそれはない。In this manner, a reinforced concrete panel is formed by placing concrete 5 inside the portion surrounded by the partition plate 9, the impermeable sheet 12 and the permeable sheet 4. Note that, unlike the hard sheet such as a steel plate, the water-impermeable sheet 12 comes into close contact with the excavated wall surface (the ground) due to the lateral pressure of the concrete 5, so that there is no possibility that a gap is formed between the sheet and the ground.
【0019】また、鉄筋カゴ3を構成する掘削孔6の幅
方向での組立部材7に鍔状に設けた止水板8はコンクリ
ート5中に埋設され、これにより地山側Aから掘削側B
へ組立部材7に沿って発生する漏水をこの止水板8で阻
止する。Further, a water stop plate 8 provided in a flange shape on an assembling member 7 in the width direction of the excavation hole 6 constituting the rebar cage 3 is buried in the concrete 5, whereby the ground side A to the excavation side B
Water leakage generated along the assembling member 7 is prevented by the water stop plate 8.
【0020】ところで、先行エレメント1を施工した後
は後行エレメント2を施工してパネルを連続させること
になるが、この後行エレメント2の施工でも鉄筋カゴ3
の地山側Aを不透水性シート12で、掘削側Bを透水性
シート4でそれぞれ覆い、同様の不透水性の遮水膜を形
成すればよい。By the way, after the preceding element 1 is constructed, the succeeding element 2 is constructed to continue the panel.
The ground side A may be covered with the water-impermeable sheet 12 and the excavation side B may be covered with the water-permeable sheet 4 to form a similar water-impermeable water-blocking film.
【0021】この場合、後行エレメント2の鉄筋カゴ3
には仕切板がないので、不透水性シート12および透水
性シート4が鉄筋カゴ3の挿入と同時に掘削孔6内に挿
入して行き、先行エレメント1の鉄筋継ぎ手に端部を固
定するなどのことが考えられる。In this case, the rebar cage 3 of the following element 2
Since there is no partition plate, the water-impermeable sheet 12 and the water-permeable sheet 4 are inserted into the excavation hole 6 at the same time as the insertion of the rebar cage 3, and the ends are fixed to the rebar joint of the preceding element 1. It is possible.
【0022】図2は本発明の第2実施例を示すもので、
先行エレメント1の鉄筋カゴ3は仕切板9間で鉄筋カゴ
3の少なくとも地山側Aの面を鋼板10で覆うものとす
る。また、鉄筋カゴ3の掘削側Bは前記第1実施例と同
じく、透水性シート4で覆うようにする。FIG. 2 shows a second embodiment of the present invention.
The reinforcing bar 3 of the preceding element 1 covers at least the surface A on the ground side between the partition plates 9 with the steel plate 10. The excavation side B of the rebar cage 3 is covered with the water permeable sheet 4 as in the first embodiment.
【0023】前記鋼板10には、適宜な大きさや間隔で
窓孔11を形成しておく。Window holes 11 are formed in the steel plate 10 at appropriate sizes and intervals.
【0024】このようにして、前記仕切板9と鋼板10
および透水性シート4で囲われた部分の内側にコンクリ
ート5を打設すれば鉄筋コンクリート製のパネルが形成
されるが、地山側に鋼板10を配置することで壁面全体
としての漏水を押さえ、止水性を大幅に向上させること
ができる。In this way, the partition plate 9 and the steel plate 10
If concrete 5 is cast inside the portion surrounded by the water permeable sheet 4, a reinforced concrete panel is formed. However, by arranging the steel plate 10 on the ground side, water leakage as the whole wall surface is suppressed, Can be greatly improved.
【0025】なお、鋼板10と掘削孔6の孔壁との間に
空隙が生じるおそれがあるが、窓孔11からコンクリー
ト5が地山と鋼板10の間に充填され、かかる空隙を充
填する。Although a gap may be formed between the steel plate 10 and the hole wall of the excavation hole 6, the concrete 5 is filled between the ground and the steel plate 10 through the window hole 11 to fill the gap.
【0026】なお、前記第1、第2実施例のいずれの場
合でも掘削側Bの透水性シート4で覆えば地下連続壁表
面のコンクリートが平滑になり、かつ、強度も増すの
で、壁面の「はつり」や洗浄作業が省力化できる。In any of the first and second embodiments, if the surface of the underground continuous wall is covered with the water-permeable sheet 4 on the excavation side B, the concrete becomes smooth and the strength increases. Labor and washing operations can be saved.
【0027】[0027]
【発明の効果】以上述べたように本発明の地下連続壁の
施工法は、壁間以外の一般部分の遮水効果を飛躍的に向
上させることができ、その結果として止水注入などの補
修作業をほとんどなくすことができるものである。As described above, the method for constructing an underground continuous wall according to the present invention can dramatically improve the water shielding effect of a general portion other than between the walls, and as a result, repair such as injection of water stoppage. Work can be almost eliminated.
【図1】本発明の地下連続壁の施工法の第1実施例を示
す平面図である。FIG. 1 is a plan view showing a first embodiment of a method for constructing an underground continuous wall according to the present invention.
【図2】本発明の地下連続壁の施工法の第2実施例を示
す平面図である。FIG. 2 is a plan view showing a second embodiment of the method for constructing an underground continuous wall according to the present invention.
【図3】止水板の配置を示す側面図である。FIG. 3 is a side view showing an arrangement of a water stop plate.
1…先行エレメント 2…後行エレメ
ント 3…鉄筋カゴ 4…透水性シー
ト 5…コンクリート 6…掘削孔 7…組立部材 8…止水板 9…仕切板 10…鋼板 11…窓孔 12…不透水性
シートDESCRIPTION OF SYMBOLS 1 ... Leading element 2 ... Trailing element 3 ... Rebar cage 4 ... Water permeable sheet 5 ... Concrete 6 ... Drilling hole 7 ... Assembly member 8 ... Water stop plate 9 ... Partition plate 10 ... Steel plate 11 ... Window hole 12 ... Water impermeability Sheet
Claims (4)
いて所定の寸法に掘削し、孔内に鉄筋カゴを吊降ろし、
コンクリートを打設して鉄筋コンクリート製のパネルを
形成する地下連続壁の施工法において、仕切板間で鉄筋
カゴの地山側面を不透水性シートで覆い、また、掘削側
面を透水性シートで覆い、この内側にコンクリートを打
設することを特徴とした地下連続壁の施工法。An excavation machine for an underground continuous wall is used to excavate to a predetermined size using a stabilizing liquid, and a reinforcing cage is suspended in a hole,
In the construction method of the continuous underground wall which casts concrete to form a reinforced concrete panel, the ground side of the reinforced basket is covered with an impermeable sheet between the partition plates, and the excavated side is covered with a permeable sheet, An underground continuous wall construction method characterized by casting concrete inside this.
いて所定の寸法に掘削し、孔内に鉄筋カゴを吊降ろし、
コンクリートを打設して鉄筋コンクリート製のパネルを
形成する地下連続壁の施工法において、仕切板間で鉄筋
カゴの少なくとも地山側面を鋼板で覆い、この鋼板の内
側にコンクリートを打設することを特徴とした地下連続
壁の施工法。2. Excavation to a predetermined size using a stabilizing liquid by an excavating machine for underground continuous wall, suspending a steel cage in a hole,
In the method of constructing a reinforced concrete panel by casting concrete to form a reinforced concrete panel, at least the ground side of the reinforced basket is covered with a steel plate between partition plates, and concrete is cast inside the steel plate. Construction method for underground continuous walls.
載の地下連続壁の施工法。3. The method for constructing an underground continuous wall according to claim 2, wherein window holes are appropriately provided in the steel plate.
組立部材に、止水板をこの組立部材が貫通するように鍔
状に設けた請求項1乃至請求項3のいずれかに記載の地
下連続壁の施工法。4. The watertight plate is provided in a flange shape so that the assembly member passes through the assembly member in the width direction of the excavation hole constituting the reinforcing bar cage. Construction method of underground continuous wall.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5111538A JP2732009B2 (en) | 1993-05-13 | 1993-05-13 | Construction method of underground continuous wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5111538A JP2732009B2 (en) | 1993-05-13 | 1993-05-13 | Construction method of underground continuous wall |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH06322748A JPH06322748A (en) | 1994-11-22 |
| JP2732009B2 true JP2732009B2 (en) | 1998-03-25 |
Family
ID=14563904
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP5111538A Expired - Lifetime JP2732009B2 (en) | 1993-05-13 | 1993-05-13 | Construction method of underground continuous wall |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2732009B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101037774B1 (en) | 2008-09-16 | 2011-05-27 | 박길석 | Connection structure for underground continuous wall construction and underground continuous wall construction method using the same |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20030016030A (en) * | 2001-08-20 | 2003-02-26 | 삼보건설기계 주식회사 | Method of construction and sealing device for ground concrete work |
| KR101219445B1 (en) * | 2011-08-11 | 2013-01-11 | 윤동현 | Construction method for underground wall |
| CN107989025A (en) * | 2017-11-24 | 2018-05-04 | 上海市机械施工集团有限公司 | The construction method of diaphram wall connection structure and diaphram wall |
| CN119593385A (en) * | 2024-11-28 | 2025-03-11 | 上海市基础工程集团有限公司 | A joint bite water-stop reinforced ultra-deep 100-meter milling groove ground wall construction technology |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0421872Y2 (en) * | 1987-06-05 | 1992-05-19 | ||
| JP3002697B2 (en) * | 1991-02-27 | 2000-01-24 | 前田建設工業株式会社 | External waterproof sheet laying method for continuous underground wall |
-
1993
- 1993-05-13 JP JP5111538A patent/JP2732009B2/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101037774B1 (en) | 2008-09-16 | 2011-05-27 | 박길석 | Connection structure for underground continuous wall construction and underground continuous wall construction method using the same |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH06322748A (en) | 1994-11-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2732009B2 (en) | Construction method of underground continuous wall | |
| KR20200026467A (en) | Precast concrete wall structure for underground using steel water-stop | |
| JP3681314B2 (en) | Water stop device used for small-scale continuous wall construction | |
| KR102371284B1 (en) | Slurry wall, construction method for the same and wire mesh assembly | |
| JPH11217824A (en) | Execution method of underground impervious wall | |
| KR102586998B1 (en) | Underground continuous wall panel with reinforced connection part and its construction method | |
| JP2887712B2 (en) | Underground diaphragm wall method | |
| JP2743279B2 (en) | Protection method for buried objects | |
| JP2949595B2 (en) | Continuous underground wall construction method | |
| JP3472867B2 (en) | Underground continuous wall construction method and steel cage with outer shell | |
| JPH06336739A (en) | Construction method of underground continuous wall | |
| JPH0371526B2 (en) | ||
| JP2761531B2 (en) | Construction method of guide for underground diaphragm wall | |
| JP7165022B2 (en) | Water shielding method and water shielding structure for steel sheet pile joints | |
| JPH11323915A (en) | Underground continuous wall construction method and steel cage with outer shell | |
| JPS6136416A (en) | Method of landslide-protecting joint for underground continuous wall | |
| JP2722185B2 (en) | Earth retaining wall core material | |
| JPH062329A (en) | Shoring and cut-off method by underground continuous wall | |
| JPH07233526A (en) | Underground wall | |
| JP6999483B2 (en) | Guide wall and how to build a guide wall | |
| JP3002788B2 (en) | Construction method of reference pile for high rigidity foundation | |
| JPS63125724A (en) | Construction method of underground continuous wall | |
| JPS63522A (en) | Underground continuous wall | |
| JP6374736B2 (en) | Underground structure and construction method of underground structure | |
| JPH05118030A (en) | Continuous underground wall made of steel and constructing method thereof |