Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP2733009B2 - Tube demagnetization method - Google Patents
[go: Go Back, main page]

JP2733009B2 - Tube demagnetization method - Google Patents

Tube demagnetization method

Info

Publication number
JP2733009B2
JP2733009B2 JP25606993A JP25606993A JP2733009B2 JP 2733009 B2 JP2733009 B2 JP 2733009B2 JP 25606993 A JP25606993 A JP 25606993A JP 25606993 A JP25606993 A JP 25606993A JP 2733009 B2 JP2733009 B2 JP 2733009B2
Authority
JP
Japan
Prior art keywords
magnetostrictive
demagnetizing
stress
measurement
demagnetization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP25606993A
Other languages
Japanese (ja)
Other versions
JPH07110271A (en
Inventor
安雄 小川
謙司 清水
▲隆▼司 黒田
禎明 境
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Engineering Corp
Original Assignee
Nippon Kokan Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Kokan Ltd filed Critical Nippon Kokan Ltd
Priority to JP25606993A priority Critical patent/JP2733009B2/en
Publication of JPH07110271A publication Critical patent/JPH07110271A/en
Application granted granted Critical
Publication of JP2733009B2 publication Critical patent/JP2733009B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Measuring Fluid Pressure (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、管に対して非接触式で
磁歪応力測定を行うための管の脱磁方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for demagnetizing a tube for measuring magnetostrictive stress in a non-contact manner on the tube.

【0002】[0002]

【従来の技術】ガスの配管系などに用いられる鋼管は、
長い年月にわたって土壌中に埋設されて用いられる。地
盤沈下や地表を走行する車両などからの荷重によって、
鋼管には曲げ応力が発生する。大きな曲げ応力が発生し
た状態が継続されると、鋼管は応力腐食割れなどによっ
て破損するおそれがある。鋼管の破損を予防する診断の
ためには、鋼管に作用している曲げ応力を測定する必要
がある。
2. Description of the Related Art Steel pipes used for gas piping systems and the like are:
It is used buried in soil for many years. Due to land subsidence or load from vehicles running on the ground,
A bending stress occurs in the steel pipe. If a state in which a large bending stress is generated continues, the steel pipe may be damaged by stress corrosion cracking or the like. For diagnosis to prevent steel pipe breakage, it is necessary to measure the bending stress acting on the steel pipe.

【0003】一般的に応力を測定する方法としては、被
検査物体の表面に予め歪みゲージを貼付け、歪みを検出
して応力に換算する方法や、鋼管に応力が発生すると、
鋼管の結晶格子が歪み、この結晶格子によって回析され
るX線の角度が変化するのを検出するX線装置を用いる
方法などがある。
In general, as a method of measuring a stress, a method of pasting a strain gauge on the surface of an object to be inspected and detecting a strain to convert the stress into a stress, or a method in which a stress is generated in a steel pipe, include:
There is a method using an X-ray apparatus for detecting that the crystal lattice of the steel pipe is distorted and the angle of the X-ray diffracted by the crystal lattice changes.

【0004】しかし、鋼管が敷設されている現場におい
て、容易に応力を測定することができる方法として磁歪
応力測定法が知られている。磁歪応力測定法は、鋼管の
透磁率の変化が応力に比例するという原理を利用する。
すなわち、鋼管が磁化された程度を検出コイルで電圧値
として取出し、この値が応力値と比例することから応力
を測定する。
However, a magnetostrictive stress measurement method is known as a method for easily measuring stress at a site where a steel pipe is laid. Magnetostrictive stress measurement uses the principle that the change in permeability of a steel pipe is proportional to the stress.
That is, the degree of magnetization of the steel pipe is taken out as a voltage value by the detection coil, and the stress is measured because this value is proportional to the stress value.

【0005】しかしながら、鋼管の磁歪応力を測定する
のに先立ち、その鋼管が地磁気などによってすでに磁化
しているときには、測定結果に誤差を生じることになる
ので、鋼管の磁歪応力を測定すべき領域の脱磁を行う必
要がある。
However, prior to measuring the magnetostrictive stress of the steel pipe, if the steel pipe is already magnetized due to geomagnetism or the like, an error occurs in the measurement result. Demagnetization must be performed.

【0006】図6は、磁歪応力測定装置を用いて、鋼管
1の周方向について磁歪センサ2の出力を測定するため
の構成を示す。磁歪センサ2、脱磁用マグネット4など
を搭載した台車が走行するためのレールを鋼管1に取付
ける。走行モータを駆動させることによって台車をレー
ルに沿って走行させ、鋼管1の周方向について磁歪応力
の測定を行う。制御装置は、磁歪センサ2から出力され
たデータの処理、台車の走行制御など磁歪応力測定装置
全体の制御を行う。表示器は測定データなどの表示を行
う。また、レールを管軸方向に移動させ、複数位置で測
定を行う。
FIG. 6 shows a configuration for measuring the output of the magnetostrictive sensor 2 in the circumferential direction of the steel pipe 1 using the magnetostrictive stress measuring device. A rail on which a truck on which a magnetostrictive sensor 2, a demagnetizing magnet 4 is mounted, and the like travels is attached to the steel pipe 1. The bogie is run along the rails by driving the running motor, and the magnetostrictive stress is measured in the circumferential direction of the steel pipe 1. The control device controls the entire magnetostrictive stress measurement device, such as processing of data output from the magnetostrictive sensor 2 and running control of the bogie. The display displays measurement data and the like. In addition, the rail is moved in the pipe axis direction, and measurement is performed at a plurality of positions.

【0007】前述のように、鋼管1の磁歪応力を測定す
るのに先立ち、脱磁を行う必要がある。その場合、図6
で示されるように、測定点P1〜Pnを鋼管1の円周上
に角度θ=5°ずつ毎に設ける。次に磁歪応力測定装置
は、各測定点P1〜Pnに脱磁用マグネット4が順次到
達するように台車を移動させる。各測定点P1〜Pnに
おいて、脱磁用マグネット4に、図7で示されるように
電流を流し、徐々に小さくなって零になる交流磁場を発
生させ脱磁を行う。このようにして、測定点P1〜Pn
においてまず脱磁処理を行いながら、台車は鋼管を一周
する。
As described above, demagnetization must be performed before measuring the magnetostrictive stress of the steel pipe 1. In that case, FIG.
, Measurement points P1 to Pn are provided on the circumference of the steel pipe 1 at every angle θ = 5 °. Next, the magnetostrictive stress measuring device moves the bogie so that the demagnetizing magnets 4 sequentially reach the measurement points P1 to Pn. At each of the measurement points P1 to Pn, a current is applied to the demagnetizing magnet 4 as shown in FIG. 7 to generate an alternating magnetic field that gradually decreases to zero, thereby performing demagnetization. In this way, the measurement points P1 to Pn
At first, the bogie goes around the steel pipe while performing demagnetization processing.

【0008】次に、磁歪応力測定装置は、脱磁処理が行
われた測定点P1〜Pnに磁歪センサ2が逆まわりに到
達するように台車を移動させ、各測定点P1〜Pnにお
いて磁歪センサ2によって磁歪応力の測定を行う。
Next, the magnetostrictive stress measuring device moves the bogie so that the magnetostrictive sensor 2 reaches the measurement points P1 to Pn subjected to the demagnetization process in the opposite direction. 2, the magnetostrictive stress is measured.

【0009】図8は磁歪応力測定装置における従来の管
の脱磁方法を含む磁歪応力測定方法を示すフローチャー
トである。ステップa1で処理をスタートさせる。ステ
ップa2では、磁歪応力測定装置は脱磁を開始する測定
点P1に脱磁用マグネット4が到達するように台車を移
動させ、脱磁用マグネット4のコイルに図7で示される
ような電流を流し、その電流に対応する交流磁場を発生
させ、鋼管1を励磁し、脱磁処理を行う。次にステップ
a3で台車を周方向Lに角度θ=5°分移動させる。次
にステップa4では、脱磁開始地点であるか否かの判断
を行い、脱磁開始地点でなければステップa2に戻り、
前述の脱磁処理を行う。このようにして、ステップa2
〜a4の処理を繰返し、脱磁マグネット4が順次測定点
P1〜Pnに到達するように台車を移動させ、各測定点
P1〜Pnにおいて脱磁処理を行う。以上のようにし
て、台車は鋼管1を一周し、脱磁マグネット4は、脱磁
開始地点P1に戻る。
FIG. 8 is a flowchart showing a magnetostrictive stress measuring method including a conventional method of demagnetizing a pipe in a magnetostrictive stress measuring apparatus. The process is started in step a1. In step a2, the magnetostrictive stress measuring device moves the bogie so that the demagnetizing magnet 4 reaches the measurement point P1 at which demagnetization starts, and supplies a current as shown in FIG. Then, an AC magnetic field corresponding to the current is generated to excite the steel pipe 1 and perform a demagnetization process. Next, at step a3, the carriage is moved in the circumferential direction L by an angle θ = 5 °. Next, in step a4, it is determined whether or not it is a demagnetization start point, and if not, the process returns to step a2.
The demagnetization process described above is performed. Thus, step a2
The process of ~ a4 is repeated, the carriage is moved so that the demagnetizing magnet 4 sequentially reaches the measuring points P1 to Pn, and the demagnetizing process is performed at each of the measuring points P1 to Pn. As described above, the bogie makes a round of the steel pipe 1, and the demagnetizing magnet 4 returns to the demagnetizing start point P1.

【0010】次にステップa5に移り磁歪応力測定装置
は、図6で示される脱磁用マグネット4と磁歪センサ2
との間隔t分だけ台車を周方向Lに移動させる。すなわ
ち、磁歪センサ2は脱磁開始地点の測定点P1に到達
し、この地点を測定開始地点とする。次にステップa6
において、磁歪センサ2によって磁歪応力の測定を行
う。次にステップa7では、脱磁処理を行うときと反対
の周方向Mに角度θ=5°分台車を移動させる。すなわ
ち磁歪センサ2を測定点Pnに移動させる。
Next, the process proceeds to step a5, where the magnetostrictive stress measuring device includes the demagnetizing magnet 4 and the magnetostrictive sensor 2 shown in FIG.
Is moved in the circumferential direction L by the interval t. That is, the magnetostrictive sensor 2 reaches the measurement point P1 at the demagnetization start point, and sets this point as the measurement start point. Next, step a6
, The magnetostrictive stress is measured by the magnetostrictive sensor 2. Next, in step a7, the carriage is moved by an angle θ = 5 ° in the circumferential direction M opposite to that when performing the demagnetization processing. That is, the magnetostrictive sensor 2 is moved to the measurement point Pn.

【0011】次にステップa8に移り、磁歪センサ2の
位置が測定開始地点であるか否かの判断を行い、測定開
始地点でなければステップa6に戻り、前述の磁歪応力
測定処理を行う。このようにしてステップa6〜a8の
処理を繰返し、磁歪センサ2が順次測定点Pn〜P1に
到達するように台車を移動させ、各測定点Pn〜P1に
おいて磁歪応力測定処理を行う。以上のようにして、台
車は鋼管1を一周し、磁歪センサ2を測定開始地点P1
に到達させる。次にステップa9に移り、磁歪応力の測
定を終了し、測定したデータの処理をする。
Next, the process proceeds to step a8, where it is determined whether or not the position of the magnetostrictive sensor 2 is the measurement start point. If not, the process returns to step a6 to perform the above-described magnetostriction stress measurement processing. In this way, the processes of steps a6 to a8 are repeated, the carriage is moved so that the magnetostrictive sensor 2 sequentially reaches the measurement points Pn to P1, and the magnetostriction stress measurement process is performed at each of the measurement points Pn to P1. As described above, the cart goes around the steel pipe 1 and the magnetostrictive sensor 2 is moved to the measurement start point P1.
To reach. Next, the process proceeds to step a9, where the measurement of the magnetostrictive stress is completed, and the measured data is processed.

【0012】[0012]

【発明が解決しようとする課題】前述のように、従来の
鋼管1の磁歪応力測定の前処理の脱磁処理は、各測定点
P1〜Pnにおいて脱磁用マグネット4に電流を流し、
電流を除々に小さくして零にして完了する。この脱磁処
理は、管周に沿って角度θ=5°ピッチで計72箇所毎
において行う必要がある。このため、72箇所において
順次脱磁処理を行うために、脱磁処理に要する時間が、
磁歪応力測定時間の2倍程度になり、磁歪応力測定全体
の効率が低下している。
As described above, in the conventional demagnetization processing for the magnetostrictive stress measurement of the steel pipe 1, current flows through the demagnetizing magnet 4 at each of the measurement points P1 to Pn.
The current is gradually reduced to zero to complete. This demagnetization process needs to be performed at a total of 72 points at a pitch of θ = 5 ° along the circumference of the tube. Therefore, the time required for the demagnetization process to sequentially perform the demagnetization process at 72 locations is
The time is about twice as long as the measurement time of the magnetostrictive stress, and the efficiency of the entire magnetostrictive stress measurement is reduced.

【0013】本発明の目的は、脱磁処理の効率化を図る
ことができる管の脱磁方法を提供することである。
An object of the present invention is to provide a method for demagnetizing a tube which can improve the efficiency of a demagnetization process.

【0014】[0014]

【課題を解決するための手段】本発明は、管の周方向に
磁歪センサを移動して管に作用している応力を測定する
磁歪応力測定のための管の脱磁方法において、脱磁用コ
イルを、予め定める強度以上の交流磁場が発生するよう
に励磁しながら、管の周方向に移動させ、少なくとも管
を一周した位置で、脱磁用コイルから発生する交流磁場
の強度を徐々に小さくして零にすることを特徴とする管
の脱磁方法である。
SUMMARY OF THE INVENTION The present invention relates to a method for demagnetizing a tube for measuring magnetostrictive stress by measuring a stress acting on the tube by moving a magnetostrictive sensor in a circumferential direction of the tube. The coil is moved in the circumferential direction of the tube while exciting so as to generate an AC magnetic field of a predetermined strength or more, and at least at a position around the tube, the intensity of the AC magnetic field generated from the demagnetizing coil is gradually reduced. A method of demagnetizing a tube, characterized in that the tube is demagnetized to zero.

【0015】[0015]

【作用】本発明に従えば、脱磁用コイルを予め定める強
度以上の交流磁場を発生するように励磁しながら、管の
周方向に移動させ、少なくとも管を一周した位置で、脱
磁用コイルから発生する交流磁場の強度を徐々に小さく
して零にする。
According to the present invention, the demagnetizing coil is moved in the circumferential direction of the tube while being excited so as to generate an AC magnetic field having a predetermined strength or more. The intensity of the alternating magnetic field generated from is gradually reduced to zero.

【0016】したがって、管周上の任意の点に注目すれ
ば、脱磁用コイルが通過し、離れていく過程で交流磁場
の強度を徐々に小さくして零にすることに相当し、脱磁
される。すなわち、管周上のすべての点で脱磁を行うこ
とができる。これによって、磁歪測定を行う箇所毎に、
脱磁処理を行う必要がなくなり、脱磁処理の効率化を図
ることができる。
Therefore, focusing on an arbitrary point on the circumference of the tube, the intensity of the AC magnetic field is gradually reduced to zero in the process of passing and leaving the demagnetizing coil, which is equivalent to demagnetizing. Is done. That is, demagnetization can be performed at all points on the pipe circumference. With this, for each location where magnetostriction measurement is performed,
It is not necessary to perform the demagnetization process, and the efficiency of the demagnetization process can be improved.

【0017】[0017]

【実施例】図1は、本発明の一実施例を適用して、脱磁
応力測定装置を用いて鋼管1の周方向について磁歪セン
サ2の出力を測定するための構成を示す。磁歪センサ
2、脱磁用マグネット4などを搭載した台車3が走行す
るためのレール5を鋼管1に取付ける。走行モータ6を
駆動することによって、台車3をレール5に沿って走行
させ、鋼管1の周方向について磁歪応力の測定を行う。
制御装置8は、磁歪センサから出力されたデータの処
理、台車3の走行制御など磁歪応力測定装置全体の制御
を行い、表示器9は、測定データなどの表示を行う。
FIG. 1 shows a configuration for applying an embodiment of the present invention to measure the output of a magnetostrictive sensor 2 in the circumferential direction of a steel pipe 1 using a demagnetizing stress measuring device. A rail 5 on which a truck 3 on which a magnetostrictive sensor 2, a demagnetizing magnet 4, and the like are mounted travels is attached to the steel pipe 1. By driving the traveling motor 6, the carriage 3 travels along the rails 5, and the magnetostrictive stress is measured in the circumferential direction of the steel pipe 1.
The control device 8 controls the entire magnetostrictive stress measuring device such as processing of data output from the magnetostrictive sensor and running control of the bogie 3, and the display 9 displays measurement data and the like.

【0018】図2は、図1で示される磁歪応力測定装置
の概略的な電気的構成を示すブロック図である。マイク
ロコンピュータなどによって実現される処理回路20
は、エンコーダ21からの出力に応答して、台車3の鋼
管1における周方向の位置を検出し、モータ6の駆動を
制御して台車3の走行を制御する。
FIG. 2 is a block diagram showing a schematic electrical configuration of the magnetostrictive stress measuring apparatus shown in FIG. Processing circuit 20 realized by microcomputer or the like
Detects the position of the bogie 3 in the circumferential direction of the steel pipe 1 in response to the output from the encoder 21 and controls the driving of the motor 6 to control the running of the bogie 3.

【0019】またこの処理回路20は、脱磁用マグネッ
ト4のコイルに電流を与え、交流磁場を発生させるなど
して脱磁用マグネット23を制御するとともに磁歪セン
サ2の動作を制御する。
The processing circuit 20 controls the demagnetizing magnet 23 by applying a current to the coil of the demagnetizing magnet 4 to generate an AC magnetic field, and also controls the operation of the magnetostrictive sensor 2.

【0020】前述のように、鋼管1の磁歪応力を測定す
るのに先立ち、脱磁を行う必要がある。本実施例では、
図3で示されるように脱磁用マグネット4を、脱磁開始
点である測定点Q1に設定する。脱磁用マグネット4に
図4で示される一定の交流電流を与え、一定の交流磁場
を発生させて鋼管1を励磁しながら、周方向Lに一定速
度で移動させる。
As described above, it is necessary to demagnetize the steel pipe 1 before measuring the magnetostrictive stress. In this embodiment,
As shown in FIG. 3, the demagnetizing magnet 4 is set to a measurement point Q1 which is a demagnetizing start point. A constant AC current shown in FIG. 4 is applied to the demagnetizing magnet 4 to move the steel tube 1 at a constant speed in the circumferential direction L while exciting the steel tube 1 by generating a constant AC magnetic field.

【0021】脱磁用マグネット4が、鋼管1を一周して
脱磁開始点の測定点Q1に戻ったとき、脱磁コイルの電
流を徐々に小さくして零にする。以上のようにして脱磁
を行うと、たとえば管周上の任意の点に注目すれば、脱
磁用コイルが通過して離れていく過程で交流磁場の強度
を徐々に小さくして零にすることに相当し、脱磁され
る。したがって、管周上のすべての点で脱磁を行うこと
ができる。
When the demagnetizing magnet 4 returns to the measurement point Q1 of the demagnetization start point after making a round of the steel pipe 1, the current of the demagnetizing coil is gradually reduced to zero. When demagnetization is performed as described above, for example, focusing on any point on the tube circumference, the intensity of the AC magnetic field is gradually reduced to zero while the demagnetizing coil passes and separates. It is demagnetized. Therefore, demagnetization can be performed at all points on the pipe circumference.

【0022】次に、図3(b)で示されるように磁歪セ
ンサ2を脱磁開始点の測定点Q1に設定する。この点を
改めて測定開始地点Q1とし、脱磁とは逆まわりに周方
向Mの管周に沿って角度θ=5°ピッチ毎、すなわち測
定点Q1〜Qnにおいて、磁歪応力の測定を行う。
Next, as shown in FIG. 3B, the magnetostrictive sensor 2 is set at the measurement point Q1 at the demagnetization start point. This point is referred to as the measurement start point Q1 again, and the magnetostrictive stress is measured at every angle θ = 5 ° pitch along the circumference of the tube in the circumferential direction M in a direction opposite to the demagnetization, that is, at the measurement points Q1 to Qn.

【0023】図5は、図1で示される磁歪応力測定装置
における本発明の管の脱磁方法を含む磁歪応力測定方法
を示すフローチャートである。ステップb1で処理をス
タートさせる。ステップb2では、磁歪応力測定装置
は、台車3を移動させて、脱磁開始地点の測定点Q1に
脱磁用マグネット4を到達させ、脱磁用マグネット4の
コイルに図4で示される一定の交流電流を与え、この電
流に対応した交流磁場を発生させ、鋼管1を励磁して脱
磁処理を行う。ステップb3において、脱磁用マグネッ
ト4を周方向Lに移動させる。ステップb4において、
現在脱磁を行っている地点が、脱磁開始地点であるか否
かの判断を行い、脱磁開始地点でなければステップb3
に戻り、前述の脱磁処理を続行する。このようにして、
ステップb3〜b4の処理を繰返し、前述の脱磁処理を
行いながら脱磁用マグネット4は管を一周する。ステッ
プb4において、脱磁用マグネット4が脱磁開始地点に
到達すると、台車3を停止させ、ステップb5におい
て、脱磁マグネット4のコイルに流す電流を徐々に小さ
くして零にする。これによって、脱磁処理が終了する。
FIG. 5 is a flowchart showing a method for measuring magnetostrictive stress including the method for demagnetizing a pipe according to the present invention in the magnetostrictive stress measuring apparatus shown in FIG. The process is started in step b1. In step b2, the magnetostrictive stress measuring device moves the carriage 3 so that the demagnetizing magnet 4 reaches the measurement point Q1 at the demagnetization start point, and the fixed magnet shown in FIG. An alternating current is applied, an alternating magnetic field corresponding to the current is generated, and the steel pipe 1 is excited to perform a demagnetization process. In step b3, the demagnetizing magnet 4 is moved in the circumferential direction L. In step b4,
It is determined whether or not the current demagnetization point is the demagnetization start point.
And the above-described demagnetization processing is continued. In this way,
The processes of steps b3 and b4 are repeated, and the demagnetizing magnet 4 goes around the pipe while performing the above-described demagnetizing process. In step b4, when the demagnetizing magnet 4 reaches the demagnetization starting point, the carriage 3 is stopped, and in step b5, the current flowing through the coil of the demagnetizing magnet 4 is gradually reduced to zero. Thus, the demagnetization process ends.

【0024】次にステップb6に移り、磁歪応力測定装
置は、図1で示される脱磁用マグネット4と磁歪センサ
2の間隔t分だけ台車を周方向Lに移動させる。すなわ
ち、磁歪センサ2は、脱磁開始地点を測定開始地点とす
る。
Next, proceeding to step b6, the magnetostrictive stress measuring device moves the bogie in the circumferential direction L by an interval t between the demagnetizing magnet 4 and the magnetostrictive sensor 2 shown in FIG. That is, the magnetostrictive sensor 2 sets the demagnetization start point as the measurement start point.

【0025】次にステップb7において、磁歪センサ2
によって磁歪応力の測定を行う。次にステップb8で
は、脱磁処理を行うときと反対の周方向Mに角度θ=5
°分台車を移動させ、磁歪センサ2を測定点Q2に到達
させる。次にステップb9に移り、磁歪センサ2の位置
が測定開始地点であるか否かの判断を行い、測定開始地
点でなければステップb7に戻り、前述の磁歪応力測定
処理を行う。このようにして、ステップb7〜ステップ
b9の処理を繰返し、台車3を順次移動させて磁歪セン
サ2を測定点Q1〜Qnに到達させ、各測定点Q1〜Q
nにおいて磁歪応力測定処理を行う。以上のように、台
車3は鋼管1を一周し、磁歪センサ2は測定開始地点に
戻る。次にステップb10に移り、磁歪応力の測定を終
了し、測定したデータの処理を行う。
Next, at step b7, the magnetostrictive sensor 2
To measure the magnetostrictive stress. Next, in step b8, the angle θ = 5 in the circumferential direction M opposite to that when performing the demagnetization process.
The cart is moved by an amount of ° to cause the magnetostrictive sensor 2 to reach the measurement point Q2. Next, the process proceeds to step b9, where it is determined whether or not the position of the magnetostrictive sensor 2 is the measurement start point. If not, the process returns to step b7 to perform the above-described magnetostriction stress measurement processing. In this way, the processing of step b7 to step b9 is repeated, and the carriage 3 is sequentially moved so that the magnetostrictive sensor 2 reaches the measurement points Q1 to Qn.
In step n, a magnetostrictive stress measurement process is performed. As described above, the trolley 3 goes around the steel pipe 1 and the magnetostrictive sensor 2 returns to the measurement start point. Next, the process proceeds to step b10, where the measurement of the magnetostrictive stress is completed, and the measured data is processed.

【0026】前述のように、磁歪応力測定を行うことに
よって、磁歪応力測定の前処理としての脱磁処理に要す
る時間は、台車3が鋼管1の周方向Lに一周する時間に
ほぼ相当し、約20秒である。従来は、前述のように磁
歪応力の測定を行う箇所毎に停止して脱磁を行い、すべ
ての脱磁を行うのに約120秒かかっていたので、本発
明の管の脱磁方法を用いることによって脱磁にかかる時
間は、約1/6になる。また、磁歪応力測定全体にかか
る時間は、従来は3分であるけれども、本実施例による
磁歪応力測定全体にかかる時間は約1分20秒であり、
約1/2になる。
As described above, by performing the magnetostrictive stress measurement, the time required for the demagnetization process as a pre-process of the magnetostrictive stress measurement substantially corresponds to the time required for the bogie 3 to make one round in the circumferential direction L of the steel pipe 1. About 20 seconds. Conventionally, it takes about 120 seconds to stop and demagnetize each point where the measurement of magnetostrictive stress is performed as described above, and it takes about 120 seconds to perform all demagnetization. As a result, the time required for demagnetization is reduced to about 1/6. Although the time required for the entire magnetostrictive stress measurement is conventionally 3 minutes, the time required for the entire magnetostrictive stress measurement according to the present embodiment is about 1 minute and 20 seconds.
About 1/2.

【0027】なお、脱磁は一周以上行ってもよい。ま
た、脱磁と測定とを逆方向に行っているけれども、同方
向に行い、管軸方向にレールを移動してから方向を切換
えるようにしてもよい。
The demagnetization may be performed one or more times. Further, although the demagnetization and the measurement are performed in the opposite directions, the directions may be switched after the rails are moved in the tube axis direction.

【0028】[0028]

【発明の効果】以上のように本発明によれば、脱磁用コ
イルを予め定める強度以上の交流磁場を発生させなが
ら、管の周方向に移動させ、少なくとも管を一周した位
置で、脱磁用コイルから発生する交流磁場の強度を徐々
に小さくして零にする。したがって、管の脱磁に要する
時間を大幅に削減することができ、脱磁処理を効率化す
るための管の脱磁方法を提供することができる。
As described above, according to the present invention, the demagnetizing coil is moved in the circumferential direction of the tube while generating an AC magnetic field of a predetermined strength or more, and demagnetized at least at a position around the tube. The intensity of the AC magnetic field generated from the coil is gradually reduced to zero. Therefore, the time required for demagnetization of the tube can be significantly reduced, and a method of demagnetizing the tube for improving the efficiency of the demagnetization process can be provided.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例を適用して、磁歪応力測定装
置を用いて鋼管1の周方向について磁歪センサ2の出力
を測定するための構成を示す。
FIG. 1 shows a configuration for measuring an output of a magnetostrictive sensor 2 in a circumferential direction of a steel pipe 1 by using a magnetostrictive stress measuring device according to an embodiment of the present invention.

【図2】図1で示される磁歪応力測定装置の概略的な電
気的構成を示すブロック図である。
FIG. 2 is a block diagram showing a schematic electrical configuration of the magnetostrictive stress measuring device shown in FIG.

【図3】本発明の管の脱磁方法、磁歪応力測定方法を説
明するための図である。
FIG. 3 is a view for explaining a tube demagnetization method and a magnetostriction stress measurement method of the present invention.

【図4】本発明の脱磁方法における脱磁用マグネット4
に流す電流のタイムチャートである。
FIG. 4 is a demagnetizing magnet 4 used in the demagnetizing method of the present invention.
4 is a time chart of a current flowing through the power supply.

【図5】図1で示される磁歪応力測定装置における本発
明の管の脱磁方法を含む磁歪応力測定方法を示すフロー
チャートである。
FIG. 5 is a flowchart showing a magnetostriction stress measurement method including the tube demagnetization method of the present invention in the magnetostriction stress measurement apparatus shown in FIG.

【図6】従来の管の脱磁方法を説明するための図であ
る。
FIG. 6 is a view for explaining a conventional method of demagnetizing a tube.

【図7】従来の管の脱磁方法における脱磁用マグネット
4に流す電流のタイムチャートである。
FIG. 7 is a time chart of a current flowing through a demagnetizing magnet 4 in a conventional tube demagnetizing method.

【図8】図1で示される磁歪応力測定装置における従来
の管の脱磁方法を含む磁歪応力測定方法を示すフローチ
ャートである。
FIG. 8 is a flowchart showing a magnetostrictive stress measurement method including a conventional pipe demagnetization method in the magnetostrictive stress measurement apparatus shown in FIG.

【符号の説明】[Explanation of symbols]

1 鋼管 2 磁歪センサ 3 台車 4 脱磁用マグネット 5 レール 6 モータ 8 制御装置 9 表示装置 20 処理 21 エンコーダ DESCRIPTION OF SYMBOLS 1 Steel pipe 2 Magnetostrictive sensor 3 Cart 4 Magnet for demagnetization 5 Rail 6 Motor 8 Control device 9 Display device 20 Processing 21 Encoder

───────────────────────────────────────────────────── フロントページの続き (72)発明者 黒田 ▲隆▼司 東京都千代田区丸の内一丁目1番2号 日本鋼管株式会社内 (72)発明者 境 禎明 東京都千代田区丸の内一丁目1番2号 日本鋼管株式会社内 (56)参考文献 特開 平3−186725(JP,A) 特開 昭62−254409(JP,A) 実開 平4−93109(JP,U) ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Kuroda Takashi Tsukasa 1-2-1, Marunouchi, Chiyoda-ku, Tokyo Inside Nippon Kokan Co., Ltd. (72) Inventor Yoshiaki Sakai 1-1-2, Marunouchi, Chiyoda-ku, Tokyo No. Nippon Kokan Co., Ltd. (56) References JP-A-3-186725 (JP, A) JP-A-62-254409 (JP, A) JP-A-4-93109 (JP, U)

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 管の周方向に磁歪センサを移動して管に
作用している応力を測定する磁歪応力測定のための管の
脱磁方法において、 脱磁用コイルを、予め定める強度以上の交流磁場が発生
するように励磁しながら、管の周方向に移動させ、 少なくとも管を一周した位置で、脱磁用コイルから発生
する交流磁場の強度を徐々に小さくして零にすることを
特徴とする管の脱磁方法。
1. A demagnetizing method for a tube for measuring a stress acting on a tube by moving a magnetostrictive sensor in a circumferential direction of the tube, wherein the demagnetizing coil has a predetermined strength or more. While energizing to generate an AC magnetic field, it is moved in the circumferential direction of the tube, and the strength of the AC magnetic field generated from the demagnetizing coil is gradually reduced to zero at least at a position around the tube. The method of demagnetizing the pipe.
JP25606993A 1993-10-13 1993-10-13 Tube demagnetization method Expired - Fee Related JP2733009B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25606993A JP2733009B2 (en) 1993-10-13 1993-10-13 Tube demagnetization method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25606993A JP2733009B2 (en) 1993-10-13 1993-10-13 Tube demagnetization method

Publications (2)

Publication Number Publication Date
JPH07110271A JPH07110271A (en) 1995-04-25
JP2733009B2 true JP2733009B2 (en) 1998-03-30

Family

ID=17287472

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25606993A Expired - Fee Related JP2733009B2 (en) 1993-10-13 1993-10-13 Tube demagnetization method

Country Status (1)

Country Link
JP (1) JP2733009B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PL233194B1 (en) * 2017-11-17 2019-09-30 Centrum Diagnostyki Rurociagow I Aparatury Spolka Z Ograniczona Odpowiedzialnoscia Demagnetizing piston for the pipelines, that force gas or liquid media
KR102020456B1 (en) * 2017-11-28 2019-09-11 한국생산기술연구원 Demagnetizer
CN114113303B (en) * 2021-12-02 2023-08-29 国家石油天然气管网集团有限公司 An internal demagnetization adjustment device for buried pipelines

Also Published As

Publication number Publication date
JPH07110271A (en) 1995-04-25

Similar Documents

Publication Publication Date Title
JP6791270B2 (en) Magnetic material inspection equipment and magnetic material inspection method
JP2014036982A (en) Method and device for width direction centering of coil
CN113970709A (en) A method and system for locating local insulation damage points of subway rails to the ground
JP2733009B2 (en) Tube demagnetization method
RU2029263C1 (en) Method of determining residual voltages in articles from ferromagnetic materials
JPH11304405A (en) Position detecting device and position detecting method using the same
CN219799322U (en) Piston rod direct current detection device
JPH09304345A (en) Magnetic head device
JP2538418Y2 (en) Automatic stress measuring device
JPH06308091A (en) Corrosion inspection device of buried metal pipe and the like
JP3204073B2 (en) Stress measuring method and apparatus utilizing magnetostriction effect
JP3159132B2 (en) Method for measuring stress in steel pipes
JP2800056B2 (en) Non-destructive stress estimation method for buried piping system
EP3990880A1 (en) Non-contact system for monitoring a metallic magnetic structure under dynamic load
JPH06213872A (en) Method for measuring crystal grain diameter of steel plate
JP2000074756A (en) Flange stress measurement device for I-section steel structures
JP3441650B2 (en) Underground thruster position continuous detection device
JP2000055749A (en) Web part stress measurement system for I-shaped steel structure
US20230015343A1 (en) Torque Measurement with Correction of an External Magnetic Field
JPH061195B2 (en) Magnetization using a digital map. Geomagnetic deviation area detection method
JPH11211407A (en) Position detection method for moving device in pipe
JP4634628B2 (en) Degradation diagnosis method for steel
JPH0348738A (en) Torque sensor
JPH06307948A (en) Method for measuring magnetostrictive stress of anticorrosion pipe
JPH08122170A (en) Method for continuously measuring bending stress in longitudinal direction of pipe

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees