JP2733752B2 - Concrete foundation for building and its construction method - Google Patents
Concrete foundation for building and its construction methodInfo
- Publication number
- JP2733752B2 JP2733752B2 JP7179547A JP17954795A JP2733752B2 JP 2733752 B2 JP2733752 B2 JP 2733752B2 JP 7179547 A JP7179547 A JP 7179547A JP 17954795 A JP17954795 A JP 17954795A JP 2733752 B2 JP2733752 B2 JP 2733752B2
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- base material
- spacer
- building
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000010276 construction Methods 0.000 title description 11
- 239000000463 material Substances 0.000 claims description 61
- 125000006850 spacer group Chemical group 0.000 claims description 50
- 238000009415 formwork Methods 0.000 claims description 10
- 238000003780 insertion Methods 0.000 claims description 10
- 230000037431 insertion Effects 0.000 claims description 10
- 238000000034 method Methods 0.000 claims description 9
- 238000005266 casting Methods 0.000 claims description 2
- 238000004080 punching Methods 0.000 claims description 2
- 238000009423 ventilation Methods 0.000 description 7
- 238000005260 corrosion Methods 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
- 239000000057 synthetic resin Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Building Environments (AREA)
Description
【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION
【0001】[0001]
【産業上の利用分野】本発明は、建設用地にコンクリー
ト打設して、長尺連続のコンクリート壁形状になし、そ
の上に土台材を載設固定して、所要の建物を構築するの
に使用する建物用コンクリート基礎と、その施工方法に
関するものである。BACKGROUND OF THE INVENTION The present invention relates to a method for constructing a required building by placing concrete on a construction site to form a long continuous concrete wall, mounting and fixing a base material thereon. The present invention relates to a concrete foundation for a building to be used and a construction method thereof.
【0002】[0002]
【従来の技術】長尺連続のコンクリート壁形状の建物用
コンクリート基礎は、コンクリート型枠を所要間隔をお
いて対向立設した基礎打設枠に、コンクリートを打設し
て成形され、そのコンクリート基礎の上部に土台材を長
手方向に沿って載置固定し、その土台材に所要の建物が
構築されるようになっている。2. Description of the Related Art A concrete foundation for a building having a long continuous concrete wall shape is formed by casting concrete into a foundation placing frame in which concrete forms are opposed to each other at a required interval, and the concrete foundation is formed. A base material is placed and fixed along the longitudinal direction on the upper part of the building, and a required building is constructed on the base material.
【0003】[0003]
【発明が解決しようとする課題】以上の従来のコンクリ
ート基礎は、平坦に連続する上面に、土台材の下面を面
接触させて載置固定する構造のため、そのコンクリート
基礎の上面は平坦な水平面であることが必要になる。従
って、コンクリート打設後にモルタル塗りして平坦水平
面に仕上げる作業が不可欠にして、コンクリート基礎の
仕上げにかなりの手数と時間を要する不具合がある。The above-mentioned conventional concrete foundation has a structure in which the lower surface of the base material is placed and fixed on the continuously continuous upper surface by surface contact, so that the upper surface of the concrete foundation is a flat horizontal surface. It is necessary to be. Therefore, it is indispensable to perform a work of applying mortar and finishing to a flat horizontal surface after placing the concrete, and there is a problem that it takes a considerable amount of time and labor to finish the concrete foundation.
【0004】そして、従来のコンクリート基礎は、基礎
上面と土台材の下面が面接触載置されるので、土台材が
木製の場合は、吸湿定性を有するコンクリートに接触し
て腐食し易くなる難点が存在すると共に、その土台材と
コンクリート基礎間に、建物床下空間の換気を促進する
遊隙が存在しないので、建物床下の換気性が悪く、床下
の強制換気装置等を設けざるを得ないケースがある。In the conventional concrete foundation, since the upper surface of the foundation and the lower surface of the base material are placed in surface contact with each other, when the base material is made of wood, there is a problem that the base material is easily corroded by contact with concrete having a constant moisture absorption property. In addition to the existing, there is no gap between the base material and the concrete foundation to promote ventilation of the space under the floor of the building, so the ventilation under the floor of the building is poor, and there are cases where forced ventilation equipment etc. under the floor must be provided. is there.
【0005】本発明は、以上の従来技術の難点を解消す
る建物用コンクリート基礎と、その施工方法を提供する
ものである。The present invention provides a concrete foundation for buildings which solves the above-mentioned disadvantages of the prior art, and a method for applying the same.
【0006】[0006]
【課題を解決するための手段】以上の技術課題を解決す
る本発明は「長尺連続の壁形状をなすコンクリート壁部
の上部に、土台材を載置固定する建物用コンクリート基
礎において、前記コンクリート壁部の上面に載置する載
置板の下方に、前記コンクリート壁部への挿着脚を突設
して、上面を平坦面になし、かつ、コンクリート打設用
型枠への挾着セット用弾接突部を有する土台材スペーサ
を、所要の間隔を有して前記コンクリート壁部に載設同
定すると共に、共通の土台材を載置する前記土台材スペ
ーサ群のスペーサ上面を同一水平面上に設定し、さら
に、前記スペーサ上面を前記コンクリート壁部のコンク
リート上面より若干量高くし、前記スペーサ上面に土台
材を載設固定する構造」の建物用コンクリート基礎と、According to the present invention, there is provided a concrete foundation for a building in which a base material is placed and fixed on an upper portion of a concrete wall portion having a long continuous wall shape. below the mounting plate to be placed on the upper surface of the wall portion, and projecting the inserted legs to the concrete wall, to a flat surface top and concrete設用
A base material spacer having a resilient contact projection for clamping and setting to a formwork is mounted and identified on the concrete wall at a required interval, and the base material spacer group for mounting a common base material. The upper surface of the spacer is set on the same horizontal plane, and further, the upper surface of the spacer is slightly higher than the upper surface of the concrete of the concrete wall portion, and a foundation material is mounted and fixed on the upper surface of the spacer, ''
【0007】「対向配設したコンクリート型枠間にコン
クリートを打設して、長尺連続のコンクリート壁形状の
建物用コンクリート基礎を施工するにおいて、前記コン
クリート打設後に、前記コンクリート打設面に載置する
載置板の下方に、前記打設コンクリートに挿入する挿着
脚と平坦上面を有し、かつ、前記コンクリート型枠間へ
の挾着セット用弾接突部を有する土台材スペーサ群を、
前記打設コンクリートの上面に所要間隔をおいて載置配
設し、共通の土台材を載置する前記土台材スペーサ群を
前記コンクリート型枠に挾着保持してスペーサ上面を共
通の水平面上になすと共に、前記スペーサ上面を前記打
設コンクリートのコンクリート上面より高く設定し、し
かるのち、前記打設コンクリートを固化して前記コンク
リート型枠を外して建物用コンクリート基礎を成形す
る」建物用コンクリート基礎の施工方法になっている。[0007] In the construction of a concrete foundation for a building having a long continuous concrete wall shape by placing concrete between concrete forms arranged opposite to each other, after placing the concrete, the concrete is placed on the concrete placing surface. below the mounting plate to location, it has a insertion legs and a flat top surface for insertion into the punching setting concrete, and to between said concrete formwork
The base material spacer group having the elastic contact projection for
The base material spacer group for mounting and disposing at a required interval on the upper surface of the cast concrete, and mounting a common base material.
The upper surface of the spacer is placed on a common horizontal plane by being sandwiched and held by the concrete formwork, and the upper surface of the spacer is set higher than the upper surface of the concrete of the cast concrete. Thereafter, the cast concrete is solidified to solidify the concrete. Remove the formwork and form the concrete foundation for the building. "
【0008】即ち、本発明の建物用コンクリート基礎と
その施工方法は、建物用コンクリート基礎の主要部を構
成するコンクリート壁部の上面に、前記構成の土台材ス
ペーサ群を載置して、そのスペーサ上面が単一の水平面
を構成すると共に、そのスペーサ上面をコンクリート壁
部の上面を高く設定し、その土台材スペーサの上に土台
材を載設する構造と施工方法が特徴である。That is, according to the concrete foundation for a building and the method for constructing the same according to the present invention, the base material spacer group having the above-mentioned structure is placed on the upper surface of the concrete wall constituting the main part of the concrete foundation for the building. The top surface constitutes a single horizontal plane, the upper surface of the spacer is set to be higher than the upper surface of the concrete wall, and the base material is placed on the base material spacer and the construction method is characterized.
【0009】[0009]
【作用】以上の構成の本発明の建物用コンクリート基礎
とその施工方法は、コンクリート型枠内に打設したコン
クリートの上面に、前記の土台材スペーサを載置配設
し、その土台材スペーサの上面を単一の水平面になし
て、打設コンクリートより高く設定するので、打設コン
クリートの上面は美麗な水平面の必要がなく、コンクリ
ート基礎の煩雑な上面仕上げ作業が省略できる。そし
て、その土台材スペーサはコンクリート型枠への挾着保
持用の弾性突部を有するので、その弾性突部によってコ
ンクリート型枠間に挾着係止状態にして保持することに
よって、スペーサ上面群を同一水平面にするレベル調整
と、そのレベル調整後の姿勢保持が極めて容易にして的
確にできる特有作用がある。 The concrete foundation for a building according to the present invention having the above-described structure.
And the construction method is to place and dispose the base material spacer on the upper surface of the concrete cast in the concrete formwork, make the upper surface of the base material spacer a single horizontal plane, Since it is set high, the upper surface of the cast concrete does not need to have a beautiful horizontal surface, and the complicated upper surface finishing work of the concrete foundation can be omitted. Soshi
The base material spacer is secured to the concrete formwork.
It has a holding elastic projection, and the elastic projection
To hold it between the concrete forms
Therefore, level adjustment to make the spacer upper surface group the same horizontal plane
It is extremely easy to maintain the posture after adjusting the level.
There is a certain effect that can be surely done.
【0010】そして、その土台材スペーサの上面に載置
した土台材とコンクリート壁部の上面との間に遊隙が確
保され、その遊隙が建物床下の換気孔として機能する。
なお、前記の土台材スペーサは、サイズ・材質と配設間
隔の設定によって、土台材の荷重を耐久性良く担持でき
ると共に、前記の挿着脚をコンクリート壁部へ挿着固定
するので、位置ずれしたり外れるおそれはない。[0010] A play space is secured between the base material placed on the upper surface of the base material spacer and the upper surface of the concrete wall, and the play function as a ventilation hole under the building floor.
The base material spacer can carry the load of the base material with high durability by setting the size / material and the arrangement interval, and the insertion leg is inserted and fixed to the concrete wall portion, so that the position shift is caused. There is no risk of dropping or falling off.
【0011】[0011]
【実施例】以下、実施例に基づいて詳しく説明する。ま
ず、図2を参照して本発明の建物用コンクリート基礎と
その施工方法に用いる土台材スペーサ1の一実施例を説
明する。即ち、土台材スペーサ1は方形状の載置板2
と、載置板2の左右側縁に垂設した側板3からなる合成
樹脂製の逆U字形状の横断面を有する短小ピース材にし
て、建物用コンクリート基礎8のコンクリート壁部9の
コンクリート上面10に覆せて載置し、側板3がコンク
リート壁部9の上端部分の側方にあらわれる形状を有
し、その載置板2には、コンクリート壁部9の打設コン
クリートの水を抜く水抜き孔6が穿設されると共に、コ
ンクリート壁部9の打設コンクリートに挿入着させる挿
着脚4を下面に突設している。そして、載置板2の左右
側縁には、後述する施工方法において、対向立設したコ
ンクリート型枠15に弾接させて挾着保持して仮係止
し、載置板2の上面5を同一平面上に存在させるレベル
調整と、そのレベル調整後の姿勢が極めて容易にして的
確にできるゴム製の弾性凸条7が隆設されている。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a detailed description will be given based on embodiments. First, with reference to FIG. 2, an embodiment of a concrete foundation for a building and a base material spacer 1 used in a method of constructing the same according to the present invention will be described. That is, the base material spacer 1 is a square mounting plate 2
And a short piece made of synthetic resin and having an inverted U-shaped cross section composed of side plates 3 hanging down from the left and right side edges of the mounting plate 2 to form a concrete upper surface of a concrete wall 9 of a concrete foundation 8 for a building. 10, and the side plate 3 has a shape that appears on the side of the upper end portion of the concrete wall portion 9. A hole 6 is formed, and an insertion leg 4 is provided on the lower surface of the concrete wall 9 so as to be inserted into the cast concrete. The left and right side edges of the mounting plate 2 are elastically brought into contact with the concrete form 15 which is erected opposite to each other in a construction method to be described later, and are temporarily held by being pinched and held.
And the level at which the upper surface 5 of the mounting plate 2 is present on the same plane.
Adjustment and posture after level adjustment are extremely easy and
An elastic ridge 7 made of rubber, which can be surely formed, is raised.
【0012】そして、この土台材スペーサ1を用いて、
図1に示す本発明一実施例の建物用コンクリート基礎8
が構成される。即ち、グランド面12から突き出して長
尺連続するコンクリート壁部9を主要部になし、上部に
土台材13を載置して、その上に所要の建物を構築する
建物用コンクリート基礎8において、当該建物の柱14
を立設するポジションのコンクリート壁部9のコンクリ
ート上面10には、図2実施例の土台材スペーサ1が覆
せて載置固定され、この土台材スペーサ1のスペーサ上
面5は、コンクリート上面10より若干量(この実施例
は約3粍)高く設定されている。Then, using this base material spacer 1,
Concrete building foundation 8 according to one embodiment of the present invention shown in FIG.
Is configured. That is, a concrete wall portion 9 protruding from the ground surface 12 is formed as a long continuous concrete wall portion as a main portion, a base material 13 is placed on the upper portion, and a concrete foundation for building 8 on which a required building is constructed is placed. Pillar 14 of building
The base material spacer 1 of FIG. 2 is mounted and fixed on the concrete upper surface 10 of the concrete wall portion 9 at the position where the base material is erected, and the spacer upper surface 5 of the base material spacer 1 is slightly higher than the concrete upper surface 10. (In this example, about 3 mm).
【0013】そして、その土台材スペーサ1は挿着脚4
をコンクリート壁部9に挿入着して固定されると共に、
共通の土台材13を載置するために群をなす土台材スペ
ーサ1のスペーサ上面5は単一の水平面を構成して設定
される。そして、この土台材スペーサ1のスペーサ上面
5に所要の土台材13が載置されて固定され、その上に
所要の建物が構築されると共に、土台材13の下面とコ
ンクリート壁部9のコンクリート上面10との間に、隣
接する土台材スペーサ1の間に連続する遊隙14が、コ
ンクリート基礎8の両側間に貫設されるようになってい
る。Then, the base material spacer 1 is attached to the insertion leg 4.
Into the concrete wall 9 and fixed.
The spacer upper surfaces 5 of the base material spacers 1 forming a group for mounting the common base material 13 are set to form a single horizontal plane. Then, a required base material 13 is placed and fixed on the spacer upper surface 5 of the base material spacer 1, a required building is constructed thereon, and the lower surface of the base material 13 and the concrete upper surface of the concrete wall portion 9 are formed. 10, a continuous gap 14 between the adjacent base material spacers 1 extends between both sides of the concrete foundation 8.
【0014】続いて、図3を参照して本発明の建物用コ
ンクリート基礎の施工方法の一実施例を説明する。即
ち、コンクリート型枠15を対向立設して、その対向間
隔内にコンクリートを打設して図1実施例の建物用コン
クリート基礎8を施工するにおいて、コンクリート型枠
15間に生コンクリート16を打設した直後に、図2実
施例の土台材スペーサ1を所定位置に配設設定する。Next, an embodiment of a method for constructing a concrete foundation for a building according to the present invention will be described with reference to FIG. That is, when the concrete form 15 is erected and the concrete is cast in the space between the concrete form 15 and the concrete foundation 8 for the building of FIG. Immediately after installation, the base material spacer 1 of the embodiment of FIG. 2 is disposed and set at a predetermined position.
【0015】詳しくは、土台材スペーサ1の両側縁に隆
起している弾接凸条7を、対向しているコンクリート型
枠15の内側に圧接させて、土台材スペーサ1をコンク
リート型枠15内に挿入して仮係止保持すると共に、挿
入脚4を生コンクリート16に挿入して、載置板2を生
コンクリート16の生コン上面17上に載置して、載置
板2のスペーサ上面5が生コン上面17より段差Cが生
ずるよう若干量高くして、生コンクリート16の所定ポ
ジションに設定される。[0015] Specifically, the elastic contact projections 7 which are raised on both side edges of the base material spacer 1, and is pressed against the inner side of the concrete form 15 which are opposed, concrete form the foundation member space Sa 1 15 And the insertion leg 4 is inserted into the ready-mixed concrete 16, and the placing plate 2 is placed on the ready-mixed concrete upper surface 17 of the ready-mixed concrete 16. 5 is slightly higher than the ready-mixed concrete upper surface 17 so as to generate a step C, and is set at a predetermined position of the ready-mixed concrete 16.
【0016】そして、続いてレーザービームを応用した
公知の電子レベル具(例えば、株式会社ニコン製の電子
レベルALー50/22)等を用いて、前記配設姿勢の
土台材スペーサ1群のスペーサ上面5が、同一水平面上
に存在するよう調整セットする。そして、生コンクリー
ト16の固化後に、コンクリート型枠15を外して図1
実施例に示す建物用コンクリート基礎8が成形される。Then, using a well-known electronic level tool (for example, an electronic level AL-50 / 22 manufactured by Nikon Corporation) or the like to which a laser beam is applied, the spacer of the base material spacer 1 group in the above-mentioned arrangement posture is used. The upper surface 5 is adjusted and set so as to be on the same horizontal plane. Then, after the ready-mixed concrete 16 is solidified, the concrete form 15 is removed, and FIG.
The concrete foundation 8 for a building shown in the embodiment is formed.
【0017】以上の実施例の建物用コンクリート基礎と
その施工方法は、前記の作用があり、コンクリート基礎
の上面の煩雑な「モルタル仕上げによる水平仕上げ作
業」が無用になると共に、コンクリート壁面9のコンク
リート上面に載置散設する土台材スペーサ1のスペーサ
上面5の水平出しは、前記の水平出しツール等によって
極めて簡便にできるので、コンクリート基礎8の成形工
事が簡素化して能率化する。そして、コンクリート基礎
8の上面と土台材13との間に、連続する遊隙14によ
る換気孔が確保できるので、木製の土台材13の腐食を
防止すると共に、建物床下の換気を活発に促進すること
ができる。The concrete foundation for a building and the method of construction according to the above-described embodiment have the above-mentioned effect, and the complicated "horizontal finishing work by mortar finishing" on the upper surface of the concrete foundation becomes unnecessary. The leveling of the spacer upper surface 5 of the base material spacer 1 placed and scattered on the upper surface can be extremely easily performed by the leveling tool or the like, so that the molding work of the concrete foundation 8 is simplified and streamlined. And since the ventilation hole by the continuous play space 14 can be ensured between the upper surface of the concrete foundation 8 and the base material 13, corrosion of the wooden base material 13 is prevented and ventilation under the building floor is actively promoted. be able to.
【0018】なお、本発明は前記の実施例に限定され
ず、土台材スペーサ1の形状を変更したり、金属製の土
台材スペーサ1にする等の変化がある。It should be noted that the present invention is not limited to the above-described embodiment, and there are changes such as changing the shape of the base material spacer 1 and using a metal base material spacer 1.
【0019】[0019]
【発明の効果】以上の説明のとおり、本発明の建物用コ
ンクリート基礎とその成形方法は建物用コンクリート基
礎の成形性が向上して、能率向上・工期短縮・コスト低
減を図ると共に、建物床下の換気性の向上と木製土台材
の腐食防止を図る諸効果がある。As described above, the concrete foundation for a building and the method of forming the same according to the present invention improve the formability of the concrete foundation for a building, improve the efficiency, shorten the construction period, and reduce the cost. There are various effects to improve ventilation and prevent corrosion of the wooden base material.
【図1】本発明一実施例の建物用コンクリート基礎を示
し、(A)はその斜視図、(B)はその使用状態の斜視
図1A and 1B show a concrete foundation for a building according to an embodiment of the present invention, wherein FIG. 1A is a perspective view thereof, and FIG.
【図2】図1実施例に用いる土台材スペーサを示し、
(A)はその平面図、(B)はその中央縦断面図、
(C)はその横断面図FIG. 2 shows a base material spacer used in the embodiment of FIG. 1;
(A) is its plan view, (B) is its central longitudinal sectional view,
(C) is the cross-sectional view
【図3】図1実施例の建物用コンクリート基礎の施工手
順と施工方法の説明図FIG. 3 is an explanatory view of a construction procedure and a construction method of a concrete foundation for a building in FIG. 1 embodiment.
1 土台材スペーサ 2 載置板 3 側板 4 挿着脚 5 スペーサ上面 6 水抜き孔 7 弾接凸条 8 コンクリート基礎 9 コンクリート壁部 10 コンクリート上面 12 グランド面 13 土台材 14 遊隙 15 コンクリート型枠 16 生コンクリート 17 生コン上面 REFERENCE SIGNS LIST 1 base material spacer 2 mounting plate 3 side plate 4 insertion leg 5 spacer upper surface 6 drain hole 7 elastic contact ridge 8 concrete foundation 9 concrete wall 10 concrete upper surface 12 ground surface 13 base material 14 play gap 15 concrete form 16 Ready-mixed concrete 17 Ready-mixed concrete upper surface
Claims (2)
部の上部に、土台材を載置固定する建物用コンクリート
基礎において、前記コンクリート壁部の上面に載置する
載置板の下方に、前記コンクリート壁部への挿着脚を突
設して、上面を平坦面になし、かつ、コンクリート打設
用型枠への挾着セット用弾接突部を有する土台材スペー
サを、所要の間隔を有して前記コンクリート壁部に載設
固定すると共に、共通の土台材を載置する前記土台材ス
ペーサ群のスペーサ上面を同一水平面上に設定し、さら
に、前記スペーサ上面を前記コンクリート壁部のコンク
リート上面より若干量高くし、前記スペーサ上面に土台
材を載設固定する構造を特徴とする建物用コンクリート
基礎。1. A building concrete foundation for mounting and fixing a base material on an upper portion of a concrete wall portion having a long continuous wall shape, wherein a lower portion of a mounting plate mounted on an upper surface of the concrete wall portion is provided. wherein the insertion leg of the concrete wall to protrude, to such a flat surface to the top surface, and concreting
A base material spacer having a resilient contact projection for clamping and setting to a formwork is mounted and fixed on the concrete wall at a required interval, and the base material spacer for mounting a common base material is provided. A concrete structure for a building, wherein the upper surface of the group of spacers is set on the same horizontal plane, the upper surface of the spacer is slightly higher than the upper surface of the concrete of the concrete wall, and a base material is placed and fixed on the upper surface of the spacer. Foundation.
クリートを打設して、長尺連続のコンクリート壁形状の
建物用コンクリート基礎を施工するにおいて、前記コン
クリート打設後に、前記コンクリート打設面に載置する
載置板の下方に、前記打設コンクリートに挿入する挿着
脚と平坦上面を有し、かつ、前記コンクリート型枠間へ
の挾着セット用弾接突部を有する土台材スペーサ群を、
前記打設コンクリートの上面に所要間隔をおいて載置配
設し、共通の土台材を載置する前記土台材スペーサ群を
前記コンクリート型枠に挾着保持してスペーサ上面を共
通の水平面上になすと共に、前記スペーサ上面を前記打
設コンクリートのコンクリート上面より高く設定し、し
かるのち、前記打設コンクリートを固化して前記コンク
リート型枠を外して建物用コンクリート基礎を成形する
ことを特徴とする建物用コンクリート基礎の施工方法。2. Casting concrete between concrete forms arranged opposite to each other, and constructing a concrete foundation for a building having a long continuous concrete wall shape. below the mounting to the mounting plate, it has a insertion legs and a flat top surface for insertion into the punching setting concrete, and to between said concrete formwork
The base material spacer group having the elastic contact projection for
The base material spacer group for mounting and disposing at a required interval on the upper surface of the cast concrete, and mounting a common base material.
The upper surface of the spacer is placed on a common horizontal plane by being sandwiched and held by the concrete formwork, and the upper surface of the spacer is set higher than the upper surface of the concrete of the cast concrete. Thereafter, the cast concrete is solidified to solidify the concrete. A method for constructing a concrete foundation for a building, comprising removing a formwork and forming a concrete foundation for a building.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP7179547A JP2733752B2 (en) | 1995-06-22 | 1995-06-22 | Concrete foundation for building and its construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP7179547A JP2733752B2 (en) | 1995-06-22 | 1995-06-22 | Concrete foundation for building and its construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH094074A JPH094074A (en) | 1997-01-07 |
| JP2733752B2 true JP2733752B2 (en) | 1998-03-30 |
Family
ID=16067663
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP7179547A Expired - Lifetime JP2733752B2 (en) | 1995-06-22 | 1995-06-22 | Concrete foundation for building and its construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2733752B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2006226023A (en) * | 2005-02-18 | 2006-08-31 | Yutaka Shimizu | Foundation packing, installation method for foundation packing, and foundation structure |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5441042Y2 (en) * | 1976-08-06 | 1979-12-03 | ||
| JPH0719415U (en) * | 1993-09-14 | 1995-04-07 | 埼玉建設センター事業協同組合 | Structure of foundation and foundation in wooden building |
-
1995
- 1995-06-22 JP JP7179547A patent/JP2733752B2/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2006226023A (en) * | 2005-02-18 | 2006-08-31 | Yutaka Shimizu | Foundation packing, installation method for foundation packing, and foundation structure |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH094074A (en) | 1997-01-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2733752B2 (en) | Concrete foundation for building and its construction method | |
| JP2004520206A (en) | Formwork for precast concrete panels | |
| JPH0782753A (en) | Constructing method for continuous footing | |
| KR200277910Y1 (en) | Assembly Structure of Euro Form for Working Wall Concrete | |
| KR200249907Y1 (en) | Device for adjusting level of a concrete form | |
| JP3182053B2 (en) | Formwork | |
| JPH0637160Y2 (en) | Sleeve fixed hardware | |
| JPS6231553Y2 (en) | ||
| JPH07286332A (en) | Execution method of precast concrete foundation and installation spacer used therefor | |
| JPH048199Y2 (en) | ||
| KR0135882Y1 (en) | Flat tie support | |
| KR200193188Y1 (en) | Beam padestal for temporary fixture | |
| JPS6235808Y2 (en) | ||
| JPH07247685A (en) | Foundation form support | |
| JPS6334036Y2 (en) | ||
| JPH076261Y2 (en) | Floor slab structure | |
| JP2001040875A (en) | Support metal for supporting concrete form | |
| JP2835328B2 (en) | Concrete formwork | |
| JPH0533300Y2 (en) | ||
| JP3024860U (en) | Decorative flat plate floor unit | |
| JPH0235944Y2 (en) | ||
| JPH06248742A (en) | Rc floor slab | |
| JPS60233253A (en) | Construction of concrete floor panel | |
| JPH0128161Y2 (en) | ||
| JPH06136768A (en) | Concrete discard form construction method |