JP2783316B2 - Core embedding device for underground continuous wall - Google Patents
Core embedding device for underground continuous wallInfo
- Publication number
- JP2783316B2 JP2783316B2 JP23913394A JP23913394A JP2783316B2 JP 2783316 B2 JP2783316 B2 JP 2783316B2 JP 23913394 A JP23913394 A JP 23913394A JP 23913394 A JP23913394 A JP 23913394A JP 2783316 B2 JP2783316 B2 JP 2783316B2
- Authority
- JP
- Japan
- Prior art keywords
- core material
- continuous wall
- underground continuous
- core
- embedding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Description
【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION
【0001】[0001]
【産業上の利用分野】本発明は、掘削された孔に地下連
続壁用芯材を埋め込む地下連続壁用芯材埋め込み装置に
関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an apparatus for embedding a core material for an underground continuous wall into an excavated hole.
【0002】[0002]
【従来の技術】地下連続壁の施工に際し、掘削機によっ
て地中に連続して掘削された孔に、クレーンを用いて例
えばH型鋼の芯材を埋め込む技術は知られている。2. Description of the Related Art When constructing an underground continuous wall, there is known a technique in which a core material of, for example, H-section steel is embedded in a hole continuously excavated in the ground by an excavator using a crane.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、クレー
ンを用いる従来技術では、長尺の芯材をクレーンで吊っ
て掘削した孔に入れるためには熟練者が必要であると共
に、危険な作業であった。However, in the prior art using a crane, a skilled worker is required and a dangerous work is required to insert a long core material into a hole excavated by hanging the crane. .
【0004】また、クレーンの作業に伴う作業空間の高
さや場所が必要であり、狭い空間では作業できないとい
う問題がある。[0004] Further, there is a problem that a work space is required to be high and a space required for the work of the crane, and work cannot be performed in a narrow space.
【0005】したがって、本発明は上記の問題点に鑑
み、クレーンを用いないで上部および周囲に空間が少な
い場所で掘削された孔に芯材を埋め込む地下連続壁用芯
材埋め込み装置を提供する事を目的としている。SUMMARY OF THE INVENTION Accordingly, the present invention has been made in view of the above problems, and provides a core material embedding device for an underground continuous wall that embeds a core material in a hole excavated in a place with a small space above and around without using a crane. It is an object.
【0006】[0006]
【課題を解決するための手段】本発明によれば、掘削さ
れた孔に地下連続壁用芯材を埋め込む地下連続壁用芯材
埋め込み装置において、掘削機に隣接して芯材ストック
台車を設け、その芯材ストック台車は複数の芯材を脱着
自在に直立して保持する保持手段を備え、ストック台車
の上部にループ状に構成された吊下げ式モノレールを有
するホイストを設け、そのホイストには芯材を把持する
把持手段を備えると共に、前記の保持手段は前記芯材を
方形に配置するよう構成され、その方形に配置された芯
材の一列が前記モノレールの真下になるよう構成してい
る。According to the present invention, there is provided an underground continuous wall core embedding apparatus for embedding an underground continuous wall core in an excavated hole, wherein a core stock carrier is provided adjacent to the excavator. The core stock truck has a holding means for detachably holding a plurality of core materials in a detachable manner, and a hoist having a hanging type monorail formed in a loop shape is provided on an upper portion of the stock cart, and the hoist is provided in the hoist. A gripping means for gripping the core material is provided, and the holding means is configured to arrange the core material in a square shape, and one row of the core material arranged in the square shape is configured to be directly below the monorail. .
【0007】また、本発明によれば、前記保持手段はチ
ェーンコンベアとそのチェーンコンベア上に配置された
位置決め部材とで構成されている。Further, according to the present invention, the holding means comprises a chain conveyor and a positioning member arranged on the chain conveyor.
【0008】また、本発明によれば、吊り下げ式モノレ
ールに2台のホイストが設けられ、前記の把持手段はリ
フティングマグネットと、芯材の端部にリフティングマ
グネットと係合するアタッチメントとで構成している。Further, according to the present invention, two hoists are provided on a suspended monorail, and the gripping means is constituted by a lifting magnet and an attachment engaged with the lifting magnet at an end of the core material. ing.
【0009】また、本発明によれば、ホイストおよびリ
フティングマグネットの操作は無線による遠隔操作とし
ており、前記掘削機が低空頭全自動3軸杭掘削機であ
る。According to the present invention, the operation of the hoist and the lifting magnet is performed by remote control by radio, and the excavator is a low head fully automatic three-axis pile excavator.
【0010】[0010]
【作用効果の説明】本発明は上記のように構成されてお
り、掘削機に隣接して設けられた芯材ストック台車には
複数の芯材が直立してストック台車上に保持されてお
り、そのストック台車上で方形に並べられている。そし
て、その方形に並べられた一列の芯材の真上にホイスト
のモノレールが来ているので、その一列上にならんでい
る芯材は順次にホイストの把持手段により把持されて直
立状態で吊上げられモノレールにより搬送されて、掘削
機により穿孔された孔の真上に移動して来るので、その
まま埋め込むことができる。The present invention is configured as described above, and a plurality of core members are held upright on the stock truck on a core stock truck provided adjacent to the excavator, It is arranged squarely on the stock trolley. And, since the monorail of the hoist comes directly above the row of cores arranged in a square, the cores arranged in the row are sequentially gripped by the gripping means of the hoist and lifted upright. Since it is transported by the monorail and moves right above the hole drilled by the excavator, it can be embedded as it is.
【0011】また、一列の芯材の埋め込みが終了すれ
ば、ストック台車上でチェーンコンベアを駆動して次の
一列の芯材をモノレールの真下に移動して埋め込み作業
が継続でき、同様にしてストック台車上の芯材がなくな
るまで作業が継続できる。When the embedding of one line of core material is completed, the chain conveyor is driven on the stock truck to move the next line of core material directly below the monorail, and the embedding operation can be continued. Work can be continued until the core material on the cart runs out.
【0012】そして、作業中にもモノレールの上部に芯
材等が突出することがなく、ストック台車と掘削機とは
隣接しているので狭い場所でも容易に作業でき、安全で
ある。Also, the core material and the like do not protrude above the monorail during the work, and the stock truck and the excavator are adjacent to each other, so that the work can be easily performed even in a narrow place, and is safe.
【0013】[0013]
【実施例】以下、図面を参照して、本発明の実施例を説
明する。Embodiments of the present invention will be described below with reference to the drawings.
【0014】図1は本発明にかかる地下連続壁用芯材埋
め込み装置と本出願人による特願平6−5580号にか
かる低空頭全自動3軸杭掘削機とを組合わせた全体斜視
図を例示し、芯材ストック台車1は低空頭全自動3軸杭
掘削機3およびその掘削機のドリルストック台車2と同
一レール4上で互いに連結されている。FIG. 1 is an overall perspective view of a combination of an apparatus for embedding a core material for an underground continuous wall according to the present invention and a fully automatic 3-axis pile excavator according to Japanese Patent Application No. 6-5580 filed by the present applicant. For example, the core stock trolley 1 is connected to a low head fully automatic triaxial pile excavator 3 and a drill stock trolley 2 of the excavator on the same rail 4.
【0015】また、芯材ストック台車1には逆L字状に
形成されたブラケット5が取付けられ、ドリルストック
台車2には同様にブラケット6が固着され、それらのブ
ラケット5、6にはループ状に構成されたモノレール7
がブラケットの下部に取付けられている。なお、符号2
4はパワー台車を示す。An inverted L-shaped bracket 5 is attached to the core stock truck 1, and a bracket 6 is similarly fixed to the drill stock truck 2, and the brackets 5, 6 are loop-shaped. Monorail 7 configured in
Is attached to the bottom of the bracket. Note that reference numeral 2
Reference numeral 4 denotes a power trolley.
【0016】そして、そのモノレール7はループの外側
のレール7bは、図1の背面側を示す図2を参照して、
前記全自動3軸杭掘削機3が穿孔した孔の中心の真上に
くるよう配置され、ループの内側のレール7aは芯材ス
トック台車1に方形に形成された芯材配置の出口1aの
列の真上に来るよう構成されている。なお、符号Aは掘
削地点、符号Bは掘削された孔、符号Cは埋め込み地
点、符号Dはすでに埋め込まれている芯材をそれぞれ示
している。The monorail 7 has a rail 7b outside the loop, and FIG. 2 shows the rear side of FIG.
The fully automatic triaxial pile excavator 3 is arranged just above the center of the drilled hole, and a rail 7a inside the loop is a row of core-arranged outlets 1a formed in the core stock truck 1. It is configured to be directly above. In addition, the code | symbol A has shown the excavation point, the code | symbol B has shown the hole which was excavated, the code | symbol C has shown the embedding point, and the code | symbol D has shown the core material which has already been embedded.
【0017】また、そのモノレール7には第1のホイス
ト9aと第2のホイスト9bとが設けられ、それらのホ
イスト9a、9bにはそれぞれリフティングマグネット
10が懸吊されている。A first hoist 9a and a second hoist 9b are provided on the monorail 7, and a lifting magnet 10 is suspended from each of the hoists 9a and 9b.
【0018】図3は芯材ストック台車1の床部分に設け
られた芯材8を直立した状態で方形に配置して保持する
保持手段の要部を示し、芯材ストック台車1に設けられ
たスプロケット12にはチェーンコンベアのチェーン1
3が係合し、そのチェーン13には保持板14が取付け
られ、その保持板14には複数(例えば5個)の位置決
め部材15が固着されている。FIG. 3 shows a main part of a holding means for arranging and holding the core material 8 provided on the floor portion of the core stock truck 1 in a rectangular shape in an upright state, and is provided on the core stock truck 1. The chain 1 of the chain conveyor is attached to the sprocket 12.
3 are engaged, a holding plate 14 is attached to the chain 13, and a plurality of (for example, five) positioning members 15 are fixed to the holding plate 14.
【0019】また、直立状態に保持する以前の芯材であ
るH型鋼8は例えば図示しないトラック等で搬送されて
チェーンコンベアの端部の保持板14に設けられた位置
決め部材15にほぼ水平に挿入され支持部材16により
支持され、その支持部材16はH型鋼が直立するまで起
こすようスプロケット12と同軸で回動可能に構成され
ている。この支持部材16は図示しない起立手段により
水平位置から直立位置まで回動できる。The H-shaped steel 8, which is the core material before being held upright, is conveyed by, for example, a truck (not shown) and inserted substantially horizontally into a positioning member 15 provided on a holding plate 14 at the end of the chain conveyor. The H-shaped steel is supported by a support member 16 which is rotatable coaxially with the sprocket 12 so that the H-shaped steel stands upright. The support member 16 can be turned from a horizontal position to an upright position by a standing means (not shown).
【0020】以下、作用に付いて説明する。The operation will be described below.
【0021】図4は芯材ストック台車1に方形に配置さ
れたH型鋼8の態様を示し、図において、第5列の真上
にモノレール7aが設けられている。そして、まず第1
のホイスト9aを第5列、Eの上に移動して、リフティ
ングマグネット10を下げてH型鋼8の端部に設けられ
たアタッチメント20に当接させてから通電しホイスト
を巻き上げてH型鋼を吊り上げ、モノレール上を移動し
て、掘削機が穿孔した孔Cに埋め込む。そして、その作
業中に第2のホイスト9bを操作して同様に第5列、D
のH型鋼を吊りあげ、モノレール7上を移動し待機する
(図2参照)。同様の作業を繰返して第5列のH型鋼8
の埋め込みが終了したら(図5参照)、チェーンコンベ
アを駆動し、保持板14を1列分移動させて(図6参
照)、同様の作業を継続すればよい。FIG. 4 shows an embodiment of the H-shaped steel 8 arranged in a square shape on the core stock truck 1. In the figure, a monorail 7a is provided immediately above the fifth row. And first,
Is moved above the fifth row, E, and the lifting magnet 10 is lowered to come into contact with the attachment 20 provided at the end of the H-shaped steel 8, and then the electric current is applied to wind up the hoist to lift the H-shaped steel. Move on the monorail and bury it in the hole C drilled by the excavator. Then, during the operation, the second hoist 9b is operated to similarly operate the fifth row, D
, And move on the monorail 7 to stand by (see FIG. 2). By repeating the same operation, the fifth row of H-section steel 8
Is completed (see FIG. 5), the chain conveyor is driven, the holding plate 14 is moved by one row (see FIG. 6), and the same operation may be continued.
【0022】なお、芯材ストック台車1のストック量を
1日の作業量にしておけば、途中補給がなく便利であ
り、かつ安全である。If the stock amount of the core stock truck 1 is set to the daily work amount, there is no replenishment on the way, which is convenient and safe.
【0023】また、図2において、作業者22は無線送
信機23を有しており、ホイスト9a、9bとリフティ
ングマグネット10とは受信機を介して操作するよう構
成されているので、現場の状況を見ながら遠隔操作で
き、便利で、安全である。In FIG. 2, the worker 22 has a wireless transmitter 23, and the hoists 9a, 9b and the lifting magnet 10 are configured to be operated via a receiver. It is convenient and safe because it can be remotely controlled while watching.
【0024】したがって、高さ方向および周囲の空間が
狭い場合においても、長尺のH型鋼を容易に掘削機が掘
削した孔に埋め込むことができる。Therefore, even in the case where the space in the height direction and the surrounding area is narrow, the long H-shaped steel can be easily embedded in the hole excavated by the excavator.
【0025】[0025]
【発明の効果】本発明は、上記のように構成されている
ので、以下の優れた効果を奏する。The present invention has the following advantages because it is configured as described above.
【0026】(1) 上空および周囲の空間が狭くて
も、地中連続壁用の芯材を埋め込むことができる。 (2) 芯材の移動を遠隔操作できるので安全であり、
2台のホイストを効率よく運転でき生産性がよい。 (3) 芯材の移動を自動化するベースマシンとするこ
とができる。(1) The core material for the underground continuous wall can be embedded even if the space above and around is narrow. (2) It is safe because the movement of the core can be controlled remotely.
Two hoists can be operated efficiently and productivity is good. (3) It can be a base machine that automates the movement of the core material.
【図1】本発明の一実施例を示す芯材埋め込み装置と掘
削機とを示す斜視図。FIG. 1 is a perspective view showing a core embedding apparatus and an excavator according to an embodiment of the present invention.
【図2】図1の背面を示す斜視図。FIG. 2 is a perspective view showing the rear surface of FIG. 1;
【図3】図1の芯材保持手段の要部を示す斜視図。FIG. 3 is a perspective view showing a main part of the core material holding means of FIG. 1;
【図4】芯材ストック台車の芯材ストックの配置例を示
す平面図。FIG. 4 is a plan view showing an example of arrangement of core stock of a core stock truck.
【図5】図4の第5列を使用後の状態を示す図。FIG. 5 is a diagram showing a state after using a fifth column in FIG. 4;
【図6】第1列〜第4列を第2列〜第5列に移動した状
態を示す図。FIG. 6 is a diagram showing a state where the first to fourth rows have been moved to the second to fifth rows.
【図7】H型鋼とアタッチメントとの分解斜視図。FIG. 7 is an exploded perspective view of an H-section steel and an attachment.
1…芯材ストック台車 2…ドリルストック台車 3…掘削機 4…レール 5、6…ブラケット 7…モノレール 8…芯材(H型鋼) 9a、9b…ホイスト 10…リフテティングマグネット 12…スプロケット 13…チェーン 14…保持板 15…位置決め部材 16…支持部材 20…アタッチメント 21…アタッチメント用ボルト 22…作業者 23…無線送信機 24…パワー台車 DESCRIPTION OF SYMBOLS 1 ... Core stock trolley 2 ... Drill stock trolley 3 ... Excavator 4 ... Rail 5, 6 ... Bracket 7 ... Monorail 8 ... Core (H-shaped steel) 9a, 9b ... Hoist 10 ... Lifting magnet 12 ... Sprocket 13 ... Chain DESCRIPTION OF SYMBOLS 14 ... Holding plate 15 ... Positioning member 16 ... Supporting member 20 ... Attachment 21 ... Attachment bolt 22 ... Worker 23 ... Wireless transmitter 24 ... Power cart
───────────────────────────────────────────────────── フロントページの続き (72)発明者 神尾 正博 東京都港区元赤坂一丁目2番7号 鹿島 建設株式会社内 (56)参考文献 特開 平4−238914(JP,A) 特開 平5−202522(JP,A) (58)調査した分野(Int.Cl.6,DB名) E02D 5/18 - 5/20 E02D 13/04──────────────────────────────────────────────────続 き Continuation of front page (72) Inventor Masahiro Kamio 1-2-7 Moto-Akasaka, Minato-ku, Tokyo Kashima Construction Co., Ltd. (56) References JP-A-4-238914 (JP, A) JP-A-Hei 5-202522 (JP, A) (58) Field surveyed (Int. Cl. 6 , DB name) E02D 5/18-5/20 E02D 13/04
Claims (6)
込む地下連続壁用芯材埋め込み装置において、掘削機に
隣接して芯材ストック台車を設け、その芯材ストック台
車は複数の芯材を脱着自在に直立して保持する保持手段
を備え、ストック台車の上部にループ状に構成された吊
下げ式モノレールを有するホイストを設け、そのホイス
トには芯材を把持する把持手段を備えると共に、前記の
保持手段は前記芯材を方形に配置するよう構成され、そ
の方形に配置された芯材の一列が前記モノレールの真下
になるよう構成した事を特徴とする地下連続壁用芯材埋
め込み装置。1. An underground continuous wall core embedding device for embedding an underground continuous wall core material in an excavated hole, wherein a core material stock truck is provided adjacent to the excavator, and the core material stock truck includes a plurality of core stock trucks. Holding means for detachably holding the material upright, a hoist having a suspension type monorail formed in a loop shape at the upper part of the stock truck, and the hoist having gripping means for gripping the core material; The holding means is configured to arrange the core material in a square shape, and one row of the core material arranged in the square shape is arranged directly below the monorail, and the core material embedding for an underground continuous wall is characterized in that: apparatus.
チェーンコンベア上に配置された位置決め部材とで構成
された請求項1に記載の地下連続壁用芯材埋め込み装
置。2. The underground continuous wall core embedding device according to claim 1, wherein said holding means comprises a chain conveyor and a positioning member arranged on the chain conveyor.
を設けた請求項1に記載の地下連続壁用芯材埋め込み装
置。3. The apparatus for embedding a core material for an underground continuous wall according to claim 1, wherein two hoists are provided on the suspended monorail.
トと、芯材の端部にリフティングマグネットと係合する
アタッチメントとで構成した請求項1に記載の地下連続
壁用芯材埋め込み装置。4. The underground continuous wall core material embedding device according to claim 1, wherein said gripping means comprises a lifting magnet and an attachment which is engaged with the lifting magnet at an end of the core material.
の操作は無線による遠隔操作とした請求項1、3、4の
いずれかに記載の地下連続壁用芯材埋め込み装置。5. An apparatus for embedding a core material for an underground continuous wall according to claim 1, wherein the operation of the hoist and the lifting magnet is performed by remote control by radio.
である請求項1に記載の地下連続壁用芯材埋め込み装
置。6. The underground continuous wall core embedding apparatus according to claim 1, wherein the excavator is a low head fully automatic triaxial pile excavator.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP23913394A JP2783316B2 (en) | 1994-10-03 | 1994-10-03 | Core embedding device for underground continuous wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP23913394A JP2783316B2 (en) | 1994-10-03 | 1994-10-03 | Core embedding device for underground continuous wall |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH08100423A JPH08100423A (en) | 1996-04-16 |
| JP2783316B2 true JP2783316B2 (en) | 1998-08-06 |
Family
ID=17040272
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP23913394A Expired - Fee Related JP2783316B2 (en) | 1994-10-03 | 1994-10-03 | Core embedding device for underground continuous wall |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2783316B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN120401540B (en) * | 2025-07-03 | 2025-12-12 | 浙江省水利水电勘测设计院有限责任公司 | Flexible composite impermeable thin wall system and construction method thereof |
-
1994
- 1994-10-03 JP JP23913394A patent/JP2783316B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH08100423A (en) | 1996-04-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2783316B2 (en) | Core embedding device for underground continuous wall | |
| TWI740251B (en) | Low-headroom excavator and assembly method thereof | |
| JPH11310921A (en) | Steel pipe pile driving device and steel pipe pile driving method | |
| JP3308219B2 (en) | Self-propelled all casing construction machine | |
| JP2006125032A (en) | Pile construction machine | |
| JP2848555B2 (en) | Core stock truck in core embedding equipment for underground continuous wall | |
| JP3401704B2 (en) | Hanging transfer device | |
| JP3049406B2 (en) | Handling device and building method using the same | |
| JP2794378B2 (en) | Transport system for large heavy objects such as steam generators in nuclear power plants, apparatus and method therefor | |
| JPH06288189A (en) | Laying method for portal culvert | |
| JP2001207770A (en) | Transporting installing device and transporting installing method for steel pipe press-in device | |
| JP6738779B2 (en) | Pile driver and method of changing the posture of the pile driver | |
| JP2014177798A (en) | Direction changing method of pile rotary press-in machine and pile rotary press-in machine reinstallation method | |
| JP3825516B2 (en) | Vertical shaft segment assembly equipment | |
| JP7519707B2 (en) | Drilling equipment main frame rotation mechanism and rotation method | |
| JP3519320B2 (en) | Shaft excavation equipment | |
| CN215798195U (en) | Steel reinforcement cage loading attachment | |
| JPS63300100A (en) | Heavy goods transport equipment | |
| JPH0881180A (en) | Horizontally mobile crane | |
| JP3351699B2 (en) | Segment feeder | |
| JPH09100629A (en) | Beam member attachment device and beam member attachment method | |
| JP2582633Y2 (en) | Heavy load transporter in tunnel space | |
| JPH05118037A (en) | Excavator | |
| JPH0977475A (en) | Lifting device and lifting transfer method | |
| JPS63184686A (en) | Small hole digging and pillar building working vehicle |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |