JP2807768B2 - Lifting equipment - Google Patents
Lifting equipmentInfo
- Publication number
- JP2807768B2 JP2807768B2 JP13306890A JP13306890A JP2807768B2 JP 2807768 B2 JP2807768 B2 JP 2807768B2 JP 13306890 A JP13306890 A JP 13306890A JP 13306890 A JP13306890 A JP 13306890A JP 2807768 B2 JP2807768 B2 JP 2807768B2
- Authority
- JP
- Japan
- Prior art keywords
- bucket
- emergency stop
- signal
- alarm
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Component Parts Of Construction Machinery (AREA)
Description
【発明の詳細な説明】 [産業上の利用分野] 本発明は、例えば地下タンク内等の地下における掘削
作業により掘削された土砂を地上へ揚げるための揚土装
置に関するものである。DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] The present invention relates to an earth-lifting apparatus for lifting earth and sand excavated by an excavation work underground, for example, in an underground tank.
[従来の技術] 従来、地下における掘削作業により掘削された土砂
は、揚土装置により地上へ引き揚げられ、トラック等に
より所定の場所に運搬されている。このような揚土装置
においては、地下での掘削作業がスムーズに行うことが
できるようにするために、掘削された土砂を迅速にかつ
効率よく引き揚げる必要があり、このため揚土装置のバ
ケットの昇降速度をできるだけ高速にすることが求めら
れている。[Related Art] Conventionally, earth and sand excavated by an excavation work underground is lifted to the ground by an earth-lifting device and transported to a predetermined place by a truck or the like. In such an excavating device, it is necessary to quickly and efficiently excavate excavated earth and sand so that excavation work under the ground can be performed smoothly. It is required that the lifting speed be as high as possible.
[発明が解決しようとする課題] しかしながら、バケットの昇降速度を例えば従来の約
2倍の70m/minの高速に設定した場合、地下の深さ30mの
場所で250m3/hの揚土能率を確保するには1サイクル当
り約2分のバケット操作が必要となる。このため、揚土
作業が30回/時間というきわめて高頻度で行われること
になり、オペレータの疲労が大きくなるばかりでなく、
注意力が散漫になってしまう。この結果、オペレータの
誤判断により、例えば作業範囲内にある建設機械等とバ
ケットとの衝突等の操作ミスを招き、揚土作業が円滑に
かつ迅速に行われなくなるおそれが生じる。[Problems to be Solved by the Invention] However, when the lifting speed of the bucket is set to, for example, 70 m / min, which is about twice as high as the conventional one, the lifting efficiency of 250 m 3 / h at a depth of 30 m underground is obtained. Approximately 2 minutes of bucket operation per cycle is required to secure this. For this reason, the unloading work is performed at a very high frequency of 30 times / hour, which not only increases the operator's fatigue, but also
Attention is distracted. As a result, an erroneous determination by the operator may cause an operation error such as a collision between a construction machine or the like in the work range and a bucket, and may cause a difficulty in quickly and quickly performing the earth discharging work.
本発明は、このような事情に鑑みてなされたものであ
って、その目的は、バケットの昇降速度が高速に設定さ
れても、オペレータによる操作ミスを低減して揚土作業
を円滑にかつ迅速に行うことのできる揚土装置を提供す
ることである。The present invention has been made in view of such circumstances, and an object of the present invention is to reduce the operator's operation mistakes and smoothly and quickly perform the earth unloading work, even if the lifting speed of the bucket is set to high speed. The purpose of the present invention is to provide a lifting device which can be carried out at a time.
[課題を解決するための手段] 前述の課題を解決するために、請求項1の発明は、掘
削した土砂を昇降自在なバケットにより上方へ引き揚げ
る揚土装置において、所定の作業範囲を監視する監視装
置と、前記バケットの位置を検出するバケット位置検出
装置と、警報装置と、前記監視装置及び前記バケット位
置検出装置からの各信号に基づいてバケットの降下を停
止させる必要があると判断したとき、前記警報装置に警
報信号を出力する制御装置とからなり、この制御装置か
らの前記警報信号により前記警報装置が警報を発するこ
とを特徴としている。[Means for Solving the Problems] In order to solve the above-mentioned problems, an invention according to claim 1 is a monitoring device for monitoring a predetermined work range in a lifting device that lifts excavated earth and sand upward by a vertically movable bucket. Device, a bucket position detecting device that detects the position of the bucket, an alarm device, and when it is determined that it is necessary to stop the lowering of the bucket based on each signal from the monitoring device and the bucket position detecting device, A control device for outputting an alarm signal to the alarm device, wherein the alarm device issues an alarm according to the alarm signal from the control device.
また請求項2の発明は、バケット非常停止装置を備
え、前記制御装置は、前記警報信号を出力したときに前
記バケット非常停止装置にもバケット非常停止信号を出
力し、警報を発すると共にバケットを停止させることを
特徴としている。The invention according to claim 2 further includes a bucket emergency stop device, wherein the control device outputs a bucket emergency stop signal to the bucket emergency stop device when outputting the alarm signal, and issues an alarm and stops the bucket. It is characterized by having
更に請求項3の発明は、バケット非常停止装置を備
え、前記制御装置は、前記警報信号を所定時間継続して
出力したときに前記バケット非常停止装置にもバケット
非常停止信号を出力し、警報を発すると共にバケットを
停止させることを特徴としている。The invention according to claim 3 further includes a bucket emergency stop device, wherein the control device outputs a bucket emergency stop signal to the bucket emergency stop device when the alarm signal is continuously output for a predetermined time, and issues an alarm. It is characterized in that it emits light and stops the bucket.
更に請求項4の発明は、掘削した土砂を昇降自在なバ
ケットにより上方へ引き揚げる揚土装置において、所定
の作業範囲を監視する監視装置と、前記バケットの位置
を検出するバケット位置検出装置と、バケット非常停止
装置と、前記監視装置及び前記バケット位置検出装置か
らの各信号に基づいてバケットの降下を停止させる必要
があると判断したとき前記バケット非常停止装置にバケ
ット非常停止信号を出力する制御装置とからなり、この
制御装置からの前記バケット非常停止信号により前記バ
ケット非常停止装置がバケットの降下を非常停止させる
ことを特徴としている。Further, the invention according to claim 4 is a lifting device for lifting up excavated earth and sand by a bucket that can be raised and lowered, a monitoring device for monitoring a predetermined work range, a bucket position detection device for detecting the position of the bucket, and a bucket. An emergency stop device, and a control device that outputs a bucket emergency stop signal to the bucket emergency stop device when it is determined that it is necessary to stop the lowering of the bucket based on each signal from the monitoring device and the bucket position detection device. The bucket emergency stop device performs an emergency stop of the lowering of the bucket in response to the bucket emergency stop signal from the control device.
[作用] このような構成をした請求項1の発明による揚土装置
においては、制御装置が、監視装置及び前記バケット位
置検出装置からの各信号に基づいてバケットの降下を停
止させる必要があると判断したとき、前記警報装置に警
報信号を出力するので、警報装置が警報を発する。この
ため、オペレータはバケットを降下させてはならないこ
とに気づき、バケットの降下を停止すると共に、作業範
囲内にいる他の人はバケットが下降することを認識す
る。[Operation] In the lifting device according to the first aspect of the present invention having such a configuration, the control device needs to stop the lowering of the bucket based on each signal from the monitoring device and the bucket position detecting device. When it is determined, an alarm signal is output to the alarm device, and the alarm device issues an alarm. For this reason, the operator realizes that the bucket must not be lowered, stops the lowering of the bucket, and others within the working range recognize that the bucket is lowering.
また、請求項2の発明では、警報を発すると共に制御
装置によりバケットの降下が自動的に停止される。その
場合請求項3の発明では、警報が所定時間継続的に発せ
られたときに、制御装置によりバケットの降下が自動的
に停止される。According to the second aspect of the present invention, an alarm is issued and the lowering of the bucket is automatically stopped by the control device. In this case, the lowering of the bucket is automatically stopped by the control device when the alarm is continuously issued for a predetermined time.
更に請求項4の発明では、制御装置が、監視装置及び
前記バケット位置検出装置からの各信号に基づいてバケ
ットの降下を停止させる必要があると判断したとき、前
記バケット非常停止装置に非常停止信号を出力するの
で、バケット非常停止装置がバケットを非常停止させ
る。このため、オペレータはバケットを降下させてはな
らないことに気づかなくても、バケットの降下は自動的
に停止される。Further, in the invention according to claim 4, when the control device determines that it is necessary to stop the lowering of the bucket based on the respective signals from the monitoring device and the bucket position detecting device, an emergency stop signal is transmitted to the bucket emergency stop device. Is output, so that the bucket emergency stop device makes the bucket emergency stop. For this reason, the lowering of the bucket is automatically stopped even if the operator does not notice that the bucket should not be lowered.
[実施例] 以下、図面を用いて本発明の実施例を説明する。Embodiment An embodiment of the present invention will be described below with reference to the drawings.
第1図は本発明にかかる揚土装置の一実施例を用いた
地下掘削作業のシステムを概略的に示す全体概要図であ
り、第2図はこの実施例の揚土装置の拡大図である。図
中、1は揚土装置、2は支柱、3は横梁、4は移動台
車、5はウィンチ、6はワイヤケーブル、7はクラムシ
ェルのバケット、8は雲台、9は監視用カメラ、10はカ
メラ位置制御及び検出装置、11はバケット位置検出装
置、12は画像処理装置、13は制御装置、14は地下レベル
設定装置、15はバケット非常停止装置、16は警報装置で
ある。FIG. 1 is an overall schematic diagram schematically showing a system for underground excavation work using an embodiment of a lifting apparatus according to the present invention, and FIG. 2 is an enlarged view of the lifting apparatus of this embodiment. . In the figure, 1 is a lifting device, 2 is a column, 3 is a horizontal beam, 4 is a moving carriage, 5 is a winch, 6 is a wire cable, 7 is a clamshell bucket, 8 is a pan head, 9 is a monitoring camera, 10 Is a camera position control and detection device, 11 is a bucket position detection device, 12 is an image processing device, 13 is a control device, 14 is an underground level setting device, 15 is a bucket emergency stop device, and 16 is an alarm device.
第1図に示すように、例えば地下タンク17を構築する
ために、この地下タンク17の外周上縁に沿ってレールが
付設され、このレール上に揚土装置1が走行可能に載置
されている。この揚土装置1は下端にレール上を走行す
る車輪を有する支柱2を備え、この支柱2の上部に横梁
3が架け渡されている。また横梁3にはその長手方向に
沿って移動可能な移動台車4が配設されており、この移
動台車4には従来と同様にウィンチ5及びワイヤケーブ
ル6を介してクラムシェルのバケット7が吊架されてい
る。As shown in FIG. 1, for example, in order to construct an underground tank 17, a rail is provided along an upper peripheral edge of the underground tank 17, and the unloading device 1 is movably mounted on the rail. I have. The lifting device 1 has a column 2 having wheels running on rails at a lower end, and a cross beam 3 is bridged over the column 2. Further, a movable carriage 4 movable along the longitudinal direction of the cross beam 3 is provided, and a clamshell bucket 7 is suspended on the movable carriage 4 via a winch 5 and a wire cable 6 as in the conventional case. It is suspended.
また横梁3に設けられたオペレータールーム下部には
雲台8を介して監視用カメラ9が配設されていると共
に、カメラ位置制御及び検出装置10が設けられている。
更に横梁3にはバケット位置検出装置11が設けられてい
る。A monitoring camera 9 is provided via a camera platform 8 below the operator room provided on the cross beam 3, and a camera position control and detection device 10 is provided.
Further, the cross beam 3 is provided with a bucket position detecting device 11.
第3図はこの実施例における制御ブロック図である。 FIG. 3 is a control block diagram in this embodiment.
第3図に示すように、監視用カメラ9は画像処理装置
12に接続されており、この画像処理装置12における画像
処理は、パターン認識による方式または色識別による方
式が考えられる。そして、この画像処理装置12は制御装
置13に接続されている。したがって、カメラ9によって
得られた信号は画像処理装置12によって画像処理され、
その処理信号が制御装置13に送られる。同様に、カメラ
位置制御及び検出装置10及びバケット位置検出装置11も
制御装置13に接続されており、カメラ9の位置信号及び
バケット7の位置信号も制御装置13に送られる。As shown in FIG. 3, the monitoring camera 9 is an image processing device.
The image processing in the image processing apparatus 12 may be performed by a pattern recognition method or a color identification method. The image processing device 12 is connected to the control device 13. Therefore, the signal obtained by the camera 9 is subjected to image processing by the image processing device 12, and
The processed signal is sent to the control device 13. Similarly, the camera position control and detection device 10 and the bucket position detection device 11 are also connected to the control device 13, and the position signal of the camera 9 and the position signal of the bucket 7 are also sent to the control device 13.
制御装置13からカメラ位置制御信号がカメラ位置制御
及び検出装置10に出力され、このカメラ位置制御信号に
より、例えば第2図に示すように地面レベル(GL)がA
からBへとなるように地下の掘削が進むにつれてカメラ
9の方向及びカメラ9のズームレンズがコントロールさ
れ、カメラ9の視界が常に一定の範囲を捕らえるように
して検出精度の向上及び死角等による影響をなくすよう
にしている。その場合、ズームコントロールの方法とし
ては、揚土装置1側より深度信号を取り込み、この深度
信号により制御装置13がコントロール信号を出力するこ
とにより、前述のように制御装置13の信号で自動的に行
う方法の他、手動操作によってコントロールすることも
できる。A camera position control signal is output from the control device 13 to the camera position control and detection device 10, and the ground level (GL) is set to A as shown in FIG.
The direction of the camera 9 and the zoom lens of the camera 9 are controlled as the underground excavation progresses from B to B, so that the field of view of the camera 9 always captures a certain range, thereby improving the detection accuracy and the effects of blind spots and the like. I try to eliminate. In this case, as a zoom control method, a depth signal is fetched from the unloading device 1 side, and the control device 13 outputs a control signal based on the depth signal, so that the signal of the control device 13 is automatically used as described above. In addition to the method used, it can be controlled manually.
更に制御装置13には地下レベル設定装置14が接続され
ていて、地下掘削の設定したレベル信号が制御装置13に
送られる。更に、制御装置13にはバケット非常停止装置
15及び警報装置16が接続されている。これにより、制御
装置13は画像処理信号及びバケット位置信号に基づいて
バケット非常停止装置15にバケット非常停止信号を、ま
た警報装置16に警報信号を出力する。Further, an underground level setting device 14 is connected to the control device 13, and a level signal set for underground excavation is sent to the control device 13. Further, the control device 13 includes a bucket emergency stop device.
15 and an alarm device 16 are connected. Thereby, the control device 13 outputs a bucket emergency stop signal to the bucket emergency stop device 15 and an alarm signal to the alarm device 16 based on the image processing signal and the bucket position signal.
次に、このように構成された本実施例の作用について
説明する。Next, the operation of the present embodiment configured as described above will be described.
まず、地下部分の作業範囲に画面を合わせる。すなわ
ち、制御装置13により雲台8及びカメラ9のズームレン
ズをコントロールして、所定の監視範囲、すなわち作業
範囲内になるように画面を合わせる。次に、バケット位
置検出装置11により、バケット7の前後及び上下位置を
検出して現時点でのバケットの位置を計測し、その位置
信号を制御装置13に送る。First, adjust the screen to the working range of the underground part. That is, the control device 13 controls the pan head 8 and the zoom lens of the camera 9 to adjust the screen so as to be within a predetermined monitoring range, that is, a working range. Next, the bucket position detecting device 11 detects the front and rear and up and down positions of the bucket 7 to measure the current position of the bucket, and sends the position signal to the control device 13.
またカメラ9からの信号を画像処理装置12により画像
処理して、作業範囲内の建設機械Mの有無及び建設機械
Mがある場合にはその位置を計測し、その有無及び位置
信号を制御装置13に送る。その場合、画像処理は、画像
処理の方式がパターン認識の方式であると建設機械Mの
形状を認識して記憶し、また色識別による方式であると
建設機械Mの一部に特殊な色の塗料を塗布してCCDカメ
ラでモニターし、画像の濃淡ヒストグラムを測定し、一
定の明るさ以上の濃淡ヒストグラムを対象に2値化を行
い、画像のX−Y斜影データを解析し、一定以上の面積
の境があれば建設機械M等としてその色を検出して記憶
することにより、行われる。Further, a signal from the camera 9 is subjected to image processing by the image processing device 12, and the presence or absence of the construction machine M within the work range and the position of the construction machine M, if any, are measured. Send to In this case, the image processing recognizes and stores the shape of the construction machine M if the image processing method is a pattern recognition method, and if the image processing method is a color recognition method, a part of the construction machine M has a special color. Apply the paint and monitor with a CCD camera, measure the density histogram of the image, perform binarization on the density histogram with a certain brightness or higher, analyze the XY oblique data of the image, and If there is a boundary between the areas, the detection is performed by detecting and storing the color as the construction machine M or the like.
制御装置13は、バケット位置信号及び建設機械Mの有
無及び位置信号に基づいて、作業範囲内に建設機械Mが
あると判断した場合には、バケット7が掘削エリアの上
方でほぼ地上位置付近に達した段階で警報装置16に警報
信号を出力する。これにより、警報装置16は警報を発し
て、揚土装置のオペレータには作業範囲内に建設機械M
がある旨の注意を、また建設機械Mのオペレータにはバ
ケットが下降する旨の注意をそれぞれ喚起せしめる。ま
た、制御装置13は、作業範囲外に建設機械Mがあると判
断した場合には、警報装置16に警報信号を発しなく、警
報装置16は警報を発しない。When the control device 13 determines that the construction machine M is within the working range based on the bucket position signal and the presence / absence of the construction machine M and the position signal, the bucket 7 is positioned near the ground position above the excavation area. At the stage when the alarm has been reached, an alarm signal is output to the alarm device 16. As a result, the alarm device 16 issues an alarm, and the operator of the excavating device is informed that the construction machine M is within the working range.
To the operator, and to the operator of the construction machine M, that the bucket is lowered. When the control device 13 determines that the construction machine M is outside the working range, the control device 13 does not issue an alarm signal to the alarm device 16, and the alarm device 16 does not emit an alarm.
オペレータが警報信号に気づかないでバケット7を下
降させた場合等、バケット7の下降中に警報が発生され
た状態が継続すると、制御装置13はバケット7の制御距
離を見込んで建設機械Mに当接する前に確実に停止でき
る位置にバケット7が達した段階でバケット非常停止装
置15に非常停止信号を出力する。これにより、バケット
非常停止装置15は、ウィンチ5の駆動装置を停止させる
と共にブレーキをかけてバケット7を非常停止させる。If the alarm continues to be generated while the bucket 7 is being lowered, such as when the operator lowers the bucket 7 without noticing the warning signal, the control device 13 will contact the construction machine M in anticipation of the control distance of the bucket 7. An emergency stop signal is output to the bucket emergency stop device 15 when the bucket 7 reaches a position where it can be stopped reliably before contact. As a result, the bucket emergency stop device 15 stops the driving device of the winch 5 and applies the brake to make the bucket 7 emergency stop.
なお、制御装置13は警報信号を出力したときに同時に
非常停止信号を出力するようにすることもできる。Note that the control device 13 may output an emergency stop signal at the same time as outputting the alarm signal.
その後、オペレータが作業範囲内の状況を確認してウ
ィンチ5の駆動装置の再起動を行うが、その場合、作業
範囲内に建設機械Mがないと制御装置13が判断した場合
には、制御装置13はウィンチ5の駆動装置を再起動す
る。これにより、バケット7は掘削レベルまで再び下降
する。また、作業範囲内に建設機械Mがあると制御装置
13が判断した場合には、制御装置13はウィンチ5の駆動
装置の再起動を不能にする。これらの制御操作が繰り返
されながら、バケット7が昇降制御され、揚土作業が行
われる。Thereafter, the operator confirms the situation within the work range and restarts the drive device of the winch 5. In this case, when the control device 13 determines that the construction machine M is not within the work range, the control device 13 restarts the drive of the winch 5. Thereby, the bucket 7 descends again to the excavation level. Also, if the construction machine M is within the working range, the control device
If the control unit 13 determines, the control unit 13 disables the restart of the drive unit of the winch 5. While these control operations are repeated, the lifting and lowering of the bucket 7 is controlled, and the earth discharging work is performed.
このようにして、バケットの昇降が制御装置13によっ
て制御されるので、オペレータの誤判断によりバケット
7を建設機械Mに衝突させてしまうという操作ミスが確
実に防止され、揚土作業が円滑にかつ迅速に行われるよ
うになる。In this way, the lifting and lowering of the bucket is controlled by the control device 13, so that an operation error of causing the bucket 7 to collide with the construction machine M due to an erroneous determination by the operator is reliably prevented, and the earth unloading operation is performed smoothly and Be done quickly.
[発明の効果] 以上の説明から明らかなように、本発明に係る揚土装
置によれば、バケットが下降動作を開始した時点で作業
範囲内に例えば建設機械等があるため、バケットの降下
を停止させる必要があるときには、揚土装置及び建設機
械等の各オペーレータに警報を発して注意を促すように
しているので、各オペレータはバケットの下降を停止さ
せたり、また建設機械等を作業範囲内から退避させたり
することができる。また、前述のようにバケットの降下
を停止させる必要があるときには、バケットの下降を自
動的に停止させるので、バケット等と建設機械等との衝
突が未然に防止できる。[Effects of the Invention] As is clear from the above description, according to the earth-lifting device according to the present invention, when the bucket starts the descending operation, for example, there is a construction machine or the like in the working range, so that the bucket descends. When it is necessary to stop the operation, a warning is issued to each operator such as a lifting device and construction equipment to alert the operator. And can be evacuated. Further, as described above, when it is necessary to stop the lowering of the bucket, the lowering of the bucket is automatically stopped, so that the collision between the bucket or the like and the construction machine or the like can be prevented.
このようにして、本発明によれば、オペレータの誤判
断による操作ミスを確実に防止することができ、揚土作
業を円滑にかつ迅速に行うことができるようになる。Thus, according to the present invention, an operation error due to an erroneous determination by the operator can be reliably prevented, and the earth discharging work can be performed smoothly and quickly.
第1図は本発明に係る揚土装置の一実施例を用いた地下
掘削作業のシステムを概略的に示す全体概要図、第2図
はこの実施例の揚土装置の拡大図、第3図はこの実施例
における制御ブロック図である。 1……揚土装置、2……支柱、3……横梁、4……移動
台車、5……ウィンチ、6……ワイヤケーブル、7……
クラムシェルのバケット、8……雲台、9……監視用カ
メラ、10……カメラ位置制御及び検出装置、11……バケ
ット位置検出装置、12……画像処理装置、13……制御装
置、14……地下レベル設定装置、15……バケット非常停
止装置、16……警報装置FIG. 1 is an overall schematic diagram schematically showing an underground excavation work system using an embodiment of a lifting device according to the present invention, FIG. 2 is an enlarged view of the lifting device of this embodiment, and FIG. Is a control block diagram in this embodiment. DESCRIPTION OF SYMBOLS 1 ... Unloading device, 2 ... Prop, 3 ... Cross beam, 4 ... Moving trolley, 5 ... Winch, 6 ... Wire cable, 7 ...
Clamshell bucket, 8 head, 9 monitoring camera, 10 camera position control and detection device, 11 bucket position detection device, 12 image processing device, 13 control device, 14 …… underground level setting device, 15 …… bucket emergency stop device, 16 …… alarm device
Claims (4)
上方へ引き揚げる揚土装置において、 所定の作業範囲を監視する監視装置と、前記バケットの
位置を検出するバケット位置検出装置と、警報装置と、
前記監視装置及び前記バケット位置検出装置からの各信
号に基づいてバケットの降下を停止させる必要があると
判断したとき、前記警報装置に警報信号を出力する制御
装置とからなり、この制御装置からの前記警報信号によ
り前記警報装置が警報を発することを特徴とする揚土装
置。1. A lifting device for lifting excavated earth and sand by means of a vertically movable bucket, comprising: a monitoring device for monitoring a predetermined working range; a bucket position detecting device for detecting a position of the bucket; an alarm device;
When it is determined that it is necessary to stop the lowering of the bucket based on each signal from the monitoring device and the bucket position detection device, the control device outputs a warning signal to the warning device. The earth lifting device, wherein the alarm device issues an alarm in response to the alarm signal.
御装置は、前記警報信号を出力したときに前記バケット
非常停止装置にもバケット非常停止信号を出力し、警報
を発すると共にバケットを停止させることを特徴とする
請求項1記載の揚土装置。2. The apparatus according to claim 1, further comprising a bucket emergency stop device, wherein the controller outputs a bucket emergency stop signal to the bucket emergency stop device when the alarm signal is output, and issues an alarm and stops the bucket. The lifting device according to claim 1, characterized in that:
御装置は、前記警報信号を所定時間継続して出力したと
きに前記バケット非常停止装置にもバケット非常停止信
号を出力し、警報を発すると共にバケットを停止させる
ことを特徴とする請求項1記載の揚土装置。3. The apparatus according to claim 1, further comprising a bucket emergency stop device, wherein the control device outputs a bucket emergency stop signal to the bucket emergency stop device when the alarm signal is continuously output for a predetermined time, and issues an alarm. The lifting device according to claim 1, wherein the bucket is stopped.
上方へ引き揚げる揚土装置において、 所定の作業範囲を監視する監視装置と、前記バケットの
位置を検出するバケット位置検出装置と、バケット非常
停止装置と、前記監視装置及び前記バケット位置検出装
置からの各信号に基づいてバケットの降下を停止させる
必要があると判断したとき前記バケット非常停止装置に
バケット非常停止信号を出力する制御装置とからなり、
この制御装置からの前記バケット非常停止信号により前
記バケット非常停止装置がバケットの降下を非常停止さ
せることを特徴とする揚土装置。4. A lifting device for lifting excavated earth and sand by means of a vertically movable bucket, a monitoring device for monitoring a predetermined work range, a bucket position detecting device for detecting a position of the bucket, and a bucket emergency stop device. And a control device that outputs a bucket emergency stop signal to the bucket emergency stop device when it is determined that it is necessary to stop the lowering of the bucket based on each signal from the monitoring device and the bucket position detection device,
The earth unloading device, wherein the bucket emergency stop device makes an emergency stop of the lowering of the bucket in response to the bucket emergency stop signal from the control device.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP13306890A JP2807768B2 (en) | 1990-05-22 | 1990-05-22 | Lifting equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP13306890A JP2807768B2 (en) | 1990-05-22 | 1990-05-22 | Lifting equipment |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0427031A JPH0427031A (en) | 1992-01-30 |
| JP2807768B2 true JP2807768B2 (en) | 1998-10-08 |
Family
ID=15096091
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP13306890A Expired - Lifetime JP2807768B2 (en) | 1990-05-22 | 1990-05-22 | Lifting equipment |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2807768B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR102680670B1 (en) * | 2023-08-07 | 2024-07-02 | 주식회사 와이씨앤 | Job notification system for clamshell heavy equipment and operation method therefor |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2012203677A (en) * | 2011-03-25 | 2012-10-22 | Penta Ocean Construction Co Ltd | Safety management system |
| JP6549060B2 (en) * | 2016-03-31 | 2019-07-24 | 日立建機株式会社 | Surrounding monitoring system for work machine |
| CN106608547A (en) * | 2016-10-26 | 2017-05-03 | 泰富重工制造有限公司 | Improper material taking collapse preventing protection method and device for cantilever type bucket wheel material taking machine |
| JP7581996B2 (en) * | 2021-03-19 | 2024-11-13 | コベルコ建機株式会社 | Remote operation support system and remote operation support method |
-
1990
- 1990-05-22 JP JP13306890A patent/JP2807768B2/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR102680670B1 (en) * | 2023-08-07 | 2024-07-02 | 주식회사 와이씨앤 | Job notification system for clamshell heavy equipment and operation method therefor |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0427031A (en) | 1992-01-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201198441Y (en) | Apparatus for rectifying deviation of container gantry crane, laser aligning container truck and preventing hoist of container truck | |
| JP6342705B2 (en) | Boom collision avoidance device for work equipment | |
| CN207957141U (en) | A kind of Locomotive remote based on infrared laser scanning recognition fills mine device automatically | |
| CN104528531A (en) | Container wharf RTG and RMG lower container truck alignment guide system and method | |
| KR20190078984A (en) | Monitoring system for preventing lift objects collision against crane | |
| JP2807768B2 (en) | Lifting equipment | |
| KR101038523B1 (en) | Radius control device for aerial work vehicles | |
| KR20120000686U (en) | Apparatus of preventing impact and elevator having the same | |
| JP2005096919A (en) | Dimension measuring device for elevator, and dimension measuring method for elevator | |
| JP2000218364A (en) | Fault monitoring device | |
| US9773175B2 (en) | System and method for tracking position of cable attached to a machine | |
| JPH01256496A (en) | Load vibration preventer at time of ungrounding of slinging load of crane with boom | |
| CN115490150A (en) | Lifting device for a container and method for detecting the orientation of a container | |
| AU2019251683A1 (en) | Civil engineering apparatus and system for monitoring a construction site | |
| JPH06239582A (en) | Wheel type crane | |
| CN113830570B (en) | Movable beam protection system of gate type bucket wheel machine | |
| JP2017137139A (en) | Anti-collision device for continuous unloader | |
| CN115535857A (en) | System and method for safely lifting steel ladle by crane | |
| JP2000344461A (en) | Danger display / monitoring device under suspended load in shaft | |
| JPH11292466A (en) | Automatic container loading method and apparatus | |
| JP3929610B2 (en) | Carriage for moving tracking measuring device of automatic tracking measuring system | |
| JPH04106095A (en) | Cable crane | |
| JP2010150029A (en) | Abnormality detection device for vehicle body supporting device | |
| CN217051326U (en) | A device is prevented lifting by collection card for container field bridge | |
| JP3526071B2 (en) | Measurement and control device for elevating gantry for installation of exterior curtain wall |