JP2807833B2 - Method for correcting uneven settlement of structures - Google Patents
Method for correcting uneven settlement of structuresInfo
- Publication number
- JP2807833B2 JP2807833B2 JP21303089A JP21303089A JP2807833B2 JP 2807833 B2 JP2807833 B2 JP 2807833B2 JP 21303089 A JP21303089 A JP 21303089A JP 21303089 A JP21303089 A JP 21303089A JP 2807833 B2 JP2807833 B2 JP 2807833B2
- Authority
- JP
- Japan
- Prior art keywords
- injection
- bag
- foundation
- settlement
- uneven settlement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims description 25
- 238000002347 injection Methods 0.000 claims description 133
- 239000007924 injection Substances 0.000 claims description 133
- 239000000463 material Substances 0.000 claims description 63
- 238000010438 heat treatment Methods 0.000 claims description 22
- 238000012937 correction Methods 0.000 claims description 18
- 239000004576 sand Substances 0.000 claims description 12
- 238000009412 basement excavation Methods 0.000 claims description 8
- 238000010276 construction Methods 0.000 claims description 8
- 238000001802 infusion Methods 0.000 claims description 6
- 239000007787 solid Substances 0.000 description 19
- 238000005259 measurement Methods 0.000 description 11
- 239000004570 mortar (masonry) Substances 0.000 description 7
- 239000002689 soil Substances 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 239000012188 paraffin wax Substances 0.000 description 4
- 238000007796 conventional method Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 239000011800 void material Substances 0.000 description 2
- 239000004568 cement Substances 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- -1 for example Substances 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
- 239000000057 synthetic resin Substances 0.000 description 1
Landscapes
- Foundations (AREA)
Description
【発明の詳細な説明】 (産業上の利用分野) 本発明は、上部構造からの荷重を、べた基礎又は独立
基礎等から直接地盤に伝える、構造物における不同沈下
の修正方法に関する。Description: TECHNICAL FIELD The present invention relates to a method for correcting uneven settlement in a structure, in which a load from a superstructure is transmitted directly to the ground from a solid foundation or an independent foundation.
(従来の技術) 通常、構造物を支持する地盤に、圧密沈下を生ずる粘
性土層がある場合、堅固な支持層まで杭を貫入する杭基
礎を採用する。例えば、海沼などの埋め立て地域の地盤
は、軟弱層が厚く堆積しているため、3階建て以下の低
層構造物でも長尺の杭が必要であった。その結果、建設
費にしめる杭基礎工事費の比率が大きくなる。(Prior Art) Usually, when there is a viscous soil layer that causes consolidation settlement in the ground supporting a structure, a pile foundation that penetrates the pile to a solid support layer is adopted. For example, on the ground in a landfill area such as a sea marsh, a thick pile of soft layers is required, so even a low-rise structure of three stories or less needs long piles. As a result, the ratio of the pile foundation construction cost to the construction cost increases.
これに代わる、杭を使用しない工法を下記に示す。 An alternative method that does not use piles is shown below.
<イ>構造物の重量に相当する土量を掘削し排除するこ
とにより、重量を低減して沈下を防止するフローティン
グ工法。<B> A floating method that reduces the weight and prevents settlement by excavating and eliminating the amount of soil equivalent to the weight of the structure.
<ロ>沈下の惧れのある軟弱層を改良する地盤改良工
法。<B> Ground improvement method to improve the soft layer that is likely to sink.
<ハ>基礎と上部構造体との間に、予めジャッキをセッ
トし、不同沈下が生じたとき、ジャッキを調整して構造
物の不同沈下を修正する工法。<C> A method in which a jack is set between the foundation and the upper structure in advance, and when uneven settlement occurs, the jack is adjusted to correct the uneven settlement of the structure.
<ニ>耐圧版を有する基礎に、予め給・排水管を敷設
し、不同沈下が生じたとき、沈下の少ないエリアに給水
して同エリアの沈下を助長し、構造物の不同沈下を修正
する工法。<D> By laying water supply / drainage pipes in advance on a foundation with a pressure-resistant version, when uneven settlement occurs, water is supplied to an area with little settlement to promote settlement in the area and correct uneven settlement of structures. Construction method.
(発明が解決しようとする課題) 前記した従来の沈下を防止、或いは修正する工法に
は、夫々次のような問題点がある。(Problems to be Solved by the Invention) The above-mentioned conventional methods for preventing or correcting settlement have the following problems, respectively.
(1)<イ>の工法においては、沈下量を精度よく予測
する方法が確立してないほか、軟弱層が不均一の場合、
過大な設計になり不経済である。また、採用した結果、
予想したより大きな沈下を生じることもあり、沈下修正
に確実性がない。(1) In the method <a>, a method for accurately predicting the settlement amount has not been established, and when the soft layer is not uniform,
It is over-designed and uneconomical. Also, as a result of adoption,
There is no certainty in subsidence correction, as it can result in larger subsidence than expected.
(2)<ロ>の工法においても、上記<イ>と同様であ
る。(2) The construction method <B> is the same as the above <A>.
(3)<ハ>の工法においては、基礎と上部構造体とを
構造上一体としないため、構造物の施工が複雑で、コス
トが増大する。また、基礎自体の沈下は修正が不可能で
ある。更に、地震に対して不安定である。(3) In the construction method of <c>, since the foundation and the upper structure are not structurally integrated, the construction of the structure is complicated and the cost increases. Also, the settlement of the foundation itself cannot be corrected. Furthermore, it is unstable against earthquakes.
(4)<ニ>の工法においては、水を多量に使用するの
で、沈下修正に長時間を要する。地盤の軟弱化が促進し
て、沈下が逆に大きくなる場合がある。近隣の建物に沈
下の影響を及ぼすおそれがある。沈下修正のための給水
管理が難しい。したがって、沈下修正に確実性がない。(4) In the method <d>, since a large amount of water is used, it takes a long time to correct the settlement. The softening of the ground may be accelerated, and the settlement may be increased. There is a danger that settlement will affect nearby buildings. Water supply management for settlement correction is difficult. Therefore, the settlement correction is not certain.
(本発明の目的) 上記した従来の課題を解決するためになされた、構造
物における不同沈下の修正方法を提供することにある。
その目的とするところは、構造物が立地する比較的軟弱
な土層が厚く堆積している地盤条件において、その地盤
に構造物を構築したとき、構造物に、その軟弱地盤に起
因する有害な不同沈下が生じることが予想される場合、
同構造物の不同沈下を修正する方法にある。(Object of the Invention) It is an object of the present invention to provide a method for correcting uneven settlement in a structure, which has been made to solve the above-mentioned conventional problems.
The purpose is to construct a structure on the ground under the condition that the relatively soft soil layer where the structure is located is thickly deposited. If unequal settlement is expected,
There is a way to correct the differential settlement of the structure.
(課題を解決するための手段) 請求項1の発明は、構築する構造物の基礎の下面より
所定深さのレベルまで地盤を掘削し、地中梁が直交する
基礎の下方の前記掘削地盤面上に、注入材を封入する注
入袋を水平に設置し、この注入袋に注入パイプの一端を
接続し、前記掘削地盤面の上部から構築する基礎の下部
まで、土砂を敷き均した後、基礎及び上部構造体を構築
して行き、構造物の構築初期の段階で、構造体の任意点
のレベル測定を行って基準値を記録しておき、構造物の
完成後、構造体の任意点のレベル測定を行い、その結
果、構造物に有害な不同沈下が予想された場合、前記不
同沈下に起因する基礎の下方に設置した前記注入袋内
に、同袋に接続した注入パイプの他端より注入材を注入
して、基礎及び構造体のレベル修正を行う、構造物の不
同沈下修正方法にある。(Means for Solving the Problems) The invention according to claim 1, wherein the ground is excavated to a level of a predetermined depth from the lower surface of the foundation of the structure to be constructed, and the excavated ground surface below the foundation where the underground beams are orthogonal to each other. On the top, an injection bag for enclosing the injection material is installed horizontally, one end of an injection pipe is connected to the injection bag, and from the upper part of the excavated ground surface to the lower part of the foundation to be built, the earth and sand are spread and leveled. And the upper structure is constructed, and at the initial stage of the construction of the structure, a level is measured at an arbitrary point of the structure and a reference value is recorded, and after the completion of the structure, the arbitrary point of the structure is Level measurement, as a result, if harmful uneven settlement of the structure is expected, in the injection bag installed below the foundation caused by the uneven settlement, from the other end of the injection pipe connected to the same bag A structure that injects a grout and modifies the foundation and structure levels It is in the method of correcting uneven settlement of objects.
請求項2の発明は、請求項1記載の構造物の不同沈下
修正方法において、注入材は、常温で固化し、高温で液
化する特性を有し、加熱して液化した注入材を袋に注入
する、構造物の不同沈下修正方法にある。According to a second aspect of the present invention, in the method for correcting uneven settlement of a structure according to the first aspect, the injection material has a property of solidifying at room temperature and liquefying at a high temperature, and injects the injection material liquefied by heating into a bag. The method of correcting uneven settlement of a structure.
請求項3の発明は、請求項1記載の構造物の不同沈下
修正方法において、注入パイプ及び注入袋に、加熱用ワ
イヤーを内蔵した、構造物の不同沈下修正方法にある。According to a third aspect of the present invention, there is provided a method for correcting settlement of a structure according to the first aspect, wherein a heating wire is incorporated in an injection pipe and an injection bag.
請求項4の発明は、請求項1記載の構造物の不同沈下
修正方法において、注入袋は、同袋の内壁材が剥離性を
有する材料で構成した、構造物の不同沈下修正方法にあ
る。According to a fourth aspect of the present invention, there is provided a method for correcting the differential settlement of a structure according to the first aspect of the present invention, wherein the injection bag has an inner wall material made of a material having releasability.
(作用) 本発明の請求項1の発明は、前記したように構成した
ので、構造物のレベル測定の結果、構造物に有害な不同
沈下が生じるおそれのある場合は、同沈下に起因する基
礎の下方に設置した注入袋に、注入パイプによって注入
材を封入する。この注入材により注入袋が膨脹すること
によって、基礎及び構造体を正規のレベルに修正する。(Operation) Since the invention of claim 1 of the present invention is configured as described above, if there is a possibility that harmful uneven settlement may occur in the structure as a result of the level measurement of the structure, the foundation caused by the settlement may be generated. The injection material is sealed by the injection pipe into the injection bag installed below the injection bag. The filling material inflates the filling bag, thereby modifying the foundation and the structure to a regular level.
不同沈下の修正に伴い、注入袋と掘削地盤の間に砂を
充填するので、注入袋の周囲に空隙が生じることがな
い。Since the sand is filled between the injection bag and the excavated ground with the correction of the differential settlement, no void is formed around the injection bag.
請求項2の発明は、注入材は、常温で固化し、高温で
液化する材料を用い、液状の注入材を注入袋に注入する
ので、作業を容易且つ短時間に行うことができる。According to the second aspect of the present invention, since the injection material is a material which solidifies at room temperature and liquefies at a high temperature, and the liquid injection material is injected into the injection bag, the operation can be performed easily and in a short time.
請求項3の発明は、注入パイプ及び注入袋に、加熱用
ワイヤーを内蔵したので、2回目の沈下修正以後の注入
材の注入時に、注入袋及び注入パイプ内に固結している
1回目の注入材を液化することにより、再注入が容易と
なる。According to the third aspect of the present invention, since the heating wire is built in the injection pipe and the injection bag, the first time the injection material is solidified in the injection bag and the injection pipe when the injection material is injected after the second settlement. By liquefying the injection material, re-injection becomes easy.
請求項3の発明は、注入袋の内壁材を剥離性のよい材
料で構成したので、注入袋内に固結している注入材と前
記内壁材とが剥離することにより、この間隙に、2回目
以降の注入材の注入が容易となる。In the invention of claim 3, the inner wall material of the injection bag is made of a material having good releasability. It becomes easy to inject the injection material after the first time.
(実施例) 以下図面を参照しながら本発明の実施例について説明
する。Embodiment An embodiment of the present invention will be described below with reference to the drawings.
<イ>構造物及びその基礎 第3図及び第4図,第13図及び第14図により説明す
る。<A> Structure and its foundation This will be described with reference to FIGS. 3 and 4, FIG. 13 and FIG.
構造物A,A′は、基礎a,a′及び、同基礎a,a′に立設
する地下1階地上2階建の上部構造体bとで構成してあ
る。The structures A and A 'are composed of foundations a and a' and an upper structure b having a first basement floor and a two-story building standing on the foundations a and a '.
基礎は、べた基礎a又は独立基礎a′などを対象とす
る。The foundation is a solid foundation a or an independent foundation a '.
べた基礎aは地中梁1及び底版(耐圧版)とからな
り、底版は地中梁1の下端に設置してある(第3図,第
4図)。The solid foundation a comprises an underground beam 1 and a bottom plate (pressure-resistant version), and the bottom plate is installed at the lower end of the underground beam 1 (FIGS. 3 and 4).
独立基礎a′はフーチング基礎である。独立基礎a′
の地中梁1は、同基礎a′と交差し、隣接する各基礎
a′と繋いである(第13図,第14図)。The independent foundation a 'is a footing foundation. Independent foundation a '
The underground beam 1 crosses the foundation a 'and is connected to each adjacent foundation a' (FIGS. 13 and 14).
基礎は上記のような構成にしてあるので、地中梁1を
有するべた基礎aや独立基礎a′は、上部構造体bから
の荷重を支持し、杭などを用いずに前記荷重を直接地盤
に伝える構造になっている。Since the foundation is configured as described above, the solid foundation a having the underground beam 1 and the independent foundation a 'support the load from the upper structure b and directly apply the load to the ground without using a pile or the like. It has a structure to tell.
<ロ>地盤掘削 構築する構造物の掘削地盤Bを、構造物の基礎a,a′
の下面より所定深さ、例えば1m程度の深さまで掘削す
る。<B> Ground excavation Excavation ground B of the structure to be constructed is converted into the foundations a and a 'of the structure.
Excavation is performed to a predetermined depth, for example, about 1 m below the lower surface of the ground.
掘削地盤Bは、後述の注入袋3を配置し、更に砂5を
敷き均すためのスペースである。The excavation ground B is a space for disposing an injection bag 3 described later and further laying sand 5 thereon.
<ハ>注入袋(第12図) 注入袋3は、地中梁が直交する基礎a,a′の下方の前
記掘削地盤B面上に、水平に設置してある。<C> Infusion bag (Fig. 12) The infusion bag 3 is horizontally installed on the surface of the excavated ground B below the foundations a and a 'where the underground beams are orthogonal.
注入袋3は、第1図に示すように、地中梁1の各交差
部の下方に内央部用袋3A,外側用袋3B、隅部用袋3Cが夫
々配置してある。As shown in FIG. 1, the infusion bag 3 has an inner central bag 3A, an outer bag 3B, and a corner bag 3C below each intersection of the underground beam 1.
注入袋3は、注入材を封入するための袋で、注入パイ
プ2が接続してある。The injection bag 3 is a bag for enclosing an injection material, and is connected to the injection pipe 2.
注入袋3は可撓性、耐久性のある材料で構成してあ
る。The injection bag 3 is made of a flexible and durable material.
注入袋3は、同袋の内壁材に剥離性を有する材料が用
いてある。それにより、注入を繰り返して行うに際し、
固化した注入材が同袋3から剥離しやすくなる。The injection bag 3 is made of a material having releasability for the inner wall material of the bag. Thereby, when performing the injection repeatedly,
The solidified injection material is easily peeled from the bag 3.
注入袋には、加熱用ワイヤー7が内蔵し、蛇行して配
設してある。同ワイヤー7には、注入パイプ2に内蔵し
た加熱用ワイヤー7′の一端が接続してある。そして、
同加熱ワイヤー7′に通電することにより、前記袋3が
加熱して封入され固化した注入材が液化し、同注入材は
前記袋3から剥離しやすくなる。The injection bag has a built-in heating wire 7 and is arranged in a meandering manner. One end of a heating wire 7 ′ built in the injection pipe 2 is connected to the wire 7. And
By energizing the heating wire 7 ', the bag 3 is heated and sealed, and the solidified injection material is liquefied, and the injection material is easily peeled off from the bag 3.
<ニ>注入パイプ(第11図,第12図) 注入パイプ2には、螺旋状の加熱用ワイヤー7′が内
蔵してあり、その一端は注入袋3に内蔵した加熱用ワイ
ヤー7と接続してある。<D> Injection pipe (FIGS. 11 and 12) The infusion pipe 2 has a built-in spiral heating wire 7 ′, and one end thereof is connected to the heating wire 7 incorporated in the infusion bag 3. It is.
注入パイプ2は、耐圧性、可撓性、伸縮性を有する材
料を用いてある。The injection pipe 2 is made of a material having pressure resistance, flexibility, and elasticity.
注入パイプ2は、その一端は注入袋3に接続してある
(第12図)。注入パイプ2は、予め注入袋3に接続して
おいても、同袋3を設置する際に接続してもよい。The injection pipe 2 has one end connected to the injection bag 3 (FIG. 12). The injection pipe 2 may be connected to the injection bag 3 in advance, or may be connected when the same bag 3 is installed.
注入パイプ2は、各注入袋3A,3B,3Cごとに各分岐パイ
プ2A,2B,2Cが夫々接続してあり、同分岐パイプ2A,2B,2C
の他端は、注入材供給パイプ2Dに連結し、同供給パイプ
2Dは地上に設けた注入口6に接続してある(第2図)。The injection pipe 2 has branch pipes 2A, 2B, and 2C connected to each of the injection bags 3A, 3B, and 3C, respectively, and the branch pipes 2A, 2B, and 2C.
Is connected to the injection material supply pipe 2D.
2D is connected to an inlet 6 provided on the ground (FIG. 2).
第2図は注入パイプの系統図である。その概略を以下
に示す。FIG. 2 is a system diagram of the injection pipe. The outline is shown below.
内央交差部用袋3A、外側交差部用袋3B、隅交差部用袋
3Cの各袋には注入用の各分岐パイプ2A,2B,2Cの一端が接
続してある。各分岐パイプ2A,2B,2Cの他端は注入材供給
パイプ2Dの一端と接続してある。注入材供給パイプ2Dの
他端は注入材貯留槽に接続し(図示省略)、同貯留槽に
は注入用ポンプPが備えてある。尚、注入材貯留槽に
は、同貯留槽から注入材を注入パイプ2Dに吐出す吐出口
が備えてある(図示省略)。Inner-center intersection bag 3A, outer intersection bag 3B, corner intersection bag
One end of each branch pipe 2A, 2B, 2C for injection is connected to each bag of 3C. The other end of each branch pipe 2A, 2B, 2C is connected to one end of the injection material supply pipe 2D. The other end of the injection material supply pipe 2D is connected to an injection material storage tank (not shown), and the storage tank is provided with an injection pump P. The injection material storage tank is provided with a discharge port for discharging the injection material from the storage tank to the injection pipe 2D (not shown).
前記各分岐パイプ2A,2B,2Cは、夫々コック4A,4B,4Cを
備え,注入材供給パイプ2Dにもコック4Dが備えてある。Each of the branch pipes 2A, 2B, and 2C includes a cock 4A, 4B, and 4C, respectively, and the injection material supply pipe 2D also includes a cock 4D.
例えば、注入袋3Aへの注入は、注入材供給パイプ2Dの
コック4D、及び分岐パイプ2Aのコック4Aを開き、他の分
岐パイプ2B,2Cのコック4B,4Cを閉じて、ポンンプPを作
動することによって、中央交差部用袋3Aに注入材を注入
することができる(第1図)。For example, the injection into the injection bag 3A is performed by opening the cock 4D of the injection material supply pipe 2D and the cock 4A of the branch pipe 2A, closing the cocks 4B and 4C of the other branch pipes 2B and 2C, and operating the pump P. This allows the injection material to be injected into the central intersection bag 3A (FIG. 1).
以上のような配管系統によって、不同沈下を修正する
注入袋3Aに注入材を供給することができる。With the above piping system, the injection material can be supplied to the injection bag 3A for correcting uneven settlement.
<ホ>注入材 注入材は、常温で固化し、加熱すると流動化する材料
が用いてある。<E> Injecting material The injecting material used is a material that solidifies at room temperature and becomes fluid when heated.
注入材は、1回目の不同沈下修正の場合は、セメント
スラリー又はモルタル等の常温で固化材を用いている。In the case of the first non-uniform settlement correction, a solidified material such as a cement slurry or mortar is used at room temperature.
注入材は、2回目以後の不同沈下修正の場合は、パラ
フィン又は合成樹脂等の熱可逆特性を有する材料を用い
る。In the case of the second and subsequent uneven settlement correction, a material having a thermoreversible property such as paraffin or a synthetic resin is used as the injection material.
即ち、1回目の不同沈下修正時に、前記袋3内の注入
材は固化しているので、2回目以後の不同沈下修正に際
しては、前記固化した注入材を加熱して液化し、2回目
以後の不同沈下修正用の注入材を注入袋3に追加注入す
る。That is, at the time of the first uneven settlement correction, the injected material in the bag 3 is solidified. Therefore, at the second and subsequent uneven settlement corrections, the solidified injection material is heated and liquefied, and the second and subsequent times are fixed. An injection material for correcting uneven settlement is additionally injected into the injection bag 3.
<ヘ>加熱用ワイヤー 加熱用ワイヤー 注入袋3には、固化した注入材を液化するための加熱
用ワイヤー7が、蛇行して内蔵してある(第12図)。<F> Heating wire Heating wire The injection bag 3 has a meandering built-in heating wire 7 for liquefying the solidified injection material (FIG. 12).
注入パイプ2には、注入材を液化状態で注入するため
の加熱用ワイヤー7′が螺旋状に内蔵してある(第11
図)。A heating wire 7 ′ for injecting the injection material in a liquefied state is helically incorporated in the injection pipe 2 (the eleventh heating wire).
Figure).
即ち、1回目の不同沈下修正時に、前記袋3内の注入
材は固化しているので、2回目以後の不同沈下修正に際
しては、前記固化した注入材を加熱用ワイヤー7,7′に
より加熱して液化し、2回目以後の不同沈下修正用の注
入材を注入袋3に追加注入するのを容易にしてある。In other words, the injection material in the bag 3 is solidified at the time of the first uneven settlement, and therefore, at the second and subsequent uneven settlement, the solidified injection material is heated by the heating wires 7, 7 '. This makes it easy to additionally inject the injection material for the second and subsequent non-uniform settlement into the injection bag 3.
<ト>構造物の不同沈下修正方法 第3図及び第4図に示したべた基礎aを有する構造物
Aの不同沈下修正方法を、第5図〜第10図により説明す
る。<G> Method of correcting uneven settlement of a structure A method of correcting uneven settlement of a structure A having a solid foundation a shown in FIGS. 3 and 4 will be described with reference to FIGS. 5 to 10. FIG.
構築する構造物Aのべた基礎aの下面より所定深さ、
例えば1m程度の深さまで地盤を掘削する(第5図)。A predetermined depth from the lower surface of the solid foundation a of the structure A to be constructed;
For example, excavate the ground to a depth of about 1 m (Fig. 5).
べた基礎aの地中梁1が直交する同基礎aの下方の掘
削地盤B面上に、注入材を封入するための注入袋3を水
平に設置するとともに、注入パイプ2を配設する。この
注入袋3には注入パイプ2の一端が接続してあり(第12
図)、同パイプ2の他端は注入材の注入口6に接続して
ある(第6図)。On the surface of the excavated ground B below the foundation a where the underground beams 1 of the solid foundation a are orthogonal to each other, an injection bag 3 for enclosing the injection material is horizontally installed, and an injection pipe 2 is provided. One end of the injection pipe 2 is connected to the injection bag 3 (the 12th
FIG. 6), the other end of the pipe 2 is connected to an injection material inlet 6 (FIG. 6).
注入袋3及び注入パイプ2の配置は、第1図及び第2
図に示すように、各注入袋3A,3B,3Cごとに分岐パイプ2
A,2B,2Cが接続してある。The arrangement of the injection bag 3 and the injection pipe 2 is shown in FIGS.
As shown in the figure, a branch pipe 2 is provided for each of the injection bags 3A, 3B, 3C.
A, 2B and 2C are connected.
尚、その際、各注入袋3A,3B,3Cの下面に、砂5を充填
するためのパイプの一端を設置し他端を地表に出してお
く(図示省略)。At this time, one end of a pipe for filling the sand 5 is installed on the lower surface of each of the injection bags 3A, 3B, 3C, and the other end is left on the ground (not shown).
前記掘削地盤B面に、構築するべた基礎aの下部まで
土砂5を敷き均して、前記注入袋3及び注入パイプ2を
埋設(第7図)した後、べた基礎a及び上部構造体bを
構築して行く(第8図)。尚、土砂5は密実な砂が好ま
しい。After the soil 5 is spread on the surface of the excavated ground B to the lower part of the solid foundation a to be constructed and the injection bag 3 and the injection pipe 2 are buried (FIG. 7), the solid foundation a and the upper structure b are removed. Build (Fig. 8). The earth and sand 5 is preferably solid sand.
構造体bを構築して行く過程の初期の段階、例えば地
上1階における各柱の周囲のレベル測定を行い、初期値
(基準値)を記録する。An initial stage of the process of constructing the structure b, for example, a level measurement around each pillar on the first floor above the ground is performed, and an initial value (reference value) is recorded.
構造物Aの完成後、前記地上1階における各柱の周囲
のレベル測定を再び行って測定値を記録し、前記基準値
と比較する。After the completion of the structure A, the level measurement around each pillar on the first floor above the ground is performed again, and the measured value is recorded and compared with the reference value.
一般に構造物Aを支持する掘削地盤Bが粘性土層の場
合、厚密沈下は長期間続くが、沈下量は比較的初期の段
階で大きい。したがって、完成直後の初期の段階から、
前記柱のレベル測定を定期的に行って記録し、その都度
前記基準値と比較する。In general, when the excavated ground B that supports the structure A is a clayey soil layer, dense settlement continues for a long period of time, but the amount of settlement is large in a relatively early stage. Therefore, from the initial stage immediately after completion,
The level measurements of the columns are taken periodically and recorded and compared with the reference values each time.
レベル測定の結果、第9図に示すように、構造物Aに
有害な不同沈下が予想された場合は、沈下の大きいべた
基礎aの下方に設置した前記注入袋3(第1図に示す袋
3A)に、同袋3に接続した注入パイプ2の注入口6より
注入材、例えばモルタルを注入する。As a result of the level measurement, as shown in FIG. 9, when harmful uneven settlement is expected for the structure A, the injection bag 3 (the bag shown in FIG. 1) installed below the solid foundation a where the settlement is large.
3A), an injection material, for example, mortar, is injected from the injection port 6 of the injection pipe 2 connected to the bag 3.
注入袋3は、モルタルが封入されることによって膨脹
するので、沈下の大きい部位のべた基礎a及び構造体b
は、膨脹圧により徐々に正規の水平レベルに修正され
る。そしてモルタルは常温で固化するので、構造物Aは
安定的に水平を保つことができる(第10図)。Since the injection bag 3 is inflated by the mortar being enclosed, the solid foundation a and the structure b at the site of large sinking
Is gradually corrected to the normal horizontal level by the inflation pressure. Since the mortar is solidified at room temperature, the structure A can be stably kept horizontal (FIG. 10).
構造物Aが水平に不同沈下修正されると、べた基礎a
の耐圧板と掘削地盤Bとの間に空隙ができるので、予め
掘削地盤B上から地表に導かれたパイプにより、前記空
隙に砂を圧送し充填する(図示省略)。When the structure A is corrected for uneven settlement horizontally, the solid foundation a
A gap is formed between the pressure plate and the excavation ground B, and sand is pressure-fed and filled into the gap by a pipe previously guided to the surface from the excavation ground B (not shown).
上記の不同沈下修正後、一定の期間、例えば2〜3年
を経てた後、前記と同様にレベル測定を再び行い、測定
値と前記基準値とを比較する。After a certain period of time, for example, two to three years, after the above-mentioned differential settlement correction, the level measurement is performed again as described above, and the measured value is compared with the reference value.
レベル測定の結果、構造物Aに有害な不同沈下が予想
された場合は、前記と同様に注入を行う。As a result of the level measurement, if harmful non-uniform settlement of the structure A is expected, injection is performed in the same manner as described above.
1回目の不同沈下修正時に注入して固化したモルタル
を溶融する。即ち、前記注入袋3に内装した加熱ワイヤ
ー7に通電することにより、モルタルは同袋3の表面か
ら液化する。The mortar that has been injected and solidified during the first uneven settlement correction is melted. That is, the mortar is liquefied from the surface of the injection bag 3 by energizing the heating wire 7 provided inside the injection bag 3.
上記の液化状態において、2回目の不同沈下修正に注
入する注入材は、例えばパラフィンを用い、1回目の修
正時の注入と同様に注入パイプ2により、沈下の大きい
べた基礎aの下方の前記注入袋3に注入する。パラフィ
ンは、液化したモルタル部分に重点的に封入される。そ
れにより注入袋3は膨脹するので、前記べた基礎a及び
構造体bは、膨脹圧により徐々に正規の水平レベルに修
正される。そしてパラフィンは徐々に固化し、構造物A
は安定して水平を保つことになる。In the liquefied state, the injection material to be injected into the second non-uniform settlement is, for example, paraffin, and the injection below the solid foundation a with large settlement is performed by the injection pipe 2 similarly to the injection at the time of the first correction. Inject into bag 3. Paraffin is mainly encapsulated in the liquefied mortar part. As a result, the filling bag 3 is inflated, so that the solid foundation a and the structure b are gradually corrected to a regular horizontal level by the inflation pressure. The paraffin solidifies gradually and the structure A
Will maintain a stable level.
構造物の修正後、べた基礎aの耐圧板と掘削地盤Bと
の空隙に砂を圧送し充填する。After the correction of the structure, the gap between the pressure plate of the solid foundation a and the excavation ground B is filled with sand under pressure.
上記の不同沈下修正後、一定の期間を経てた後、前記
と同様にレベル測定を行い、測定値と前記基準値とを比
較し、構造物Aに有害な不同沈下が予想された場合は、
3回目の修正を前記2回目と同様に行う。After the above-mentioned uneven settlement correction, after a certain period of time, perform a level measurement in the same manner as described above, compare the measured value with the reference value, and if harmful uneven settlement of the structure A is expected,
The third correction is performed in the same manner as the second correction.
第13図及び第14図は、本発明に適用する独立基礎a′
と上部構造体bとから構成した構造物A′を示す。FIGS. 13 and 14 show the independent foundation a 'applied to the present invention.
And a structure A 'composed of the upper structure b.
この場合、前記注入袋3は、掘削地盤B上で、且つ独
立基礎a′の直下に設置してもよい。それにより掘削地
盤Bを浅くすることができる。In this case, the injection bag 3 may be installed on the excavated ground B and directly below the independent foundation a '. Thereby, the excavated ground B can be made shallow.
前記構造物Aの沈下測定は、任意の階における各柱の
周囲のレベル測定にしたが、それに代えて、任意の階に
おける床の傾斜装置により床のレベル測定を行い、不同
沈下量を管理することもできる。Although the settlement measurement of the structure A is performed by measuring the level around each pillar at an arbitrary floor, the floor level measurement is performed by a floor tilting device at an arbitrary floor, and the uneven settlement amount is managed instead. You can also.
また、前記地中梁1に傾斜計を設置し、地中梁1のレ
ベル測定を行い、不同沈下量を管理することもできる。In addition, an inclinometer can be installed on the underground beam 1 to measure the level of the underground beam 1 and manage the amount of uneven settlement.
(発明の効果) 本発明は以上説明たようになるから次のような効果を
得ることができる。(Effects of the Invention) Since the present invention has been described above, the following effects can be obtained.
<イ>従来方法では、直接基礎を採用できなかった軟弱
地盤上に建設する構造物が、建設可能となり、極めて経
済的である。<A> With the conventional method, a structure to be constructed on soft ground, for which a foundation could not be directly adopted, can be constructed and is extremely economical.
<ロ>構造物の不同沈下を修正コントロールすることに
より、不同沈下に起因する、軟弱地盤の層厚にばらつき
がある場合でも、不同沈下の修正が可能である。<B> By correcting and controlling the differential settlement of the structure, it is possible to correct the differential settlement even if there is a variation in the thickness of the soft ground due to the differential settlement.
<ハ>構造物の不同沈下を修正コントロールすることに
より、不同沈下に起因する、構造物における上部構造体
の荷重にばらつきがある場合でも、不同沈下の修正が可
能である。<C> By correcting and controlling the differential settlement of the structure, it is possible to correct the differential settlement even when there is a variation in the load of the upper structure in the structure caused by the differential settlement.
<ニ>従来の注水方式と異なり、不同沈下だけでなく、
等沈下(自然沈下)が継続する場合でも、等沈下の修正
が可能である。<D> Unlike conventional water injection methods, not only differential settlement,
Even when the subsidence (natural subsidence) continues, it is possible to correct the subsidence.
<ホ>従来のジャッキアップによる不同沈下修正と異な
り、基礎等を毀損することがない。<E> Unlike the conventional settlement correction by jack-up, the foundation is not damaged.
<へ>地震時に、万が一構造物が傾斜しても、それによ
る不同沈下の修正が可能、且つ容易である。<F> Even if the structure is tilted in the event of an earthquake, it is possible and easy to correct uneven settlement.
<ト>地下室を有する構造物の場合の沈下修正は、従来
工法より極めて合理的、且つローコストである。<G> In the case of a structure having a basement, settlement correction is much more rational and less costly than the conventional method.
<チ>掘削地盤と基礎の間に土砂を敷き均らし、構造物
の不同沈下修正後も砂を充填することができるので、掘
削地盤と基礎の間に空隙が生じることがない。注入袋に
封入する注入材は、加熱により液化して注入するので、
作業が容易且つ短時間で行うことができる。<H> Since the earth and sand can be spread and leveled between the excavated ground and the foundation and the sand can be filled even after the uneven settlement of the structure is corrected, no void is generated between the excavated ground and the foundation. Since the injection material sealed in the injection bag is liquefied and injected by heating,
The work can be performed easily and in a short time.
<リ>注入袋及び注入パイプに加熱用ワイヤーを内蔵し
たので、先行注入の固化材を加熱することにより液化し
て、容易に追加注入することができる。<I> Since the heating wire is incorporated in the injection bag and the injection pipe, the solidified material of the previous injection is liquefied by heating, and can be easily additionally injected.
<ヌ>注入袋の内壁材を剥離性能を有する材料で構成し
たので、注入袋に対する先行注入の固化材の剥離が、加
熱による液化とあいまって、極めて容易に追加注入する
ことができる。<N> Since the inner wall material of the injection bag is made of a material having a peeling performance, the separation of the solidified material of the preceding injection into the injection bag, together with the liquefaction by heating, allows the additional injection to be performed very easily.
【図面の簡単な説明】 第1図は、本発明に係る構造物の不同沈下修正方法に適
用する注入袋の配置図 第2図は、注入袋及び注入パイプの機能系統図 第3図は、本発明に適用する構造物のべた基礎の平面図 第4図は、同構造物のべた基礎の縦断面図 第5図乃至第10図は、本発明の構造物の不同沈下修正方
法の工程を示す縦断面図 第11図は、注入パイプの斜視図 第12図は、注入袋の斜視図 第13図は、本発明に適用する構造物の独立基礎の平面図 第14図は、同構造物の独立基礎の縦断面図 (符号) A,A′……構造物、B……掘削地盤、P……ポンプ、H
……電源 a……べた基礎、a′……独立基礎、b……構造体、1
……地中梁 2……注入パイプ、2A,2B,2C……注入パイプ(分岐パイ
プ) 2D……注入パイプ(供給パイプ) 3A,3B,3C……注入袋、4A,4B,4C,4D……コック 5……砂、7,7′……加熱用ワイヤーBRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a layout view of an injection bag applied to a method for correcting uneven settlement of a structure according to the present invention. FIG. 2 is a functional system diagram of an injection bag and an injection pipe. FIG. 4 is a longitudinal sectional view of a solid foundation of a structure applied to the present invention. FIG. 5 to FIG. 10 are diagrams showing steps of a method for correcting uneven settlement of a structure of the present invention. Fig. 11 is a perspective view of an injection pipe. Fig. 12 is a perspective view of an injection bag. Fig. 13 is a plan view of an independent foundation of a structure applied to the present invention. Fig. 14 is the same structure. Longitudinal cross-section of the independent foundation (signs) A, A '... structure, B ... excavated ground, P ... pump, H
... power supply a ... solid foundation, a '... independent foundation, b ... structure, 1
… Underground beam 2… Injection pipe, 2A, 2B, 2C …… Injection pipe (branch pipe) 2D …… Injection pipe (supply pipe) 3A, 3B, 3C …… Injection bag, 4A, 4B, 4C, 4D …… cock 5 …… sand, 7,7 ′ …… heating wire
───────────────────────────────────────────────────── フロントページの続き (72)発明者 谷澤 房郎 東京都新宿区西新宿1丁目25号1号 大 成建設株式会社内 (72)発明者 村松 正重 東京都新宿区西新宿1丁目25号1号 大 成建設株式会社内 (56)参考文献 特開 平1−312123(JP,A) 特公 昭54−19083(JP,B2) (58)調査した分野(Int.Cl.6,DB名) E02D 35/00 E02D 27/34 E02D 27/38──────────────────────────────────────────────────続 き Continuing from the front page (72) Inventor Fushiro Tanizawa 1-25-1, Nishishinjuku, Shinjuku-ku, Tokyo Inside Taisei Corporation (72) Inventor Masajuge Muramatsu 1-25, Nishishinjuku, Shinjuku-ku, Tokyo No. 1 Taisei Corporation (56) References JP-A-1-312123 (JP, A) JP-B-54-19083 (JP, B2) (58) Fields investigated (Int. Cl. 6 , DB Name) E02D 35/00 E02D 27/34 E02D 27/38
Claims (4)
のレベルまで地盤を掘削し、地中梁が直交する基礎の下
方の前記掘削地盤面上に、注入材を封入する注入袋を水
平に設置し、 この注入袋に注入パイプの一端を接続し、 前記掘削地盤面の上部から構築する基礎の下部まで、土
砂を敷き均した後、基礎及び上部構造体を構築して行
き、 構造物の構築初期の段階で、構造体の任意点のレベル測
定を行って基準値を記録しておき、 構造物の完成後、構造体の任意点のレベル測定を行い、 その結果、構造物に有害な不同沈下が予想された場合、 前記不同沈下に起因する基礎の下方に設置した前記注入
袋内に、同袋に接続した注入パイプの他端より注入材を
注入して、基礎及び構造体のレベル修正を行うことを特
徴とする、 構造物の不同沈下修正方法。1. An excavation ground for excavating a ground to a predetermined depth from a lower surface of a foundation of a structure to be constructed, and an injection bag for enclosing an injectable material is provided on the excavated ground surface below the foundation to which an underground beam is orthogonal. Install horizontally, connect one end of the injection pipe to this injection bag, spread the earth and sand from the upper part of the excavated ground surface to the lower part of the foundation to be built, build the foundation and the upper structure, At the initial stage of construction of a structure, measure the level at an arbitrary point on the structure and record the reference value.After completing the structure, measure the level at an arbitrary point on the structure. When harmful uneven settlement is expected, the injection material is injected from the other end of the injection pipe connected to the bag into the injection bag installed below the foundation caused by the uneven settlement, and the foundation and structure Repair of structures, characterized by level correction Right way.
において、注入材は、常温で固化し、高温で液化する特
性を有し、加熱して液化した注入材を袋に注入すること
を特徴とする、構造物の不同沈下修正方法。2. The method for correcting uneven settlement of a structure according to claim 1, wherein the injection material has a property of solidifying at room temperature and liquefying at high temperature, and injects the injection material liquefied by heating into a bag. A method for correcting uneven settlement of a structure.
において、注入パイプ及び注入袋に、加熱用ワイヤーを
内蔵したことを特徴とする、構造物の不同沈下修正方
法。3. The method of claim 1, wherein a heating wire is incorporated in the injection pipe and the injection bag.
において、注入袋は、同袋の内壁材が剥離性を有する材
料で構成したことを特徴とする、構造物の不同沈下修正
方法。4. The method of claim 1, wherein the infusion bag is made of a material having a releasable inner wall material. .
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP21303089A JP2807833B2 (en) | 1989-08-21 | 1989-08-21 | Method for correcting uneven settlement of structures |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP21303089A JP2807833B2 (en) | 1989-08-21 | 1989-08-21 | Method for correcting uneven settlement of structures |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0376934A JPH0376934A (en) | 1991-04-02 |
| JP2807833B2 true JP2807833B2 (en) | 1998-10-08 |
Family
ID=16632348
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP21303089A Expired - Fee Related JP2807833B2 (en) | 1989-08-21 | 1989-08-21 | Method for correcting uneven settlement of structures |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2807833B2 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112482454A (en) * | 2020-11-24 | 2021-03-12 | 河海大学 | Deviation rectifying construction method for building or structure by using bionic principle |
| CN112482455A (en) * | 2020-11-24 | 2021-03-12 | 河海大学 | Post-grouting miniature steel pipe pile building or structure deviation rectifying and reinforcing construction method |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4807624B2 (en) * | 2006-06-29 | 2011-11-02 | 株式会社 ▲高▼▲橋▼監理 | Non-uniform settlement correction method for buildings using water pressure. |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5419083B2 (en) | 2009-08-28 | 2014-02-19 | 公立大学法人公立はこだて未来大学 | Wireless tag management server, wireless tag, and wireless tag management system |
-
1989
- 1989-08-21 JP JP21303089A patent/JP2807833B2/en not_active Expired - Fee Related
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5419083B2 (en) | 2009-08-28 | 2014-02-19 | 公立大学法人公立はこだて未来大学 | Wireless tag management server, wireless tag, and wireless tag management system |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112482454A (en) * | 2020-11-24 | 2021-03-12 | 河海大学 | Deviation rectifying construction method for building or structure by using bionic principle |
| CN112482455A (en) * | 2020-11-24 | 2021-03-12 | 河海大学 | Post-grouting miniature steel pipe pile building or structure deviation rectifying and reinforcing construction method |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0376934A (en) | 1991-04-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106958256B (en) | A caisson construction technology with layered pouring and multiple subsidence | |
| Brown et al. | Compaction grouting | |
| CN211200426U (en) | Anti-sliding supporting and retaining structure for miniature steel pipe pile retaining wall | |
| US4338047A (en) | System for pier underpinning of settling foundation | |
| Mishu et al. | Foundation remedies for residential construction over karst limestone in Nashville, Tennessee | |
| US4453366A (en) | Process of forming a continuous wall in the ground | |
| JP3126896B2 (en) | Restoration method for uneven settlement structures | |
| CN107503323B (en) | A kind of method of construction of ecological slope protection | |
| CN108999142A (en) | The construction method of dome rectangular light-duty caisson and pile foundation combined type deep water breakwater | |
| JP2807833B2 (en) | Method for correcting uneven settlement of structures | |
| CN115030155B (en) | Construction method of photovoltaic support prefabricated piles based on grouting technology for harder strata | |
| JPH0547685B2 (en) | ||
| US20120163923A1 (en) | Structure supporting system | |
| US4981399A (en) | Method and apparatus for increasing bearing capacity of soft soil and constructing cutoff wall | |
| CN117027012A (en) | High-polymer grouting rapid reinforced high-fill side slope and construction method thereof | |
| CN103266624B (en) | Method for supporting oil and gas pipeline penetrating through karst active zone | |
| CN114635715A (en) | Method for reinforcing hard rock mining cavity by support method and hard rock mining cavity support structure | |
| JP4080421B2 (en) | How to adjust the height of the structure | |
| KR102596812B1 (en) | Self-supporting retaining wall system based on multi-step structure by selectively measuring of moisture | |
| CN116180825B (en) | A method for preventing and reinforcing uneven settlement of the outer retaining wall of an underground garage | |
| CN115874651A (en) | Foundation structure in house building construction | |
| CN114718078B (en) | Building envelope for soft soil of ultra-large deep foundation pit and construction method | |
| US6508609B2 (en) | Method of forming an in-situ void system | |
| CN116556308A (en) | Foundation reinforcement method combining steel pipe column and grouting technology | |
| Fava et al. | Design and construction of an urban tunnel in Rabat, Morocco |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |