Structure of concrete block and method of stacking concrete block on slope

Info

Publication number
JP2829626B2
JP2829626B2 JP14926089A JP14926089A JP2829626B2 JP 2829626 B2 JP2829626 B2 JP 2829626B2 JP 14926089 A JP14926089 A JP 14926089A JP 14926089 A JP14926089 A JP 14926089A JP 2829626 B2 JP2829626 B2 JP 2829626B2
Authority
JP
Japan
Prior art keywords
concrete block
slope
concrete
block
stage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP14926089A
Other languages
Japanese (ja)
Other versions
JPH0321723A (en
Inventor
俊一 烏田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KEIKON KK
Original Assignee
KEIKON KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KEIKON KK filed Critical KEIKON KK
Priority to JP14926089A priority Critical patent/JP2829626B2/en
Publication of JPH0321723A publication Critical patent/JPH0321723A/en
Application granted granted Critical
Publication of JP2829626B2 publication Critical patent/JP2829626B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Retaining Walls (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は岩部切取法面に積み重ねて設置されるコンク
リートブロックの構造及び該コンクリートブロックを順
次積み重ねて設置する施工方法に関する。
Description: TECHNICAL FIELD The present invention relates to a structure of concrete blocks stacked and installed on a rock cutting surface and a construction method of sequentially stacking and installing the concrete blocks.

(従来の技術) 従来、岩部切取法面の崩壊を防止し、かつ該切取面の
外観を良くするために、該法面にコンクリートブロック
を積み重ねて設置したり、あるいは該法面にコンクリー
トを吹き付けて固定したりしている。
(Prior Art) Conventionally, in order to prevent collapse of a rock cut slope and to improve the appearance of the cut face, concrete blocks are stacked and installed on the slope, or concrete is sprayed on the slope. Or fixed.

(発明が解決しようとする課題) ところが、従来のコンクリートブロックの積み重ね施
工方法においては、該コンクリートブロックの勾配を定
めることが困難である上、積み重ねの位置決めも困難で
あった。
(Problems to be Solved by the Invention) However, in the conventional method of stacking concrete blocks, it is difficult to determine the gradient of the concrete blocks, and it is also difficult to position the stack.

そこで本発明の目的は、コンクリートブロックを積み
重ねた場合に、勾配が簡単に決定できると同時に積み重
ねの位置決めも簡単に行なわれるようにしてコンクリー
トブロックの施工性を改善せんとするにある。
Therefore, an object of the present invention is to improve the workability of concrete blocks by stacking concrete blocks so that the gradient can be easily determined and the positioning of the stack can be easily performed.

(課題を解決するための手段) 本発明の特徴とするところは、次のコンクリートブロ
ックの構造及び該コンクリートブロックの設置施工方法
を提供するところにある。
(Means for Solving the Problems) It is a feature of the present invention to provide the following structure of a concrete block and a method of installing and installing the concrete block.

法面に沿って積み重ね設置される平板状のコンクリー
トブロックと、該コンクリートブロックの上下にそれぞ
れ設けられ、固定ボルトを螺入して鋼材を固定する固定
ボルト用のインサートと、該コンクリートブロックの上
面及び下面に設けられ、ガイドピンを嵌入することによ
り上下のコンクリートブロックを位置決め載置するガイ
ドピン穴と、前記コンクリートブロックの上面に設けら
れた取外し自在の凹型鋼に設けられ、勾配調整ねじが螺
入されるナットと、コンクリートブロックの裏面に設け
られ、該コンクリートブロックを法面に固定するアンカ
ーとからなり、このコンクリートブロックが法面に沿っ
て積み重ね設置されること。
A flat concrete block stacked and installed along the slope, inserts for fixing bolts provided respectively above and below the concrete block and screwing the fixing bolt to fix the steel material, and an upper surface of the concrete block and A guide pin hole provided on the lower surface for positioning and placing the upper and lower concrete blocks by inserting guide pins, and a detachable concave steel provided on the upper surface of the concrete block, and a gradient adjusting screw is screwed therein. A concrete block and an anchor provided on the back surface of the concrete block for fixing the concrete block to the slope, and the concrete blocks are stacked and installed along the slope.

上記コンクリートブロックを次の工程によって法面に
積み重ね設置するコンクリートブロックの施工方法。
A concrete block construction method in which the concrete blocks are stacked and installed on a slope by the following steps.

イ.基礎ブロックを法面下の平地に設置し、固定する。I. Install the foundation block on the flat ground below the slope and fix it.

ロ.該基礎ブロックの嵌入溝に1段目のコンクリートブ
ロックの下面を嵌入し、凹型鋼に設けられたナットに螺
入された勾配調整ねじを回転させて該コンクリートブロ
ックが所定の勾配になるように調整する。
B. The lower surface of the first-stage concrete block is fitted into the fitting groove of the base block, and the concrete block is adjusted to have a predetermined gradient by rotating a gradient adjusting screw screwed into a nut provided on the concave steel. I do.

ハ.コンクリートブロックの裏面に設置されたアンカー
と法面設置のアンカーとを連結固定する。
C. The anchor installed on the back of the concrete block and the anchor installed on the slope are connected and fixed.

ニ.凹型鋼を取り外す。D. Remove the concave steel.

ホ.コンクリートブロックと法面との間に裏込コンクリ
ートを打設する。
E. Pour back concrete between the concrete block and the slope.

ヘ.2段目のコンクリートブロックに固定ボルトで鋼材を
上下のインサートに螺入固定し、これを1段目のコンク
リートブロックの上面に位置させ、1段目のコンクリー
トブロックに設けられたガイドピンを2段目のコンクリ
ートブロックに形成されたガイドピン嵌入穴に嵌入させ
て位置決め載置する。
F. Screw the steel material into the upper and lower inserts with fixing bolts on the second-stage concrete block, position it on the upper surface of the first-stage concrete block, and attach the guide pins provided on the first-stage concrete block. It is positioned and mounted by being inserted into guide pin insertion holes formed in the second stage concrete block.

ト.凹型鋼に設けられたナットに螺入された勾配調整ね
じを回転させて2段目のコンクリートブロックが所定の
勾配になるように調整する。
G. The second level concrete block is adjusted to have a predetermined gradient by rotating a gradient adjusting screw screwed into a nut provided on the concave steel.

チ.鋼材を貫通して固定ボルトを取り付け、該固定ボル
トを1段目のコンクリートブロックの上下のインサート
に螺入固定する。
H. A fixing bolt is attached through the steel material, and the fixing bolt is screwed into the upper and lower inserts of the first concrete block.

リ.2段目のコンクリートブロックに設けられたアンカー
と法面設置のアンカーとを連結固定する。
Reconnect and fix the anchor provided on the second-stage concrete block with the anchor installed on the slope.

ヌ.凹型鋼と鋼材とを取り外す。Nu. Remove the concave steel and steel material.

ル.2段目のコンクリートブロックと法面との間に裏込コ
ンクリートを打設する。
Le. Pour back concrete between the 2nd concrete block and the slope.

ヲ.所定の段数だけ前記2段目のコンクリートブロック
の設置工程を繰り返して施工を完了する。
ヲ. The installation is completed by repeating the step of installing the second concrete block for a predetermined number of steps.

(実施例) 以下、図によって本発明の一実施例を説明する。Hereinafter, an embodiment of the present invention will be described with reference to the drawings.

第1図は1段目のコンクリートブロックの設置状態を
示す断面図である。
FIG. 1 is a sectional view showing an installation state of a first-stage concrete block.

図を参照して、まず基礎ブロック1を設置する。基礎
ブロック1は貫通穴2及び後述のコンクリートブロック
が載置される嵌入溝3を有している。基礎ブロック1は
据え付け用の敷きモルタル4の上に正確に位置決めして
設置され、鉄筋5を貫通穴2を通して地中に埋設して該
基礎ブロック1を固定する。その後、貫通穴2にモルタ
ルを注入して鉄筋5を基礎ブロック1に固定する。
Referring to the figure, first, a basic block 1 is installed. The base block 1 has a through hole 2 and a fitting groove 3 in which a concrete block described later is placed. The base block 1 is accurately positioned and installed on the laying mortar 4 for installation, and the reinforcing bar 5 is embedded in the ground through the through hole 2 to fix the base block 1. Thereafter, mortar is injected into the through-hole 2 to fix the reinforcing bar 5 to the base block 1.

次に1段目のコンクリートブロック61を基礎ブロック
1の嵌入溝3に嵌入する。コンクリートブロック61は上
下に1個以上のインサート71が設けられている。又、コ
ンクリートブロック61の上面には凹型鋼81が設置されて
いる。凹型鋼81は該コンクリートブロック61が固定され
た後に取り外されるものであり、該凹型鋼81が取り外さ
れた後のコンクリートブロック61の上面にはガイドピン
91が設けられている。又、凹型鋼81の上部にはナット10
1が固定され、該ナット101には勾配調整ねじ111が螺入
されている。尚、ここで凹型鋼81は省略可能である。こ
の場合には勾配調整ねじ111が螺入されるナット101をコ
ンクリートブロック61の上面に固定設置しなければなら
ないので、該ナット101をガイドピン兼用とすることが
望ましい。コンクリートブロック61の背面にはアンカー
121が所定数だけ設けられている。
Then fitting the concrete block 61 of each stage to the insertion groove 3 of base block 1. Concrete block 61 is one or more inserts 71 upward and downward. Further, concave steel 81 is installed on the upper surface of the concrete block 61. Recessed steel 8 1 is intended to be removed after the concrete block 61 is fixed, the upper surface of the concrete block 61 after the concave-section steel 8 1 is removed guide pin
9 1 is provided. Further, the nut 10 is at the top of the concave Steel 8 1
1 is fixed, the slope adjusting screw 11 1 for the nut 10 1 is screwed. Here, concave steel 8 1 can be omitted. In this case, since must fixedly mounted a nut 10 1 gradient adjusting screw 11 1 is screwed to the upper surface of the concrete block 61, it is desirable that the said nut 10 first guide pin combined. Anchor on the back of the concrete block 6 1
12 1 is provided by a predetermined number.

1段目のコンクリートブロック61は図示しないクレー
ンによって吊り上げられて基礎ブロック1の嵌入溝3中
に嵌入載置される。
First stage of the concrete block 61 is fitted placed lifted by a crane, not shown in the insertion groove 3 of base block 1.

その後、勾配調整ねじ111を回転させてコンクリート
ブロック61を所定の勾配に調整する。
Thereafter, the slope adjusting screw 11 1 is rotated to adjust the concrete block 61 in a predetermined slope.

勾配を調整した後、アンカー121と法面に埋設された
アンカー13とを鉄筋141で熔接固定する。
After adjusting the slope and welding and fixing the anchor 13 embedded in the anchor 121 and the slope face by rebar 14 1.

コンクリートブロック61が完全に固定されると、凹型
鋼81を取り外し、更にコンクリートブロック61と法面と
の間に裏込コンクリート15を打設する。
When concrete block 61 is fully seated, remove the concave steel 8 1, further pouring the Urakomi concrete 15 between the concrete block 61 and slopes.

所定時間が経過して(通常24時間程度である)裏込コ
ンクリート15が十分に強度を持つに至ると、次のような
手順で2段目のコンクリートブロック62を1段目のコン
クリートブロック61の上面に載せる作業を行なう。
After the lapse of a predetermined time (usually about 24 hours) the Urakomi concrete 15 reaches with sufficient strength, the concrete blocks 6 2 of the second stage in the following steps first stage concrete block 6 Work to put on top of 1 .

第2図を参照して、まず、平地にて2段目のコンクリ
ートブロック62に角型鋼16を固定する。この固定は取り
付けボルト17を上下のインサート72に螺入させて行な
う。角型鋼16の長さは、2段目のコンクリートブロック
62の高さと前記1段目のコンクリートブロック61の高さ
の合計高さとなっている。尚、角型鋼16は直線を出すと
同時に、裏込めコンクリートを打設する際の1段目と2
段目の継目の膨らみを防止するための構造物である。
With reference to Figure 2, first, to secure the rectangular steel 16 in the concrete block 6 2 of the second stage at level ground. The fixing is performed by screwing the mounting bolt 17 at the top and bottom of the insert 7 2. The length of square steel 16 is the second stage concrete block
Concrete blocks 6 1 6 2 height and the first stage has a height total height. In addition, the square steel 16 makes a straight line, and at the same time the first stage and
This is a structure for preventing the swelling of the seam of the step.

次いで、該角型鋼16が設置された状態のコンクリート
ブロック62をクレーンで吊り上げ、1段目のコンクリー
トブロック61の上面に載置し、1段目のコンクリートブ
ロック61に設けられたガイドピン91を2段目のコンクリ
ートブロック62の下面に設けられたガイドピン穴182
嵌入させる。尚、ガイドピン穴182は1段目のコンクリ
ートブロック61には不要であるが、コンクリートブロッ
クを規格品とするために、該ガイドピン穴を設置して置
いてもよい。このガイドピン91がガイドピン穴182に嵌
入することによって簡単に位置決めされる。そして、2
段目のコンクリートブロック62の勾配調整ねじ112を回
転させて所定の勾配とし、次いで取り付ボルト17をイン
サート71に螺入させて角型鋼16と1段目のコンクリート
ブロック61とを結合固定し、2段目のコンクリートブロ
ック62を所定の勾配に固定する。そして、アンカー122
と法面に埋設された法面アンカー13とを鉄筋142で熔接
固定する。これによって、2段目のコンクリートブロッ
ク62の固定を強固とし、かつ勾配を正確に調整できる。
Then, lifting the concrete blocks 6 2 with the angular type steel 16 is installed in a crane, placed on the top surface of the concrete blocks 61 of the first stage, the guide pin provided on the first stage of the concrete blocks 61 9 1 is fitted into the guide pin holes 18 2 provided on the lower surface of the concrete block 6 2 of the second stage. Although the guide pin hole 18 2 is not required in the first stage of the concrete block 61, to the concrete block and standard products, it may be placed by installing the guide pin holes. The guide pin 9 1 is simply positioned by fitting the guide pin holes 18 2. And 2
Gradient adjusting screw 11 2 concrete blocks 6 2 -th stage is rotated with a predetermined slope, then taken up bolts 17 and the concrete block 61 with rectangular steel 16 by threaded into the insert 7 1 1-stage bound fixed, to secure the second stage of the concrete blocks 6 2 in a predetermined slope. And anchor 12 2
A slope anchors 13 embedded in the slope to weld fixed by rebar 14 2. Thus, the firm of the second stage of the concrete block 6 2 fixed and slope can be precisely adjusted.

2段目のコンクリートブロック62の固定作業が完了す
ると、該コンクリートブロック62と法面との間に裏込コ
ンクリートを打設する。
When fixing work of concrete blocks 6 2 of the second stage is completed, the pouring the Urakomi concrete between the concrete block 6 2 and slope.

裏込コンクリートの打設が完了すると、凹型鋼82と角
型鋼16を取り外して2段目のコンクリートブロック62
施工が終了する。
When pouring the Urakomi concrete is completed, the second stage of construction of the concrete block 6 2 ends by removing the concave steel 82 and rectangular steel 16.

3段目以降のコンクリートブロックの設置は前記2段
目のコンクリートブロックの設置と同じであるから、3
段目以降の施工の説明は省略する。
Since the setting of the concrete blocks in the third and subsequent steps is the same as the setting of the concrete blocks in the second step, 3
The description of the construction after the step is omitted.

以上は、本発明の一実施例であって、本発明は上記実
施例に限定されるものではない。
The above is one embodiment of the present invention, and the present invention is not limited to the above embodiment.

例えば、インサートの設置数はコンクリートブロック
の大きさによって適宜に選択採用されるものである。
For example, the number of inserts is appropriately selected and adopted depending on the size of the concrete block.

又、アンカーの数も同様にコンクリートブロックの大
きさによって適宜に選択採用されるものである。
Similarly, the number of anchors is also appropriately selected and adopted depending on the size of the concrete block.

アンカー同士の連結固定は図示の鉄筋を熔接して連結
固定するものに限定されるものではなく、例えば、鋼線
で連結固定する構造とすることもできる。
The connection and fixation of the anchors is not limited to the connection and fixation by welding the illustrated rebar, and for example, a structure of connecting and fixing with a steel wire can also be used.

(発明の効果) 以上説明したように本発明によると、施工工程が簡単
となり、かつ作業効率が向上するものとなる。
(Effects of the Invention) As described above, according to the present invention, the construction process is simplified and the working efficiency is improved.

又、位置決めが簡単となり、かつ施工精度が向上す
る。
In addition, positioning is simplified, and construction accuracy is improved.

【図面の簡単な説明】[Brief description of the drawings]

第1図は1段目のコンクリートブロックを設置した状態
を示す断面図、第2図は第1図のコンクリートブロック
の正面図、第3図は2段目のコンクリートブロックの設
置状態をしめす断面図である。 1:基礎ブロック、2:貫通穴、3:嵌入溝 4:敷きモルタル、5:鉄筋 61、62:コンクリートブロック 71、72:インサート、81、82:凹型鋼 91:ガイドピン、101:ナット 111、112:勾配調整ねじ 121、122:アンカー、13:アンカー 141、142:鉄筋、15:裏込めコンクリート 16:角型鋼、17:取り付けボルト 182:ガイドピン穴
1 is a sectional view showing a state where a first-stage concrete block is installed, FIG. 2 is a front view of the concrete block in FIG. 1, and FIG. 3 is a sectional view showing an installed state of a second-stage concrete block. It is. 1: Basic Block 2: through hole, 3: fitting grooves 4: laying mortar, 5: reinforcing bar 6 1, 6 2: Concrete blocks 7 1, 7 2: insert, 8 1, 8 2: Recessed Steel 9 1: Guide Pin, 10 1 : Nut 11 1 , 11 2 : Slope adjusting screw 12 1 , 12 2 : Anchor, 13: Anchor 14 1 , 14 2 : Reinforcing bar, 15: Backfill concrete 16: Square steel, 17: Mounting bolt 18 2 : Guide pin hole

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】法面に沿って積み重ね設置される平板状の
コンクリートブロックと、 該コンクリートブロックの上下にそれぞれ設けられ、固
定ボルトを螺入して鋼材を固定する固定ボルト用のイン
サートと、 該コンクリートブロックの上面及び下面に設けられ、ガ
イドピンを嵌入することにより上下のコンクリートブロ
ックを位置決め載置するガイドピン穴と、 前記コンクリートブロックの上面に設けられた取外し自
在の凹型鋼に設けられ、勾配調整ねじが螺入されるナッ
トと、 コンクリートブロックの裏面に設けられ、該コンクリー
トブロックを法面に固定するアンカーとからなり、 法面に沿って積み重ね設置されることを特徴とするコン
クリートブロックの構造。
1. A flat concrete block which is stacked and installed along a slope, and inserts for fixing bolts which are respectively provided above and below the concrete block and which are screwed with fixing bolts to fix steel. Guide pin holes provided on the upper and lower surfaces of the concrete block for positioning and placing the upper and lower concrete blocks by inserting guide pins, and provided on a removable concave steel provided on the upper surface of the concrete block, A concrete block structure comprising: a nut into which an adjusting screw is screwed; and an anchor provided on a back surface of the concrete block and fixing the concrete block to a slope, wherein the concrete block is stacked and installed along the slope. .
【請求項2】次の工程からなることを特徴とする法面に
積み重ね設置される請求項第1項記載のコンクリートブ
ロックの施工方法。 イ.基礎ブロックを法面下の平地に設置し、固定する。 ロ.該基礎ブロックの嵌入溝に1段目のコンクリートブ
ロックの下面を嵌入し、凹型鋼に設けられたナットに螺
入された勾配調整ねじを回転させて該コンクリートブロ
ックが所定の勾配になるように調整する。 ハ.コンクリートブロックの裏面に設置されたアンカー
と法面設置のアンカーとを連結固定する。 ニ.凹型鋼を取り外す。 ホ.コンクリートブロックと法面との間に裏込コンクリ
ートを打設する。 ヘ.2段目のコンクリートブロックに固定ボルトで鋼材を
上下のインサートに螺入固定し、これを1段目のコンク
リートブロックの上面に位置させ、1段目のコンクリー
トブロックに設けられたガイドピンを2段目のコンクリ
ートブロックに形成されたガイドピン嵌入穴に嵌入させ
て位置決め載置する。 ト.凹型鋼に設けられたナットに螺入された勾配調整ね
じを回転させて2段目のコンクリートブロックが所定の
勾配になるように調整する。 チ.鋼材を貫通して固定ボルトを取り付け、該固定ボル
トを1段目のコンクリートブロックの上下のインサート
に螺入固定する。 リ.2段目のコンクリートブロックに設けられたアンカー
と法面設置のアンカーとを連結固定する。 ヌ.凹型鋼と鋼材とを取り外す。 ル.2段目のコンクリートブロックと法面との間に裏込コ
ンクリートを打設する。 ヲ.所定の段数だけ前記2段目のコンクリートブロック
の設置工程を繰り返して施工を完了する。
2. The concrete block construction method according to claim 1, wherein the concrete blocks are stacked and installed on a slope. I. Install the foundation block on the flat ground below the slope and fix it. B. The lower surface of the first-stage concrete block is fitted into the fitting groove of the base block, and the concrete block is adjusted to have a predetermined gradient by rotating a gradient adjusting screw screwed into a nut provided on the concave steel. I do. C. The anchor installed on the back of the concrete block and the anchor installed on the slope are connected and fixed. D. Remove the concave steel. E. Pour back concrete between the concrete block and the slope. F. Screw the steel material into the upper and lower inserts with fixing bolts on the second-stage concrete block, position it on the upper surface of the first-stage concrete block, and attach the guide pins provided on the first-stage concrete block. It is positioned and mounted by being inserted into guide pin insertion holes formed in the second stage concrete block. G. The second level concrete block is adjusted to have a predetermined gradient by rotating a gradient adjusting screw screwed into a nut provided on the concave steel. H. A fixing bolt is attached through the steel material, and the fixing bolt is screwed into the upper and lower inserts of the first concrete block. Reconnect and fix the anchor provided on the second-stage concrete block with the anchor installed on the slope. Nu. Remove the concave steel and steel material. Le. Pour back concrete between the 2nd concrete block and the slope.ヲ. The installation is completed by repeating the step of installing the second concrete block for a predetermined number of steps.
JP14926089A 1989-06-12 1989-06-12 Structure of concrete block and method of stacking concrete block on slope Expired - Fee Related JP2829626B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14926089A JP2829626B2 (en) 1989-06-12 1989-06-12 Structure of concrete block and method of stacking concrete block on slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14926089A JP2829626B2 (en) 1989-06-12 1989-06-12 Structure of concrete block and method of stacking concrete block on slope

Publications (2)

Publication Number Publication Date
JPH0321723A JPH0321723A (en) 1991-01-30
JP2829626B2 true JP2829626B2 (en) 1998-11-25

Family

ID=15471364

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14926089A Expired - Fee Related JP2829626B2 (en) 1989-06-12 1989-06-12 Structure of concrete block and method of stacking concrete block on slope

Country Status (1)

Country Link
JP (1) JP2829626B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400673B (en) * 2016-05-23 2018-10-09 中交第一航务工程局有限公司 A kind of installation method of novel drawing anchor block

Also Published As

Publication number Publication date
JPH0321723A (en) 1991-01-30

Similar Documents

Publication Publication Date Title
KR20210033815A (en) Method for strengthening the foundation of a structure with improved construction precision and reinforced structural strength
JP2829626B2 (en) Structure of concrete block and method of stacking concrete block on slope
EP2931976B1 (en) Foundation system for bridges and other structures
JP3185129B2 (en) Column-integrated column base fixed foundation structure and its construction method
JPS61233131A (en) Foundation structure of pole
CN214246273U (en) Cast-in-place roof beam of underground assembly type station exempts from formwork structure
JPH0674591B2 (en) Anchor support beam construction method
EP0058851A1 (en) Building structure of prefabricated elements
JP2002097818A (en) Installation method of building base isolation base
JPS59192145A (en) Fixing of iron pillar
JP2649205B2 (en) Anchor bolt burying method
CA2144938C (en) Method of manufacturing building modules and structures formed thereby
JPH0593423A (en) Guide wall constructing pc slab and construction method of guide wall
CN114592423B (en) Wet joint connection construction method for prefabricated pier column and bearing platform
JP7396763B1 (en) 3-point anchor integrated liner, long anchor integrated liner, equipment installation method
CN216999270U (en) Wet seam connecting structure of prefabricated pier stud and bearing platform
KR200494977Y1 (en) Fixing structure under a foundation in pile pressing system for foundation reinforcement
JP4231344B2 (en) The method of erection of pillars in the lightweight embankment method and the anchor bolt positioning jig used therefor
JPH0464368B2 (en)
JP3025144B2 (en) How to build a fuel pool foundation
JP3368360B2 (en) How to install a packer plate for equipment installation
JPH08232270A (en) Method for stabilizing slope
JPS6268928A (en) Construction for foundation for setting machine
JP3017084U (en) Jig for level adjustment of side form
JP2717643B2 (en) Prefabricated retaining wall

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080925

Year of fee payment: 10

LAPS Cancellation because of no payment of annual fees