Hoop connection device

Info

Publication number
JP2830005B2
JP2830005B2 JP1025375A JP2537589A JP2830005B2 JP 2830005 B2 JP2830005 B2 JP 2830005B2 JP 1025375 A JP1025375 A JP 1025375A JP 2537589 A JP2537589 A JP 2537589A JP 2830005 B2 JP2830005 B2 JP 2830005B2
Authority
JP
Japan
Prior art keywords
hoop material
hoop
cutting
welding
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1025375A
Other languages
Japanese (ja)
Other versions
JPH02205263A (en
Inventor
貞夫 中西
洋 永島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shinko Electric Co Ltd
Original Assignee
Shinko Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shinko Electric Co Ltd filed Critical Shinko Electric Co Ltd
Priority to JP1025375A priority Critical patent/JP2830005B2/en
Publication of JPH02205263A publication Critical patent/JPH02205263A/en
Application granted granted Critical
Publication of JP2830005B2 publication Critical patent/JP2830005B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Description

【発明の詳細な説明】 「産業上の利用分野」 この発明は、フープ材の連続的供給を必要とする場合
に、フープ材どうしの溶接・接続に用いられるフープ材
接続装置に関するものである。
Description: TECHNICAL FIELD The present invention relates to a hoop material connection device used for welding and connecting hoop materials when continuous supply of hoop materials is required.

「従来の技術」 従来、ICのリードフレーム等の電子部品、精密機器用
素材となる銅、銅合金、ニッケル鋼等の薄板(フープ
材)は、そのプレス工程、打ち抜き工程等の加工工程に
供給される際には、これをロール状に巻回したフープロ
ールと呼ばれる形態で供給されるのが通常である。しか
しながら、これら工程の加工能率を向上する点や材料の
無駄を省く点から見れば、このフープ材は途切れること
なく連続して供給されることが望ましいことは言うまで
もない。そこで、これら工程の前には、フープ材どうし
の相対向する端部を突合せ又はラップ溶接するフープ材
接続装置(以下「接続装置」と略称する)が設置される
ことが最近多くなってきた。
Conventional technology Conventionally, electronic components such as lead frames for ICs, and thin plates (hoop materials) such as copper, copper alloys, and nickel steel, which are used as materials for precision equipment, are supplied to the pressing and punching processes. When this is done, it is usually supplied in a form called a hoop roll in which it is wound into a roll. However, it is needless to say that the hoop material is desirably supplied continuously without interruption from the viewpoint of improving the processing efficiency of these steps and eliminating waste of materials. Therefore, before these steps, a hoop material connection device (hereinafter, abbreviated as “connection device”) for butt-welding or lap welding opposing ends of the hoop materials has recently been frequently installed.

第4図は、従来の接続装置の一例である縦型フープ材
接続装置を示す図である。この図において、接続装置SW
1は、フープ材(図示略)の搬送方向(図中矢印Y1)に
沿って列設された切断ユニット1、溶接ユニット2、圧
延ユニット3、及び、これら3つのユニットが搭載さ
れ、前記フープ材の搬送方向Yに略直交する方向に往復
動自在に構成された溶接機本体4から構成されている。
FIG. 4 is a view showing a vertical hoop material connecting device which is an example of a conventional connecting device. In this figure, the connection device SW
Reference numeral 1 denotes a cutting unit 1, a welding unit 2, a rolling unit 3, which are arranged in a row along a conveying direction (arrow Y1 in the figure) of a hoop material (not shown), and these three units are mounted. The welding machine body 4 is configured to be reciprocally movable in a direction substantially perpendicular to the transport direction Y of the welding machine.

このような接続装置SW1を用いてフープ材の接続を行
うには、まず、フープ材が前記プレス工程等に順調に供
給されている際には、溶接機本体4を移動させること
で、前記各ユニット1〜3をフープ材の長手方向に沿う
中心線C(以下「通板センター」と略称する)から外し
ておく。すなわち、これがフープ材を供給している状態
における溶接機本体4の通常位置となる。
In order to connect the hoop material using such a connection device SW1, first, when the hoop material is smoothly supplied to the pressing step or the like, the welding machine body 4 is moved, and The units 1 to 3 are removed from the center line C (hereinafter, abbreviated as “threading center”) along the longitudinal direction of the hoop material. That is, this is the normal position of the welding machine main body 4 in a state where the hoop material is being supplied.

次に、フープ材の供給中に、図示せぬ検出手段により
フープコイルの終了が検出されると、フープ材の供給が
停止され、新しいフープコイルとの接続が行われる。
Next, when the detection means (not shown) detects the end of the hoop coil during the supply of the hoop material, the supply of the hoop material is stopped, and connection with a new hoop coil is performed.

まず、前記溶接機本体4を移動させることで、各ユニ
ット1〜3を前記通板センターC付近にまで臨ませる。
この後、これまでに供給されていた先行フープ材の終端
部が切断ユニット1上に固定され、先行フープ材終端部
の切断整形が行われる。続いて、先行フープ材に接続さ
れる新しいフープコイル(後行フープ材)の始端部が切
断ユニット1上に固定され、切断整形される。
First, by moving the welding machine body 4, the units 1 to 3 are made to approach the vicinity of the passing center C.
Thereafter, the terminal end of the preceding hoop material that has been supplied so far is fixed on the cutting unit 1, and the cutting end of the preceding hoop material is cut and shaped. Subsequently, the starting end of a new hoop coil (following hoop material) connected to the preceding hoop material is fixed on the cutting unit 1 and cut and shaped.

次に、溶接機本体4側方に立つ作業者Mにより先行フ
ープ材と後行フープ材が溶接ユニット2上へ送出され、
切断整形された先行フープ材終端部と後行フープ材始端
部との突合せ又はラップ溶接が行われる。この結果、先
行フープ材と後行フープ材とがその端部で接続されると
共に、溶接部に溶接ビードによる隆起部が形成される。
Next, the leading hoop material and the succeeding hoop material are sent out onto the welding unit 2 by the worker M standing on the side of the welding machine body 4, and
Butt or lap welding is performed between the cut and shaped leading hoop material end and the trailing hoop material starting end. As a result, the leading hoop material and the trailing hoop material are connected at their ends, and a bulge is formed at the welded portion by a weld bead.

そして、溶接が終わったフープ材の溶接部が圧延ユニ
ット3上に送られ、溶接部に形成された隆起部がローラ
等により平坦化される。以上の手順で、接続装置SW1に
よるフープ材の接続が完了する。
Then, the welded portion of the hoop material after the welding is sent to the rolling unit 3, and the raised portion formed in the welded portion is flattened by a roller or the like. With the above procedure, the connection of the hoop material by the connection device SW1 is completed.

一方、第5図は従来の接続装置の他の例である横型フ
ープ材接続装置を示す図である。この接続装置SW2は、
前記接続装置SW1において各ユニット1〜3を横に列設
したような構成である。すなわち、この接続装置SW2
は、フープ材の搬送方向(図中矢印Y2方向)に直交する
方向(図中矢印Y3方向)に沿い、かつフープ材の通板セ
ンターCから離れるに従って切断ユニット11、圧延ユニ
ット13、溶接ユニット12の順に列設された3つのユニッ
トと、これらユニット11〜13が搭載されたユニットベー
ス14と、このユニットベース14を前記矢印Y3方向に往復
動自在に支持する溶接機本体15とから構成されている。
On the other hand, FIG. 5 is a view showing a horizontal hoop material connecting device which is another example of the conventional connecting device. This connection device SW2 is
This is a configuration in which the units 1 to 3 are arranged side by side in the connection device SW1. That is, this connection device SW2
The cutting unit 11, the rolling unit 13, and the welding unit 12 are arranged along a direction (arrow Y3 direction in the figure) perpendicular to the hoop material transport direction (arrow Y3 direction in the figure) and away from the hoop material passing center C. , A unit base 14 on which these units 11 to 13 are mounted, and a welding machine body 15 for supporting the unit base 14 reciprocally in the arrow Y3 direction. I have.

このような接続装置SW2を用いてフープ材の接続を行
うには、まず、フープ材が前記プレス工程等に順調に供
給されている際には、ユニットベース14を移動させるこ
とで、前記切断ユニット11をフープ材の通板センターC
を臨む位置に配置しておく。すなわち、これがフープ材
を供給している状態におけるユニットベース14の通常位
置となる。
In order to connect the hoop material using such a connection device SW2, first, when the hoop material is smoothly supplied to the pressing step or the like, the unit base 14 is moved, so that the cutting unit 11: Hoop material passing center C
Is placed in a position facing the. That is, this is the normal position of the unit base 14 in a state where the hoop material is being supplied.

次に、フープ材の供給中に、図示せぬ検出手段により
フープコイルの終了が検出されると、まず先行フープ材
の終端部が切断ユニット11上に固定され、先行フープ材
終端部の切断整形が行われる。続いて、後行フープ材の
始端部が切断ユニット11上に固定され、切断整形され
る。
Next, during the supply of the hoop material, when the end of the hoop coil is detected by the detection means (not shown), first, the terminal end of the preceding hoop material is fixed on the cutting unit 11, and the cutting and shaping of the preceding hoop material terminal portion is performed. Done. Subsequently, the starting end of the succeeding hoop material is fixed on the cutting unit 11 and cut and shaped.

次に、ユニットベース14を移動させることで、先行フ
ープ材と後行フープ材が溶接ユニット12上へ送られ、切
断整形された先行フープ材終端部と後行フープ材始端部
との突合せ又はラップ溶接がユニットベース14後方のフ
ープ材側方に立つ作業者Mにより行われる。
Next, by moving the unit base 14, the preceding hoop material and the succeeding hoop material are sent onto the welding unit 12, and the cut end of the leading hoop material end portion and the trailing hoop material starting end portion are joined or wrapped. The welding is performed by an operator M standing on the side of the hoop material behind the unit base 14.

そして、ユニットベース14を前述の通常状態に戻す途
中において、溶接が終わったフープ材の溶接部が圧延ユ
ニット13上に位置した際にこの圧延ユニット13を作動さ
せ、溶接部に形成された隆起部を平坦化する。以上の手
順で、接続装置SW2によるフープ材の接続が完了する。
In the process of returning the unit base 14 to the above-described normal state, when the welded portion of the hoop material having been welded is positioned on the rolling unit 13, the rolling unit 13 is operated, and the raised portion formed in the welded portion is formed. Is flattened. With the above procedure, the connection of the hoop material by the connection device SW2 is completed.

なお、これら従来の接続装置SW1、SW2において、溶接
機本体4にはその下面にキャスター、レール等が設けら
れることで手動により往復動され、またユニットベース
14にはモータ、アクチュエータ等が設けられることで自
動的に往復動されるように構成されている。
In these conventional connection devices SW1 and SW2, the welding machine body 4 is provided with casters, rails and the like on its lower surface to be reciprocated manually,
The motor 14 is configured to be automatically reciprocated by being provided with a motor, an actuator and the like.

ところで、このようなフープ材を接続する接続装置
は、その設置環境等を考慮すると、次のような条件を満
足することが望ましい。
By the way, it is desirable that the connection device for connecting such a hoop material satisfies the following conditions in consideration of the installation environment and the like.

装置本体が小形でプレスマシンの間などの狭い空間
内に設置可能であること、 通板中(フープ材がプレス工程等に順調に供給され
ている状態)においてフープ材と接続装置(特に溶接ユ
ニット)とが干渉しあわないこと、 フープ材の接続作業が容易でかつ再現性の高いもの
であること。
The main body of the machine is small and can be installed in a narrow space such as between press machines. The hoop material and the connecting device (particularly the welding unit ) Should not interfere with each other, and the connection of the hoop material should be easy and highly reproducible.

このような観点から前記各接続装置SW1、SW2を眺めて
みると、これら接続装置SW1、SW2は以下に挙げるような
問題点をそれぞれ抱えていた。
Looking at the connection devices SW1 and SW2 from such a viewpoint, these connection devices SW1 and SW2 have the following problems, respectively.

まず、縦型の接続装置SW1においては、各ユニット1
〜3がフープ材の搬送方向Y1に沿って列設されているた
め、切断→溶接→圧延の各工程間を移動する際にはフー
プ材を移動させねばならず、フープ材の接続作業全体が
大変面倒なものとなっていた。また、各ユニット1〜3
における作業を作業員Mによる手作業とした場合、各ユ
ニット1〜3の両サイドに作業員Mの腕が入りうる空間
を確保せねばならず、必然的に装置全体の大型化を招い
ていた。さらに、溶接機本体4は手動で移動する構成で
あるがために、各ユニット1〜3の通板センターC上へ
の位置決めが大変困難であり、フープ材の接続作業を更
に面倒なものとする要因となっていた。
First, in the vertical connection device SW1, each unit 1
3 are arranged in a row along the hoop material transport direction Y1, so that the hoop material must be moved when moving between the steps of cutting → welding → rolling. It was very troublesome. In addition, each unit 1-3
In the case of the manual operation by the worker M, the space in which the arm of the worker M can enter must be secured on both sides of each of the units 1 to 3, which inevitably leads to an increase in the size of the entire apparatus. . Furthermore, since the welding machine main body 4 is configured to move manually, it is very difficult to position the units 1 to 3 on the passing center C, and the connection work of the hoop material is further complicated. Was a factor.

一方、横型の接続装置SW2においては、通板中におい
てフープ材と切断ユニット11とが同位置に配置される構
成であるので、この切断ユニット11とフープ材とが干渉
しあわないように注意を払う必要がある。また、各ユニ
ット11〜13がフープ材の搬送方向Y2に直交する方向Y3に
列設されているので、この方向の設置スペースを大きく
必要として、これがために装置が必然的に大型化する傾
向にある。さらに、第5図に示すように、作業員Mの立
つ位置がフープ材の接合作業を行う位置に対して斜めと
なるので、例えば溶接作業においてフープ材両端の溶け
落ち防止の作業等ができない等、その操作性が大変悪
い。このため、各ユニット11〜13を自動化することとな
るが、このユニットの自動化に伴い更に装置全体が大型
化する、という悪循環を招いていた。
On the other hand, in the horizontal connection device SW2, since the hoop material and the cutting unit 11 are arranged at the same position during the passage, care must be taken so that the cutting unit 11 and the hoop material do not interfere with each other. You need to pay. Further, since the units 11 to 13 are arranged in a row in the direction Y3 orthogonal to the hoop material transport direction Y2, a large installation space is required in this direction, and this tends to inevitably increase the size of the apparatus. is there. Further, as shown in FIG. 5, since the position where the worker M stands is inclined with respect to the position where the joining operation of the hoop material is performed, for example, it is not possible to perform the work for preventing the burnout of both ends of the hoop material in the welding operation. , Its operability is very poor. For this reason, each of the units 11 to 13 is to be automated, but this automation of the units has caused a vicious cycle in which the entire apparatus is further enlarged.

このような問題点を解決するために、本出願人は、先
に第6図に示すような接続装置SW3を提案している(特
願昭62−316510号)。第6図において、接続装置SW3
は、切断ユニット21と、溶接ユニット22と、圧延ユニッ
ト23と、これら各ユニット21〜23が上面に搭載される本
体フレーム24とから概略構成されている。そして、フー
プ材20は、この本体フレーム24上方をその一辺に沿って
(図中矢印Y4方向)横断するように搬送され、すなわ
ち、この本体フレーム24上面のフープ材20に沿う帯状の
部分は、フープ材20が横断するフープ材横断部25とされ
る。また、本体フレーム24上面のフープ材横断部25側方
には、フープ材20の横断方向Y4に沿って帯状のガイド部
材27aが取り付けられると共に、このガイド部材27aから
所定距離だけ離間されて、これと平行にガイド部材27b
が取り付けられている。そして、これらガイド部材27
a、27b間の本体フレーム24上面には、前記各ユニット21
〜23が搭載される移動テーブル26が載置されている。ま
た、この移動テーブル26底面にはキャスター(図示略)
が取り付けられ、これにより、移動テーブル26は前記ガ
イド部材27a、27bひ沿って、すなわちフープ材20の横断
方向Y4に沿って移動自在に構成されている。
In order to solve such a problem, the present applicant has previously proposed a connection device SW3 as shown in FIG. 6 (Japanese Patent Application No. 62-316510). In FIG. 6, the connection device SW3
Is generally composed of a cutting unit 21, a welding unit 22, a rolling unit 23, and a main body frame 24 on which these units 21 to 23 are mounted on the upper surface. Then, the hoop material 20 is conveyed so as to cross over the main body frame 24 along one side thereof (in the direction of arrow Y4 in the figure), that is, a band-shaped portion along the hoop material 20 on the upper surface of the main body frame 24 is The hoop material crossing portion 25 is defined by the hoop material 20. A band-like guide member 27a is attached along the transverse direction Y4 of the hoop material 20 to the side of the hoop material crossing portion 25 on the upper surface of the main body frame 24, and is separated from the guide member 27a by a predetermined distance. Parallel to the guide member 27b
Is attached. And these guide members 27
a, 27b, on the upper surface of the main body frame 24, each unit 21
The moving table 26 on which the to 23 are mounted is mounted. Also, casters (not shown) are provided on the bottom of the moving table 26.
The moving table 26 is configured to be movable along the guide members 27a and 27b, that is, along the transverse direction Y4 of the hoop member 20.

一方、前記フープ材横断部25の中央部には、作業部29
が設けられている。この作業部29の上面には、前記ガイ
ド部材27a、27bと同様に帯状のガイド部材28、28、…が
取り付けられている。
On the other hand, in the center of the hoop material crossing section 25,
Is provided. On the upper surface of the working unit 29, belt-like guide members 28, 28,... Are attached similarly to the guide members 27a, 27b.

そして、前記各ユニット21〜23は移動テーブル26に固
定されずに前記ガイド部材27a、27b間に挟まれた状態で
搭載され、これにより、各ユニット21〜23は、フープ材
20の横断方向Y4に沿って移動自在となるようにフープ材
横断部25側方に列設されると共に、作業部29の後方に位
置した段階でこの作業部29の上面への進退が自在に構成
されている。
The units 21 to 23 are not fixed to the moving table 26 but are mounted in a state of being sandwiched between the guide members 27a and 27b.
The hoop member 20 is arranged side by side so as to be movable along the transverse direction Y4, and the work unit 29 can be freely moved to the upper surface at a stage located behind the work unit 29. It is configured.

このような接合装置SW3において、通板中、すなわち
フープ材20が第6図に示すように前記プレス工程等に順
調に供給されている際には、前記各ユニット21〜23を移
動テーブル26上に位置させておくことで、これらユニッ
ト21〜23をフープ材の通板センターCから外しておく。
これが、各ユニット21〜23の通常位置となる。
In such a bonding apparatus SW3, the respective units 21 to 23 are placed on the moving table 26 during the passing, that is, when the hoop material 20 is smoothly supplied to the pressing step and the like as shown in FIG. , The units 21 to 23 are removed from the hoop material passing center C.
This is the normal position of each of the units 21 to 23.

次に、フープ材の供給中に、図示せぬ検出手段により
フープコイルの終了が検出されると、フープ材の供給が
停止され、新しいフープコイルとの接続が行われる。ま
ず、前記移動テーブル26を移動させることで、切断ユニ
ット21を作業部29後方にまで臨ませた後、この切断ユニ
ット21を前方に移動させることで、第7図に示すように
作業部29にまで移動させる。その後、これまでに供給さ
れていた先行フープ材20bの終端部が切断ユニット21上
に固定され、先行フープ材20b終端部の切断整形が行わ
れる。続いて、先行フープ材20bに接続される後行フー
プ材20aの始端部が切断ユニット21上に固定され、切断
整形される。
Next, when the detection means (not shown) detects the end of the hoop coil during the supply of the hoop material, the supply of the hoop material is stopped, and connection with a new hoop coil is performed. First, by moving the moving table 26 so that the cutting unit 21 faces the rear of the working unit 29, by moving the cutting unit 21 forward, as shown in FIG. Move up to Thereafter, the end of the preceding hoop material 20b that has been supplied so far is fixed on the cutting unit 21, and the end of the preceding hoop material 20b is cut and shaped. Subsequently, the starting end of the succeeding hoop material 20a connected to the preceding hoop material 20b is fixed on the cutting unit 21 and cut and shaped.

次に、切断ユニット21を移動テーブル26上に戻した
後、移動テーブル26を左に移動させることで、溶接ユニ
ット22を作業部29後方にまで臨ませ、さらにこの溶接ユ
ニット22を前方に移動させることで、第8図に示すよう
に作業部29上面にまで移動させる。そして、切断整形さ
れた先行フープ材20bの終端部と後行フープ材20aの始端
部との突合せ又はラップ溶接が行われ、その端部間が接
続されると共に、溶接個所に溶接ビードによる隆起部が
形成される。
Next, after returning the cutting unit 21 onto the moving table 26, the moving table 26 is moved to the left so that the welding unit 22 faces the rear of the working unit 29, and the welding unit 22 is further moved forward. As a result, the work unit 29 is moved to the upper surface as shown in FIG. Then, butt welding or lap welding is performed between the cut end of the leading hoop material 20b and the starting end of the succeeding hoop material 20a, and the ends are connected together, and a bulge due to a welding bead is formed at a welding point. Is formed.

さらに、溶接ユニット22を移動テーブル26上に戻した
後、移動テーブル26を左に移動させることで、圧延ユニ
ット23を作業部29後方にまで臨ませ、この状態で圧延ユ
ニット23を前方に移動させることで、第9図に示すよう
に作業部29にまで移動させる。そして、溶接が終わった
フープ材20の溶接個所に形成された隆起部がローラ等に
より平坦化される。
Further, after the welding unit 22 is returned on the moving table 26, the moving unit 26 is moved to the left so that the rolling unit 23 faces the rear of the working unit 29, and in this state, the rolling unit 23 is moved forward. Thus, as shown in FIG. Then, the raised portion formed at the welding location of the hoop material 20 after the welding is flattened by a roller or the like.

この後、圧延ユニット23を移動テーブル26上に戻して
から、移動テーブル26を右に移動させることで、各ユニ
ット21〜23を通板中における通常位置に配置し、以上に
よりフープ材20の接続が完了する。
After that, the rolling unit 23 is returned to the moving table 26, and then the moving table 26 is moved to the right, so that the units 21 to 23 are arranged at the normal positions during the passage, and the connection of the hoop material 20 is performed as described above. Is completed.

「発明が解決しようとする課題」 ところで、上述した接続装置SW3においては、フープ
材20の接続作業における切断、溶接、圧延作業に応じ
て、移動テーブル26を左右に移動させつつ各ユニット21
〜23を作業部29へ移動、後退させるだけでよいので、接
続作業時の操作性の向上が図られるものの、未だ次のよ
うな欠点を有していた。
[Problems to be Solved by the Invention] In the connection device SW3 described above, each unit 21 is moved while moving the moving table 26 left and right in accordance with the cutting, welding, and rolling operations in the connection operation of the hoop material 20.
23 to the work unit 29, and only need to be moved backward, so that the operability during the connection work can be improved, but it still has the following disadvantages.

切断、溶接、圧延の各ユニット21〜23が各々独立して
設けられているため、装置全体の横幅寸法B′(第6図
参照)が大となってしまい、プレスマシンの間などの狭
い空間内に設置可能とする当初の目的を充分に達成し得
ない。
Since the cutting, welding, and rolling units 21 to 23 are provided independently of each other, the width B '(see FIG. 6) of the entire apparatus becomes large, and a narrow space such as between press machines is used. The initial purpose of being able to be installed in a room cannot be sufficiently achieved.

各ユニット21〜23毎に、作業部29上面へ進退自在に支
持するための摺動ガイド機構を設けなければならないた
め、製造コストが高くなってしまう。
Since a sliding guide mechanism must be provided for each of the units 21 to 23 so as to be able to move back and forth on the upper surface of the working unit 29, manufacturing costs increase.

この発明は前記問題点に鑑みてなされたもので、接続
作業の操作性を向上し、通板中のフープ材と装置との干
渉を防止し得るのは勿論のこと、装置全体の幅寸法を可
能な限り小とし、かつ製造コストの低廉化を実現し得る
フープ材接続装置の提供を目的としている。
The present invention has been made in view of the above-described problems, and it is possible to improve the operability of the connection operation and prevent interference between the hoop material in the passing plate and the device, and also reduce the width of the entire device. It is an object of the present invention to provide a hoop connection device which can be made as small as possible and which can realize a low production cost.

「課題を解決するための手段」 この発明は、2本のフープ材の相対向する端部を切断
整形すると共に、これら両フープ材の溶接箇所に形成さ
れた隆起部を開閉自在に設けられた一対のローラによっ
て加圧して平坦化する切断平坦化手段と、この切断平坦
化手段によって切断整形された前記両フープ材の各々の
端部を突き合わせまたはラップ溶接する溶接手段と、上
面に前記切断平坦化手段および溶接手段が搭載されると
共に、前記フープ材が横断するフープ材横断部が設けら
れ、このフープ材横断部の一部に作業部が形成された本
体フレームと、この本体フレームのフープ材横断部側方
に前記フープ材の横断方向に沿って移動自在に設けら
れ、前記切断平坦化手段と前記溶接手段とが搭載された
移動テーブルとから構成され、前記切断平坦化手段およ
び前記溶接手段は、それぞれ、前記移動テーブル上に前
記フープ材の横断方向と交差する方向に移動自在に支持
され、前記一対のローラは、前記切断平坦化手段の移動
方向に沿って回転可能に支持されたことを特徴としてい
る。
[Means for Solving the Problems] According to the present invention, opposing ends of two hoop materials are cut and shaped, and a raised portion formed at a welding portion between the two hoop materials is provided so as to be freely opened and closed. Cutting flattening means for pressing and flattening by a pair of rollers, welding means for abutting or lap welding each end of the both hoop materials cut and shaped by the cutting flattening means, and cutting flattening on an upper surface And a welding machine, and a hoop member crossing portion of the hoop member is provided, a main body frame having a working portion formed in a part of the hoop member crossing portion, and a hoop member of the main body frame. A moving table provided on the side of the crossing portion so as to be movable along the transverse direction of the hoop material, and having the cutting and flattening means and the welding means mounted thereon; The means and the welding means are respectively supported on the moving table so as to be movable in a direction intersecting the transverse direction of the hoop material, and the pair of rollers are rotatable along the moving direction of the cutting and flattening means. It is characterized by being supported by.

「作用」 上記の構成によれば、2本のフープ材の相対向する端
部を切断整形する機能と、これら両フープ材の溶接個所
に形成された隆起部を開閉自在に設けられた一対のロー
ラによって加圧して平坦化する機能とを一体化し、切断
平坦化手段を構成したので、ローラを接した状態として
おけば、切断手段を横移動させる動作と同じ動作によっ
て圧延をすることができ、また、装置の横幅寸法として
は、切断平坦化手段を搭載するのに必要な幅寸法と、溶
接手段を搭載するのに必要な幅寸法と、溶接手段を作業
部へ進退させる際に切断平坦化手段を退避させるのに必
要な幅寸法とを足し合わせた寸法だけ確保すれば良いこ
とになり、従来のように、各々別個に構成された切断ユ
ニットと、圧延ユニットと、溶接ユニットを搭載する場
合と比較して、その横幅寸法を小とすることができ、ま
た、各ユニットを移動自在に支持する摺動ガイド機構が
2組で済むことになる。
[Operation] According to the above configuration, a function of cutting and shaping opposing ends of the two hoop materials, and a pair of bosses formed at welding locations of the two hoop materials so as to be freely opened and closed. Since the function of flattening by pressing with a roller is integrated, and the cutting flattening means is configured, if the rollers are kept in contact, rolling can be performed by the same operation as moving the cutting means laterally, In addition, as the lateral width of the device, the width required to mount the cutting flattening means, the width required to mount the welding means, and the flattening when moving the welding means to the working section. It is only necessary to secure a dimension obtained by adding the width dimension necessary for retracting the means, and, as in the conventional case, when a cutting unit, a rolling unit, and a welding unit each separately configured are mounted. Compare with As a result, the width can be reduced, and only two sets of sliding guide mechanisms for movably supporting each unit are required.

「実施例」 以下、この発明の実施例について図面を参照して説明
する。
Hereinafter, embodiments of the present invention will be described with reference to the drawings.

第1図〜第3図は、この発明の一実施例によるフープ
材接続装置の構成を示す図である。
1 to 3 are views showing the configuration of a hoop material connecting device according to an embodiment of the present invention.

まず、第1図において、符号SWはフープ材接続装置で
あり、2本のループ材の相対向する端部を切断整形する
と共に、これら両フープ材の溶接個所に形成された隆起
部を開閉自在に設けられた一対のローラ40,41によって
加圧して平坦化する切断圧延ユニット(切断平坦化手
段)31と、切断整形された前記両フープ材の各々の端部
を突合せ又はラップ溶接する溶接ユニット(溶接手段)
32と、これら各ユニット31,32が上面に搭載される本体
フレーム33とから該略構成されている。
First, in FIG. 1, reference numeral SW denotes a hoop material connecting device, which cuts and shapes opposing ends of two loop materials, and freely opens and closes a ridge formed at a welding portion of these two hoop materials. A cutting and rolling unit (cutting and flattening means) 31 for flattening by pressing with a pair of rollers 40 and 41 provided in a pair, and a welding unit for butt-welding or lap-welding the respective ends of the cut and shaped hoop materials. (Welding means)
32 and a main body frame 33 on which the units 31, 32 are mounted.

フープ材20は、本体フレーム33の上方をその一辺に沿
って(第1図に示す矢印Y方向へ)横断するように搬送
され、すなわち、この本体フレーム33の上面のフープ材
20に沿う帯状の部分は、フープ材横断部35とされる。こ
のフープ材横断部35には、フープ材20の接続作業を行う
際に、先行フープ材20bの終端を固定する固定装置36
と、後行フープ材20aの始端を固定する固定装置37が設
けられており、これら固定装置36と37の間に、作業部39
が形成されている。
The hoop material 20 is transported so as to cross over the main body frame 33 along one side thereof (in the direction of arrow Y shown in FIG. 1), that is, the hoop material on the upper surface of the main body frame 33.
The belt-like portion along 20 is a hoop material crossing portion 35. A fixing device 36 for fixing the terminal end of the preceding hoop material 20b when connecting the hoop material 20 is connected to the hoop material crossing portion 35.
And a fixing device 37 for fixing the starting end of the trailing hoop material 20a, and a working unit 39 is provided between these fixing devices 36 and 37.
Are formed.

ここで、切断圧延ユニット31の構成について、第2図
および第3図を参照して説明する。
Here, the configuration of the cutting and rolling unit 31 will be described with reference to FIG. 2 and FIG.

これらの図において、45,46は、本体フレーム33のフ
ープ材横断部35の側方に配設された2本のレールであ
り、これらレール45,46の上には、、フープ材20の横断
方向に沿って移動自在な摺動ガイド47が載置されてい
る。この摺動ガイド47の上には、フープ材20の横断方向
と直交する方向に延びる2本のガイドレール48,49を介
して移動テーブル50が載置されており、移動テーブル50
はフープ材20の横断方向と直交する方向に移動自在とな
っている。この移動テーブル50には板状のフレーム51が
垂直に設けられ、このフレーム51に切断機構52と圧延機
構60が取り付けられている。
In these figures, 45 and 46 are two rails arranged on the side of the hoop material crossing portion 35 of the main body frame 33. On these rails 45 and 46, the hoop material 20 A sliding guide 47 movable in the direction is placed. A moving table 50 is mounted on the sliding guide 47 via two guide rails 48 and 49 extending in a direction orthogonal to the transverse direction of the hoop member 20.
Is movable in a direction orthogonal to the transverse direction of the hoop member 20. A plate-like frame 51 is provided vertically on the moving table 50, and a cutting mechanism 52 and a rolling mechanism 60 are attached to the frame 51.

切断機構52は、移動テーブル50上面に互いに隙間を隔
てて垂直に設けられたガイド板53,54と、ガイド板53,54
の隙間上に、上下動自在に支持されたシャー55と、エア
ーシリンダ56およびアーム57,58等によって構成され、
エアーシリンダ56を駆動することによってアーム57,58
が揺動し、シャー55が押し下げられ、フープ材20の端部
が切断整形されるようになっている。この切断機構52の
前方、すなわちフープ材横断部35と隣接する位置に、圧
延機構60が設けられている。
The cutting mechanism 52 includes guide plates 53 and 54 vertically provided on the upper surface of the moving table 50 with a gap therebetween, and guide plates 53 and 54
In the gap of, is constituted by a shear 55 supported movably up and down, an air cylinder 56 and arms 57 and 58,
By driving the air cylinder 56, the arms 57, 58
Swings, the shear 55 is pushed down, and the end of the hoop material 20 is cut and shaped. A rolling mechanism 60 is provided in front of the cutting mechanism 52, that is, at a position adjacent to the hoop material crossing portion 35.

圧延機構60は、ガイド板53,54間に回動自在に支持さ
れた下ローラ40と、フレーム51に取り付けられたガイド
61によって上下動自在に支持されたホルダ62と、ホルダ
62の下端に回転自在に支持され上ローラ41と、ホルダ62
の上端に形成された雌螺子穴にねじ込まれたボルト状の
加圧力調整つまみ63と、ホルダ62を常時上方へ引き上げ
るスプリング64(第3図参照)と、フレーム51の上端部
に取り付けられたトグルクランプ機構65とから構成さ
れ、トグルクランプ機構65のレバー66を手前(第2図で
は右方向)に引いて、押し下げると、トグルクランプ機
構65のロッド67が下方へ移動して加圧力調整つまみ63を
下方に押し下げ、これにより、上ローラ41が下ローラ40
に圧接する。この状態で、切断圧延ユニット31を移動す
ることにより、フープ材20の溶接部に形成された隆起部
が一対のローラ40,41によって加圧され平坦化される。
この場合、加圧力調整つまみ63を回して、ロッド67下端
との間の距離を変えることにより、ローラ40,41間の加
圧力が調整される。
The rolling mechanism 60 includes a lower roller 40 rotatably supported between the guide plates 53 and 54, and a guide attached to the frame 51.
A holder 62 movably supported by 61 and a holder
The upper roller 41, which is rotatably supported at the lower end of
A bolt-shaped pressure adjusting knob 63 screwed into a female screw hole formed at the upper end of the frame, a spring 64 (see FIG. 3) for always pulling up the holder 62, and a toggle attached to the upper end of the frame 51. When the lever 66 of the toggle clamp mechanism 65 is pulled forward (to the right in FIG. 2) and pressed down, the rod 67 of the toggle clamp mechanism 65 moves downward, and the pressing force adjusting knob 63 is constituted. Down, so that the upper roller 41
Press against In this state, by moving the cutting and rolling unit 31, the raised portion formed in the welded portion of the hoop material 20 is pressed and flattened by the pair of rollers 40, 41.
In this case, the pressing force between the rollers 40 and 41 is adjusted by turning the pressing force adjusting knob 63 to change the distance between the rod and the lower end of the rod 67.

次に、溶接ユニット32は、第3図に示すように、レー
ル45,46の上に、フープ材20の横断方向に沿って移動自
在に載置された摺動ガイド77と、この摺動ガイド77の上
に、フープ材20の横断方向と直交する方向に延びる2本
のガイドレール78,79を介して載置された移動テーブル8
0と、この移動テーブル80上に設けられた溶接装置81と
から構成されている。そして、摺動ガイド77は、切断圧
延ユニット31の摺動ガイド47と図示せぬ連結部材を介し
て連結されており、これにより溶接ユニット32は切断圧
延ユニット31と連動してレール45,46上を左右に移動す
るようになっている。
Next, as shown in FIG. 3, the welding unit 32 includes a sliding guide 77 movably mounted on the rails 45 and 46 along the transverse direction of the hoop material 20, and a sliding guide 77 The moving table 8 mounted on the hoop material 20 via two guide rails 78 and 79 extending in a direction orthogonal to the transverse direction of the hoop material 20.
0 and a welding device 81 provided on the moving table 80. The sliding guide 77 is connected to the sliding guide 47 of the cutting and rolling unit 31 via a connecting member (not shown), so that the welding unit 32 moves on the rails 45 and 46 in conjunction with the cutting and rolling unit 31. To move left and right.

以上によって、本体フレーム33のフープ材横断部35の
側方に、切断圧延ユニット31と溶接ユニット32が、フー
プ材20の横断方向に沿って移動自在に列設されており、
されに各ユニット31および32は、作業部39を臨む位置に
おいてこの作業部39へ進退自在となっている。
By the above, the cutting and rolling unit 31 and the welding unit 32 are arranged side by side in the transverse direction of the hoop material 20 movably in the lateral direction of the hoop material crossing portion 35 of the main body frame 33,
In addition, each of the units 31 and 32 can freely advance and retreat to the working unit 39 at a position facing the working unit 39.

次に、上述した構成の接続装置SWの使用方法について
説明する。
Next, a method of using the connection device SW having the above configuration will be described.

(i)通板中の動作 通板中、すなわちフープ材20がプレス工程等に順調に
供給されている際には、前記各ユニット31,32を第1図
に示すようにフープ材の通板センターCから外してお
く。この状態がフープ材を供給している状態における各
ユニット31,32の通常位置となる。この場合、後述する
作業の能率性を考慮して、切断圧延ユニット31を作業部
39後方に臨ませて切断作業待機状態とする。
(I) Operation During Passing During the passing, that is, when the hoop material 20 is smoothly supplied to the pressing process or the like, the units 31 and 32 are passed through the hoop material as shown in FIG. Remove from center C. This state is the normal position of each unit 31, 32 in the state where the hoop material is being supplied. In this case, in consideration of the efficiency of the work described later, the cutting and rolling unit 31 is
39 Make the cutting work standby state by facing backward.

(ii)フープ材の切断作業 次に、フープ材の供給中に、図示せぬ検出手段により
フープコイルの終了が検出されると、フープ材の供給が
停止され、新しいフープコイルとの接続が行われる。
(Ii) Hoop material cutting operation Next, if the detection means (not shown) detects the end of the hoop coil during the supply of the hoop material, the supply of the hoop material is stopped, and connection with a new hoop coil is performed.

まず、切断圧延ユニット31を作業部39まで引き出し、
これまでに供給されていた先行フープ材20bの終端部を
固定装置36,37によって作業部39上に固定する。その
後、エアーシリンダ56を駆動することによって、シャー
55が押し下げられ、先行フープ材20b終端部が切断整形
される。続いて、先行フープ材20bに接続される後行フ
ープ材20aの始端部が固定装置36,37によって作業部39上
に固定され、エアーシリンダ56が駆動されて切断整形さ
れる。
First, pull out the cutting and rolling unit 31 to the working section 39,
The end portion of the preceding hoop material 20b that has been supplied so far is fixed on the working unit 39 by the fixing devices 36 and 37. Then, by driving the air cylinder 56, the shear
55 is pushed down, and the end of the preceding hoop material 20b is cut and shaped. Subsequently, the starting end of the succeeding hoop material 20a connected to the preceding hoop material 20b is fixed on the working section 39 by the fixing devices 36 and 37, and the air cylinder 56 is driven to perform cutting and shaping.

(iii)フープ材の溶接作業 次に、切断圧延ユニット31を第1図に示す位置まで押
し込んで、元の位置に戻した後、左方へ移動し、第1図
に2点鎖線Aで示す位置まで移動させることで、溶接ユ
ニット32を作業部39後方にまで臨ませ、さらにこの溶接
ユニット32を前方に引き出すことで作業部39まで移動さ
せる。そして、切断整形された先行フープ材20b終端部
と後行フープ材20a始端部との突合せ又はラップ溶接が
行われる。この結果、先行フープ材20bと後行フープ材2
0aとがその端部で接続されると共に、溶接個所に溶接ビ
ードによる隆起部が形成される。
(Iii) Welding work of hoop material Next, the cutting and rolling unit 31 is pushed into the position shown in FIG. 1 and returned to the original position, and then moved to the left, and is shown by a two-dot chain line A in FIG. By moving the welding unit 32 to the position, the welding unit 32 is made to reach the rear of the working unit 39, and the welding unit 32 is further pulled out to move to the working unit 39. Then, butt welding or lap welding is performed between the end of the preceding hoop material 20b cut and shaped and the beginning of the succeeding hoop material 20a. As a result, the leading hoop material 20b and the trailing hoop material 2
Oa is connected at its end, and a bulge is formed at the welding location by a weld bead.

(iv)フープ材の圧延作業 次に、溶接ユニット32を後方へ押し込んで元の位置に
戻した後、右方へ移動させることで、切断圧延ユニット
31を作業部39後方にまで臨ませ、この状態で切断圧延ユ
ニット31を前方に引き出すことで作業部39まで移動させ
る。そして、トグルクランプ機構65のレバー66を手前に
引いて、押し下げることにより、上ローラ41を下ローラ
40に圧接させ、この状態で、切断圧延ユニット32を後方
へ押し込むことにより、溶接が終わったフープ材20の溶
接部に形成された隆起部がローラ40,41によって加圧さ
れ平坦化される。
(Iv) Rolling operation of the hoop material Next, after pushing back the welding unit 32 to the original position and moving it to the right, the cutting rolling unit
The cutting / rolling unit 31 is pulled out forward in this state so that the cutting unit 31 is moved to the working unit 39. Then, the upper roller 41 is moved downward by pulling the lever 66 of the toggle clamp mechanism 65 toward the front and pressing down.
By pressing the cutting and rolling unit 32 backward in this state, the raised portion formed at the welded portion of the hoop material 20 after welding is pressed by the rollers 40 and 41 to be flattened.

この後、レバー66を引き上げ、ローラ40,41間の圧接
を解除した後、切断圧延ユニット31を元の位置に戻すこ
とで、各ユニット31,32を通板中における通常位置に配
置する。
Thereafter, the lever 66 is pulled up to release the pressure contact between the rollers 40 and 41, and then the cutting and rolling unit 31 is returned to the original position, so that the units 31 and 32 are arranged at the normal positions during the passage.

以上の手順で、接続装置SWによるフープ材20の接続が
完了する。
With the above procedure, the connection of the hoop material 20 by the connection device SW is completed.

上述した一実施例によれば、フープ材20の接続作業に
おける各作業(切断、溶接、圧延)に応じて、各ユニッ
ト31,32を左右に移動させつつ作業部39へ移動、後退さ
せれるだけでよいので、先行フープ材20bと後行フープ
材20aとを切断整形した後は、これらフープ材20a,20bを
移動させる必要がなく、したがって、フープ材20の切断
作業の後の作業が大変容易となる。
According to the above-described embodiment, in accordance with each operation (cutting, welding, and rolling) in the connection operation of the hoop material 20, the units 31 and 32 are moved to the working unit 39 while being moved right and left, and are merely retracted. After cutting and shaping the leading hoop member 20b and the trailing hoop member 20a, there is no need to move these hoop members 20a and 20b, and therefore, the work after the cutting operation of the hoop member 20 is very easy. Becomes

また、各作業においてユニット31,32は単体で作業部3
9へ移動するので、ユニット31,32の両側に広い空間を確
保でき、操作性が大変良好となる。
In each operation, units 31 and 32 are
Moving to 9, a wide space can be secured on both sides of the units 31, 32, and the operability is very good.

さらに、通板中においては各ユニット31,32は、フー
プ材20が横断するフープ材横断部35から離れた位置に退
避しているので、これらユニット31,32とフープ材20と
が干渉しあうことがない。
Furthermore, since the units 31 and 32 are retracted to a position away from the hoop material crossing portion 35 where the hoop material 20 crosses during the passing, the units 31, 32 and the hoop material 20 interfere with each other. Nothing.

そして、切断機構52と、圧延機構60が一体化されて、
切断圧延ユニット31が構成されているので、第1図に示
す接続装置SWの横幅寸法Bは、第6図に示す従来の接続
装置SW3の横幅寸法B′に比較して小となる。すなわ
ち、本実施例においては、本体フレーム33上に溶接ユニ
ット32を搭載するのに必要な幅寸法B1と、切断圧延ユニ
ット31を搭載するのに必要な幅寸法B2と、溶接ユニット
32を作業部39へ進退させる際に切断圧延ユニット31を第
1図に2点鎖線Aで示す位置まで退避させるのに必要な
幅寸法B3とを足し合わせた寸法Bだけ確保すれば良いこ
とになり、第6図に示すように、各々別個に構成された
各ユニット21〜23を搭載する場合と比較して、横幅寸法
Bが小さくなる。また、第6図に示す従来の接続装置SW
3においては、各ユニット21〜23を移動自在に支持する
摺動ガイド機構を3組設けなければならなかったが、本
実施例においては、摺動ガイド47,77が2組で済む。
And the cutting mechanism 52 and the rolling mechanism 60 are integrated,
Since the cutting and rolling unit 31 is configured, the width B of the connection device SW shown in FIG. 1 is smaller than the width B ′ of the conventional connection device SW3 shown in FIG. That is, in this embodiment, the width dimension B 1 required to mount the welding unit 32 on the body frame 33, a width B 2 required for mounting the cutting rolling unit 31, the welding unit
32 that the may be secured by a dimension B corresponding to the sum and width B 3 required to retract the cutting roll unit 31 to the position shown in Figure 1 to the two-dot chain line A in advancing and retracting the working unit 39 Thus, as shown in FIG. 6, the width B becomes smaller as compared with the case where the individually configured units 21 to 23 are mounted. Further, the conventional connection device SW shown in FIG.
In 3, three sets of sliding guide mechanisms for movably supporting the units 21 to 23 had to be provided, but in this embodiment, only two sets of sliding guides 47 and 77 are required.

よって、この実施例によれば、接続作業の操作性を向
上し得ると共に、通板中のフープ材と装置との干渉を防
止し得るのは勿論のこと、装置全体の横幅寸法を小と
し、製造コストを低廉化し得るフープ材接続装置SWを実
現することができる。
Therefore, according to this embodiment, not only can the operability of the connection work be improved, but also the interference between the hoop material in the passing plate and the device can be prevented, and the width of the entire device can be reduced, A hoop material connection device SW that can reduce the manufacturing cost can be realized.

なお、この発明のフープ材接続装置は、寸法、形状等
その細部が前記実施例に限定されず、種々の変形例が可
能である。例えば、前記実施例では各ユニット31,32を
手動により移動させていたが、これをモータ、アクチュ
エータ等の人力によらない手段で移動させても良いこと
は勿論である。
The hoop material connecting device of the present invention is not limited in its details such as size and shape to the above embodiment, and various modifications are possible. For example, in the above-described embodiment, the units 31 and 32 are manually moved. However, it is needless to say that the units 31 and 32 may be moved by means such as a motor and an actuator which does not depend on human power.

「発明の効果」 以上詳細に説明したように、この発明によれば、2本
のフープ材の相対向する端部を切断整形すると共に、こ
れら両フープ材の溶接箇所に形成された隆起部を開閉自
在に設けられた一対のローラによって加圧して平坦化す
る切断平坦化手段と、この切断平坦化手段によって切断
整形された前記両フープ材の各々の端部を突き合わせま
たはラップ溶接する溶接手段と、上面に前記切断平坦化
手段および溶接手段が搭載されると共に、前記フープ材
が横断するフープ材横断部が設けられ、このフープ材横
断部の一部に作業部が形成された本体フレームと、この
本体フレームのフープ材横断部側方に前記フープ材の横
断方向に沿って移動自在に設けられ、前記切断平坦化手
段と前記溶接手段とが搭載された移動テーブルとから構
成され、前記切断平坦化手段および前記溶接手段は、そ
れぞれ、前記移動テーブル上に前記フープ材の横断方向
と交差する方向に移動自在に支持され、前記一対のロー
ラは、前記切断平坦化手段の移動方向に沿って回転可能
に支持された構成としたので、装置の横幅寸法として
は、切断平坦化手段を搭載するのに必要な幅寸法と、溶
接手段を搭載するのに必要な幅寸法と、溶接手段を作業
部へ進退させる際に切断平坦化手段を退避させるのに必
要な幅寸法とを足し合わせた寸法だけ確保すれば良いこ
とになり、従来のように、各々別個に構成された切断ユ
ニットと、圧延ユニットと、溶接ユニットを搭載する場
合と比較して、その横幅寸法を小とすることができ、例
えば、プレスマシン間などの既設ラインの狭いスペース
にも収納することができ、さらに、各ユニットを移動自
在に支持する摺動ガイド機構が2組で済むので、製造コ
ストを低廉化することができるという効果が得られる。
[Effects of the Invention] As described above in detail, according to the present invention, the opposing ends of the two hoop materials are cut and shaped, and the ridge formed at the welding portion of the two hoop materials is formed. Cutting flattening means for pressing and flattening by a pair of rollers provided to be openable and closable, and welding means for abutting or lap welding each end of the two hoop materials cut and shaped by the cutting flattening means; A main body frame on which the cutting flattening means and the welding means are mounted on the upper surface, and a hoop material crossing portion where the hoop material traverses is provided, and a working part is formed in a part of the hoop material crossing portion, The main body frame is provided on a side of the hoop material crossing portion so as to be movable along a transverse direction of the hoop material, and includes a moving table on which the cutting flattening means and the welding means are mounted. The cutting and flattening means and the welding means are each supported on the moving table so as to be movable in a direction intersecting the transverse direction of the hoop material, and the pair of rollers move the cutting and flattening means. Because it was configured to be supported rotatably along the direction, as the lateral width of the device, the width required to mount the cutting flattening means, the width required to mount the welding means, It is only necessary to secure a dimension obtained by adding the width dimension necessary for retracting the cutting flattening means when moving the welding means to and from the working unit. Units, rolling units, and welding units can be smaller in width than when they are mounted, and can be stored in narrow spaces on existing lines, such as between press machines. Further, the sliding guide mechanism for movably supporting the unit requires only two sets, the effect of being able to reduce the production cost is obtained.

【図面の簡単な説明】[Brief description of the drawings]

第1図はこの発明の一実施例によるフープ材接続装置の
構成を示す平面図、第2図は同フープ材接続装置の構成
を示す正面図、第3図は同フープ材接続装置の構成を示
す側面図、第4図〜第6図は従来のフープ材接続装置を
示す平面図、第7図〜第9図は第6図に示すフープ材接
続装置によりフープ材の接続作業を行っている状態を示
す平面図である。 SW……フープ材接続装置、 Y……フープ材横断方向、 20……フープ材、 31……切断圧延ユニット(切断圧延手段)、 32……溶接ユニット(溶接手段)、 23……本体フレーム、 35……フープ材横断部、 39……作業部、 52……切断機構、 60……圧延機構。
FIG. 1 is a plan view showing the configuration of a hoop connection device according to an embodiment of the present invention, FIG. 2 is a front view showing the configuration of the hoop connection device, and FIG. 3 is a configuration of the hoop connection device. 4 to 6 are plan views showing a conventional hoop material connecting device, and FIGS. 7 to 9 perform hoop material connecting work using the hoop material connecting device shown in FIG. It is a top view showing a state. SW: Hoop material connection device, Y: Hoop material cross direction, 20: Hoop material, 31: Cutting and rolling unit (cutting and rolling means), 32: Welding unit (welding means), 23: Body frame, 35… hoop material crossing section, 39… working section, 52… cutting mechanism, 60… rolling mechanism.

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】2本のフープ材の相対向する端部を切断整
形すると共に、これら両フープ材の溶接箇所に形成され
た隆起部を開閉自在に設けられた一対のローラによって
加圧して平坦化する切断平坦化手段と、 この切断平坦化手段によって切断整形された前記両フー
プ材の各々の端部を突き合わせまたはラップ溶接する溶
接手段と、 上面に前記切断平坦化手段および溶接手段が搭載される
と共に、前記フープ材が横断するフープ材横断部が設け
られ、このフープ材横断部の一部に作業部が形成された
本体フレームと、 この本体フレームのフープ材横断部側方に前記フープ材
の横断方向に沿って移動自在に設けられ、前記切断平坦
化手段と前記溶接手段とが搭載された移動テーブルとか
ら構成され、 前記切断平坦化手段および前記溶接手段は、それぞれ、
前記移動テーブル上に前記フープ材の横断方向と交差す
る方向に移動自在に支持され、 前記一対のローラは、前記切断平坦化手段の移動方向に
沿って回転可能に支持された ことを特徴とするフープ材接続装置。
1. A method for cutting and shaping opposing ends of two hoop materials, and pressing a flat portion formed at a welding portion of the two hoop materials by a pair of openably and closably provided rollers. Cutting and flattening means, and welding means for butt-welding or lap welding each end of the hoop members cut and shaped by the cutting and flattening means, and the cutting and flattening means and the welding means are mounted on the upper surface. A main body frame having a working portion formed in a part of the hoop material crossing portion, and a hoop material crossing portion of the main body frame on a side of the hoop material crossing portion. The cutting flattening means and the welding means are provided so as to be movable along the transverse direction, and are provided with a moving table on which the cutting flattening means and the welding means are mounted. Respectively,
The pair of rollers are supported rotatably on the moving table in a direction intersecting the transverse direction of the hoop material, and the pair of rollers are rotatably supported along the moving direction of the cutting and flattening means. Hoop connection device.
JP1025375A 1989-02-03 1989-02-03 Hoop connection device Expired - Lifetime JP2830005B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1025375A JP2830005B2 (en) 1989-02-03 1989-02-03 Hoop connection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1025375A JP2830005B2 (en) 1989-02-03 1989-02-03 Hoop connection device

Publications (2)

Publication Number Publication Date
JPH02205263A JPH02205263A (en) 1990-08-15
JP2830005B2 true JP2830005B2 (en) 1998-12-02

Family

ID=12164099

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1025375A Expired - Lifetime JP2830005B2 (en) 1989-02-03 1989-02-03 Hoop connection device

Country Status (1)

Country Link
JP (1) JP2830005B2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6094374U (en) * 1983-11-30 1985-06-27 株式会社プラズマ・ウエルド社 material bonding device

Also Published As

Publication number Publication date
JPH02205263A (en) 1990-08-15

Similar Documents

Publication Publication Date Title
KR101526275B1 (en) Welding wire regenerator
JP3974464B2 (en) Butt metal plate butt joining device
US3394857A (en) Combination strip joining and planishing apparatus
CN113664090B (en) Stamping strip manufacturing system
CN212384429U (en) Battery tab folding and rolling equipment and battery tab folding and rolling equipment with double stations
JP2830005B2 (en) Hoop connection device
JP2899276B1 (en) Butt joining apparatus and joining method for strip-shaped metal sheets
JP2004230396A (en) Apparatus and method for manufacturing thin-walled welded pipe
JPH07106383B2 (en) Strip welding equipment
US3137936A (en) Fusion welding
CN223785905U (en) A motor core cutting and welding integrated equipment
JP2520338B2 (en) Strip welding equipment
JP3397922B2 (en) Method and apparatus for joining moving steel plates
JPH01157732A (en) Hoop stock connection device
JP3053534B2 (en) Squeeze roll stand
JPH0753284B2 (en) Hot rolling equipment
CN220742170U (en) Automatic interfacing apparatus of non-woven fabrics
JP2015085371A (en) Cold rolling method for steel plate coil and cold rolling facility therefor
JPS6344236Y2 (en)
KR102617317B1 (en) A skelp connection welding device that prevents welding defects by improving the cut surface of the skelp
JPH0634074Y2 (en) Material bonder
JP3674932B2 (en) Rolled material joining apparatus having a die changer
JP3059805B2 (en) Method and apparatus for welding a lead having a large number of terminal connector pins
JPH0211999Y2 (en)
JPH11300418A (en) Device for joining band-shaped metallic material