Equipment centralized unit that is also used for formwork

Info

Publication number
JP2834663B2
JP2834663B2 JP33524193A JP33524193A JP2834663B2 JP 2834663 B2 JP2834663 B2 JP 2834663B2 JP 33524193 A JP33524193 A JP 33524193A JP 33524193 A JP33524193 A JP 33524193A JP 2834663 B2 JP2834663 B2 JP 2834663B2
Authority
JP
Japan
Prior art keywords
formwork
box
vertical pipe
gas
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP33524193A
Other languages
Japanese (ja)
Other versions
JPH07190495A (en
Inventor
泰久 首藤
俊博 丸岡
美紀男 田家
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okumuragumi KK
Original Assignee
Okumuragumi KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okumuragumi KK filed Critical Okumuragumi KK
Priority to JP33524193A priority Critical patent/JP2834663B2/en
Publication of JPH07190495A publication Critical patent/JPH07190495A/en
Application granted granted Critical
Publication of JP2834663B2 publication Critical patent/JP2834663B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Housings, Intake/Discharge, And Installation Of Fluid Heaters (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、高層マンションなどの
複数層集合住宅における各戸向けの設備配管,熱源機器
およびメータ類を収容するための型枠兼用の設備集中ユ
ニットに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an equipment centralized unit which also serves as a form for accommodating equipment piping, heat source equipment and meters for each house in a multi-story apartment house such as a high-rise apartment.

【0002】[0002]

【従来の技術】従来、各戸向けの設備集中ユニットは、
内部に収納する設備配管,ガス湯沸器,開閉バルブおよび
メータ類の保守,点検を容易にすべく、高層マンション
等の廊下側の壁に凹部を設けてチャンバ室とし、このチ
ャンバ室内に設置されていた。しかし、このようなチャ
ンバ室を躯体施工時に現場打ちコンクリートやPC版で
構築すると、壁凹部用型枠の手間やPC版の製作,取付
の手間が多大になる等の理由で、施工費用が高くなると
いう欠点があった。そこで、このような欠点を解消する
各戸向けの設備集中ユニットとして、図7に示すような
ものが提案されている(特公昭61−49582号公
報)。この設備集中ユニットは、一対の戸の隣接部に1
つずつ設けられ、室内51と共用の廊下52を区切る現
場打ちコンクリートまたはPC版の壁53の廊下側を配
管カバー54で覆い、この内部に、廊下52の床および
天井スラブを貫通する共用の給水竪管55,1対の汚水
竪管56,通気竪管57,ガス竪管58を収容している。
そして、上記壁53および廊下52の床,天井スラブを
仕上げた後、配管カバー54に設けた開口に前面を突出
させて嵌め込んだ1対のガス湯沸器59を支持金具(図
示せず)によって天井に取り付け、配管カバー54内に
各1対の水道メータ60,ガスメータ61を設置し、こ
れらの機器と対応する各竪管を、要所に開閉バルブを介
設した水道,ガス,給湯の各枝管62,63,64で接続す
る。また、上記各枝管62,63,64から分岐する水
道,ガス,給湯の各横管65,66,67および1対の汚水
横管68は、壁53の開口部に嵌め込まれたボード69
を貫通して、各室内51に導かれ、各戸に水道水,ガス,
湯を供給するようになっている。
2. Description of the Related Art Conventionally, a facility centralized unit for each house is:
In order to facilitate maintenance and inspection of the equipment piping, gas water heater, on-off valve and meters to be housed inside, a recess is provided in the wall on the corridor side of high-rise apartments etc. to form a chamber, which is installed in this chamber. I was However, if such a chamber is constructed from cast-in-place concrete or PC plate at the time of frame construction, the construction cost is high because the labor for forming the wall recessed formwork and the production and installation of the PC plate become large. There was a disadvantage of becoming. Therefore, as a facility centralized unit for each house that solves such a drawback, a unit as shown in FIG. 7 has been proposed (Japanese Patent Publication No. 61-49582). This equipment centralized unit is located in the area adjacent to a pair of doors.
The corridor side of the cast-in-place concrete or PC plate wall 53 that is provided one by one and separates the interior 51 and the common corridor 52 is covered with a pipe cover 54, and a common water supply penetrating the floor and ceiling slab of the corridor 52 therein. A vertical pipe 55, a pair of sewage vertical pipes 56, a ventilation vertical pipe 57, and a gas vertical pipe 58 are accommodated.
After finishing the floor and ceiling slabs of the wall 53 and the corridor 52, a pair of gas water heaters 59 fitted into the openings provided in the pipe cover 54 with their front faces protruding are supported by fittings (not shown). A pair of water meters 60 and gas meters 61 are installed in the pipe cover 54, and the vertical pipes corresponding to these devices are connected to water, gas, and hot water supply via open / close valves at important points. Each branch pipe 62, 63, 64 connects. The horizontal pipes 65, 66, 67 for water, gas, and hot water branched from the branch pipes 62, 63, 64, and a pair of sewage horizontal pipes 68 are mounted on a board 69 fitted into the opening of the wall 53.
Through each of the rooms 51, and tap water, gas,
Hot water is supplied.

【0003】[0003]

【発明が解決しようとする課題】ところが、上記従来の
設備集中ユニットは、廊下52に突出して外気や風に晒
される配管カバー54内に設けられるため、寒冷期には
水道枝管62や給湯枝管64が凍結するという問題があ
る。また、配管カバー54が突出している分だけ廊下5
2の幅が狭くなるから、廊下外側の腰壁を平面図上で直
線状にしようとすると、自ずと廊下幅が広がって、配管
カバー部分以外の箇所に無駄スペースができる一方、逆
に、廊下幅を一定にしようとすると、平面図上で配管カ
バー部分の腰壁を凸状にせねばならず、凸状腰壁の施工
に手間と費用がかかるという問題がある。
However, since the above-described conventional equipment centralized unit is provided in a pipe cover 54 which projects into a corridor 52 and is exposed to outside air and wind, the cold water supply branch pipe 62 and the hot water supply branch are provided. There is a problem that the tube 64 freezes. In addition, the corridor 5 corresponds to the amount that the pipe cover 54 protrudes.
When the waist wall outside the corridor is made linear in the plan view, the width of the corridor naturally widens, and wasteful space is created in places other than the pipe cover part, while conversely, the corridor width decreases. If it is desired to make the height constant, the waist wall of the pipe cover portion must be made convex in a plan view, and there is a problem that it takes time and cost to construct the convex waist wall.

【0004】ここで、廊下52の床および天井スラブを
貫通する給水,汚水,通気,ガスの各竪管55〜58は、
通常、上記スラブが現場打ちの鉄筋コンクリートの場合
は、型枠に貫通穴用のスリーブを配置してから床,天井
のスラブコンクリートを打設し、打設後にできた貫通穴
にこれらの竪管を挿通して配設され、上記スラブがPC
版の場合は、PC版に予め工場等で開けられた貫通穴に
これらの竪管を挿通して配設される。しかし、前者の場
合は、型枠に取り付けたスリーブがズレやすくて所定位
置に貫通穴が開かないことが多く、コンクリート側での
斫り工事や竪管側での位置合わせが必要になって作業能
率が低下するとともに、竪管を配設してその周囲をシー
リングしない限り貫通穴から雨水が下階に漏れるという
問題がある。また、躯体コンクリートの打設後の型枠解
体は、3〜4階上階のコンクリートの打設が完了した後
に行なわれることから、竪管,配管工事が相当遅れるこ
とになって、種々の雑工事が集中する竣工間際にはこの
配管工事が竣工を遅らせる虞もある。一方、後者の場合
は、前者のような貫通穴の位置ズレや工事遅延の問題は
ないが、工場での穴明けに手間を要するという問題と、
前者と同様の雨水漏れの問題がある。
The water supply, sewage, ventilation, and gas vertical pipes 55 to 58 penetrating the floor and ceiling slabs of the corridor 52 are:
Usually, when the above slab is cast-in-place reinforced concrete, place sleeves for through holes in the formwork, then cast slab concrete on the floor and ceiling, and insert these vertical pipes into the through holes created after casting. The slab is inserted through
In the case of a plate, these vertical pipes are arranged by penetrating through holes formed in the PC plate in advance at a factory or the like. However, in the former case, the sleeve attached to the formwork is easily displaced and a through hole is often not opened at the specified position, so it is necessary to cut the concrete side and align it on the vertical pipe side. The efficiency is reduced, and rainwater leaks from the through hole to the lower floor unless the vertical pipe is provided and the surrounding area is sealed. In addition, since formwork dismantling after casting concrete is performed after the concrete placement on the 3rd to 4th floors is completed, vertical pipe and plumbing work will be considerably delayed, and various miscellaneous operations will be performed. Immediately before the completion of construction, where the work is concentrated, this plumbing work may delay the completion. On the other hand, in the case of the latter, there is no problem of the positional deviation of the through-hole and the construction delay as in the former, but there is a problem that it takes time to drill at the factory,
There is the same problem of rainwater leakage as the former.

【0005】そこで、本発明の目的は、各戸向けの設備
配管や熱源機器を収納したユニットを、室の廊下側外壁
の凹部の型枠に兼用するという着想に基づき、このユニ
ットの構造を工夫することによって、施工に手間と費用
をかけずに所定の廊下幅を確保しつつ、水道枝管や給湯
枝管の凍結を防止し、雨水の漏れの心配およびスラブの
斫り工事をなくし、竪管の位置合わせを容易にして作業
能率を向上させ、とりわけ躯体工事と竪管,配管工事を
同時に施工できて施工上の隘路を解消でき、さらには梁
下の空間を有効活用でき、各戸の配管工事を容易にでき
る型枠兼用の設備集中ユニットを提供することにある。
Accordingly, an object of the present invention is to devise the structure of this unit based on the idea that a unit accommodating equipment pipes for each house and a heat source device is also used as a mold for a concave portion of a corridor-side outer wall of a room. In this way, it is possible to secure the required corridor width without the need for labor and cost for construction, prevent freezing of water supply branch pipes and hot water supply branch pipes, eliminate the risk of rainwater leakage and eliminate slab shaving work, and To improve work efficiency, especially for building work and vertical pipe and plumbing work at the same time, eliminating bottlenecks in the work, and also making effective use of the space under the beam, making pipe work for each house possible. It is an object of the present invention to provide a facility centralized unit that can also be used for a formwork.

【0006】[0006]

【課題を解決するための手段】上記目的を達成するた
め、請求項1の型枠兼用の設備集中ユニットは、複数層
集合住宅における各戸向けの設備配管,熱源機器および
メータ類を収納するための型枠兼用の設備集中ユニット
において、矩形の上部板と建物の階高内法寸法と等しい
高さを有して上記上部板の三辺に垂設された側部板から
なる箱体と、この箱体内に、略全高に亘って垂設され、
上端が上記上部板を貫通して建物のスラブ厚さ以上に突
出する共用竪管と、上記箱体内に設けられたガス湯沸器
および開閉バルブと、上記箱体をコンクリート打設用の
型枠に兼用すべく、上記側部板の外面に突設された複数
のセパレータまたは複数のセパレータのための端部保持
具とを備えたことを特徴とする。
In order to achieve the above-mentioned object, a facility centralized unit which also serves as a form according to the first aspect of the present invention is a multi-family apartment house for accommodating facility piping, heat source equipment and meters for each house. In a facility concentrated unit that also serves as a formwork, a box consisting of a rectangular upper plate and side plates having a height equal to the inside height of the building and having three side plates vertically provided on three sides of the upper plate; In the box, it is suspended over almost the entire height,
A common vertical pipe having an upper end protruding beyond the slab thickness of the building through the upper plate, a gas water heater and an opening / closing valve provided in the box body, and a formwork for casting the box body into concrete A plurality of separators protruding from the outer surface of the side plate, or end holders for the plurality of separators.

【0007】また、請求項2の設備集中ユニットは、上
記上部板に梁の断面形状に対応する段部を設けるととも
に、対向する一対の上記側部板の上端部に上記梁の断面
形状に対応する切欠きを設けている。さらに、請求項3
の設備集中ユニットは、上記共用竪管が、ガス竪管と水
道竪管であり、各戸内へ向かう横管が、箱体の開口に対
向する上記側部板を貫通して建物の壁厚さ以上に突出し
ている。
According to a second aspect of the present invention, in the facility centralized unit, a stepped portion corresponding to a cross-sectional shape of a beam is provided on the upper plate, and a cross-sectional shape of the beam is provided at upper end portions of a pair of opposed side plates. Notches are provided. Further, claim 3
In the equipment centralized unit, the common vertical pipe is a gas vertical pipe and a water vertical pipe, and the horizontal pipe going to each house penetrates the side plate facing the opening of the box, and the wall thickness of the building is It protrudes above.

【0008】[0008]

【作用】請求項1の型枠兼用の設備集中ユニットは、矩
形の上部板の三辺に側部板を垂設してなる箱体内に、箱
体の略全高に亘る共用竪管,ガス湯沸器および開閉バル
ブが設けられる一方、側部板の外面に、複数のセパレー
タのための端部保持具が設けられている。上記箱体を、
その開口を廊下側に向けてコンクリートを打設すべき階
の床スラブ上の所定位置に据え付け、箱体内の共用竪管
の下端を、床スラブから突出する下階の共用竪管の上端
と接続するとともに、箱体の前面両側に外側の壁型枠を
連結する。続いて、上記箱体および壁型枠の内面に沿わ
せて壁の鉄筋を配置した後、これらの内側に箱体背面の
凹部壁用の型枠および内側の壁型枠を配置し、さらに箱
体の側部板と上記凹部壁用の型枠とを、端部保持具に挿
通したセパレータによって連結する。次に、壁型枠の上
端および箱体の上部板を上階の床スラブの型枠に連結
し、この型枠上にスラブの鉄筋を配置する。かくて、箱
体の高さが、コンクリートを打設すべき階の階高内法寸
法になり、上部板を貫通する竪管の上端が、上階の床ス
ラブ厚さ以上に突出して、箱体を含む型枠の据え付けが
終了し、この型枠内にコンクリートが打設される。な
お、箱体の上部板と側部板の外面に複数のセパレータが
突設されている場合は、箱体の前面両側に外側の壁型枠
を連結し、壁の鉄筋を配置し、凹部壁用の型枠と内側の
壁型枠を配置した後、上記セパレータを凹部壁用の型枠
に連結し、さらに壁型枠および箱体の上部板を上階の床
スラブの型枠に連結し、この型枠内にスラブの鉄筋を配
置して型枠の据え付けを終了する。
According to a first aspect of the present invention, there is provided a facility centralized unit serving also as a formwork, wherein a common vertical pipe and a gas hot water extending over substantially the entire height of the box body are provided in a box body having side plates suspended from three sides of a rectangular upper plate. A boiler and an open / close valve are provided, while end holders for a plurality of separators are provided on the outer surface of the side plate. The above box,
With the opening facing the corridor, install it at a predetermined position on the floor slab on the floor where concrete is to be cast, and connect the lower end of the common vertical pipe in the box with the upper end of the lower vertical common pipe protruding from the floor slab. At the same time, the outer wall formwork is connected to both front sides of the box. Subsequently, after arranging the reinforcing bars of the wall along the inner surfaces of the box and the wall form, a mold for the concave wall on the back of the box and an inner wall form are arranged inside these, and furthermore, The side plate of the body and the formwork for the recessed wall are connected by a separator inserted through the end holder. Next, the upper end of the wall form and the upper plate of the box are connected to the form of the floor slab on the upper floor, and the reinforcing steel of the slab is arranged on this form. Thus, the height of the box becomes the inside dimension of the floor on which concrete is to be cast, and the upper end of the vertical pipe penetrating the upper plate projects beyond the thickness of the floor slab on the upper floor. The installation of the form including the body is completed, and concrete is poured into the form. In the case where a plurality of separators are protruded from the outer surface of the upper plate and the side plate of the box, the outer wall formwork is connected to both sides of the front of the box, the reinforcing bar of the wall is arranged, and the recessed wall is formed. After placing the formwork and the inner wall formwork, the separator is connected to the formwork for the recessed wall, and the wall formwork and the upper plate of the box body are connected to the formwork of the floor slab on the upper floor. Then, the reinforcing bars of the slab are arranged in the formwork, and the installation of the formwork is completed.

【0009】かくて、躯体工事たるコンクリート打設と
共用竪管の工事が同時に行なわれ、設備配管やガス湯沸
器を収納した箱体は、躯体に埋め込まれた状態で一体化
されることになる。従って、躯体と竪管の同時施工によ
り施工上の隘路が解消できるうえ、竪管用のスラブ貫通
穴に起因する雨水漏れの心配や斫り作業や竪管の位置修
正がなくなるとともに、箱体が壁凹部に埋まるので、施
工の手間と費用をかけずに所定の廊下幅を確保でき、ガ
ス湯沸器に連なる水道枝管や給湯枝管の凍結も防止され
る。その後、必要に応じて、箱体に例えば扉を取り付
け、箱体内に例えば共用堅管,ガス湯沸器,開閉バルブを
互いに接続する枝管やメータ類を取り付ける。なお、こ
れら後付けする枝管やメータ類を、予め箱体内に全て取
り付けておくことも可能である。
[0009] Thus, the concrete construction as the skeleton construction and the construction of the common vertical pipe are performed simultaneously, and the box housing the equipment piping and the gas water heater is integrated while being embedded in the skeleton. Become. Therefore, the simultaneous construction of the skeleton and the vertical pipe can eliminate the bottleneck in the construction, eliminate the risk of rainwater leakage due to the slab through hole for the vertical pipe, eliminate the cutting work and correct the position of the vertical pipe, and reduce the box body wall. Since it is buried in the concave portion, a predetermined corridor width can be secured without the labor and cost of construction, and freezing of the water supply branch pipe and the hot water supply branch pipe connected to the gas water heater is also prevented. Thereafter, if necessary, for example, a door is attached to the box body, and, for example, a common pipe, a gas water heater, and branch pipes and meters for connecting the open / close valve to each other are attached to the box body. In addition, it is also possible to attach all the branch pipes and meters to be attached later in the box body in advance.

【0010】請求項2の設備集中ユニットでは、箱体の
上部板に梁の断面形状に対応する段部が設けられ、対向
する一対の側部板の上端部に同形状の切欠きが設けられ
ている。そこで、上述と同様に箱体内の共用竪管の下端
を、床スラブから突出する下階の共用竪管の上端と接続
するとともに、箱体の前面両側に外側の壁型枠を連結す
る。続いて、上記箱体および壁型枠の内面に沿わせて壁
の鉄筋を配置した後、これらの内側に箱体背面の凹部壁
用の型枠および内側の壁型枠を配置し、さらに箱体の側
部板と上記凹部壁用の型枠とを、端部保持具に挿通した
セパレータによって連結する。次に、壁型枠の上端およ
び箱体の上部板を上階の床スラブの型枠に連結し、かつ
箱体の上部板および床スラブの型枠を梁型枠に連結し、
これらの型枠内にスラブおよび梁の鉄筋を配置する。こ
れにより、梁型枠が箱体を介して床スラブに支えられた
状態で型枠の据え付けが終了し、この型枠内にコンクリ
ートを打設する。この場合も、躯体工事と竪管工事が同
時に行なわれるので、上述と同様の効果が奏されるう
え、梁型枠が支えられて補強されるとともに、梁下の空
間を設備集中ユニットの設置に有効活用できるという利
点がある。
In the facility centralized unit of the present invention, a step corresponding to the cross-sectional shape of the beam is provided on the upper plate of the box, and a notch of the same shape is provided at the upper end of a pair of opposed side plates. ing. Therefore, in the same manner as described above, the lower end of the common vertical pipe in the box is connected to the upper end of the lower common vertical pipe protruding from the floor slab, and the outer wall form is connected to both sides of the front of the box. Subsequently, after arranging the reinforcing bars of the wall along the inner surfaces of the box and the wall form, a mold for the concave wall on the back of the box and an inner wall form are arranged inside these, and furthermore, The side plate of the body and the formwork for the recessed wall are connected by a separator inserted through the end holder. Next, the upper end of the wall form and the upper plate of the box are connected to the form of the floor slab on the upper floor, and the upper plate of the box and the form of the floor slab are connected to the beam form,
The slab and beam rebar are placed in these forms. Thereby, the installation of the formwork is completed in a state where the beam formwork is supported by the floor slab via the box body, and concrete is poured into the formwork. Also in this case, the skeleton work and the vertical pipe work are performed at the same time, so that the same effects as described above are exerted, and the beam formwork is supported and reinforced, and the space under the beam is used for installation of the equipment centralized unit. There is an advantage that it can be used effectively.

【0011】請求項3の設備集中ユニットでは、共用竪
管が、ガス竪管と水道竪管であり、各戸へ向かう横管
が、箱体の奥の側部板を貫通して壁厚さ以上に突出して
いる。従って、上記横管を、凹部壁用の型枠を貫いて室
内に達するように配置した後に、コンクリートを打設す
れば、水道,給湯,ガスなどの横管がコンクリート壁から
室内に突出した状態となるので、請求項1で述べたと同
じ効果に加えて、室内の各配管作業が容易になるという
利点がある。
[0011] In the facility centralized unit according to the third aspect, the common vertical pipe is a gas vertical pipe and a water vertical pipe, and the horizontal pipe toward each house passes through the side plate at the back of the box and has a wall thickness or more. It protrudes. Therefore, after arranging the horizontal pipe so as to penetrate the recessed wall formwork and reach the room and then pouring concrete, the horizontal pipes for water, hot water, gas, etc. project from the concrete wall into the room. Therefore, in addition to the same effect as described in claim 1, there is an advantage that each piping work in the room becomes easy.

【0012】[0012]

【実施例】以下、本発明を図示の実施例により詳細に説
明する。図1,図2,図3は、本発明の型枠兼用の設備集
中ユニットの一例の正面図とその断面図,側面図とその
断面図,平面図とその断面図を夫々示している。これら
の図において、設備集中ユニットは、平面図(図3(A)
参照)上で矩形をなす上部板2と,建物の階高内法寸法と
等しい高さを有して上部板2の三辺に垂設された側部板
3からなる鋼製の箱体1と、この箱体1内に、略全高に
亘って垂設され、上端が上部板2を貫通して建物のスラ
ブ厚さ以上に突出する共用竪管としての水道竪管4およ
びガス竪管5と、箱体1内に設けられたガス湯沸器6,
後述する種々の開閉バルブおよび上記水道竪管4,ガス
竪管5,ガス湯沸器6,開閉バルブを互いに接続する種々
の枝管と、箱体1をコンクリート打設用の型枠に兼用す
べく、上記上部板2および側部板3の外面に設けられた
複数のセパレータのための端部保持具7,7,…とで構成
される。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below in detail with reference to the illustrated embodiments. FIGS. 1, 2, and 3 show a front view, a cross-sectional view, a side view, a cross-sectional view, a plan view, and a cross-sectional view, respectively, of an example of a facility centralized unit that also serves as a mold according to the present invention. In these figures, the equipment concentration unit is a plan view (FIG. 3A).
A steel box 1 comprising a rectangular upper plate 2 and a side plate 3 having a height equal to the inside height of the building and being vertically provided on three sides of the upper plate 2. A water pipe 4 and a gas pipe 5 serving as common pipes, which are vertically installed in the box 1 over substantially the entire height, and whose upper end penetrates the upper plate 2 and protrudes beyond the slab thickness of the building. And the gas water heater 6, provided in the box 1,
The box 1 is also used as a formwork for concrete casting, and various branch pipes for connecting the open / close valves described later, the vertical water pipe 4, the gas vertical pipe 5, the gas water heater 6, and the open / close valve to each other. , End holders 7, 7,... For a plurality of separators provided on the outer surface of the upper plate 2 and the side plate 3.

【0013】上記上部板2には、図2(B)に示すよう
に、梁38(図5参照)の横断面形状に対応する段部8が
設けられ、左右一対の側部板3a,3bには、図2(A)に
示すように、上記横断面形状に対応する切欠き9が設け
られている。上記箱体1は、図1(B)に示すように、山
型鋼をコ字状に組んだ複数の横方向の補強枠10と四隅
の縦方向の補強枠10で内部が補強され、横方向の補強
枠10の外面に沿って上記端部保持具7が配設され、横
方向の補強枠10の左右に水平に設けた固定具11で上
記ガス竪管5と水道竪管4が固定されるとともに、正面
の開口が片開き扉12で覆われ、閉じられた扉12の上
部の穴13(図2(B)参照)から、箱体内の上部に固定さ
れたガス湯沸器6の排気口14が突出するようになって
いる。この実施例では、箱体1内の中央下部にガスメー
タ15と水道メータ16が配設され、ガスメータ15の
入側とガス竪管5が、開閉バルブたるガスコック17を
もつガス枝管18で、ガスメータ15の出側とガス湯沸
器6が、ガスコック19をもつガス枝管20で夫々接続
され、このガス枝管20から下後方に分岐するガス横管
21が、後方の側部板3cを貫通して壁厚さ以上に突出
している(図2(B)参照)。
As shown in FIG. 2B, the upper plate 2 is provided with a step 8 corresponding to the cross-sectional shape of the beam 38 (see FIG. 5), and a pair of left and right side plates 3a, 3b is provided. As shown in FIG. 2 (A), a notch 9 corresponding to the above-mentioned cross-sectional shape is provided. As shown in FIG. 1 (B), the inside of the box body 1 is reinforced by a plurality of lateral reinforcing frames 10 in which angle steel is assembled in a U-shape and vertical reinforcing frames 10 at four corners. The end holder 7 is disposed along the outer surface of the reinforcing frame 10, and the gas vertical pipe 5 and the water vertical pipe 4 are fixed by fasteners 11 provided horizontally on the left and right sides of the horizontal reinforcing frame 10. At the same time, the front opening is covered with the one-sided door 12 and the exhaust of the gas water heater 6 fixed to the upper part of the inside of the box through the hole 13 (see FIG. 2B) on the closed door 12. The mouth 14 protrudes. In this embodiment, a gas meter 15 and a water meter 16 are disposed at the lower center in the box 1, and the gas meter 15 and the gas vertical pipe 5 are connected by a gas branch pipe 18 having a gas cock 17 serving as an open / close valve. 15 and the gas water heater 6 are connected by a gas branch pipe 20 having a gas cock 19, and a gas horizontal pipe 21 branching downward from the gas branch pipe 20 to the lower rear penetrates the rear side plate 3c. And project more than the wall thickness (see FIG. 2B).

【0014】また、上記水道メータ16の入側と水道竪
管4が、図1(B)に示すように、開閉バルブたる止水弁
22をもつ水道枝管23で、水道メータ16の出側とガ
ス湯沸器6が、止水弁24と逆止弁25をもつ水道枝管
26で夫々接続され、この水道枝管26から後方へ分岐
する水道横管27が、後方の側部板3cを貫通して上述
と同様に突出する。さらに、ガス湯沸器6で沸かされた
湯は、下方へ延びる給湯枝管28を通って側部板3cか
ら上述と同様に突出する給湯横管29を経て室内に供給
される。なお、水道およびガス竪管4,5の下端には、
下階の竪管との接続のための内周ねじをもつ雌接続部4
a,5aが形成され、両竪管4,5の上端には、上階の竪管
との接続のための外周ねじをもつ雄接続部4b,5bが形
状されている。
As shown in FIG. 1B, the inlet side of the water meter 16 and the water pipe 4 are connected to a water branch pipe 23 having a shutoff valve 22 as an open / close valve. And the gas water heater 6 are respectively connected by a water supply branch pipe 26 having a water stop valve 24 and a check valve 25, and a water supply horizontal pipe 27 branching backward from the water supply branch pipe 26 is connected to the rear side plate 3c. And project in the same manner as described above. Further, the hot water boiled by the gas water heater 6 is supplied to the room through a hot water supply branch pipe 28 extending downward and a hot water supply horizontal pipe 29 protruding from the side plate 3c in the same manner as described above. In addition, at the lower ends of the water and gas vertical pipes 4 and 5,
Female connection 4 with internal thread for connection to lower vertical pipe
a, 5a are formed, and male connection portions 4b, 5b having outer peripheral threads for connection to the upper floor vertical tube are formed at the upper ends of both the vertical tubes 4, 5.

【0015】上記構成の型枠兼用の設備集中ユニットを
用いたコンクリートの打設方法は、次のとおりである。
まず、この箱体1を、その開口を廊下側に向けて(図4
参照)コンクリートを打設すべき床スラブ上の所定位置
に据え付け、箱体1内の水道,ガス竪管4,5の下端の雌
接続部4a,5aを、床スラブから突出する下階の水道,ガ
ス竪管の上端の雄接続部4b,5bに接続するとともに、
箱体1の前面両側を、左右の外側の壁型枠34a,34a
に連結する。続いて、上記箱体1および壁型枠の内面に
沿わせて壁の鉄筋を配置した後、これらの内側に、図5
および図6に示すように、箱体背面の凹部壁用の背部型
枠32と側部型枠33、左右の内側の壁型枠34b,34
bを配置し、箱体1の側部板3の外面に設けられている
複数の端部保持具7,7…に、図4〜図6に示すよう
に、丸鋼の両端にねじを切ってなるセパレータ30を内
面側から水平に挿通して、対向する凹部壁用の背部型枠
32と側部型枠33,33を貫通させ、セパレータの端
部に螺合したナット37を締め付けて内側と外側の型枠
を所定寸法隔てて連結する。次に、壁型枠34a,34b
の上端および箱体1の上部板2を上階の床スラブの型枠
39に連結し、かつ箱体1の上部板の段部8および床ス
ラブの型枠39を梁の下部型枠40や側部型枠に連結
し、これらの型枠内にスラブおよび梁の鉄筋を配置す
る。尚、箱体1と各壁型枠との連結は、図4〜図6に示
される周知手法、つまり壁型枠とその外面に縦横に組ん
だ支保工35に挿通したセパレータ30の他端を、座金
36を介してナット37で止めて行なわれる。また、上
部板2が平坦で段部8がなく,側部板にも切欠き9がな
い場合は、上部板を上階の床スラブの型枠39(図5参
照)に連結すればよい。
A method of placing concrete using the above-structured unit having a combined use of a mold and a facility is as follows.
First, with the opening of the box 1 facing the corridor side (Fig. 4
See below) Install concrete at a predetermined position on the floor slab on which concrete is to be cast, and connect the water supply in the box 1 and the female connection portions 4a, 5a at the lower ends of the gas vertical pipes 4, 5 to the lower floor water supply projecting from the floor slab. , Connected to the male connection parts 4b, 5b at the upper end of the gas vertical pipe,
The left and right outer wall forms 34a, 34a
Connect to Subsequently, the reinforcing bar of the wall is arranged along the inner surfaces of the box 1 and the wall form.
As shown in FIG. 6 and FIG. 6, the back form 32 and the side form 33 for the concave wall on the back of the box body, and the left and right inner wall forms 34b, 34.
b is arranged, and a plurality of end holders 7, 7... provided on the outer surface of the side plate 3 of the box 1 are threaded at both ends of the round steel as shown in FIGS. The separator 30 is horizontally inserted from the inner surface side, the back mold 32 for the concave wall and the side molds 33, 33 facing each other are penetrated, and the nut 37 screwed to the end of the separator is tightened to the inside. And the outer mold are connected at a predetermined distance. Next, the wall forms 34a, 34b
And the upper plate 2 of the box 1 are connected to the formwork 39 of the floor slab on the upper floor, and the step 8 of the upper plate of the box 1 and the formwork 39 of the floor slab are connected to the lower formwork 40 of the beam. Connect to the side forms and place the slab and beam reinforcement in these forms. The connection between the box 1 and each of the wall forms is performed by a well-known method shown in FIGS. 4 to 6, that is, by connecting the other end of the separator 30 inserted through the wall form and the supporter 35 assembled vertically and horizontally on the outer surface thereof. , And is stopped by a nut 37 via a washer 36. If the upper plate 2 is flat and has no stepped portion 8 and the side plate has no notch 9, the upper plate may be connected to the formwork 39 of the upper floor slab (see FIG. 5).

【0016】こうして、図4,図5に示すように、梁の
下部型枠40が上部板2の段部8と同一水平面をなし、
上階床スラブの型枠39が上部板2の頂部と同一水平面
をなし、梁の側部型枠31と上部板2の垂直部が対向し
て、打設される梁38が箱体1を介して床スラブで支え
られると共に、箱体1の高さが、コンクリートを打設す
べき階の階高内法寸法になり、上部板2を貫通する水
道,ガス竪管4,5の上端4b,5bが、図4,図5の破線で
示す上階の床スラブ厚さ以上に突出した状態で、型枠の
据え付けが終わる。次に、この型枠内に、図4〜図6の
断面記号で示すようにコンクリートを打設し、コンクリ
ート硬化後に型枠を取り外す。その後、箱体1内の未接
続のガス,水道メータ15,16を、各枝管18,20;2
3,26;28やガス湯沸器6と接続し、箱体1の前面に
扉12を取り付けて設備集中ユニットの工事が終了す
る。かくて、躯体工事たるコンクリート打設と水道,ガ
ス竪管4,5を含む設備集中ユニットの工事が同時に行
なわれ、設備配管やガス湯沸器6を収納した鋼製の箱体
1は、躯体つまり凹部壁に埋め込まれた状態で一体化さ
れる。
Thus, as shown in FIGS. 4 and 5, the lower formwork 40 of the beam forms the same horizontal plane as the step 8 of the upper plate 2,
The formwork 39 of the upper floor slab forms the same horizontal plane as the top of the upper plate 2, the side formwork 31 of the beam and the vertical portion of the upper plate 2 face each other, and the beam 38 to be cast forms the box 1. And the upper end 4b of the water and gas vertical pipes 4 and 5 penetrating through the upper plate 2 while the height of the box 1 becomes the inside height of the floor where concrete is to be cast. , 5b project beyond the thickness of the floor slab on the upper floor indicated by the broken line in FIGS. 4 and 5, the installation of the formwork is completed. Next, concrete is poured into the form as shown by the cross-sectional symbols in FIGS. 4 to 6, and after the concrete is hardened, the form is removed. Thereafter, the unconnected gas and water meters 15 and 16 in the box 1 are removed from the respective branch pipes 18 and 20;
3, 26; 28 and the gas water heater 6, the door 12 is attached to the front of the box 1, and the construction of the equipment centralized unit is completed. Thus, the concrete construction as the skeleton construction and the construction of the equipment centralized unit including the water supply pipe and the gas vertical pipes 4 and 5 are simultaneously performed, and the steel box 1 containing the equipment pipes and the gas water heater 6 is composed of the skeleton. That is, they are integrated while being embedded in the recess wall.

【0017】従って、躯体と設備集中ユニットの同時施
工によって、竪管工事が従来のように躯体工事の後追い
になって竣工を遅らせることがなく、施工上の隘路を解
消できるうえ、貫通穴のズレによるコンクリートの斫り
や竪管の位置修正が不要になって、竪管工事が著しく容
易になるとともに、貫通穴から雨水が下階に漏れること
もなくなる。また、箱体1が凹部壁に囲まれているの
で、水道枝管23や給湯枝管28が寒冷期の外気や風に
晒されず、これら枝管の凍結が防止できるとともに、廊
下52に突出部 (図7参照)がなくなって壁と腰壁が平
面図上で平行な直線になるから、躯体の施工に手間と費
用をかけずに廊下を所定幅にすることができる。
Therefore, by simultaneous construction of the skeleton and the facility centralized unit, the vertical pipe work does not follow up the skeleton construction as in the prior art, and the completion is not delayed. This eliminates the necessity of shaving concrete and correcting the position of the vertical pipe, greatly facilitating the vertical pipe construction and preventing rainwater from leaking down through the through holes to the lower floors. Further, since the box 1 is surrounded by the recessed wall, the water supply branch pipe 23 and the hot water supply branch pipe 28 are not exposed to the outside air and the wind in the cold season, so that the branch pipes can be prevented from freezing and project into the corridor 52. Since the part (see FIG. 7) is eliminated and the wall and the lumbar wall become parallel straight lines in the plan view, the corridor can be set to a predetermined width without any labor and cost for construction of the skeleton.

【0018】上記実施例では、箱体1の上部板2に段部
8を,側部板3a,3bに切欠き9を夫々設けて、この部分
を梁型枠の一部として用いているので、打設された梁コ
ンクリート38が、箱体1を介して床スラブに支えられ
るので型枠の強度が上がりかつ支保工35が少なくで
き、また、箱体1の介在により壁型枠や上階床スラブの
型枠が補強されかつ組みやすくなるとともに、梁下の空
間を設備集中ユニットの設置に有効活用できて、建物の
省スペースが図られるという利点がある。また、水道,
ガス,給湯の各横管27,21,29が、図5,図6の如く
箱体1の奥の側部板3cを貫通して壁厚さ以上に突出し
ているので、これらの横管が、コンクリート打設後に壁
から室内に突出した状態となって、その後の室内での各
配管工事が容易になるという利点がある。
In the above embodiment, the step 8 is provided in the upper plate 2 of the box 1 and the notch 9 is provided in the side plates 3a and 3b, and this portion is used as a part of the beam form. Since the cast concrete beam 38 is supported by the floor slab via the box 1, the strength of the form is increased and the number of supports 35 can be reduced. There is an advantage that the formwork of the floor slab is reinforced and easily assembled, and the space under the beam can be effectively used for installation of the facility centralized unit, thereby saving the building space. Also,
Since the horizontal pipes 27, 21, and 29 for gas and hot water supply penetrate through the side plate 3c at the back of the box 1 and protrude beyond the wall thickness as shown in FIGS. In addition, there is an advantage that after the concrete is cast, the pipes protrude into the room from the wall, thereby facilitating subsequent plumbing work in the room.

【0019】なお、本発明の箱体の上部板,対向する一
対の側部板は、上記実施例と異なり段部,切欠きのない
平坦なものにすることもでき、また、本発明の水道,ガ
ス,給湯などの枝管は、奥の側部板を貫通する各横管を
もたないものにすることもできる。これらの場合でも、
躯体工事と竪管工事が同時に施工でき、箱体が凹部壁に
埋め込まれるので、竪管工事を容易化して施工上の隘路
を解消し、貫通穴に伴う雨水漏れ,斫り作業,竪管の位置
修正をなくし、水道枝管や給湯枝管の凍結を防止でき、
躯体施工に手間と費用をかけずに所定の廊下幅を確保で
きるという既述の効果が奏される。また、上記実施例で
は、箱体にガスメータや水道メータおよび各枝管を組み
込んだが、これを後付けにすることもできる。また、本
発明の竪管は、実施例の水道,ガス竪管に限らず電気幹
線管などであってもよい。さらに、実施例の箱体の外面
のセパレータのための端部保持具の代わりに、箱体の外
面に直接セパレータを突設することも可能である。
The upper plate of the box body of the present invention and the pair of opposing side plates may be flat without step portions or notches, unlike the above embodiment. The branch pipes for gas, hot water and the like may not have the horizontal pipes penetrating the back side plate. Even in these cases,
Structural work and vertical pipe work can be performed at the same time, and the box body is embedded in the recessed wall, facilitating vertical pipe work and eliminating bottlenecks in construction, rainwater leakage due to through holes, shaving work, vertical pipe work. Eliminates position correction, prevents freezing of water supply branch pipes and hot water supply branch pipes,
The above-described effect that a predetermined corridor width can be ensured without spending time and money on the construction of the frame is achieved. Further, in the above embodiment, the gas meter, the water meter, and the respective branch pipes are incorporated in the box, but these can be retrofitted. Further, the vertical pipe of the present invention is not limited to the water pipe and gas vertical pipe of the embodiment, but may be an electric main pipe. Further, instead of the end holder for the separator on the outer surface of the box of the embodiment, it is also possible to project the separator directly on the outer surface of the box.

【0020】[0020]

【発明の効果】以上の説明で明らかなように、請求項1
の型枠兼用の設備集中ユニットは、矩形の上部板と建物
の階高内法寸法と等しい高さを有して上記上部板の三辺
に垂設された側部板からなる箱体と、この箱体内に、略
全高に亘って垂設され、上端が上記上部板を貫通して建
物のスラブ厚さ以上に突出する共用竪管と、上記箱体内
に設けられたガス湯沸器および開閉バルブと、上記箱体
をコンクリート打設用の型枠に兼用すべく、上記側部板
の外面に突設された複数のセパレータまたは複数のセパ
レータのための端部保持具とを備えているので、躯体工
事と竪管工事が同時に施工でき、箱体が凹部壁に埋め込
まれるから、竪管工事を容易化して施工上の隘路を解消
でき、貫通穴に伴う雨水漏れ,斫り作業,竪管の位置修正
をなくすことができ、水道枝管や給湯枝管の凍結を防止
でき、躯体施工に手間と費用をかけずに所定の廊下幅を
確保することができる。
As is apparent from the above description, claim 1
A box body consisting of a rectangular upper plate and side plates vertically extending on three sides of the upper plate and having a height equal to the inside height of the building, In this box, a common vertical pipe which is suspended substantially over the entire height and whose upper end penetrates through the upper plate and protrudes beyond the slab thickness of the building, a gas water heater provided in the box, and a switchgear A valve and a plurality of separators protruding from the outer surface of the side plate or end holders for the plurality of separators so that the box also serves as a formwork for concrete casting. The framing work and the vertical pipe work can be performed at the same time, and the box body is embedded in the recessed wall, so that the vertical pipe work can be facilitated and the construction bottleneck can be eliminated, and rainwater leakage, shaving work, vertical pipe work associated with through holes Position can be eliminated, freezing of water supply branch pipes and hot water supply branch pipes can be prevented. It is possible to secure a predetermined corridor width without the between and cost.

【0021】また、請求項2の設備集中ユニットは、箱
体の上部板に梁の断面形状に対応する段部を設け、対向
する一対の側部板の上端部に同形状の切欠きを設けてい
るので、梁型枠が箱体を介して床スラブで支えられるか
ら、上述の効果に加えて、型枠が補強されて強度が上が
りかつ組みやすくなるとともに、梁下の空間を設備集中
ユニットの設置に有効活用できて、建物の省スペースを
図ることができる。さらに、請求項3の設備集中ユニッ
トは、各戸内へ向かう横管が、箱体の奥の側部板を貫通
して壁厚さ以上に突出しているので、これらの横管が、
打設後のコンクリート壁から室内に突出して、室内での
各配管工事が容易になるという利点がある。
According to a second aspect of the present invention, there is provided a facility centralized unit, wherein a step portion corresponding to a cross-sectional shape of a beam is provided in an upper plate of a box, and a notch having the same shape is provided in an upper end portion of a pair of opposed side plates. Since the beam formwork is supported by the floor slab via the box, the formwork is reinforced and the strength is increased and easy to assemble. Can be effectively used for the installation of a building, and the space of the building can be saved. Furthermore, in the facility centralized unit according to claim 3, since the horizontal pipes going to each house penetrate through the side plate at the back of the box and protrude beyond the wall thickness, these horizontal pipes are:
There is an advantage that each of the plumbing works can be easily performed in the room by projecting into the room from the concrete wall after the casting.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の型枠兼用の設備集中ユニットの一実
施例の正面図および図2(B)のI−I線断面図である。
FIG. 1 is a front view of an embodiment of an equipment concentration unit that also serves as a mold according to the present invention, and is a cross-sectional view taken along line II of FIG. 2B.

【図2】 上記実施例の側面図および図1(A)のII−II
線断面図である。
FIG. 2 is a side view of the above embodiment and II-II of FIG. 1 (A).
It is a line sectional view.

【図3】 上記実施例の平面図および図1(A)のIII−I
II線断面図である。
FIG. 3 is a plan view of the above embodiment and III-I of FIG. 1 (A).
FIG. 2 is a sectional view taken along line II.

【図4】 上記実施例の施工態様を示す正面図である。FIG. 4 is a front view showing a construction mode of the embodiment.

【図5】 上記実施例の施工態様を示す側面図である。FIG. 5 is a side view showing a construction mode of the embodiment.

【図6】 上記実施例の施工態様を示す平面図である。FIG. 6 is a plan view showing a construction mode of the embodiment.

【図7】 従来の設備集中ユニットを示す平面図であ
る。
FIG. 7 is a plan view showing a conventional facility centralized unit.

【符号の説明】[Explanation of symbols]

1…箱体、2…上部板、3…側部板、4…水道竪管、4
a,5a…雄接続部、4b,5b…雌接続部、5…ガス竪管、
6…ガス湯沸器、7…端部保持具、8…段部、9…切欠
き、10…補強枠、11…固定具、12…片開き扉、1
3…穴、14…排気口、15…ガスメータ、16…水道
メータ、17,19…ガスコック、18,20…ガス枝
管、21…ガス横管、22,24…止水弁、23,26…
水道枝管、25…逆止弁、27…水道横管、28…給湯
枝管、29…給湯横管、30…セパレータ、31…梁の
側部型枠、32,33…凹部壁用の背部,側部型枠、34
a,34b…壁型枠、35…支保工、36…座金、37…
ナット、38…梁、39…スラブ型枠、40…梁の下部
型枠。
DESCRIPTION OF SYMBOLS 1 ... Box body, 2 ... Upper plate, 3 ... Side plate, 4 ... Water pipe, 4
a, 5a: male connection, 4b, 5b: female connection, 5: gas vertical pipe,
6 ... gas water heater, 7 ... end holder, 8 ... step, 9 ... notch, 10 ... reinforcement frame, 11 ... fixer, 12 ... single door, 1
3 ... hole, 14 ... exhaust port, 15 ... gas meter, 16 ... water meter, 17, 19 ... gas cock, 18, 20 ... gas branch pipe, 21 ... gas horizontal pipe, 22, 24 ... water stop valve, 23, 26 ...
Water supply branch pipe, 25 ... check valve, 27 ... water supply horizontal pipe, 28 ... hot water supply branch pipe, 29 ... hot water supply horizontal pipe, 30 ... separator, 31 ... side frame of beam, 32, 33 ... back for concave wall , Side formwork, 34
a, 34b ... wall formwork, 35 ... support, 36 ... washer, 37 ...
Nuts, 38: Beam, 39: Slab formwork, 40: Lower formwork of beam.

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) F24H 9/06 301 E04G 15/06──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 6 , DB name) F24H 9/06 301 E04G 15/06

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 複数層集合住宅における各戸向けの設備
配管,熱源機器およびメータ類を収納するための型枠兼
用の設備集中ユニットにおいて、 矩形の上部板と建物の階高内法寸法と等しい高さを有し
て上記上部板の三辺に垂設された側部板からなる箱体
と、 この箱体内に、略全高に亘って垂設され、上端が上記上
部板を貫通して建物のスラブ厚さ以上に突出する共用竪
管と、 上記箱体内に設けられたガス湯沸器および開閉バルブ
と、 上記箱体をコンクリート打設用の型枠に兼用すべく、上
記側部板の外面に突設された複数のセパレータまたは複
数のセパレータのための端部保持具とを備えたことを特
徴とする型枠兼用の設備集中ユニット。
Claims: 1. A centralized facility unit for housing equipment piping, heat source equipment, and meters for a house in a multi-story apartment house, comprising: a rectangular upper plate and a height equal to the inside height of the building. And a box body comprising side plates vertically provided on three sides of the upper plate, and vertically suspended in the box body over substantially the entire height, and an upper end thereof penetrates the upper plate to form a building. A common vertical pipe protruding beyond the slab thickness, a gas water heater and an opening / closing valve provided in the box body, and an outer surface of the side plate so that the box body can also be used as a formwork for concrete casting. And a plurality of separators or end holders for the plurality of separators, the equipment centralized unit also serving as a mold.
【請求項2】 上記上部板に梁の断面形状に対応する段
部を設けると共に、対向する一対の上記側部板の上端部
に上記梁の断面形状に対応する切欠きを設けたことを特
徴とする請求項1に記載の型枠兼用の設備集中ユニッ
ト。
2. A method according to claim 1, wherein a stepped portion corresponding to the cross-sectional shape of the beam is provided in the upper plate, and a notch corresponding to the cross-sectional shape of the beam is provided at upper end portions of the pair of side plates facing each other. 2. The facility centralized unit which also serves as a mold according to claim 1.
【請求項3】 上記共用竪管が、ガス竪管と水道竪管で
あり、各戸内へ向かう横管が、箱体の開口に対向する上
記側部板を貫通して建物の壁厚さ以上に突出しているこ
とを特徴とする請求項1または2に記載の型枠兼用の設
備集中ユニット。
3. The common vertical pipe is a gas vertical pipe and a water vertical pipe, and a horizontal pipe toward each house penetrates through the side plate facing the opening of the box body and has a wall thickness equal to or greater than the wall thickness of the building. 3. The facility centralized unit which also serves as a formwork according to claim 1 or 2, wherein the unit is protruded from the unit.
JP33524193A 1993-12-28 1993-12-28 Equipment centralized unit that is also used for formwork Expired - Fee Related JP2834663B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP33524193A JP2834663B2 (en) 1993-12-28 1993-12-28 Equipment centralized unit that is also used for formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP33524193A JP2834663B2 (en) 1993-12-28 1993-12-28 Equipment centralized unit that is also used for formwork

Publications (2)

Publication Number Publication Date
JPH07190495A JPH07190495A (en) 1995-07-28
JP2834663B2 true JP2834663B2 (en) 1998-12-09

Family

ID=18286329

Family Applications (1)

Application Number Title Priority Date Filing Date
JP33524193A Expired - Fee Related JP2834663B2 (en) 1993-12-28 1993-12-28 Equipment centralized unit that is also used for formwork

Country Status (1)

Country Link
JP (1) JP2834663B2 (en)

Also Published As

Publication number Publication date
JPH07190495A (en) 1995-07-28

Similar Documents

Publication Publication Date Title
JPS5996346A (en) Fabricated core of building
JP2834664B2 (en) Construction method of equipment centralized unit also used for formwork
JP2834663B2 (en) Equipment centralized unit that is also used for formwork
JPH10160099A (en) Piping method and piping structure in meter box
CN110778154A (en) Integral prefabricated toilet
EP3399113B1 (en) Plumbing unit
KR101930673B1 (en) Construction method of Thermal Breaking type apartment housing using heat insulation panel
JPS5812932A (en) Concentrating system for installed pipeline and heat supplying machine and apparatus in multiple dwelling house
US3618622A (en) Plumbing system
JP2704498B2 (en) Method of forming meter box in apartment house, unit for meter box, and method of using the same
JPS6244636B2 (en)
CN210947401U (en) Prefabricated wall's assembled water supply pipe structure
JP3808854B2 (en) Partition wall support
JPH08312169A (en) Method of compounding unit construction of multiple dwelling house
RU215352U1 (en) Building block for building utilities
KR920003577Y1 (en) Supplying pipe system in the bathroom
JPH0828798A (en) Unit type pipe space forming member
BR102018003399A2 (en) prefabricated brick building and assembly process of this building
CN112144749A (en) An on-site prefabricated wall panel installation structure
KR20210157583A (en) Precast double pannel for underground outer wall and the construction method using them
KR200338297Y1 (en) Water supply system having drainpipe
JPH06158878A (en) Dwelling unit variable housing system
CN221941691U (en) A water heater installation back wall
KR200321105Y1 (en) Pipe mounting structure for pipe of laying-type for air conditioner
JP2560145B2 (en) Indoor piping method and piping equipment