JP2838180B2 - Building construction method - Google Patents
Building construction methodInfo
- Publication number
- JP2838180B2 JP2838180B2 JP5292730A JP29273093A JP2838180B2 JP 2838180 B2 JP2838180 B2 JP 2838180B2 JP 5292730 A JP5292730 A JP 5292730A JP 29273093 A JP29273093 A JP 29273093A JP 2838180 B2 JP2838180 B2 JP 2838180B2
- Authority
- JP
- Japan
- Prior art keywords
- base
- fixing
- nut
- foundation
- base body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims description 28
- 238000009435 building construction Methods 0.000 title description 10
- 238000010276 construction Methods 0.000 claims description 13
- 238000003780 insertion Methods 0.000 claims description 11
- 230000037431 insertion Effects 0.000 claims description 11
- 210000000988 bone and bone Anatomy 0.000 claims description 6
- 238000005219 brazing Methods 0.000 claims description 2
- 239000004570 mortar (masonry) Substances 0.000 description 14
- 239000000463 material Substances 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 4
- 238000000576 coating method Methods 0.000 description 2
- 239000003973 paint Substances 0.000 description 2
- 239000002023 wood Substances 0.000 description 2
- ATJFFYVFTNAWJD-UHFFFAOYSA-N Tin Chemical compound [Sn] ATJFFYVFTNAWJD-UHFFFAOYSA-N 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 239000007769 metal material Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Foundations (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は木造住宅等の建物の施工
方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a building such as a wooden house.
【0002】[0002]
【従来の技術】従来、木造住宅等の建物の土台はコンク
リートで形成された基礎と、この基礎に所定間隔で埋設
された土台本体を固定するための複数本のアンカーボル
トと、この複数本のアンカーボルトが挿入される、ボル
ト挿入孔が形成された土台本体と、前記アンカーボルト
にそれぞれ螺合され前記土台本体を締付け固定する固定
ナットとで構成され、該土台の土台本体の上部に柱、胴
差、桁等を組立てて上棟を施工した後、上棟の上部に屋
根を取付けて建物を施工していた。2. Description of the Related Art Conventionally, the foundation of a wooden house or the like is a foundation formed of concrete, a plurality of anchor bolts for fixing a foundation body buried at a predetermined interval on the foundation, and a plurality of bolts. An anchor bolt is inserted, a base body having a bolt insertion hole formed therein, and a fixing nut screwed into the anchor bolt to fasten and fix the base body. After assembling the girder and girder, the upper building was constructed, and then the roof was attached to the upper part of the upper building to construct the building.
【0003】[0003]
【本発明が解決しようとする課題】従来の建物の施工で
は基礎の上面を水平になるように加工しなければなら
ず、この基礎の上面を水平にする作業がヌキ板を水平面
に設置し、充填したモルタルをコテで丁寧に撫付けて行
なう方法や、レベルモルタルなるものを用いる方法があ
るが、前者は正確な水平面が得られず、作業に手数がか
かり、硬化するまでに長時間かかるという欠点があっ
た。また、後者は表面張力で水平面に加工するものであ
るが、水のような表面張力が得られず、正確な水平面が
得られないとともに、硬化するまでに長時間かかるとい
う欠点があった。また、土台の土台本体と、この土台本
体の上部に設置される上棟との接続強度が弱く、十分な
耐震強度が得られないという欠点があった。[Problems to be Solved by the Invention] In the conventional construction of a building, the upper surface of the foundation must be machined so as to be horizontal. There is a method of carefully patting the filled mortar with a trowel or a method using a level mortar, but the former can not obtain an accurate horizontal surface, it takes time to work, and it takes a long time to cure There were drawbacks. In the latter method, the surface is processed into a horizontal surface by surface tension. However, surface tension like water cannot be obtained, an accurate horizontal surface cannot be obtained, and it takes a long time to cure. In addition, the connection strength between the base body of the base and the upper building installed on the top of the base body is weak, and there is a disadvantage that sufficient earthquake resistance cannot be obtained.
【0004】本発明は以上のような従来の欠点に鑑み、
簡単な作業で短時間に土台本体を正確な水平面に設置す
ることができるとともに、土台と上棟とを強固に接続し
て、木造3階建て住宅でも十分な強度と、耐震強度が得
られる建物の施工方法を提供することを目的としてい
る。The present invention has been made in view of the above-mentioned conventional drawbacks,
The base can be installed on an accurate horizontal surface in a short time with simple work, and the base and the upper building are firmly connected to each other. It aims to provide a construction method.
【0005】本発明の前記ならびにそのほかの目的と新
規な特徴は次の説明を添付図面と照し合せて読むと、よ
り完全に明らかになるであろう。ただし、図面はもっぱ
ら解説のためのものであって、本発明の範囲を限定する
ものではない。The above and other objects and novel features of the present invention will become more fully apparent when the following description is read in conjunction with the accompanying drawings. However, the drawings are for explanation only, and do not limit the scope of the present invention.
【0006】[0006]
【課題を解決するための手段】上記目的を達成するため
に、本発明は基礎を形成する基礎形成工程と、この基礎
形成工程時に該基礎の上部に水平状態で土台本体を固定
支持することのできる高さ調整ナットおよび固定ナット
を螺合させることのできる複数本の土台用アンカーボル
トを所定間隔で埋設する土台用アンカーボルト埋設工程
と、基礎に埋設された複数本の土台用アンカーボルトに
それぞれ螺合させた高さ調整ナットを土台本体を水平に
支持できる位置に水平器を用いてセットする高さ調整ナ
ット位置決め工程と、この高さ調整ナット位置決め工程
を経た後、土台本体のボルト挿入孔内に前記土台用アン
カーボルトをそれぞれ挿入して高さ調整ナットに支持さ
せるとともに、該土台用アンカーボルトにそれぞれ固定
ナットを螺合させて土台本体を固定する土台本体固定工
程と、この土台本体固定工程後に前記複数本の土台用ア
ンカーボルトの上端部にそれぞれ筋違取付け金具および
長ナットを介して木骨ボルトを接続し、該木骨ボルトに
筋違取付け金具を介してそれぞれ螺合されるナットによ
って胴差や桁を固定するとともに、木骨ボルトに取付け
られた筋違取付け金具を用いて筋違を取付けながら上棟
を施工する上棟施工工程と、この上棟施工工程後にあら
かじめ仕上げ状態に組付けられた屋根を吊上げ、前記上
棟の上部に取付け固定する屋根取付け工程とで建物の施
工方法を構成している。In order to achieve the above object, the present invention provides a foundation forming step for forming a foundation, and a step of fixing and supporting a base body in a horizontal state on an upper portion of the foundation during the foundation forming step. The base anchor bolt embedding process of embedding a plurality of base anchor bolts that can screw the height adjustment nut and the fixing nut at predetermined intervals, and the plurality of base anchor bolts embedded in the foundation, respectively. A height adjustment nut positioning step of setting the screwed height adjustment nut at a position where the base body can be supported horizontally by using a leveler, and after this height adjustment nut positioning step, a bolt insertion hole of the base body is passed. The base anchor bolts are respectively inserted into the base anchor bolts and supported by height adjusting nuts, and fixing nuts are screwed into the base anchor bolts, respectively. A base body fixing step of fixing the base body, and after this base body fixing step, a timbered bolt is connected to the upper end of each of the plurality of anchor bolts via a bracing bracket and a long nut, respectively. An upper ridge construction process of fixing the trunk difference and the girder with nuts screwed through the bracing fittings, respectively, and constructing the upper ridge while attaching the bracing using the bracing fittings attached to the wooden bone bolts, After the upper ridge construction step, the roof mounting step in which a roof previously assembled in a finished state is lifted and the roof is attached and fixed to the upper part of the upper ridge constitutes a construction method of the building.
【0007】[0007]
【作用】上記のように構成された建物の施工方法は、水
平器で土台用アンカーボルトに螺合された高さ調整ナッ
トの位置を同一面に位置させ、土台本体を確実に水平に
設置されるとともに、複数個の土台用アンカーボルトと
上棟の胴差や桁にナットによって固定される木骨ボルト
が長ナットによって固定され、一体化された状態とな
る。According to the construction method of the building constructed as described above, the position of the height adjusting nut screwed to the anchor bolt for the base with the leveler is located on the same plane, and the base body is securely installed horizontally. At the same time, the plurality of anchor bolts for the base and the timber bone bolts fixed to the body difference and the girder of the upper ridge by nuts are fixed by the long nuts, and are in an integrated state.
【0008】[0008]
【本発明の実施例】以下、図面に示す実施例により、本
発明を詳細に説明する。DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, the present invention will be described in detail with reference to the embodiments shown in the drawings.
【0009】図1ないし図16の本発明の第1の実施例
において、1は基礎2を形成する基礎形成工程で、この
基礎形成工程1はコンクリート枠3内に鉄筋等を配置
し、コンクリートを流し込む従来と同様な作業によって
行なう。In the first embodiment of the present invention shown in FIGS. 1 to 16, reference numeral 1 denotes a foundation forming step for forming a foundation 2; This is performed by the same operation as in the past.
【0010】5は前記基礎形成工程1時に、基礎2の上
部に水平状態で土台本体6を固定支持することができる
ように、図2および図3に示すように所定間隔で基礎2
に土台用アンカーボルト9を埋設する土台用アンカーボ
ルト埋設工程で、この土台用アンカーボルト埋設工程5
は基礎2の鉄筋等に針金等を用いて固定したり、あるい
は基礎2を形成するコンクリート枠3の上部に吊下げ状
態に支持したりして基礎2内に埋設したり、あるいはコ
ンクリート打込み後に、土台用アンカーボルト9をコン
クリートに差込んで埋設してもよい。[0010] As shown in FIGS. 2 and 3, the base 5 is provided at predetermined intervals as shown in FIGS. 2 and 3 so that the base body 6 can be fixedly supported on the base 2 in a horizontal state at the time of the base forming step 1.
In the base anchor bolt burying step of burying the base anchor bolt 9 in the base, the base anchor bolt burying step 5 is performed.
Is fixed to a reinforcing bar or the like of the foundation 2 using a wire or the like, or is supported in a suspended state on an upper part of a concrete frame 3 forming the foundation 2 and is buried in the foundation 2 or after concrete is poured in, The base anchor bolt 9 may be inserted into concrete and buried.
【0011】この基礎2内に埋設される土台用アンカー
ボルト9は図4および図5に示すように、前記基礎2内
に埋設されるU字状の土台用アンカーボルト本体10
と、この土台用アンカーボルト本体10の上部に突出さ
れた土台本体6を締付け固定できる該土台本体6の高さ
寸法よりも長いねじ部11と、このねじ部11と螺合さ
れる高さ調整ナット12および固定ナット13とから構
成されている。As shown in FIGS. 4 and 5, the anchor bolt 9 for the base buried in the foundation 2 is a U-shaped anchor bolt body 10 for the base buried in the foundation 2 as shown in FIGS.
A screw portion 11 longer than the height of the base body 6 capable of tightening and fixing the base body 6 protruding from the upper portion of the base anchor bolt body 10, and a height adjustment screwed with the screw portion 11 It is composed of a nut 12 and a fixed nut 13.
【0012】14は前記基礎2に埋設された複数本の土
台用アンカーボルト9にそれぞれ螺合された高さ調整ナ
ット12を図6に示すように、水平器15を用いて同一
平面になるようにセットする高さ調整ナット位置決め工
程で、この高さ調整ナット位置決め工程14では座金4
を介して高さ調整ナット12に支持され、かつ土台用ア
ンカーボルト9のねじ部11が挿入される支持部材16
が下部に設けられたスケール17を用いて行なう。A height adjusting nut 12 screwed to a plurality of base anchor bolts 9 buried in the foundation 2 is coplanar with a leveling device 15 as shown in FIG. In the height adjustment nut positioning step to be set to the
A support member 16 supported by the height adjustment nut 12 through the base member and into which the threaded portion 11 of the anchor bolt 9 for the base is inserted.
Is performed using a scale 17 provided below.
【0013】また、図7に示すように土台用アンカーボ
ルト9のねじ部11と螺合する支持部材16Aが下部に
設けられたスケール17Aを用い、水平器15でスケー
ル17Aの0点が位置するようにスケール17Aを回転
させて上下移動させ、0点が一致したところで土台用ア
ンカーボルト9のねじ部11にスプレー塗料を塗布し、
ねじ部11よりスケール17Aの支持部材16Aを外し
た後、高さ調整ナット12をねじ部11に螺合させ、塗
料の塗布したところまでねじ込んで、すべての高さ調整
ナット12を同一水平面に位置させてもよい。Further, as shown in FIG. 7, a scale 17A provided with a support member 16A provided at a lower portion to be screwed with the screw portion 11 of the anchor bolt 9 for the base is used. The scale 17A is rotated and moved up and down as described above, and spray paint is applied to the threaded portion 11 of the anchor bolt 9 for the base when the zero point matches.
After removing the support member 16A of the scale 17A from the screw portion 11, the height adjusting nut 12 is screwed into the screw portion 11 and screwed up to the place where the paint is applied, so that all the height adjusting nuts 12 are positioned on the same horizontal plane. May be.
【0014】なお、この高さ調整ナット位置決め工程1
4前、あるいは該高さ調整ナット位置決め工程14で、
土台用アンカーボルト9を正確な垂直状態にする作業を
行なう。この作業は支持部材16あるいは支持部材16
Aを用いて行なうと容易にできる。The height adjusting nut positioning step 1
4 before or in the height adjustment nut positioning step 14,
An operation for accurately setting the anchor bolt 9 for the base to a vertical state is performed. This operation is performed by the support member 16 or the support member 16.
A can be easily achieved by using A.
【0015】18は前記高さ調整ナット位置決め工程1
4後に、図8および図9に示すように土台本体6のボル
ト挿入孔19内に土台用アンカーボルト9のねじ部11
を挿入し、座金4を介して高さ調整ナット12に土台本
体6を支持させるとともに、ねじ部11に座金4を介し
て固定ナット13をそれぞれ螺合させて締付ける土台本
体固定工程で、この土台本体固定工程18で固定された
土台本体6は高さ調整ナット12の位置によって正確な
水平面になっている。Reference numeral 18 denotes the height adjusting nut positioning step 1
4, the screw portion 11 of the anchor bolt 9 for the base is inserted into the bolt insertion hole 19 of the base body 6 as shown in FIGS.
Is inserted, and the base body 6 is supported by the height adjustment nut 12 via the washer 4, and the fixing nut 13 is screwed into the screw portion 11 via the washer 4 to tighten the base body 6. The base body 6 fixed in the main body fixing step 18 has an accurate horizontal plane depending on the position of the height adjustment nut 12.
【0016】20は高さ調整ナット12の周囲に必要に
応じて行うモルタル21を塗布したり、あるいは充填す
るモルタル塗布工程で、このモルタル塗布工程20は図
10に示すように、土台本体固定工程18後に高さ調整
ナット12の周囲にモルタル21を塗布したり、あるい
は図11に示すように前記高さ調整ナット位置決め工程
14後に高さ調整ナット12の周囲にモルタル21を塗
布し、高さ調整ナット12の廻り止めや発錆を防止する
ために行なうものである。Reference numeral 20 denotes a mortar application step for applying or filling a mortar 21 around the height adjustment nut 12 as necessary. The mortar application step 20 is, as shown in FIG. The mortar 21 is applied around the height adjusting nut 12 after 18 or the mortar 21 is applied around the height adjusting nut 12 after the height adjusting nut positioning step 14 as shown in FIG. This is performed to prevent the nut 12 from turning and preventing rust.
【0017】22は前記土台本体固定工程18後、ある
いは前記モルタル塗布工程20後に前記土台本体6上に
図12に示すように上棟23を施工する上棟施工工程
で、この上棟施工工程22は前記土台本体6上に複数本
の柱24、胴差25、桁26を取付けるとともに、前記
複数本の土台用アンカーボルト9の上端部にそれぞれ長
ナット27を介して木骨ボルト28を螺合接続し、該木
骨ボルト28を前記胴差25および桁26に形成された
木骨ボルト挿入孔29、29をそれぞれ貫通させ木骨ボ
ルト28に螺合された胴差位置決めナット30、胴差固
定ナット31、桁位置決めナット32および桁固定ナッ
ト33で固定する。Reference numeral 22 denotes an upper building construction step for constructing an upper building 23 on the base body 6 after the base body fixing step 18 or the mortar applying step 20 as shown in FIG. A plurality of pillars 24, a gap 25, and a girder 26 are mounted on the main body 6, and a timber bolt 28 is screw-connected to an upper end portion of each of the plurality of base anchor bolts 9 via a long nut 27. The wooden frame bolt 28 penetrates through the wooden frame bolt insertion holes 29, 29 formed in the body gap 25 and the spar 26, and is screwed into the wooden frame bolt 28, the body gap locating nut 30, the body gap fixing nut 31, and the girder locating nut 32. And the girder fixing nut 33.
【0018】なお、前記胴差25および桁26に形成さ
れた木骨ボルト挿入孔29、29には、図13に示すよ
うに胴差25および桁26の締付け損害を防止するため
の金属材製のスリーブ34が取付けられている。The timber bolt insertion holes 29, 29 formed in the body gap 25 and the girder 26 are made of metal material to prevent tightening damage of the body gap 25 and the girder 26 as shown in FIG. A sleeve 34 is attached.
【0019】また、前記土台本体6、胴差25および桁
26寄りの部位の前記木骨ボルト28にはそれぞれ図1
4に示すような筋違取付け金具35が取付けられ、対向
する該筋違取付け金具35、35にターンバックル36
が介装された筋違37をそれぞれ取付ける。FIG. 1 shows the structure of the base body 6, the body gap 25, and the wooden frame bolt 28 near the girder 26.
4 and a turnbuckle 36 is attached to the facing braces 35, 35 facing each other.
Is attached to each of the braces 37 interposed.
【0020】38は前記上棟施工工程22後にあらかじ
め設定された土台本体6の上部で、図15に示すように
仕上げ状態で組付けられる屋根組付け工程39Aを経た
屋根39を図16に示すようにクレーン40で吊上げ、
前記上棟23の上部に取付け固定する屋根取付け工程
で、この屋根取付け工程38は前記土台本体6の上部で
屋根用桁41、束42、母屋43、タルキ44、野地4
5、軒天上46、破風47等の屋根本体48を組立てる
とともに、この屋根本体48に取付けられた瓦、トタ
ン、カラーベスト等の屋根材49を取付けて屋根49を
組立てる。この組立てられた屋根39を上棟23の桁2
6と屋根39の屋根用桁41とを複数本のボルト50、
ナット51で締付け固定することにより取付ける。Reference numeral 38 denotes an upper portion of the base body 6 which is set in advance after the upper building construction step 22. As shown in FIG. 15, a roof 39 having undergone a roof assembling step 39A which is assembled in a finished state as shown in FIG. Lifted by crane 40,
In the roof mounting step of mounting and fixing on the upper part of the upper ridge 23, the roof mounting step 38 includes a roof girder 41, a bundle 42, a purlin 43, a tark 44, a field 4
5. While assembling the roof body 48 such as the eaves ceiling 46 and the gable 47, the roof 49 is assembled by attaching the roof material 49 such as a tile, a tin, and a color vest attached to the roof body 48. This assembled roof 39 is connected to the girder 2 of the upper building 23.
6 and the roof girder 41 of the roof 39, a plurality of bolts 50,
It is attached by tightening and fixing with a nut 51.
【0021】このような方法で建物を施工することによ
り、土台7の土台本体6の上面を容易に水平状態にする
ことができるとともに、高いところで屋根材49を取付
けたりする作業が不要で、安全で楽に効率よく行なうこ
とができる。By constructing a building in such a manner, the upper surface of the base body 6 of the base 7 can be easily made horizontal, and the work of attaching the roofing material 49 at a high place is not required, and the safety is improved. Can be performed easily and efficiently.
【0022】[0022]
【本発明の異なる実施例】次に、図17ないし図25に
示す本発明の異なる実施例につき説明する。なお、これ
らの本発明の異なる実施例の説明に当って、前記本発明
の第1の実施例と同一構成部分には同一符号を付して重
複する説明を省略する。Next, different embodiments of the present invention will be described with reference to FIGS. In the description of the different embodiments of the present invention, the same components as those of the first embodiment of the present invention are denoted by the same reference numerals, and redundant description will be omitted.
【0023】図17ないし図19の本発明の第2の実施
例において、前記本発明の第1の実施例と主に異なる点
は、モルタル塗布工程20あるいは土台本体固定工程1
8後に図18に示すように、土台本体6の上部に上棟2
3を施工する上棟施工工程22を行なうとともに、この
上棟施工工程22の後に別の水平状態の位置で組立てた
屋根39を図19に示すようにクレーン40で吊上げ、
上棟23の上部に位置させ、上棟23の桁26と屋根3
9の屋根用桁41とを複数本のボルト50、ナット51
とで締付け固定して屋根取付け工程38Aを行なった点
で、このような方法で建物を施工しても、前記本発明の
第1の実施例と同様な作用効果が得られる。The second embodiment of the present invention shown in FIGS. 17 to 19 is different from the first embodiment of the present invention mainly in the mortar coating step 20 or the base body fixing step 1.
8 later, as shown in FIG.
3 is carried out, and the roof 39 assembled at another horizontal position after the upper building construction step 22 is lifted by a crane 40 as shown in FIG.
Located on the upper part of the upper building 23, the girder 26 and the roof 3 of the upper building 23
Nine roof girders 41 and a plurality of bolts 50 and nuts 51
Since the roof mounting step 38A is performed by tightening and fixing, the same operation and effect as those of the first embodiment of the present invention can be obtained even if the building is constructed by such a method.
【0024】図20ないし図22の本発明の第3の実施
例において、前記本発明の第1の実施例と主に異なる点
は上棟施工工程22Aで、この上棟施工工程22Aは柱
24間の土台本体6、胴差25および桁26に、図22
に示すような筋違プレート52を複数本の釘53で固定
し、筋違37を取付けて上棟23Aを施工している。こ
のようにして筋違37を取付けても、前記本発明の第1
の実施例と同様な作用効果が得られる。In the third embodiment of the present invention shown in FIGS. 20 to 22, the main different point from the first embodiment of the present invention is an upper ridge construction step 22A. 22 is attached to the base body 6, the gap 25 and the girder 26.
The bracing plate 52 shown in FIG. 3 is fixed with a plurality of nails 53, and the bracing 37 is attached to construct the upper ridge 23A. Even if the bracing 37 is attached in this manner, the first
The same operation and effect as those of the embodiment can be obtained.
【0025】図23ないし図25の本発明の第4の実施
例において、前記本発明の第1の実施例と主に異なる点
はモルタル塗布工程を行わずに上棟施工工程22Bを行
った点で、この上棟施工工程22Bは図25に示すよう
な両側上下部に形成された木骨ボルト挿入孔54、5
4、54、54が形成された筋違フレーム55を土台本
体6と胴差25との間、および胴差25と桁26との間
にそれぞれ木骨ボルト28、28が貫通するように介装
する作業を行って上棟23Bを施工している。このよう
な上棟施工工程22Bを使用した建物の施工方法を行う
と、木造3階建ての住宅でも十分な強度と、耐震強度が
得られる。前記筋違フレーム55はアルミ材等を用いた
板材で形成しても良く、あるいは外側フレームを板材で
形成し、筋違部材として棒状部材を用いて構成したもの
を使用しても良い。The fourth embodiment of the present invention shown in FIGS. 23 to 25 is mainly different from the first embodiment of the present invention in that an upper building construction process 22B is performed without performing a mortar coating process. The upper ridge construction step 22B includes two wooden frame bolt insertion holes 54, 5 formed in the upper and lower portions on both sides as shown in FIG.
The braced frame 55 on which 4, 54, 54 are formed is interposed between the base body 6 and the waist 25 and between the waist 25 and the girder 26 so that the timber bolts 28, 28 penetrate therethrough. Work is being carried out on the upper wing 23B. When a building construction method using the upper ridge construction process 22B is performed, sufficient strength and seismic strength can be obtained even in a three-story wooden house. The bracing frame 55 may be formed of a plate material using an aluminum material or the like, or may be formed by forming the outer frame by a plate material and using a bar-shaped member as a bracing member.
【0026】なお、前記本発明の各実施例ではすべての
木骨ボルト28を土台用アンカーボルト9に接続したも
のについて説明したが、本発明はこれに限らず部分的に
土台用アンカーボルト9に接続しない木骨ボルト28を
使用しても良い。In each of the embodiments of the present invention described above, all the timber bolts 28 are connected to the anchor bolt 9 for the base. However, the present invention is not limited to this, and the bolts 28 are partially connected to the anchor bolt 9 for the base. A non-timbered bolt 28 may be used.
【0027】[0027]
【本発明の効果】以上の説明から明らかなように、本発
明にあっては次に列挙する効果が得られる。As is apparent from the above description, the following effects can be obtained in the present invention.
【0028】(1)基礎を形成する基礎形成工程と、こ
の基礎形成工程時に該基礎の上部に水平状態で土台本体
を固定支持することのできる高さ調整ナットおよび固定
ナットを螺合させることのできる複数本の土台用アンカ
ーボルトを所定間隔で埋設する土台用アンカーボルト埋
設工程と、基礎に埋設された複数本の土台用アンカーボ
ルトにそれぞれ螺合させた高さ調整ナットを土台本体を
水平に支持できる位置に水平器を用いてセットする高さ
調整ナット位置決め工程と、この高さ調整ナット位置決
め工程を経た後、土台本体のボルト挿入孔内に前記土台
用アンカーボルトをそれぞれ挿入して高さ調整ナットに
支持させるとともに、該土台用アンカーボルトにそれぞ
れ固定ナットを螺合させて土台本体を固定する土台本体
固定工程と、この土台本体固定工程後に前記複数本の土
台用アンカーボルトの上端部にそれぞれ筋違取付け金具
および長ナットを介して木骨ボルトを接続し、該木骨ボ
ルトに筋違取付け金具を介してそれぞれ螺合されるナッ
トによって胴差や桁を固定するとともに、木骨ボルトに
取付けられた筋違取付け金具を用いて筋違を取付けなが
ら上棟を施工する上棟施工工程と、この上棟施工工程後
にあらかじめ仕上げ状態に組付けられた屋根を吊上げ、
前記上棟の上部に取付け固定する屋根取付け工程とから
なるので、基礎の上面を水平面に仕上げる手数やコスト
のかかる作業が不要な概略的な水平面仕上げでよく、基
礎を簡単に形成することができる。(1) A foundation forming step of forming a foundation, and a height adjusting nut and a fixing nut capable of fixing and supporting a base body in a horizontal state on the foundation during the foundation forming step. An anchor bolt embedding process for embedding a plurality of anchor bolts for the base at predetermined intervals, and a height adjustment nut screwed to each of the anchor bolts for the base embedded in the foundation to level the base body. After the height adjustment nut positioning step of setting using a leveling device at a position where it can be supported, and after this height adjustment nut positioning step, insert the base anchor bolts into the bolt insertion holes of the base body, respectively, and set the height. A base body fixing step of fixing the base body by screwing fixing nuts to the base anchor bolts while supporting the adjustment nut, After the base body fixing step, a wooden bone bolt is connected to the upper ends of the plurality of base anchor bolts via a bracing bracket and a long nut, respectively, and each is screwed to the wooden bolt via a brazing bracket. An upper ridge construction process in which the upper ridge is constructed while fixing braces and girders with nuts and installing braces using bracing fittings attached to the timber bolts, and assembled in a finished state in advance after this upper ridge construction process Lifted roof,
Since the method includes a roof mounting process of mounting and fixing the foundation on the upper part of the upper building, a rough horizontal surface finishing which does not require a troublesome and costly operation for finishing the upper surface of the foundation into a horizontal plane is required, and the foundation can be easily formed.
【0029】(2)前記(1)によって、土台用アンカ
ーボルトと長ナットを介して上棟の胴差や桁に固定され
る木骨ボルトが一体化されているので、土台本体と上棟
との接続強度が強く、木造3階建ての住宅でも十分な強
度と、耐震強度が得られる。(2) According to the above (1), the timber frame bolts fixed to the body difference and the girder of the upper building via the anchor bolts for the base and the long nuts are integrated, so that the connection strength between the base body and the upper building. It is strong enough to provide sufficient strength and seismic resistance even for a three-story wooden house.
【0030】(3)前記(1)によって、水平器を用い
て土台用アンカーボルトに螺合させた高さ調整ナットを
同一水平面に位置させることにより、土台本体を正確に
水平面に位置固定することができる。したがって、水平
面に設置する作業が容易で、短時間ででき、かつ低コス
トで行なうことができる。(3) According to the above (1), the height adjusting nut screwed to the anchor bolt for the base is positioned on the same horizontal plane by using the leveler, so that the base main body is accurately positioned and fixed on the horizontal plane. Can be. Therefore, the installation work on the horizontal surface is easy, can be performed in a short time, and can be performed at low cost.
【0031】(4)前記(1)によって、基礎の上面と
土台本体との間に隙間ができ、該隙間を空気の通気孔と
して利用することができる。(4) By the above (1), a gap is formed between the upper surface of the foundation and the base body, and the gap can be used as an air vent.
【0032】(5)前記(1)によって、複数本の土台
用アンカーボルトの上端部にそれぞれ筋違取付け金具お
よび長ナットを介して木骨ボルトを接続し、該木骨ボル
トに筋違取付け金具を介してそれぞれ螺合されるナット
によって胴差や桁を固定するとともに、木骨ボルトに取
付けられた筋違取付け金具を用いて筋違を取付けながら
上棟を施工する上棟施工工程を行っているので、木骨ボ
ルトと筋違取付け金具とが一体化し、かつ該筋違取付け
金具に筋違が取付けられるため、筋違が木骨ボルトと一
体化し、十分な筋違効果が得られると共に、筋違がの取
り付が容易で確実に行うことができる。(5) According to the above (1), the timber bolts are connected to the upper ends of the plurality of base anchor bolts through bracing brackets and long nuts, respectively. As the upper building construction process of fixing the body gap and the girder with nuts that are screwed together and installing the braces using bracing fittings attached to the wood frame bolts, the upper building construction process is performed. Since the bracing is integrated with the bracing bracket and the bracing is attached to the bracing bracket, the bracing is integrated with the timber bolts, and a sufficient bracing effect is obtained, and the bracing is attached. It can be done easily and reliably.
【図1】本発明の第1の実施例を示す工程図。FIG. 1 is a process chart showing a first embodiment of the present invention.
【図2】土台用アンカーボルト埋設工程の説明図。FIG. 2 is an explanatory view of a base anchor bolt embedding step.
【図3】図2の3−3線に沿う断面図。FIG. 3 is a sectional view taken along line 3-3 in FIG. 2;
【図4】土台用アンカーボルトの正面図。FIG. 4 is a front view of a base anchor bolt.
【図5】土台用アンカーボルトの平面図。FIG. 5 is a plan view of a base anchor bolt.
【図6】高さ調整ナット位置決め工程の説明図。FIG. 6 is an explanatory view of a height adjusting nut positioning step.
【図7】高さ調整ナット位置決め工程の異なる説明図。FIG. 7 is a different explanatory view of a height adjusting nut positioning step.
【図8】土台本体固定工程の説明図。FIG. 8 is an explanatory view of a base body fixing step.
【図9】図8の9−9線に沿う断面図。FIG. 9 is a sectional view taken along lines 9-9 in FIG. 8;
【図10】モルタル塗布工程の説明図。FIG. 10 is an explanatory view of a mortar application step.
【図11】モルタル塗布工程の異なる説明図。FIG. 11 is a different explanatory view of a mortar application step.
【図12】上棟施工工程の説明図。FIG. 12 is an explanatory diagram of an upper building construction process.
【図13】木骨ボルトと胴差あるいは桁の取付け状態の
説明図。FIG. 13 is an explanatory view of a mounting state of a wooden bone bolt and a body difference or a girder.
【図14】筋違取付け金具の説明図。FIG. 14 is an explanatory view of a bracing fitting.
【図15】屋根の組立て工程の説明図。FIG. 15 is an explanatory diagram of a roof assembling process.
【図16】屋根の取付け状態の説明図。FIG. 16 is an explanatory diagram of a state in which a roof is mounted.
【図17ないし図19】本発明の第2の実施例を示す説
明図。FIG. 17 to FIG. 19 are explanatory diagrams showing a second embodiment of the present invention.
【図20ないし図22】本発明の第3の実施例を示す説
明図。FIGS. 20 to 22 are explanatory views showing a third embodiment of the present invention.
【図23ないし図25】本発明の第4の実施例を示す説
明図。FIG. 23 to FIG. 25 are explanatory diagrams showing a fourth embodiment of the present invention.
1:基礎形成工程、2:基礎、3:コンクリー卜枠、
4:座金、5:土台用アンカーボルト埋設工程、6:土
台本体、7:土台、9:土台用アンカーボルト、10:
土台用アンカーボルト本体、11:ねじ部、12:高さ
調整ナット、13:固定ナット、14:高さ調整ナット
位置決め工程、15:水平器、16、16A:支持部
材、17、17A:スケール、18:土台本体固定工
程、19:ボルト挿入孔、20:モルタル塗布工程、2
1:モルタル、22、22A、22B:上棟施工工程、
23、23A、23B:上棟、24:柱、25:胴差、
26:桁、27:長ナット、28:木骨ボルト、29:
木骨ボルト挿入孔、30:胴差位置決めナット、31:
胴差固定ナット、32:桁位置決めナット、33:桁固
定ナット、34:スリーブ、35:筋違取付け金具、3
6:ターンバックル、37:筋違、38、38A:屋根
取付け工程、39:屋根、39A:屋根組付け工程、4
0:クレーン、41:屋根用桁、42:束、43:母
屋、44:タルキ、45:野地、46:軒天上、47:
破風、48:屋根本体、49:屋根材、50:ボルト、
51:ナット、52:筋違プレート、53:釘、54:
木骨ボルト挿入孔、55:筋違フレーム。1: foundation forming step, 2: foundation, 3: concrete frame,
4: Washer, 5: Base anchor bolt embedding process, 6: Base body, 7: Base, 9: Base anchor bolt, 10:
Anchor bolt body for base, 11: screw part, 12: height adjustment nut, 13: fixing nut, 14: height adjustment nut positioning step, 15: leveler, 16, 16A: support member, 17, 17A: scale, 18: base body fixing step, 19: bolt insertion hole, 20: mortar application step, 2
1: Mortar, 22, 22A, 22B: Upper building construction process,
23, 23A, 23B: Upper building, 24: Pillar, 25: Body difference,
26: girder, 27: long nut, 28: timber bolt, 29:
Timber bone bolt insertion hole, 30: body difference positioning nut, 31:
Body difference fixing nut, 32: girder positioning nut, 33: girder fixing nut, 34: sleeve, 35: bracing fitting, 3
6: turnbuckle, 37: bracing, 38, 38A: roof mounting process, 39: roof, 39A: roof mounting process, 4
0: crane, 41: roof girder, 42: bundle, 43: purlin, 44: tarki, 45: noji, 46: eaves above, 47:
Gust, 48: roof body, 49: roof material, 50: bolt,
51: nut, 52: bracing plate, 53: nail, 54:
Wood frame bolt insertion hole, 55: Bracing frame.
Claims (1)
礎形成工程時に該基礎の上部に水平状態で土台本体を固
定支持することのできる高さ調整ナットおよび固定ナッ
トを螺合させることのできる複数本の土台用アンカーボ
ルトを所定間隔で埋設する土台用アンカーボルト埋設工
程と、基礎に埋設された複数本の土台用アンカーボルト
にそれぞれ螺合させた高さ調整ナットを土台本体を水平
に支持できる位置に水平器を用いてセットする高さ調整
ナット位置決め工程と、この高さ調整ナット位置決め工
程を経た後、土台本体のボルト挿入孔内に前記土台用ア
ンカーボルトをそれぞれ挿入して高さ調整ナットに支持
させるとともに、該土台用アンカーボルトにそれぞれ固
定ナットを螺合させて土台本体を固定する土台本体固定
工程と、この土台本体固定工程後に前記複数本の土台用
アンカーボルトの上端部にそれぞれ筋違取付け金具およ
び長ナットを介して木骨ボルトを接続し、該木骨ボルト
に筋違取付け金具を介してそれぞれ螺合されるナットに
よって胴差や桁を固定するとともに、木骨ボルトに取付
けられた筋違取付け金具を用いて筋違を取付けながら上
棟を施工する上棟施工工程と、この上棟施工工程後にあ
らかじめ仕上げ状態に組付けられた屋根を吊上げ、前記
上棟の上部に取付け固定する屋根取付け工程とを含むこ
とを特徴とする建物の施工方法。1. A foundation forming step for forming a foundation, and a height adjusting nut and a fixing nut capable of fixing and supporting a base body in a horizontal state on an upper part of the foundation during the foundation forming step. A process for embedding a plurality of anchor bolts for a base at predetermined intervals and a height adjustment nut screwed onto each of the anchor bolts for a plurality of bases buried in the foundation to horizontally support the base body. After going through a height adjustment nut positioning step of setting using a leveler at a position where it can be made, and this height adjustment nut positioning step, insert the anchor bolts for the base into the bolt insertion holes of the base body to adjust the height. A base body fixing step of fixing the base body by supporting a nut and screwing a fixing nut to each of the base anchor bolts; After the body fixing step, a wooden bone bolt is connected to an upper end of each of the plurality of base anchor bolts via a bracing bracket and a long nut, and nuts which are respectively screwed to the wooden bolt via a brazing bracket. The upper ridge construction process of fixing the girder and the girder by using the bracing bracket attached to the timber bolts, and installing the bracing while installing the bracing, and it was assembled in a finished state in advance after this upper ridge construction process A roof mounting step of lifting a roof and mounting and fixing the roof on the upper part of the upper building.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5292730A JP2838180B2 (en) | 1993-10-27 | 1993-10-27 | Building construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5292730A JP2838180B2 (en) | 1993-10-27 | 1993-10-27 | Building construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH07119206A JPH07119206A (en) | 1995-05-09 |
| JP2838180B2 true JP2838180B2 (en) | 1998-12-16 |
Family
ID=17785584
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP5292730A Expired - Fee Related JP2838180B2 (en) | 1993-10-27 | 1993-10-27 | Building construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2838180B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2016162905A1 (en) | 2015-04-10 | 2016-10-13 | 種市 薫 | Coupling nut and hold-down construction method |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0416628A (en) * | 1990-05-09 | 1992-01-21 | Kaoru Taneichi | Base construction method and building construction method and base and anchor bolts for base |
| JPH0452817A (en) * | 1990-06-15 | 1992-02-20 | Hitachi Ltd | Device for restarting program interruption |
-
1993
- 1993-10-27 JP JP5292730A patent/JP2838180B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH07119206A (en) | 1995-05-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7228661B2 (en) | Rapid steel frame assembly | |
| US4081940A (en) | System and apparatus for interconnecting structural members, and method of utilizing same | |
| JP7783317B2 (en) | Combined anchor and fastener assembly, particularly for concrete structures, and method of using same | |
| US3913287A (en) | Structural system | |
| JP2838180B2 (en) | Building construction method | |
| JP2717504B2 (en) | Building construction methods and bracing plates | |
| CA2488548A1 (en) | Construction fastening system | |
| JP2716357B2 (en) | Rising section formwork fixing jig | |
| JP3032104B2 (en) | Fixing method of pillar lower end | |
| JP3378902B2 (en) | Roof or balcony handrail fixing structure | |
| JPS63184665A (en) | Method for embedding anchor for mounting handrail support | |
| JP3244102U (en) | Steel house foundation structure and anchor set used therein | |
| JPS5927458Y2 (en) | Handrail installation device | |
| JPH0416628A (en) | Base construction method and building construction method and base and anchor bolts for base | |
| JPS5927459Y2 (en) | Handrail installation device | |
| JP3997080B2 (en) | Scaffolding platform | |
| JPS6329782Y2 (en) | ||
| JPS6246758Y2 (en) | ||
| JPH0849322A (en) | How to install a precast concrete wall | |
| JPH0417718Y2 (en) | ||
| JPS6243041Y2 (en) | ||
| JP2598008Y2 (en) | Floor structure and bundle of steel building balcony | |
| JP2003120129A (en) | Sash fitting method | |
| JPH06212743A (en) | Building wrapping fixing method | |
| TR2024002953A2 (en) | COMBINED ANCHOR AND CONNECTION DEVICE DESIGNED SPECIFICALLY FOR CONCRETE STRUCTURES AND ITS USE METHOD |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |