Method of forming concrete formwork for construction of slope protection structure

Info

Publication number
JP2847641B2
JP2847641B2 JP23512596A JP23512596A JP2847641B2 JP 2847641 B2 JP2847641 B2 JP 2847641B2 JP 23512596 A JP23512596 A JP 23512596A JP 23512596 A JP23512596 A JP 23512596A JP 2847641 B2 JP2847641 B2 JP 2847641B2
Authority
JP
Japan
Prior art keywords
corner member
unevenness
frame
protection structure
slope protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP23512596A
Other languages
Japanese (ja)
Other versions
JPH09105128A (en
Inventor
泰弘 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KENSETSU KISO ENJINIARINGU KK
Original Assignee
KENSETSU KISO ENJINIARINGU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KENSETSU KISO ENJINIARINGU KK filed Critical KENSETSU KISO ENJINIARINGU KK
Priority to JP23512596A priority Critical patent/JP2847641B2/en
Publication of JPH09105128A publication Critical patent/JPH09105128A/en
Application granted granted Critical
Publication of JP2847641B2 publication Critical patent/JP2847641B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、特に法面保護構造
物等を構築する際に、地山に配設する法面保護構造物構
築用のコンクリート用型枠の形成方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for forming a concrete formwork for constructing a slope protection structure which is disposed on the ground, particularly when constructing a slope protection structure or the like.

【0002】[0002]

【従来の技術】地山に沿って縦横に延びるよう格子状に
型枠を組み、この型枠内に鉄筋を配した後、コンクリー
トを打設して構築する法面保護構造物を構築するための
コンクリート構造物(以下、単にコンクリート構造物と
称する)が従来より知られている。
2. Description of the Related Art In order to construct a slope protection structure, a formwork is assembled in a lattice shape so as to extend vertically and horizontally along the ground, a reinforcing bar is arranged in the formwork, and concrete is poured into the formwork. (Hereinafter simply referred to as a concrete structure) has been conventionally known.

【0003】近年、上記コンクリート構造物を構築する
にあたって、上記型枠をエキスパンドメタルで形成し、
その強靱な構造によりコンクリートの強度を高める構造
が創案された。このようなコンクリート構造物の施工に
おいては、図4に示すように、エキスパンドメタル1を
地山2に沿って縦横に延びるように格子状に配設する。
In recent years, when constructing the concrete structure, the formwork is formed from expanded metal,
A structure that enhances the strength of concrete was devised by its tough structure. In the construction of such a concrete structure, as shown in FIG. 4, the expanded metal 1 is arranged in a lattice shape so as to extend vertically and horizontally along the ground 2.

【0004】このエキスパンドメタル1は、薄い鋼板に
細かい切り込みを交互に入れたものを引っ張り、金網状
に広げることによって製造されるもので、一般には、連
続製造するために、1829mmの幅で、いわゆる定尺物の薄
い鋼板ロールを順次送り出しながら交互に切り込みを入
れて、エキスパンド加工し、所定の寸法で裁断してい
る。従って、上記1829mmの長さで形成したエキスパンド
メタル1を地山2に沿って縦横に継ぎ足して配設してい
る。
[0004] The expanded metal 1 is manufactured by pulling thin steel plates with fine cuts alternately and expanding them in a wire net shape. Cuts are made alternately while successively feeding out thin steel rolls of a fixed length, expanded, and cut into predetermined dimensions. Therefore, the expanded metal 1 having a length of 1829 mm is arranged vertically and horizontally along the ground 2.

【0005】特注品として2438mmの幅の鋼板もあるが、
納期が遅いという不都合があるため一般化されていな
い。また、この特注品はロール材ではないので、エキス
パンド加工の際、その都度加工装置を止めて逐一鋼板を
当該加工装置に差し込まなければならないため、連続加
工ができず、作業が煩雑で工数が掛かるという不都合が
あった。さらに、この特注品を裁断していくと寸法端数
がでて材料費が不経済であるという不都合があった。従
って、結局、定尺物の鋼板で形成したエキスパンドメタ
ル1の寸法が短くても、これらの端部を互いに重ね合わ
せてスポット溶接し、継ぎ足して使用するほうが施工費
が廉価であった。
[0005] There is a steel plate with a width of 2438 mm as a special order product,
It is not generalized due to the inconvenience of late delivery. In addition, since this custom-made product is not a roll material, during the expanding process, the processing device must be stopped and the steel plate must be inserted into the processing device each time, so that continuous processing cannot be performed, and the work is complicated and requires many man-hours. There was an inconvenience. Furthermore, when this custom-made product is cut, there is a disadvantage that the size fraction is increased and the material cost is uneconomical. Therefore, even if the dimensions of the expanded metal 1 formed of a steel plate of a fixed length are short, it is more cost effective to overlap these ends and spot-weld them together, and to use them together.

【0006】ところで、前記枠体としてのエキスパンド
メタル1は、図5に示すように、その長手方向端部を順
次重ね合わせて、この重合部をスポット溶接により接続
して連結している。そのため、その重ね継手部分におい
て型枠3が不連続になり、且つエキスパンドメタル1は
裁断により網目が途中で途切れているので、コンクリー
ト打設後の表面仕上げが施工し難かった。また、法面等
の地山2には凹凸があるため、地山2に沿って縦横に配
設した枠体の高さに段差ができやすかった。
Meanwhile, as shown in FIG. 5, the expanded metal 1 as the frame body has its longitudinal ends sequentially overlapped, and the overlapped portions are connected by spot welding to be connected. Therefore, since the formwork 3 becomes discontinuous at the lap joint portion and the mesh of the expanded metal 1 is cut off in the middle by cutting, it is difficult to finish the surface finish after concrete casting. In addition, since the ground 2 such as a slope has unevenness, the height of the frame body arranged vertically and horizontally along the ground 2 is likely to have a step.

【0007】従って、エキスパンドメタル1で形成され
た枠体同士の継手部分の段差をコンクリート打設後の表
面仕上げによって修正しなければならず、その作業性を
低下させ、施工費用が増大するという問題があった。
[0007] Therefore, the step at the joint between the frames formed of the expanded metal 1 must be corrected by surface finishing after concrete casting, which lowers the workability and increases the construction cost. was there.

【0008】以上のような問題点は、通常のクリンプ金
網の場合も同じであり、適当な長さのクリンプ金網を継
ぎ足して、順次重ね合わせて溶接して連結する場合、エ
キスパンドメタル製金網の場合と同様に、その重ね継手
部分において型枠3が不連続になるため、コンクリート
打設後の表面仕上げが施工し難かった。また、法面等の
地山2に沿って縦横に配設した枠体の高さにも段差がで
きやすかった。
[0008] The above problems are the same in the case of a normal crimped wire netting. In the case where a crimped wire net of an appropriate length is added and successively overlapped and connected by welding, in the case of an expanded metal wire netting, Similarly to the above, since the formwork 3 becomes discontinuous at the lap joint portion, it was difficult to finish the surface finish after concrete casting. In addition, the height of the frames arranged vertically and horizontally along the ground 2 such as a slope was easy to have a step.

【0009】上述のような課題に鑑み、本発明は、エキ
スパンドメタル製金網或いはクリンプ金網等の各種の金
網によりコンクリート構造物の枠体を構成する際に、枠
体同士の継手部分の段差をなくして連続した型枠仕上げ
面を形成し、コンクリート打設後の表面仕上げの作業性
を向上させることができると共に、施工費用を減少させ
ることができる法面保護構造物構築用のコンクリート用
型枠の形成方法を提供することを目的としている。
In view of the above-described problems, the present invention eliminates a step in a joint portion between frames when forming a frame of a concrete structure with various metal meshes such as an expanded metal mesh or a crimp wire mesh. Forming a continuous formwork finish surface, improving the workability of surface finish after concrete casting, and reducing the construction cost of a concrete formwork for constructing a slope protection structure. It is intended to provide a forming method.

【0010】[0010]

【課題を解決するための手段】前記目的を達成するた
め、本発明の法面保護構造物構築用のコンクリート用型
枠の形成方法は、長手方向端部を順次接続して延出させ
た複数の金網を所定間隔をあけて相対向して地山上に起
立させ、該相対向させた金網の間に長手方向に沿って縦
鉄筋を配設すると共に、該金網を上記所定間隔に維持す
る横鉄筋を配設することにより枠体を形成し、次いでこ
の枠体の上縁部に不陸調整用コーナー部材を接合するに
際し、該不陸調整用コーナー部材を、金網相互間の高さ
方向における最大の段差に相当する高さ方向の幅を有す
るように設定し、該不陸調整用コーナー部材の上縁を最
も高い金網の上端縁に合わせて位置させると共に、前記
枠体の最外側に配置するように構成した。
In order to achieve the above object, a method of forming a concrete formwork for constructing a slope protection structure according to the present invention is directed to a method of forming a concrete formwork in which longitudinal ends are sequentially connected and extended. Erected on the ground facing each other at predetermined intervals, and a vertical reinforcing bar is disposed along the longitudinal direction between the opposing metal meshes, and a horizontal bar for maintaining the metal mesh at the predetermined interval. A frame is formed by arranging a reinforcing bar, and then, when joining the corner member for adjusting unevenness to the upper edge portion of the frame, the corner member for adjusting unevenness is placed in a height direction between the wire meshes. It is set so as to have a width in the height direction corresponding to the maximum step, and the upper edge of the corner member for adjusting unevenness is positioned so as to match the upper edge of the highest wire mesh, and is arranged on the outermost side of the frame body. It was configured to be.

【0011】前記不陸調整用コーナー部材は、矩形の横
断面形状、円形の横断面形状又はU字形の横断面形状を
有している。
The corner member for adjusting unevenness has a rectangular cross section, a circular cross section, or a U-shaped cross section.

【0012】不陸調整用コーナー部材がU字形の横断面
形状を有している場合は、各金網に対してその上端縁部
から下方に向いて嵌合しており、そのU字形の高さ方向
の幅が接続した金網相互間の高さ方向における最大の段
差に相当する高さ方向の幅を有しているように構成され
る。
In the case where the corner member for adjusting unevenness has a U-shaped cross section, the corner member is fitted to each wire mesh downward from the upper end edge thereof, and the height of the U-shape is adjusted. The width in the direction is configured so as to have a width in the height direction corresponding to the maximum step in the height direction between the connected metal meshes.

【0013】前述した本発明の構成によれば、その長手
方向端部を順次接続して延出させた金網の不連続な継手
部が、その各上縁部外側に設けられた連続した不陸調整
用コーナー部材により連続化されて、枠体間に配設され
る鉄筋により骨組みが補強される。これにより金網の継
手部に段差の無い連続した型枠仕上げ面が形成され、表
面仕上げの作業性が向上すると共に、施工費用が減少す
る。
According to the configuration of the present invention described above, the discontinuous joint portions of the wire mesh whose longitudinal ends are sequentially connected and extended are connected to the continuous uneven portions provided on the outside of each upper edge portion. The frame is made continuous by the adjusting corner members, and the frame is reinforced by the reinforcing bars provided between the frames. As a result, a continuous form-finished surface having no steps is formed at the joint portion of the wire mesh, so that the workability of the surface finish is improved and the construction cost is reduced.

【0014】[0014]

【発明の実施の形態】以下、本発明による法面保護構造
物構築用のコンクリート用型枠を形成する場合の好適な
実施の形態を添付図面に基づいて詳述する。図1及び図
2に示すように、本発明によって形成される法面保護構
造物構築用のコンクリート用型枠10の枠体11は、地
山12上に相対向して二条に起立される。この枠体11
はクリンプ金網やエキスパンドメタル製金網その他各種
の金網が用いられ得るが、本実施例では強靱性に優れた
エキスパンドメタル11aにより形成され、例えば1829
mmの長さ寸法のいわゆる定尺物を採用している。このエ
キスパンドメタル11aは、その長手方向の端部を順次
接続して上記地山12に沿って延出される。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments for forming a concrete formwork for constructing a slope protection structure according to the present invention will be described below in detail with reference to the accompanying drawings. As shown in FIG. 1 and FIG. 2, a frame 11 of a concrete formwork 10 for constructing a slope protection structure formed according to the present invention is opposed to a ground 12 and is erected in two rows. This frame 11
Although various wire meshes such as a crimp wire mesh and an expanded metal wire mesh may be used, in this embodiment, the wire mesh is made of expanded metal 11a having excellent toughness.
A so-called fixed length object with a length of mm is used. The expanded metal 11 a is extended along the ground 12 by sequentially connecting its longitudinal ends.

【0015】具体的には、法面等の地山12に、これに
沿って縦横に延びる格子状のコンクリート構造物を構築
するため、エキスパンドメタル11aは地山12に沿っ
て縦横に延出して格子状に配設される。
Specifically, in order to construct a lattice-shaped concrete structure extending vertically and horizontally along the ground 12 such as a slope, the expanded metal 11a extends vertically and horizontally along the ground 12. They are arranged in a grid.

【0016】これら相対向するエキスパンドメタル11
aの間には、これらの間を所定の間隔に維持すると共
に、コンクリートの骨材となってこれを補強するための
横鉄筋13a及び縦鉄筋13bが設けられる。
These opposing expanded metals 11
Between a, a horizontal reinforcing bar 13a and a vertical reinforcing bar 13b are provided to maintain a predetermined interval therebetween and to serve as a concrete aggregate to reinforce it.

【0017】次に、上記相対向するエキスパンドメタル
11aの各上端縁部に、これに沿って線状の連続した不
陸調整用コーナー部材14が設けられる。
Next, at each upper end edge of the opposing expanded metal 11a, a linear continuous irregularity adjusting corner member 14 is provided along the upper end edge.

【0018】図3(A)に示すように、本発明によって
形成される法面保護構造物構築用のコンクリート用型枠
10の第1の実施の形態にあっては、上記不陸調整用コ
ーナー部材14は矩形断面を有する帯材により形成され
ている。さらに、この帯材にはドラム等に巻かれた線状
の長いものを使用する。この帯材からなる不陸調整用コ
ーナー部材14は、上記エキスパンドメタル11aの各
上端縁部の外側にスポット溶接等により固定されてい
る。
As shown in FIG. 3A, in the first embodiment of the concrete formwork 10 for constructing a slope protection structure formed according to the present invention, the corner for unevenness adjustment is used. The member 14 is formed of a strip having a rectangular cross section. Further, a long linear material wound on a drum or the like is used as the band material. The non-adjustment corner member 14 made of this strip is fixed to the outside of each upper edge of the expanded metal 11a by spot welding or the like.

【0019】次に、上記第1の実施の形態における作用
を述べる。地山12等の法面に沿ってコンクリート構造
物を格子状に縦横に構築する場合、前述したように、そ
の構築位置に相当する場所に上記エキスパンドメタル1
1aからなる枠体11を配設する。このエキスパンドメ
タル11aは、単体においては製造上不連続部が無いの
で強靱な構造を有し、型枠内に設ける鉄筋量を少なくす
ることができる。
Next, the operation of the first embodiment will be described. When constructing a concrete structure vertically and horizontally along the slope of the ground 12 or the like, as described above, the expanded metal 1 is placed at a location corresponding to the construction position.
A frame 11 made of 1a is provided. The expanded metal 11a has a tough structure because there is no discontinuous portion in its manufacture alone, and the amount of reinforcing bars provided in the mold can be reduced.

【0020】ところで、法面等の地山12には凹凸があ
り(このように平坦でないことを本発明では不陸と称す
る。)ので、地山12に沿って縦横に配設した枠体11
の高さに段差ができ易い。また、エキスパンドメタル同
士の接続は、各長手方向端部を重ね合わせてスポット溶
接することにより行っているので、当該エキスパンドメ
タル11aの重ね継手部分が不連続になっている。
Since the ground 12 such as a slope has irregularities (this unevenness is referred to as non-landing in the present invention), the frame 11 arranged vertically and horizontally along the ground 12.
It is easy to form a step at the height of the building. In addition, since the connection between the expanded metals is performed by overlapping the ends in the longitudinal direction and performing spot welding, the lap joint portion of the expanded metal 11a is discontinuous.

【0021】このエキスパンドメタル11aの不連続な
継手部11bが、図3(A)に示すようにその各上縁部
外側に設けられた線状に連続した不陸調整用コーナー部
材14により連続化される。
As shown in FIG. 3A, the discontinuous joint portion 11b of the expanded metal 11a is made continuous by a line-shaped non-adjustment corner member 14 provided outside each upper edge portion thereof. Is done.

【0022】例えば、エキスパンドメタル11aの高さ
方向の段差については、一番高いエキスパンドメタル1
1aに合わせて上記不陸調整用コーナー部材14をスポ
ット溶接して取り付けるようにし、エキスパンドメタル
11aの厚さ方向の段差については、一番外側のエキス
パンドメタル11aに合わせて上記不陸調整用コーナー
部材14をスポット溶接して取り付ける。そして、この
不陸調整用コーナー部材14の高さ方向の幅は、エキス
パンドメタル相互の一番大きな段差に合わせて設定し、
その長さ寸法は巻線のように長い程連続性が維持され
る。
For example, regarding the step in the height direction of the expanded metal 11a,
1a, the unevenness-adjusting corner member 14 is spot-welded and attached, and the step in the thickness direction of the expanded metal 11a is adjusted in accordance with the outermost expanded metal 11a. 14 is attached by spot welding. The width in the height direction of the corner member for unevenness adjustment 14 is set in accordance with the largest step between the expanded metals.
The continuity is maintained as the length is longer, such as a winding.

【0023】これによりエキスパンドメタル11aの継
手部に段差の無い連続した型枠仕上げ面が形成され、表
面仕上げの作業性を向上することができると共に、施工
費用を減少することができる。
As a result, a continuous form-finished surface without a step is formed at the joint portion of the expanded metal 11a, so that the workability of the surface finish can be improved and the construction cost can be reduced.

【0024】図3(B)は本発明によって形成される法
面保護構造物構築用のコンクリート用型枠10の第2の
実施の形態を示すものである。この実施の形態にあって
は、不陸調整用コーナー部材14aとして横断面が円形
の巻線を採用したものであり、前記第1実施例と同様に
相対向するエキスパンドメタル11aの上端縁部の外側
に設けている。この第2の実施の形態における作用効果
は基本的には上記第1の実施の形態と同様の作用効果を
示すが、特に本実施例はエキスパンドメタル相互の段差
の小さい場合に適する。
FIG. 3B shows a second embodiment of a concrete formwork 10 for constructing a slope protection structure formed according to the present invention. In this embodiment, a winding having a circular cross section is adopted as the corner member 14a for adjusting unevenness, and the upper end edge of the expanded metal 11a facing the same as in the first embodiment. It is provided outside. Although the operation and effect of the second embodiment basically show the same operation and effect as those of the first embodiment, this embodiment is particularly suitable when the step between the expanded metals is small.

【0025】さらに、図3(C)は本発明によって形成
された法面保護構造物構築用のコンクリート用型枠10
の第3の実施の形態を示すものである。第3の実施の形
態にあっては、不陸調整用コーナー部材14bとして、
横断面がU字形状の線状部材を採用したものであり、上
記相対向するエキスパンドメタル11aの上端縁部に嵌
合している。
FIG. 3C is a concrete formwork 10 for constructing a slope protection structure formed according to the present invention.
This shows a third embodiment of the present invention. In the third embodiment, as the corner member 14b for adjusting unevenness,
The cross section employs a linear member having a U-shaped cross section, and is fitted to the upper end edge of the opposed expanded metal 11a.

【0026】この実施の形態における作用効果は、基本
的には前記第1及び第2実施の形態と同様の作用効果を
示すが、特に本実施の形態はエキスパンドメタル11a
の上端縁部にワンタッチで取り付けることができる。但
し、U字形状の線状部材のU字形の高さ方向の幅を、エ
キスパンドメタル相互間の高さ方向における最大の段差
に相当する高さ方向の幅を有するように設定する必要が
ある。
The operation and effect of this embodiment are basically the same as those of the first and second embodiments. However, in this embodiment, the expanded metal 11a
Can be attached to the top edge of the device with a single touch. However, it is necessary to set the width of the U-shaped linear member in the height direction of the U-shape so as to have a width in the height direction corresponding to the maximum step in the height direction between the expanded metals.

【0027】尚、本発明は上記エキスパンドメタル11
aの製造上の不都合に鑑みて創案したものであるが、上
記枠体11にクリンプ金網等を採用し、その長さ寸法が
不整合である場合にも当然適用し得ることは明らかであ
る。
The present invention relates to the expanded metal 11 described above.
Although it was created in view of the manufacturing inconvenience a, it is obvious that the present invention can be applied to a case where a crimped wire mesh or the like is used for the frame body 11 and the lengths thereof are inconsistent.

【0028】[0028]

【発明の効果】以上述べたように、本発明によれば、コ
ンクリート構造物の型枠同士の継手部分の段差をなくし
て連続した型枠仕上げ面を形成し、表面仕上げの作業性
を向上させることができると共に、施工費用を減少させ
ることができるという優れた効果を発揮する。また、コ
ーナー部材により上記段差を支持するので強固になる。
As described above, according to the present invention, a continuous form-finished surface is formed by eliminating the step at the joint between the forms of the concrete structure, and the workability of the surface finish is improved. And an excellent effect that the construction cost can be reduced. Further, since the above-mentioned step is supported by the corner member, it becomes strong.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明によって形成されるコンクリート用型枠
の第1の実施の形態を示す斜視図である。
FIG. 1 is a perspective view showing a first embodiment of a concrete formwork formed by the present invention.

【図2】図1の実施の形態により形成されたコンクリー
ト用型枠の配設状態を示す側面図である。
FIG. 2 is a side view showing an arrangement state of a concrete formwork formed according to the embodiment of FIG. 1;

【図3】本発明によって形成されたコンクリート用型枠
を示し、(A)は第1の実施の形態の横断面図,(B)
は第2の実施の形態の横断面図,(C)は第3の実施の
形態の横断面図である。
FIG. 3 shows a concrete formwork formed according to the present invention, wherein (A) is a cross-sectional view of the first embodiment, (B).
Is a cross-sectional view of the second embodiment, and (C) is a cross-sectional view of the third embodiment.

【図4】従来のコンクリート用型枠の配設状態を示す側
面図である。
FIG. 4 is a side view showing an arrangement state of a conventional concrete formwork.

【図5】従来のコンクリート用型枠の要部を示す斜視図
である。
FIG. 5 is a perspective view showing a main part of a conventional concrete formwork.

【符号の説明】[Explanation of symbols]

10 コンクリート用型枠 11 枠体 11a エキスパンドメタル 12 地山 14,14a,14b コーナー部材 DESCRIPTION OF SYMBOLS 10 Formwork for concrete 11 Frame body 11a Expanded metal 12 Ground 14, 14a, 14b Corner member

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 長手方向端部を順次接続して延出させた
複数の金網を所定間隔をあけて相対向して地山上に起立
させ、該相対向させた金網の間に長手方向に沿って縦鉄
筋を配設すると共に、該金網を上記所定間隔に維持する
横鉄筋を配設することにより枠体を形成し、次いでこの
枠体の上縁部に不陸調整用コーナー部材を接合するに際
し、該不陸調整用コーナー部材を、金網相互間の高さ方
向における最大の段差に相当する高さ方向の幅を有する
ように設定し、該不陸調整用コーナー部材の上縁を最も
高い金網の上端縁に合わせて位置させると共に、前記枠
体の最外側に配置することを特徴とする、法面保護構造
物構築用のコンクリート用型枠の形成方法。
1. A plurality of metal nets extended by connecting their longitudinal ends sequentially and standing on the ground at predetermined intervals, facing each other, along the longitudinal direction between the metal nets facing each other. A frame is formed by arranging a vertical reinforcing bar and arranging a horizontal reinforcing bar for maintaining the wire mesh at the above-mentioned predetermined interval, and then joining a corner member for unevenness adjustment to an upper edge portion of the frame. At this time, the unevenness adjusting corner member is set so as to have a width in the height direction corresponding to the maximum step in the height direction between the wire meshes, and the upper edge of the unevenness adjusting corner member is the highest. A method for forming a concrete formwork for constructing a slope protection structure, wherein the method is arranged so as to be aligned with an upper edge of a wire net and at the outermost side of the frame.
【請求項2】 前記不陸調整用コーナー部材が矩形の横
断面形状を有することを特徴とする、請求項1に記載の
法面保護構造物構築用のコンクリート用型枠の形成方
法。
2. The method for forming a concrete formwork for building a slope protection structure according to claim 1, wherein the corner member for adjusting unevenness has a rectangular cross-sectional shape.
【請求項3】 前記不陸調整用コーナー部材が円形の横
断面形状を有することを特徴とする、請求項1に記載の
法面保護構造物構築用のコンクリート用型枠の形成方
法。
3. The method of claim 1, wherein the corner member for adjusting unevenness has a circular cross-sectional shape.
【請求項4】 長手方向端部を順次接続して延出させた
複数の金網を所定間隔をあけて相対向して地山上に起立
させ、該相対向させた金網の間に長手方向に沿って縦鉄
筋を配設すると共に、該金網を上記所定間隔に維持する
横鉄筋を配設することにより枠体を形成し、次いでこの
枠体の上縁部に不陸調整用コーナー部材を接合するに際
し、該不陸調整用コーナー部材をU字形の横断面形状を
有するように形成するとともに、金網相互間の高さ方向
における最大の段差に相当する高さ方向の幅を有するよ
うに設定し、上記金網の上端縁部から嵌合して配置する
ことを特徴とする、法面保護構造物構築用のコンクリー
ト用型枠の形成方法。
4. The longitudinal ends are sequentially connected and extended.
Multiple wire meshes standing on the ground facing each other at predetermined intervals
Between the opposed wire mesh along the longitudinal direction
Arrange the streaks and maintain the wire mesh at the above-mentioned predetermined interval
A frame is formed by arranging horizontal reinforcing bars,
When joining the corner member for unevenness adjustment to the upper edge of the frame
And, the corner member for unevenness adjustment has a U-shaped cross section.
And the height direction between the wire meshes
Has a width in the height direction corresponding to the largest step in
And fitted and placed from the top edge of the wire mesh
A method for forming a concrete formwork for constructing a slope protection structure , characterized in that :
JP23512596A 1996-09-05 1996-09-05 Method of forming concrete formwork for construction of slope protection structure Expired - Lifetime JP2847641B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23512596A JP2847641B2 (en) 1996-09-05 1996-09-05 Method of forming concrete formwork for construction of slope protection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23512596A JP2847641B2 (en) 1996-09-05 1996-09-05 Method of forming concrete formwork for construction of slope protection structure

Publications (2)

Publication Number Publication Date
JPH09105128A JPH09105128A (en) 1997-04-22
JP2847641B2 true JP2847641B2 (en) 1999-01-20

Family

ID=16981431

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23512596A Expired - Lifetime JP2847641B2 (en) 1996-09-05 1996-09-05 Method of forming concrete formwork for construction of slope protection structure

Country Status (1)

Country Link
JP (1) JP2847641B2 (en)

Also Published As

Publication number Publication date
JPH09105128A (en) 1997-04-22

Similar Documents

Publication Publication Date Title
JPH04343973A (en) Form member for concrete construction and method and device for its manufacture
EP1633937B1 (en) Composite construction element, in particular for making wall structures for buildings and process for its manufacture
WO2014117214A1 (en) Rebar mesh and method of production
JP2847641B2 (en) Method of forming concrete formwork for construction of slope protection structure
JP2532651Y2 (en) Concrete formwork for building slope protection structures
CN212534815U (en) Structural steel concrete longitudinal steel bar constraint structure
US6622446B1 (en) Weldless spacer for wire reinforcement of concrete
JP2832669B2 (en) Reinforcement method for concrete structure and curved surface forming machine used in the method
KR100658831B1 (en) Truss deck plate with vertical bar at end of lattice wire
CN118110309A (en) Reinforcing steel bar structure of extra-high voltage electromagnetic shielding room terrace and construction method thereof
KR200390911Y1 (en) Truss deck plate with vertical fixing bar attached to lattice wire
JP2736224B2 (en) Enforcement method for formwork, mortar, concrete, etc.
JPH0355682Y2 (en)
JP2775398B2 (en) Cast-in-place method and construction method
WO1997013936A1 (en) Spacer
JP3854994B2 (en) Reinforcement method for one section when manufacturing concrete caisson
JP2003064691A (en) Mesh frame and its manufacturing method
JPH08151637A (en) Spraying slope frame construction method and slope frame skeleton material used for it
JP2584535Y2 (en) Wire mesh for spraying on slopes
JP2769438B2 (en) Aggregate for slope protection construction
JPS5854130A (en) Installing method for slope form
JP3199501B2 (en) Reinforcing method of reinforcing steel wire mesh used for concrete structures
JP3067346U (en) Mesh formwork
JP3380396B2 (en) Wire material with indentation indentation
JPH11303305A (en) Large ALC panel