JP2863802B2 - Construction method of dome frame - Google Patents
[go: Go Back, main page]

JP2863802B2 - Construction method of dome frame - Google Patents

Construction method of dome frame

Info

Publication number
JP2863802B2
JP2863802B2 JP9372890A JP9372890A JP2863802B2 JP 2863802 B2 JP2863802 B2 JP 2863802B2 JP 9372890 A JP9372890 A JP 9372890A JP 9372890 A JP9372890 A JP 9372890A JP 2863802 B2 JP2863802 B2 JP 2863802B2
Authority
JP
Japan
Prior art keywords
roof
erection
steel truss
frame
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP9372890A
Other languages
Japanese (ja)
Other versions
JPH03290550A (en
Inventor
修 貞広
俊樹 小林
敏彦 平間
伊知郎 草間
健一 杉崎
九州男 本田
修司 奥田
喜男 瀧上
仁 高木
康一 五月女
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Original Assignee
Shimizu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd filed Critical Shimizu Construction Co Ltd
Priority to JP9372890A priority Critical patent/JP2863802B2/en
Publication of JPH03290550A publication Critical patent/JPH03290550A/en
Application granted granted Critical
Publication of JP2863802B2 publication Critical patent/JP2863802B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】 「産業上の利用分野」 この発明は、多目的スタジアム等の屋根に用いて好適
なドーム架構の架設工法に関する。
Description: TECHNICAL FIELD The present invention relates to a method of constructing a dome frame suitable for a roof of a multipurpose stadium or the like.

「従来の技術」 一般にスタジアムや多目的ホール、実験棟など広い空
間を確保するための屋根構造の一つとして、ドーム架構
がある。このドーム架構は、アーチ状の鉄骨トラスを頂
部から下部構造体の上部に放射状に架設してドーム形屋
根を形成するもので、たとえば野球スタジアムとして適
用する場合、ドーム内で野球ができるよう60m以上の有
効高さをもつ高い空間を確保できるものである。
"Conventional technology" Generally, there is a dome frame as one of roof structures for securing a large space such as a stadium, a multipurpose hall, and an experimental building. This dome frame is a structure in which an arched steel truss is radiated from the top to the upper part of the lower structure to form a dome-shaped roof.For example, when applied as a baseball stadium, 60 m or more to allow baseball in the dome It is possible to secure a high space with an effective height of.

従来より、このようなドーム形屋根を架設する方法と
しては、第12図に示すような方法が知られている。
Conventionally, as a method of erection of such a dome-shaped roof, a method as shown in FIG. 12 is known.

この従来方法は、下部構造体1の内側において、全て
の鉄骨トラス2の架設位置に鉄骨トラス2のアーチ高さ
に合わせた数列の支保工3を配置しておき、各々の架設
位置において、鉄骨トラス2の分割ユニット4をクロー
ラークレーン5等で吊り上げつつ対応する支保工3間に
架設し、分割ユニット4同士を接合して鉄骨トラス2を
各々形成し、このように各鉄骨トラス2を放射状に架設
形成することにより、ドーム形屋根全体を架設するよう
にしている。
According to this conventional method, several rows of supports 3 corresponding to the arch height of the steel truss 2 are arranged at the erection positions of all the steel trusses 2 inside the lower structure 1, and at each erection position, The divided units 4 of the truss 2 are erected between the corresponding supports 3 while being lifted by the crawler crane 5 or the like, and the divided units 4 are joined to form the steel trusses 2 respectively. By forming the bridge, the entire dome-shaped roof is bridged.

「発明が解決しようとする課題」 しかしながら、上記した従来の架設工法によれば、架
設すべき鉄骨トラス2の全てに対して、架設用の支保工
3を必要とし、多数の支保工3を幾重にも屋根架設対象
地に建て、施工せざるを得なかった。
[Problems to be Solved by the Invention] However, according to the above-described conventional erection method, all the steel trusses 2 to be erected require erection supports 3 and a large number of erections 3 are required. However, the building had to be built and constructed on the roof construction site.

特に、野球ドームの施工の場合、中央部で70m程度の
高さの支保工3を必要とするなど、支保工全体に使用す
る鉄骨量が膨大となると共に、支保工の仮設工事が大掛
かりとなり、仮設費用が多大なる欠点があった。このた
め、施工コストの低減を有効に図れなかった。
In particular, in the case of construction of a baseball dome, the amount of steel frames used for the entire support work becomes enormous, such as requiring a support 3 with a height of about 70 m at the center, and the temporary work of the support becomes large, There was a drawback that the temporary cost was great. For this reason, it was not possible to effectively reduce the construction cost.

さらには、全ての鉄骨トラス2を各々の架設位置で架
設工事をするようにしていると共に、クレーン数に限り
があることからも、作業効率がよいとは言えず、工期短
縮を有効に図れなかった。特に、屋根架設対象地に全面
にわたって支保工を建てるようにしているため、屋根架
設作業中は、グラウンド工事を行うことができず、この
点でも工期長期化の要因となっていた。
Further, all the steel trusses 2 are constructed at the respective construction positions, and the number of cranes is limited, so that the work efficiency cannot be said to be good, and the construction period cannot be effectively reduced. Was. In particular, since the shoring work is to be built over the entire area where the roof is to be erected, ground construction cannot be performed during the roof erection work, and this also causes the construction period to be prolonged.

この発明は、上記事情に鑑みてなされたもので、架設
費用および工期短縮を有効に図ることができ、これによ
り経済的な架構を実現できる重層形のドーム架構の架設
工法を提供することを目的としている。
The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a method of erection of a multi-layered dome frame that can effectively reduce the erection cost and the construction period, thereby realizing an economical framing. And

「課題を解決するための手段」 この発明は、頂部から放射状に分割されたアーチ状の
架構ユニットから構成されるドーム架構を下部構造上に
架設する工法であって、架設範囲の中央に架設構台を配
置し、架設範囲の所望の位置から前記架構ユニットを1
ユニット又は数ユニットずつ前記架設構台および前記下
部構造間に架設しながら、架設された当該架構ユニット
を前記架設構台回りに順次回転移動させることにより、
全ての架構ユニットを放射状に配置してドーム架構を形
成しておき、当該ドーム架構の端部の架構ユニットを作
業ステージに用い、前記下層のドーム架構と同一の架設
手順により上層のドーム架構を架設するようにしたこと
を特徴としている。
[Means for Solving the Problems] The present invention relates to a method of erection of a dome frame composed of an arch-shaped framing unit radially divided from a top portion on a lower structure. And place the frame unit 1 from a desired position in the erection range.
By sequentially rotating the erected frame unit around the erection gantry while erection between the erection gantry and the lower structure by unit or several units,
All the frame units are arranged radially to form a dome frame, and the frame unit at the end of the dome frame is used as a work stage, and an upper dome frame is erected by the same erection procedure as the lower dome frame. It is characterized by doing so.

「作用」 本発明によれば、架設範囲の端部から架構ユニットを
架設範囲の中央の架設構台およびその周囲の下部構造間
に1ユニット又は数ユニットずつ架設しながら、この架
設された架構ユニットを順次架設範囲方向に回転移動さ
せ、各架構ユニットを放射状に配置することにより、下
層のドーム架構全体が形成されることになる。
According to the present invention, the erection unit is installed between the erection unit at the center of the erection range and the lower structure around the erection unit from the end of the erection range by one unit or several units. By sequentially rotating and moving in the direction of the erection range and arranging the respective frame units radially, the entire lower dome frame is formed.

そして、下層のドーム架構の端部の架構ユニットを作
業ステージとして用いて、新たな架構ユニットを架設構
台および下部構造間に架設し、下層のドーム架構と同一
手段により、上層のドーム架構全体が形成されることに
なる。このように、既設のドーム架構端部の架構ユニッ
トを作業ステージに用いることにより、その上にドーム
架構を二層、三層にわたって架設することができ、重層
形のドーム架構の架設が実現できる。
Then, using the frame unit at the end of the lower dome frame as a work stage, a new frame unit is erected between the erection gantry and the lower structure, and the entire upper dome frame is formed by the same means as the lower dome frame. Will be done. In this way, by using the existing frame unit at the end of the dome frame for the work stage, the dome frame can be laid over two or three layers on the work unit, and a multi-layer dome frame can be erected.

この場合、まず、下層のドーム架構の架設に要する支
保工は、1ユニット又は数ユニットを架設する分の中央
の架設構台および作業ステージのみで足りるから、全て
の架設範囲に支保工を必要とせず、前記架設構台、作業
ステージ以外の架設範囲において下部構造の同時施工を
可能とする。また、二層目以降のドーム架構は下層の架
構ユニットがそのまま作業ステージとして使えるから、
最初の作業ステージは撤去でき、上記作用を同様に奏す
る。
In this case, first, since only the central erection gantry and work stage for erection of one unit or several units are sufficient for the erection of the lower dome frame, no erection is required for the entire erection area. Accordingly, simultaneous construction of the lower structure is possible in a construction area other than the construction gantry and the work stage. In addition, since the lower frame unit can be used as it is as a work stage for the dome frame after the second layer,
The first working stage can be removed and performs the same effect as above.

「実施例」 以下、本発明の実施例について図面を参照しながら説
明する。
Hereinafter, embodiments of the present invention will be described with reference to the drawings.

第1図ないし第11図は、この発明を野球場等のスタジ
アムにおける開閉式屋根に適用した例を示すものであ
る。第1図および第2図において、全体として符号10で
示すものがスタジアムである。
1 to 11 show an example in which the present invention is applied to a retractable roof in a stadium such as a baseball field. In FIG. 1 and FIG. 2, the stadium is indicated by reference numeral 10 as a whole.

このスタジアム10は、ほぼ円形のグラウンド11と、グ
ラウンド11の周囲に設けられた観客席(共に屋根架設対
象)12と、これらグラウンド11および観客席12の全体を
覆う開閉式屋根13とからなっている。
The stadium 10 comprises a substantially circular ground 11, spectator seats 12 (both for roof construction) 12 provided around the ground 11, and a retractable roof 13 covering the whole of the ground 11 and the spectator seats 12. I have.

第1図は開閉式屋根13の閉状態を示しているもので、
この屋根13は全体として、平面形状が円形をなし、かつ
球面体を伏せたような上に凸なドーム形に形成されてい
る。
FIG. 1 shows the closed state of the retractable roof 13.
The roof 13 as a whole has a circular planar shape and is formed in an upwardly convex dome shape with a spherical body turned down.

この屋根13は、平面視における円形中心から左右にほ
ぼ2分割され、その一方(内野側)が親屋根14とされる
と共に、他方(外野側)が子屋根15とされている。親屋
根14は、子屋根15に対してその曲率半径が略屋根厚だけ
大きくされ、従って、子屋根15は親屋根14の下方に重畳
可能に構成されている。
The roof 13 is divided into approximately two right and left sides from the center of the circle in plan view, and one (infield side) is a parent roof 14 and the other (outfield side) is a child roof 15. The parent roof 14 has a radius of curvature larger than that of the child roof 15 by approximately the roof thickness. Therefore, the child roof 15 is configured to be superimposable below the parent roof 14.

これら親屋根14および子屋根15は、観客席12の周囲に
設けられた略環状の支持構造物(下部構造)16に支持さ
れている。この支持構造物16は、閉状態の子屋根15下方
に位置する半環状の子屋根支持部17と、親屋根14下方に
位置し、観客席12の端部からこれに離間する一方向に延
在する形状の親屋根支持部18とから構成されている。
The parent roof 14 and the child roof 15 are supported by a substantially annular support structure (lower structure) 16 provided around the audience seats 12. The support structure 16 includes a semi-annular sub-roof support section 17 positioned below the closed roof 15 and a uni-roof support section positioned below the main roof 14 and extending in one direction away from the end of the audience seat 12. And a parent roof support 18 having a shape.

子屋根支持部17には、第2図および第3図に示すよう
に、平面形状における子屋根15の半円よりやや小径な環
状の軌道19が形成されている。この軌道19は、子屋根15
の端部における法線方向の底面20およびその上下から垂
直に立ち上がる側面21、21を有する溝部に形成されてい
る。一方、子屋根15の端部には、第3図に示すように、
前記軌道19内に嵌合する形状の駆動機構付き台車22が配
設され、この台車22と軌道19の底面20、および側面21、
21との間には走行車輪23・・・が配設されている。これ
により子屋根15は、屋根13の円形中心を中心として回動
自在に構成されている。
As shown in FIGS. 2 and 3, an annular track 19 having a diameter slightly smaller than a semicircle of the child roof 15 in a planar shape is formed in the child roof support portion 17. This track 19 is
Is formed in a groove having a bottom surface 20 in the normal direction at the end of the substrate and side surfaces 21 and 21 rising vertically from above and below. On the other hand, at the end of the child roof 15, as shown in FIG.
A truck 22 with a drive mechanism having a shape fitting into the track 19 is provided, and the bottom surface 20, and the side surface 21, of the truck 22 and the track 19,
The traveling wheels 23 are arranged between the traveling wheels 21 and 21. Thereby, the child roof 15 is configured to be rotatable around the circular center of the roof 13.

一方、親屋根支持部18の上面と前記親屋根15との間に
は、第1図、第2図および第4図に示すように、親屋根
15の外円よりやや大径な外円を有する馬蹄形状の駆動機
構付き移動ベット24が介在され、この移動ベッド24は、
親屋根支持部18上面に敷設された軌道25、25、・・・上
に載置されている。
On the other hand, as shown in FIGS. 1, 2, and 4, between the upper surface of the parent roof support portion 18 and the parent roof 15,
A moving bed 24 with a horseshoe-shaped drive mechanism having an outer circle slightly larger than the outer circle of 15 is interposed, and this moving bed 24 is
Are placed on tracks 25, 25,... Laid on the upper surface of the main roof support portion 18.

この移動ベッド24は、第4図に示すように、親屋根15
下端にピン支承26を介して設けられた基台27と、この基
台27下面に設けられた走行車輪28、・・・とから該略構
成されている。また、この基台27には、前記子屋根支持
部17の軌道19と同一の位置に軌道29が形成されている。
従って、前記子屋根14は、子屋根支持部17の軌道19のみ
ならず親屋根支持部18の軌道29を伝って、屋根13の円形
中心を中心としてその全周に亙って回動自在とされてい
る。
As shown in FIG. 4, the moving bed 24 is
The base 27 is provided at a lower end of the base 27 via a pin bearing 26, and running wheels 28 are provided on the lower surface of the base 27. A track 29 is formed on the base 27 at the same position as the track 19 of the sub-roof support portion 17.
Accordingly, the sub-roof 14 is rotatable not only along the track 19 of the sub-roof support section 17 but also along the track 29 of the parent roof support section 18 and around the circular center of the roof 13 around the entire circumference. Have been.

なお、台車22、移動ベッド24の操作方法は、例えば遠
隔操作により操作員が適宜指令する等周知の手段を用い
ればよく、何等特殊な手段を用いる必要はない。
The cart 22 and the moving bed 24 may be operated by using a well-known means such as an operator appropriately giving an instruction by remote control, and it is not necessary to use any special means.

また、前記親屋根支持部18上の軌道25、・・・は、親
屋根15の両端部および必要とされる位置に架設され、親
屋根支持部18の延在方向に沿ってそれぞれ平行に延びる
構成とされている。従って、前記親屋根14および子屋根
15は、これらが互いに重畳した状態において、移動ベッ
ド24が軌道25、・・・に沿って移動することにより、観
客席12(およびグラウンド11)から退却自在に構成され
ている。
The tracks 25 on the parent roof support portion 18 are installed at both ends of the parent roof 15 and at required positions, and extend in parallel with the extending direction of the parent roof support portion 18, respectively. It has a configuration. Therefore, the parent roof 14 and the child roof
The movable bed 15 is configured to be able to retreat from the spectator seat 12 (and the ground 11) when the movable bed 24 moves along the tracks 25,.

ところで、屋根13を構成する親屋根14は、第1図に示
すように、頂部30から移動ベッド24上面に放射状に一定
間隔(本実施例では7.5度間隔)で架設された複数のア
ーチ状の鉄骨トラス31を主体として構成されている。こ
の鉄骨トラス31は、第4図に示すように、上弦材32、下
弦材33、及びこれらを互いに連結するラチス材34の各部
材をボックス状に組み立てて構成されている。また、一
定間隔で放射状に架設された鉄骨トラス31、31の間に
は、つなぎ材、ブレース材等の連結材35が介在され、こ
れにより全ての鉄骨トラス31が円周方向に互いに連結さ
れた構造とされている。
Incidentally, as shown in FIG. 1, the main roof 14 constituting the roof 13 has a plurality of arch-like structures which are erected from the top 30 to the upper surface of the moving bed 24 at regular intervals (in the present embodiment, at intervals of 7.5 degrees). The steel truss 31 is mainly configured. As shown in FIG. 4, the steel truss 31 is constructed by assembling each member of an upper chord material 32, a lower chord material 33, and a lattice material 34 connecting these members to each other in a box shape. In addition, between the steel trusses 31, 31 laid radially at regular intervals, a connecting material 35 such as a linking material, a brace material, etc. was interposed, so that all the steel trusses 31 were connected to each other in the circumferential direction. It has a structure.

同様に、子屋根15は、第1図に示すように、閉状態に
おいて、頂部30から台車22上に放射状に一定間隔(本実
施例では7.5度間隔)で架設された複数のアーチ状の鉄
骨トラス36を主体として構成され、隣接する各鉄骨トラ
ス36、36の間には前記連結材35が同様に介在され、全て
の鉄骨トラス36が円周方向に互いに連結された構造とさ
れている。
Similarly, as shown in FIG. 1, in the closed state, the sub-roof 15 is provided with a plurality of arched steel frames erected from the top 30 on the carriage 22 at regular intervals (in this embodiment, at 7.5-degree intervals). The truss 36 is mainly used, and the connecting member 35 is similarly interposed between the adjacent steel trusses 36, 36, so that all the steel trusses 36 are connected to each other in the circumferential direction.

以上のような構成を有する開閉式屋根13においては、
以下のような開閉作用を発揮する。
In the retractable roof 13 having the above configuration,
It has the following opening and closing actions.

第5図(イ)に示すように、子屋根15がグラウンド11
の左側に位置し、かつ親屋根14がグラウンド11の右側に
位置した状態にある場合には、これら子屋根15、親屋根
14は一体的にグラウンド11および観客席12上方を覆い、
これらグラウンド11等の上に大屋根を形成する。これに
より、グラウンド11および観客席12は雨風をしのげるも
のとなり、悪天候時においても、人々は競技および観戦
を存分に楽しむことができるようになるわけである。
As shown in Fig. 5 (a), the child roof 15 is
If the parent roof 14 is located on the right side of the ground 11 and the child roof 15 and the parent roof
14 integrally covers the ground 11 and the audience seat 12 above,
A large roof is formed on the ground 11 and the like. As a result, the ground 11 and the spectator seat 12 are able to withstand rain and wind, so that even in bad weather, people can fully enjoy the game and watching the game.

一方、開閉式屋根13を開けるためには、子屋根15の端
部に位置する移動台車22の移動を開始すべく、遠隔操作
により指令する。これにより、台車22が親屋根14に向っ
て軌道19上を移動することで、第5図(ロ)に示すよう
に、子屋根15もこれに連れて移動し、結果的に子屋根15
が親屋根14下に重畳された状態になるまで移動する。こ
れにより、第5図(ハ)に示すように、子屋根15の部分
は、大きく開口する。
On the other hand, in order to open the openable roof 13, a command is issued by remote control to start the movement of the movable carriage 22 located at the end of the sub-roof 15. As a result, the bogie 22 moves on the track 19 toward the parent roof 14, and as shown in FIG. 5 (b), the child roof 15 also moves with it.
Move until it is superimposed under the parent roof 14. As a result, as shown in FIG. 5 (c), the portion of the sub-roof 15 is greatly opened.

次に、子屋根15が親屋根14の下に重畳された状態で、
親屋根14の端部に位置する移動ベッド24の移動を開始す
べく、遠隔操作により指令する。これにより移動ベッド
24が観客席12から離間する方向に向って軌道25、・・・
上を移動することで、子屋根15、親屋根14もこれに連れ
て移動する。これにより、第5図(ニ)に示すように、
屋根13の大半は大きく開口し、グラウンド11および観客
席12はこの部分において屋根を撤去されたものとなる。
これにより、観客席12内の人々は開放部からの日光及び
そよ風等を享受できるわけである。
Next, with the child roof 15 superimposed under the parent roof 14,
A command is issued by remote control to start moving the moving bed 24 located at the end of the main roof 14. This allows moving beds
Track 24 moves away from spectator seat 12 in the direction of distance 25, ...
By moving up, the child roof 15 and the parent roof 14 also move with it. As a result, as shown in FIG.
Most of the roof 13 has a large opening, and the ground 11 and the audience seats 12 have the roof removed at this portion.
As a result, the people in the audience seats 12 can enjoy the sunlight and the breeze from the opening.

また、この状態から第1図に示すような状態、すなわ
ち、屋根の閉状態とするには、遠隔操作により台車22、
移動ベッド24を前述の方向と逆方向に移動させればよ
い。
In order to change the state from this state to the state shown in FIG.
What is necessary is just to move the moving bed 24 in the direction opposite to the above-mentioned direction.

このように、以上のような構成を有する開閉式屋根13
によれば、子屋根15を親屋根14の下方に回転移動させ、
さらにこれら子屋根15、親屋根14を観客席12から離間す
る方向に移動させることにより、屋根の開閉が可能とな
り、グラウンド11および観客席12上方の開放および封鎖
が全く自由にしかも簡単に行え、天候への対応が意のま
まとなる。
Thus, the openable roof 13 having the above-described configuration
According to, the child roof 15 is rotated and moved below the parent roof 14,
Further, by moving the child roof 15 and the parent roof 14 in a direction away from the spectator seat 12, the roof can be opened and closed, and the opening and closing of the ground 11 and the spectator seat 12 can be performed completely freely and easily, Responding to the weather is at your disposal.

以上のような構造のスタジアム10において、開閉式屋
根13の架設は以下のようにして行なわれる。
In the stadium 10 having the structure described above, the erection of the openable roof 13 is performed as follows.

[子屋根15の架設] (1) 準備段階として、第6図ないし第7図に示すよ
うに、グラウンド11において、架設すべき屋根13の架設
範囲の中央に架設構台40を建てる。同様に、架設範囲の
端部に架設構台40から遠心方向へ延びる作業ステージ41
を仮設する。そして、前記架設構台40の上面には芯出し
を行った環状のジャッキ付きピン支承42を設ける。さら
に、該ピン支承42近傍位置の架設構台40上面および前記
作業ステージ41上面には、鉄骨トラス36の支持位置にジ
ャッキ付きローラー支承43、44を設け、移動ベッド24上
面には、鉄骨トラス36の下端を支持するピン支承26を設
ける。
[Construction of Child Roof 15] (1) As a preparation stage, as shown in FIGS. 6 and 7, on the ground 11, a construction gantry 40 is erected at the center of the construction area of the roof 13 to be constructed. Similarly, a work stage 41 extending in the centrifugal direction from the erection gantry 40 at the end of the erection range.
Is temporarily established. On the upper surface of the erection gantry 40, a centered annular pin support with jacks 42 is provided. Further, on the upper surface of the erection gantry 40 near the pin bearing 42 and on the upper surface of the work stage 41, roller bearings 43 and 44 with jacks are provided at supporting positions of the steel truss 36, and on the upper surface of the moving bed 24, the steel truss 36 is provided. A pin bearing 26 for supporting the lower end is provided.

(2) 一方、地上においては、上弦材32、下弦材32、
ラチス材34から構成される大梁2台分を箱型に地組み
し、屋根13を等間隔に放射状に分割してなる同一形状の
鉄骨トラス36を必要数製作する。各鉄骨トラス36は、揚
重時、架設時の作業容易性、安全性を考慮して、施工可
能な数まで分割し、鉄骨トラスユニット37とする。本実
施例においては、各々の鉄骨トラス31の先端角を7.5度
に設定し、それぞれ遠心方向に4分割する。
(2) On the other hand, on the ground, upper chord 32, lower chord 32,
Two girders composed of lattice members 34 are laid in a box shape, and the required number of steel trusses 36 of the same shape, which is obtained by dividing the roof 13 radially at equal intervals, is manufactured. Each of the steel trusses 36 is divided into workable truss units 37 in consideration of the workability and safety at the time of lifting and erection. In this embodiment, the tip angle of each steel truss 31 is set to 7.5 degrees, and each is divided into four in the centrifugal direction.

(3) まず、1番目の鉄骨トラス36の架設作業を行う
(第6図および第7図参照)。この場合、架設範囲の端
部において、鉄骨トラス36を構成する各鉄骨トラスユニ
ット37をクレーン5により作業ステージ41上に吊り上げ
る。その後、作業ステージ41上で各鉄骨トラスユニット
37を、対応するローラー支承43、44、および移動ベッド
24上の台車22間に架設し、隣接する鉄骨トラスユニット
37同士を溶接等手段により接合し、これにより鉄骨トラ
ス36全体を接続し、当該鉄骨トラス36を架設構台40、移
動ベッド24の台車22間に架設する。
(3) First, the first steel truss 36 is erected (see FIGS. 6 and 7). In this case, each steel truss unit 37 constituting the steel truss 36 is lifted on the work stage 41 by the crane 5 at the end of the erection range. Then, on the work stage 41, each steel truss unit
37, corresponding roller bearings 43, 44, and moving bed
An adjacent steel truss unit installed between carts 22 on 24
37 are joined together by welding or the like, thereby connecting the entire steel truss 36, and the steel truss 36 is erected between the erection gantry 40 and the carriage 22 of the movable bed 24.

この架設状態では、鉄骨トラス36の上端側は各ローラ
ー支承43、44により支持されるから、鉄骨トラス36から
のスラスト力(水平反力)はローラーにより外部へ逃が
され、架設構台40、作業ステージ41はスラスト力を受け
ない。また、ローラー支承43、44における上下方向への
変形はジャッキで調節して拘束することにより、ローラ
ーのトラス方向への変形を小さくすることができる。
In this erection state, since the upper end side of the steel truss 36 is supported by the roller bearings 43 and 44, the thrust force (horizontal reaction force) from the steel truss 36 is released to the outside by the rollers, and the erection gantry 40 Stage 41 receives no thrust. In addition, the deformation of the roller bearings 43 and 44 in the vertical direction is adjusted by a jack and restrained, so that the deformation of the roller in the truss direction can be reduced.

(4) 1ユニットの鉄骨トラス36の架設が完了した
ら、作業ステージ41上の各ローラー支承44をジャッキダ
ウンする。この時、架設構台40上の鉄骨トラス36上端に
は、トラス方向へ若干の変形および撓みが生じる。かか
る変形および撓みは、鉄骨トラス36の上端をピン支承42
に先に支持させた場合、鉄骨トラス36の上端にスラスト
力を生じさせる。しかしながら、本願の場合には、当該
鉄骨トラス36上端は前記した如くローラー支承43により
支持されているから、前記スラスト力はローラーにより
外部へ逃がされ、架設構台40自体はスラスト力を受けな
いことになる。したがって、架設構台40の合理的な構造
設計を可能とする。
(4) When the installation of one unit of the steel truss 36 is completed, the roller bearings 44 on the work stage 41 are jacked down. At this time, a slight deformation and bending occur in the truss direction at the upper end of the steel truss 36 on the erection gantry 40. Such deformation and deflection cause the upper end of the steel truss 36 to
If it is supported first, a thrust force is generated at the upper end of the steel truss 36. However, in the case of the present application, since the upper end of the steel truss 36 is supported by the roller bearing 43 as described above, the thrust force is released to the outside by the roller, and the erection gantry 40 itself does not receive the thrust force. become. Therefore, rational structural design of the erection gantry 40 is enabled.

(5) ジャッキダウン後は、鉄骨トラス36は両端のロ
ーラー支承43、台車22合のみに支持される単純梁構造と
みなされる。そのため、鉄骨トラス36には最大応力およ
び最大撓みが生じる。そこで、ジャッキダウン後の鉄骨
トラス36の状態を考慮し、次ぎの対策を講じる。
(5) After jacking down, the steel truss 36 is regarded as a simple beam structure supported only by the roller bearings 43 and the bogie 22 at both ends. Therefore, the maximum stress and the maximum bending occur in the steel truss. Therefore, the following measures are taken in consideration of the state of the steel truss 36 after jack down.

(6) 応力の増大に対しては、鉄骨トラス36を補強す
ることにより対応する。この際変形を考慮して鉄骨トラ
ス36には予めキャンバーを持たせておく。また、鉄骨ト
ラス36の上下端間にPC鋼線を張設し、鉄骨トラス36にプ
レストレスを導入することにより、応力の負担を軽減
し、鉄骨トラス36に生じる変形を抑制する。
(6) An increase in stress is dealt with by reinforcing the steel truss 36. At this time, the steel truss 36 is provided with a camber in advance in consideration of deformation. In addition, a PC steel wire is stretched between the upper and lower ends of the steel truss 36 to introduce a prestress into the steel truss 36, thereby reducing the stress load and suppressing the deformation of the steel truss 36.

(7) 次ぎに、ローラー支承43に支持された鉄骨トラ
ス36の各弦材32、33の上端部を架設構台40上のピン支承
42に対し、現場合わせによるつなぎ材45を使用して接合
し、これにより1ユニットの鉄骨トラス36を完成させ
る。この場合接合手段としては、鉄骨トラス36上端のつ
なぎ材45先端を環状のピン支承42内部に挿入し、先端部
とピン支承42とをボルト接合する方法、あるいは溶接す
る方法のいずれを用いてもよい。この場合、頂部30に集
中する鉄骨トラス36の上端部同士の収まりが良くなる利
点がある。なお、ローラー支承43はその後に撤去する。
(7) Next, the upper ends of the chord members 32 and 33 of the steel truss 36 supported by the roller bearing 43 are pin-supported on the erection gantry 40.
The truss 36 is joined to the truss 42 by using a joining material 45 that is fitted on site, thereby completing one unit of the steel truss 36. In this case, as a joining means, any of a method of inserting the tip of the connecting material 45 at the upper end of the steel truss 36 into the annular pin bearing 42 and bolting the tip and the pin bearing 42 or a method of welding is used. Good. In this case, there is an advantage that the upper end portions of the steel trusses 36 concentrated on the top portion 30 are better fitted. Note that the roller bearing 43 is subsequently removed.

ここで、鉄骨トラス36の上端部は先にピン支承42に接
合しておくのではなく、後から現場合わせのつなぎ材45
を介してピン支承42に接合するようにしているため、施
工誤差等を中央で吸収することができると共に、最初か
らピン支承42と接合する場合に比較して、鉄骨トラス36
への応力および変形の集中を防ぐことができる。
Here, the upper end of the steel frame truss 36 is not joined to the pin bearing 42 first, but the connecting material 45
Because it is joined to the pin bearing 42 through the, the construction error etc. can be absorbed at the center, and compared to the case where the pin bearing 42 is joined from the beginning, the steel truss 36
Concentration of stress and deformation on the substrate can be prevented.

(8) 次ぎに、当該鉄骨トラス36をピン支承42を軸中
心として円周方向へ2ユニット分の角度(15度)だけ回
転移動させる。
(8) Next, the steel truss 36 is rotationally moved in the circumferential direction by an angle of two units (15 degrees) around the pin bearing 42 as an axis.

この場合、鉄骨トラス36の脚部(下端部)は移動ベッ
ド24上面の溝内を走行する台車22に支持されていること
から、台車22を軌道に沿って走行させることにより、鉄
骨トラス36を回転移動させることができる。あるいは、
台車をフリーにして接線方向へ油圧ジャッキ等で引っ張
る又は押す事により、鉄骨トラス36を所望の角度だけ回
転移動させることができる。
In this case, since the leg (lower end) of the steel truss 36 is supported by the trolley 22 running in the groove on the upper surface of the moving bed 24, the truss 36 is moved by moving the trolley 22 along the track. It can be rotated and moved. Or,
By pulling or pushing the bogie in a tangential direction with a hydraulic jack or the like while the cart is free, the steel truss 36 can be rotated and moved by a desired angle.

(9) 次ぎに、前記鉄骨トラス36を架設した場所にお
いて、作業ステージ41上で2番目の鉄骨トラス36を架設
構台40および移動ベッド24上の次ぎの台車22間に架設さ
せる(第8図参照)。その架設方法は、前述した通りで
ある(工程(3)〜工程(7))。
(9) Next, at the place where the steel truss 36 is erected, the second steel truss 36 is erected on the work stage 41 between the erection gantry 40 and the next carriage 22 on the moving bed 24 (see FIG. 8). ). The erection method is as described above (step (3) to step (7)).

(10) そして、当該鉄骨トラス36と先に15度回動させ
ておいた1番目の鉄骨トラス36との間のブレース材、つ
なぎ材等の連結材35を施工する。この連結材35の各部材
の長さ寸法は、ジャッキダウン後の変形を考慮して決定
する必要がある。
(10) Then, a connecting material 35 such as a brace material, a connecting material, or the like is installed between the steel truss 36 and the first steel truss 36 that has been previously rotated by 15 degrees. The length dimension of each member of the connecting member 35 needs to be determined in consideration of deformation after jack down.

(11) 次ぎに、当該2番目の鉄骨トラス36を工程
(8)の方法で先頭の鉄骨トラス36と共に15度円周方向
へ回転移動させる。この場合においても、台車22を自走
させてもよいし、先頭の鉄骨トラス36を接線方向にPC鋼
線で引っ張って全体を回転移動させてもよい。
(11) Next, the second steel truss 36 is rotated 15 degrees in the circumferential direction together with the first steel truss 36 by the method of step (8). In this case as well, the carriage 22 may be driven by itself, or the leading steel truss 36 may be pulled tangentially with a PC steel wire and rotated as a whole.

(12) 同様にして、地上に仮置きされた残りの鉄骨ト
ラス36について、前記工程(3)〜工程(8)を繰り返
すことにより、残りの鉄骨トラス36を1ユニットずつ架
設範囲の端部において架設し、順次前方へと15度ずつ回
転移動させる。
(12) Similarly, by repeating the above-mentioned steps (3) to (8) for the remaining steel trusses 36 temporarily placed on the ground, the remaining steel trusses 36 are placed one by one at the end of the installation range. It is erected and sequentially rotated forward by 15 degrees.

このようにして、最後の鉄骨トラス36を架設範囲の端
部に架設することにより、全ての鉄骨トラス36が架設構
台40のピン支承42から放射状に配置されることになり、
子屋根15全体の架設が完了することになる(第9図参
照)。
In this way, by erection of the last steel truss 36 at the end of the erection range, all the steel trusses 36 are arranged radially from the pin bearing 42 of the erection gantry 40,
The construction of the entire sub-roof 15 is completed (see FIG. 9).

[親屋根15の架設] (13) 上記のようにして、子屋根15の架設が完成した
ら、次いで、親屋根14の架設作業を行う。
[Erecting of the parent roof 15] (13) After the erection of the child roof 15 is completed as described above, the erection work of the parent roof 14 is performed.

まず、子屋根15を第9図の如く、親屋根14の架設範囲
の真下に位置させ、架設すべき親屋根14の端部に子屋根
15の端部を合わせる。そして、子屋根15の端部の鉄骨ト
ラス36Aを親屋根14架設用の作業ステージとして活用す
る。したがって、真下の作業ステージ41は不要となるか
ら撤去し、中央の架設構台40はそのまま親屋根14架設用
として残しておく。そして、第10図に示すように、前記
子屋根15の頂部30には芯出しを行った環状のジャッキ付
きピン支承50を設ける。さらに、該ピン支承50側方およ
び前記鉄骨トラス36A上面には、鉄骨トラス31の支持位
置にジャッキ付きローラー支承43、44を設け、移動ベッ
ド24上面には、鉄骨トラス36の下端を円周方向に回転移
動させる凹溝状のスライドレール51を敷設し、スライド
レール51内に滑走台車52を設け、当該滑走台車52に鉄骨
トラス36の下端を支持するピン支承26を設ける。
First, as shown in Fig. 9, the child roof 15 is positioned directly below the area where the parent roof 14 is to be installed, and the child roof 15
Match the 15 ends. The steel truss 36A at the end of the child roof 15 is used as a work stage for erection of the main roof 14. Therefore, the work stage 41 immediately below is unnecessary, so that it is removed, and the center erection gantry 40 is left as it is for erection of the parent roof 14. Then, as shown in FIG. 10, an annular centered pin support 50 with a jack is provided on the top 30 of the sub-roof 15. Further, on the side of the pin bearing 50 and on the upper surface of the steel truss 36A, roller bearings 43 and 44 with jacks are provided at supporting positions of the steel truss 31, and on the upper surface of the moving bed 24, the lower end of the steel truss 36 is provided in a circumferential direction. A slide rail 51 in the form of a groove for rotation and movement is laid, a sliding carriage 52 is provided in the slide rail 51, and a pin bearing 26 for supporting the lower end of the steel truss 36 is provided on the sliding carriage 52.

(14) 地上においては、子屋根15の鉄骨トラス36同様
に、上弦材32、下弦材32、ラチス材34から構成される大
梁2台分を箱型に地組みし、親屋根14を構成する鉄骨ト
ラス31を製作し、各鉄骨トラス31は、鉄骨トラス36同様
の理由により分割し、鉄骨トラスユニットとする。本実
施例においては、各鉄骨トラス31の先端角は7.5度に設
定し、それぞれ遠心方向に4分割する。
(14) On the ground, as in the case of the steel truss 36 of the sub-roof 15, two girders composed of the upper chord 32, the lower chord 32, and the lattice 34 are laid in a box shape to form the parent roof 14. A steel truss 31 is manufactured, and each steel truss 31 is divided for the same reason as the steel truss 36 to form a steel truss unit. In the present embodiment, the tip angle of each steel truss 31 is set to 7.5 degrees, and each is divided into four in the centrifugal direction.

(15) 子屋根15の端部の鉄骨トラス36A上に各鉄骨ト
ラスユニットをクレーン5により吊り上げた後、鉄骨ト
ラス36A上で各鉄骨トラスユニット37を、対応するロー
ラー支承43、44、および移動ベッド24上のピン支承26間
に架設し、隣接する鉄骨トラスユニット同士を溶接等手
段により接合し、これにより鉄骨トラス31全体を接続
し、当該鉄骨トラス31を架設構台40、移動ベッド24の滑
走台車52間に架設する。
(15) After each steel truss unit is lifted by the crane 5 on the steel truss 36A at the end of the sub-roof 15, each steel truss unit 37 is supported on the steel truss 36A, and the corresponding roller bearings 43 and 44, and the moving bed. The steel truss units 31 are connected between the pin bearings 26 on the base 24, and the adjacent steel truss units are joined to each other by welding or the like, thereby connecting the entire steel truss 31. It is erected between 52.

この架設状態では、鉄骨トラス31の上端側は各ローラ
ー支承43、44により支持されるから、鉄骨トラス31から
のスラスト力(水平反力)は各ローラーにより処理さ
れ、架設構台40、鉄骨トラス36Aはスラスト力を受けな
い。
In this erection state, since the upper end side of the steel truss 31 is supported by the roller bearings 43 and 44, the thrust force (horizontal reaction force) from the steel truss 31 is processed by each roller, and the erection gantry 40, the steel truss 36A Does not receive thrust.

(16) 1ユニットの鉄骨トラス31の架設が完了した
ら、中間の鉄骨トラス36A上の各ローラー支承43、44を
ジャッキダウンする。そして、ローラー支承43に支持さ
れた鉄骨トラス31の各弦材32、33の上端部を子屋根15の
頂部13上のピン支承50に対し、現場合わせによるつなぎ
材45を使用して接合し、これにより1ユニットの鉄骨ト
ラス31を完成させる。この場合接合手段としては、前記
した鉄骨トラス36と同様の手段でよい。
(16) When the installation of one unit of the steel truss 31 is completed, the roller bearings 43 and 44 on the intermediate steel truss 36A are jacked down. Then, the upper ends of the respective chords 32, 33 of the steel truss 31 supported by the roller bearing 43 are joined to the pin bearing 50 on the top 13 of the sub-roof 15 by using a joining material 45 by site adjustment, Thus, one unit of the steel truss 31 is completed. In this case, the joining means may be the same as the above-described steel truss 36.

(17) なお、各鉄骨トラス31の上端の収まりについて
は、以下の処理方法もある。
(17) In addition, the following processing method may be used for fitting the upper end of each steel truss 31.

すなわち、第11図に示すように、子屋根15を架設後、
頂部30のピン支承43をジャッキダウンして子屋根15を自
立させる。さらに、架設構台40上面に親屋根14架設用の
第2の架設構台53を子屋根15と独立して設け、架設構台
53上面に芯だしした環状のピン支承42を設ける。この状
態で、架設構台53上面のローラー支承43に鉄骨トラス31
の上端部を支持させ、中間部のローラー支承44をジャッ
キダウンし、最後に鉄骨トラス31の上端部をつなぎ材45
を介してピン支承42に接合する。この方法によれば、親
屋根14の反力によるスラスト力は、子屋根15において処
理されるため、架設構台53にはスラスト力が伝達されな
い利点がある。
That is, as shown in FIG. 11, after the sub-roof 15 is erected,
The pin bearing 43 on the top 30 is jacked down so that the child roof 15 becomes independent. Further, on the upper surface of the erection gantry 40, a second erection gantry 53 for erection of the main roof 14 is provided independently of the child roof 15,
53 A centered annular pin bearing 42 is provided on the upper surface. In this state, the steel truss 31 is attached to the roller bearing 43 on the top of the erection gantry 53.
Of the steel truss 31 and finally connect the upper end of the steel truss 31 with the connecting material 45.
To the pin bearing 42 via. According to this method, since the thrust force due to the reaction force of the main roof 14 is processed in the sub-roof 15, there is an advantage that the thrust force is not transmitted to the erection gantry 53.

(18) 次ぎに、当該鉄骨トラス31をピン支承50を軸中
心として円周方向へ2ユニット分の角度(15度)だけ回
転移動させる。この場合、鉄骨トラス31の脚部(下端
部)は移動ベッド24上面のスライドレール51内の滑走台
車52に支持されているから、滑走台車52をPC鋼線および
ジャッキを用いて引っ張ることにより、滑走台車52をス
ライドレール51内を滑走させ、鉄骨トラス31を回転移動
させることができる。
(18) Next, the steel truss 31 is rotationally moved by an angle of two units (15 degrees) in the circumferential direction around the pin bearing 50 as an axis. In this case, since the leg (lower end) of the steel truss 31 is supported by the sliding carriage 52 in the slide rail 51 on the upper surface of the moving bed 24, the sliding carriage 52 is pulled by using a PC steel wire and a jack. The sliding trolley 52 can slide on the slide rail 51, and the steel truss 31 can be rotated.

(19) さらに、鉄骨トラス36A上で2番目の鉄骨トラ
ス31を架設構台40および移動ベッド24上の次ぎの滑走台
車52間に架設する。その架設方法は、前述した通りであ
る(工程(3)〜工程(7))。
(19) Further, the second steel frame truss 31 is erected on the steel truss 36A between the erection gantry 40 and the next sliding vehicle 52 on the moving bed 24. The erection method is as described above (step (3) to step (7)).

(20) また、当該鉄骨トラス31と先に15度回動させて
おいた1番目の鉄骨トラス31との間のブレース材、つな
ぎ材等の連結材35を施工する。そして、当該2番目の鉄
骨トラス31を工程(8)の方法で先頭の鉄骨トラス31と
共に15度円周方向へ回転移動させる。
(20) In addition, a connecting member 35 such as a brace material or a connecting material between the steel truss 31 and the first steel truss 31 previously rotated by 15 degrees is constructed. Then, the second steel truss 31 is rotated 15 degrees in the circumferential direction together with the first steel truss 31 by the method of step (8).

(21) 同様にして、地上に仮置きされた残りの鉄骨ト
ラス31についても、前記工程(3)〜工程(8)を繰り
返すことにより、残りの鉄骨トラス36を1ユニットずつ
鉄骨トラス36A上にて架設し、連結材35を取り付けた
後、順次前方へと15度ずつ回転移動させる。このように
して、最後の鉄骨トラス31を架設範囲の端部に架設する
ことによって、全ての鉄骨トラス31が架設構台40のピン
支承50から放射状に配置されることになり、親屋根15全
体の架設が完了することになる。
(21) Similarly, for the remaining steel trusses 31 temporarily placed on the ground, the above-mentioned steps (3) to (8) are repeated to place the remaining steel trusses 36 on the steel truss 36A one by one. After installing the connecting member 35, the connecting member 35 is sequentially rotated forward by 15 degrees. In this manner, by erection of the last steel truss 31 at the end of the erection range, all the steel trusses 31 are radially arranged from the pin bearings 50 of the erection gantry 40, and the entire parent roof 15 is The erection will be completed.

(22) 最後に、子屋根15、親屋根14を頂部13において
それぞれ支持しているピン支承42、50を同時にジャッキ
ダウンすることにより、子屋根15、親屋根14の各鉄骨ト
ラス36・・・、31・・・の上端部をいっせいに設計高さ
まで降ろし、親屋根14、子屋根15を自立させるととも
に、頂部30の施工を行い、屋根13全体の施工を完了す
る。また、架設構台40はその後に撤去する。なお、各大
屋根14、子屋根15の付帯工事は架設工事と同時施工によ
り行う。
(22) Finally, by simultaneously jacking down the pin bearings 42 and 50 supporting the child roof 15 and the parent roof 14 at the top 13, respectively, the steel trusses 36 of the child roof 15 and the parent roof 14 are obtained. , 31... Are lowered to the design height at the same time, the parent roof 14 and the child roof 15 are made independent, the top 30 is constructed, and the construction of the entire roof 13 is completed. The erection gantry 40 is subsequently removed. Ancillary work for each large roof 14 and sub-roof 15 will be carried out simultaneously with the erection work.

この実施例によれば、以下のような効果を奏する。 According to this embodiment, the following effects can be obtained.

親屋根14の架設に際しては、既設の子屋根15の端部
の鉄骨トラス36Aをそのまま親屋根14架設用の作業ステ
ージとして活用できるから、新たに作業ステージを組む
必要がなく、親屋根14の架設に要する仮設部材、仮設工
事の省略化、仮設費用の削減を図ることができる。
When installing the parent roof 14, the steel truss 36A at the end of the existing child roof 15 can be used as it is as a work stage for installing the parent roof 14, so there is no need to construct a new work stage. Temporary members and temporary work required for the construction can be omitted, and the cost of temporary construction can be reduced.

また、子屋根15の作業ステージ41は不要であり、撤
去できるから、グラウンド11上には架設構台40のみを残
して親屋根14の架設工事を行うことができ、その間のグ
ラウンド11における同時施工が広く可能である。これに
より、スタジアム10の施工工期の短縮、生産性の向上を
図ることができる。
In addition, since the work stage 41 of the child roof 15 is unnecessary and can be removed, the erection work of the parent roof 14 can be performed while leaving only the erection gantry 40 on the ground 11, and simultaneous construction on the ground 11 during that time can be performed. Widely possible. Thus, the construction period of the stadium 10 can be shortened and productivity can be improved.

親屋根14は、各鉄骨トラス31を子屋根15端部の鉄骨
トラス36A上で1ユニットずつ架設構台40および支持ベ
ッド42間に架設しながら、架設構台40のピン支承42回り
に順次支持ベッド24のスライドレール51上を回転移動さ
せて、屋根全体を架設していくようにしているから、架
設作業が単純な工程の繰り返しであり、架設作業が安全
であり、かつ作業効率が良い。
The main roof 14 is constructed such that each of the steel trusses 31 is erected one by one on the steel truss 36A at the end of the sub-roof 15 between the erection gantry 40 and the support bed 42, and sequentially around the pin bearings 42 of the erection gantry 40. Since the entire roof is erected by rotating on the slide rail 51, the erection work is a repetition of a simple process, the erection work is safe, and the work efficiency is good.

同様に、子屋根15も、上記親屋根14と同様な架設手
順であるから、同様な効果を奏することができる。
Similarly, the sub-roof 15 has the same installation procedure as the main roof 14, so that a similar effect can be obtained.

子屋根15の架設工事においては、中央の架設構台40
と1ユニット架設分の作業ステージ41のみの支保工で足
りる。したがって、全ての鉄骨トラス36に対して支保工
を必要とせず、その支保工の数が大幅に低減されると共
に、支保工に要する鉄骨量が大幅に減る。これにより、
仮設費用の低減化を図ることができる。また、クレーン
5の数は1ユニット分で足り、クレーン5の移動範囲も
一定の狭い範囲で足り、したがって、作業効率がよく、
作業上の安全性も高い。
In the construction work for the sub-roof 15, the central erection gantry 40
It is enough to support only the work stage 41 for one unit. Therefore, no support is required for all the steel trusses 36, the number of supports is greatly reduced, and the amount of steel required for the support is significantly reduced. This allows
Temporary costs can be reduced. Further, the number of the cranes 5 is sufficient for one unit, and the moving range of the cranes 5 is sufficient in a fixed narrow range.
Work safety is also high.

また、子屋根15の架設工事に支保工は鉄骨トラス36
の1ユニット分で足りるから、子屋根15の架設工事にお
いて、それ以外のグラウンド11はオープンスペースであ
り、親屋根14の架設工事と同様にグラウンド11の同時施
工を広く行うことができる。
In addition, the steel truss 36
Therefore, in the construction work of the child roof 15, the other ground 11 is an open space, and the simultaneous construction of the ground 11 can be widely performed similarly to the construction work of the parent roof 14.

各親屋根14、子屋根15の頂部の支持条件を、最初に
ローラー支承43としておき、次ぎに中間部のローラー支
承44をジャッキダウンさせて予め変形させた後に、つな
ぎ材45を介してピン支承42に接合支持させるようにして
いるから、中央の架設構台40は親屋根14、子屋根15の各
鉄骨トラス31、36の反力としてのスラスト力を受けず、
これにより架設構台40の合理的な設計を図ることができ
る。
The support condition of the top part of each parent roof 14 and child roof 15 is first set as a roller bearing 43, and then the roller support 44 in the middle part is jacked down and deformed in advance, and then the pin support is connected via a connecting material 45. Since it is made to be joined and supported by 42, the central erection gantry 40 does not receive the thrust force as the reaction force of each steel truss 31, 36 of the parent roof 14, child roof 15,
Thus, a rational design of the erection gantry 40 can be achieved.

このように、略同一の架設手順により、下層の子屋
根15、上層の親屋根14と順に積み重ねながら架設してい
くことができ、二層、三層、あるいはそれ以上の重層形
のドーム架構の経済的な架設の実現を図ることができ
る。これにより、二枚屋根のみならず、三枚屋根、四枚
屋根といった多数に分割されてなる開閉式屋根の架設に
対しても、好適に本発明の架設工法を用いることができ
る。
In this way, it is possible to construct the lower roof 15 and the upper parent roof 14 by stacking them in this order by using substantially the same construction procedure. Economical construction can be achieved. Accordingly, the erection method according to the present invention can be suitably used for erection of an openable roof which is divided into a large number of parts, such as a three-story roof and a four-story roof, as well as a two-story roof.

また、本実施例では、各鉄骨トラス31・・・、36・
・・を1ユニットずつ吊り上げて架設し、順次回転移動
させる方法を採用しているが、数ユニットずつ架設して
まとめて回転移動させて、屋根を架設する方法を採用し
てもよい。
In the present embodiment, each steel truss 31.
.. Are lifted and erected one unit at a time, and are rotated sequentially. Alternatively, a method of laying several units at a time and rotating and moving them together to lay a roof may be adopted.

「発明の効果」 以上、詳細に説明したように、本発明は、頂部から放
射状に分割されたアーチ状の架構ユニットから構成され
るドーム架構を下部構造上に架設する工法であって、架
設範囲の中央に架設構台を配置し、架設範囲の端部から
前記架構ユニットを1ユニットずつ又は数ユニットずつ
前記架設構台および前記下部構造間に架設しながら、架
設された当該架構ユニットを前記架設構台回りに順次回
転移動させることにより、架構ユニットを放射状に配置
して下層のドーム架構を形成しておき、当該ドーム架構
の端部の架構ユニットを作業ステージに用いて、前記下
層のドーム架構と同一の架設手順により上層のドーム架
構を架設するようにしたことを特徴とするから、以下の
ような効果を奏する。
[Effects of the Invention] As described above in detail, the present invention relates to a method of constructing a dome frame composed of an arch-shaped frame unit radially divided from the top on the lower structure, A erection gantry is arranged at the center of the erection unit, and while the erection unit is erected between the erection gantry and the lower structure one unit or several units at a time from the end of the erection range, the erection unit is rotated around the erection gantry. By sequentially rotating the frame unit, the frame units are radially arranged to form a lower dome frame, and the frame unit at the end of the dome frame is used as a work stage, and the same as the lower dome frame. Since the upper dome frame is erected by the erection procedure, the following effects are obtained.

下層のドーム架構の架設時には支保工が架設範囲の端
部の1ユニット分又は数ユニット分のみでよいから、他
の架設範囲への支保工を必要とし、支保工の数を減らす
と共に、仮設費用の低減化が図れる。また、上層のドー
ム架構の架設時には下層のドーム架構の端部の架構ユニ
ットを作業ステージとして活用でき、下層のドーム架構
と略同一の架設手段により架設するようにしているか
ら、下層のドーム架構の架設時と同様に支保工が要ら
ず、仮設費用のさらなる低減化が図れる。
When the lower dome frame is erected, only one or a few units at the end of the erection area need to be erected. Therefore, erection is required for other erection areas, reducing the number of erections and temporary costs. Can be reduced. Also, when the upper dome frame is erected, the frame unit at the end of the lower dome frame can be used as a work stage, and the dome frame of the lower dome frame is constructed using substantially the same means as the lower dome frame. As in the case of erection, no support work is required, and the cost of temporary construction can be further reduced.

さらには、下層、上層のドーム架構の架設作業は、架
設範囲の端部で略全てが行なわれるから、作業範囲が狭
く、作業能率、作業効率の向上を図ることができ、ま
た、架構ユニット揚重用のクレーンも端部のみで足りる
から、安全作業を確保できる。これにより、上記した仮
設費用の低減化と合わせて、架設費用の大幅な削減を図
ることができる。
Further, since almost all of the work of erection of the lower and upper dome frames is performed at the ends of the erection range, the work range is narrow, and the work efficiency and work efficiency can be improved. A heavy crane is sufficient at the end, so safe work can be ensured. Thereby, the construction cost can be significantly reduced in addition to the above-described reduction in the temporary construction cost.

しかも、上記したように、架設範囲の支保工を減らす
ことができることから、その直下の下部構造の同時施工
が可能となり、生産性の向上を図ることができる。
In addition, as described above, since it is possible to reduce the number of supports in the erection range, it is possible to simultaneously construct the lower structure immediately below the erection range, and it is possible to improve productivity.

このように、本発明のドーム架構の架設工法を用いる
ことによって、極めて経済的な重層形のドーム架構の実
現を安全かつ容易に図ることができる。
As described above, by using the dome frame erection method of the present invention, it is possible to safely and easily realize an extremely economical multi-layer dome frame.

【図面の簡単な説明】[Brief description of the drawings]

第1図ないし第11図はこの発明の一実施例を示すもの
で、第1図は開閉式屋根の平面図、第2図はその断面
図、第3図は子屋根の端部を示す断面図、第4図は親屋
根の端部を示す断面図、第5図(イ)〜(ニ)は開閉式
屋根の作用を示す平面図、第6図は子屋根の架設作業を
示す平面図、第7図はその断面図、第8図は子屋根の架
設作業を示す平面図、第9図は子屋根の架設完了時を示
す平面図、第10図は親屋根の架設作業を示す断面図、第
11図は別方法による親屋根の架設作業を示す断面図、第
12図は架設工法の従来例を示す断面図である。 10……スタジアム、 11……グラウンド、 12……観客席、 13……開閉式屋根、 14……親屋根(上層のドーム架構)、 15……子屋根(下層のドーム架構)、 16……支持構造物(下部構造)、 24……移動ベッド、30……頂部、 31、36……鉄骨トラス(架構ユニット)、 36A……端部の鉄骨トラス、 40……架設構台、 41……作業ステージ。
1 to 11 show an embodiment of the present invention. FIG. 1 is a plan view of an openable roof, FIG. 2 is a sectional view thereof, and FIG. 3 is a sectional view showing an end of a child roof. Fig. 4, Fig. 4 is a sectional view showing the end of the main roof, Figs. 5 (a) to 5 (d) are plan views showing the operation of the openable roof, and Fig. 6 is a plan view showing the work of erection of the child roof. , FIG. 7 is a cross-sectional view thereof, FIG. 8 is a plan view showing the work of erection of the child roof, FIG. 9 is a plan view showing the completion of erection of the child roof, and FIG. Figure, No.
Fig. 11 is a sectional view showing the work of erection of the parent roof by another method.
FIG. 12 is a sectional view showing a conventional example of the erection method. 10… Stadium, 11… Ground, 12… Audience seats, 13… Retractable roof, 14… Parent roof (upper dome frame), 15… Child roof (lower dome frame), 16… Supporting structure (substructure), 24… Movable bed, 30 …… Top, 31, 36 …… Steel truss (frame unit), 36A …… Steel truss at the end, 40 …… Building gantry, 41 …… Work stage.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 平間 敏彦 東京都中央区京橋2丁目16番1号 清水 建設株式会社内 (72)発明者 草間 伊知郎 東京都中央区京橋2丁目16番1号 清水 建設株式会社内 (72)発明者 杉崎 健一 東京都中央区京橋2丁目16番1号 清水 建設株式会社内 (72)発明者 本田 九州男 東京都中央区京橋2丁目16番1号 清水 建設株式会社内 (72)発明者 奥田 修司 東京都中央区京橋2丁目16番1号 清水 建設株式会社内 (72)発明者 瀧上 喜男 東京都港区芝浦4丁目18番32号 株式会 社東京鐵骨橋梁製作所内 (72)発明者 高木 仁 東京都港区芝浦4丁目18番32号 株式会 社東京鐵骨橋梁製作所内 (72)発明者 五月女 康一 東京都港区芝浦4丁目18番32号 株式会 社東京鐵骨橋梁製作所内 (56)参考文献 特開 昭62−242037(JP,A) 特開 平2−292432(JP,A) 特開 昭61−60938(JP,A) 実開 昭53−51446(JP,U) (58)調査した分野(Int.Cl.6,DB名) E04B 7/16 E04B 1/32 102──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Toshihiko Hirama 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Ichiro Kusama 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Construction Inside (72) Inventor Kenichi Sugisaki 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Corporation (72) Inventor Honda Kyushu 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Corporation ( 72) Inventor Shuji Okuda 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Yoshio Takigami 4--18-32 Shibaura, Minato-ku, Tokyo Inside Tokyo Steel Frame Bridge Co., Ltd. 72) Inventor Jin Takagi 4- 18-32 Shibaura, Minato-ku, Tokyo Inside the Tokyo Steel Bridge Bridge Manufacturing Co., Ltd. (72) Koichi Satsuki 4-18-32 Shibaura, Minato-ku, Tokyo (56) References JP-A-62-242037 (JP, A) JP-A-2-292432 (JP, A) JP-A-61-60938 (JP, A) 53-51446 (JP, U) (58) Field surveyed (Int. Cl. 6 , DB name) E04B 7/16 E04B 1/32 102

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】頂部から放射状に分割されたアーチ状の架
構ユニットから構成されるドーム架構を下部構造上に架
設する工法において、架設範囲の中央に架設構台を配置
し、架設範囲の端部から前記架構ユニットを1ユニット
又は数ユニットずつ前記架設構台および前記下部構造間
に架設しながら、架設された当該架構ユニットを前記架
設構台回りに順次回転移動させることにより、架構ユニ
ットを放射状に配置して下層のドーム架構を形成してお
き、当該ドーム架構の端部の架構ユニットを作業ステー
ジに用い、前記下層のドーム架構と同一の架設手順によ
り上層のドーム架構を架設するようにしたことを特徴と
するドーム架構の架設工法。
In a construction method for constructing a dome frame composed of an arch-shaped frame unit radially divided from a top on a lower structure, a erection gantry is arranged at the center of the erection range, and the erection frame is positioned from an end of the erection range. By arranging the frame units one by one or several units between the erection gantry and the lower structure while sequentially rotating the erected frame units around the erection gantry, the frame units are radially arranged. A lower dome frame is formed, and a frame unit at an end of the dome frame is used for a work stage, and an upper dome frame is erected by the same erection procedure as the lower dome frame. Dome frame construction method.
JP9372890A 1990-04-09 1990-04-09 Construction method of dome frame Expired - Fee Related JP2863802B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9372890A JP2863802B2 (en) 1990-04-09 1990-04-09 Construction method of dome frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9372890A JP2863802B2 (en) 1990-04-09 1990-04-09 Construction method of dome frame

Publications (2)

Publication Number Publication Date
JPH03290550A JPH03290550A (en) 1991-12-20
JP2863802B2 true JP2863802B2 (en) 1999-03-03

Family

ID=14090475

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9372890A Expired - Fee Related JP2863802B2 (en) 1990-04-09 1990-04-09 Construction method of dome frame

Country Status (1)

Country Link
JP (1) JP2863802B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115853125B (en) * 2023-02-24 2023-05-02 山西建筑工程集团有限公司 Circular cone-shaped dome steel structure with upper opening and installation method thereof

Also Published As

Publication number Publication date
JPH03290550A (en) 1991-12-20

Similar Documents

Publication Publication Date Title
CN115199051B (en) Construction method of large span canopy for football field
JP2863802B2 (en) Construction method of dome frame
JP2869494B2 (en) Construction method of dome frame
JP6736226B2 (en) Structure and construction method of the structure constructed on the tower-shaped building
JP2985110B2 (en) Construction method of steel roof
JP3212233B2 (en) Power plant construction method using overhead crane
KR100586843B1 (en) Lift-up construction method of roof membrane structure and roof membrane structure
CN113530059A (en) Combined supporting system of retractable roof and building
JPH10110500A (en) Dome roof structure and construction method
JPH07331882A (en) How to build a multi-layer suspension structure
JPH09144197A (en) Method for constructing roof of stadium
JP3122915B2 (en) Single layer truss roof push-up method
JP3212516B2 (en) Construction method of silo by swiveling crane
JP2003268879A (en) Method for constructing roof structure
JPH03260237A (en) Erection of dome structure
JPH0960114A (en) Construction method of dome-like roof
JP2796448B2 (en) Building construction method and building construction equipment used for the construction method
JP2743094B2 (en) How to build a steel dome
Tanno et al. Fukuoka Dome, Japan
JPS584043A (en) Construction of dome type large roof
JP2969545B2 (en) Temporary column support device
JPH06185120A (en) Construction method for upper structure of roof, etc.
JP3110876B2 (en) Dome roof and construction method
JP2745187B2 (en) Rotary building
Matsudo et al. Construction of the Roof of the New National Stadium of Japan Considering Efficiency and Structural Capacity