JP2866903B2 - Construction management method of dynamic compaction method - Google Patents
Construction management method of dynamic compaction methodInfo
- Publication number
- JP2866903B2 JP2866903B2 JP31583490A JP31583490A JP2866903B2 JP 2866903 B2 JP2866903 B2 JP 2866903B2 JP 31583490 A JP31583490 A JP 31583490A JP 31583490 A JP31583490 A JP 31583490A JP 2866903 B2 JP2866903 B2 JP 2866903B2
- Authority
- JP
- Japan
- Prior art keywords
- signal
- acceleration
- construction management
- hammer
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Description
【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、ロープで吊り上げたハンマを所定の高さか
ら落下させて地盤を圧密する動圧密工法の施工管理方法
に関するものである。DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] The present invention relates to a construction management method of a dynamic compaction method for compacting a ground by dropping a hammer suspended by a rope from a predetermined height.
〔従来の技術〕 動圧密装置を用いた工法は地盤改良工法の1つとして
よく知られている。そしてこれの施工管理方法も種々あ
り、その一例として特公昭63−265013号明細書に示され
ているものが一般に行なわれている。[Prior Art] A construction method using a dynamic compaction apparatus is well known as one of ground improvement construction methods. There are various construction management methods, such as the one disclosed in Japanese Patent Publication No. 63-265013 as an example.
この従来の動圧密工法に用いられる装置を第7図で説
明すると、クローラクレーンaのワイヤ巻取りドラムb
にドラム回転検出器cを設け、巻取りドラムbの巻取り
回転量及び回転方向からハンマdの揚程を検出し、これ
によりこのハンマdを落下したときの地盤の沈下量を演
算処理している。An apparatus used in the conventional dynamic compaction method will be described with reference to FIG.
Provided with a drum rotation detector c, detects the lift of the hammer d from the winding rotation amount and the rotation direction of the winding drum b, and thereby calculates the amount of ground subsidence when the hammer d falls. .
またハンマdの地切りを検出するため、巻上げ操作圧
力スイッチe及び揚程を補正するためのブーム角検出器
fを設けている。In addition, a hoisting operation pressure switch e and a boom angle detector f for correcting the lift are provided to detect the hammer d.
そしてこの動圧密装置を用いた従来の施工管理は、各
動圧密装置単体で、しかも有線方式で行なわれており、
複数台での動圧密装置の施工管理は施工管理者がそれぞ
れの動圧密装置の施工データを集めてまわっている。And the conventional construction management using this dynamic consolidation device is performed by each dynamic consolidation device alone and in a wired manner,
The construction manager of a plurality of dynamic consolidation devices is managed by a construction manager by gathering the construction data of each dynamic consolidation device.
上記従来の施工管理方法では、複数台の動圧密装置を
リアルタイムな同時管理ができず、施工管理に多大な時
間を要している。さらに均一な地盤改良の管理が容易で
なかった。In the above-mentioned conventional construction management method, real-time simultaneous management of a plurality of dynamic consolidation apparatuses cannot be performed, and a great deal of time is required for construction management. Further, it was not easy to manage uniform ground improvement.
本発明は上記のことにかんがみなされたもので、複数
台の動圧密装置の施工状況をリアルタイムで、また同時
集中施工管理が可能となり、広い面積にわたる地盤改良
状態を常時把握できるようにした動圧密工法の施工管理
方法を提供することを目的とするものである。The present invention has been made in view of the above, and has provided a dynamic consolidation system capable of real-time monitoring of the construction status of a plurality of dynamic consolidation devices and simultaneous centralized construction management, so that the state of ground improvement over a large area can be constantly grasped. An object of the present invention is to provide a construction management method of a construction method.
上記目的を達成するために、本発明に係る施工管理方
法は、複数台の動圧密装置にて、それぞれのハンマを落
下させて地盤を圧密するようにした動圧密工法におい
て、各動圧密装置よりハンマの加速度、貫入量、落下高
さの地盤改良の施工管理データを無線にて随時送信し、
この各施工管理データを、移動車に搭載された群管理セ
ンタにて受信して処理するようにしている。In order to achieve the above object, the construction management method according to the present invention is a dynamic consolidation method in which a plurality of dynamic consolidation devices are used to drop respective hammers to consolidate the ground. The construction management data of ground improvement of hammer acceleration, penetration amount, and drop height is transmitted wirelessly at any time,
Each of the construction management data is received and processed by the group management center mounted on the mobile vehicle.
1つの群管理センタにて複数圧の動圧密装置の施工状
況をリアルタイムで、また同時集中施工管理が行われ
る。群管理センタは上記動圧密装置の移動に伴って適宜
移動する。At one group management center, the construction status of the dynamic consolidation device of plural pressures is performed in real time and simultaneous centralized construction management is performed. The group management center moves as needed with the movement of the dynamic compaction device.
本発明の実施例を第1図から第6図に基づいて説明す
る。An embodiment of the present invention will be described with reference to FIGS.
第2図において、1は通常一般のクローラクレーンで
あり、第1、第2の巻上げウインチ2,3を備えている。
4は三脚構造にしたタワーで、このタワー4は上記クロ
ーラクレーン1の例えば第1の巻上げウインチ2にて吊
下げられて移動可能となっており、かつクローラクレー
ン1の近傍に垂直状態に設置されている。5はハンマで
あり、このハンマ5はロープ機構6に支持されたチャッ
ク7に連結されている。チャック7は油圧力にて係脱作
動するようになっている。上記チャック7を支持するロ
ープ機構6のロープの一端はタワー4の上部に連結さ
れ、他端はクローラクレーン1の第2の巻上げウインチ
3にて連結されていて、この第2の巻上げウインチ3に
てロープを巻込むことによりチャック7が上昇するよう
になっている。この構成によればチャック7に作用する
荷重のほとんどがタワー4にて支持されるようになる。
タワー4の上端部にはチャック7の上昇限を検出するリ
ミットスイッチ8が備えてある。In FIG. 2, reference numeral 1 denotes a general crawler crane, which includes first and second hoisting winches 2, 3.
Reference numeral 4 is a tower having a tripod structure. The tower 4 is suspended and movable by, for example, a first hoisting winch 2 of the crawler crane 1 and is installed vertically near the crawler crane 1. ing. Reference numeral 5 denotes a hammer, which is connected to a chuck 7 supported by a rope mechanism 6. The chuck 7 is engaged and disengaged by hydraulic pressure. One end of the rope of the rope mechanism 6 supporting the chuck 7 is connected to the upper part of the tower 4, and the other end is connected to the second hoisting winch 3 of the crawler crane 1. The chuck 7 is raised by winding the rope. According to this configuration, most of the load acting on the chuck 7 is supported by the tower 4.
The upper end of the tower 4 is provided with a limit switch 8 for detecting the upper limit of the chuck 7.
上記ハンマ5の支枠5aには、このハンマ5の衝撃加速
度を検出する加速度センサ9と、ハンマ5の地切りを検
出するアーミングセンサ10と、加速度センサ9の検出値
をストアすると共に、無線送信する加速度送信ユニット
11と、送信アンテナ12とが取付けてある。In the support frame 5a of the hammer 5, an acceleration sensor 9 for detecting the impact acceleration of the hammer 5, an arming sensor 10 for detecting the ground breaking of the hammer 5, and a detection value of the acceleration sensor 9 are stored and transmitted wirelessly. Acceleration transmission unit
11 and a transmission antenna 12 are attached.
一方上記クローラクレーン1から離れた適所には、上
記加速度送信ユニット11から送信アンテナ12を介して無
線送信されたデータを受信して所定の処理を行なう群管
理センタ13が移動車に搭載して設置されている。On the other hand, a group management center 13 that receives data wirelessly transmitted from the acceleration transmission unit 11 via the transmission antenna 12 and performs predetermined processing is mounted on a mobile vehicle at an appropriate place away from the crawler crane 1 and installed on a mobile vehicle. Have been.
上記加速度送信ユニット11は第3図に示すようになっ
ていて、14はCPU、15はA/D変換器、16はメモリ(RAM)
である。そして加速度センサ9の検出信号はプリアンプ
17、バッファアンプ18を介してCPU14に入力されるよう
になっている。また19はトリガ信号回路で、このトリガ
信号回路19はコンパレータ20とスレッシュホールド21と
からなり、加速度信号がある一定レベル以上に達したこ
とを判別する比較回路となっている。The acceleration transmission unit 11 is configured as shown in FIG. 3, 14 is a CPU, 15 is an A / D converter, and 16 is a memory (RAM).
It is. The detection signal of the acceleration sensor 9 is a preamplifier.
17, input to the CPU 14 via the buffer amplifier 18. Reference numeral 19 denotes a trigger signal circuit. The trigger signal circuit 19 includes a comparator 20 and a threshold 21, and serves as a comparison circuit for determining whether the acceleration signal has reached a certain level or higher.
またアーミングセンサ10の信号はプリアンプ22、コン
パレータ23からなるアーミング信号回路24を介してCPU1
4に入力されるようになっている。The signal of the arming sensor 10 is sent to the CPU 1 through an arming signal circuit 24 including a preamplifier 22 and a comparator 23.
4 is to be entered.
さらに25はデジタル変調機、26はトラスミッタであ
る。25 is a digital modulator and 26 is a transmitter.
群管理センタ13は第4図に示すように、受信装置27、
パソコン28、CPT29、ハードディスク30からなってい
る。The group management center 13 includes, as shown in FIG.
It consists of a personal computer 28, a CPT 29, and a hard disk 30.
上記構成における作用を以下に説明する。 The operation of the above configuration will be described below.
ハンマ5が落下してこれが接地したときの衝撃加速度
は加速度センサ9にて検出され、この検出した微少信号
は加速度送信ユニット11に入力され、これでプリアンプ
17、バッファアンプ18で増幅され、A/D変換機15でデジ
タル信号に変換され、メモリ16にデータをストアする。The impact acceleration when the hammer 5 falls and touches the ground is detected by the acceleration sensor 9, and the detected small signal is input to the acceleration transmission unit 11, and the
17. The signal is amplified by the buffer amplifier 18, converted into a digital signal by the A / D converter 15, and stored in the memory 16.
ストアが完了すると、加速度センサ9に接続された検
出信号系の電源がOFFとなり、次に送信アンテナ12に接
続した送信信号系の電源が立上り(ON)、メモリ16にス
トアされている加速度信号をデジタル変調機24でデジタ
ル変調され、トランスミッタ25からアンテナ12で送信さ
れる。この制御の全てはCPU14にて行なわれる。When the storing is completed, the power of the detection signal system connected to the acceleration sensor 9 is turned off, the power of the transmission signal system connected to the transmitting antenna 12 rises (ON), and the acceleration signal stored in the memory 16 is restored. The signal is digitally modulated by the digital modulator 24 and transmitted from the transmitter 25 by the antenna 12. All of this control is performed by the CPU 14.
ここにおいて、第1図に示すように、動圧密装置Aは
複数台、ランダムに作業しており、それぞれの加速度送
信ユニット11より上記加速度信号が送信される。Here, as shown in FIG. 1, a plurality of dynamic compaction apparatuses A are working at random, and the acceleration signal is transmitted from each acceleration transmission unit 11.
上記各装置の加速度送信ユニット11より送信されてき
た加速度信号は群管理センタ13の受信装置27で受信さ
れ、パソコン28で処理され、その結果をCRT29に表示す
ると共にハードディスク30にストアしていく。The acceleration signal transmitted from the acceleration transmission unit 11 of each device is received by the receiving device 27 of the group management center 13, processed by the personal computer 28, and the result is displayed on the CRT 29 and stored in the hard disk 30.
上記のように、ハンマ5に取付けた加速度センサ9か
らの信号をリアルタイムで送信するのではなく、一旦メ
モリ16に取込んで電波環境が安定した状態(ハンマ5が
接地して静止した状態)となってから送信するため、信
号のとりこぼしが少ない。また加速度送信ユニット11の
制御をアーミング信号で行なっているので自動計測が可
能となった。As described above, instead of transmitting the signal from the acceleration sensor 9 attached to the hammer 5 in real time, the signal is once taken into the memory 16 and the radio wave environment is stabilized (the hammer 5 is grounded and stopped). Since the signal is transmitted after the signal has been transmitted, there is little signal loss. Further, since the control of the acceleration transmission unit 11 is performed by the arming signal, automatic measurement is possible.
上記加速度信号を自動的に取込むために、信号入力の
有無、信号の取込みを受付けるための準備信号の2種類
の信号がある。前者をトリガ信号、後者をアーミング信
号と呼んでいる。In order to automatically capture the acceleration signal, there are two types of signals: presence or absence of a signal input, and a preparation signal for receiving the signal. The former is called a trigger signal, and the latter is called an arming signal.
トリガ信号はトリガ信号回路19によって作られる。 The trigger signal is generated by the trigger signal circuit 19.
アーミング信号は銃の引金を押える安全装置のような
もので、アーミング信号なしでトリガ信号が入ってもA/
D変換によるデータの取込みが行なわれないシーケンス
になっている。The arming signal is like a safety device that holds down the trigger of the gun.
The sequence does not take in data by D conversion.
この実施例でのアーミング信号はハンマ5の支柱に取
付けた2枚の歪ゲージ10a,10bの変化により信号を取出
している。The arming signal in this embodiment is obtained by changing the two strain gauges 10a and 10b attached to the column of the hammer 5.
そしてこのアーミング信号はハンマ5の引上げにより
発生し、充分なレベルと一定時間Δtに達しない場合
は、信号としての有効性をCPU14が判別し、アーミング
を確実なものにしている。The arming signal is generated by pulling up the hammer 5, and when the level does not reach a sufficient level and a predetermined time Δt, the CPU 14 determines the validity of the signal and assures arming.
第5図はアーミング確定とトリガ信号によるデータ取
込みを示すもので、ハンマ5が地切りされてアーミング
信号回路24のコンパレータ23の出力が立上がると、一定
時間Δt経過後アーミングが確定される。アーミングが
確定するとCPU14は加速度センサアップ系への電源がON
となり、加速度センサのオーバトランスの準備を行な
い、信号の入力を待ち、0.5秒後スタンバイ状態とな
る。その後A/D変換器15は随時データを取込み、メモリ1
6に格納し続ける。FIG. 5 shows the determination of the arming and the data acquisition by the trigger signal. When the hammer 5 is grounded and the output of the comparator 23 of the arming signal circuit 24 rises, the arming is determined after a lapse of a predetermined time Δt. When arming is confirmed, the CPU 14 turns on the power to the acceleration sensor up system
Then, the over-transformer of the acceleration sensor is prepared, a signal input is waited, and a standby state is entered after 0.5 seconds. After that, the A / D converter 15 fetches data from time to time,
Continue to store in 6.
加速度データは、ハンマ5が落下をはじめるとマイナ
スになり、接地した瞬間t1より瞬間的に上昇する。この
ときトリガ信号が発生し、この値がスレッシュホールド
21のレベルを越えると、このときの取込み確定データを
メモリ16に取込み、この取込みが終了後、アンプ系の電
源をOFFにして送信系の電源をONにして、送信周波数を
セッティングし、上記メモリ16内のデータを送信する。
そして送信終了後、送信系の電源をOFFにする。以上の
作動が動圧密終了まで繰返される。Acceleration data will become negative when the hammer 5 starts to fall, it rises instantaneously from the moment the ground t 1. At this time, a trigger signal is generated and this value is
When the level exceeds 21 levels, the captured data at this time is loaded into the memory 16, and after this loading is completed, the power supply of the amplifier system is turned off, the power supply of the transmission system is turned on, and the transmission frequency is set. Send the data in 16.
Then, after the transmission is completed, the power of the transmission system is turned off. The above operation is repeated until the dynamic consolidation ends.
群管理センタ13では、上記各加速度送信ユニット11か
らの送信内容を受信し、これに接続したデータ処理ユニ
ットで所定の処理が行なわれる。In the group management center 13, the transmission content from each of the acceleration transmission units 11 is received, and a predetermined process is performed in the data processing unit connected thereto.
このとき、加速度センサ9による検出波形から上記ハ
ンマ5の接地時の加速度のほかに貫入量もわかる。At this time, in addition to the acceleration when the hammer 5 touches the ground, the penetration amount can be known from the waveform detected by the acceleration sensor 9.
すなわち、第5図において、落下始めt1から接地加速
度の立上がり点t2までの時間を群管理センタ13で処理す
ることにより求めることができる。That may be determined by the in Figure 5, treatment with group management center 13 the time from the drop beginning t 1 to the rising point t 2 of the ground acceleration.
第6図は上記群管理センタ13にて受信された1打撃点
ごとのデータを示すもので、図中aは加速度、bは貫入
量(累計)を示す。S1、S2…はそれぞ1個所づつの動圧
密パスを示す。FIG. 6 shows data for each hitting point received by the group management center 13. In the drawing, a indicates acceleration, and b indicates the amount of penetration (total). S 1 , S 2, ... Indicate one dynamic consolidation path.
ランダムに作業している各動圧密装置A、A…は、そ
れぞれにおいて、予定打撃数が終了するか、目標地盤改
良状態になれば、次のポイントに移動する。そのとき、
群管理センタ13は各動圧密装置Aごとの施工状態を把握
して、各動圧密装置Aのオペレータに、時々刻々の施工
状況を表示すると共に、次の作業メッセージ等を無線に
てオペレータ席に設置しているオペレーションユニット
に指示を与え、施工状況をコントロールし、管理してい
る。また毎日の施工管理はプリントアウトしており、改
良地盤の施工管理データは全てハードディスクにストア
される。Each of the dynamic consolidation devices A, A,..., Which are working at random, moves to the next point when the expected number of impacts ends or the target ground is improved. then,
The group management center 13 grasps the construction state of each dynamic compaction apparatus A, displays the construction situation every moment to the operator of each dynamic compaction apparatus A, and transmits the next work message and the like to the operator seat by radio. It gives instructions to the installed operation units to control and manage the construction status. The daily construction management is printed out, and all the construction management data of the improved ground is stored on the hard disk.
なお上記実施例では貫入量は加速度信号の波形から群
管理センタ13に求めるようにした例を示したが、これは
他のやり方でもよい。In the above-described embodiment, an example is described in which the penetration amount is obtained from the group management center 13 from the waveform of the acceleration signal. However, this may be another method.
すなわち第2図において、タワー4の頂部に、ハンマ
5が地切りしてからリミットスイッチ8に当接する位置
までの上昇距離を、ロープの移動長さから検出するロー
タリエンコーダ31を設け、このロータリエンコーダ31か
らの検出信号を機体に装備したランニングユニット32に
入力する。この上昇距離は貫入量の変化により徐々に変
化するから、各ストローク毎に差をとることにより貫入
量が算出される。That is, in FIG. 2, a rotary encoder 31 is provided at the top of the tower 4 for detecting, based on the moving length of the rope, a rising distance from a position at which the hammer 5 breaks down to a position where the hammer 5 contacts the limit switch 8. The detection signal from 31 is input to the running unit 32 mounted on the body. Since this rising distance changes gradually with the change in the amount of penetration, the amount of penetration is calculated by taking a difference for each stroke.
ランニングユニット32は入力された検出値はタワー4
の頂部に設けらた第2の送信アンテナ33より群管理セン
タ13へ送信される。The running unit 32 detects the input detection value as the tower 4
Is transmitted to the group management center 13 from the second transmission antenna 33 provided at the top of the group.
この場合、群管理センタ13ではこの第2の送信アンテ
ナ33からの信号とハンマ5の加速度送信ユニット11から
の信号の双方が入力され、この両信号をパソコン28で処
理する。In this case, both the signal from the second transmitting antenna 33 and the signal from the acceleration transmitting unit 11 of the hammer 5 are input to the group control center 13, and both signals are processed by the personal computer 28.
本発明によれば、複数台の動圧密装置の施工状況をリ
アルタイムで、また同時集中施工管理が可能となり、広
い面積にわたる地盤改良状態を常時把握できる。ADVANTAGE OF THE INVENTION According to this invention, the construction status of a plurality of dynamic compaction apparatuses can be managed in real time and simultaneously centralized construction management, and the ground improvement state over a large area can be always grasped.
そして特に本発明によれば、移動車に搭載された群管
理センタにて上記各動圧密装置からの施工管理データを
送信するようにしたことにより、作業の進捗状況に応じ
て変化する複数台の動圧密装置の配置態形に合わせて最
適の位置に群管理センタを逐次移動でき、作業の進捗に
応じて移動する動圧密装置の各ポイント毎の施工状況を
正確に管理することができる。And, in particular, according to the present invention, the group management center mounted on the mobile vehicle transmits the construction management data from each of the dynamic consolidation devices, so that a plurality of units changing according to the progress of the work are provided. The group management center can be sequentially moved to an optimum position in accordance with the arrangement of the dynamic compaction device, and the construction status of each point of the dynamic compaction device that moves according to the progress of the work can be accurately managed.
図面は本発明の実施例を示すもので、第1図は施工管理
システムを示す全体説明図、第2図は動圧密工法を実施
するための装置を概略的に示す構成説明図、第3図はハ
ンマ側に備えた検出手段を示すブロック図、第4図は地
上側に備える群管理センタを示すブロック図、第5図は
検出データの検出状態を示すタイムチャート、第6図は
施工管理波形を示す線図である。第7図は従来の施工管
理システムに用いられる動圧密装置の構成説明図であ
る。 1はクローラクレーン、2,3は巻上げウインチ、4はタ
ワー、5はハンマ、6はロープ機構、7はチャック、9
は加速度センサ、10はアーミングセンサ、11は加速度送
信ユニット、12は送信アンテナ、13は群管理センタ、14
はCPU、16はメモリ、24はアーミング信号回路、25は受
信装置、26はパソコン、27はCRT、28はハードディス
ク。Drawings show an embodiment of the present invention, FIG. 1 is an overall explanatory view showing a construction management system, FIG. 2 is a structural explanatory view schematically showing an apparatus for performing a dynamic compaction method, FIG. Is a block diagram showing detection means provided on the hammer side, FIG. 4 is a block diagram showing a group management center provided on the ground side, FIG. 5 is a time chart showing a detection state of detection data, and FIG. 6 is a construction management waveform. FIG. FIG. 7 is a configuration explanatory view of a dynamic compaction device used in a conventional construction management system. 1 is a crawler crane, 2 and 3 are hoisting winches, 4 is a tower, 5 is a hammer, 6 is a rope mechanism, 7 is a chuck, 9
Is an acceleration sensor, 10 is an arming sensor, 11 is an acceleration transmission unit, 12 is a transmission antenna, 13 is a group management center, 14
Is a CPU, 16 is a memory, 24 is an arming signal circuit, 25 is a receiving device, 26 is a personal computer, 27 is a CRT, and 28 is a hard disk.
フロントページの続き (72)発明者 二宮 康治 東京都港区赤坂4丁目9番9号 日本国 土開発株式会社内 (72)発明者 渡辺 篤 東京都港区赤坂4丁目9番9号 日本国 土開発株式会社内 (72)発明者 逢沢 正行 東京都港区赤坂4丁目9番9号 日本国 土開発株式会社内 (56)参考文献 特開 昭58−106021(JP,A) 特開 昭63−265013(JP,A) (58)調査した分野(Int.Cl.6,DB名) E02D 3/046Continuing on the front page (72) Inventor Koji Ninomiya 4-9-9 Akasaka, Minato-ku, Tokyo Inside Soil Development Co., Ltd. (72) Inventor Atsushi Watanabe 4-9-9 Akasaka, Minato-ku, Tokyo Sat, Japan Inside the Development Co., Ltd. (72) Inventor Masayuki Aizawa 4-9-1-9 Akasaka, Minato-ku, Tokyo Japan Soil Development Co., Ltd. (56) References JP-A-58-106021 (JP, A) JP-A-63- 265013 (JP, A) (58) Field surveyed (Int. Cl. 6 , DB name) E02D 3/046
Claims (1)
マを落下させて地盤を圧密するようにした動圧密工法に
おいて、 各動圧密装置よりハンマの加速度、貫入量、落下高さの
地盤改良の施工管理データを無線にて随時送信し、 この各施工管理データを、移動車に搭載された群管理セ
ンタにて受信して処理するようにしたことを特徴とする
動圧密工法の施工管理方法。A dynamic consolidation method in which a plurality of dynamic compaction devices drop respective hammers to consolidate the ground, wherein the ground of the acceleration, penetration amount, and drop height of the hammer from each dynamic compaction device. The construction management of the dynamic consolidation method characterized in that the construction management data of the improvement is transmitted by radio at any time, and each of the construction management data is received and processed by the group management center mounted on the mobile vehicle. Method.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP31583490A JP2866903B2 (en) | 1990-11-22 | 1990-11-22 | Construction management method of dynamic compaction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP31583490A JP2866903B2 (en) | 1990-11-22 | 1990-11-22 | Construction management method of dynamic compaction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH04189913A JPH04189913A (en) | 1992-07-08 |
| JP2866903B2 true JP2866903B2 (en) | 1999-03-08 |
Family
ID=18070135
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP31583490A Expired - Fee Related JP2866903B2 (en) | 1990-11-22 | 1990-11-22 | Construction management method of dynamic compaction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2866903B2 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005068918A (en) * | 2003-08-27 | 2005-03-17 | Giken Seisakusho Co Ltd | Work environment monitoring system and work environment monitoring work execution method |
| CN103469784A (en) * | 2012-06-08 | 2013-12-25 | 北汽福田汽车股份有限公司 | Hoisting device for dynamic compactor and dynamic compactor |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US11274808B2 (en) | 2010-06-17 | 2022-03-15 | Rtc Industries, Inc. | LED lighting assembly and method of lighting for a merchandise display |
| CN103510502B (en) * | 2013-09-27 | 2015-07-08 | 同济大学 | Real-time monitoring method and system for dynamic compaction machine construction based on impact acceleration measurement of rammer |
| CN106836178A (en) * | 2017-02-14 | 2017-06-13 | 杭州杭重工程机械有限公司 | A kind of dynamic compaction machinery and its control method |
| CN107843743B (en) * | 2017-09-27 | 2020-01-10 | 上海申元岩土工程有限公司 | Dynamic compaction construction data acquisition method based on impact acceleration |
| CN115369850A (en) * | 2021-05-20 | 2022-11-22 | 湖南三一智能控制设备有限公司 | Rammer center positioning method and device and dynamic compaction machine |
| CN114635409A (en) * | 2022-04-21 | 2022-06-17 | 北京瑞明建筑设计院有限公司 | Dynamic compaction method and system for deep layer in hole with quality control of dynamic parameters of rammer and rope body |
| CN119577899B (en) * | 2024-11-15 | 2025-09-12 | 中南大学 | Quality control method and system for roadbed dynamic compaction construction based on rammer dynamic response |
-
1990
- 1990-11-22 JP JP31583490A patent/JP2866903B2/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005068918A (en) * | 2003-08-27 | 2005-03-17 | Giken Seisakusho Co Ltd | Work environment monitoring system and work environment monitoring work execution method |
| CN103469784A (en) * | 2012-06-08 | 2013-12-25 | 北汽福田汽车股份有限公司 | Hoisting device for dynamic compactor and dynamic compactor |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH04189913A (en) | 1992-07-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2866903B2 (en) | Construction management method of dynamic compaction method | |
| CA2479782A1 (en) | Wireless apparatus and method for analysis of driven piles | |
| EP0695420B1 (en) | Monitoring soil compaction | |
| CN105043445B (en) | A remote monitoring system for dynamic compaction quality and its working method | |
| US10232578B2 (en) | Blow count optimization | |
| CN207437065U (en) | Hole device is examined in a kind of ultrasonic pouring stake | |
| JP2011127287A (en) | Construction method and apparatus for compacting subaqueous mound | |
| CN111379558A (en) | Intelligent measurement system and method for drilling data for percussion drilling | |
| CN116025023B (en) | Breaking hammer control method and device, breaking hammer system and storage medium | |
| US11091892B2 (en) | Soil compaction method using a laser scanner | |
| CN104763000A (en) | Detection method for completeness of foundation pile | |
| KR101071967B1 (en) | Method and machine for dynamic ground compaction | |
| EP1518027B1 (en) | Drop mass compaction of soil | |
| CN212317973U (en) | Intelligent drilling data measuring system for percussion drilling | |
| CN107843743B (en) | Dynamic compaction construction data acquisition method based on impact acceleration | |
| JP2866904B2 (en) | Dynamic consolidation equipment | |
| JP7215785B1 (en) | RIPPLE FOUNDATION CONSTRUCTION SYSTEM AND RIPPLE FOUNDATION CONSTRUCTION METHOD | |
| WO2025185160A8 (en) | Method for monitoring compaction settlement of dynamically compacted foundation by means of multi-factor sensing | |
| CN114964117A (en) | Detection device and detection method of pile sinking depth, penetration degree and rebound amount of hammered pile | |
| JPH073794A (en) | Measuring system of penetration depth of elongating body into ground | |
| KR102699067B1 (en) | Pile penetration measurement device and a pile driver that can measure the penetration of piles | |
| JPH01256621A (en) | Method for compacting ground consisting of sand, gravel, coarse alluvium and crushed stone | |
| US20050129467A1 (en) | Drop mass compaction of soil | |
| CN209353385U (en) | A kind of existing building pile's integrity testing device that can repeat hammering automatically | |
| CN217580070U (en) | Intelligent crawler-type dynamic compaction machine force measuring device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |