JP2869764B2 - Reservoir construction method - Google Patents
Reservoir construction methodInfo
- Publication number
- JP2869764B2 JP2869764B2 JP35527593A JP35527593A JP2869764B2 JP 2869764 B2 JP2869764 B2 JP 2869764B2 JP 35527593 A JP35527593 A JP 35527593A JP 35527593 A JP35527593 A JP 35527593A JP 2869764 B2 JP2869764 B2 JP 2869764B2
- Authority
- JP
- Japan
- Prior art keywords
- slab
- outer peripheral
- girder
- cast
- peripheral block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Sewage (AREA)
Description
【0001】[0001]
【産業上の利用分野】河川に流れ込む雨水を一時的に貯
水し、河川が減水した時点で放水する調整池の構築工
法。[Industrial application] A construction method of a regulating pond that temporarily stores rainwater flowing into a river and discharges water when the river is reduced.
【0002】[0002]
【従来技術】従来のこの種調整池は図8▲a▼に示すよ
うにプレキャストのボックスカルバート101,101
で底板102、蓋板103でつなぎ合わせたもの、図8
▲b▼のようにL字型のプレキャストブロック104,
104を向い合わせ、蓋板106とプレキャストの平板
105とでその境い目を仕切るものなどが用いられてい
る。しかしながら、プレキャストのブロックを用いるこ
とは、工期が短くてすむ利点はあるが、コストが嵩む難
点がある。2. Description of the Prior Art As shown in FIG.
FIG. 8 shows a bottom plate 102 and a lid plate 103 joined together.
L-shaped precast block 104 as shown in ▲ b ▼
The one that faces 104 and partitions the boundary between the cover plate 106 and the precast flat plate 105 is used. However, using a precast block has the advantage of shortening the construction period, but has the disadvantage of increasing costs.
【0003】一方この後調整池全体を場所打ち施工する
と、工期が著るしく長くなる難点がある。特に上床版を
場所打ち施工すると、型枠にコンクリートの重量を支持
する支持装置が必要であり、しかも、コンクリートの養
生期間中型枠を設置しなければならない。このため作業
工程がきわめて煩雑となる。[0003] On the other hand, if the whole regulating pond is subsequently cast in place, there is a problem that the construction period becomes extremely long. In particular, when the upper slab is cast in place, a supporting device for supporting the weight of the concrete is required for the formwork, and the formwork must be installed during the curing of the concrete. For this reason, the work process becomes extremely complicated.
【0004】[0004]
【発明が解決しようとする課題】調整池の構築をできる
だけ工期を短く、しかも、コストを安くすること。およ
び施工の設計許容範囲を大きくすること。The object of the present invention is to reduce the construction period of a regulating pond as much as possible and to reduce the cost. And increase the design tolerance of construction.
【0005】[0005]
【技術的手段】第1工程: 第1工程として角部外周縁ブロック2、直線部外周縁ブ
ロック3で囲まれた調整池予定区域内に所要箇所に桁受
部1bを有し、上床版定着鉄筋1aを直立させ、底板定
着鉄筋1cを有する柱1を基礎b上に建て込み、外周縁
ブロック2,3の桁受部3bと、柱1の桁受部1bとの
間に直立した上床版定着鉄筋4aを植設した桁4を懸架
する。 第2工程: 底板に場所打ちコンクリート7を打設する。 第3工程: 桁4、柱1、角部外周縁ブロック2、直線部外周縁ブロ
ック3により囲まれた部分に、それらに直立して植設さ
れた上床版定着鉄筋2a,3a,4aに型枠床版8をそ
の周縁が当接するように載置する。 第4工程: 上床版定着鉄筋2a,3a,4aの先端を折り曲げて、
上床版場所打ちコンクリート9を打設して上床版Uを形
成する。[Technical Means] First Step: As a first step, a girder receiving section 1b is provided at a required place in a regulating pond scheduled area surrounded by a corner outer peripheral block 2 and a straight outer peripheral block 3 , and the upper floor slab is fixed. The rebar 1a is erected, the column 1 having the bottom plate anchoring rebar 1c is erected on the foundation b, and the upper slab is erected between the girder receiving portion 3b of the outer peripheral block 2, 3 and the girder receiving portion 1b of the column 1. The girder 4 on which the anchoring reinforcing bar 4a is planted is suspended. Second step: Cast-in-place concrete 7 is cast on the bottom plate. Third step: The upper floor slab anchoring rebars 2a, 3a, 4a are erected upright on the portion surrounded by the girder 4, the pillar 1, the corner outer peripheral block 2, and the straight outer peripheral block 3. The frame floor slab 8 is placed so that its peripheral edge abuts. Fourth step: By bending the tips of the upper floor slab anchoring reinforcing bars 2a, 3a, 4a,
The upper slab U is formed by casting the cast-in-place concrete 9.
【0006】[0006]
【作用】特に上床版Uをプレキャストの床版型枠8上に
上床版場所打ちコンクリート9を施工して形成したの
で、場所打ち施工のみによる上床版の施工に比べて型枠
の設置工程がきわめて簡易化される。[Function] In particular, since the upper slab U is formed by casting the upper slab cast-in-place concrete 9 on the precast slab form 8, the installation process of the form slab is extremely complicated compared to the construction of the upper slab by only the cast-in-place construction. Simplified.
【0007】また柱1は十の字断面としたので少ない素
材で十分の強度が得られ、かつ、その上床版定着鉄筋1
aはプレキャストの型枠床板8のつなぎ目の補強として
有効である。Further, since the pillar 1 has a cross-shaped cross section, sufficient strength can be obtained with a small amount of material, and the upper floor slab fixing steel 1
“a” is effective as reinforcement of the joint of the precast form floor panel 8.
【0008】[0008]
【実施例】以下、本発明工法の実施例について説明す
る。EXAMPLES Examples of the method of the present invention will be described below.
【0009】第1工程:まづ、調整池部分を掘削後、基
礎bを構築し(図7)、図4に示すように掘削部分を角
部外周縁ブロック2、直線部外周縁ブロック3で囲み、
所定箇所に柱1を建て込む。First step: First, after excavating the regulating pond portion, the foundation b is constructed (FIG. 7), and the excavated portion is formed by the corner outer peripheral block 2 and the straight portion outer peripheral block 3 as shown in FIG. Box,
Pillar 1 is erected at a predetermined location.
【0010】柱1は図1,図2に示すように断面十の字
形をなし、頂部に桁受部1bを設ける。また桁受部1b
の頂面には上床版用定着鉄筋1aが直立して植設されて
いる。The column 1 has a cross-shaped cross section as shown in FIGS. 1 and 2, and a girder receiving portion 1b is provided at the top. Girder receiving part 1b
An anchoring reinforcing bar 1a for the upper deck is planted upright on the top surface of the slab.
【0011】また柱1の下端部には図3に示すように底
板用定着鉄筋1cが鉄筋用穴1dに植設されている。す
なわち、柱1は中空で使用中水が中空断面内に流通され
る。1vはレベリング調整用ボルトである。角部外周縁
ブロック2、直線部外周縁ブロック3にはそれぞれ、上
床版用定着鉄筋2a,3aが直立して、底板用定着鉄筋
2b,3cが水平方向に植設されている。また、図2,
図4に示すように直線部外周縁ブロック3には桁受け凹
所3bが設けられている。つぎに図5のように直線部外
周縁ブロック3の桁受け凹所3bと、柱1の桁受け部1
bの間に桁4を掛け渡す。桁4には図2に示すように、
上床版用定着鉄筋4aが直立のまま植設されている。桁
4と柱1は接続鋼板5を両側から当接し、接続ボルト5
vで接続する。At the lower end of the column 1, as shown in FIG. 3, a fixing reinforcing bar 1c for a bottom plate is implanted in a hole 1d for a reinforcing bar. That is, the pillar 1 is hollow, and the in-use water flows through the hollow section. 1v is a leveling adjustment bolt. Fixing rebars 2a, 3a for the upper deck are erected on the corner outer peripheral block 2 and the straight portion outer peripheral block 3, respectively, and the fixing rebars 2b, 3c for the bottom plate are planted in the horizontal direction. Also, FIG.
As shown in FIG. 4, the linear portion outer peripheral edge block 3 is provided with a girder receiving recess 3b. Next, as shown in FIG. 5, the girder receiving recess 3b of the straight portion outer peripheral edge block 3 and the girder receiving portion 1
Multiply digit 4 between b. In digit 4, as shown in FIG.
An anchoring reinforcing bar 4a for the upper floor slab is planted in an upright state. The girder 4 and the column 1 abut the connecting steel plate 5 from both sides, and the connecting bolt 5
Connect with v.
【0012】第2工程:図4に示すように底板場所打ち
コンクリート7が底板用定着鉄筋1c,2b,3cを内
蔵して打設される。Second step: As shown in FIG. 4, the cast-in-place concrete 7 is cast with the anchoring rebars 1c, 2b, 3c for the bottom plate incorporated therein.
【0013】第3工程:つぎに、桁4、柱1、角部外周
縁ブロック3、直線部外周縁ブロック2の上床版用定着
鉄筋4a,1a,2a,3aの内側に図5のように型枠
床版8を載置する。Third step: Next, as shown in FIG. 5, inside the fixing bars 4a, 1a, 2a, 3a for the upper floor slab, the spar 4, the pillar 1, the corner outer peripheral block 3, and the straight outer peripheral block 2. The form floor slab 8 is placed.
【0014】第4工程:最後に上床版用定着鉄筋1a,
2a,3a,4aのそれぞれを直立状態から先端を折り
曲げ、上床版場所打ちコンクリート9を打設し、上床版
Uを構築する。Fourth step: Finally, the anchoring reinforcing bar 1a for the upper slab,
The top of each of 2a, 3a, and 4a is bent from an upright state, and an upper deck slab cast-in-place concrete 9 is cast to construct an upper deck slab U.
【0015】なお、図6は第1、第2工程、第3工程、
第4工程、を順を追って示してある。また図7は第4工
程終了時点の図6のf7−f7断面図である。FIG. 6 shows a first process, a second process, a third process,
The fourth step is shown in order. FIG. 7 is a cross-sectional view taken along the line f7-f7 in FIG. 6 at the end of the fourth step.
【0016】[0016]
▲a▼ 場所打ち施工すると、コストが比較的高くなる
柱1、桁4、上床版8をプレキャストとしたので、場所
打ち施工する場合に比ベコストが著るしく低下できる。
特に上床版Uをプレキャストの型枠床版8上に上床版場
所打ちコンクリート9を打設して施工したので、型枠の
施工が著るしく簡易化されるとともに、プレキャストの
みによる施工に比べて設計許容範囲が拡大される。(A) When the cast-in-place construction is performed, since the pillar 1, the girder 4, and the upper floor slab 8, which are relatively expensive, are precast, the cost can be significantly reduced compared to the cast-in-place construction.
In particular, since the upper slab U was cast with the upper slab cast-in-place concrete 9 on the precast form slab 8, the construction of the formwork was remarkably simplified, and compared with the construction using only the precast. The design tolerance is expanded.
【0017】▲b▼ 柱1は十の字形の断面としたた
め、軽量で大きい強度が得られる。また柱1頂面の上床
版定着鉄筋1aは床版型枠8のつなぎ目の補強に役立
つ。(B) Since the column 1 has a cross-shaped cross, light weight and high strength can be obtained. In addition, the upper slab fixing reinforcing bar 1a on the top surface of the column 1 serves to reinforce the joint of the slab formwork 8.
【図1】 柱1の上部斜視図、FIG. 1 is a top perspective view of a pillar 1,
【図2】 柱1、角部外周縁ブロック2、直線部外周縁
ブロック3、桁4、接続鋼板5の斜視図、FIG. 2 is a perspective view of a pillar 1, a corner outer peripheral block 2, a straight outer peripheral block 3, a girder 4, and a connecting steel plate 5,
【図3】 柱1の底板部分の斜視図、FIG. 3 is a perspective view of a bottom plate portion of the pillar 1,
【図4】 桁4を取付ける前の外周縁ブロック部分の平
面図、FIG. 4 is a plan view of an outer peripheral block before mounting the beam 4;
【図5】 同じく桁4を取付け、型枠床版8を載置した
ときの平面図、FIG. 5 is a plan view when the spar 4 is attached and the form floor slab 8 is placed,
【図6】 全体平面図、FIG. 6 is an overall plan view,
【図7】 図6f7−f7断面図、FIG. 7 is a sectional view of FIG. 6f7-f7,
【図8】 ▲a▼ 従来の調整池の施工例、 ▲b▼ 同じく他の施工例、[Fig. 8] ▲ a ▼ Construction example of conventional regulating pond, ▲ b ▼ Other construction example,
【符号の説明】 1:柱、1a:上床版定着鉄筋、1b:桁受部、1c:
底板定着鉄筋、1d:鉄筋用穴、1v:レベリング調整
用ボルト、2:角部外周縁ブロック、2a:上床版定着
鉄筋、2b:底板定着鉄筋、3:直線部外周縁ブロッ
ク、3a:上床版定着鉄筋、3b:桁受凹所、3c:底
板定着鉄筋、4:桁、4a:上床版定着鉄筋、5:接続
鋼板、5v:接続ボルト、6:型枠床版、7:底板場所
打ちコンクリート、8:型枠床版、9:上床版場所打ち
コンクリート、U:上床版、b:基礎。[Explanation of Signs] 1: Pillar, 1a: Upper floor slab fixing reinforcing bar, 1b: Girder receiver, 1c:
Bottom plate anchoring bar, 1d: Hole for reinforcing bar, 1v: Leveling adjustment bolt, 2: Corner outer peripheral block, 2a: Top floor anchoring bar, 2b: Bottom plate anchoring bar, 3: Linear outer edge block, 3a: Upper floor slab Anchored reinforcing bar, 3b: girder receiving recess, 3c: bottom plate anchoring bar, 4: girder, 4a: upper deck slab anchoring bar, 5: connecting steel plate, 5v: connecting bolt, 6: formwork floor slab, 7: bottom plate cast-in-place concrete , 8: Formwork slab, 9: Upper slab cast-in-place concrete, U: Upper slab, b: Foundation.
Claims (2)
直線部外周縁ブロック3で囲まれた調整池予定区域内に
所要箇所に桁受部1bを有し、上床版定着鉄筋1aを直
立させ、底板定着鉄筋1cを有する柱1を基礎b上に建
て込み、外周縁ブロック2,3の桁受部3bと、柱1の
桁受部1bとの間に直立した上床版定着鉄筋4aを植設
した桁4を懸架し、 第2工程として、底板に場所打ちコンクリート7を打設
し、第3工程として、桁4、柱1、角部外周縁ブロック
2、直線部外周縁ブロック3により囲まれた部分に、そ
れらに直立して植設された上床版定着鉄筋2a,3a,
4aに型枠床版8をその周縁が当接するように載置し、
第4工程として、上床版定着鉄筋2a,3a,4aの先
端を折り曲げて、上床版場所打ちコンクリート9を打設
して上床版Uを形成する、 ことを特徴とする調整池構築工法。As a first step, a corner outer peripheral block 2 ,
A girder receiving portion 1b is provided at a required place in the planned reservoir area surrounded by the straight portion outer peripheral block 3 and the upper floor slab anchoring bar 1a is erected, and the column 1 having the bottom plate anchoring bar 1c is built on the foundation b. And a girder 4 in which an upright slab fixing steel bar 4a is planted is suspended between the girder receiving portions 3b of the outer peripheral blocks 2 and 3 and the girder receiving portion 1b of the column 1. As a second step, the girder 4 is attached to the bottom plate. The cast-in-place concrete 7 is cast, and as a third step, the upper floor is planted upright on the portion surrounded by the girder 4, the pillar 1, the corner outer peripheral block 2, and the straight outer peripheral block 3. Plate anchoring rebars 2a, 3a,
4a, the formwork slab 8 is placed so that the periphery thereof abuts,
As a fourth step, an upper deck slab U is formed by bending the tips of the upper deck slab anchoring rebars 2a, 3a, 4a and casting the upper deck slab cast-in-place concrete 9.
の調整池構築工法。2. The regulating pond construction method according to claim 1, wherein the pillar 1 has a cross-shaped cross section.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP35527593A JP2869764B2 (en) | 1993-12-31 | 1993-12-31 | Reservoir construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP35527593A JP2869764B2 (en) | 1993-12-31 | 1993-12-31 | Reservoir construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH07197510A JPH07197510A (en) | 1995-08-01 |
| JP2869764B2 true JP2869764B2 (en) | 1999-03-10 |
Family
ID=18442982
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP35527593A Expired - Lifetime JP2869764B2 (en) | 1993-12-31 | 1993-12-31 | Reservoir construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2869764B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5349271B2 (en) * | 2009-12-08 | 2013-11-20 | 株式会社日東 | Water storage tank and its assembly parts |
| KR100956740B1 (en) * | 2010-03-03 | 2010-05-06 | 주식회사 중앙씨앤씨 | Container assembled with precast members |
-
1993
- 1993-12-31 JP JP35527593A patent/JP2869764B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH07197510A (en) | 1995-08-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2742994B2 (en) | Bridge pier reinforcement method | |
| JPH08269911A (en) | Concrete wall balustrade mounting structure | |
| KR102585526B1 (en) | Composite frame with end-buried girder joint | |
| JP2869764B2 (en) | Reservoir construction method | |
| JPH0881918A (en) | Pipe and construction method thereof | |
| JP3232487B2 (en) | Construction method of column base and column base structure | |
| JPH084196A (en) | Building panel | |
| JPS605748B2 (en) | Construction method for walls using unit steel formwork | |
| JP2759361B2 (en) | Pillar support members for building reinforced concrete buildings | |
| JP2745238B2 (en) | Temporary support for slab half PCa board erection | |
| JP2724891B2 (en) | Construction method of pillar half PCa formwork | |
| JP4013170B2 (en) | How to build a large culvert | |
| JP2000356041A (en) | Concrete casting method | |
| JP2780055B2 (en) | Construction method of reinforced concrete building | |
| JP3082147B2 (en) | Construction method of reinforced concrete structures | |
| JPH04128430A (en) | concrete foundation | |
| JP2759360B2 (en) | Construction method of reinforced concrete building | |
| JP2722121B2 (en) | Construction method of reinforced concrete building | |
| JPS6375231A (en) | Building housing | |
| JPH02171441A (en) | Beam structure for building | |
| JP3002026B2 (en) | Structure of residential continuous foundation | |
| JP2784449B2 (en) | Steel reinforced concrete foundation | |
| JP2540375B2 (en) | Basic structure of building | |
| JPH07189274A (en) | Framed stud and method of reversely driven rigid frame prefabrication construction | |
| JPH1060911A (en) | Construction method for foundation structure of light-weight building |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080108 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090108 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090108 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 11 Free format text: PAYMENT UNTIL: 20100108 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100108 Year of fee payment: 11 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 12 Free format text: PAYMENT UNTIL: 20110108 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120108 Year of fee payment: 13 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 13 Free format text: PAYMENT UNTIL: 20120108 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 14 Free format text: PAYMENT UNTIL: 20130108 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 15 Free format text: PAYMENT UNTIL: 20140108 |
|
| EXPY | Cancellation because of completion of term |