JP2880348B2 - Pile head treatment method for cast-in-place concrete pile - Google Patents

Pile head treatment method for cast-in-place concrete pile

Info

Publication number
JP2880348B2
JP2880348B2 JP6537492A JP6537492A JP2880348B2 JP 2880348 B2 JP2880348 B2 JP 2880348B2 JP 6537492 A JP6537492 A JP 6537492A JP 6537492 A JP6537492 A JP 6537492A JP 2880348 B2 JP2880348 B2 JP 2880348B2
Authority
JP
Japan
Prior art keywords
pile
container
concrete
containers
crushing agent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP6537492A
Other languages
Japanese (ja)
Other versions
JPH05272133A (en
Inventor
荘太 山田
久巳 川崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Osaka Cement Co Ltd
Original Assignee
Sumitomo Osaka Cement Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Osaka Cement Co Ltd filed Critical Sumitomo Osaka Cement Co Ltd
Priority to JP6537492A priority Critical patent/JP2880348B2/en
Publication of JPH05272133A publication Critical patent/JPH05272133A/en
Application granted granted Critical
Publication of JP2880348B2 publication Critical patent/JP2880348B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、場所打ちコンクリート
杭の杭頭処理工法に係り、特に静的破砕剤の水和膨張作
用により、余盛りコンクリート部分を破砕除去するよう
にした杭頭処理工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pile head treatment method for cast-in-place concrete piles, and more particularly to a pile head treatment method for crushing and removing excess concrete by hydration and expansion of a static crushing agent. It is about.

【0002】[0002]

【従来の技術】一般に、ビルや橋などを建造する場合の
基礎杭として、現場において杭孔を掘削し、この杭孔内
に生コンクリートを打設して杭を形成する、いわゆる場
所打ちコンクリート杭が従来より採用されている。上記
工法においては、場所打ちコンクリート杭の杭頭余盛り
部分の不良コンクリートを破砕除去する必要性がある。
しかし、従来から行なわれていたブレーカー等を使用し
て破砕除去する方法では、近隣に与える騒音や振動等に
よる環境悪化といった問題を有している。
2. Description of the Related Art Generally, a so-called cast-in-place concrete pile is used as a foundation pile for building a building, a bridge, or the like, in which a pile hole is excavated at a site, and fresh concrete is poured into the pile hole to form a pile. Has been conventionally employed. In the above-mentioned construction method, it is necessary to crush and remove the defective concrete in the extra pile head of the cast-in-place concrete pile.
However, the conventional method of crushing and removing using a breaker or the like has a problem that the environment is deteriorated due to noise, vibration, or the like given to the neighborhood.

【0003】また、騒音や振動等の問題がない破砕除去
方法として、水和により発熱膨張する静的破砕剤を用い
た杭頭処理工法が知られている。この工法は、図9及び
図10に示すように前記静的破砕剤を充填した第1の容
器1a…を、鉄筋籠2の主筋2a…に周方向に沿って結
束線3…で取り付けると共に、前記静的破砕剤を充填し
た複数の第2の容器1b…を、鉄筋籠2の周方向に沿っ
て間隔をあけて主筋2…に垂直に結束線3…で取り付け
る。
[0003] As a crushing and removing method free from problems such as noise and vibration, a pile head treatment method using a static crushing agent that generates heat and expands due to hydration is known. In this method, as shown in FIGS. 9 and 10, the first containers 1a filled with the static crushing agent are attached to the main bars 2a. A plurality of second containers 1b filled with the static crushing agent are vertically attached to the main reinforcing bars 2 at intervals along the circumferential direction of the reinforcing bar cage 2 with binding wires 3.

【0004】そして、その状態で該鉄筋籠2を杭孔4内
に挿入し、予め杭孔4内に満たした掘削時の安定液中に
第1及び第2の容器1a、1bを沈め、安定液中の水分
を容器1a、1b内の静的破砕剤に接触させて該破砕剤
を膨張させるとともにコンクリートを打設養生させ、そ
の後前記破砕剤の膨張によって破砕した場所打ちコンク
リート杭の杭頭余盛り部分5を除去するものである。ま
た、前記第1の容器1a…は、杭本体6と杭頭余盛り部
分5との境界に亀裂を生じさせて、杭頭余盛り部分5を
杭本体6から切り離すためのものであり、前記第2の容
器1b…の破砕剤は、杭頭余盛り部分5を分割するよう
に破砕して、杭頭余盛り部分5の除去を容易にするもの
である。
In this state, the cage 2 is inserted into the pile hole 4, and the first and second containers 1a and 1b are immersed in the stable liquid at the time of excavation which has been filled in the pile hole 4 in advance. The moisture in the liquid is brought into contact with the static crushing agent in the containers 1a and 1b to expand the crushing agent and cast and cure the concrete, and thereafter the pile head of the cast-in-place concrete crushed by the expansion of the crushing agent. The raised portion 5 is to be removed. The first containers 1a are for causing a crack at the boundary between the pile main body 6 and the pile head extra portion 5 to separate the pile head extra portion 5 from the pile main body 6. The crushing agent of the second containers 1b is crushed so as to divide the pile head extra portion 5, thereby facilitating removal of the pile head extra portion 5.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、図9及
び図10に示した杭頭処理方法にあっては、杭径が15
00mm程度までは十分精度良く杭頭余盛り部分5を破
砕除去できるが、1600mm程度以上の大径になると
破砕剤の破砕作用が十分機能せず、亀裂の精度が悪くな
って余盛り部分5を精度良く破砕除去することが困難に
なる。
However, in the pile head processing method shown in FIGS. 9 and 10, the pile diameter is 15 mm.
The extra pile portion 5 can be crushed and removed with sufficient accuracy up to about 00 mm. However, when the diameter is larger than about 1600 mm, the crushing action of the crushing agent does not function sufficiently, and the accuracy of the cracks deteriorates. It becomes difficult to crush and remove accurately.

【0006】このような問題を解決するため従来では、
杭径が1600mm程度以上の場合、図11及び図12
に示すように、鉄筋籠2の主筋2a…に図9及び図10
に示した例と同様にして静的破砕剤を充填した第1の容
器1a…を取付け、さらに主筋2、2間に鉄筋7…を組
むとともに、これら鉄筋7…によって第1の容器1a…
の内側の、杭孔4の中心部近傍にさらに第1の容器1a
…を取り付けて、第1の容器1a…を二重のリング状と
する。また、前記鉄筋7…の上方にも、該鉄筋7…と同
様に、鉄筋8…を組み、前記鉄筋7…と鉄筋8…に前記
第2の容器1b…の上下端部を固定して、第2の容器1
b…の配置位置を前記従来の場合より、杭坑の内側とす
る。そして、前述した操作と同様にして杭頭余盛り部分
5の破砕除去を行なっている。
Conventionally, to solve such a problem,
11 and 12 when the pile diameter is about 1600 mm or more.
As shown in FIG. 9 and FIG.
In the same manner as in the example shown in FIG. 1, a first container 1a filled with a static crushing agent is attached, and rebars 7 are assembled between the main rebars 2 and 2, and the first containers 1a.
The first container 1a is further provided near the center of the pile hole 4 inside the
Are attached to form the first containers 1a into a double ring shape. In addition, the rebars 8 are assembled above the rebars 7 in the same manner as the rebars 7. The upper and lower ends of the second container 1 b are fixed to the rebars 7 and the rebars 8. Second container 1
The arrangement position of b ... is set inside the pile pit compared to the conventional case. Then, the extra pile portion 5 is crushed and removed in the same manner as described above.

【0007】しかし、この場合には、コンクリートを打
設する際トレミー管が前記中心部近傍の第1の容器1a
…にぶつかってしまう恐れがあり、またぶつかった場合
には該容器1a…が鉄筋7…から外れてしまい、その破
砕効果が得られないといった不都合を生じる可能性があ
った。
However, in this case, when the concrete is poured, the tremee pipe is placed in the first container 1a near the center.
, And if they do, the container 1a may come off the reinforcing bars 7, and the crushing effect may not be obtained.

【0008】また、上述の工法においては、第2の容器
1b…の下端が、内側の第1の容器1a…を固定するた
めの鉄筋7…で固定されているので、第2の容器1b…
の下端と第1の容器1a…の高さがほぼ同レベルとなる
と共に、第1の容器1a…と第2の容器1b…がほぼ同
様に膨張するため、第1の容器1a…の破砕剤により杭
本体6と杭頭余盛り部分5との間に亀裂が入る前に、第
2の容器1b…の破砕剤によって杭本体6側に杭本体6
にとって有害な亀裂が生じる可能性があった。
In the above-described method, the lower ends of the second containers 1b are fixed by the reinforcing bars 7 for fixing the inner first containers 1a.
Are at substantially the same level as the lower end of the first container 1a, and the first container 1a and the second container 1b expand substantially in the same manner. Before a crack is formed between the pile main body 6 and the pile head extra portion 5, the crushing agent of the second container 1b.
Harmful cracks could occur.

【0009】本発明は前記事情に鑑みてなされたもの
で、その目的とするところは、杭径が1600mm以上
の場所打ちコンクリート杭の杭頭処理においても、トレ
ミー管が第1の容器1a…に接触することなく余盛り部
分5を精度良く破砕除去することができると共に、杭本
体6側に亀裂を生じさせることがない場所打ちコンクリ
ート杭の杭頭処理工法を提供することにある。
The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a method for forming a tremee pipe into a first container 1a even in a pile head treatment of a cast-in-place concrete pile having a pile diameter of 1600 mm or more. An object of the present invention is to provide a pile head treatment method for a cast-in-place concrete pile that can accurately crush and remove the excess embossed portion 5 without contact, and does not cause a crack on the pile body 6 side.

【0010】[0010]

【課題を解決するための手段】本発明の場所打ちコンク
リート杭の杭頭処理工法は、まず前記静的破砕剤を透水
性の第1及び第2容器内に充填し、前記第1の容器の断
面積が、前記第2の容器の断面積より大きいものとし、
前記第1の容器を前記鉄筋籠の内周側周縁部の、前記コ
ンクリートの杭頭余盛り部分の下端部に対応する位置
に、周方向に沿って取付けるとともに杭孔の半径方向に
少なくとも二重に取付け、かつ、複数の前記第2の容器
を前記鉄筋籠の内周側周縁部の、前記コンクリートの杭
頭余盛り部分の前記第1の容器より上方の位置に、周方
向に沿って間隔あけてそれぞれ垂直に取付けるとともに
杭孔の半径方向に少なくとも二重に取付け、次に該鉄筋
籠を杭孔内に挿入して前記第1及び第2の容器を予め該
杭孔内に満たされた安定液と接触させ、その後杭孔内に
コンクリートを打設することを前記課題の解決手段とし
た。
According to the pile head treatment method of the cast-in-place concrete pile according to the present invention, first, the static crushing agent is filled in first and second permeable containers, and the first container is filled with the static crushing agent. The cross-sectional area is larger than the cross-sectional area of the second container;
The first container is mounted along the circumferential direction at a position corresponding to the lower end portion of the extra pile head portion of the concrete on the inner peripheral side peripheral portion of the rebar cage, and at least double in the radial direction of the pile hole. And a plurality of the second containers are circumferentially spaced from each other at a position above the first container in an extra portion of the pile head of the concrete on the inner peripheral side peripheral portion of the reinforcing bar cage. Each of the first and second containers was vertically filled and mounted at least twice in the radial direction of the pile hole, and then the reinforced cage was inserted into the pile hole to fill the first and second containers in advance. The solution to the above-mentioned problem was to bring the concrete into contact with the stabilizing liquid and then to cast concrete into the pile hole.

【0011】[0011]

【作用】上記構成によれば、第1の容器及び第2の容器
を半径方向に沿って少なくとも2重に配置することによ
り、1600mm以上の場所打ちコンクリート杭の杭頭
処理に対応することができる。そして、第1の容器及び
第2の容器を鉄筋籠の内側の周縁部に取り付けることに
より、トレミー管との接触を防止している。さらに、破
砕剤を充填した第1の容器の断面積を第2の容器の断面
積より大きくすることにより、第1の容器の破砕剤の容
量を大きくして第1の容器の膨張量を第2の容器の膨張
量より大きくすることで、第2の容器による亀裂より
も、第1の容器による亀裂が先にできるようにすること
ができる。
According to the above arrangement, by arranging the first container and the second container at least doubly in the radial direction, it is possible to cope with the pile head treatment of the cast-in-place concrete pile of 1600 mm or more. . Then, the first container and the second container are attached to the inner peripheral portion of the reinforcing bar cage, thereby preventing contact with the tremy tube. Further, by increasing the cross-sectional area of the first container filled with the crushing agent to be larger than the cross-sectional area of the second container, the capacity of the crushing agent in the first container is increased to reduce the expansion amount of the first container. By making the amount of expansion larger than that of the second container, it is possible to make the first container crack earlier than the second container crack.

【0012】[0012]

【実施例】以下、本発明の一実施例を図面を参照して説
明する。図1ないし図8は、この実施例の場所打ちコン
クリート杭の杭頭処理工法を説明するための図面であっ
て、これら図面に示される杭頭処理工法は、特に杭径が
1600mm以上の大径の場合に好適に採用されるもの
である。
An embodiment of the present invention will be described below with reference to the drawings. 1 to 8 are drawings for explaining a pile head treatment method for a cast-in-place concrete pile according to this embodiment. The pile head treatment method shown in these drawings is particularly effective for a pile diameter of 1600 mm or more. Is suitably adopted in the case of

【0013】この実施例の杭頭処理方法は、杭を構成す
る場所打ちコンクリートを打設した後に、スライムを杭
内に残さないために余盛りされた杭上端部(杭頭余盛り
部分5)を静的破砕剤で破砕するものである。そして、
この実施例の杭頭処理方法においては、まず、従来と同
様にして安定液の存在下で杭孔4を掘削する。また、杭
孔掘削時に杭孔4周壁が崩壊するのを防止するための安
定液としては、ベントナイト溶液やベントナイト溶液に
CMCや分散剤を添加したものなどが用いられる。
The pile head processing method according to this embodiment is based on the following: After the cast-in-place concrete that forms the pile, the pile upper end portion (pile head extra portion 5) that is extra-filled so as not to leave the slime in the pile. Is crushed with a static crushing agent. And
In the pile head processing method of this embodiment, first, the pile hole 4 is excavated in the presence of the stabilizing liquid as in the conventional method. Further, as a stabilizer for preventing the peripheral wall of the pile hole 4 from collapsing at the time of excavating the pile hole, a bentonite solution or a solution obtained by adding a CMC or a dispersant to a bentonite solution is used.

【0014】次に、図1及び図2に示す第1及び第2の
容器10、11に、静的破砕剤を充填する。なお、ここ
で静的破砕剤を充填するというのは、容器の内部を静的
破砕剤で満たすことである。前記第1及び第2の容器1
0、11は、透水性を有する管状のものである。なお、
透水性の第1及び第2の容器10、11としては、全体
を紙等の浸透性の材料によって形成したものや、容器の
周壁の一部あるいは開口部を破砕剤が抜け落ちない程度
のメッシュからなるネットで形成したものなどを用いる
ことができる。
Next, the first and second containers 10 and 11 shown in FIGS. 1 and 2 are filled with a static crushing agent. Here, filling the static crushing agent means filling the inside of the container with the static crushing agent. The first and second containers 1
Numerals 0 and 11 are tubular having water permeability. In addition,
The water-permeable first and second containers 10 and 11 may be entirely formed of a permeable material such as paper, or may be formed of a part of the peripheral wall or opening of the container from a mesh that does not allow the crushing agent to fall off. A net formed from such a net can be used.

【0015】すなわち、このような容器では、容器自体
が水の浸透性(透水性)を有し、あるいはネット部から
容易に水が通過することにより、透水性の容器となるの
である。そして、このような構成により静的破砕剤を充
填した該容器は、後述するように安定液と接触した際容
易に水分を内部に吸収し、前記顆粒状の静的破砕剤と水
分とを接触させるものとなっている。
That is, in such a container, the container itself has water permeability (water permeability), or the water is easily passed through the net portion, so that the container becomes a water-permeable container. And the container filled with the static crushing agent by such a configuration easily absorbs moisture when it comes into contact with the stabilizing liquid as described later, and contacts the granular static crushing agent with the water. It has become.

【0016】本実施例においては、容器の両端開口をネ
ットで被覆したものを、第1の容器及び第2の容器1
0、11とした。そして、第1の容器10…の断面積
は、第2の容器11…の断面積より大きなものとなって
いる。このように第1の容器10…の断面積を大きくす
ることにより、第1の容器10…内に満たされた静的破
砕剤の膨張量を第2の容器11…内に満たされた静的破
砕剤の膨張量より大きなものとしている。
In the present embodiment, the first container and the second container 1 are formed by covering the openings at both ends of the container with a net.
0 and 11. The cross-sectional area of the first containers 10 is larger than the cross-sectional area of the second containers 11. By increasing the cross-sectional area of the first containers 10 in this manner, the expansion amount of the static crushing agent filled in the first containers 10 can be reduced by the static amount filled in the second containers 11. It is larger than the swelling amount of the crushing agent.

【0017】前記静的破砕剤とは、酸化カルシウム等の
水和により発熱膨張する膨張性破砕剤を主成分とし、こ
れに公知の遅延剤等を添加してなるものである。ここ
で、遅延剤を添加するのは、その種類および添加量を適
宜調整することにより、静的破砕剤の水和膨張圧の発現
時間を所望する時間に調整することができるからであ
る。
The static crushing agent is composed of a swelling crushing agent which is exothermic and expands due to hydration of calcium oxide or the like, and to which a known retarder or the like is added. Here, the reason why the retarder is added is that by appropriately adjusting the type and amount of the retarder, the time required for the hydration expansion pressure of the static crushing agent to be exhibited can be adjusted to a desired time.

【0018】なお、このような静的破砕剤としては、予
め顆粒状に成型されたものが用いられる。ここで、静的
破砕剤を顆粒状にするのは、各粒子間に適宜の大きさの
空隙を持たせることにより、後述するように杭孔4内の
安定液が各粒子に十分接触できるようにするためであ
る。
Incidentally, as such a static crushing agent, one which has been molded into granules in advance is used. Here, the granulation of the static crushing agent is performed by providing a gap of an appropriate size between each particle so that the stable liquid in the pile hole 4 can sufficiently contact each particle as described later. In order to

【0019】また、静的破砕剤を顆粒状に成型する方法
としては、ブリケッティングマシンによって静的破砕剤
の乾粉を高い圧力で連続的に強固なアーモンド状のブリ
ケットに造粒する方法や、コンパクティングマシンによ
って破砕剤の乾粉をスムースロールで板状に圧縮成型し
た後、破砕して造粒する方法などが好適に採用される
が、もちろんその他の乾式圧縮成型方法も採用可能であ
る。また、静的破砕剤の顆粒の大きさとしては、少なく
とも各粒子間に水が容易に侵入できるだけの空隙が形成
される程度以上であればよく、例えば下記第1表に示し
た粒度分布のものが好ましい。
As a method of molding the static crushing agent into granules, a method of continuously granulating dry powder of the static crushing agent at a high pressure into a strong almond-like briquette by a briquetting machine, A method in which a dry powder of a crushing agent is compression-molded into a plate shape by a smooth roll using a compacting machine, and then crushed and granulated is preferably employed. Of course, other dry compression molding methods can also be employed. In addition, the size of the granules of the static crushing agent may be at least as large as that at least a void is formed between the particles so that water can easily enter, and for example, those having a particle size distribution shown in Table 1 below Is preferred.

【0020】[0020]

【表1】 [Table 1]

【0021】そして、静的破砕剤が充填された第1及び
第2の容器10、11は、杭の配筋となる鉄筋籠2に取
り付けられる。前記鉄筋籠2は、多数の主筋2a…を円
周上に平行に配置すると共に、これら主筋2a…を多数
のリング状のフープ筋2b…で固定したものである。
Then, the first and second containers 10 and 11 filled with the static crushing agent are attached to the reinforcing bar cage 2 serving as a reinforcing bar for the pile. The rebar basket 2 has a plurality of main bars 2a arranged in parallel on the circumference, and these main bars 2a are fixed by a number of ring-shaped hoop bars 2b.

【0022】また、前記第1及び第2の容器10、11
の取り付け方法については、図2に示すように、まず、
鉄筋籠2の主筋2aに第1及び第2の取付具12、13
を取り付け、これら第1及び第2の取付具12、13を
介して第1及び第2の容器10、11を主筋に取り付け
るようになっている。
The first and second containers 10, 11
First, as shown in FIG. 2,
First and second fittings 12 and 13 are attached to the main reinforcement 2a of the reinforcing rod cage 2.
, And the first and second containers 10 and 11 are attached to the main bar via the first and second attachments 12 and 13.

【0023】前記第1の取付具12は、図3ないし図5
に示すように、主筋2aに沿って延在する基部12a
と、基部12aから水平に延出する延出部12bとから
なり、前記基部12aは主筋2aと結束線もしくは溶接
によって取り付けられるようになっている。
The first fitting 12 is shown in FIGS.
As shown in the figure, a base 12a extending along the main muscle 2a
And an extension 12b extending horizontally from the base 12a. The base 12a is attached to the main bar 2a by a binding wire or welding.

【0024】また、延出部12bには、その長さ方向に
並んで二つの矩形の貫通孔12c、12cが形成されて
いる。これら貫通孔12c、12cは、延出部12b
を、該延出部12bの長さ方向に対して直角かつ水平に
貫通するように形成されている。そして、第1の取付具
12は、これら貫通孔12c、12cにそれぞれ第1の
容器12を挿通して嵌合することによって、第1の容器
12を主筋2aに取り付けるようになっている。そし
て、延出部12bの下面は、延出部12bの先端側が細
くなるようにテーパーが付けられている。また、延出部
12bの後端部には、主筋2aと嵌合するための略半円
状の凹部12dが形成されている。
The extension 12b has two rectangular through-holes 12c, 12c arranged in the longitudinal direction. These through holes 12c, 12c
Are formed so as to penetrate at right angles and horizontally with respect to the length direction of the extending portion 12b. The first fixture 12 is adapted to attach the first container 12 to the main reinforcement 2a by inserting and fitting the first container 12 into these through holes 12c. The lower surface of the extension 12b is tapered so that the tip of the extension 12b becomes thinner. A substantially semicircular concave portion 12d for fitting with the main bar 2a is formed at the rear end of the extending portion 12b.

【0025】そして第1の取付具12は、図2に示すよ
うに、その延出部12bが、鉄筋籠2の中心方向を向く
ように配置されると共に、円周方向に間隔をあけて同じ
高さに複数配置されている。また、第1の取付具12
は、延出部12bの高さが杭本体6と杭頭余盛り部分5
の境界の高さにされている。
As shown in FIG. 2, the first mounting member 12 has the extending portion 12b arranged so as to face the center of the reinforcing bar 2 and the first mounting member 12 is spaced apart in the circumferential direction. Several are arranged at the height. Also, the first fixture 12
The height of the extension portion 12b is the pile main body 6 and the pile head extra portion 5
The height of the border has been.

【0026】そして、前記第1の容器10は、予め円弧
状に形成された状態で、前記第1の取付具12の貫通孔
12cに挿通されるようになっている。そして、複数の
円弧状の第1の容器10…が、第1の取付具12…の2
つの貫通孔12c…のそれぞれ挿通されて、鉄筋籠2の
内周の周縁に周方向に沿って二重に配置される。すなわ
ち、第1の容器10…は、鉄筋籠2の内周側周縁部にお
いて二重のリング状に配置される。
The first container 10 is inserted into the through hole 12c of the first fixture 12 in a state of being formed in an arc shape in advance. Then, the plurality of arc-shaped first containers 10 are connected to the first mounting members 12.
The two through-holes 12c are respectively inserted, and are doubly arranged along the circumferential direction on the inner peripheral edge of the reinforcing bar cage 2. That is, the first containers 10 are arranged in a double ring shape at the inner peripheral edge of the rebar basket 2.

【0027】前記第2の取付具13は、主筋2aから水
平に延出するように主筋2aに取り付けられる。また、
第2の取付具13には、その長さ方向に沿って並んだ2
つの矩形の貫通孔13a、13aが形成されている。こ
れら貫通孔13a、13aは、第2の取付具13を上下
垂直に貫通するように形成されている。これら貫通孔1
3a、13aにそれぞれ第2の容器11、11を挿通し
て嵌合することにより、第2の容器11、11を主筋2
aに取り付けられるようになっている。また、第2の取
付具13の後端部には、主筋2aと嵌合するための略半
円状の凹部13bが形成されている。さらに、第2の取
付具13の左右の側面は、第2の取付具13が先端に向
かって細くなるようなテーパーが付けられている。
The second attachment 13 is attached to the main bar 2a so as to extend horizontally from the main bar 2a. Also,
The second fixture 13 has two pieces arranged along the length direction thereof.
Rectangular through holes 13a, 13a are formed. These through holes 13a, 13a are formed so as to penetrate the second mounting member 13 vertically and vertically. These through holes 1
By inserting and fitting the second containers 11 and 11 into the 3a and 13a, respectively, the second containers 11 and 11 are
a. A substantially semicircular recess 13b for fitting with the main bar 2a is formed at the rear end of the second mounting member 13. Further, the left and right side surfaces of the second attachment 13 are tapered such that the second attachment 13 becomes thinner toward the tip.

【0028】そして、第2の取付具13は、前記第1の
取付具12の上方において、図2に示すように、先端を
鉄筋籠2の中心方向に向けて、一本の主筋2aに上下2
個ずつ取付けられると共に、周方向に間隔をあけて、複
数取り付けられている。前記第2の容器11…は、その
上下端部を、一本の主筋2aに取り付けられた2本の第
2の取付具13、13のそれぞれの貫通孔13a…に挿
通して嵌合することによって、主筋2aに、該主筋2a
の長さ方向に沿って垂直に取り付けられる。また、第2
の容器11…は、鉄筋籠2の半径方向に2重に取付られ
るようになっている。
As shown in FIG. 2, the second mounting member 13 is vertically moved above one of the main reinforcing bars 2a with its tip directed toward the center of the rebar cage 2 as shown in FIG. 2
A plurality is attached at a time and at intervals in the circumferential direction. The upper and lower ends of the second containers 11 are inserted into the through holes 13a of the two second mounting members 13 attached to one main bar 2a and fitted. Thus, the main muscle 2a is
Mounted vertically along the length of the. Also, the second
Are mounted in the radial direction of the reinforcing cage 2 doubly.

【0029】すなわち、第2の容器11…は、鉄筋籠2
の内周側周縁部において、一対ずつ周方向に間隔あけ
て、垂直に複数配置されるようになっている。また、第
2の容器11の下端は、第1の容器10の取り付け位置
より上方になるようになっている。また、主筋2aに
は、図5及び図8に示すように前記第1の取付具12よ
り上方、すなわち、杭頭余盛り部分5に対応する位置
に、主筋にコンクリートが付着しないように主筋を覆う
主筋縁切り材15が取り付けられている。
That is, the second containers 11 are reinforced cages 2
In the inner peripheral edge portion, a plurality of pairs are vertically arranged at intervals in the circumferential direction. The lower end of the second container 11 is located above the position where the first container 10 is attached. The main reinforcing bar 2a is provided with a main reinforcing bar above the first fixture 12 as shown in FIGS. 5 and 8, that is, at a position corresponding to the pile head margin 5 so that concrete does not adhere to the main reinforcing bar. A covering main bar trimming member 15 is attached.

【0030】次いで、鉄筋籠2を安定液が入れられた杭
孔4内に挿入して沈漬する。すると、安定液が第1及び
第2の容器10、11内に浸透して顆粒状の静的破砕剤
と接触し、静的破砕剤が膨張を開始する。この際に、杭
孔4内の安定液の水位が低く、第1及び第2の容器1
0、11が、安定液に完全に浸らなかった場合でも、後
述するように、安定液とコンクリートを置換する際に安
定液の水位が上がり、第1及び第2の容器10、11を
安定液に浸漬することができる。
Next, the reinforcing rod cage 2 is inserted into the pile hole 4 in which the stabilizing liquid has been placed, and is immersed. Then, the stabilizing liquid permeates into the first and second containers 10 and 11 and comes into contact with the granular static crushing agent, and the static crushing agent starts to expand. At this time, the water level of the stable liquid in the pile hole 4 is low, and the first and second containers 1
Even when 0 and 11 are not completely immersed in the stabilizing liquid, as will be described later, the water level of the stabilizing liquid rises when replacing the concrete with the stabilizing liquid, and the first and second containers 10 and 11 are placed in the stabilizing liquid. Can be immersed.

【0031】そして、安定液とコンクリートとを置換し
ながらコンクリートを打設し、打設完了後、コンクリー
トの強度が発現するまで養生する。すると、この間に静
的破砕剤の膨張発現が完了しているため、土を掘り起こ
して根切りを行なうときには、余盛りコンクリートが静
的破砕剤の膨張力により予め設定された位置で破砕され
ている。
Then, concrete is poured while replacing the stabilizing liquid with concrete, and after the placement is completed, the concrete is cured until the concrete develops its strength. Then, during this time, since the expansion of the static crushing agent has been completed, when digging up the soil and performing root cutting, the excess embankment concrete is crushed at a preset position by the expansion force of the static crushing agent .

【0032】この際に、前記第1の容器10…の断面積
が、第2の容器11…の断面積より大きく、第1の容器
10…の膨張量の方が、第2の容器11…の膨張量より
大きいので、第1の容器10…によって形成される杭本
体6と杭頭余盛り部分5との境界の亀裂の方が、第2の
容器11…によって杭頭余盛り部分5に形成される亀裂
よりも先にできることになる。
At this time, the cross-sectional area of the first containers 10 is larger than the cross-sectional area of the second containers 11 and the amount of expansion of the first containers 10 is larger than that of the second containers 11. Of the boundary between the pile body 6 and the pile head extra portion 5 formed by the first containers 10... This can be done before cracks are formed.

【0033】以上説明したように、第1及び第2の容器
10、11を、鉄筋籠2の内周側周縁部において、径方
向に二重に設けることによって、1600mm以上の径
を有する場所打ちコンクリート杭においても、杭頭余盛
り部分5を破砕することができると共に、第1及び第2
の容器10、11が鉄筋籠2の内周側周縁部にあること
によって、第1及び第2の容器10、11が杭孔4内に
コンクリートを打設するためのトレミー管に接触するの
を防止することができる。
As described above, the first and second containers 10 and 11 are provided in a radially double manner at the inner peripheral side edge portion of the reinforcing bar cage 2 so as to be cast in place having a diameter of 1600 mm or more. Also in the concrete pile, the pile head extra portion 5 can be crushed, and the first and second piles can be crushed.
Of the first and second containers 10 and 11 in contact with the tremy pipe for placing concrete in the pile hole 4 by the presence of the containers 10 and 11 on the inner peripheral side of the rebar cage 2. Can be prevented.

【0034】また、第2の容器11の下端が、第1の容
器10より上方にあると共に、第1の容器10によって
できる杭本体6と杭頭余盛り部分5との境界の亀裂の方
が、第2の容器11によって余盛り部分5に形成される
亀裂より先にできることから、杭本体6と杭頭余盛り部
分5の亀裂により、第2の容器11による亀裂が杭本体
6側に至るのを防止することができる。すなわち、杭本
体6側に杭本体6にとって有害な亀裂ができるのを防止
することができる。以下に、上記実施例に基づいて行な
った杭頭処理についての結果を実施例1及び実施例2と
して説明するが、本発明は、これら実施例1及び実施例
2に限定されるものではない。 (実施例1)図1及び図2に示す場所打ちコンクリート
杭において、場所打ちコンクリート杭の杭径Lを300
0mm、余盛りコンクリートの深さdを800mm、か
ぶりコンクリートの幅Wを150mmとして以下のよう
に施工した。
The lower end of the second container 11 is located above the first container 10, and the crack at the boundary between the pile main body 6 and the pile head extra portion 5 formed by the first container 10 is better. Since the second container 11 can be formed before the crack formed in the extra pile 5 by the second container 11, the crack in the pile main body 6 and the extra pile head 5 causes the crack by the second container 11 to reach the pile main body 6 side. Can be prevented. That is, it is possible to prevent a harmful crack from being formed on the pile main body 6 side. Hereinafter, the results of the pile head processing performed based on the above-described example will be described as Example 1 and Example 2, but the present invention is not limited to Example 1 and Example 2. (Example 1) In the cast-in-place concrete pile shown in FIG. 1 and FIG.
0 mm, the depth d of the excess concrete was 800 mm, and the width W of the cover concrete was 150 mm, and the work was performed as follows.

【0035】まず、NEW−CAB(商品名;住友セメ
ント株式会社製)のB管(第1の容器10)とM管(第
2の容器11)とを上述のように第1及び第2の取付具
12、13を用いて鉄筋籠2の主筋2aに取付けた。な
お、前記B管10とM管11には、静的破砕剤の一種で
あるCAB(商品名;住友セメント株式会社製)が充填
されている。なお、前記CABとして予め顆粒状に成型
したものを用いている。また、前記B管10及びM管1
1は、その両端開口部をネットで覆い、静的破砕剤が管
内より抜け落ちないようにし、かつ管内に水が容易に浸
透するようにしている。
First, the B-tube (first container 10) and the M-tube (second container 11) of NEW-CAB (trade name; manufactured by Sumitomo Cement Co., Ltd.) are connected to the first and second tubes as described above. It was attached to the main reinforcement 2a of the reinforcing rod cage 2 using the attachments 12 and 13. The B pipe 10 and the M pipe 11 are filled with CAB (trade name; manufactured by Sumitomo Cement Co., Ltd.) which is a kind of static crushing agent. In addition, what was previously molded into granules is used as the CAB. The B pipe 10 and the M pipe 1
No. 1 covers the openings at both ends thereof with a net so that the static crushing agent does not fall out of the inside of the tube and that water easily penetrates into the tube.

【0036】次に、この鉄筋籠2を杭孔4内に挿入し、
B管10及びM管11を安定液中に沈めた後、コンクリ
ートを打設した。そして、10日間経過した後土を掘り
起こしたところ、杭本体6と杭頭余盛り部分5の境界に
沿って1cm〜2cmの間隙の亀裂が発生すると共に、
杭頭余盛り部分5に、該杭頭余盛り部分5がだいたい7
分割になるような亀裂が発生した。また、杭頭余盛り部
分5に発生した亀裂は、杭本体6側に達することがなか
った。 (実施例2)図1及び図2に示す場所打ちコンクリート
杭において、場所打ちコンクリート杭の杭径Lを230
0mm、余盛りコンクリートの深さdを900mm、か
ぶりコンクリートの幅Wを100mmとして以下のよう
に施工した。
Next, the rebar cage 2 is inserted into the pile hole 4,
After submerging the B pipe 10 and the M pipe 11 in the stabilizing solution, concrete was poured. When the soil was dug up after 10 days, cracks of a gap of 1 cm to 2 cm occurred along the boundary between the pile main body 6 and the pile head extra portion 5, and
The pile head extra part 5 is approximately 7 in the pile head extra part 5.
Cracks were generated that would result in splitting. Further, the crack generated in the pile head excess portion 5 did not reach the pile main body 6 side. (Example 2) In the cast-in-place concrete pile shown in FIGS. 1 and 2, the pile diameter L of the cast-in-place concrete pile was set to 230.
0 mm, the depth d of the excess concrete was 900 mm, and the width W of the cover concrete was 100 mm.

【0037】まず、NEW−CAB(商品名;住友セメ
ント株式会社製)のB管10とM管11とを上述のよう
に第1及び第2の取付具13、14を用いて鉄筋籠2の
主筋2aに取付けた。なお、前記B管10とM管11に
は、静的破砕剤の一種であるCAB(商品名;住友セメ
ント株式会社製)が充填されている。なお、前記CAB
として予め顆粒状に成型したものを用いている。また、
前記B管10及びM管11は、その両端開口部をネット
で覆い、静的破砕剤が管内より抜け落ちないようにし、
かつ管内に水が容易に浸透するようにした。
First, the B-tube 10 and the M-tube 11 of NEW-CAB (trade name; manufactured by Sumitomo Cement Co., Ltd.) are connected to the rebar basket 2 by using the first and second fittings 13 and 14 as described above. Attached to main bar 2a. The B pipe 10 and the M pipe 11 are filled with CAB (trade name; manufactured by Sumitomo Cement Co., Ltd.) which is a kind of static crushing agent. The CAB
What was previously molded into granules is used. Also,
The B tube 10 and the M tube 11 cover both ends of the opening with a net so that the static crushing agent does not fall out of the tube,
Water was easily penetrated into the tube.

【0038】次に、この鉄筋籠を杭孔4内に挿入し、B
管10及びM管11を安定液中に沈めた後、コンクリー
トを打設した。そして、10日間経過した後土を掘り起
こしたところ、杭本体6と杭頭余盛り部分5の境界に沿
って1cm〜2cmの間隙の亀裂が発生すると共に、杭
頭余盛り部分5に、該杭頭余盛り部分5がだいたい6分
割になるような亀裂が発生した。また、杭頭余盛り部分
5に発生した亀裂は、杭本体6側に達することがなかっ
た。
Next, the rebar cage is inserted into the pile hole 4 and B
After submerging the pipe 10 and the M pipe 11 in the stabilizing solution, concrete was poured. When the soil was excavated after elapse of 10 days, a crack having a gap of 1 cm to 2 cm was generated along the boundary between the pile main body 6 and the pile head extra portion 5, and the pile Cracks were generated so that the head portion 5 was roughly divided into six. Further, the crack generated in the pile head excess portion 5 did not reach the pile main body 6 side.

【0039】[0039]

【発明の効果】以上、詳細に説明したように、本発明の
場所打ちコンクリート杭の杭頭処理方法によれば、第1
の容器と第2の容器とを鉄筋籠の内周周縁部で少なくと
も径方向に二重に設けることにより、杭孔にコンクリー
トを打設するためのトレミー管が、第1及び第2の容器
に接触することなく、杭径が1600mm以上のコンク
リート杭においても、杭頭の処理を行なうことができ
る。また、第2の容器の下端を第1の容器の上方に取り
付けると共に、第1の容器の断面積を第2の容器の断面
積より大きくすることによって、静的破砕材によって杭
本体側に亀裂ができるのを防止することができる。
As described in detail above, according to the pile head treatment method of the cast-in-place concrete pile of the present invention,
By providing the container and the second container at least in the radial direction at the inner peripheral edge of the rebar cage at least in a radial direction, a tremy pipe for placing concrete in the pile hole is provided in the first and second containers. Without contact, even for a concrete pile having a pile diameter of 1600 mm or more, the pile head can be treated. In addition, by attaching the lower end of the second container above the first container and making the cross-sectional area of the first container larger than the cross-sectional area of the second container, a crack is generated on the pile body side by the static crushing material. Can be prevented.

【図面の簡単な説明】[Brief description of the drawings]

【図1】上記実施例の場所打ちコンクリート杭の杭頭処
理方法を説明するための杭孔内部を示す平面図である。
FIG. 1 is a plan view showing the inside of a pile hole for explaining a pile head processing method of a cast-in-place concrete pile according to the embodiment.

【図2】上記杭孔内部の側断面図である。FIG. 2 is a side sectional view of the inside of the pile hole.

【図3】上記杭頭処理方法において、第1の容器を支持
する第1の取付具を示す側面図である。
FIG. 3 is a side view showing a first fixture supporting a first container in the pile head processing method.

【図4】上記第1の取付具を示す平面図である。FIG. 4 is a plan view showing the first attachment.

【図5】上記第1の取付具を主筋に取り付けた状態を示
す側面図である。
FIG. 5 is a side view showing a state where the first attachment is attached to a main bar.

【図6】上記杭頭処理方法において、第2の容器を支持
する第2の取付具を示す側面図である。
FIG. 6 is a side view showing a second fixture supporting a second container in the pile head processing method.

【図7】上記第2の取付具を示す平面図である。FIG. 7 is a plan view showing the second attachment.

【図8】上記第2の取付具を主筋に取り付けた状態を示
す側面図である。
FIG. 8 is a side view showing a state where the second attachment is attached to a main bar.

【図9】上記従来の技術を説明するための杭孔内部を示
す平面図である。
FIG. 9 is a plan view showing the inside of a pile hole for explaining the conventional technique.

【図10】上記杭孔内部を示す側断面図である。FIG. 10 is a side sectional view showing the inside of the pile hole.

【図11】上記発明が解決しようとする課題を説明する
ための杭孔内部を示す平面図である。
FIG. 11 is a plan view showing the inside of a pile hole for describing a problem to be solved by the above invention.

【図12】上記杭孔内部を示す側断面図である。FIG. 12 is a side sectional view showing the inside of the pile hole.

【符号の説明】[Explanation of symbols]

2 鉄筋籠 2a 主筋 4 杭孔 5 杭頭余盛り部分 10 第1の容器 11 第2の容器 2 Reinforcing cage 2a Main reinforcement 4 Pile hole 5 Extra pile head 10 First container 11 Second container

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平5−59721(JP,A) 特開 平3−179991(JP,A) 特開 平2−266018(JP,A) 特公 平2−22811(JP,B2) 特公 昭61−45012(JP,B1) (58)調査した分野(Int.Cl.6,DB名) E02D 5/34 ──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-A-5-59721 (JP, A) JP-A-3-1799991 (JP, A) JP-A-2-266018 (JP, A) 22811 (JP, B2) Japanese Patent Publication No. 61-45012 (JP, B1) (58) Fields investigated (Int. Cl. 6 , DB name) E02D 5/34

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 掘削時の安定液を満たした杭孔内に、予
め静的破砕剤を取付けた筒状の鉄筋籠を挿入した後コン
クリートを打設し、コンクリートの杭頭余盛り部分を前
記静的破砕剤の水和膨張作用により破砕するようにした
場所打ちコンクリート杭の杭頭処理工法において、 まず前記静的破砕剤を透水性の第1及び第2容器内に充
填し、前記第1の容器の断面積を、前記第2の容器の断
面積より大きいものとし、前記第1の容器を前記鉄筋籠
の内周側周縁部の、前記コンクリートの杭頭余盛り部分
の下端部に対応する位置に、周方向に沿って取付けると
ともに杭孔の半径方向に少なくとも二重に取付け、か
つ、複数の前記第2の容器を前記鉄筋籠の内周側周縁部
の、前記コンクリートの杭頭余盛り部分の前記第1の容
器より上方の位置に、周方向に沿って間隔あけてそれぞ
れ垂直に取付けるとともに杭孔の半径方向に少なくとも
二重に取付け、次に該鉄筋籠を杭孔内に挿入して前記第
1及び第2の容器を予め該杭孔内に満たされた安定液と
接触させ、その後杭孔内にコンクリートを打設すること
を特徴とする場所打ちコンクリート杭の杭頭処理工法。
[Claim 1] A cylindrical reinforced cage having a static crushing agent previously inserted thereinto is inserted into a pile hole filled with a stable liquid during excavation, and then concrete is poured into the pile hole. In a pile head treatment method for a cast-in-place concrete pile that is crushed by the hydration and expansion action of a static crushing agent, first, the static crushing agent is filled into first and second permeable containers, and the first The cross-sectional area of the container is larger than the cross-sectional area of the second container, and the first container corresponds to the lower end portion of the extra pile portion of the concrete pile head on the inner peripheral edge of the reinforcing bar cage. At a position where the pile is attached along the circumferential direction and at least doubly in the radial direction of the pile hole, and the plurality of second containers are attached to the inner periphery of the reinforcing rod cage at the periphery of the concrete pile head. At a position above the first container of the heap portion, Are mounted vertically at intervals along the direction and at least doubly mounted in the radial direction of the pile hole, and then the reinforcing cage is inserted into the pile hole, and the first and second containers are previously placed in the pile hole. A pile head treatment method for cast-in-place concrete piles, which comprises bringing concrete into contact with a stable liquid filled in the pile and then placing concrete into the pile hole.
JP6537492A 1992-03-23 1992-03-23 Pile head treatment method for cast-in-place concrete pile Expired - Lifetime JP2880348B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6537492A JP2880348B2 (en) 1992-03-23 1992-03-23 Pile head treatment method for cast-in-place concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6537492A JP2880348B2 (en) 1992-03-23 1992-03-23 Pile head treatment method for cast-in-place concrete pile

Publications (2)

Publication Number Publication Date
JPH05272133A JPH05272133A (en) 1993-10-19
JP2880348B2 true JP2880348B2 (en) 1999-04-05

Family

ID=13285132

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6537492A Expired - Lifetime JP2880348B2 (en) 1992-03-23 1992-03-23 Pile head treatment method for cast-in-place concrete pile

Country Status (1)

Country Link
JP (1) JP2880348B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102828505B (en) * 2012-08-07 2014-12-03 中建三局第一建设工程有限责任公司 Tool type fixing frame for prolonging and protecting cast-in-place pile reinforcement cage
JP6214034B2 (en) * 2013-08-26 2017-10-18 太平洋マテリアル株式会社 Static crusher, concrete processing method
CN106703018B (en) * 2017-02-20 2019-02-22 云南建投基础工程有限责任公司 A kind of superfine cast-in-place pile reinforcement cage with grouting pipe and acoustic measuring pipe and its manufacturing method
CN110656644B (en) * 2019-09-26 2024-02-09 广东省建筑工程机械施工有限公司 Reinforcement cage erecting structure and method for breaking pile head of cast-in-place pile through reverse static blasting

Also Published As

Publication number Publication date
JPH05272133A (en) 1993-10-19

Similar Documents

Publication Publication Date Title
JP3894893B2 (en) Construction method of foundation ground
JP2880348B2 (en) Pile head treatment method for cast-in-place concrete pile
JP2595391B2 (en) Pile head treatment method for cast-in-place concrete pile
JP4555974B2 (en) Construction method of foundation pile to improve ground around pile head
JPH09328748A (en) Pile cap of reinforced concrete pile, base plate of pile cap, and construction method for reinforced concrete pile
JPH04124317A (en) Improvement of foundation ground for building
JP6498253B1 (en) Pipe burying method
JP2839669B2 (en) Pile head crushing method for cast-in-place concrete piles
JPS5850219A (en) Treatment of head of pile
JPH06228947A (en) Construction of landslide protection wall in ground filled up with wastes
JPH0579265A (en) Discharged soil free execution device for foundation pile and execution method for foundation pile
JP2766444B2 (en) Pile head treatment method for cast-in-place concrete pile
JP2004124452A (en) Foundation pile structure and construction method of foundation pile on supporting ground
JPS5927026A (en) On-site pile head treatment work
JPH11190022A (en) Working method for foundation pile
JPH11200362A (en) Earth retaining work
JP2610591B2 (en) Manufacturing method of static crushing agent
JPH02266018A (en) Pile-head treating method of cast-in-place pile by use of stabilizing liquid
JPS63523A (en) Treatment of heat of cast-in-place concrete pile
JP2867281B2 (en) Method for treating the head of a continuous underground wall
JPH08326068A (en) Construction method of hollow deep foundation using air bag
JPH0739666B2 (en) Permeable temporary earth retaining material, permeable frame structure and concrete wall construction method
JP3898929B2 (en) Liquefaction prevention structure
JP3454332B2 (en) Groove backfill method
JP2593248B2 (en) How to remove the excess part of cast-in-place pile

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19990105

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080129

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090129

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100129

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100129

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110129

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120129

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120129

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130129

Year of fee payment: 14

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130129

Year of fee payment: 14