Scour prevention construction method

Info

Publication number
JP2884251B2
JP2884251B2 JP1779890A JP1779890A JP2884251B2 JP 2884251 B2 JP2884251 B2 JP 2884251B2 JP 1779890 A JP1779890 A JP 1779890A JP 1779890 A JP1779890 A JP 1779890A JP 2884251 B2 JP2884251 B2 JP 2884251B2
Authority
JP
Japan
Prior art keywords
rubble
scouring
aggregate
laying
stones
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP1779890A
Other languages
Japanese (ja)
Other versions
JPH03224913A (en
Inventor
正 松本
和之 平田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP1779890A priority Critical patent/JP2884251B2/en
Publication of JPH03224913A publication Critical patent/JPH03224913A/en
Application granted granted Critical
Publication of JP2884251B2 publication Critical patent/JP2884251B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)

Description

【発明の詳細な説明】 〈産業上の利用分野〉 本発明は基礎捨石等の基礎工の洗掘防止工法に関する
ものである。
DETAILED DESCRIPTION OF THE INVENTION <Industrial Application Field> The present invention relates to a scouring prevention method for foundation works such as rubble.

〈従来の技術〉 基礎捨石の洗掘を防止する工法として、捨石より大重
量の粗石を捨石の表層に敷き詰め、粗石の重量で潮流な
どの洗掘力に対抗する工法が知られている。
<Conventional technology> As a method of preventing scouring of basic rubble, a method is known in which rubble heavier than rubble is laid on the surface of rubble and the weight of the rubble counters the scouring power of tidal currents. .

具体的には海上から一個ずつ吊り降ろした粗石を潜水
夫が石均して敷き詰めている。
More specifically, divers are rubbing stones one by one from the sea.

〈本発明が解決しようとする問題点〉 前記した従来の洗掘防止技術には、つぎのような問題
点がある。
<Problems to be Solved by the Present Invention> The conventional scouring prevention technology described above has the following problems.

〈イ〉 粗石の石均し作業を潜水夫に頼っているため、
作業が非効率的であるだけでなく、施工期間が長期化す
る傾向にある。
<a> Because we depend on diver for leveling work of coarse stone,
Not only is the work inefficient, but the construction period tends to be longer.

〈ロ〉 長期間の潜水作業を強いられるため、潜水夫の
健康に与える影響が心配されている。
<B> Because long-term diving work is required, there are concerns about the effects on the health of divers.

〈ハ〉 石均しに熟練技術を必要とするが、こうした熟
練潜水夫の確保が困難になりつつある。
<C> Skill leveling requires skill, but it is becoming difficult to secure such skilled divers.

〈本発明の目的〉 本発明は以上の問題点を解決するために成されたもの
で、その目的とするところは潜水夫の労働負担の軽減や
工期の大幅短縮および施工効率の向上を図れる、洗掘防
止工法を提供することにある。
<Object of the present invention> The present invention has been made to solve the above problems, the purpose of which is to reduce the labor load of divers and significantly shorten the construction period and improve construction efficiency, An object of the present invention is to provide a scouring prevention method.

〈問題点を解決するための手段〉 即ち本発明は基礎捨石の表面に洗掘防止用の粗石を敷
設する洗掘防止方法において、隣接させて並べた複数の
粗石間を、該各粗石が基礎捨石表面の凹凸に追随可能に
ロープ材で連結して粗石の集合体を予め製作し、前記複
数の粗石の集合体単位で基礎捨石の表面に順次敷設する
ことを特徴とする、洗掘防止方法である。
<Means for Solving the Problems> That is, the present invention relates to a scouring prevention method for laying rubble for preventing scouring on the surface of a base rubble. The stone is connected with a rope material so as to be able to follow the irregularities on the surface of the basic rubble, and the aggregate of the coarse stone is manufactured in advance, and the plurality of aggregates of the coarse stone are sequentially laid on the surface of the basic rubble. It is a scouring prevention method.

〈本発明の説明〉 以下、図面を参照しながら本発明について説明する。<Description of the Present Invention> Hereinafter, the present invention will be described with reference to the drawings.

まず、本工法に使用する粗石について説明する。 First, the rubble used in the present method will be described.

〈イ〉粗石 従来は多数の粗石を一つずつ敷設していたが、本発明
では第1図に示すように同一平面上に縦横方向に並べた
複数個の粗石1群の集合体Aを敷設単位として敷設す
る。
<A> Coarse stone Conventionally, a large number of cobble stones were laid one by one, but in the present invention, as shown in FIG. 1, an aggregate of a group of a plurality of cobble stones arranged vertically and horizontally on the same plane. A is laid as a laying unit.

粗石1は天然石、金属製或はコンクリート製等の重量
物で構成し、その形状は敷設した粗石1間に間隙の発生
を抑止できる角柱体が好ましい。
The crushed stone 1 is made of a heavy material such as natural stone, metal or concrete, and its shape is preferably a prism that can suppress generation of a gap between the laid crushed stones 1.

また粗石1の取り扱い性を配慮して、粗石1の上面中
央に吊具2を設ける。
In addition, a hanging tool 2 is provided at the center of the upper surface of the rubble 1 in consideration of the handleability of the rubble 1.

吊具2は粗石1の吊り荷重に充分耐えられる強度を有
し、特に粗石1から離脱しない状態で連結する。第2図
に棒状体の一方にリングを設けた吊具2を、接着剤3
(例えばエポキシ樹脂)を使用して粗石1に貫入して固
着した場合を示すが、その他公知の吊り構造を採用でき
ることは勿論である。
The hanger 2 has sufficient strength to withstand the hanging load of the rubble 1, and is particularly connected to the rubble 1 in a state in which the rubble 1 does not separate. In FIG. 2, the hanging member 2 provided with a ring on one side of the rod-shaped body is attached to an adhesive 3
Although the case where the rubble 1 is penetrated and fixed by using (for example, an epoxy resin) is shown, it is a matter of course that other known suspension structures can be adopted.

〈ロ〉粗石群の連結構造 第3図にロープ材4を用いて複数個の粗石1群を連結
した場合の平面図を示す。
<B> Coarse Stone Group Connection Structure FIG. 3 is a plan view showing a case where a plurality of coarse stone groups are connected using the rope material 4.

ロープ材4には防錆処理を施したワイヤロープや耐食
性に優れた高強度樹脂ロープ等を使用する。
As the rope material 4, a wire rope subjected to a rust-proof treatment, a high-strength resin rope excellent in corrosion resistance, or the like is used.

そして、縦横方向に配列した各粗石1の吊具2の首下
部を利用し、このロープ材4の両端を最外側に位置する
各粗石1間にロープクリップ等で固定し、途中の各粗石
1についてはロープ材4を吊具2の首下に巻き付け、最
終的に升目状にロープ材4を張り巡らして隣接する各粗
石1間に連続性を持たせる。
Then, using the lower part of the neck of the hanging tool 2 of each rubble 1 arranged in the vertical and horizontal directions, both ends of the rope material 4 are fixed between the outermost rubbles 1 with a rope clip or the like. For the rubble 1, the rope material 4 is wound around the neck of the hanging tool 2, and finally the rope material 4 is stretched in a grid shape to provide continuity between the adjacent rubbles 1.

縦横方向に張り巡らしたロープ材4の交差部を固定し
ないで巻き付けるのは、隣接する各粗石1を敷設面の凹
凸に追随させるためである。
The reason that the crossing portion of the rope material 4 stretched in the vertical and horizontal directions is wound without fixing is to make each of the adjacent rough stones 1 follow the unevenness of the laying surface.

〈作用〉 つぎに施工方法について説明する。<Operation> Next, the construction method will be described.

〈イ〉曳航(第4図) 第3図のように複数の粗石1群をロープ材4で結びつ
けた集合体Aを複数製作し、これらを台船5に搭載して
現場まで曳航する。
<A> Towing (FIG. 4) As shown in FIG. 3, a plurality of aggregates A in which a plurality of coarse stones 1 are tied together by a rope material 4 are produced, and these are mounted on a barge 5 and towed to the site.

粗石1の集合体Aは、陸上で製作したものを台船5に
積み込むか、或は台船5上で粗石1群の配列作業や連結
作業を行って製作する。
The aggregate A of the rubble 1 is manufactured by loading the shore made on the berth 5 or by arranging and connecting the rubble 1 group on the berth 5.

〈ロ〉敷設(第1、5、6図) 敷設現場に到着したら、クリーン船6等で粗石1の集
合体Aを吊り上げ、海底の基礎捨石B上に順次据え付け
ていく。
<B> Laying (Figs. 1, 5 and 6) Upon arrival at the laying site, the aggregate A of the coarse stones 1 is lifted by the clean ship 6 or the like, and is sequentially installed on the basic rubble B on the sea floor.

粗石1の集合体Aを吊り上げる際、第1図に示すよう
に吊り枠7および吊り枠7に下げた多数の吊りワイヤ8
を用いると、集合体Aをバランスよく安全に吊ることが
できる。
When the aggregate A of the rubble 1 is lifted, as shown in FIG.
By using the above, the assembly A can be safely suspended in a well-balanced manner.

このとき、潜水夫は集合体Aの据付を補助するだけで
よい。
At this time, the diver only needs to assist the installation of the aggregate A.

集合体Aを構成する各粗石1は交差部にロープ材4を
巻き付けて僅かながら自由な移動が許容されているの
で、第6図に示すように基礎捨石B表面の凹凸に追随し
てなじみがよい。
Each rubble 1 constituting the aggregate A is wrapped with a rope material 4 at the intersection, and is allowed to move freely, albeit slightly, so that the rubble 1 follows the irregularities on the surface of the basic rubble B as shown in FIG. Is good.

〈ハ〉仕上げ工(第7図) 最後に潜水夫によって、各粗石1の均し仕上げする。<C> Finishing work (Fig. 7) Finally, each rubble 1 is leveled by a diver.

必要に応じ、隣接する粗石1間に発生した間隙を間詰
め9する。
If necessary, the gap generated between the adjacent rubbles 1 is thinned 9.

このようにして、基礎捨石Bの表面を洗掘防止用の粗
石1群で覆い洗掘を防止する。
In this manner, scouring is prevented by covering the surface of the basic rubble B with the rough stones 1 for preventing scouring.

〈本発明の効果〉 本発明は説明したようになるから次の効果が得られ
る。
<Effects of the Present Invention> The present invention is as described above, and the following effects can be obtained.

〈イ〉 粗石の集合体単位で敷切作業を行えるため、施
工効率が著しく向上する。
<A> The work efficiency can be remarkably improved because the work of laying stones can be done in units of coarse stones.

そのため、従来に比べて施工期間を大幅に短縮でき
る。
Therefore, the construction period can be significantly reduced as compared with the related art.

〈ロ〉 潜水夫の労働負担を軽減できるうえに、潜水時
間も短かくて済む。
<B> Not only can the diver's work load be reduced, but the diving time can be shortened.

そのため、潜水夫の労働環境の改善と安全性の向上が
図れる。
Therefore, the working environment and safety of the diver can be improved.

〈ハ〉 潜水夫の人数を削減できる。<C> The number of divers can be reduced.

〈ニ〉 敷設面積が増大するほど、施工面や経済面での
利点がより顕著となる。
<D> As the laying area increases, the construction and economic advantages become more remarkable.

〈ホ〉 隣接する各粗石間がロープ材で連結してあるの
で、洗掘防止効果が高い。
<E> Since the adjacent rubble stones are connected by rope material, the scouring prevention effect is high.

【図面の簡単な説明】[Brief description of the drawings]

第1図:本発明に係る洗掘防止工法の説明図であって粗
石の集合体を敷設時の斜視図 第2図:吊具を設けた粗石の部分断面図 第3図:粗石の連結状態を示す平面図 第4図:曳航時の説明図 第5図:粗石の集合体の敷設時の全体図 第6図:粗石の敷設状態を説明するための拡大図 第7図:粗石の仕上げ状態を説明するための拡大図
FIG. 1 is an explanatory view of a scouring prevention method according to the present invention, and is a perspective view when a rubble aggregate is laid. FIG. 2: A partial cross-sectional view of a rubble provided with a hanger FIG. Fig. 4: Illustration when towing Fig. 5: Overall view when laying aggregate of rubble Fig. 6: Enlarged view for explaining laying of rubble Fig. 7 : Enlarged view for explaining the finished state of rubble

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) E02B 3/14 301 E02D 15/10 ──────────────────────────────────────────────────続 き Continuation of front page (58) Investigated field (Int.Cl. 6 , DB name) E02B 3/14 301 E02D 15/10

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】基礎捨石の表面に洗掘防止用の粗石を敷設
する洗掘防止方法において、 隣接させて並べた複数の粗石間を、該各粗石が基礎捨石
表面の凹凸に追随可能にロープ材で連結して粗石の集合
体を予め製作し、 前記複数の粗石の集合体単位で基礎捨石の表面に順次敷
設することを特徴とする、 洗掘防止方法。
A scouring prevention method for laying rubble for preventing scouring on the surface of a basic rubble, wherein each rubble follows irregularities on the surface of the base rubble. A method for preventing scouring, characterized in that an aggregate of rubble is preliminarily manufactured by being connected with a rope material, and the plurality of aggregates of rubble are sequentially laid on the surface of a basic rubble.
JP1779890A 1990-01-30 1990-01-30 Scour prevention construction method Expired - Fee Related JP2884251B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1779890A JP2884251B2 (en) 1990-01-30 1990-01-30 Scour prevention construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1779890A JP2884251B2 (en) 1990-01-30 1990-01-30 Scour prevention construction method

Publications (2)

Publication Number Publication Date
JPH03224913A JPH03224913A (en) 1991-10-03
JP2884251B2 true JP2884251B2 (en) 1999-04-19

Family

ID=11953733

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1779890A Expired - Fee Related JP2884251B2 (en) 1990-01-30 1990-01-30 Scour prevention construction method

Country Status (1)

Country Link
JP (1) JP2884251B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007162321A (en) * 2005-12-13 2007-06-28 Sanei Marin Kk Block charging method for building upwelling flow generating structure and charging device used therefor

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2513973Y2 (en) * 1993-07-22 1996-10-09 昌司 行本 Natural stone block
JPH0731944U (en) * 1993-11-15 1995-06-16 昌司 行本 Natural stone block
EP1128111A1 (en) * 2000-02-22 2001-08-29 OFFICINE MACCAFERRI S.p.A. A process for the manufacture of a protecting and immobilising element of the mattress like type, and element so obtained
JP2011190665A (en) * 2010-03-17 2011-09-29 Nishimatsu Constr Co Ltd Hoisting implement for slope block
JP7057847B2 (en) * 2020-07-17 2022-04-20 鹿島建設株式会社 Construction method of scour prevention structure

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5640726B2 (en) 2010-12-21 2014-12-17 ソニー株式会社 Information processing apparatus, communication system, and charging method for wireless terminal apparatus

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5640726B2 (en) 2010-12-21 2014-12-17 ソニー株式会社 Information processing apparatus, communication system, and charging method for wireless terminal apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007162321A (en) * 2005-12-13 2007-06-28 Sanei Marin Kk Block charging method for building upwelling flow generating structure and charging device used therefor

Also Published As

Publication number Publication date
JPH03224913A (en) 1991-10-03

Similar Documents

Publication Publication Date Title
CN105421245B (en) Bent cap is without support steel hoop method construction technology
JP3527718B2 (en) Prestressed concrete structure
JP2884251B2 (en) Scour prevention construction method
CN107130715A (en) Teeth groove is poured after a kind of to be linked and packed the construction method of formula building roof system
CN206408639U (en) Assembled steel reinforced concrete composite bridge
CN107130716A (en) After pour teeth groove and be linked and packed formula building roof system
CN107227814A (en) Sectional construction method for large cantilever concrete structure
CN206769150U (en) After pour teeth groove and be linked and packed formula building roof system
CN106284415A (en) A kind of water intake caisson hang floating construction method
JPS6314909A (en) Scour-proof construction for underwater structure
JPH07207641A (en) Pier
CN214615737U (en) A blasting passive protection device
CN215107823U (en) Stone-built structure lighthouse
JPS5912274Y2 (en) Mooring device for floating fence
JP2000144675A (en) Scour prevention method
LU601115B1 (en) Method for Installing and Debugging Netting in Large-Scale Ship-Type Truss Fish Farming Platform
CN105735155A (en) A bridge mid-span sagging reinforcement device and its construction method
CN217733965U (en) Hydrophilic platform convenient to construct
SU1456508A1 (en) Method of reinforcing a foundation
JPS61277708A (en) Scouring-preventing device
CN109722980A (en) A kind of semi-rigid suspension arch bridge and its construction method
CN216865913U (en) Sleeve pre-buried type high-altitude operation soft platform
CN110359723A (en) A kind of old house use replacement or newly-increased assembled balcony structure and its construction method
JPH11107219A (en) Wire scaffold and construction thereof
JP2003171920A (en) Natural stone fixing unit and multiple nature type construction method using unit

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees