JP2887728B2 - Large structure installation equipment and installation method - Google Patents
[go: Go Back, main page]

JP2887728B2 - Large structure installation equipment and installation method - Google Patents

Large structure installation equipment and installation method

Info

Publication number
JP2887728B2
JP2887728B2 JP7132794A JP7132794A JP2887728B2 JP 2887728 B2 JP2887728 B2 JP 2887728B2 JP 7132794 A JP7132794 A JP 7132794A JP 7132794 A JP7132794 A JP 7132794A JP 2887728 B2 JP2887728 B2 JP 2887728B2
Authority
JP
Japan
Prior art keywords
installation
winding
lifting
suspension beam
large structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP7132794A
Other languages
Japanese (ja)
Other versions
JPH07257872A (en
Inventor
恒実 村山
宏信 林
清高 大江
三津夫 佐々木
皓 田中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP7132794A priority Critical patent/JP2887728B2/en
Publication of JPH07257872A publication Critical patent/JPH07257872A/en
Application granted granted Critical
Publication of JP2887728B2 publication Critical patent/JP2887728B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、吊り荷を吊り上げて据
付ける据付け装置及び据付け方法に係り、特に高炉等の
大型構造物の構成部材の据付け作業に適した据付け装置
及びこれを使用する据付け工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an installation apparatus and method for lifting and installing a suspended load, and more particularly to an installation apparatus suitable for installation of components of a large structure such as a blast furnace and an installation using the same. It concerns the construction method.

【0002】[0002]

【従来の技術】高炉建設または改修を例にとって説明す
ると、高炉鉄皮据付け工法は、図3に示すようにしてな
されている。図示されているように据付け作業に際し
て、先ず、高炉鉄皮30を囲繞する櫓を利用し作業デッ
キ32が構築される。この櫓上には主揚重機(図示せ
ず)が設置されており、その巻回ワイヤ33の先端部に
取り付けられたフック34には、例えば、2本の吊りワ
イヤ35a,35bが引っ掛けられている。これら吊り
ワイヤ35a,35bの先端部に取り付けられたクラン
プ36a,36bが、分割鉄皮31の上部に所定の間隔
で設けられた吊りピース37a,37bに係合されるこ
とにより、分割鉄皮31が主揚重機に吊下されている。
2. Description of the Related Art The construction or repair of a blast furnace will be described by way of example. The blast furnace iron shell installation method is performed as shown in FIG. In the installation work as shown in the figure, first, a work deck 32 is constructed using a turret surrounding the blast furnace steel shell 30. A main hoist (not shown) is installed on this tower, and, for example, two hanging wires 35a and 35b are hooked on a hook 34 attached to a tip end of the winding wire 33. I have. The clamps 36a, 36b attached to the distal ends of the suspending wires 35a, 35b are engaged with suspending pieces 37a, 37b provided at predetermined intervals on the upper part of the divided iron cover 31, thereby forming the divided iron cover 31. Are suspended from the main lifting machine.

【0003】また、分割鉄皮31の下部にも、所定の間
隔で吊りピース38a,38bが設けられており、これ
ら吊りピース38a,38bには鳶線39a,39bの
先端部に取り付けられたクランプ40a,40bがそれ
ぞれ係合されている。これら鳶線39a,39bは、シ
ーブ41,42,43をそれぞれ介して張り巡らされ、
作業デッキ32上に設置したウインチ44a,44bに
よって巻き取られるように成っている。また、クランプ
40a、40bをフック34に係合する場合もある。
Further, hanging pieces 38a, 38b are provided at predetermined intervals below the divided steel shell 31, and these hanging pieces 38a, 38b are provided with clamps attached to the distal ends of tongue wires 39a, 39b. 40a and 40b are engaged respectively. These tomblines 39a, 39b are stretched through sheaves 41, 42, 43, respectively.
The winch is wound by winches 44a and 44b installed on the work deck 32. Further, the clamps 40a and 40b may be engaged with the hook 34 in some cases.

【0004】即ち、分割鉄皮31の据付け作業は、地上
に仮置きされた分割鉄皮31を主揚重機により吊下して
作業デッキ32上に取り込み、この分割鉄皮31を櫓内
の中央部に吊り下げた後、合図者Aの指示でオペレータ
B,Cがウインチ44a,44bを操作して鳶線39
a,39bを巻き取って横引きすることにより、所定の
据付け位置に着座させ溶接して行われている。
[0004] That is, in the installation work of the divided steel frame 31, the divided steel frame 31 temporarily placed on the ground is suspended by a main lifting machine and taken into the work deck 32, and the divided steel frame 31 is placed in the center of the tower. The operator B, C operates the winches 44a, 44b according to the instruction of the signer A, and hangs the wire 39.
The a and 39b are wound and laterally pulled to be seated at a predetermined installation position and welded.

【0005】また、特公平2−61522号公報には、
高炉鉄皮内部にその径方向に沿って掛け渡した走行用ビ
ーム上に作業台車を搭載し、揚重設備により分割鉄皮を
作業台車上に搭載して、走行用ビーム上で作業台車を走
行させることにより分割鉄皮を所定の据付け位置に据え
付ける大型構造物の側壁据付工法及び該工法に用いる作
業台車が提案されている。
Also, Japanese Patent Publication No. 2-61522 discloses that
A work carriage is mounted on a traveling beam that extends across the inside of the blast furnace steel along the radial direction, and the split steel is mounted on the work carriage by the lifting equipment, and the work carriage travels on the traveling beam. There has been proposed a side wall installation method for a large structure in which a divided steel shell is installed at a predetermined installation position by doing so, and a work vehicle used for the installation method.

【0006】[0006]

【発明が解決しようとする課題】ところで、従来の大型
構造物の据付け技術には、次のような課題があった。即
ち、前者の据付け工法にあっては、鳶線39a,39b
が作業デッキ32上の広範囲に渡って張り巡らされるた
め、他の作業を規制する必要が生じ、又、鳶線39a,
39bを引っ掛け易いので安全上問題があった。
By the way, there are the following problems in the conventional technology for mounting large structures. That is, in the former installation method, the tomb wires 39a, 39b
Is spread over a wide area on the work deck 32, so that it is necessary to regulate other work.
There was a problem in safety because 39b was easily hooked.

【0007】一方、後者の据付け工法にあっては、高炉
分割鉄皮の内部に走行用ビームを設置すると共にその上
に作業台車を搭載する必要があり、且つ、据付けの進捗
に伴って走行用ビーム及び作業台車を順次上方へと移設
する必要があるので、据付け作業に多くの人員及び時間
を要し、作業コストが増大するという問題があった。
[0007] On the other hand, in the latter installation method, it is necessary to install a traveling beam inside the blast-furnace split steel shell and mount a work carriage on the beam, and as the installation progresses, the traveling beam is required. Since it is necessary to sequentially move the beam and the work carriage upward, there is a problem that the installation work requires a large number of people and time, and the work cost increases.

【0008】また、据付けを行う部材形状に応じて作業
台車の形状や部材の支持構造を変更する必要があるの
で、汎用性に乏しいという問題があった。
In addition, since it is necessary to change the shape of the work cart and the support structure of the members according to the shape of the member to be installed, there is a problem that the versatility is poor.

【0009】本発明の目的は、上記課題に鑑み、据付け
作業の人員及び時間を減少して作業コストを低減するこ
とができ、汎用性に富みかつ安全性が高い大型構造物の
据付け装置及び据付け工法を提供することにある。
SUMMARY OF THE INVENTION In view of the above-mentioned problems, an object of the present invention is to reduce the number of personnel and time required for installation work, thereby reducing the work cost, and to provide a versatile and highly safe installation apparatus and installation for large structures. To provide a construction method.

【0010】[0010]

【課題を解決するための手段】上記目的を達成すべく本
発明に係る大型構造物の据付け装置は、揚重機によって
吊り上げられる吊りビームと、この吊りビームに取り付
けられる複数の吊上げ部材と、これら吊上げ部材の先端
部で据付け部材を保持する保持具と、上記吊りビームに
搭載された巻取装置と、この巻取装置に巻回される巻回
ワイヤの先端部に取り付けられた係合具とを具備するも
のである。
In order to achieve the above object, an apparatus for installing a large structure according to the present invention comprises a hanging beam lifted by a hoist, a plurality of lifting members attached to the lifting beam, and a lifting member. A holder for holding the installation member at the distal end of the member, a winding device mounted on the hanging beam, and an engaging tool attached to the distal end of a winding wire wound around the winding device. It is provided.

【0011】上記据付け装置の構成において、好ましく
は、上記巻取装置が上記吊りビームの長手方向両端部に
それぞれ搭載されているものである。
In the configuration of the installation device, preferably, the winding device is mounted on each of both ends in the longitudinal direction of the suspension beam.

【0012】また、好ましくは、上記巻取装置が上記吊
りビームに回動自在に搭載されているものである。
Preferably, the winding device is rotatably mounted on the suspension beam.

【0013】一方、本発明に係る大型構造物の据付け工
法は、揚重機で吊りビームを吊り上げて、その複数の吊
上げ部材で据付け部材を吊下すると共に、上記吊りビー
ムに搭載した巻取装置によって固定側にその先端部を係
合した巻回ワイヤを巻き取ることにより、上記吊りビー
ムを横引きしてこれに吊下した据付け部材を所定の据付
け位置に据付けるようにしたものである。
On the other hand, in the method of installing a large structure according to the present invention, a lifting beam is lifted by a lifting machine, the mounting member is hung by a plurality of lifting members, and a winding device mounted on the hanging beam. By winding the winding wire having its distal end engaged with the fixed side, the suspension beam is laterally pulled, and the installation member suspended from the suspension beam is installed at a predetermined installation position.

【0014】上記据付け工法の構成において、好ましく
は、上記巻取装置を上記吊りビームの長手方向両端部に
それぞれ搭載し、各巻取装置によって固定側にその先端
部を係合した巻回ワイヤの巻き取り量を調整することに
より、上記吊りビームを横引きすると共に位置調整して
これに吊下した据付け部材を所定の据付け位置に据付け
るようにしたものである。
In the construction of the installation method, preferably, the winding device is mounted on each of both ends in the longitudinal direction of the suspension beam, and the winding wire is wound with the leading end engaged on the fixed side by each winding device. By adjusting the take-up amount, the suspension beam is laterally pulled and the position is adjusted, and the installation member suspended from the suspension beam is installed at a predetermined installation position.

【0015】[0015]

【作用】上記据付け装置の構成によれば、吊りビームに
取り付けられた複数の吊上げ部材の保持具で据付け部材
を保持した後、揚重機によって吊りビームを吊り上げる
と、吊りビームに据付け部材が吊下される。そして、上
記吊りビームに搭載された巻取装置に巻回されている巻
回ワイヤの係合具を固定側に係合した後、この巻取装置
によって巻回ワイヤを巻き取ると、上記吊りビームが固
定側へ横引きされ、この吊りビームに吊下された据付け
部材が所定の据付け位置に据付けられるものである。
According to the construction of the installation device, after the installation member is held by the holders of the plurality of lifting members attached to the suspension beam, and the lifting beam is lifted by the hoist, the installation member is suspended by the suspension beam. Is done. Then, after engaging the engaging member of the winding wire wound on the winding device mounted on the hanging beam on the fixed side, winding the winding wire by the winding device, the hanging beam Is pulled laterally to the fixed side, and an installation member suspended by the suspension beam is installed at a predetermined installation position.

【0016】また、上記巻取装置を上記吊りビームの長
手方向両端部にそれぞれ搭載すれば、各巻取装置によっ
て巻回ワイヤの巻き取り量を調整することにより、上記
吊りビームが固定側へ横引きされるだけでなく、その位
置が微調整され、この吊りビームに吊下された据付け部
材がより正確にに据付けられるものである。
Further, if the winding device is mounted at both ends in the longitudinal direction of the hanging beam, the amount of winding of the winding wire is adjusted by each winding device, whereby the hanging beam is laterally pulled to the fixed side. In addition, the position is finely adjusted, and the installation member suspended by the suspension beam can be more accurately installed.

【0017】さらに、上記巻取装置を上記吊りビームに
回動自在に搭載すれば、巻回ワイヤの係合具の固定方向
へ向けて巻取装置を傾動させることにより、巻取装置か
ら巻回ワイヤが離脱するのが防止されるものである。
Further, if the winding device is rotatably mounted on the suspension beam, the winding device is tilted in the direction in which the engagement member of the winding wire is fixed, so that the winding device can rotate from the winding device. The wire is prevented from coming off.

【0018】一方、上記据付け工法の構成によれば、先
ず、揚重機で吊りビームを吊り上げて、その複数の吊上
げ部材で据付け部材を吊下する。そして、上記吊りビー
ムに搭載した巻取装置の巻回ワイヤの先端部を固定側に
係合し、この巻取装置によって巻回ワイヤを巻き取る。
すると、巻回ワイヤを巻き取るにつれて上記吊りビーム
が横引きされ、この吊りビームに吊下された据付け部材
が所定の据付け位置に据付けられるものである。
On the other hand, according to the construction of the above-described installation method, first, the lifting beam is lifted by the lifting machine, and the mounting member is hung by the plurality of lifting members. Then, the leading end of the winding wire of the winding device mounted on the suspension beam is engaged with the fixed side, and the winding wire is wound by the winding device.
Then, as the winding wire is wound up, the suspension beam is pulled laterally, and the installation member suspended by the suspension beam is installed at a predetermined installation position.

【0019】また、上記据付け工法において、上記吊り
ビームの長手方向両端部に巻取装置をそれぞれ搭載し、
各巻取装置によって巻回ワイヤの巻き取り量を調整す
る。すると、巻回ワイヤを巻き取るにつれて上記吊りビ
ームが固定側へ横引きされるだけでなく、その位置が微
調整され、この吊りビームに吊下された据付け部材が所
定の据付け位置により正確かつ容易に据付けられるもの
である。
In the above-mentioned installation method, winding devices are mounted on both ends of the suspension beam in the longitudinal direction, respectively.
The winding amount of the winding wire is adjusted by each winding device. Then, as the winding wire is wound up, the hanging beam is not only laterally pulled to the fixed side, but also its position is finely adjusted, and the installation member suspended by this hanging beam can be accurately and easily adjusted to a predetermined installation position. It is installed in.

【0020】[0020]

【実施例】以下、本発明に係る大型構造物の据付け装置
及び据付け工法の好適実施例を添付図面に基づいて詳細
に説明する。図1に示すように、第1の実施例の大型構
造物の据付け装置1は、固定クレーン,走行クレーン又
はユニック等の揚重機(図示せず)によって吊り上げら
れる吊りビーム2を具備している。この吊りビーム2
は、例えば、H鋼材等にて形成されており、その長手方
向寸法が据付け部材3の最大吊り点間隔よりも大きく設
定されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of the apparatus and method for installing a large structure according to the present invention will be described below in detail with reference to the accompanying drawings. As shown in FIG. 1, a large structure installation apparatus 1 of the first embodiment includes a suspension beam 2 that is lifted by a lifting machine (not shown) such as a fixed crane, a traveling crane, or a UNIC. This hanging beam 2
Is made of, for example, an H steel material, and its longitudinal dimension is set to be larger than the maximum hanging point interval of the installation member 3.

【0021】吊りビーム2の上両端部には、上記揚重機
のフック4に引っ掛けるための引掛けワイヤ5,6が取
り付けられている。具体的には、これら引掛けワイヤ
5,6の基端環部はフック4に引っ掛けられ、その先端
環部にはそれぞれクランプ(図示せず)が取り付けられ
ている。各クランプは、吊りビーム2の上両端部に溶接
固定した吊りピース7,8に係合されている。尚、本実
施例にあっては、吊りビーム2の上両端部に引掛けワイ
ヤ5,6を取り付けたが、これに限らず、チェーン等の
他の吊上げ部材やフック4に係合可能な金具等を使用し
ても良い。
At both upper ends of the suspension beam 2, hook wires 5, 6 for hooking on the hooks 4 of the hoist are attached. Specifically, the base ring portions of the hooking wires 5 and 6 are hooked on the hook 4, and clamps (not shown) are respectively attached to the distal end ring portions. Each clamp is engaged with a suspension piece 7, 8 which is welded and fixed to both upper ends of the suspension beam 2. In this embodiment, the hook wires 5 and 6 are attached to the upper and lower ends of the suspension beam 2, but the invention is not limited to this. Etc. may be used.

【0022】また、吊りビーム2の下両端部には係合金
具(図示せず)が溶接固定されており、これら係合金具
には吊りワイヤ9,10の基端環部に取り付けたクラン
プ(図示せず)が係合されている。一方、各吊りワイヤ
9,10の先端部には、据付け部材3を保持するための
クランプやフック等の保持具11がそれぞれ取り付けら
れている。この保持具11は、据付け部材3を直接把持
するか、或いは据付け部材3に仮止めした吊りピース
(図示せず)に係合されて、据付け部材3を保持するよ
うに成っている。
At the lower end portions of the suspension beam 2, engagement fittings (not shown) are welded and fixed, and these engagement fittings are clamped to the base wires of the suspension wires 9 and 10 (clamps). (Not shown) is engaged. On the other hand, holders 11 such as clamps and hooks for holding the installation member 3 are attached to the distal ends of the suspension wires 9 and 10, respectively. The holder 11 directly holds the installation member 3 or is engaged with a suspension piece (not shown) temporarily fixed to the installation member 3 to hold the installation member 3.

【0023】尚、本実施例にあっては、吊りビーム2の
下両端部に吊りワイヤ9,10を取り付けているが、こ
れに限らず、チェーン等の他の吊上げ部材を採用しても
良い。また、本実施例の据付け装置1は利用度の高い2
点吊り据付け装置として構成したが、これに限らず、上
記吊りビーム2の下部に3本以上の吊りワイヤを有する
多点吊り据付け装置として構成することができる。
In this embodiment, the suspension wires 9, 10 are attached to the lower ends of the suspension beam 2, but the invention is not limited to this, and another lifting member such as a chain may be employed. . In addition, the installation apparatus 1 of the present embodiment has a high utilization 2
Although the present invention has been described as a point hanging installation apparatus, the present invention is not limited to this, and a multi-point hanging installation apparatus having three or more hanging wires below the hanging beam 2 can be used.

【0024】また、上記吊りビーム2上には、巻回ワイ
ヤ12を巻取り又は巻き戻しする機構を備えたウインチ
等の巻取装置14が搭載されている。本実施例にあって
は、吊りビーム2上の長手方向両端部に2台の巻取装置
14a,14bが搭載されており、各巻取装置14a,
14bは、それぞれの巻回ワイヤ12a,12bが上記
引掛けワイヤ5,6と接触しないように、上記吊りピー
ス7,8の内側に搭載されている。さらに、各巻取装置
14a,14bは、吊りビーム2上の長手方向両端部に
おいて、長手方向両外方へそれぞれ傾斜させてハの字状
に固定することが、各巻取装置14a,14bから巻回
ワイヤ12a,12bが離脱するのを防止する上で好ま
しい。尚、各巻取装置14a,14bは、例えば、ペン
ダント方式のボタン操作により、巻取り又は巻き戻し操
作するように成っている。
A winding device 14 such as a winch having a mechanism for winding or rewinding the winding wire 12 is mounted on the suspension beam 2. In the present embodiment, two winding devices 14a and 14b are mounted at both ends in the longitudinal direction on the suspension beam 2, and each of the winding devices 14a and 14b is mounted.
14b is mounted inside the suspending pieces 7, 8 so that the wound wires 12a, 12b do not contact the hooking wires 5, 6. Further, each winding device 14a, 14b can be fixed at the both ends in the longitudinal direction on the suspension beam 2 by inclining outward in both longitudinal directions, respectively, to form a C-shape. It is preferable to prevent the wires 12a and 12b from coming off. Each of the winding devices 14a and 14b is configured to perform a winding or rewinding operation by operating a pendant button, for example.

【0025】そして、各巻取装置14a,14bに巻回
される巻回ワイヤ12a,12bの先端部には、クラン
プやフック等の係合具13a,13bが取り付けられて
いる。これら係合具13a,13bは、例えば、櫓(図
示せず)の支柱等の固定側に取り付けた係合ピース16
a,16bに係合固定されるものである。具体的には、
上記係合具13a,13bは、据付け部材3を据付け位
置へ横引きしたい方向の固定側に係合固定される。即
ち、この固定側は、上記揚重機による初期吊下位置に対
して、据付け位置よりも外方に位置している。
[0025] At the distal ends of the winding wires 12a and 12b wound around the winding devices 14a and 14b, engaging members 13a and 13b such as clamps and hooks are attached. These engaging members 13a and 13b are, for example, engaging pieces 16 attached to a fixed side such as a column of a tower (not shown).
a and 16b. In particular,
The engaging members 13a and 13b are engaged and fixed on the fixed side in the direction in which the mounting member 3 is to be laterally pulled to the installation position. That is, the fixed side is located outside the installation position with respect to the initial suspension position by the hoist.

【0026】次に、第1の実施例における作用を、本発
明に係る大型構造物の据付け工法を説明しながら述べ
る。本実施例の大型構造物の据付け工法は、上記据付け
装置1を使用して行われる。先ず、上記吊りビーム2に
取り付けられた吊りワイヤ9,10の保持具11によ
り、高炉鉄皮を据え付ける際、分割鉄皮等の据付け部材
3を保持すると共に、上記吊りビーム2の上両端部に取
り付けられた引掛けワイヤ5,6を揚重機のフック4に
引っ掛ける。
Next, the operation of the first embodiment will be described with reference to the method of installing a large structure according to the present invention. The installation method for a large structure according to the present embodiment is performed using the installation apparatus 1 described above. First, when the blast furnace steel is installed by the holders 11 of the hanging wires 9 and 10 attached to the hanging beam 2, the installation members 3 such as the split steel are held and the upper ends of the hanging beam 2 The attached hook wires 5 and 6 are hooked on the hook 4 of the hoist.

【0027】次に、揚重機の巻回ワイヤを巻上げてその
先端に取り付けられたフック4を上昇させることによ
り、上記吊りビーム2を吊り上げて地上に仮置きされた
据付け部材3を作業デッキ15上に取り込み、この据付
け部材3を櫓(図示せず)内の中央部に吊り下げる。
Next, by winding up the winding wire of the hoist and raising the hook 4 attached to the tip of the lifting wire, the hanging beam 2 is lifted and the installation member 3 temporarily placed on the ground is placed on the work deck 15. And the installation member 3 is suspended at a central portion in a tower (not shown).

【0028】そして、作業者が各巻取装置14a,14
bの巻回ワイヤ12a,12bを巻き戻しつつ手繰り寄
せ、それぞれの先端部に取り付けられた係合具13a,
13bを、例えば、櫓の支柱等の固定側に取り付けた係
合ピース16a,16bに係合固定する。
Then, the operator operates each of the winding devices 14a, 14a.
b, while the unwinding wire 12a, 12b is unwound and pulled back, the engaging members 13a, 13a,
13b is engaged and fixed to engaging pieces 16a, 16b attached to a fixed side such as a column of a tower, for example.

【0029】その後、ペンダント方式のボタン操作によ
り各巻取装置14a,14bを操作して巻回ワイヤ12
a,12bを巻き取ると、上記吊りビーム2が櫓の支柱
等の固定側へ横引きされ、この吊りビーム2に吊下され
た据付け部材3を所定の据付け位置に着座させ溶接して
据付けることができるものである。
Thereafter, the respective winding devices 14a and 14b are operated by operating a pendant button, and the winding wire 12 is operated.
When a and 12b are wound up, the hanging beam 2 is laterally pulled to a fixed side such as a column of the tower, and the installation member 3 suspended by the hanging beam 2 is seated at a predetermined installation position and is installed by welding. Is what you can do.

【0030】上記吊りビーム2を固定側へ横引きするだ
けなら吊りビーム2に1台の巻取装置14を搭載すれば
良いが、特に、本実施例にあっては、上記吊りビーム2
上の長手方向両端部に2台の巻取装置14a,14bが
搭載されているので、各巻取装置14a,14bの巻回
ワイヤ12a,12bの巻取り量を調整することによ
り、上記吊りビーム2が固定側へ横引きされるだけでな
く、その位置を微調整することができ、この吊りビーム
2に吊下された据付け部材3をより正確に据付けること
ができる。
If the suspension beam 2 is only to be pulled laterally to the fixed side, a single winding device 14 may be mounted on the suspension beam 2. In particular, in this embodiment, the suspension beam 2
Since the two winding devices 14a and 14b are mounted at both ends in the upper longitudinal direction, by adjusting the winding amount of the winding wires 12a and 12b of each of the winding devices 14a and 14b, the suspension beam 2 can be adjusted. Can be finely adjusted as well as being laterally pulled to the fixed side, and the installation member 3 suspended on the suspension beam 2 can be more accurately installed.

【0031】据付け完了後は、ペンダント方式のボタン
操作により各巻取装置14a,14bを操作して巻回ワ
イヤ12a,12bを巻き戻し、櫓内の中央部まで据付
け装置1を戻す。そして、巻回ワイヤ12a,12bの
係合具13a,13bを固定側から外し、揚重機の巻回
ワイヤを巻き上げ、次の据付け部材3の据付け作業へと
移行する。
After completion of the installation, the winding wires 12a and 12b are rewound by operating the respective winding devices 14a and 14b by operating a pendant button, and the installation device 1 is returned to the center of the tower. Then, the engaging members 13a and 13b of the winding wires 12a and 12b are removed from the fixed side, the winding wire of the hoist is wound up, and the process proceeds to the next installation work of the installation member 3.

【0032】以上のように、第1の実施例の据付け装置
1を使用した本実施例の据付け工法によれば、従来の据
付け工法に比べて、据付け作業の人員及び時間を減少す
ることができ、その結果、作業コストを低減することが
できる。また、従来の据付け工法のように作業デッキ1
5上で鳶線を張り巡らす必要がないので、作業の安全性
を確保することができる。さらに、据付け部材3の形状
等に装置構造が左右されないので、汎用性に富んでい
る。特に、本実施例は、据付け部材3の搬入口が制限さ
れている場合に極めて有効である。
As described above, according to the installation method of the present embodiment using the installation apparatus 1 of the first embodiment, it is possible to reduce the number and time of the installation work as compared with the conventional installation method. As a result, work costs can be reduced. Also, as in the conventional installation method, the work deck 1
Since there is no need to run a tomb line on the top 5, work safety can be ensured. Further, since the device structure is not affected by the shape of the mounting member 3 and the like, the versatility is high. In particular, this embodiment is extremely effective when the entrance of the installation member 3 is restricted.

【0033】また、図2は、本発明に係る大型構造物の
据付け装置の第2の実施例における要部を示す概略図で
ある。図示されているように、第2の実施例の据付け装
置21にあっては、上記巻取装置14a,14bが上記
吊りビーム2上の長手方向両端部に回動自在に搭載され
ている。具体的には、上記吊りビーム2上の長手方向両
端部には回動台座22がそれぞれ設けられており、各回
動台座22上に各巻取装置14a,14bが搭載されて
いるものである。
FIG. 2 is a schematic view showing a main part of a second embodiment of the apparatus for installing a large structure according to the present invention. As shown in the drawing, in the installation device 21 of the second embodiment, the winding devices 14a and 14b are rotatably mounted on both ends of the hanging beam 2 in the longitudinal direction. More specifically, rotating pedestals 22 are provided at both ends in the longitudinal direction of the suspension beam 2, and the winding devices 14 a and 14 b are mounted on each of the rotating pedestals 22.

【0034】第2の実施例は、基本的には第1の実施例
と同様の作用効果を奏するが、特に第2の実施例にあっ
ては、上記巻取装置14a,14bが上記吊りビーム2
に設けられた回動台座22上に搭載されているので、巻
回ワイヤ12a,12bの係合具13a,13bの固定
方向へ向けて回動台座22により回動させて各巻取装置
14a,14bを傾動させることにより、各巻取装置1
4a,14bから巻回ワイヤ12a,12bが離脱する
のを防止することができるものである。
The second embodiment basically has the same function and effect as the first embodiment. In particular, in the second embodiment, the winding devices 14a and 14b are connected to the suspension beams 14a and 14b. 2
Is mounted on a rotating pedestal 22 provided on the winding wire 12a, the winding devices 14a, 14b are rotated by the rotating pedestal 22 in a direction in which the engaging members 13a, 13b of the winding wires 12a, 12b are fixed. By tilting the
It is possible to prevent the wound wires 12a, 12b from being detached from the wires 4a, 14b.

【0035】[0035]

【発明の効果】以上述べたように、本発明に係る大型構
造物の据付け装置及び据付け工法によれば、据付け作業
の人員及び時間を減少して作業コストを低減することが
でき、汎用性に富みかつ安全性が高いという優れた効果
を発揮する。
As described above, according to the apparatus and method for installing a large structure according to the present invention, the number of personnel and time required for the installation work can be reduced, and the work cost can be reduced. It has an excellent effect of being rich and highly safe.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る大型構造物の据付け装置の第1の
実施例を示す概略図である。
FIG. 1 is a schematic view showing a first embodiment of a large structure installation apparatus according to the present invention.

【図2】本発明に係る大型構造物の据付け装置の第2の
実施例における要部を示す概略図である。
FIG. 2 is a schematic view showing a main part of a second embodiment of the apparatus for installing a large structure according to the present invention.

【図3】従来の大型構造物の据付け工法の一例を示す概
略図である。
FIG. 3 is a schematic view showing an example of a conventional large-structure installation method.

【符号の説明】[Explanation of symbols]

1 据付け装置 2 吊りビーム 3 据付け部材 4 フック 5,6 引掛けワイヤ 7,8 吊りピース 9,10 吊りワイヤ 11 保持具 12,12a,12b 巻回ワイヤ 13a,13b 係合具 14,14a,14b 巻取装置 15 作業デッキ 21 据付け装置 22 回動台座 30 高炉鉄皮 31 分割鉄皮 32 作業デッキ 33 巻回ワイヤ 34 フック 35a,35b 吊りワイヤ 36a,36b クランプ 37a,37 吊りピース 38a,38b 吊りピース 39a,39b 鳶線 40a,40b クランプ 41,42,43 シーブ 44a,44b ウインチ A 合図者 B,C オペレータ DESCRIPTION OF SYMBOLS 1 Installation apparatus 2 Hanging beam 3 Installation member 4 Hook 5, 6 Hanging wire 7, 8 Hanging piece 9, 10 Hanging wire 11 Holder 12, 12a, 12b Winding wire 13a, 13b Engagement tool 14, 14a, 14b Winding Picking device 15 Work deck 21 Installation device 22 Rotating pedestal 30 Blast furnace steel 31 Split steel 32 Work deck 33 Winding wire 34 Hook 35a, 35b Hanging wire 36a, 36b Clamp 37a, 37 Hanging piece 38a, 38b Hanging piece 39a, 39b Tobi wire 40a, 40b Clamp 41, 42, 43 Sheave 44a, 44b Winch A Signaler B, C Operator

───────────────────────────────────────────────────── フロントページの続き (72)発明者 大江 清高 福岡県北九州市戸畑区大字中原46−59 新日本製鐵株式会社 機械・プラント事 業部内 (72)発明者 佐々木 三津夫 千葉県富津市新富20−1 新日本製鐵株 式会社 技術開発本部内 (72)発明者 田中 皓 福岡県北九州市戸畑区大字中原46番地の 59 日鐵プラント設計株式会社内 (56)参考文献 特開 昭58−207287(JP,A) 実開 昭62−89279(JP,U) 実開 平3−100272(JP,U) (58)調査した分野(Int.Cl.6,DB名) B66C 1/00 - 1/68 B66C 13/08 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Kiyotaka Oe 46-59 Ohara Nakahara, Tobata-ku, Kitakyushu-shi, Fukuoka Nippon Steel Corporation Machinery & Plant Business Department (72) Inventor Mitsuo Sasaki 20 Shintomi, Futtsu-shi, Chiba -1 Inside Nippon Steel Corporation Technology Development Division (72) Inventor Akira Tanaka 59 Nippon Steel Plant Design Co., Ltd., 46-46 Nakahara, Tobata-ku, Kitakyushu-shi, Fukuoka Prefecture (56) References JP-A-58-207287 (JP, A) JP-A 62-89279 (JP, U) JP-A 3-100272 (JP, U) (58) Fields investigated (Int. Cl. 6 , DB name) B66C 1/00-1 / 68 B66C 13/08

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】揚重機によって吊り上げられる吊りビーム
と、該吊りビームに取り付けられる複数の吊上げ部材
と、該吊上げ部材の先端部で据付け部材を保持する保持
具と、上記吊りビームに搭載された巻取装置と、該巻取
装置に巻回される巻回ワイヤの先端部に取り付けられた
係合具とを具備することを特徴とする大型構造物の据付
け装置。
1. A lifting beam to be lifted by a lifting machine, a plurality of lifting members attached to the lifting beam, a holder for holding an installation member at a tip of the lifting member, and a winding mounted on the lifting beam. An installation device for a large structure, comprising: a take-up device; and an engaging tool attached to a distal end portion of a winding wire wound around the take-up device.
【請求項2】前記巻取装置が、上記吊りビームの長手方
向両端部にそれぞれ搭載されている請求項1に記載の大
型構造物の据付け装置。
2. The installation apparatus for a large structure according to claim 1, wherein said winding devices are respectively mounted on both ends in the longitudinal direction of said suspension beam.
【請求項3】前記巻取装置が、上記吊りビームに回動自
在に搭載されている請求項1または請求項2に記載の大
型構造物の据付け装置。
3. The large structure installation apparatus according to claim 1, wherein the winding device is rotatably mounted on the suspension beam.
【請求項4】揚重機で吊りビームを吊り上げて、その複
数の吊上げ部材で据付け部材を吊下すると共に、上記吊
りビームに搭載した巻取装置によって固定側にその先端
部を係合した巻回ワイヤを巻き取ることにより、上記吊
りビームを横引きしてこれに吊下した据付け部材を所定
の据付け位置に据付けるようにしたことを特徴とする大
型構造物の据付け工法。
4. A winding in which a lifting beam is lifted by a lifting machine, an installation member is hung by a plurality of lifting members, and a leading end thereof is engaged with a fixed side by a winding device mounted on the lifting beam. An installation method for a large structure, wherein the suspension beam is laterally drawn by winding a wire, and an installation member suspended from the suspension beam is installed at a predetermined installation position.
【請求項5】前記巻取装置を上記吊りビームの長手方向
両端部にそれぞれ搭載し、各巻取装置によって固定側に
その先端部を係合した巻回ワイヤの巻き取り量を調整す
ることにより、上記吊りビームを横引きすると共に位置
調整してこれに吊下した据付け部材を所定の据付け位置
に据付けるようにした請求項4に記載の大型構造物の据
付け工法。
5. The winding device is mounted on each of both ends in the longitudinal direction of the suspension beam, and the amount of winding of the winding wire whose leading end is engaged on the fixed side by each winding device is adjusted. 5. The method for installing a large structure according to claim 4, wherein the suspension beam is laterally pulled and adjusted in position, and an installation member suspended therefrom is installed at a predetermined installation position.
JP7132794A 1994-03-17 1994-03-17 Large structure installation equipment and installation method Expired - Lifetime JP2887728B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7132794A JP2887728B2 (en) 1994-03-17 1994-03-17 Large structure installation equipment and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7132794A JP2887728B2 (en) 1994-03-17 1994-03-17 Large structure installation equipment and installation method

Publications (2)

Publication Number Publication Date
JPH07257872A JPH07257872A (en) 1995-10-09
JP2887728B2 true JP2887728B2 (en) 1999-04-26

Family

ID=13457351

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7132794A Expired - Lifetime JP2887728B2 (en) 1994-03-17 1994-03-17 Large structure installation equipment and installation method

Country Status (1)

Country Link
JP (1) JP2887728B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107140533A (en) * 2017-05-25 2017-09-08 河南成兴建设工程有限公司 A kind of hanging method of concrete T type crane girder

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3100272U (en) 2003-09-05 2004-05-13 株式会社 コムスン Stationary measuring instrument

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3100272U (en) 2003-09-05 2004-05-13 株式会社 コムスン Stationary measuring instrument

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107140533A (en) * 2017-05-25 2017-09-08 河南成兴建设工程有限公司 A kind of hanging method of concrete T type crane girder

Also Published As

Publication number Publication date
JPH07257872A (en) 1995-10-09

Similar Documents

Publication Publication Date Title
JP2887728B2 (en) Large structure installation equipment and installation method
JPH08218641A (en) Method and device for aerial building of pillar material
JP2855014B2 (en) Disassembled jib crane
JPH11286386A (en) Large structure installation equipment and installation method
JP2720339B2 (en) Cable laying method
JP2003180009A (en) Wire transfer method
JPH0940236A (en) Wire rope winding device
JP2551161Y2 (en) Overhead traveling crane equipment
JP4354055B2 (en) Overhanging method for overhead ground wire
JPH0631156B2 (en) Crane interposition rope device
JPS58123811A (en) Method for removing body of converter
JPH06210074A (en) Stage hanging mechanism
JP2018090372A (en) Workpiece conveyance method using crane
JP3193334B2 (en) Gondola steady rest device
JPH10152288A (en) Suspension jig
JPH07137991A (en) Wire rope hoisting device
JP3330525B2 (en) How to install the integrated assembly escalator
CN220278641U (en) A multifunctional workbench for electric welding
JPH09315299A (en) Pipe transfer device
JPH11315311A (en) How to suspend the blast furnace replacement stage in the furnace
JP2560703Y2 (en) Jig for sling
JPH0891773A (en) Overhead traveling crane
JP2659083B2 (en) Method and device for mounting wire on pedestal etc.
JPH08226121A (en) Placed pile reinforced steel cage construction equipment
JPS6317792A (en) Method and device for exchanging wire rope for crane

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19981222