JP2888424B2 - Roving winding method - Google Patents
Roving winding methodInfo
- Publication number
- JP2888424B2 JP2888424B2 JP8046781A JP4678196A JP2888424B2 JP 2888424 B2 JP2888424 B2 JP 2888424B2 JP 8046781 A JP8046781 A JP 8046781A JP 4678196 A JP4678196 A JP 4678196A JP 2888424 B2 JP2888424 B2 JP 2888424B2
- Authority
- JP
- Japan
- Prior art keywords
- bobbin
- roving
- length
- rail
- height position
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Spinning Or Twisting Of Yarns (AREA)
Description
【0001】[0001]
【産業上の利用分野】この発明は粗紡機における粗糸巻
取方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for winding a roving in a roving machine.
【0002】[0002]
【従来の技術】従来、粗紡機で巻かれた粗糸満ボビン
(以下、満ボビンと記す)をボビンキャリッジに吊下し
て精紡クリールの予備レールへ搬送し、精紡クリールで
消尽された小玉ボビンを予備レールの満ボビンと交換、
篠継し、小玉ボビンの残粗糸をロービングストリッパで
除去し、空ボビンとして粗紡機へ返送する粗糸ボビン自
動搬送システムが知られている。このシステムにおい
て、片側で前後2列から成る精紡クリールでは、篠継が
自動的に行われている(特開昭62−53425号,特
開昭64−52828号等)。この篠継装置の口出しノ
ズルは口出位置において、下降位置に取り降された満ボ
ビンの所定の高さ位置の外周と対向して吸引動作をす
る。そのため、満ボビンの粗糸端は、篠継装置の下降位
置に取り降された時に、口出位置の口出しノズルの吸引
口と対向する高さ位置になければ口出し動作が正しく行
われない。そのため、従来は粗紡機で満ボビンに巻取る
際、粗糸全長が目標値を越えてから再び前記高さ位置と
なったときに機台を停止している。2. Description of the Related Art Conventionally, a full bobbin wound with a roving machine (hereinafter referred to as a full bobbin) is suspended on a bobbin carriage, conveyed to a spare spinning creel rail, and consumed by the spinning creel. Replace bobbin with full bobbin of spare rail,
A roving bobbin automatic transfer system is known in which a roving stripper removes the remaining roving from a small ball bobbin with a roving stripper and returns it to the roving machine as an empty bobbin. In this system, Shinotsu is automatically performed on a spinning creel consisting of two rows on one side (Japanese Patent Application Laid-Open Nos. Sho 62-53425 and 64-52828). In the outlet position, the outlet nozzle of the Shinotsu device performs a suction operation in opposition to the outer periphery of the full bobbin taken down to the lower position at a predetermined height position. For this reason, when the roving end of the full bobbin is taken down to the lowered position of the shino splicing device, the pouring operation is not performed properly unless the roving end is at a height position facing the suction port of the pouring nozzle at the pouring position. For this reason, conventionally, when winding on a full bobbin using a roving machine, the machine stand is stopped when the overall length of the roving exceeds the target value and returns to the height position again.
【0003】[0003]
【発明が解決しようとする課題】前記によれば、粗糸巻
取張力等の誤差により、粗糸全長が目標値となったとき
のボビンレール高さは一定とならない。しかも、満管停
止後、ドッフィングのためにボビンレールを下降させる
関係上、その下降の際にボビンレールの昇降切換が行わ
れることを防止するためにボビンレールの上昇途中で停
止させる場合があり、その際ボビンレールの上昇途中で
前記高さ位置を過ぎた直後に満管長となったときには、
紡出状態でボビンレールはそれから更にほぼ1往復して
前記高さ位置にて停止することになる。この1往復分
(2層分)の巻量は粗糸長にすると70〜80ヤードで
かなり余分に巻かれることになり、最大この程度のばら
つきが玉揚毎の満ボビンに生じていた。ところで前記篠
継装置は精紡クリールの片側において少なくともクリー
ル1列分を精紡機の両側で同時的に篠継するので、予備
レールに予め準備する満ボビンの数は、精紡機の錘数の
1/2である。例えば精紡機の錘数が粗紡機の錘数の8
倍に設定してある時、粗紡機の玉揚げ4回分の満ボビン
が精紡予備レールに準備される。この時に、前記のよう
に満ボビンの満管長がかなりばらついているので、小玉
ボビンとなった時の残粗糸量が大きくばらつく。このよ
うに残粗糸量のばらついた小玉ボビンをロービンストリ
ッパで処理する時、その処理時間を残粗糸の多い小玉ボ
ビンに応じて設定せねばならず、ボビンストリップ時間
が長くなり、効率が悪い。しかも、残粗糸が数10ヤー
ドも残ることもあって、折角紡出した粗糸が無駄となる
量が多くなる傾向にあった。According to the above, the height of the bobbin rail when the total length of the roving reaches the target value is not constant due to an error in the roving winding tension and the like. In addition, after the full load is stopped, the bobbin rail is lowered for doffing.Therefore, there is a case where the bobbin rail is stopped halfway up in order to prevent the bobbin rail from being moved up and down during the descent. At that time, when the bobbin rail has reached the full length just after passing the height position during the ascent of the bobbin rail,
In the spinning state, the bobbin rail will then make approximately one more reciprocation and stop at the level. When the roving length is set to 70 to 80 yards, the winding amount for one reciprocation (for two layers) is considerably extra wound, and this maximum variation has occurred in the full bobbin for each doffing. By the way, since the Shino splicer simultaneously sprinkles at least one row of creels on one side of the spinning creel on both sides of the spinning machine at the same time, the number of full bobbins prepared in advance on the spare rail is one of the number of spindles of the spinning machine. / 2. For example, the number of spindles of the spinning machine is 8
When set to double, full bobbins for four doffings of the roving machine are prepared on the spinning spare rail. At this time, since the full bobbin length of the full bobbin varies considerably as described above, the residual roving amount when the bobbin becomes a small bobbin varies greatly. When processing the small bobbin with the remaining roving amount in this way with the low-bin stripper, the processing time must be set according to the small bobbin with a large amount of the remaining roving, and the bobbin stripping time becomes longer, and the efficiency is reduced. bad. In addition, the residual roving may remain for several tens of yards, and the amount of roving spun at the angle is likely to increase.
【0004】[0004]
【課題を解決するための手段】この発明は、粗紡機にお
いてボビン胴巻部においてもボビンレールの昇降方向を
切換可能に構成しておき、満ボビンとなるまでの適宜の
タイミングで、その時点での紡出長と予め設定した満管
長とから残り紡出長を演算すると共に、その時点から粗
糸を予め設定した数層分巻取る際の数層分の粗糸長を演
算し、残り紡出長をその数層分の粗糸長と比較して残り
紡出長が数層分の粗糸長以下に達したとき満ボビン時の
最終粗糸端高さ位置を予測演算し、その演算結果と予め
設定した粗糸端目標高さ位置に基づいてボビンレールの
昇降切換位置を演算し、最終粗糸端高さ位置が目標高さ
位置となるようにレヤーピッチを変えることなくボビン
レールの昇降切換をボビン胴巻部において制御するよう
にした。これにより、紡出粗糸の無駄が少なくなると共
に篠継の為の粗糸の口出し作業が容易になる。SUMMARY OF THE INVENTION The present invention relates to a roving machine in which a bobbin rail is lifted and lowered in a bobbin body winding section.
It is configured to be switchable, and at an appropriate timing until the bobbin becomes full, the remaining spinning length is calculated from the spinning length at that time and the preset full length, and the roving yarn is preliminarily calculated from that time. Calculate the roving length of several layers when winding up for the set number of layers, compare the remaining spun length with the roving length of the several layers, and determine that the remaining spun length is less than the roving length of the several layers. When the bobbin rail is reached, the final roving end height position at the time of full bobbin is predicted and calculated, and the lifting / lowering switching position of the bobbin rail is calculated based on the calculation result and the preset roving end target height position. The switching of the bobbin rail up / down is controlled in the bobbin body winding section without changing the layer pitch so that the end height position becomes the target height position. As a result, the waste of the spun roving is reduced, and the work of extracting the roving for the splicing is facilitated.
【0005】[0005]
【発明の実施の形態】ボビンレールが昇降してボビンを
成形する際、満ボビンとなるまでの適宜のタイミング、
たとえば、上下肩部での昇降切換のタイミングで、その
時点での紡出長と予め設定した満管長とから残り紡出長
を演算すると共に、その時点から粗糸を予め設定した数
層分(たとえば2層分)巻取る際の数層分の粗糸長を演
算し、残り紡出長をその数層分の粗糸長と比較する。そ
して残り紡出長がその数層分の粗糸長以下に達したとき
満ボビン時の最終粗糸端高さ位置を予測演算する。その
演算結果と予め設定した粗糸端目標高さ位置に基づいて
ボビンレールの昇降切換位置を演算し、その演算結果に
基づいて満ボビン時の最終粗糸端高さ位置が目標高さ位
置となるようにレヤ−ピッチを変えることなくボビンレ
ールの昇降切換位置を制御する。DESCRIPTION OF THE PREFERRED EMBODIMENTS When a bobbin rail is moved up and down to form a bobbin, an appropriate timing until a bobbin becomes full,
For example, at the timing of the vertical switching at the upper and lower shoulders, the remaining spinning length is calculated from the spinning length at that time and the preset full length, and the roving is divided into a predetermined number of layers (from that time). The roving length of several layers at the time of winding (for example, two layers) is calculated, and the remaining spinning length is compared with the roving length of the several layers. When the remaining spinning length has reached the roving length of the several layers or less, the final roving end height position at the time of full bobbin is predicted and calculated. Based on the calculation result and the preset roving end target height position, the lifting / lowering switching position of the bobbin rail is calculated, and based on the calculation result, the final roving end height position at the time of full bobbin is set to the target height position. Thus, the position at which the bobbin rail is moved up and down is controlled without changing the layer pitch .
【0006】[0006]
【実施例】図1はコーンドラム式粗紡機の駆動機構を示
している。周知のように粗紡機のドラフトパ−ト7は図
示しないメインモ−タによってベルト伝動機構や歯車列
を介して回転駆動され、フライヤ12もメインモ−タに
よってベルト伝動機構やドライビングシャフトを介して
回転駆動されるようにしてある。またボビンホイール2
1はメインモ−タによって回転駆動される周知のコーン
ドラム式無段変速機によって回転駆動され、ロングラッ
ク228の移動によりベルトが移動されることによって
変速されるようにしてある。FIG. 1 shows a drive mechanism of a cone drum type roving machine. As is well known, the draft part 7 of the roving machine is rotationally driven by a main motor (not shown) via a belt transmission mechanism and a gear train, and the flyer 12 is also rotationally driven by the main motor via a belt transmission mechanism and a driving shaft. It is so. Also bobbin wheel 2
Reference numeral 1 denotes a rotary drive driven by a well-known cone drum type continuously variable transmission which is driven to rotate by a main motor, and the belt is moved by the movement of the long rack 228 so that the speed is changed.
【0007】次にボビンレール20は満管近くまでボビ
ン成形装置210の公知の動作によって昇降切換される
ようになっている。ボビン成形装置210は、例えばボ
ビンレール20の下降によりラックアンカーバーブラケ
ット217,ラックアンカーバー216を介してスタッ
グホーン211を傾動させ、この傾動により一方のチェ
ン219とロッド220を介してビーム221の一端を
スプリング222に抗して引上げ、レバーシングブラケ
ット214を他方のロッド220aを介して時計方向に
付勢し、スタッグホーン211の傾動で押圧ねじ215
aがスワローテールキャッチ213aとレバーシングブ
ラケット214との係合を外し、レバーシングロッド2
18を左方へ押し、レバーシングベベルギヤ224を切
換え、昇降方向を切換えるものである。ラックアンカー
バー216は、ロングラック228移動用の制御モータ
227により回転されるピニオン軸226によって図示
しないベベルギヤ,支軸212,及び支軸212と一体
のピニオン212aを介して軸方向に送られ、ボビンレ
ール20の昇降高さが徐々に短くされ、肩部が形成され
る。前記制御モータ227は粗糸張力検出装置RTから
の張力信号を加味して、ロングラック228に送りを与
えるもので、特開昭62−8979号で公知である。尚
215は左側の押圧ねじ、213は左側のスワローテー
ルキャッチ、223はフレーム、219aは右側のチェ
ンである。Next, the bobbin rail 20 is moved up and down to a position near the full tube by a known operation of the bobbin forming apparatus 210. The bobbin forming apparatus 210 tilts the stag horn 211 via the rack anchor bar bracket 217 and the rack anchor bar 216 by lowering the bobbin rail 20, for example, and the tilt causes one end of the beam 221 via one of the chains 219 and the rod 220. Is pulled up against the spring 222, the levering bracket 214 is urged clockwise through the other rod 220a, and the pressing screw 215 is tilted by the stag horn 211.
a disengages the swallow tail catch 213a from the reversing bracket 214 and removes the reversing rod 2
By pushing 18 to the left, the levering bevel gear 224 is switched, and the ascending and descending direction is switched. The rack anchor bar 216 is sent in the axial direction by a pinion shaft 226 rotated by a control motor 227 for moving the long rack 228 through a not-shown bevel gear, a support shaft 212, and a pinion 212 a integral with the support shaft 212. The elevation height of the rail 20 is gradually shortened, and a shoulder is formed. The control motor 227 feeds the long rack 228 in consideration of a tension signal from the roving yarn tension detecting device RT, and is known in Japanese Patent Application Laid-Open No. 62-8979. 215 is a left pressing screw, 213 is a left swallow tail catch, 223 is a frame, and 219a is a right chain.
【0008】このようなボビン成形装置210の前記ビ
ーム221の左右下方には、ビーム221を上方へ押上
げ可能な付勢シリンダ230,230aがフレーム22
3に装着してある。付勢シリンダ230,230aのピ
ストンロッドのストロークは、ボビンレール20の上昇
又は下降端においてチェン219(219a)により引
張られ、切換直前のビーム位置までビーム221を押上
げることができるストロークに設定してある。前記スワ
ローテールキャッチ213,213aの下側には、昇降
切換確認用の検出スイッチ231,231aが配設して
ある。またスワローテールキャッチ213,213aの
上側には、フレーム223に昇降切換シリンダ232,
232aが配設してある。制御装置100は、中央演算
処理装置CPU102,読出専用メモリROM103,
書換自在メモリRAM104および、ボビン巻径を現時
点から過去の所定層分記憶しておくボビン巻径エリア1
14を含み、図2に示すフローチャートに従うプログラ
ムを記憶すると共に、その入力装置(キーボード)10
6からは、ボビン巻径形状を示すデータ(上、下肩部B
1,B2を示す関数式l1 =f1 (D),l2 =f
2 (D),レヤーピッチh,粗糸目標高さ位置Ye,満
管長さLe±aヤード)、最終粗糸端高さ位置の区分の
ための高さデータ(第3図に示すBゾーン,Cゾーン及
び許容ゾーンZを示すデータで、許容ゾーンZは満管長
さLe±aの範囲を示す)、及び紡出条件等が入力され
ると共に、粗糸張力検出装置RTからの粗糸張力信号、
エンコーダPG3からのボビンレールの高さ位置Y1 に
対応する検出値及び検出スイッチ231,231aから
の昇降切換確認信号が入力されるようにしてある。ま
た、前記付勢シリンダ230,230a及び昇降切換シ
リンダ232,232aの動作指令が出力されるように
してある。[0008] Biasing cylinders 230, 230a capable of pushing up the beam 221 upward are provided on the frame 22 below and to the left and right of the beam 221 of the bobbin forming apparatus 210.
3 is attached. The stroke of the piston rod of the urging cylinders 230 and 230a is set to a stroke that can be pulled up by the chain 219 (219a) at the ascending or descending end of the bobbin rail 20 and push up the beam 221 to the beam position immediately before switching. is there. Below the swallow tail catches 213 and 213a, detection switches 231 and 231a for confirming the change of the elevation are arranged. On the upper side of the swallow tail catches 213 and 213a, a lifting / lowering switching cylinder 232,
232a is provided. The control device 100 includes a central processing unit CPU 102, a read-only memory ROM 103,
A rewritable memory RAM 104 and a bobbin winding diameter area 1 for storing the bobbin winding diameter for a predetermined layer from the present time to the past.
14 and stores the program according to the flowchart shown in FIG.
6 shows data indicating the bobbin winding diameter shape (upper and lower shoulders B
1, B2, a functional expression l 1 = f 1 (D), l 2 = f
2 (D), layer pitch h, roving target height position Ye, full length Le ± a yards), height data for classification of final roving end height position (B zone, C shown in FIG. 3) Data indicating the zone and the permissible zone Z, the permissible zone Z indicates the range of the full length Le ± a), the spinning conditions, etc., and the roving tension signal from the roving tension detecting device RT;
Lifting switching confirmation signal from the detection value and the detection switch 231,231a corresponding to the height position Y 1 of the bobbin rail from the encoder PG3 is are to be input. Further, operation commands for the urging cylinders 230 and 230a and the lift switching cylinders 232 and 232a are output.
【0009】次に図2に示すフローチャートに従って動
作を説明する。起動と共にボビンレール20が昇降し、
また昇降切換の都度ロングラック228が制御モータ2
27によって送られ、このときピニオン軸226の回転
によってピニオン212Aを回転させラックアンカーバ
ー216を短くし、ボビンレール20の昇降距離が徐々
に短くされて、粗糸ボビンの肩部が形成される。ステッ
プP1ではこのようにして粗糸Rの巻取が行われ、ステ
ップP2で、検出スイッチ231,231aからの信号
で昇降切換が行われたか判断され、ステップP3ではそ
の都度図示しないオートカウンタにより得られる現在紡
出長と予め設定した満管長とから算出される残り紡出長
が、現在から予め設定した数層例えば2層巻いた時の2
層分の粗糸長と比較され、残り紡出長L2 が最終2層長
さ以下となったかを判断する。その最終2層長さはコー
ンベルト位置を測る図示しない位置検出器(例えば制御
モータ227の回転量を測るエンコーダなど)の検出値
から算出される現在のボビン巻径と平均層厚さΔda及
び肩形状データを基に予測演算される。次いでステップ
P4で、満管時の粗糸端高さ位置Ynを演算する。平均
層厚さΔdaで巻かれていくとすれば、ボビン巻径
D1,D2は予測できるので、最終粗糸端高さ位置Yn
は、ボビンレール20の下降から上昇への上肩部B1で
の切換位置B1aで演算する場合(第3図(1),
(3)) Yn=f2(D2)−h・(L2−L1)/(π・D2) ボビンレール20の上昇から下降への下肩部B2での切
換位置B2aで演算する場合(第3図(2),(4)) Yn=f1(D2)+h・(L2−L1)/(π・D2) 但し、次回ボビン巻径D1(最終1層前),最終ボビン
巻径D2 L1=π・D1(f2(D1)−f1(D1))/h となる。図4に示すように、ボビンレール20の原点0
は、ボビン15の粗糸巻上端と対応しており、座標方向
は粗糸ボビンの原点0から下向きにプラスとしている。Next, the operation will be described with reference to the flowchart shown in FIG. The bobbin rail 20 goes up and down with the start,
The long rack 228 is connected to the control motor
At this time, the pinion 212A is rotated by the rotation of the pinion shaft 226 to shorten the rack anchor bar 216, and the ascending and descending distance of the bobbin rail 20 is gradually shortened, thereby forming the shoulder of the roving bobbin. In step P1, the roving yarn R is wound in this way, and in step P2, it is determined whether or not the up / down switching has been performed based on the signals from the detection switches 231 and 231a. The remaining spinning length calculated from the current spinning length to be set and the preset full length is 2 when a predetermined number of layers, for example, two layers are wound from the present time.
Is compared with the roving length layer fraction, the remaining spinning length L 2 to determine whether a following final two-layer length. The final two layer lengths are the current bobbin winding diameter, average layer thickness Δda, and shoulder thickness calculated from the detection values of a position detector (not shown) that measures the cone belt position (eg, an encoder that measures the rotation amount of the control motor 227). The prediction calculation is performed based on the shape data. Next, in Step P4, the roving end height position Yn when the tube is full is calculated. Assuming that the bobbin is wound with the average layer thickness Δda, the bobbin winding diameters D 1 and D 2 can be predicted, so that the final roving end height position Yn
Is calculated at the switching position B1a at the upper shoulder B1 from the lowering to the raising of the bobbin rail 20 (FIG. 3 (1),
(3)) Yn = f 2 (D 2 ) −h · (L 2 −L 1 ) / (π · D 2 ) The calculation is performed at the switching position B2a at the lower shoulder B2 from the rise of the bobbin rail 20 to the fall. Case (FIGS. 3 (2), (4)) Yn = f 1 (D 2 ) + h · (L 2 −L 1 ) / (π · D 2 ) However, the next bobbin winding diameter D 1 (one last layer before) ), The final bobbin winding diameter D 2 L 1 = π · D 1 (f 2 (D 1 ) −f 1 (D 1 )) / h. As shown in FIG.
Corresponds to the upper end of the roving winding of the bobbin 15, and the coordinate direction is plus from the origin 0 of the roving bobbin downward.
【0010】次にステップP5で、ステップP4での演
算結果が許容ゾーンZ内にあるか判別し、そうであれ
ば、演算後1回目の昇降切換を行った後に、エンコーダ
PG3からのボビンレール昇降位置信号が目標高さ位置
Yeとなった時に機台を停止させる。許容ゾーンZを外
れた時、最終巻層の粗糸の巻方向(ボビン15に対して
上から下へ粗糸が巻かれるかどうか)及び、最終粗糸端
高さ位置YnがBゾーンかCゾーンかで、次のように4
つの場合が生じる。 粗糸の巻方向が下から上、Bゾーンで停止(図3の
(1)) 最終昇降切換位置YrとするとYr,Yn間でボビン巻
径D2 で巻く量とYe,Yr間でボビン巻径(D2 +2
・Δda)で巻く量が同じ関係及び、D2 と(D2 +2
・Δda)をほぼ等しいとすると近似式 Yr=(Ye+Yn)/2 が得られる。以下、同様の考え方で、 粗糸の巻方向が上から下、Bゾーンで停止(図3の
(2)) Yr=f1(D2)+(Ye−Yn)/2 粗糸の巻方向が下から上、Cゾーンで停止(図3の
(3)) Yr=f2(D2)+(Ye−Yn)/2 粗糸の巻方向が上から下、Cゾーンで停止(図3の
(4)) Yr=(Ye+Yn)/2 これらの式の該当する条件のものにYnを代入して最終
昇降切換位置YrをステップP6で演算する。Next, at step P5, it is determined whether or not the result of the calculation at step P4 is within the permissible zone Z. If so, the first lifting / lowering switching is performed after the calculation, and then the bobbin rail lift / lower from the encoder PG3 is performed. The machine is stopped when the position signal reaches the target height position Ye. When deviating from the permissible zone Z, the winding direction of the roving in the final winding layer (whether the roving is wound from the top to the bottom with respect to the bobbin 15) and the final roving end height position Yn are set to B zone or C zone. In the zone, 4
Two cases occur. On the winding direction of the roving from the lower, stopping in B zone (in Fig. 3 (1)) last lift switching position Yr to the Yr, the amount wound bobbin winding diameter D 2 between Yn and Ye, bobbin between Yr Diameter (D 2 +2
The relationship where the winding amount is the same in Δda), and D 2 and (D 2 +2)
Assuming that Δda) is substantially equal, the approximate expression Yr = (Ye + Yn) / 2 is obtained. Hereinafter, in the same way, the winding direction of the roving is stopped from the top to the bottom in zone B ((2) in FIG. 3). Yr = f 1 (D 2 ) + (Ye−Yn) / 2 The winding direction of the roving Stops from bottom to top and in zone C (FIG. 3 (3)) Yr = f 2 (D 2 ) + (Ye−Yn) / 2 The roving direction is stopped from top to bottom and in zone C (FIG. 3). (4)) Yr = (Ye + Yn) / 2 Yn is substituted for the condition corresponding to these equations to calculate the final lifting / lowering switching position Yr in Step P6.
【0011】そしてステップP7で図3の(1a),
(4a)ではそれぞれ切換位置B1a、B2aで演算
後、1回昇降切換がメカニカルに行われた後、また、図
3の(2a),(3a)では演算後直ちに、次に昇降切
換させるために、昇降方向に対応した付勢シリンダ23
0,230aの一方を作動させ、ピストンロッドでビー
ム221の一端を押上げる。例えば図3の(1)の場合
では、演算後、粗糸を上から下へ巻いた後、下から上に
巻方向を切換え、この時は図1の状態となるから、次の
切換、つまり最終昇降切換位置Yrまでに左側の付勢シ
リンダ230によりビーム221の左端を2点鎖線の位
置へ押上げる。これによりレバーシングブラケット21
4の右端がスプリング222の力によりロッド220a
を介して下方へ引張られるが、スワローテールキャッチ
213aがレバーシングブラケット214と係合してい
るのでレバーシングブラケット214は時計方向へ揺動
できない。Then, in step P7, (1a) of FIG.
In (4a), after the computation at the switching positions B1a, B2a , respectively, after one-time up / down switching is mechanically performed, and in (2a), (3a) of FIG. , Urging cylinder 23 corresponding to the vertical direction
0, 230a, and one end of the beam 221 is pushed up by the piston rod. For example, in the case of (1) in FIG. 3, after the calculation, the roving is wound from top to bottom, and then the winding direction is switched from bottom to top. At this time, the state shown in FIG. 1 is obtained. The left end of the beam 221 is pushed up to the position indicated by the two-dot chain line by the urging cylinder 230 on the left side up to the final lifting switching position Yr. Thereby, the reversing bracket 21
4 has a rod 220a by the force of a spring 222.
However, since the swallow tail catch 213a is engaged with the reversing bracket 214, the reversing bracket 214 cannot swing clockwise.
【0012】そしてステップP8でエンコーダPG3か
らのボビンレール20の昇降位置信号が最終昇降切換位
置Yrになると、ステップP9で切換シリンダ(この場
合、右側のもの)232aを作動させてスワローテール
キャッチ213aとレバーシングブラケット214との
係合を外す。これによりレバーシングブラケット214
が時計方向へ瞬時に揺動し、レバーシングロッド218
が左行し、レバーシングベベルギヤ224が切換り、ボ
ビンレール20は下降から上昇に切換わる。従って、粗
糸は図3の(1a)のようにボビン胴巻部の途中で昇降
方向が切換えられ、ボビンレール20からの昇降位置信
号が目標高さ位置Yeとなったとき、機台を停止する。
最終昇降切換位置Yrは、この実施例では満管前2層目
に切換った時から後の極めて短い残り紡出長を基に演算
しているので、最終昇降切換位置Yrで昇降切換を行っ
た後、目標高さ位置Yeで停止させることにより、満管
長さも設定値の許容範囲の中央値に極めて誤差少なく近
づけることができる。尚、満管となる3層前、あるいは
4層前で最終粗糸端高さ位置Ynの演算を行い、最終昇
降切換位置Yrで昇降切換することもできる。また、図
3の(1a),(2a)の場合において最終の粗糸巻方
向を下から上とするように胴巻部で昇降切換することも
できる。第1実施例の粗糸巻取方法は、コーンドラムを
用いないでサーボモータを用いてボビン変速を行う形式
のボビン成形装置によっても実施できる。[0012] When the vertical position signal of the bobbin rail 20 from the encoder PG3 is a final lifting switching position <br/> location Yr in step P8, the switching cylinder (in this case, the right one) in Step P9 actuates the 232a The engagement between the swallow tail catch 213a and the levering bracket 214 is released. As a result, the levering bracket 214
Swings instantaneously in the clockwise direction, causing the leversing rod 218 to rotate.
Moves to the left, the levering bevel gear 224 switches, and the bobbin rail 20 switches from descending to ascending. Therefore, the roving direction of the roving is switched in the middle of the bobbin body as shown in FIG. 3A, and the machine stand is stopped when the lifting position signal from the bobbin rail 20 reaches the target height position Ye. .
In this embodiment, since the final ascent / descent switching position Yr is calculated based on the extremely short remaining spinning length after switching to the second layer before full filling, the ascent / descent switching is performed at the final ascending / descending switching position Yr. Then, by stopping at the target height position Ye, the full tube length can be made to approach the median of the allowable range of the set value with an extremely small error. It is also possible to calculate the final roving end height position Yn three layers before or four layers before the full tube is filled, and switch the vertical position at the final vertical switching position Yr. Further, in the cases of (1a) and (2a) of FIG. 3, the up-and-down switching can be performed at the body winding portion so that the final roving winding direction is from bottom to top. The roving winding method of the first embodiment can also be performed by a bobbin forming apparatus of a type in which a bobbin speed is changed using a servomotor without using a cone drum.
【0013】第2実施例 次に図1のボビン成形装置210のレバーシングブラケ
ット214を瞬時に切換える切換機構(チェン219
(219a)、ロッド220(220a、ビーム221
及びスプリング222)に代わる異なる機構を図5を用
いて説明する。この例ではレバーシングブラケット21
4の左右両側下方に夫々一対の空圧式の付勢シリンダ2
30b,230cが設けてあり、そのピストンロッドの
上部に取付けたピン241,241aがレバーシングブ
ラケット214の左右端と夫々係脱するようにしてあ
る。例えばスタッグホーン211が時計方向へ揺動する
とき、付勢シリンダ230cはピストンロッドを引込め
る方向に圧空が供給され、付勢シリンダ230bはピス
トンロッドを突出させておく。付勢シリンダ230cの
ピン241aはレバーシングブラケット214の右端を
下方へ押すが、スワローテールキャッチ213aと係合
しているため時計方向に揺動できず、付勢シリンダ23
0cの上側圧力室は圧空で蓄圧される。通常のボビン成
形の際は、ラックアンカーバー216の揺動でスタッグ
ホーン211の押圧ピン215aがスワローテールキャ
ッチ213aとレバーシングブラケット214との係合
を外し、ボビン胴巻部での昇降切換は昇降切換シリンダ
232a(又は232)で行う。スワローテールキャッ
チ213aとレバーシングブラケット214との係合が
外されると、付勢シリンダ230cの蓄圧された圧空
が、バネの作用をしてレバーシングブラケット214を
瞬時に時計方向へ揺動させ、ボビンレール20の昇降方
向を切換える。Second Embodiment Next, a switching mechanism (chain 219) for instantly switching the levering bracket 214 of the bobbin forming apparatus 210 of FIG.
(219a), rod 220 (220a, beam 221)
And a different mechanism replacing the spring 222) will be described with reference to FIG. In this example, the levering bracket 21
4, a pair of pneumatic biasing cylinders 2 at the lower left and right sides, respectively.
30b and 230c are provided, and pins 241 and 241a attached to the upper part of the piston rod are respectively engaged with the left and right ends of the levering bracket 214. For example, when the stag horn 211 swings clockwise, compressed air is supplied to the urging cylinder 230c in a direction to retract the piston rod, and the urging cylinder 230b keeps the piston rod protruding. The pin 241a of the urging cylinder 230c pushes the right end of the levering bracket 214 downward, but cannot engage clockwise because of engagement with the swallow tail catch 213a.
The upper pressure chamber of 0c is stored with compressed air. During normal bobbin molding, the swinging of the rack anchor bar 216 causes the pressing pin 215a of the stag horn 211 to disengage the swallow tail catch 213a from the reversing bracket 214, and the elevation switching at the bobbin body winding section is the elevation switching This is performed by the cylinder 232a (or 232). When the swallow tail catch 213a is disengaged from the levering bracket 214, the compressed air stored in the urging cylinder 230c acts as a spring to instantly swing the levering bracket 214 clockwise, The vertical direction of the bobbin rail 20 is switched.
【0014】第3実施例 図6は図5の一対の付勢シリンダに代えて、1つの付勢
シリンダ230dで行うようにしたもので、レバーシン
グブラケット214の下部を突出部214aに形成し、
ここに付勢シリンダ230dのピストンロッドがピン連
結してある。付勢シリンダ230dの前側、又は後側圧
力室に次に切換えたい方向へ付勢するように交互に圧空
が供給され、蓄圧される。Third Embodiment FIG. 6 shows a third embodiment in which a single urging cylinder 230d is used in place of the pair of urging cylinders shown in FIG.
Here, the piston rod of the urging cylinder 230d is connected with a pin. Compressed air is alternately supplied to the front or rear pressure chamber of the urging cylinder 230d so as to urge it in the next desired switching direction, and the pressure is accumulated.
【0015】[0015]
【発明の効果】以上のように本発明によれば、ボビン胴
巻部においてもボビンレールの昇降方向を切換可能に構
成しておき、満ボビンとなるまでの適宜のタイミング
で、その時点での残り紡出長とその時点からの数層分の
粗糸巻長とを演算し、残り紡出長が数層分の粗糸巻長以
下に達したとき予測演算した最終粗糸端高さ位置と予め
設定した粗糸端目標高さ位置に基づいてボビンレールの
昇降切換位置を演算し、その演算結果に基づいてレヤー
ピッチを変えることなく最終粗糸端高さ位置が目標高さ
位置となるようにボビンレールの昇降切換をボビン胴巻
部において制御するようにし、あるいは、粗糸巻取のた
めに、昇降切換位置に応じてボビンレールの昇降を切換
えてボビン成形を行うボビンリード式の粗紡機におい
て、ボビン胴巻部においてもボビンレールの昇降方向を
切換可能に構成しておき、ボビンレールの設定高さ位置
でその時点での紡出長と予め設定した満管長とから残り
紡出長を演算し、その残り紡出長をその時点から粗糸を
予め設定した数層分巻取る際の数層分の粗糸長と比較
し、残り紡出長がその数層分の粗糸長以下に達したとき
満ボビン時の最終粗糸端高さ位置を予測演算し、その演
算結果と予め設定した粗糸端目標高さ位置に基づいてボ
ビンレールの昇降切換位置を演算し、レヤーピッチを変
えることなく最終粗糸端高さ位置が目標高さ位置となる
ようにボビンレールの昇降切換をボビン胴巻部において
制御するようにしたので、満ボビン時の最終粗糸端高さ
位置を一定位置にできて篠継作業の際に粗糸端の口出し
作業を容易にでき、また粗糸の巻量を一定長にできて無
駄になる残粗糸量を少なくできる。As described above, according to the present invention, the bobbin cylinder
The winding direction of the bobbin rail can be switched at the winding section.
At the appropriate timing until the bobbin becomes full, the remaining spinning length at that time and the roving winding length of several layers from that time are calculated, and the remaining spinning length is equivalent to several layers. The bobbin rail up / down switching position is calculated based on the final calculated roving end height position and the preset roving end target height position that are predicted when the roving winding length is reached, and the layer pitch is determined based on the calculation result. bobbin lifting switching of the bobbin rail so that the final roving end height position is the target height position without changing wrapping
In a bobbin lead type roving machine in which the bobbin rail is switched by raising and lowering the bobbin rail in accordance with the vertical switching position for bobbin winding, the bobbin rail is also raised and lowered at the bobbin body winding section. Direction
It is configured to be switchable, and at the set height position of the bobbin rail, the remaining spinning length is calculated from the spinning length at that time and the preset full length, and the remaining spinning length is calculated from that point as roving yarn. Is compared with the roving length of several layers when winding up a predetermined number of layers, and when the remaining spinning length has reached the roving length of the several layers or less, the final roving end height at full bobbin The position of the bobbin rail is calculated based on the calculation result and the preset roving end target height position, and the final roving end height position is changed to the target height position without changing the layer pitch. Is controlled at the bobbin body winding part so that the final roving end height position when the bobbin is full can be kept at a fixed position, and the roving The remaining roving yarn is wasteful because it is easy to take out the end and the roving amount of the roving yarn can be made constant length. A it can be reduced.
【図1】本願発明の方法を実施するのに好適な粗紡機の
駆動機構図である。FIG. 1 is a drive mechanism diagram of a roving machine suitable for carrying out the method of the present invention.
【図2】図1の制御プログラムを示すフローチャート図
である。FIG. 2 is a flowchart illustrating a control program of FIG. 1;
【図3】昇降切換位置の補正の説明図である。FIG. 3 is an explanatory diagram of a correction of an elevation switching position.
【図4】ボビンを示す図である。FIG. 4 is a view showing a bobbin.
【図5】ボビン成形装置の他の例を示す説明図である。FIG. 5 is an explanatory view showing another example of the bobbin forming apparatus.
【図6】ボビン成形装置の他の例を示す説明図である。FIG. 6 is an explanatory view showing another example of the bobbin forming apparatus.
12 フライヤ 15 ボビン 20 ボビンレール 100 制御装置 Yn 最終粗糸端高さ位置 Ye 目標高さ位置 12 Flyer 15 Bobbin 20 Bobbin rail 100 Control device Yn Final roving end height position Ye Target height position
───────────────────────────────────────────────────── フロントページの続き (72)発明者 橋本 秀樹 愛知県春日井市石尾台1−2タウン石尾 台130−1 (72)発明者 大森 誠 愛知県津島市南本町6−24 (72)発明者 佐々木 賢次 愛知県小牧市藤島町梵天82番地 合議体 審判長 玉城 信一 審判官 佐藤 雪枝 審判官 大槻 清寿 (56)参考文献 特開 平1−250423(JP,A) ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Hideki Hashimoto 1-2-1 Ishiodai, Kasugai-shi, Aichi Prefecture 130-1 Town Ishiodai (72) Inventor Makoto Omori 6-24 Minamihonmachi, Tsushima-shi, Aichi Prefecture (72) Inventor Kenji Sasaki 82, Brahma, Fujishima-cho, Komaki-shi, Aichi Prefecture Referee, Shinichi Tamaki, Referee Judge Sato Yukie, Referee Kiyohisa Otsuki (56) References JP 1-250423 (JP, A)
Claims (2)
てボビンレールの昇降を切換えてボビン成形を行うボビ
ンリード式の粗紡機において、ボビン胴巻部においても
ボビンレールの昇降方向を切換可能に構成しておき、満
ボビンとなるまでの適宜のタイミングで、その時点での
紡出長と予め設定した満管長とから残り紡出長を演算す
ると共に、その時点から粗糸を予め設定した数層分巻取
る際の数層分の粗糸長を演算し、残り紡出長をその数層
分の粗糸長と比較して残り紡出長が数層分の粗糸長以下
に達したとき満ボビン時の最終粗糸端高さ位置を予測演
算し、その演算結果と予め設定した粗糸端目標高さ位置
に基づいてボビンレールの昇降切換位置を演算し、レヤ
ーピッチを変えることなく最終粗糸端高さ位置が目標高
さ位置となるようにボビンレールの昇降切換をボビン胴
巻部において制御することを特徴とする粗糸巻取方法。For 1. A coarse yarn winding, in Rovers bobbin lead expressions for bobbin molding by switching the lifting of the bobbin rail in response to lifting the switch position, even in the bobbin wrapping unit
The lifting direction of the bobbin rail is configured to be switchable, and at an appropriate timing until the bobbin rail becomes full, the remaining spinning length is calculated from the spinning length at that time and the preset full length, and the From the point in time, calculate the roving length of several layers when winding up a predetermined number of layers of roving, compare the remaining spinning length with the roving length of the several layers, and calculate the remaining spinning length of several layers. When the length of the bobbin rail is less than or equal to the minimum roving length, the final roving end height position when the bobbin is full is predicted and calculated. calculated, the bobbin trunk lifting switching of the bobbin rail such that the final roving end height position becomes the target height position without changing the Reyapitchi
A roving yarn winding method characterized in that control is performed in a winding section .
てボビンレールの昇降を切換えてボビン成形を行うボビ
ンリード式の粗紡機において、ボビン胴巻部においても
ボビンレールの昇降方向を切換可能に構成しておき、ボ
ビンレールの設定高さ位置でその時点での紡出長と予め
設定した満管長とから残り紡出長を演算し、その残り紡
出長をその時点から粗糸を予め設定した数層分巻取る際
の数層分の粗糸長と比較し、残り紡出長がその数層分の
粗糸長以下に達したとき満ボビン時の最終粗糸端高さ位
置を予測演算し、その演算結果と予め設定した粗糸端目
標高さ位置に基づいてボビンレールの昇降切換位置を演
算し、レヤーピッチを変えることなく最終粗糸端高さ位
置が目標高さ位置となるようにボビンレールの昇降切換
をボビン胴巻部において制御することを特徴とする粗糸
巻取方法。For 2. A crude yarn winding, in Rovers bobbin lead expressions for bobbin molding by switching the lifting of the bobbin rail in response to lifting the switch position, even in the bobbin wrapping unit
The lifting direction of the bobbin rail is configured to be switchable, and the remaining spinning length is calculated from the spinning length at that time and the preset full length at the set height position of the bobbin rail, and the remaining spinning length is calculated. Is compared with the roving length of several layers when the roving is wound up by a predetermined number of layers from that time, and when the remaining spinning length has reached the roving length of the several layers or less, the full bobbin time The final roving end height position is predicted and calculated, and the bobbin rail up / down switching position is calculated based on the calculation result and the preset roving end target height position, and the final roving end height is maintained without changing the layer pitch. A method for winding a roving yarn, characterized in that switching of lifting and lowering of a bobbin rail is controlled in a bobbin body winding section so that the position is at a target height position.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8046781A JP2888424B2 (en) | 1996-02-07 | 1996-02-07 | Roving winding method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8046781A JP2888424B2 (en) | 1996-02-07 | 1996-02-07 | Roving winding method |
Related Parent Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1318587A Division JP2750623B2 (en) | 1989-12-07 | 1989-12-07 | Roving winding method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH08232127A JPH08232127A (en) | 1996-09-10 |
| JP2888424B2 true JP2888424B2 (en) | 1999-05-10 |
Family
ID=12756880
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP8046781A Expired - Lifetime JP2888424B2 (en) | 1996-02-07 | 1996-02-07 | Roving winding method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2888424B2 (en) |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2586558B2 (en) * | 1988-03-30 | 1997-03-05 | 株式会社豊田自動織機製作所 | Method and apparatus for stopping constant winding length of roving yarn of roving machine |
-
1996
- 1996-02-07 JP JP8046781A patent/JP2888424B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH08232127A (en) | 1996-09-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101544323B (en) | Yarn winding device and yarn winding method | |
| JP2888424B2 (en) | Roving winding method | |
| CN1184123C (en) | Winding method and device | |
| JPH0349868B2 (en) | ||
| JP3147624B2 (en) | Drive control method for simultaneous pipe changer | |
| CN102126645A (en) | Yarn winding machine and yarn winding method | |
| JP3594703B2 (en) | Rewinding method of spinning cake in pot spinning equipment | |
| JP2723103B2 (en) | Bobbin forming equipment for roving machines | |
| JPH0977374A (en) | Winder | |
| JP4243545B2 (en) | Method for operating a spinning device | |
| JPH06313228A (en) | Method for winding roving of flyer frame | |
| JP3042000B2 (en) | Suitable position stop device for roving machine | |
| JP2750623B2 (en) | Roving winding method | |
| JP4635958B2 (en) | Pipe yarn forming method in spinning machine | |
| JPH02229232A (en) | Apparatus for performing ending on spinning position of spinning frame | |
| JP2991249B2 (en) | Method and apparatus for preventing shoulder stop in roving machine | |
| JP2586558B2 (en) | Method and apparatus for stopping constant winding length of roving yarn of roving machine | |
| JPH059822A (en) | Winding method for roving in roving frame | |
| IT9020962A1 (en) | PROCEDURE AND EQUIPMENT FOR SEPARATING THE WOVEN WRAPPED ON THE SPOOLS FROM THE FLAPS AND STOP THE HEAD OF THE WOVEN ON THE SPOOLS AT THE LEVERAGE IN A SPINDLE OR SIMILAR BENCH | |
| JP2590780B2 (en) | How to stop roving winding of roving machine | |
| JP3019576B2 (en) | Switching method of bobbin rails for roving machines | |
| JP2829094B2 (en) | Shinotsu operation control device | |
| JPH07150424A (en) | Method for preventing shoulder of formed roving package from collapsing in roving frame and apparatus therefor | |
| JP3136990B2 (en) | Ring rail lifting and lowering method at start of spinning machine and ring rail lifting and lowering control device | |
| JP2000045137A (en) | Cop changing apparatus of roving frame and roving frame |