Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP2917735B2 - How to install bridge supports - Google Patents
[go: Go Back, main page]

JP2917735B2 - How to install bridge supports - Google Patents

How to install bridge supports

Info

Publication number
JP2917735B2
JP2917735B2 JP6068793A JP6068793A JP2917735B2 JP 2917735 B2 JP2917735 B2 JP 2917735B2 JP 6068793 A JP6068793 A JP 6068793A JP 6068793 A JP6068793 A JP 6068793A JP 2917735 B2 JP2917735 B2 JP 2917735B2
Authority
JP
Japan
Prior art keywords
plate
pier
main girder
lower plate
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP6068793A
Other languages
Japanese (ja)
Other versions
JPH06272215A (en
Inventor
義直 伊奈
洋三 後藤
益朗 星加
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OOBAYASHIGUMI KK
Original Assignee
OOBAYASHIGUMI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OOBAYASHIGUMI KK filed Critical OOBAYASHIGUMI KK
Priority to JP6068793A priority Critical patent/JP2917735B2/en
Publication of JPH06272215A publication Critical patent/JPH06272215A/en
Application granted granted Critical
Publication of JP2917735B2 publication Critical patent/JP2917735B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、例えば、ゴム支承を
介して橋脚に支持された主桁を構築する橋梁工事に採用
され、特に、主桁コンクリート打設後にゴム支承に所要
のせん断変形を与えるようにした橋梁支承の設置方法の
改良に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is used, for example, in bridge construction for constructing a main girder supported on a pier via a rubber bearing. It relates to the improvement of the installation method of the bridge bearing that was given.

【0002】[0002]

【従来の技術】大スパンの橋脚上にゴム支承を介してコ
ンクリート主桁を構築する場合、主桁のクリープ・乾燥
収縮による支承点で主桁の移動量が大きくなるので、こ
の初期移動量を予め見込んで支承構造が設計される。つ
まり、主桁コンクリートを打設する前にゴム支承に予め
適切なせん断変形を与えておき、その後のクリープや乾
燥収縮による主桁の初期移動によってゴム支承のせん断
変形が緩和されるようにし、初期移動が収まった状態で
ゴム支承の剪断変形が最小になるように工夫している。
2. Description of the Related Art When a concrete main girder is constructed on a large span pier via rubber bearings, the amount of movement of the main girder at a bearing point due to creep and drying shrinkage of the main girder becomes large. The bearing structure is designed in anticipation. In other words, prior to placing the main girder concrete, an appropriate shear deformation is given to the rubber bearing in advance, and the initial deformation of the main girder due to subsequent creep or drying shrinkage reduces the shear deformation of the rubber bearing, The device is designed to minimize the shear deformation of the rubber bearing when the movement stops.

【0003】ところが、支承構造を設計する際に、複雑
な計算を行って主桁の初期移動量を算出し、支承の剪断
変形が最小になるようにする必要があるにも拘らず、現
実には計算通りに主桁が移動するとは限らないという問
題があった。
However, when designing the bearing structure, it is necessary to perform a complicated calculation to calculate the initial displacement of the main girder to minimize the shear deformation of the bearing. Has a problem that the main girder does not always move as calculated.

【0004】これに対し、主桁が初期移動した後にその
移動量によって生じた支承の歪を修正する方法が開発さ
れている。具体的には、橋脚頂部にアンカーボルトなど
によりベースプレートを固定し、その上にゴム支承(上
プレートと下プレートとの間にゴム部材を挟み込んだ構
造)を仮固定する。このゴム支承の下プレートを前記ベ
ースプレート上に重ねて位置決めし、適宜な機構で下プ
レートをベースプレートに仮固定するとともに、ゴム支
承の上プレートの上には主桁の型枠を仮設してコンクリ
ートを打設する。その後、下プレートの仮固定を解除
し、橋脚と下プレートとの間に水平ジャッキを設置し、
この水平ジャッキによりゴム支承の下プレートを主桁移
動方向に所定距離だけ変位させる。上プレートは主桁に
固定されているので、下プレートをジャッキにより変位
させることでゴム支承が剪断変形する。そして、下プレ
ートを変位させて所定位置に位置決めしたとき、下プレ
ートをベースプレートに溶接して固定する。
On the other hand, a method has been developed for correcting the distortion of the bearing caused by the amount of movement of the main girder after the initial movement. Specifically, a base plate is fixed to an apex of the pier by an anchor bolt or the like, and a rubber bearing (a structure in which a rubber member is sandwiched between an upper plate and a lower plate) is temporarily fixed thereon. The lower plate of the rubber bearing is superimposed on the base plate and positioned, and the lower plate is temporarily fixed to the base plate by an appropriate mechanism, and a formwork of a main girder is temporarily provided on the upper plate of the rubber bearing to concrete. Cast in. Then, release the temporary fixing of the lower plate, install a horizontal jack between the pier and the lower plate,
The lower plate is displaced by a predetermined distance in the main girder moving direction by the horizontal jack. Since the upper plate is fixed to the main girder, when the lower plate is displaced by the jack, the rubber bearing is sheared. When the lower plate is displaced and positioned at a predetermined position, the lower plate is fixed to the base plate by welding.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、このよ
うな従来のゴム支承の設置方法では次のような問題点が
あった。水平ジャッキにより下プレートをベースプレー
トに沿って変位させているので、下プレートとベースプ
レートとの間には主桁の大きな垂直荷重が加わっている
ので、両プレート間にはきわめて大きな摩擦力が作用す
る。この摩擦力に抗して下プレートを変位させるので、
大容量のジャッキが必要となる。特に、両プレート間の
摩擦係数は安定していないので、摩擦係数が最も大きい
場合を想定して大容量のジャッキを用意しておかなけれ
ばならなかった。しかも、大容量の水平ジャッキを設置
するための架台なども大規模にならざるを得ず、その設
置や撤去の作業も面倒であった。
However, such a conventional method of installing a rubber bearing has the following problems. Since the lower plate is displaced along the base plate by the horizontal jack, a large vertical load of the main girder is applied between the lower plate and the base plate, so that a very large frictional force acts between the two plates. Since the lower plate is displaced against this frictional force,
Large capacity jacks are required. In particular, since the friction coefficient between the two plates is not stable, a large-capacity jack had to be prepared on the assumption that the friction coefficient was the largest. In addition, the mount for installing a large-capacity horizontal jack had to be large, and the work of installing and removing it was troublesome.

【0006】また、ゴム支承の下プレートを最終的にベ
ースプレートに溶接して固定しているので、橋脚頂部と
主桁間の狭い空間で溶接作業を行わなければならず、そ
の作業性が悪いばかりか、溶接火花によってゴム支承を
損傷する惧れがあった。さらには、溶接後に下プレート
の位置を修正するのは非常に困難であった。
Further, since the lower plate of the rubber bearing is finally welded and fixed to the base plate, the welding operation must be performed in a narrow space between the pier top and the main girder, and the workability is poor. Otherwise, there was a fear that the rubber bearing was damaged by the welding spark. Furthermore, it was very difficult to correct the position of the lower plate after welding.

【0007】この発明は前述した従来の問題点に鑑みな
されたもので、その目的は、支承の設計段階で複雑な計
算を行うことなく、大容量のジャッキを必要とせず、ま
た溶接作業を行うことなく作業が容易でありながら、前
述したような剪断変形を与えることができる橋梁支承の
設置方法を提供することにある。
The present invention has been made in view of the above-mentioned conventional problems, and has as its object to perform complicated calculations at the stage of designing a bearing, do not require a large-capacity jack, and perform welding work. It is an object of the present invention to provide a method of installing a bridge bearing which can provide the above-described shearing deformation without any difficulty in operation.

【0008】[0008]

【課題を解決するための手段】上記目的を達成するた
め、この発明は、橋脚頂部にベースプレートを固定し、
このベースプレートの上に中間プレートをスライド自在
に配置し、この中間プレートの上に上下のプレート間に
ゴム部材を有したゴム支承を配置し、このゴム支承の下
プレートを前記橋脚頂部に仮固定するとともに該ゴム支
承の上プレート上に主桁の型枠を設置し、この型枠にコ
ンクリートを打設した後、前記下プレートと前記中間プ
レートとを固定するとともに前記下プレートと前記橋脚
との仮固定を解除し、前記橋脚頂部と前記主桁との間に
垂直ジャッキを設置して前記ゴム支承に作用する垂直荷
重を低減し、前記ベースプレートと前記下プレートとの
間に付設した横押しネジ機構により前記下プレートと前
記中間プレートを一体的に主桁方向に所定距離だけ変位
させ、変位後の位置で前記中間プレートを前記橋脚頂部
にボルトにより固定するものである。
In order to achieve the above object, the present invention is to fix a base plate on a pier top,
An intermediate plate is slidably disposed on the base plate, a rubber bearing having a rubber member between the upper and lower plates is disposed on the intermediate plate, and a lower plate of the rubber bearing is temporarily fixed to the pier top. At the same time, a formwork of the main girder is installed on the upper plate of the rubber bearing, and concrete is poured into the formwork. Then, the lower plate and the intermediate plate are fixed, and the lower plate and the pier are temporarily Release the fixation, install a vertical jack between the pier top and the main girder to reduce the vertical load acting on the rubber bearing, and provide a horizontal push screw mechanism provided between the base plate and the lower plate. The lower plate and the intermediate plate are integrally displaced in the main girder direction by a predetermined distance, and the intermediate plate is fixed to the bridge pier apex at a position after the displacement by a bolt. It is intended to.

【0009】[0009]

【作用】前記垂直ジャッキにより前記ゴム支承に加わっ
ている垂直荷重を低減するので、前記ベースプレートと
前記中間プレートとの間の摩擦力は小さくなり、簡単な
横押しネジ機構で容易に中間プレートと前記下プレート
とをベースプレートに沿って変位させることができる。
Since the vertical load applied to the rubber bearing by the vertical jack is reduced, the frictional force between the base plate and the intermediate plate is reduced, and the intermediate plate can be easily connected to the intermediate plate by a simple horizontal push screw mechanism. The lower plate can be displaced along the base plate.

【0010】[0010]

【実施例】この発明の一実施例によるゴム支承の設置方
法の主要工程を図1〜図4に順に示している。まず図1
に示すように、橋脚1の頂部にアンカーボルト2によっ
てベースプレート3を固定する。ベースプレート3の設
置部分はプレートの厚み分だけ凹ませて、プレート上面
が周辺部の橋脚頂面と面一になるように設定する。ベー
スプレート3には後述する作用に供されるボルト穴が形
成されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The main steps of a method of installing a rubber bearing according to an embodiment of the present invention are shown in FIGS. First, Figure 1
As shown in (1), the base plate 3 is fixed to the top of the pier 1 with the anchor bolts 2. The installation portion of the base plate 3 is recessed by the thickness of the plate, and the upper surface of the plate is set so as to be flush with the peripheral pier top surface. The base plate 3 is formed with a bolt hole used for an operation described later.

【0011】次に、図2に示すように、ベースプレート
3上に中間プレート4を重ねる。中間プレート4はベー
スプレート3より幅が狭く且つ長さが長い。また、ベー
スプレート3と中間プレート4との摩擦を低減するよう
に、両プレートには表面処理が施されている。さらに、
ジャッキベース8とジャッキネジ9とからなる2つの横
押しネジ機構をベースプレート3上で中間プレート4の
両側部にセットする。ジャッキベース8の下面の両端部
にはベースプレート3の両端部を抱えるように嵌合する
一対の爪が形成されており、ベースプレート3の上面に
載る部分の厚みは中間プレート4の厚みとほぼ同じであ
る。また、ベースプレート3より大きくはみ出したジャ
ッキベース8の端部はL字型に曲っており、その部分の
ネジ穴にはジャッキネジ9が水平に取り付けられてい
る。
Next, as shown in FIG. 2, the intermediate plate 4 is overlaid on the base plate 3. The intermediate plate 4 is narrower and longer than the base plate 3. Both plates are subjected to a surface treatment so as to reduce friction between the base plate 3 and the intermediate plate 4. further,
Two lateral push screw mechanisms including a jack base 8 and a jack screw 9 are set on the base plate 3 on both sides of the intermediate plate 4. A pair of claws are formed at both ends of the lower surface of the jack base 8 so as to hold both ends of the base plate 3, and the thickness of a portion placed on the upper surface of the base plate 3 is almost the same as the thickness of the intermediate plate 4. is there. The end of the jack base 8 that protrudes larger than the base plate 3 is bent in an L-shape, and a jack screw 9 is horizontally mounted in a screw hole in that portion.

【0012】前記のようにベースプレート3上に中間プ
レート4と2つの横押しネジ機構をセットした後、さら
にその上にゴム支承5を設置する。ゴム支承5は、周知
のように下プレート6と上プレート7との間に支承本体
であるゴム部材を挟んだものである。下プレート6はベ
ースプレート3とほぼ同じ大きさで、これを中間プレー
ト4とジャッキベース8の上に載置し、複数のボルト1
0で下プレート6をベースプレート3に仮固定する。ま
た、上プレート7の上に主桁20の型枠を設置し、そこ
にコンクリートを打設して主桁20を構築する。
After setting the intermediate plate 4 and the two lateral push screw mechanisms on the base plate 3 as described above, the rubber bearing 5 is further installed thereon. As is well known, the rubber bearing 5 has a rubber member serving as a bearing main body interposed between the lower plate 6 and the upper plate 7. The lower plate 6 is substantially the same size as the base plate 3, and is placed on the intermediate plate 4 and the jack base 8.
At 0, the lower plate 6 is temporarily fixed to the base plate 3. In addition, a formwork of the main girder 20 is set on the upper plate 7 and concrete is poured into the formwork to construct the main girder 20.

【0013】主桁20が完成した後、別のボルト11に
より下プレート6を中間プレート4に固定するととも
に、前記の仮固定用ボルト10を取り去る。この結果、
ゴム支承5の下プレート6と中間プレート4とが一体化
され、かつ両プレート6,4がベースプレート3の上を
スライド可能な状態となる。
After the main girder 20 is completed, the lower plate 6 is fixed to the intermediate plate 4 by another bolt 11, and the temporary fixing bolt 10 is removed. As a result,
The lower plate 6 and the intermediate plate 4 of the rubber bearing 5 are integrated, and both plates 6 and 4 are slidable on the base plate 3.

【0014】さらに、図3には示していないが、橋脚1
の頂部と主桁20の下面との間に垂直ジャッキを設置
し、そのジャッキによってゴム支承5に加わる垂直荷重
を低減して中間プレート4とベースプレート3間に生じ
る摩擦力を低減する。このようにして摩擦力が低減され
た状態で、横押しネジ機構のジャッキネジ9を回転して
下プレート6の端面を主桁方向(図中矢印方向)に押し
て、一体の下プレート6と中間プレート4とを図中の
方向に所定位置まで変位させる。このように、一体の下
プレート6と中間プレート4を矢印方向に変位させる
と、上プレート7は主桁20に固定されているので、ゴ
ム支承5の本体部分が剪断変形してその歪が調整され
る。
Further, although not shown in FIG.
A vertical jack is provided between the top of the main girder 20 and the lower surface of the main girder 20, and the vertical load applied to the rubber bearing 5 by the jack is reduced to reduce the frictional force generated between the intermediate plate 4 and the base plate 3. With the frictional force reduced in this way, the end face of the lower plate 6 is pushed in the direction of the main girder (the direction of the arrow in the drawing) by rotating the jack screw 9 of the lateral push screw mechanism, and the lower plate 6 is interposed with the lower plate 6 The plate 4 is displaced rightward in the figure to a predetermined position. As described above, when the integrated lower plate 6 and intermediate plate 4 are displaced in the direction of the arrow, the upper plate 7 is fixed to the main girder 20, so that the main body portion of the rubber bearing 5 is sheared and its distortion is adjusted. Is done.

【0015】そして、中間プレート4を所定位置まで変
位させた状態で、図4に示すように、中間プレート4を
ボルト12で橋脚1に固定し、前記垂直ジャッキを取り
外す。
Then, with the intermediate plate 4 displaced to a predetermined position, as shown in FIG. 4, the intermediate plate 4 is fixed to the pier 1 with bolts 12 and the vertical jack is removed.

【0016】なお、前記横押しネジ機構は使用後に取り
外し、別の場所で繰り返し使用することができる。この
場合、ネジ機構を取り外した後の隙間は適宜な部材で埋
めるのが望ましい。
The lateral push screw mechanism can be removed after use and used repeatedly at another place. In this case, it is desirable to fill the gap after removing the screw mechanism with an appropriate member.

【0017】[0017]

【発明の効果】以上詳細に説明したように、この発明で
は、垂直ジャッキが支承に加わる垂直荷重を低減するた
めに使用されるものであるから、その容量を設定する際
にプレート間の不安定な摩擦の要素を加味する必要がな
く、比較的小容量の垂直ジャッキでもプレート間の摩擦
を低減して、簡単な横押しネジ機構で下プレートを移動
させることができる。
As described above in detail, according to the present invention, since the vertical jack is used to reduce the vertical load applied to the bearing, when the capacity of the vertical jack is set, there is an instability between the plates. There is no need to take into account any factors of friction, and even a relatively small-capacity vertical jack can reduce the friction between the plates and move the lower plate with a simple horizontal push screw mechanism.

【0018】また、橋脚と主桁の間に垂直ジャッキを設
置する作業は、従来方法における水平ジャッキの設置に
比べて容易であり、撤去も容易である。さらに、従来の
溶接固定に替えて中間プレートをボルトで橋脚に固定す
るので、狭い場所での固定作業が容易になり、溶接火花
でゴム支承を損傷するおそれもなく、固定位置の変更に
も比較的容易に対処することができる。
Further, the work of installing a vertical jack between the pier and the main girder is easier than the installation of the horizontal jack in the conventional method, and is easy to remove. Furthermore, since the intermediate plate is fixed to the pier with bolts instead of the conventional welding fixation, fixing work in narrow places is easy, there is no risk of damaging the rubber bearing with welding sparks, and it is compared to changing the fixing position Can be easily dealt with.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明の一実施例によるゴム支承の第1の設
置工程を示す正面図と平面図である。
FIG. 1 is a front view and a plan view showing a first installation process of a rubber bearing according to one embodiment of the present invention.

【図2】この発明の一実施例によるゴム支承の第2の設
置工程を示す正面図と平面図である。
FIGS. 2A and 2B are a front view and a plan view showing a second installation process of a rubber bearing according to one embodiment of the present invention.

【図3】この発明の一実施例によるゴム支承の第3の設
置工程を示す正面図と平面図である。
3A and 3B are a front view and a plan view showing a third installation step of a rubber bearing according to one embodiment of the present invention.

【図4】この発明の一実施例によるゴム支承の第4の設
置工程を示す正面図と平面図である。
FIG. 4 is a front view and a plan view showing a fourth installation process of the rubber bearing according to one embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 橋脚 2 アンカーボルト 3 ベースプレート 4 中間プレート 5 ゴム支承 6 下プレート 7 上プレート 8 ジャッキベース(横押しネジ機構) 9 ジャッキネジ(横押しネジ機構) 10 ボルト 11 ボルト 12 ボルト 20 主桁 DESCRIPTION OF SYMBOLS 1 Bridge pier 2 Anchor bolt 3 Base plate 4 Intermediate plate 5 Rubber bearing 6 Lower plate 7 Upper plate 8 Jack base (lateral push screw mechanism) 9 Jack screw (horizontal push screw mechanism) 10 bolt 11 bolt 12 bolt 20 main girder

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) E01D 19/04 ──────────────────────────────────────────────────続 き Continued on front page (58) Field surveyed (Int.Cl. 6 , DB name) E01D 19/04

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 橋脚頂部にベースプレートを固定し、こ
のベースプレートの上に中間プレートをスライド自在に
配置し、この中間プレートの上に上下のプレート間にゴ
ム部材を有したゴム支承を配置し、このゴム支承の下プ
レートを前記橋脚頂部に仮固定するとともに該ゴム支承
の上プレート上に主桁の型枠を設置し、この型枠にコン
クリートを打設した後、前記下プレートと前記中間プレ
ートとを固定するとともに前記下プレートと前記橋脚と
の仮固定を解除し、前記橋脚頂部と前記主桁との間に垂
直ジャッキを設置して前記ゴム支承に作用する垂直荷重
を低減し、前記ベースプレートと前記下プレートとの間
に付設した横押しネジ機構により前記下プレートと前記
中間プレートを一体的に主桁方向に所定距離だけ変位さ
せ、変位後の位置で前記中間プレートを前記橋脚頂部に
ボルトにより固定することを特徴とする橋梁支承の設置
方法。
1. A base plate is fixed to the apex of a pier, an intermediate plate is slidably disposed on the base plate, and a rubber bearing having a rubber member between upper and lower plates is disposed on the intermediate plate. A lower plate of the rubber bearing is temporarily fixed to the top of the pier, and a main girder formwork is installed on the upper plate of the rubber support, and concrete is poured into the formwork. While fixing the temporary fixing of the lower plate and the pier, a vertical jack is installed between the pier top and the main girder to reduce the vertical load acting on the rubber bearing, and the base plate and The lower plate and the intermediate plate are integrally displaced by a predetermined distance in the main girder direction by a horizontal push screw mechanism attached between the lower plate and the position after the displacement. A method for installing a bridge bearing, wherein the intermediate plate is fixed to the top of the pier with bolts.
JP6068793A 1993-03-19 1993-03-19 How to install bridge supports Expired - Lifetime JP2917735B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6068793A JP2917735B2 (en) 1993-03-19 1993-03-19 How to install bridge supports

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6068793A JP2917735B2 (en) 1993-03-19 1993-03-19 How to install bridge supports

Publications (2)

Publication Number Publication Date
JPH06272215A JPH06272215A (en) 1994-09-27
JP2917735B2 true JP2917735B2 (en) 1999-07-12

Family

ID=13149471

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6068793A Expired - Lifetime JP2917735B2 (en) 1993-03-19 1993-03-19 How to install bridge supports

Country Status (1)

Country Link
JP (1) JP2917735B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100364864B1 (en) * 1999-10-18 2002-12-16 주식회사유신코퍼레이션 Bridge shoe for bias
JP4705004B2 (en) * 2006-11-17 2011-06-22 株式会社ブリヂストン Strain adjustment jig and strain adjustment method
JP6528579B2 (en) * 2015-07-24 2019-06-12 株式会社大林組 How to replace the seismic isolation system
CN119195005A (en) * 2024-11-11 2024-12-27 广东省建筑工程集团控股有限公司 An implementation method of an assembled Larsen steel plate trestle

Also Published As

Publication number Publication date
JPH06272215A (en) 1994-09-27

Similar Documents

Publication Publication Date Title
JP3554755B2 (en) How to install the vibration control device
KR101891942B1 (en) Earthquake reinforcement method of existing structure
JP2917735B2 (en) How to install bridge supports
CN210529715U (en) Detachable deep foundation pit excavation braced system
JP2929923B2 (en) Shear deformation correction structure of base-isolated bearing
JP3860892B2 (en) Mounting method and apparatus for sliding bridge girder support
JP4213827B2 (en) Joint structure of mobile formwork device
JP3581691B2 (en) Mounting method and mounting structure of horizontal force damper for structure
JP2849701B2 (en) Slip elastic bearing device for structures
JPH06173220A (en) Installing method for elastic bearing body for structure
EP0404510A1 (en) Apparatus for positioning and supporting an inner mold panel of a form
JP2715046B2 (en) Movable part support method for bridge girder for extrusion erection
JP2003293316A (en) Bearing position adjusting method and its adjusting jig
JP3358279B2 (en) Installation method of elastic bearings and stoppers for structures
JPH10159028A (en) Bearing installation method
JP3829458B2 (en) Attaching the vibration control device to the building
JP2766882B2 (en) Detachment method of seismic isolation device and detachment device used for the method
JP3012188B2 (en) Bridge girder bearing device and construction method
JP3194786B2 (en) Precast concrete formwork construction method
JP2003293315A (en) Bearing position adjusting method and its adjusting jig
JP4176928B2 (en) Sliding bearing
JPH11107384A (en) Building support structure
JPH07189215A (en) Correcting structure against shearing deformation of vibratory isolation support
JP2004060312A (en) Timbering for bridge
JPH0641681B2 (en) Preliminary shear deformation installation device for rubber bearing