JP2920464B2 - Asphalt casting apparatus and construction method - Google Patents
Asphalt casting apparatus and construction methodInfo
- Publication number
- JP2920464B2 JP2920464B2 JP34035093A JP34035093A JP2920464B2 JP 2920464 B2 JP2920464 B2 JP 2920464B2 JP 34035093 A JP34035093 A JP 34035093A JP 34035093 A JP34035093 A JP 34035093A JP 2920464 B2 JP2920464 B2 JP 2920464B2
- Authority
- JP
- Japan
- Prior art keywords
- asphalt
- construction
- form member
- casting device
- bucket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000010426 asphalt Substances 0.000 title claims description 145
- 238000010276 construction Methods 0.000 title claims description 61
- 238000005266 casting Methods 0.000 title claims description 41
- 238000009415 formwork Methods 0.000 description 12
- 238000000034 method Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 6
- 238000005192 partition Methods 0.000 description 5
- 239000013535 sea water Substances 0.000 description 4
- 239000000463 material Substances 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000000638 solvent extraction Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 101100495270 Caenorhabditis elegans cdc-26 gene Proteins 0.000 description 1
- 239000004809 Teflon Substances 0.000 description 1
- 229920006362 Teflon® Polymers 0.000 description 1
- 230000009189 diving Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 238000002844 melting Methods 0.000 description 1
- 230000008018 melting Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 239000011347 resin Substances 0.000 description 1
- 229920005989 resin Polymers 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 238000004381 surface treatment Methods 0.000 description 1
Landscapes
- Underground Or Underwater Handling Of Building Materials (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、海底地盤上に平らにア
スファルトを打設して基礎を構築し、基礎の上部に構造
物を施工するためのアスファルト打設装置に関し、特
に、溶融したアスファルトを収容するバケット装置と、
1度に施工する範囲を設定する型枠部材を一体に構成し
たものを用い、一定の厚さのアスファルトの層を施工可
能にする装置とその装置を用いた施工方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an asphalt placing apparatus for constructing a foundation by placing asphalt flatly on a seabed, and constructing a structure on top of the foundation. A bucket device for accommodating the
The present invention relates to an apparatus which can integrally form an asphalt layer having a constant thickness by using an integrally formed form member for setting a range to be applied at a time, and a method of using the apparatus.
【0002】[0002]
【従来の技術】防波堤や護岸等の構造物の工事を行う場
合には、その構造物の基礎として捨石基礎を施工し、そ
の上部を平らに均してからケーソン等を載置する方法が
用いられている。また、前記ケーソン等の構造物を施工
する場合には、そのケーソンが波浪の影響により移動す
ることを防止するために、ケーソンの下部にアスファル
トマットを敷き込む工法を用いる場合もある。前述した
ように、捨石基礎の上にアスファルトマットを施工する
ことは、波の荒い海域ではケーソンを支持する捨石基礎
に対して、支持基盤が洗掘されることを防止するために
も使用されるもので、例えば、特公平1−46645号
公報等に示されるようにして用いられる。前記構造物を
構築する場合の支持構造は、例えば、図9に示されるよ
うに構築されるもので、海底地盤2を平らに均してから
捨石基礎3を施工し、その上にアスファルトマット4を
敷き込んでから、ケーソンや護岸等の構造物1を構築す
る工法を用いている。2. Description of the Related Art When constructing a structure such as a breakwater or a seawall, a method of laying a rubble foundation as a foundation of the structure, flattening the upper part thereof, and placing a caisson or the like is used. Have been. When a structure such as the caisson is constructed, a method of laying an asphalt mat under the caisson may be used in order to prevent the caisson from moving under the influence of waves. As mentioned above, installing asphalt mats on rubble foundations is also used to prevent caisson-supporting rubble foundations from being scoured in rough seas. It is used, for example, as shown in Japanese Patent Publication No. Hei 4-46645. The support structure in the case of constructing the above-mentioned structure is, for example, constructed as shown in FIG. 9, where the submarine ground 2 is leveled, the rubble foundation 3 is constructed, and the asphalt mat 4 is placed thereon. And then constructing a structure 1 such as a caisson or seawall.
【0003】前記構造物1の下部に敷き込むアスファル
トマットは、陸上の製造工場で製造されたものを、施工
現場に搬送し、クレーン等を用いて海底に施工すること
が一般に行われている。また、前記アスファルトマット
は、厚さが5〜20cmで、長さと幅が2〜10m程度の
板状の部材として製造され、内部に補強用の繊維やワイ
ヤ等を挿入して、クレーンによる取扱いを容易に行い得
るように構成している。さらに、前記図9に示されるよ
うに、海底地盤上に捨石基礎を高く盛り上げるようにし
て構築し、その上に構造物を施工することの他に、平ら
な海底地盤上に直接構造物を施工する場合がある。その
ような施工方法を用いる場合には、海底地盤を平らに均
してから、捨石基礎を所定の厚さで施工し、その上にア
スファルトマットを敷き込んでからケーソン等の構造物
を施工することができる。[0003] Asphalt mats to be laid under the structure 1 are generally transported to a construction site from a land-based manufacturing plant, and constructed on the sea floor using a crane or the like. In addition, the asphalt mat is manufactured as a plate-like member having a thickness of 5 to 20 cm and a length and a width of about 2 to 10 m. It is configured so that it can be easily performed. Further, as shown in FIG. 9, in addition to constructing the rubble foundation on the seabed ground so as to be raised high and constructing the structure thereon, the structure is directly constructed on the flat seabed ground. May be. When using such a construction method, after flattening the seabed ground, constructing a rubble foundation with a predetermined thickness, laying an asphalt mat on it, and constructing a structure such as a caisson be able to.
【0004】[0004]
【発明が解決しようとする課題】前記従来例に示される
ように、アスファルトマットを構造物の下部に敷き込む
工法を用いる場合には、陸上でアスファルトマットを製
造してから施工現場まで搬送し、施工現場で台船等に積
載したクレーン装置を用いて海底の施工現場に敷き込む
ことが必要である。しかしながら、アスファルトマット
は比較的重量が大きなものであり、幅が広く長いシート
状のものを陸上で搬送したり、荷役に際しての吊り上げ
等の取扱い作業が面倒であるという問題がある。また、
アスファルトマットを海底に敷き込む工事を行う場合に
も、潜水作業員がアスファルトマットの位置決め等を行
うことが必要となり、広い面積にアスファルトマットを
敷き込む作業を行う場合に、工事期間が長くなったり、
作業能率の上でも多くの問題がある。As shown in the above conventional example, when a construction method of laying an asphalt mat under a structure is used, the asphalt mat is manufactured on land and then transported to a construction site. It is necessary to use a crane device loaded on a barge or the like at the construction site to lay it on the seabed construction site. However, asphalt mats are relatively heavy, and there is a problem in that handling operations such as transporting a wide and long sheet-like material on land and lifting during loading and unloading are troublesome. Also,
Even when laying asphalt mats on the sea floor, it is necessary for diving workers to perform positioning of asphalt mats, etc., and when laying asphalt mats over a large area, the construction period will be longer. ,
There are many problems in working efficiency.
【0005】そこで、アスファルトマットを施工するこ
とに代えて、例えば、特開平5−79039号公報等に
示されるように、アスファルトを直接捨石基礎の上に流
して、アスファルトの層を施工することが考えられてい
る。前記従来例においては、特に、捨石基礎の斜面に対
してアスファルトを流し込み、所定の厚さのアスファル
トの層を構築する装置として構成されており、アスファ
ルトを収容するバケット装置の下部に開閉蓋部材を配置
して、海底の工事区域でアスファルトを投下する作業を
容易に行い得るようにしている。そして、施工を広い面
積に亘って、アスファルトによる捨石基礎の表面の被覆
を行い、構造物の支持基盤を強化する作業を、連続して
容易に行うことができるものとされる。ところが、前述
したようなアスファルトの施工装置を使用する場合に、
平らな地盤上に一様な厚さのアスファルトを施工するこ
とが困難となることが多くある。つまり、打設装置に複
数のバケット装置を縦横に並べた状態で設け、各バケッ
ト装置に設けた開閉蓋を一度に開き、中に収容したアス
ファルトを流下させ、その後で、打設装置を引き上げる
とアスファルトが周囲に流れてしまい、必要とされる部
分でのアスファルトの施工厚さを一定に維持できないと
いう問題が生じる。[0005] Therefore, instead of asphalt mating, for example, as shown in Japanese Patent Application Laid-Open No. 5-79039, asphalt is flowed directly onto a rubble foundation to form an asphalt layer. It is considered. In the conventional example, in particular, asphalt is poured into the slope of the rubble foundation, and is configured as a device for constructing a layer of asphalt having a predetermined thickness, and an opening / closing lid member is provided at a lower portion of a bucket device for storing asphalt. It is arranged so that the work of dropping asphalt in the seabed construction area can be easily performed. Then, the work of covering the surface of the rubble foundation with asphalt over a wide area and strengthening the support base of the structure can be continuously and easily performed. However, when using asphalt construction equipment as described above,
It is often difficult to apply asphalt of uniform thickness on flat ground. In other words, a plurality of bucket devices are provided in the placing device in a state of being arranged vertically and horizontally, the opening / closing lid provided in each bucket device is opened at a time, the asphalt accommodated therein flows down, and then the placing device is pulled up. Asphalt flows to the surroundings, and a problem arises in that the construction thickness of the asphalt at a required portion cannot be kept constant.
【0006】前述したような問題を解決するためには、
例えば、アスファルトを施工する区域に対して、バケッ
ト装置に収容させるアスファルトの量に応じて区切り部
材を配置し、バケット装置から投下するアスファルト
が、区画の内部で一様な厚さに施工する手段を用いるこ
ともできる。また、前述したような区画手段を用いる場
合に、例えば、アスファルト製の長くて幅の狭いブロッ
ク部材を使用すると、施工したアスファルトが区画部材
と一体になって、海底地盤に所定の厚さのアスファルト
の層を形成することが可能になる。ところが、区画部材
を使用する際に、アスファルトをバケット装置から投下
すると、流動性を有するアスファルトが区画部材の上を
乗り越えてしまうことがあり、区画の内部でのアスファ
ルトの厚さを維持することができないことがある。そこ
で、前記区画部材を施工厚さよりも高く形成すると、ア
スファルトの層の上に凹凸が生じることになり、構造物
を載置した際に、安定性が良くないという問題が発生す
る。In order to solve the above problems,
For example, for an area where asphalt is to be constructed, a partition member is arranged in accordance with the amount of asphalt to be accommodated in the bucket device, and asphalt dropped from the bucket device is provided with a means for constructing a uniform thickness inside the section. It can also be used. In addition, when the above-described partitioning means is used, for example, if a long and narrow block member made of asphalt is used, the asphalt constructed is integrated with the partitioning member, and asphalt having a predetermined thickness is formed on the seabed ground. Can be formed. However, when the asphalt is dropped from the bucket device when using the partition member, the asphalt having fluidity may climb over the partition member, and the thickness of the asphalt inside the partition may be maintained. There are things you can't do. Therefore, if the partition member is formed to be higher than the construction thickness, irregularities will be generated on the asphalt layer, and when the structure is mounted, there is a problem that stability is not good.
【0007】[0007]
【発明の目的】本発明は、前述したようなアスファルト
の施工上の問題を解消するもので、アスファルトを収容
するバケット装置に対して、その周囲に型枠部材を一体
に設けた打設装置を提供すること、およびバケット装置
からアスファルトを投下した後で、所定の時間施工現場
に打設装置をおいてアスファルトが流動性をなくした状
態で、打設装置を上昇させることにより、アスファルト
を一定の厚さに施工する方法を提供すること、さらに、
上部構造物の滑動防止、および上部構造物と基礎間の遮
水を行い得る施工方法を提供することを目的としてい
る。An object of the present invention is to solve the above-mentioned problems in asphalt construction, and to provide a casting apparatus in which a form member is integrally provided around a bucket apparatus for storing asphalt. After the asphalt is dropped from the bucket device, the asphalt is dropped at a construction site for a predetermined period of time, and the asphalt is removed from the flowability. Providing a method to be applied to the thickness,
It is an object of the present invention to provide a construction method capable of preventing sliding of an upper structure and preventing water between the upper structure and a foundation.
【0008】[0008]
【課題を解決するための手段】本発明は、海底地盤上に
構造物を構築するに際して、前記構造物の基礎としてア
スファルトの層を施工する装置に関する。本発明におい
ては、前記施工装置を打設装置の枠体の中央部にバケッ
ト装置を配置し、前記バケット装置に溶融したアスファ
ルトを収容するとともに、バケット装置の下部に開閉可
能に開閉蓋を設け、前記枠体の周囲には、型枠部材を支
持する枠部材を配置し、アスファルトの打設範囲を設定
する装置を構成している。また、本発明においては、前
記打設装置に設ける型枠部材を支持部材に対して上下動
可能に設け、アスファルトの施工条件に対応させて、型
枠部材の高さの位置決めを行い得るように構成すること
ができる。SUMMARY OF THE INVENTION The present invention relates to an apparatus for constructing an asphalt layer as a foundation of a structure when constructing the structure on the seabed. In the present invention, a bucket device is arranged at the center of the frame of the casting device, and the melting device is accommodated in the bucket device. A frame member for supporting the form member is arranged around the frame body, and an apparatus for setting an asphalt driving range is configured. Further, in the present invention, the form member provided in the casting device is provided so as to be vertically movable with respect to the support member, and the height of the form member can be determined in accordance with asphalt construction conditions. Can be configured.
【0009】また、本発明のアスファルトの打設方法で
は、バケット装置と型枠部材とを一体に設けた打設装置
を使用し、打設装置を施工現場の海底に位置決めした状
態でバケット装置からアスファルトを投下し、型枠部材
により区画された内部に一定の厚さのアスファルトの層
を構築した状態で所定の時間打設装置を移動させず、ア
スファルトの流動性が小さくなった状態で打設装置を移
動させる手段を用いることができる。さらに、本発明に
おいて、打設装置を用いてアスファルトの施工を所定の
範囲で行うに際して、既に施工した区画に隣接した部分
に新たに施工する時に、既に施工したアスファルトに対
応する型枠部材を、上昇させる位置に保持し、他の型枠
部材と既に施工したアスファルトにより、新たに施工す
るアスファルトの区画を構成する手段を用いることがで
きる。Further, in the method for placing asphalt according to the present invention, a casting device in which a bucket device and a form member are integrally provided is used, and the bucket device is positioned on the seabed at a construction site. The asphalt is dropped, the casting device is not moved for a predetermined time in a state where the asphalt layer of a certain thickness is constructed inside the section defined by the form member, and the asphalt is poured in a state where the fluidity of the asphalt is reduced. Means for moving the device can be used. Furthermore, in the present invention, when performing asphalt construction in a predetermined range using a casting device, when newly constructing a portion adjacent to the section already constructed, a formwork member corresponding to the already constructed asphalt, It is possible to use a means for holding a section to be newly constructed with the asphalt which is held at the position to be raised and which is newly constructed with other form members and asphalt already constructed.
【0010】[0010]
【作用】前述したように、本発明の打設装置は、バケッ
ト装置の周囲にアスファルトの施工厚さよりも高い型枠
部材を配置しておき、バケット装置から投下されたアス
ファルトが、その流動性により型枠部材を乗り越えて周
囲に流れ出すことを防止して、枠で設定された内部での
アスファルトの施工厚さを維持できるようにする。ま
た、前記型枠部材に対しては、そのアスファルトに接す
る内面に、アスファルトの付着を防止する処理を施して
おき、アスファルトが鉄板に付着しないようにして、施
工することができる。さらに、本発明の施工方法を用い
た場合には、型枠部材で区画された施工部分に対して、
バケット装置からアスファルトを投下した後で、海水に
よりアスファルトを冷却して流動性が低下した状態で、
打設装置を引き上げるような手段を用いることにより、
必要とする区間でのアスファルトの施工厚さを確保する
ことができる。そして、前述したような方法を用いるこ
とにより、アスファルトの施工を広い範囲で一定の厚さ
で行うことができ、各施工区間の打ち継ぎ部に凹凸等が
形成されずに、構造物に対する平らな支持基盤を容易に
構築することができる。As described above, according to the casting apparatus of the present invention, a formwork member having a thickness higher than the asphalt construction thickness is arranged around the bucket apparatus, and the asphalt dropped from the bucket apparatus is subjected to the flowability. The construction thickness of the asphalt in the interior set by the frame can be maintained by preventing the material from flowing over the form member to the surroundings. In addition, the mold member may be subjected to a process for preventing the asphalt from adhering to the inner surface in contact with the asphalt so that the asphalt does not adhere to the iron plate. Furthermore, when using the construction method of the present invention, for the construction portion partitioned by the formwork member,
After dropping asphalt from the bucket device, in a state where the asphalt is cooled by seawater and fluidity is reduced,
By using a means to raise the casting device,
The construction thickness of asphalt in a required section can be secured. Then, by using the method as described above, asphalt construction can be performed with a constant thickness over a wide range, and no unevenness or the like is formed at a joint portion of each construction section, and a flat structure for the structure is formed. The support base can be easily constructed.
【0011】[0011]
【実施例】図示される例にしたがって、本発明のアスフ
ァルト施工装置を説明する。図1、2に示されるよう
に、本発明の打設装置10では、アスファルトを施工す
る範囲を設定する枠体11の周囲に型枠部材15、16
……を配置し、枠体の中央部にバケット装置20を設け
ている。また、前記枠体11においては、上部フレーム
12の下部に脚14、14a……を設けて、打設装置を
支持する手段を構成しており、周囲には側枠13、13
a……を下側に設けて、前記側枠に対して型枠部材1
5、16……を取り付ける。さらに、前記上部フレーム
12は、図2に示されるように、縦横に梁部材を組み合
わせて構成し、その中央部に型枠部材を支持する部分を
設けている。そして、前記上部フレーム12とバケット
装置20の上部とを斜め梁部材で接続して、バケット装
置の上部に吊り上げ部材19を設け、クレーンのフック
9を用いて、打設装置10を吊り上げて移動させ得るよ
うに構成する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The asphalt construction apparatus of the present invention will be described with reference to the illustrated example. As shown in FIGS. 1 and 2, in the casting device 10 of the present invention, form members 15, 16 are provided around a frame 11 for setting an asphalt application range.
Are arranged, and a bucket device 20 is provided at the center of the frame. In the frame 11, legs 14, 14a,... Are provided below the upper frame 12 to constitute means for supporting the casting device.
a are provided on the lower side, and the frame member 1 is provided with respect to the side frame.
Attach 5, 16 ... Further, as shown in FIG. 2, the upper frame 12 is formed by combining beam members in the vertical and horizontal directions, and a portion for supporting the form member is provided at the center thereof. Then, the upper frame 12 and the upper portion of the bucket device 20 are connected by an oblique beam member, a lifting member 19 is provided on the upper portion of the bucket device, and the driving device 10 is lifted and moved using the hook 9 of the crane. It is configured to obtain.
【0012】前記打設装置10の上部フレーム12の中
央部に対して、その上部に設けたバケット装置20は、
下部に開閉蓋21をヒンジ22を介して開閉可能に設け
ており、前記開閉蓋21を図示を省略した開閉手段によ
り作動させるように構成する。そして、バケット装置2
0にアスファルトを収容して、アスファルトの施工位置
まで搬送し、打設装置を海中に沈めて施工位置に位置決
めし、開閉蓋21を開くことによりアスファルトを投下
することができるようにする。また、本発明の装置にお
いて、枠体の外側下部に配置する型枠部材15、16…
…は、アスファルトを施工する厚さよりも高く形成され
るもので、流動性を有するアスファルトがバケット装置
20から投下された際に、そのアスファルトの流れる勢
いにより型枠部材15を乗り越えて周囲に飛散すること
を防止する。さらに、前記型枠部材15、16……のア
スファルトが接する内側の面には、アスファルトが付着
しないように表面処理を施すもので、例えば、テフロン
等の樹脂材料をコーティングすることや、アスファルト
が付着しない性質を有する塗料等を塗布して構成する。A bucket device 20 provided above the center of the upper frame 12 of the casting device 10
An opening / closing lid 21 is provided at the lower part via a hinge 22 so as to be opened and closed, and the opening / closing lid 21 is configured to be operated by opening / closing means (not shown). And the bucket device 2
The asphalt is stored at 0, transported to the asphalt construction position, the casting device is submerged in the sea, positioned at the construction position, and the opening and closing cover 21 is opened so that the asphalt can be dropped. Further, in the device of the present invention, the form members 15, 16,...
Are formed to be thicker than the thickness at which the asphalt is constructed, and when the asphalt having fluidity is dropped from the bucket device 20, the asphalt flows over the form member 15 due to the flowing force of the asphalt and scatters around. To prevent that. Further, a surface treatment is performed on the inner surfaces of the mold members 15, 16... In contact with asphalt so as to prevent asphalt from adhering. For example, a resin material such as Teflon is coated, or asphalt adheres. It is constituted by applying a paint or the like having a property not to be applied.
【0013】前記図1、2に示されるような構成を有す
る打設装置10を用いて、アスファルトを海底に施工す
る場合には、図3に示すようにして実行される。前記図
3に示す例において、海底地盤2に対して、従来の海底
構造物の施工の場合と同様に、捨石基礎3を所定の厚さ
に亘って設け、その捨石基礎3の上に所定の厚さでアス
ファルトの層25を施工する。その際に、打設装置10
を海底の施工位置に着床させ、バケット装置20の開閉
蓋21、21aを開いてアスファルトを投下すると、打
設装置の周囲の型枠部材で仕切られた位置までアスファ
ルトが流れ、区画された範囲内で所定の厚さで平らにな
った状態で固化する。また、アスファルトが型枠部材に
接すると、金属製で熱伝導率の大きな型枠部材が海水に
より冷却されるのでアスファルトの周囲の部分が急速に
冷却される。したがって、打設装置を用いてアスファル
トの施工を行う場合に、その施工区画の周囲の部分が固
化して、内部の溶融アスファルトが外に漏れ出すことが
ない状態で、型枠部材を取り外すことができるので、打
設装置を長時間海中に埋没させておく必要はない。When asphalt is installed on the seabed using the casting apparatus 10 having the structure shown in FIGS. 1 and 2, the operation is performed as shown in FIG. In the example shown in FIG. 3, a rubble foundation 3 is provided to a predetermined thickness on the submarine ground 2 in the same manner as in the case of the construction of the conventional submarine structure, and a predetermined thickness is provided on the rubble foundation 3. Apply a layer 25 of asphalt with a thickness. At that time, the driving device 10
When the asphalt is dropped by opening the open / close lids 21 and 21a of the bucket device 20, the asphalt flows to a position partitioned by the formwork member around the casting device, and the divided area It solidifies in a flat state at a predetermined thickness. Also, when the asphalt comes into contact with the form member, the form member made of metal and having a high thermal conductivity is cooled by seawater, so that the portion around the asphalt is rapidly cooled. Therefore, when performing asphalt construction using a casting device, it is possible to remove the formwork member in a state where the surrounding part of the construction section is solidified and the molten asphalt inside does not leak out. It is not necessary to immerse the casting device in the sea for a long time.
【0014】前述したようにして、バケット装置からア
スファルトを供給して、海底にアスファルトの層を所定
の厚さに施工する際に、バケット装置から投下したアス
ファルトの一部が、捨石基礎を構成する石の間に入り込
み、石をアスファルトにより相互に固着させる作用を行
う。そのために、バケット装置に収容するアスファルト
の量は、捨石の間に入り込む量をあらかじめ加算した量
に設定し、アスファルトの層の厚さを設定厚さに構築で
きるようにすることが必要である。As described above, when asphalt is supplied from the bucket device and a layer of asphalt is constructed to a predetermined thickness on the seabed, part of the asphalt dropped from the bucket device constitutes a rubble foundation. It penetrates between the stones and acts to fix the stones together by asphalt. Therefore, it is necessary to set the amount of asphalt to be stored in the bucket device to an amount obtained by adding in advance the amount that enters between the rubbles, so that the thickness of the asphalt layer can be set to the set thickness.
【0015】本発明の打設装置において、枠体11の周
囲に配置する型枠部材15、16……を、側枠13…に
対して固定位置に取り付けると、捨石基礎の表面が大き
く凹凸を生じている場合、または、既に施工した区画の
隣に施工する場合に、打設装置を傾斜させるという問題
が発生する。そこで、本発明の打設装置においては、図
4に示されるように、側枠13、13a……に対して、
型枠部材15、16……をそれぞれ上下動可能に設け
て、施工部分の地盤に対応させることができる。例え
ば、図4の側枠13aに設ける型枠部材16において
は、型枠部材16を側枠13aに対して固定ねじ18を
用いて取り付けており、型枠部材の下部に突出する高さ
の調整を行った状態で、アスファルトを海中で施工する
ことができるようにする。また、図4の型枠部材15に
示される例では、側枠13に対してガイドピン17を設
けておき、型枠部材15に設けたガイド孔に前記ピン1
7を係合させることにより、型枠部材15の下面が海底
の凹凸に係合した状態で位置決めされる。また、既に打
設されたアスファルトマットの層4がある場合には、そ
の高さに対応させて型枠を位置決めして、アスファルト
の層の端部を区画できるようにしている。In the casting apparatus according to the present invention, when the frame members 15, 16... Arranged around the frame body 11 are fixed to the side frames 13,. If it occurs, or if it is installed next to a section that has already been installed, the problem of tilting the casting device occurs. Therefore, in the casting device of the present invention, as shown in FIG. 4, the side frames 13, 13a.
The form members 15, 16,... Can be provided to be vertically movable, respectively, so as to correspond to the ground of the construction portion. For example, in the form member 16 provided on the side frame 13a of FIG. 4, the form member 16 is attached to the side frame 13a using the fixing screw 18, and the height of the projecting portion below the form member is adjusted. In this state, asphalt can be constructed in the sea. In the example shown in the form member 15 of FIG. 4, a guide pin 17 is provided for the side frame 13, and the pin 1 is provided in a guide hole provided in the form member 15.
7 is engaged, the lower surface of the form member 15 is positioned in a state of being engaged with the unevenness on the seabed. In addition, when the asphalt mat layer 4 has already been cast, the formwork is positioned according to its height so that the end of the asphalt layer can be partitioned.
【0016】前述したように構成した打設装置を使用
し、海底の平らな地盤にアスファルトを施工する場合
に、図5に示されるように、広い施工区域30に対し
て、最初に隣接しない区間31、33、35……のよう
に、順次施工する。その後で、既に施工した区域31、
33の間の区域32に対して、アスファルトを施工する
場合には、既に施工した部分の端部に、対応する型枠部
材が引っ掛かって打設装置が傾いたりすることになり、
アスファルトの層の厚さを一定に維持できないという問
題が生じる。そこで、本発明においては、前記図4に示
したように、型枠部材を上下動させる手段を設けて、型
枠部材が位置する部分の高さに対応させて、型枠部材の
位置決めを行う手段を設けて、型枠部材の高さを設定す
ることができる。そして、例えば、図6に示されるよう
に、既に施工した区域31に隣接させて、区域34にア
スファルトを施工する際に、施工区域に隣接する区間で
の型枠部材の高さを設定することができ、型枠部材を既
に施工したアスファルトの層の高さに合わせて位置決め
することができる。また、打設装置に設ける型枠部材を
側枠に対して摺動させる状態で保持して、アスファルト
に載った型枠部材が側枠に摺動し、打設装置を下降させ
て位置決めする等の手段を用いることができる。When asphalt is constructed on the flat ground on the sea floor using the casting apparatus constructed as described above, as shown in FIG. Construction is performed sequentially, such as 31, 33, 35. After that, the already constructed area 31,
When asphalt is applied to the area 32 between 33, the corresponding form member is hooked to the end of the already applied portion, and the setting device is inclined,
The problem arises that the thickness of the asphalt layer cannot be kept constant. Therefore, in the present invention, as shown in FIG. 4, means for vertically moving the form member is provided, and the form member is positioned in accordance with the height of the portion where the form member is located. Means can be provided to set the height of the formwork member. Then, for example, as shown in FIG. 6, when asphalt is constructed in the area 34 adjacent to the already constructed area 31, the height of the formwork member in the section adjacent to the construction area is set. The form member can be positioned according to the height of the asphalt layer already applied. Also, the form member provided on the setting device is held in a state of being slid with respect to the side frame, and the form member placed on the asphalt slides on the side frame, and the setting device is lowered and positioned. Means can be used.
【0017】前述したように構成した打設装置を用い
て、海底地盤の上にアスファルトの層を平らに打設する
際には、図7、8に示されるように、台船5にアスファ
ルト混合装置6とクレーン8を載置した作業装置を使用
する。前記台船5に設けるアスファルト混合装置6に
は、陸上で作成したアスファルト合材を一時貯蔵してお
き、打設装置10のバケット装置に対してシュート7等
を用いて移載し、アスファルトを収容した打設装置をク
レーン8により吊り下げて海底地盤2の施工位置に搬送
する。そして、打設装置を施工位置に位置決めしてアス
ファルトを投下し、型枠部材により区画された区域に所
定の厚さでアスファルトの層を打設して、構造物を構築
することができる。前述したようにして、クレーンを用
いて打設装置を移動させ、海底地盤上に構造物を設置す
るために必要とされる区域に対して、前記図5に示され
るようにして、所定の広さの区間にアスファルトを打設
して、支持基盤を構築するような工法を用いることがで
きる。When the asphalt layer is cast flat on the seabed using the casting apparatus constructed as described above, asphalt mixing is applied to the barge 5 as shown in FIGS. A working device on which the device 6 and the crane 8 are mounted is used. The asphalt mixture prepared on land is temporarily stored in the asphalt mixing device 6 provided on the barge 5, and is transferred to the bucket device of the casting device 10 using the chute 7 or the like, and the asphalt is stored. The driven casting device is suspended by the crane 8 and transported to the construction position of the submarine ground 2. Then, the casting apparatus is positioned at the construction position, the asphalt is dropped, and a layer of asphalt is cast at a predetermined thickness in an area defined by the formwork member, whereby a structure can be constructed. As described above, the crane is used to move the setting device, and the area required for installing the structure on the seabed is provided with a predetermined area as shown in FIG. It is possible to use a construction method in which asphalt is cast in the section of the bridge to construct a support base.
【0018】なお、前記本発明の実施例において、アス
ファルトを施工するための打設装置の形状と、バケット
装置の配置位置、および、打設装置の枠体に対して上下
動可能に設ける型枠部材の支持構造等は、施工区域の状
態に合わせて任意に構成することができる。また、バケ
ット装置に設ける開閉蓋の構造や、開閉蓋の開閉のため
に用いる構成部材等は、従来のアスファルトの取り扱い
に使用するバケット装置等の装置と同様に、任意に構成
することができる。さらに、本発明の装置を用いてアス
ファルトを施工する場合には、複数の打設装置を用い
て、施工区域に対して順次アスファルトの区画を施工す
ることもでき、広い面積に亘ってアスファルトの打設を
行う際に、工事の能率を向上させ、工事期間の短縮を図
ることを可能にする。In the embodiment of the present invention, the shape of the driving device for asphalt, the position of the bucket device, and the formwork which is vertically movable with respect to the frame of the driving device. The support structure and the like of the members can be arbitrarily configured according to the state of the construction area. Further, the structure of the opening / closing lid provided in the bucket device, the components used for opening / closing the opening / closing lid, and the like can be arbitrarily configured in the same manner as a conventional device such as a bucket device used for handling asphalt. Furthermore, when asphalt is constructed using the apparatus of the present invention, asphalt sections can be constructed sequentially in the construction area by using a plurality of placing apparatuses, and asphalt can be constructed over a wide area. When installing, it is possible to improve the efficiency of construction and shorten the construction period.
【0019】[0019]
【発明の効果】本発明の打設装置は、前述したように構
成したものであるから、バケット装置の周囲にアスファ
ルトの施工厚さよりも高い型枠部材を配置しておき、バ
ケット装置から投下されたアスファルトが、その流動性
により型枠部材を乗り越えて周囲に流れ出すことを防止
して、枠で設定された内部でのアスファルトの施工厚さ
を維持することができる。さらに、上部構造物の滑動を
防止し、また上部構造物と基礎間の遮水を行い得ること
ができる。また、前記型枠部材に区画された内部にアス
ファルトを施工する際に、溶融されたアスファルトの型
枠部材に接する部分が、海水により急速に冷却されるた
めに、打設装置を施工位置から除去する時間を短くする
ことができ、工事の施工能率を向上させることが可能に
なる。さらに、本発明の施工方法を用いた場合には、枠
部材で区画された施工部分に対して、バケット装置から
アスファルトを投下した後で、海水によりアスファルト
を冷却して流動性が低下した状態で、打設装置を引き上
げるような手段を用いることにより、必要とする区間で
のアスファルトの施工厚さを確保することができる。そ
して、前述したような方法を用いることにより、アスフ
ァルトの施工を広い範囲で一定の厚さで行うことがで
き、構造物に対する支持基盤を容易に構築することがで
きる。したがって、従来のアスファルトマットを用いる
施工方法に比較して、構造物を支持する基盤の構築作業
を容易に行うことができ、作業工程を簡素化できるもの
となる。Since the casting apparatus of the present invention is constructed as described above, a form member having a thickness greater than the asphalt construction thickness is arranged around the bucket apparatus, and is dropped from the bucket apparatus. It is possible to prevent the asphalt from flowing over the form member and flowing out to the surroundings due to its fluidity, and to maintain the construction thickness of the asphalt inside the frame set by the frame. Further, it is possible to prevent the upper structure from sliding, and to provide water shielding between the upper structure and the foundation. In addition, when asphalt is installed in the interior defined by the formwork member, the portion of the molten asphalt in contact with the formwork member is rapidly cooled by seawater, so the casting device is removed from the work position. The time required for the construction can be shortened, and the construction efficiency of the construction can be improved. Furthermore, when the construction method of the present invention is used, after the asphalt is dropped from the bucket device to the construction portion partitioned by the frame member, the asphalt is cooled by seawater and the fluidity is reduced. By using means for raising the casting device, it is possible to secure the construction thickness of asphalt in a required section. Then, by using the above-described method, asphalt can be applied in a wide range with a constant thickness, and a support base for a structure can be easily constructed. Therefore, as compared with the conventional construction method using asphalt mats, the construction work of the base supporting the structure can be easily performed, and the work process can be simplified.
【図1】 本発明の打設装置の構成を示す説明図であ
る。FIG. 1 is an explanatory diagram showing a configuration of a casting device according to the present invention.
【図2】 打設装置の平面図である。FIG. 2 is a plan view of the casting device.
【図3】 本発明の打設装置を用いてアスファルトを施
工する状態を示す説明図である。FIG. 3 is an explanatory diagram showing a state in which asphalt is constructed using the casting device of the present invention.
【図4】 型枠部材を移動可能に設ける例の説明図であ
る。FIG. 4 is an explanatory view of an example in which a mold member is movably provided.
【図5】 アスファルトの施工状態の説明図である。FIG. 5 is an explanatory view of a construction state of asphalt.
【図6】 アスファルトの打ち継ぎの説明図である。FIG. 6 is an explanatory diagram of splicing of asphalt.
【図7】 打設装置に対してアスファルトを供給する装
置の説明図である。FIG. 7 is an explanatory diagram of a device for supplying asphalt to a casting device.
【図8】 台船を用いてアスファルトを施工する状態の
説明図である。FIG. 8 is an explanatory diagram of a state in which asphalt is constructed using a barge.
【図9】 海中構造物の施工の一般的な例の説明図であ
る。FIG. 9 is an explanatory diagram of a general example of construction of an underwater structure.
1 構造物、 2 海底地盤、 3 捨石基礎、
4 アスファルトマット、 5 台船、10 打
設装置、 11 枠体、 12 上部フレーム、1
3 側枠、 15 型枠部材、 20 バケット
装置、21 開閉蓋、 25 アスファルト、 3
0 施工区域。1 structure, 2 submarine ground, 3 rubble foundation,
4 asphalt mat, 5 barges, 10 casting equipment, 11 frame, 12 upper frame, 1
3 Side frame, 15 Form member, 20 Bucket device, 21 Opening / closing lid, 25 Asphalt, 3
0 Construction area.
Claims (4)
て、前記構造物の基礎としてアスファルトの層を施工す
る装置において、 前記施工装置を打設装置の枠体の中央部にバケット装置
を配置し、前記バケット装置に溶融したアスファルトを
収容するとともに、バケット装置の下部に開閉可能に開
閉蓋を設け、 前記枠体の周囲には、型枠部材を支持する枠部材を配置
し、アスファルトの打設範囲を設定することを特徴とす
るアスファルトの打設装置。1. An apparatus for constructing a structure of asphalt as a foundation of the structure when constructing a structure on the seabed ground, wherein the construction device is provided with a bucket device at a central portion of a frame of a casting device. A container for holding the molten asphalt in the bucket device, an openable / closable lid provided at the lower part of the bucket device so as to be openable and closable, and a frame member for supporting a form member disposed around the frame body; An asphalt casting device characterized by setting a range.
材に対して上下動可能に設け、アスファルトの施工条件
に対応させて、型枠部材の高さの位置決めを行い得るよ
うに構成することを特徴とする請求項1に記載のアスフ
ァルトの打設装置。2. A configuration in which a form member provided in the casting device is provided so as to be vertically movable with respect to a support member, and a height of the form member can be determined in accordance with asphalt construction conditions. The asphalt driving device according to claim 1, wherein:
た打設装置を使用し、打設装置を施工現場の海底に位置
決めした状態でバケット装置からアスファルトを投下
し、型枠部材により区画された内部に一定の厚さのアス
ファルトの層を構築した状態で所定の時間打設装置を施
工位置に保持し、アスファルトの流動性がなくなった状
態で打設装置を移動させることを特徴とするアスファル
トの施工方法。3. An asphalt is dropped from a bucket device using a casting device in which a bucket device and a form member are integrally provided, and the casting device is positioned on the sea floor at a construction site, and partitioned by the form member. Characterized in that the casting device is kept at the construction position for a predetermined time in a state where a layer of asphalt having a constant thickness is built in the inside, and the casting device is moved in a state where the asphalt has no fluidity. Construction method of asphalt.
所定の範囲で行うに際して、既に施工した区画に隣接し
た部分に新たに施工する時に、既に施工したアスファル
トに対応する型枠部材を、上昇させる位置に保持し、他
の型枠部材と既に施工したアスファルトにより、新たに
施工するアスファルトの区画を構成することを特徴とす
る請求項3に記載のアスファルトの施工方法。4. When performing asphalt construction within a predetermined range using a casting device, when newly constructing a part adjacent to a section already constructed, a form member corresponding to the already constructed asphalt is raised. The asphalt construction method according to claim 3, wherein the asphalt section to be newly constructed is constituted by holding at a position to be made and using another form member and the asphalt already constructed.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP34035093A JP2920464B2 (en) | 1993-12-09 | 1993-12-09 | Asphalt casting apparatus and construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP34035093A JP2920464B2 (en) | 1993-12-09 | 1993-12-09 | Asphalt casting apparatus and construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH07158069A JPH07158069A (en) | 1995-06-20 |
| JP2920464B2 true JP2920464B2 (en) | 1999-07-19 |
Family
ID=18336099
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP34035093A Expired - Fee Related JP2920464B2 (en) | 1993-12-09 | 1993-12-09 | Asphalt casting apparatus and construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2920464B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4833098B2 (en) * | 2006-04-06 | 2011-12-07 | 日本道路株式会社 | Material transportation method for marine revetment |
| JP4976917B2 (en) * | 2007-05-15 | 2012-07-18 | 日本道路株式会社 | Asphalt material placement work ship for sealing |
| CN117385883A (en) * | 2023-11-17 | 2024-01-12 | 中国水利水电第四工程局有限公司 | An asphalt paver for concrete core wall construction |
-
1993
- 1993-12-09 JP JP34035093A patent/JP2920464B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH07158069A (en) | 1995-06-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2920464B2 (en) | Asphalt casting apparatus and construction method | |
| US4441685A (en) | Column form | |
| CN107938594A (en) | Deep water mixing dike construction method | |
| US4923335A (en) | Process and device for the production of a marine engineering structure, such as a pier, jetty and the like | |
| JP2022019515A (en) | Construction method for scouring prevention structure | |
| JP7628850B2 (en) | Guide member for installation of immersed tunnel and construction method of immersed tunnel | |
| CN113481883B (en) | Reinforcing and reinforcing construction method for bridge underwater structure | |
| JPH0742702B2 (en) | Underwater casting equipment for asphalt | |
| JP3308958B2 (en) | Construction method and form carrier for landfill structures | |
| CN111519641B (en) | Water stop box mold of cast-in-place concrete independent foundation and construction method | |
| JPH0579039A (en) | Underwater laying equipment of asphalt, etc. | |
| JPH07206373A (en) | Asphalt plied timber handling device | |
| JP3722201B2 (en) | Method of placing underwater concrete using lightweight aggregate | |
| JP2026053141A (en) | Work equipment | |
| JP2013002075A (en) | Construction method of marine structure, and marine structure | |
| NL2014401B1 (en) | Device and method for applying a protective material mat to a subsurface under water. | |
| JP3388416B2 (en) | Construction equipment for the layer for preventing the suction of landfill soil in reclaimed seawalls | |
| JPH10147935A (en) | Throw-down device below water surface and method thereof | |
| JPH08277513A (en) | Quay equipment repair method | |
| JPH10121450A (en) | Binding engineering method of caison and foundation pile | |
| JP4753733B2 (en) | Method and apparatus for spraying spatter on seabed | |
| Kumara et al. | DESIGN OF A BARGE FOR SMALL SCALE EXCAVATOR IN NARROW CANAL | |
| CA1218862A (en) | Column form | |
| JPH0853827A (en) | Dam construction method | |
| JPH09328756A (en) | Stopper device of caisson |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 19990330 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080430 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090430 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100430 Year of fee payment: 11 |
|
| LAPS | Cancellation because of no payment of annual fees |