Foundation structure

Info

Publication number
JP2945792B2
JP2945792B2 JP3236640A JP23664091A JP2945792B2 JP 2945792 B2 JP2945792 B2 JP 2945792B2 JP 3236640 A JP3236640 A JP 3236640A JP 23664091 A JP23664091 A JP 23664091A JP 2945792 B2 JP2945792 B2 JP 2945792B2
Authority
JP
Japan
Prior art keywords
foundation
piping
footing
closed
pipes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP3236640A
Other languages
Japanese (ja)
Other versions
JPH0579047A (en
Inventor
孝司 大井
修 伊藤
弘之 荒井
哲朗 花木
俊彦 大岡
規和 浅井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Motor Corp
Toyota T&S Construction Co Ltd
Original Assignee
Toyota Motor Corp
Toyota T&S Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Motor Corp, Toyota T&S Construction Co Ltd filed Critical Toyota Motor Corp
Priority to JP3236640A priority Critical patent/JP2945792B2/en
Publication of JPH0579047A publication Critical patent/JPH0579047A/en
Application granted granted Critical
Publication of JP2945792B2 publication Critical patent/JP2945792B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、プレキャストコンクリ
ート化されかつフーチング及びこのフーチングに立設さ
れる基礎梁を備え、上部構造からの荷重を地盤に伝達す
る基礎構造に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a foundation which is made of precast concrete and has a footing and a foundation beam erected on the footing to transmit a load from a superstructure to the ground.

【0002】[0002]

【従来の技術】上部構造からの荷重を地盤に伝達するた
めの基礎構造には種々あるが、以下、布基礎(連続フー
チング基礎)を例にして説明する。
2. Description of the Related Art There are various types of foundation structures for transmitting a load from a superstructure to the ground. Hereinafter, a fabric foundation (continuous footing foundation) will be described as an example.

【0003】最近では、現場施工時間の短縮、寸法精度
等の製品管理の向上等の観点から、布基礎はプレキャス
トコンクリート化されており、工場等でフーチング及び
フーチングに立設される基礎梁(もしくは基礎柱)が精
度良く生産されている。この布基礎を用いて住宅等を建
築する場合、上下水道等の設備のための配管用の孔が必
要となるが、配管用の孔を設ける位置、個数は住宅のプ
ラニング、設備の仕様や敷地形状等により多種多様であ
る。従って、従来では布基礎に設けられる配管用の孔の
位置も個々の住宅等に合わせて設計されていた。
[0003] Recently, from the viewpoint of shortening the construction time on site and improving product management such as dimensional accuracy, the cloth foundation is made of precast concrete, and footing is installed at a factory or the like. Foundation pillar) is produced with high accuracy. When building a house or the like using this fabric foundation, holes for piping for facilities such as water and sewage are required, but the location and number of holes for piping are based on the planning of the house, equipment specifications and site There are various types depending on the shape and the like. Therefore, conventionally, the positions of the holes for piping provided in the cloth foundation have also been designed according to individual houses and the like.

【0004】しかしながら、このような方式では効率が
悪いため、工場生産の段階で基礎梁に所定の間隔で複数
の配管用の孔を予め形成し、現場にて適宜必要な配管用
の孔を選択して使用するという方法が採られている。こ
のような技術の一例が実開昭60−438号公報に開示
されており、以下に図5〜図7を用いて簡単に説明す
る。
However, since such a method is inefficient, a plurality of piping holes are formed in advance at predetermined intervals in a foundation beam at the stage of factory production, and the necessary piping holes are selected on site. And use it. An example of such a technique is disclosed in Japanese Utility Model Laid-Open No. 60-438, and will be briefly described below with reference to FIGS.

【0005】図5に示されるように、この基礎構造で
は、フーチング100とこのフーチング100に立設さ
れる基礎梁102とから成る布基礎104において、基
礎梁102の下端部に所定の間隔で矩形状の配管用の貫
通孔106、108、110が複数個形成されている。
そして、現場にて、図6及び図7に示されるように、配
管用の貫通孔106、108、110の内、配管経路に
近い位置にある貫通孔106が選択され、この貫通孔1
06内へ管路112が案内されている。配管工事が終了
すると、埋戻し作業が行われる。
[0005] As shown in FIG. 5, in this foundation structure, in a cloth foundation 104 composed of a footing 100 and a foundation beam 102 erected on the footing 100, the lower end of the foundation beam 102 is rectangularly arranged at a predetermined interval. A plurality of through-holes 106, 108, 110 for piping having a shape are formed.
Then, at the site, as shown in FIGS. 6 and 7, the through hole 106 located at a position close to the piping path is selected from the through holes 106, 108, and 110 for the piping.
The pipe 112 is guided into the inside of the pipe 06. When the plumbing is completed, backfill work is performed.

【0006】[0006]

【発明が解決しようとする課題】しかしながら、住宅等
の基礎では、一般に根入れ深さが浅く、地盤面からフー
チング100の上面までの距離Hに対しこの距離Hに近
い径寸法Pを持つ管路112を埋設すると地盤のかぶり
量が非常に少なくなる。従って、地盤面上に隙間114
(図7参照)が生じるおそれがある。ここで、結果とし
て使用しなかった配管用の貫通孔108、110をその
ままの状態にして埋戻した場合、隙間114から雨水や
鼠等の小動物が床下に侵入するという問題点が生じる。
However, in a foundation of a house or the like, the depth of the ground is generally shallow, and a pipe having a diameter dimension P close to the distance H with respect to the distance H from the ground surface to the upper surface of the footing 100 is generally used. When 112 is buried, the fogging amount of the ground becomes very small. Therefore, the gap 114 is formed on the ground surface.
(See FIG. 7). Here, as a result, when the unused through-holes 108 and 110 for the piping are buried in the state as they are, there is a problem that small animals such as rainwater and rats enter under the floor from the gap 114.

【0007】この問題点を解決するべく従来では、使用
しなかった配管用の貫通孔108、110を埋戻し前に
モルタル等で塞いでいた。従って、現場での作業が煩雑
化するという問題点が生じる。
Conventionally, in order to solve this problem, the unused through-holes 108 and 110 for piping have been closed with mortar or the like before backfilling. Therefore, there is a problem that work on site becomes complicated.

【0008】本発明は上記事実を考慮し、配管用の案内
路を複数設けた場合においても、使用しなかった案内路
を埋め戻し前に閉塞する作業が不要な基礎構造を得るこ
とを目的とする。
The present invention has been made in consideration of the above-described circumstances, and has as its object to obtain a basic structure which does not require an operation of closing an unused guideway before backfilling even when a plurality of guideways for piping are provided. I do.

【0009】[0009]

【課題を解決するための手段】本発明は、プレキャスト
コンクリート化されかつフーチング及びこのフーチング
に立設される基礎梁を備え、上部構造からの荷重を地盤
に伝達する基礎構造であって、前記基礎梁における前記
フーチングに近接する部位に所定の間隔で複数個設けら
れ、かつ前記基礎梁の肉厚一部で破砕可能に閉塞された
配管用の案内路を備えたことを特徴としている。
SUMMARY OF THE INVENTION The present invention relates to a foundation structure which is made of precast concrete and includes a footing and a foundation beam erected on the footing to transmit a load from an upper structure to the ground. A plurality of guide beams are provided at predetermined intervals in a portion of the beam close to the footing, and are provided with piping guide paths which are crushably closed at a part of the thickness of the foundation beam.

【0010】[0010]

【作用】本発明に係る基礎構造では、基礎梁におけるフ
ーチングに近接する部位に所定間隔で複数個の配管用の
案内路が設けられており、しかも基礎梁の肉厚一部で破
砕可能に閉塞されているので、配管時に必要な案内路を
適宜選択して前記肉厚一部を破砕するだけで管路を通す
ことができる。この際、使用されなかった配管用の案内
路は依然として前記肉厚一部によって閉塞されているの
で、従来のように埋戻し前にモルタル等で配管用の孔を
閉塞する作業が不要になる。従って、現場での作業効率
が向上する。また、埋戻し後の状態では前記肉厚一部に
よって配管用の案内路は閉塞されているので、埋戻し後
に仮に配管用の案内路の一部が露出したとしても、雨水
や小動物が侵入することがなく、外観品質も向上され
る。
In the foundation structure according to the present invention, a plurality of guide paths for piping are provided at predetermined intervals in a portion of the foundation beam close to the footing, and moreover, the foundation beam is partially crushably closed at a part of its thickness. Therefore, a guide path necessary for piping can be appropriately selected, and the pipe can be passed simply by crushing a part of the thickness. At this time, since the unused piping guideway is still closed by the part of the thickness, it is not necessary to close the piping hole with mortar or the like before backfilling as in the related art. Accordingly, work efficiency at the site is improved. Further, in the state after backfilling, since the guideway for piping is closed by the part of the wall thickness, even if a part of the guideway for piping is exposed after backfilling, rainwater and small animals enter. And appearance quality is also improved.

【0011】[0011]

【実施例】以下に、図1及び図2を用いて、本発明に係
る基礎構造の一実施例を説明する。なお、図1及び図2
は、後述する管路24が配管される以前の状態(製品化
された状態)で示されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the basic structure according to the present invention will be described below with reference to FIGS. 1 and 2
Is shown in a state (a productized state) before a pipe 24 to be described later is piped.

【0012】図2に示されるように、布基礎10は、平
面視で矩形状のフーチング12とこのフーチング12の
幅方向中間部にフーチング12の長手方向に沿って立設
される基礎梁14とから成る。この基礎梁14を連続配
置することにより、住宅等の下部構造即ち基礎が形成さ
れるようになっている。そして、この布基礎10上に図
示しない住宅等が構築され、該住宅等の荷重が布基礎1
0を介して地盤16(図3参照)へ伝達される。
As shown in FIG. 2, the cloth foundation 10 includes a footing 12 having a rectangular shape in plan view and a foundation beam 14 erected along the longitudinal direction of the footing 12 at a widthwise intermediate portion of the footing 12. Consists of By continuously arranging the foundation beams 14, a lower structure such as a house, that is, a foundation is formed. Then, a house or the like (not shown) is constructed on the cloth foundation 10, and the load of the house or the like is applied to the cloth foundation 1.
0 to the ground 16 (see FIG. 3).

【0013】また、この布基礎10は、プレキャストコ
ンクリート化されたものである。基礎梁14の下部、即
ちフーチング12と接合する部位には、フーチング12
の長手方向に沿って一定間隔で矩形開口状の配管用の案
内路18、20、22が形成されている。これらの配管
用の案内路18、20、22の内、必要な配管用の案内
路(例えば、配管用の案内路18)を現場で適宜選択し
て上下水道等の設備のための管路24が貫通配置される
ようになっている。
The cloth base 10 is made of precast concrete. A footing 12 is provided at a lower portion of the foundation beam 14, that is, at a portion where the footing 12 is joined.
Are formed at regular intervals along the longitudinal direction of the pipe. Of the guide paths 18, 20, 22 for the pipes, necessary guide paths for the pipes (for example, the guide paths 18 for the pipes) are appropriately selected at the site, and the pipes 24 for facilities such as water supply and sewage are selected. Are arranged to penetrate.

【0014】図1に示されるように、これらの配管用の
案内路18、20、22は、基礎梁14の建物外側(図
1において矢印OUT側)の肉厚一部が残された状態に
形成されている。この肉厚一部、即ち閉塞部26、2
8、30によって、配管用の案内路18、20、22は
閉塞されている。この閉塞部26、28、30の建物外
側の面は基礎梁14の建物外側の面と面一であり、また
その肉厚寸法Bは極薄く設定されている。従って、閉塞
部26、28、30は、図示しないハンマー等で容易に
破砕することができ、破砕することにより配管用の案内
路18、20、22は貫通孔になる。
As shown in FIG. 1, the guide paths 18, 20, and 22 for these pipes are in a state where a part of the thickness of the foundation beam 14 outside the building (the arrow OUT side in FIG. 1) is left. Is formed. Part of this thickness, that is, the closed portions 26, 2
The guide paths 18, 20, 22 for pipes are closed by 8, 30. The outer surfaces of the closed portions 26, 28, and 30 are flush with the outer surfaces of the foundation beams 14, and the thickness B is set to be extremely thin. Therefore, the closing portions 26, 28, and 30 can be easily crushed with a hammer or the like (not shown), and the crushing turns the guide paths 18, 20, and 22 for pipes into through holes.

【0015】以下に、本実施例の作用を説明する。工場
等でプレキャストコンクリート化された布基礎10は、
図1及び図2に示される状態で製品化された状態とな
る。この状態で布基礎10は現場へ搬入されて、地盤中
に適宜連続配置されて連続フーチング基礎として住宅等
の下部構造を構成する。
The operation of this embodiment will be described below. The cloth foundation 10 made into a precast concrete at a factory or the like
The product is in the state shown in FIGS. 1 and 2. In this state, the cloth foundation 10 is carried into the site, and is appropriately arranged continuously in the ground to constitute a substructure such as a house as a continuous footing foundation.

【0016】ここで、配管時に配管用の案内路18、2
0、22の内、管路24の配管経路に近い配管用の案内
路18が選択されて、作業者が図示しないハンマで叩く
ことにより閉塞部26が破砕される(図3には、閉塞部
26が破砕され配管用の案内路18が貫通孔となった状
態が示されている)。閉塞部26の破砕後、管路24が
貫通配置される。その後、埋戻し作業が所定の地盤面
(図3参照)に達するまで行われる。なお、住宅等の基
礎としてこの布基礎10を用いる場合には、図3に示さ
れるように根入れ深さが浅いが、寒冷地等における住宅
等の建築物の基礎として用いる場合には根入れ深さが更
に深くされる。
At the time of piping, the guide paths 18, 2
The pipe guide path 18 close to the pipe path of the pipe line 24 is selected from the pipes 0 and 22, and the worker taps it with a hammer (not shown) to break the blocker 26 (FIG. 3 shows the blocker). 26 is crushed, and the pipe guide path 18 is shown as a through hole.) After the crushing of the closing portion 26, the conduit 24 is arranged to penetrate. Thereafter, the backfilling operation is performed until a predetermined ground surface (see FIG. 3) is reached. In addition, when this cloth foundation 10 is used as a foundation of a house or the like, the depth of the root is shallow as shown in FIG. 3, but when the cloth is used as a foundation of a house or the like in a cold region or the like, the root is inserted. The depth is made deeper.

【0017】このように本実施例では、布基礎10の基
礎梁14に製品化された状態では閉塞部26、28、3
0によって閉塞された複数の配管用の案内路18、2
0、22を設け、使用する配管用の案内路18の閉塞部
26のみが破砕され、使用しない配管用の案内路20、
22の閉塞部28、30はそのまま残しておけるように
構成したので、従来のように埋戻し前に使用しない貫通
孔をモルタル等で塞ぐ作業が不要になる。従って、現場
での作業効率を向上させることができる。
As described above, in the present embodiment, the closed portions 26, 28, 3
Guide paths 18, 2 for a plurality of pipes closed by
0, 22 are provided, only the closed portion 26 of the guideway 18 for the used pipe is crushed, and the guideway 20 for the unused pipe is used.
Since the closing portions 28 and 30 of the 22 are configured to be left as they are, it is not necessary to close the through holes that are not used before backfilling with mortar or the like as in the related art. Therefore, work efficiency on site can be improved.

【0018】また、埋戻し後の状態で、例えば雨水等の
流れにより表面の土が削られ、閉塞部28、30の上端
部付近が露出したとしても、隙間が生じることはない。
従って、雨水や鼠等の小動物が床下に侵入することを防
止することができる。さらに、基礎梁14と面一の閉塞
部28、30によって配管用の案内路20、22の閉塞
状態を保てるので、隙間が生じることによる住宅等の外
観品質の低下を招くこともない。
Further, even if the soil on the surface is shaved by the flow of rainwater or the like in the state after the backfilling and the vicinity of the upper ends of the closed portions 28 and 30 is exposed, no gap is generated.
Therefore, it is possible to prevent small animals such as rainwater and rats from entering under the floor. Further, the closed state of the guideways 20, 22 for piping can be maintained by the closed portions 28, 30 flush with the foundation beam 14, so that the appearance quality of a house or the like due to a gap is not reduced.

【0019】また、一定間隔で複数の配管用の案内路1
8、20、22を形成しているので、布基礎10を画一
的な規格で生産することができ、量産に資することがで
きる。
Further, guide paths 1 for a plurality of pipes are provided at regular intervals.
Since the fabric bases 8, 20, and 22 are formed, the fabric base 10 can be produced according to a uniform standard, which can contribute to mass production.

【0020】なお、本実施例では、閉塞部26、28、
30の建物外側の面と基礎梁14の建物外側の面とが面
一になるように閉塞部26、28、30を設けている
が、閉塞部26、28、30を設ける位置はこれに限ら
ず、図4に示されるように閉塞部40を基礎梁14の肉
厚方向中間部に形成する構成でもよい。寒冷地以外の住
宅等の基礎として用いる場合には、一般に根入り深さを
浅くするため不陸の影響を受け易く、このため図1に示
される建物外側の面と面一になるような閉塞部26、2
8、30を適用するのが好ましく、逆に、寒冷地の住宅
等の基礎として用いる場合には、一般に根入り深さを深
くするため不陸の影響を受けず、このため表裏面のいず
れからも配管用の案内路18の位置が確認できて作業性
に富む図4に示される肉厚方向中間部に設けられた閉塞
部40を適用するのが好ましい。
In this embodiment, the closing portions 26, 28,
The closing portions 26, 28, 30 are provided so that the outer surface of the building 30 and the outer surface of the foundation beam 14 are flush with each other, but the position of the closing portions 26, 28, 30 is not limited to this. Instead, as shown in FIG. 4, a configuration in which the closing portion 40 is formed at the intermediate portion in the thickness direction of the foundation beam 14 may be employed. When used as a foundation for a house or the like other than in a cold region, it is generally susceptible to irregularities due to a shallower root depth, and therefore, a blockage that is flush with the outer surface of the building shown in FIG. Parts 26, 2
It is preferable to apply 8, 30. Conversely, when used as a foundation for a house in a cold region, it is generally unaffected by unevenness because the depth of the root is deepened. Also, it is preferable to apply the closing part 40 provided at the middle part in the thickness direction shown in FIG. 4 which can confirm the position of the piping guide path 18 and is rich in workability.

【0021】また、本実施例の閉塞部26、28、30
の建物外側の面はコンクリート素地面とされているが、
閉塞部26、28、30の建物外側の面に閉塞部26、
28、30の位置を示す識別マークを付けて作業し易く
してもよい。
Further, the closing portions 26, 28, 30 of the present embodiment
The outside surface of the building is concrete ground,
Closed portions 26, 28, 30 on the outer surface of the building,
Identification marks indicating the positions of 28 and 30 may be added to facilitate the work.

【0022】[0022]

【発明の効果】以上説明したように、本発明に係る基礎
構造は、配管用の案内路を複数設けた場合においても、
使用しなかった案内路を埋め戻し前に閉塞する作業が不
要になるという優れた効果を有する。
As described above, the basic structure according to the present invention can be used even when a plurality of guide paths for piping are provided.
There is an excellent effect that an operation of closing an unused guideway before backfilling becomes unnecessary.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る基礎構造の一実施例に係る布基礎
を示す図1の1−1線断面図である。
FIG. 1 is a sectional view taken along line 1-1 in FIG. 1 showing a cloth foundation according to an embodiment of a foundation structure according to the present invention.

【図2】図1の布基礎の建物外側から見た側面図であ
る。
FIG. 2 is a side view of the cloth foundation of FIG. 1 as viewed from the outside of the building.

【図3】図1の布基礎の基礎梁に設けられた配管用の案
内路を閉塞する閉塞部が破砕されて管路が貫通配置され
た状態を示す図1に対応する断面図である。
3 is a cross-sectional view corresponding to FIG. 1, showing a state in which a blockage that closes a guide path for piping provided on a foundation beam of the cloth foundation in FIG.

【図4】図1の閉塞部の変形例を示す図1に対応する断
面図である。
FIG. 4 is a cross-sectional view corresponding to FIG. 1 and showing a modified example of the closing portion of FIG. 1;

【図5】従来例に係る布基礎を示す斜視図である。FIG. 5 is a perspective view showing a cloth foundation according to a conventional example.

【図6】図5の配管用の貫通孔の一つに管路が貫通配置
された状態を示す図5の6−6線断面図である。
6 is a cross-sectional view taken along the line 6-6 in FIG. 5, showing a state in which a pipeline is disposed through one of the through holes for piping in FIG.

【図7】図5の配管用の貫通孔において管路が貫通配置
されたものと開口状態のものとを示す図5に対応する側
面図である。
FIG. 7 is a side view corresponding to FIG. 5, showing a pipe through-hole in the pipe through-hole of FIG. 5 and an open state;

【符号の説明】[Explanation of symbols]

10 布基礎 12 フーチング 14 基礎梁 18 配管用の案内路 20 配管用の案内路 22 配管用の案内路 24 管路 26 閉塞部(肉厚一部) 28 閉塞部(肉厚一部) 30 閉塞部(肉厚一部) 40 閉塞部(肉厚一部) DESCRIPTION OF SYMBOLS 10 Cloth foundation 12 Footing 14 Foundation beam 18 Guideway for piping 20 Guideway for piping 22 Guideway for piping 24 Pipeline 26 Closed part (partially thick) 28 Closed part (partially thick) 30 Closed part (Part of wall thickness) 40 Closed part (part of wall thickness)

フロントページの続き (72)発明者 荒井 弘之 愛知県豊田市トヨタ町1番地 トヨタ自 動車株式会社内 (72)発明者 花木 哲朗 愛知県豊田市トヨタ町1番地 トヨタ自 動車株式会社内 (72)発明者 大岡 俊彦 愛知県豊田市亀首町上向イ田65番地 豊 田総建株式会社内 (72)発明者 浅井 規和 愛知県豊田市亀首町上向イ田65番地 豊 田総建株式会社内 (58)調査した分野(Int.Cl.6,DB名) E02D 27/01 101 Continued on the front page (72) Inventor Hiroyuki Arai 1 Toyota Town, Toyota City, Aichi Prefecture Toyota Motor Corporation (72) Inventor Tetsuro Hanaki 1 Toyota Town Toyota City, Aichi Prefecture Toyota Motor Corporation (72) Invention Inventor Toshihiko Ooka 65, Kamikomi-cho, Izumo, Toyota-shi, Aichi Prefecture Inside Toyota Soken Co., Ltd. (58) Investigated field (Int.Cl. 6 , DB name) E02D 27/01 101

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 プレキャストコンクリート化されかつフ
ーチング及びこのフーチングに立設される基礎梁を備
え、上部構造からの荷重を地盤に伝達する基礎構造であ
って、 前記基礎梁における前記フーチングに近接する部位に所
定の間隔で複数個設けられ、かつ前記基礎梁の肉厚一部
によって破砕可能に閉塞された配管用の案内路を備えた
ことを特徴とする基礎構造。
1. A base structure which is made of precast concrete and includes a footing and a foundation beam erected on the footing, and transmits a load from an upper structure to the ground, and a portion of the foundation beam close to the footing. A plurality of pipes are provided at predetermined intervals at a predetermined interval, and are provided with guide paths for pipes which are closed so that they can be crushed by a part of the thickness of the foundation beam.
JP3236640A 1991-09-17 1991-09-17 Foundation structure Expired - Lifetime JP2945792B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3236640A JP2945792B2 (en) 1991-09-17 1991-09-17 Foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3236640A JP2945792B2 (en) 1991-09-17 1991-09-17 Foundation structure

Publications (2)

Publication Number Publication Date
JPH0579047A JPH0579047A (en) 1993-03-30
JP2945792B2 true JP2945792B2 (en) 1999-09-06

Family

ID=17003622

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3236640A Expired - Lifetime JP2945792B2 (en) 1991-09-17 1991-09-17 Foundation structure

Country Status (1)

Country Link
JP (1) JP2945792B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0762673A (en) * 1993-08-24 1995-03-07 Hitoshi Mori Method for joining pca base board member and pca beam member
JP3521483B2 (en) * 1994-06-03 2004-04-19 日本精工株式会社 Sealed thrust bearing for strut
JP4321503B2 (en) 2005-07-21 2009-08-26 株式会社ジェイテクト Suspension bearing
KR100690365B1 (en) * 2005-12-05 2007-03-09 주식회사 일진글로벌 McPherson Strut Bearing
JP5404455B2 (en) * 2009-05-14 2014-01-29 株式会社秋月事務所 Piping structure of building and construction method of piping
JP6198405B2 (en) * 2013-02-15 2017-09-20 三菱電機株式会社 Local assembly house for electrical equipment
AU2022475799A1 (en) * 2022-08-23 2024-11-28 Jgc Corporation Construction method for structure

Also Published As

Publication number Publication date
JPH0579047A (en) 1993-03-30

Similar Documents

Publication Publication Date Title
EP4273343A2 (en) Screw pile for supporting a building structure
JP2945792B2 (en) Foundation structure
CN205875193U (en) Assembled stake integral structure
CN207512777U (en) Assembled underground pipe gallery
CN1059726C (en) Construction method and apparatus against gap leakage between panel and pipe
JP2003193494A (en) Underground hollow structure constructing method and the underground hollow structure
US9260862B2 (en) Beveled trench forming device for concrete slab foundations
JP3014623B2 (en) Anchor construction method for steel tube column retaining wall
CN107780659A (en) A kind of construction method of wire netting enclosure wall
JP2009102804A (en) Earth retaining construction method
JP2008214946A (en) Underground structure and construction method
KR200348730Y1 (en) Square vertical culvert tunnel using steel waterproof plate and concrete
JPH0322335Y2 (en)
JP2001164559A (en) Construction method of continuous underground wall guide wall making use of l-type precast member
JPH089877B2 (en) Underground water tank and its construction method
JPH01198920A (en) Reinforcing method for underground earth guarding wall by earth anchor
JPH03169911A (en) Construction of underground steel wall
KR930001842B1 (en) Plastics pit and method for construction same
JPS5847093Y2 (en) Earth retaining basket
JP2000045313A (en) Groundwater permeation method using soil cement column soil retaining wall
JP2554322Y2 (en) PVC small diameter manhole
JP2000328561A (en) Groundwater permeation method for soil cement column retaining wall
Stephens Camp Ocean Pines Aviary Extension
JP2006112184A (en) Outdoor toilet construction basic structure
JPS6215343Y2 (en)

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080625

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090625

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090625

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100625

Year of fee payment: 11