JP2948070B2 - Concrete placing method and concrete property measuring device - Google Patents
Concrete placing method and concrete property measuring deviceInfo
- Publication number
- JP2948070B2 JP2948070B2 JP24264393A JP24264393A JP2948070B2 JP 2948070 B2 JP2948070 B2 JP 2948070B2 JP 24264393 A JP24264393 A JP 24264393A JP 24264393 A JP24264393 A JP 24264393A JP 2948070 B2 JP2948070 B2 JP 2948070B2
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- fluidity
- measuring
- hopper
- casting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 title claims description 31
- 238000005266 casting Methods 0.000 claims description 37
- 239000000463 material Substances 0.000 claims description 17
- 238000002156 mixing Methods 0.000 claims description 15
- 238000004898 kneading Methods 0.000 claims description 8
- 239000000203 mixture Substances 0.000 claims description 8
- 238000005259 measurement Methods 0.000 claims description 6
- 238000009434 installation Methods 0.000 claims description 4
- 238000012546 transfer Methods 0.000 description 23
- 241000196324 Embryophyta Species 0.000 description 18
- 239000004020 conductor Substances 0.000 description 9
- 239000004568 cement Substances 0.000 description 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 238000013329 compounding Methods 0.000 description 4
- 238000005303 weighing Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- -1 gravel Substances 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000002352 surface water Substances 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000004615 ingredient Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 230000001678 irradiating effect Effects 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 238000010998 test method Methods 0.000 description 1
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Description
【0001】[0001]
【産業上の利用分野】この発明は、ダム等のコンクリー
ト打設作業において使用されるコンクリートの打設方法
とコンクリートの性状測定装置に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a concrete placing method used in concrete placing work for dams and the like and a concrete property measuring apparatus.
【0002】[0002]
【従来の技術】従来より、コンクリートを用いたダム工
事においては、作業現場に設けられたコンクリートプラ
ントで作られたコンクリートが使用されている。上記コ
ンクリートプラントでは、コンクリートの材料(砂,砂
利,セメント,混和剤および水)を計量した後、そのコン
クリートの材料をミキサーにて混練して、まだ固まらな
いコンクリートが作られる。上記混練されたコンクリー
トをコンクリートプラントのホッパーに一時貯蔵して、
ホッパーからトランスファーカーに積み込んだ後、トラ
ンスファーカーでタワークレーンの近傍まで運搬する。
その後、上記トランスファーカーからコンクリートをバ
ケットに積み替えて、このバケットをタワークレーンに
よって吊上げる。そして、ダム側の打設地点の打設指揮
者の指示に基づいてバケットをダムの打設地点まで運搬
した後、バケットの底を開いて、コンクリートを打設す
る。2. Description of the Related Art Conventionally, in dam construction using concrete, concrete produced by a concrete plant provided at a work site has been used. In the above concrete plant, concrete materials (sand, gravel, cement, admixture, and water) are weighed, and then the concrete materials are kneaded with a mixer to produce concrete that has not yet set. Temporarily store the kneaded concrete in a hopper of a concrete plant,
After loading from the hopper to the transfer car, transport it to the vicinity of the tower crane using the transfer car.
Thereafter, concrete is transferred from the transfer car to a bucket, and the bucket is lifted by a tower crane. Then, after transporting the bucket to the placement point of the dam based on the instruction of the placement conductor at the placement point on the dam side, the bottom of the bucket is opened and concrete is placed.
【0003】[0003]
【発明が解決しようとする課題】ところで、上記コンク
リートを打設する場所が同一平面(以下、ブロックとい
う)であっても、ダムの表面部,中央部,鉄筋の有る部分
および鉄筋のない部分等によって、異なる配合種類と性
状のコンクリートを打設している。このコンクリートの
配合種類は、セメント量の多少と骨材の大小によって、
例えばA,B,C,…と区別している。また、上記コンク
リートの性状は、まだ固まらないコンクリートの粘稠度
を示すスランプで表わされ、そのスランプの大小によっ
て、同一配合種類であっても流動性が異なる。つまり、
上記スランプが大きいときはコンクリートの流動性が大
きく、スランプが小さいときはコンクリートの流動性が
小さくなる。したがって、上記性状によってコンクリー
トを区別しており、同一配合種類に性状が例えば2種類
ある場合は、A1,A2,B1,B2,C1,C2,…のよう
に区別している。By the way, even if the place where the concrete is cast is on the same plane (hereinafter referred to as a block), the dam surface, the center, the part with the reinforcing bar, the part without the reinforcing bar, etc. Depending on the type of concrete, different types of concrete and properties are cast. Depending on the amount of cement and the size of the aggregate,
For example, A, B, C,. In addition, the properties of the concrete are represented by slumps indicating the consistency of the concrete that has not yet set, and the flowability differs depending on the size of the slumps even if they are of the same blending type. That is,
When the slump is large, the fluidity of the concrete is large, and when the slump is small, the fluidity of the concrete is small. Therefore, concrete is distinguished by the above properties, and when there are, for example, two properties of the same compounding type, they are distinguished as A1, A2, B1, B2, C1, C2,.
【0004】そして、上記打設地点の打設指揮者は、コ
ンクリートプラントの責任者に打設すべきコンクリート
の配合種類と性状および数量を指示している。[0004] The placement conductor at the placement site instructs the person in charge of the concrete plant about the type, properties and quantity of concrete to be placed.
【0005】ところが、上記コンクリートプラントにお
いて、混練されたコンクリートの性状が打設指揮者の指
示したものと異なる場合がある。すなわち、セメントが
混ざらない骨材だけの場合や骨材が少ない場合あるいは
骨材の表面水が多く全体に水量が多い場合等である。そ
して、上記打設指揮者が指示したものと性状が異なるコ
ンクリートを判別することが困難なため、性状の異なる
コンクリートをそのまま打設して、ダムの品質が悪くな
るという問題がある。また、指示されたものと性状が異
なるコンクリートを廃棄処分する場合、打設作業を一旦
中断して、処分を行わなければならないため、作業効率
が悪いという問題がある。However, in the above-mentioned concrete plant, the properties of the kneaded concrete may be different from those specified by the casting conductor. That is, there are a case where only the aggregate in which the cement is not mixed, a case where the aggregate is small, and a case where the surface water of the aggregate is large and the amount of water is large as a whole. Since it is difficult to distinguish concrete having different properties from those instructed by the casting conductor, there is a problem that concrete having different properties is cast as it is and the quality of the dam is deteriorated. In the case of disposing of concrete having a property different from the specified one, there is a problem that the work efficiency is poor because the casting operation must be temporarily interrupted and the disposal performed.
【0006】そこで、この発明の目的は、混練されたコ
ンクリートの性状を測定することによって、異なった性
状のコンクリートを打設するのを防止できるコンクリー
トの打設方法と、混練されたコンクリートの表面形状を
測定することによって、そのコンクリートの性状を測定
できるコンクリートの性状測定装置とを提供することに
ある。SUMMARY OF THE INVENTION Accordingly, an object of the present invention is to provide a concrete casting method capable of preventing concrete of different properties from being poured by measuring the properties of the mixed concrete, and a surface shape of the mixed concrete. It is an object of the present invention to provide a concrete property measuring device capable of measuring the property of the concrete by measuring the concrete property.
【0007】[0007]
【課題を解決するための手段】上記目的を達成するた
め、請求項1のコンクリートの打設方法は、指定された
配合種類と流動性に応じてコンクリートの材料を計量す
るステップと、上記計量されたコンクリートの材料をミ
キサーで混練するステップと、上記ミキサーで混練され
た上記コンクリートの流動性を測定するステップと、上
記コンクリートの流動性を測定するステップにおける測
定結果に基づき、上記コンクリートの流動性が予定した
流動性であると判別したときのみに上記コンクリートを
予定打設地点に打設するステップとを有することを特徴
としている。In order to achieve the above object, a concrete casting method according to claim 1 includes a step of measuring a concrete material in accordance with a specified combination type and fluidity; Mixing the mixed concrete material with a mixer, measuring the fluidity of the concrete kneaded with the mixer, and measuring the fluidity of the concrete based on the measurement results in the fluidity of the concrete. And placing the concrete at the scheduled placement location only when it is determined that the fluidity is as planned.
【0008】また、請求項2のコンクリートの打設方法
は、請求項1の配合明示方法において、上記コンクリー
トの測定された上記流動性が、上記コンクリートの指定
された上記流動性と略同一でなくて、指定された上記配
合種類と同一配合種類で打設に用いられる他の流動性で
あるときに、上記他の流動性に合致する打設地点に打設
するように表示するステップを有することを特徴として
いる。In the concrete casting method according to a second aspect of the present invention, in the concrete mixing method according to the first aspect, the measured fluidity of the concrete is not substantially the same as the specified fluidity of the concrete. And, when there is another fluidity used for casting with the same blending type as the specified blending type, a step of displaying so as to be placed at a casting location matching the other fluidity. It is characterized by.
【0009】また、請求項3のコンクリートの打設方法
は、ミキサーから投入された一定形状の容器内のコンク
リートの表面までの距離を測定する距離センサーと、上
記距離センサーを回動するモータと、上記距離センサー
の回動角を測定するロータリーエンコーダとを備え、上
記距離センサーからの上記コンクリートの表面までの距
離を表わす信号と上記ロータリエンコーダからの上記距
離センサーの回動角を表わす信号とに基づいて、上記容
器内の上記コンクリートの表面の凹凸形状を求めること
を特徴としている。According to a third aspect of the present invention, there is provided a concrete casting method, comprising: a distance sensor for measuring a distance from a mixer to a surface of concrete in a container having a predetermined shape; a motor for rotating the distance sensor; A rotary encoder that measures a rotation angle of the distance sensor, based on a signal representing a distance from the distance sensor to the surface of the concrete and a signal representing a rotation angle of the distance sensor from the rotary encoder. And determining the irregular shape of the surface of the concrete in the container.
【0010】[0010]
【作用】上記請求項1のコンクリートの打設方法によれ
ば、指定された配合種類と流動性に応じてコンクリート
の材料を計量し、上記計量されたコンクリートの材料を
ミキサーで混練する。その後、上記ミキサーで混練され
たコンクリートの流動性を測定して、その測定結果に基
づき、コンクリートの流動性が予定した流動性であると
判別したときのみにコンクリートを予定打設地点に打設
する。一方、所定量のセメントが混ざらなかったり、骨
材が少なかったり、あるいは骨材の表面水が多く全体に
水量が多かったりして、予定した流動性のコンクリート
ができなかったときには、コンクリートを予定打設地点
に打設しないようにする。According to the concrete casting method of the first aspect, the concrete material is weighed according to the specified mixing type and fluidity, and the weighed concrete material is kneaded with a mixer. After that, the fluidity of the concrete kneaded by the mixer is measured, and based on the measurement result, the concrete is poured into the scheduled pouring point only when it is determined that the fluidity of the concrete is the expected fluidity. . On the other hand, when the predetermined amount of cement is not mixed, the amount of aggregate is small, or the surface water of the aggregate is large and the total amount of water is large, the expected fluidity of concrete cannot be obtained. Do not cast at the set point.
【0011】したがって、予定打設地点に異なった性状
のコンクリートを打設するのを防止できる。Therefore, it is possible to prevent concrete of different properties from being placed at the scheduled placement point.
【0012】また、上記請求項2のコンクリートの打設
方法によれば、上記コンクリートの測定された流動性
が、コンクリートの指定された流動性と略同一でなく
て、指定された配合種類と同一配合種類で打設に用いら
れる他の流動性であるときには、他の流動性に合致する
打設地点に打設する。According to the concrete casting method of the second aspect, the measured fluidity of the concrete is not substantially the same as the specified fluidity of the concrete, but is the same as the specified mixing type. When it is another fluidity used for casting in the type of compounding, it is cast at a casting point matching the other fluidity.
【0013】したがって、たとえ異なる流動性のコンク
リートが作られたとしても、指定された配合種類と同一
配合種類で打設に用いられる他の流動性であれば、その
コンクリートの流動性に合った打設地点に打設して利用
でき、コンクリートを廃棄処分する作業と打設作業の中
断を減らすから、作業効率がよくなる。Therefore, even if a concrete having a different fluidity is produced, if a concrete having the same composition as the specified composition is used for the casting, the concrete suitable for the concrete is used. The work efficiency can be improved because it can be used by casting at the installation site, and the interruption of concrete disposal work and casting work is reduced.
【0014】また、上記請求項3のコンクリートの性状
測定装置によれば、上記距離センサーをモータで回動し
て、ミキサーから投入された一定形状の容器内のコンク
リートの表面までの距離を距離センサーによって測定す
ると共に、距離センサーの回動角をロータリーエンコー
ダによって測定する。そして、上記距離センサーからの
コンクリートの表面までの距離を表わす信号とロータリ
エンコーダからの距離センサーの回動角を表わす信号と
に基づいて、上記容器内のコンクリートの表面の凹凸形
状を求める。そして、上記容器内のコンクリートの表面
の凹凸形状の例えば高低差や勾配等はコンクリートの性
状を表わすから、予めそのコンクリートの表面の凹凸形
状の高低差や勾配等とコンクリートの性状とを照合して
おき、コンクリートの性状を求める。According to the concrete property measuring device of the third aspect, the distance sensor is rotated by a motor to measure the distance from the mixer to the surface of the concrete in the container having a predetermined shape. And the rotation angle of the distance sensor is measured by a rotary encoder. Then, based on a signal indicating the distance to the surface of the concrete from the distance sensor and a signal indicating the rotation angle of the distance sensor from the rotary encoder, the uneven shape of the surface of the concrete in the container is obtained. And, for example, the difference in height or gradient of the unevenness of the surface of the concrete in the container represents the property of the concrete, and the height difference or the slope of the unevenness of the surface of the concrete is compared in advance with the property of the concrete. Calculate the properties of concrete.
【0015】したがって、上記一定形状の容器内に投入
されたコンクリートの表面の凹凸形状を求めることによ
って、コンクリートの性状を測定できるコンクリートの
性状測定装置を実現できる。Therefore, a concrete property measuring apparatus capable of measuring the property of concrete by determining the unevenness of the surface of the concrete placed in the container having the predetermined shape can be realized.
【0016】[0016]
【実施例】以下、この発明のコンクリートの打設方法と
コンクリートの性状測定装置を実施例により詳細に説明
する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The concrete casting method and concrete property measuring apparatus of the present invention will be described below in detail with reference to embodiments.
【0017】図1はこの発明の一実施例のコンクリート
の打設方法を用いたコンクリート打込設備の概略図を示
しており、1は砂利・砕石等の骨材を貯蔵する骨材ビ
ン、2は上記骨材ビン1から昇降機10を用いて搬送さ
れた骨材を受けて、その骨材とセメントと混和剤および
水等を練り混ぜるコンクリートプラント、3は上記コン
クリートプラント2で練り混ぜられ、まだ固まっていな
いコンクリートを積み込むトランスファーカー、4は上
記トランスファーカー3が走行するバンカー線、5は上
記トランスファーカー3のコンクリートを積み替えるバ
ケット、6は上記バケット5をブーム6aの先端から吊
り下げて、ダム7に運搬するタワークレーンである。上
記バンカー線4は、コンクリートプラント2からタワー
クレーン6の近傍まで敷設されている。上記コンクリー
トプラント2には、コンクリートの材料を計量する容器
(図示せず)と各材料を混練するミキサー(図示せず)
および混練されたコンクリートを一時貯蔵するホッパー
11とを備えている。上記ダム7の打設地点の打設指揮
者Aは、上記コンクリートプラント2の責任者に打設す
べきコンクリートの配合種類と性状(流動性)および数
量を指示し、その指示に従ってコンクリートプラント2
の責任者は、コンクリート材料を計量し、混練する操作
を行う。なお、上記コンクリートの性状は、まだ固まら
ないコンクリートの粘稠度を示すスランプで表される。FIG. 1 is a schematic view of a concrete pouring facility using a concrete pouring method according to one embodiment of the present invention, wherein 1 is an aggregate bin for storing aggregates such as gravel and crushed stone, and 2 Is a concrete plant that receives the aggregate transported from the aggregate bin 1 using the elevator 10 and kneads the aggregate, cement, an admixture, water, etc., 3 is kneaded in the concrete plant 2, and A transfer car for loading unconsolidated concrete, 4 is a bunker line on which the transfer car 3 travels, 5 is a bucket for transferring the concrete of the transfer car 3, 6 is a bucket for hanging the bucket 5 from the tip of a boom 6 a, and a dam. 7 is a tower crane to be transported. The bunker line 4 is laid from the concrete plant 2 to the vicinity of the tower crane 6. In the concrete plant 2, a container (not shown) for measuring the material of the concrete and a mixer (not shown) for kneading each material are provided.
And a hopper 11 for temporarily storing the kneaded concrete. The installation conductor A at the installation site of the dam 7 instructs the person in charge of the concrete plant 2 on the type of mix, the properties (fluidity) and the quantity of concrete to be installed, and in accordance with the instructions, the concrete plant 2
Responsible for measuring and kneading the concrete material. In addition, the property of the said concrete is represented by the slump which shows the consistency of the concrete which has not set yet.
【0018】図2は上記コンクリート打込設備を上方か
ら見た概略図である。上記コンクリートプラント2から
タワークレーン6側に敷設されたバンカー線4のコンク
リートプラント2側近傍にポイント13を配置して、そ
のポイント13から分岐線14を敷設している。そし
て、上記分岐線14の先端にはコンクリートの捨場15
を設けている。FIG. 2 is a schematic view of the concrete driving equipment as viewed from above. A point 13 is arranged near the concrete plant 2 side of the bunker line 4 laid from the concrete plant 2 to the tower crane 6 side, and a branch line 14 is laid from the point 13. At the end of the branch line 14, a concrete dump 15
Is provided.
【0019】また、図3は上記コンクリートプラント2
内の二つのミキサー21,22とそのミキサー21,22
の下方に配置されたホッパー11を示している。上記ホ
ッパー11は、底部から開口部に向けて徐々に広がる略
円錐形状をしており、底部にはゲート12を設けてい
る。上記計量されたコンクリートの材料が配管20を通
ってミキサー21,22に溜り、そのコンクリートの材
料をミキサー21,22によって混練する。その後、上
記ミキサー21,22を順に転倒して、ミキサー21,2
2内のコンクリートはホッパー11内に放出される。こ
のとき、上記ホッパー11内には、ミキサー21から移
したコンクリートがホッパー11内の底部から図3の右
よりに塊26の状態で溜り、上記ミキサー22から移し
たコンクリートが塊26上の図3の左よりに塊27の状
態で積み重なる。なお、上記ホッパー11内のコンクリ
ートの塊26,27の形状は、コンクリートの性状の大
小によって積み重なる状態が変る。すなわち、上記ホッ
パー11内のコンクリートのスランプが小さいときは、
コンクリートの表面形状の凹凸は大きくなる一方、上記
ホッパー11内のコンクリートのスランプが大きいとき
は、コンクリートの表面形状の凹凸は小さくなる。ま
た、上記ミキサー21,22の間には、ホッパー11内
のコンクリートの性状を測定する性状測定装置25を配
置している。FIG. 3 shows the concrete plant 2
Mixers 21 and 22 and the mixers 21 and 22
Is shown below the hopper 11. The hopper 11 has a substantially conical shape gradually expanding from the bottom toward the opening, and a gate 12 is provided at the bottom. The weighed concrete material accumulates in the mixers 21 and 22 through the pipe 20, and the concrete material is kneaded by the mixers 21 and 22. After that, the mixers 21 and 22 are turned over in order, and
The concrete in 2 is discharged into the hopper 11. At this time, the concrete transferred from the mixer 21 accumulates in the hopper 11 from the bottom in the hopper 11 in the form of lumps 26 from the right in FIG. Are stacked in the state of lump 27 from the left of. The shape of the concrete lumps 26 and 27 in the hopper 11 changes depending on the properties of the concrete. That is, when the concrete slump in the hopper 11 is small,
While the surface irregularities of the concrete become large, when the slump of the concrete in the hopper 11 is large, the surface irregularities of the concrete become small. Further, a property measuring device 25 for measuring the property of the concrete in the hopper 11 is disposed between the mixers 21 and 22.
【0020】上記性状測定装置25は、図3,4に示す
ように、ミキサー21,22の間の配管20に固定され
た支持部材30にミキサー21,22の配列方向に対し
て直角方向に貫通する回転軸32を回転自在に支持して
いる。上記回転軸32の一端には、超音波センサー33
を固定する一方、回転軸32の他端には、支持部材30
側からロータリーエンコーダ34とモータ35を取り付
けている。上記ロータリーエンコーダ34とモータ35
は、支持部30から回転軸32に平行にモータ35側に
延びるブラケット31に固定している。上記モータ35
は回転軸32を回転駆動して、図3の矢印Rに示すよう
に、回転軸32に直角な垂直平面に沿って所定の角度範
囲で超音波を発射するように超音波センサー33を回動
する。上記超音波センサー33は、回動しながらコンク
リートの表面までの距離を測定する。そして、上記超音
波センサー33からコンクリートまでの距離を表わす信
号とロータリーエンコーダ34から超音波センサー33
の回転角を表わす信号とを受けて、図示しない測定部は
ホッパー11内のコンクリートの表面形状を求めて、そ
のコンクリートの性状を測定する。すなわち、予めホッ
パー11内のコンクリートの性状をスランプ試験方法
(JIS A1101)によりスランプの値を測定し、
ホッパー11内に放出されたコンクリートの表面の凹凸
形状の高低差と照合しておき、ホッパー11内のコンク
リートの表面の凹凸形状の高低差からコンクリートの性
状に相当するスランプの値を求めるのである。なお、上
記ホッパー11内のコンクリートの表面の凹凸形状の高
低差だけでなく、コンクリートの表面の凹凸形状の勾配
からコンクリートの性状を求めてもよい。As shown in FIGS. 3 and 4, the property measuring device 25 penetrates through a support member 30 fixed to a pipe 20 between the mixers 21 and 22 in a direction perpendicular to the arrangement direction of the mixers 21 and 22. The rotating shaft 32 is rotatably supported. An ultrasonic sensor 33 is provided at one end of the rotation shaft 32.
While the other end of the rotating shaft 32 has a support member 30
A rotary encoder 34 and a motor 35 are attached from the side. The rotary encoder 34 and the motor 35
Are fixed to a bracket 31 extending from the support portion 30 to the motor 35 side in parallel with the rotation shaft 32. The motor 35
Rotates the rotation shaft 32 and rotates the ultrasonic sensor 33 so as to emit ultrasonic waves in a predetermined angle range along a vertical plane perpendicular to the rotation shaft 32 as shown by an arrow R in FIG. I do. The ultrasonic sensor 33 measures the distance to the concrete surface while rotating. Then, a signal indicating the distance from the ultrasonic sensor 33 to the concrete and the rotary encoder 34 and the ultrasonic sensor 33
Receiving the signal indicating the rotation angle of the hopper 11, the measuring unit (not shown) obtains the surface shape of the concrete in the hopper 11, and measures the property of the concrete. That is, the property of the concrete in the hopper 11 is measured in advance by the slump test method (JIS A1101),
The value of the slump corresponding to the property of the concrete is obtained from the height difference of the unevenness of the concrete surface in the hopper 11 by comparing the unevenness of the unevenness of the surface of the concrete discharged into the hopper 11. In addition, the property of the concrete may be obtained from the gradient of the unevenness of the concrete surface as well as the height difference of the unevenness of the concrete surface in the hopper 11.
【0021】上記構成のコンクリート打込設備におい
て、コンクリートの計量から打設までの作業は、図5に
示すシーケンス図に従って行われる。In the concrete pouring equipment having the above structure, the operations from concrete weighing to concrete pouring are performed according to the sequence diagram shown in FIG.
【0022】まず、上記コンクリートプラント2の責任
者は、ステップS1で打設指揮者Aからの指示に基づい
て、コンクリートの配合種類と性状を選択する。次ぎ
に、ステップS2で計量開始を指令する。そして、ステ
ップS3でコンクリートの材料を計量した後、ステップ
S4に進み、計量されたコンクリートの材料を混練用の
ミキサー21,22に放出する。次ぎに、ステップS5
に進み、次ぎの計量指令を待ち、計量指令されるとステ
ップS2に進み、ステップS2〜S5を繰り返す。First, the person in charge of the concrete plant 2 selects the type and properties of the concrete based on the instruction from the casting conductor A in step S1. Next, in step S2, a command to start weighing is issued. Then, after measuring the concrete material in step S3, the process proceeds to step S4, and the measured concrete material is discharged to the mixers 21 and 22 for kneading. Next, step S5
, And waits for the next weighing command. When the weighing command is issued, the process proceeds to step S2, and steps S2 to S5 are repeated.
【0023】次ぎに、ステップS6でコンクリートをミ
キサー21,22によって混練する。次ぎに、ステップ
S7に進み、混練されたコンクリートをミキサー21,
22からホッパー11に放出する。そして、ステップS
8で、次ぎの混練指令を待ち、ステップS4で次ぎのコ
ンクリートをミキサー21,22に放出して、混練指令
されるとステップS6に進み、ステップS6〜S8を繰
り返す。Next, in step S6, the concrete is kneaded by the mixers 21 and 22. Next, proceeding to step S7, the kneaded concrete is mixed with the mixer 21,
Discharged from hopper 22 to hopper 11. And step S
At 8, a next kneading command is waited, and at step S4, the next concrete is discharged to the mixers 21 and 22, and when the kneading command is issued, the process proceeds to step S6, and steps S6 to S8 are repeated.
【0024】次ぎに、ステップS9でミキサー21,2
2内のコンクリートをホッパー11に貯蔵する。そし
て、ステップS10に進み、上記性状測定装置25によ
ってホッパー11内のコンクリートの表面形状からコン
クリートの性状を測定する。次ぎに、ステップS11で
ホッパー11内のコンクリートの性状が指定された性状
の場合、ステップS12に進む一方、ホッパー11内の
コンクリートの性状が指定された性状でない場合、ステ
ップS21に進む。Next, at step S9, the mixers 21, 2
The concrete in 2 is stored in the hopper 11. Then, the process proceeds to step S10, and the property of the concrete is measured from the surface shape of the concrete in the hopper 11 by the property measuring device 25. Next, in step S11, when the property of the concrete in the hopper 11 is the property specified, the process proceeds to step S12, and when the property of the concrete in the hopper 11 is not the specified property, the process proceeds to step S21.
【0025】そして、ステップS12に進み、ホッパー
11のゲート12を開く。そして、上記ホッパー11内
のコンクリートが全てゲート12から落ちた後、ステッ
プS13でゲート12を閉じる。そして、ステップS1
4で次ぎの貯蔵を待ち、上記ステップS7でコンクリー
トをホッパー11に放出するとステップS9に進み、ス
テップS9〜S14を繰り返す。Then, the process proceeds to a step S12, where the gate 12 of the hopper 11 is opened. After all the concrete in the hopper 11 has fallen from the gate 12, the gate 12 is closed in step S13. Then, step S1
In step S4, the next storage is awaited. When the concrete is discharged to the hopper 11 in step S7, the process proceeds to step S9, and steps S9 to S14 are repeated.
【0026】次ぎに、ステップS15に進み、ステップ
S12でホッパー11のゲート12からコンクリートを
トランスファーカー3に積み込む。次ぎに、ステップS
16に進み、トランスファーカー3のコンクリートをバ
ケット5に放出する。なお、上記トランスファーカー3
のコンクリートをバケット5に放出する前には、トラン
スファーカー3はバンカー線4上を走行して、バケット
5に近接する位置で停止するようにしている。次ぎに、
ステップS17でトランスファーカー3をコンクリート
プラント2のホッパー11の下の位置に後退させて停止
して、次ぎの積み込みを待つ。そして、上記ステップS
12でホッパー11のゲート12が開くと、ステップS
15に進み、ステップS15〜S17を繰り返す。Next, proceeding to step S15, concrete is loaded into the transfer car 3 from the gate 12 of the hopper 11 in step S12. Next, step S
Proceed to 16 and discharge the concrete of the transfer car 3 to the bucket 5. The transfer car 3
Before the concrete is discharged to the bucket 5, the transfer car 3 runs on the bunker line 4 and stops at a position close to the bucket 5. Next,
In step S17, the transfer car 3 is retracted to a position below the hopper 11 of the concrete plant 2 and stopped, and waits for the next loading. Then, the above step S
When the gate 12 of the hopper 11 is opened in step 12,
Proceeding to step S15, steps S15 to S17 are repeated.
【0027】次ぎに、ステップS18に進み、トランス
ファーカー3内のコンクリートをバケット5に積み込
む。次ぎに、ステップS19に進み、タワークレーン6
でバケット5を吊り上げて運搬して、コンクリートを図
2に示す予定打設地点16に放出する。そして、ステッ
プS20でバケット5をバンカー線4上の着床位置に着
床させ、次ぎの積み込みを待つ。そして、ステップS1
6でトランスファーカー3のコンクリートをバケット5
に放出するとステップS18に進み、ステップS18〜
S20を繰り返す。Next, the process proceeds to step S18, where the concrete in the transfer car 3 is loaded into the bucket 5. Next, the process proceeds to step S19, where the tower crane 6
, The bucket 5 is lifted and transported, and the concrete is discharged to the scheduled placing point 16 shown in FIG. Then, in step S20, the bucket 5 is landed at the landing position on the bunker line 4, and the next loading is awaited. Then, step S1
6 transfer the concrete of transfer car 3 to bucket 5
, The process proceeds to Step S18, and Steps S18-
S20 is repeated.
【0028】一方、ステップS21でホッパー11内の
コンクリートの性状が指定された配合種類の他の性状に
合致するかどうか確認して、ステップS10で測定した
性状が指定された配合種類の他の性状に合致する場合、
ステップS22に進み、合致する配合種類と性状を表示
し、打設指揮者Aに変更を知らせて、ステップS12に
進む。そして、上記ホッパー11内のコンクリートは、
トランスファーカー3とバケット5により運搬され、打
設指揮者Aの指示にしたがって配合種類と他の性状に合
致する変更打設地点に放出する。一方、ステップS21
において、ステップS10で測定した性状が指定された
配合種類の他の性状に合致しない場合、ステップS23
に進み、ホッパー11内のコンクリートの廃棄処理を行
う。そして、ステップS24で材料の計量を中止して、
ステップS25に進み、指定した性状でないコンクリー
トが作られた原因を究明する。On the other hand, in step S21, it is checked whether or not the properties of the concrete in the hopper 11 match the other properties of the specified combination type, and the properties measured in step S10 are changed to other properties of the specified combination type. If
Proceeding to step S22, the matching combination type and properties are displayed, the change is notified to the casting conductor A, and the process proceeds to step S12. And the concrete in the hopper 11 is
It is transported by the transfer car 3 and the bucket 5 and is discharged to a modified casting site that matches the combination type and other properties according to the instruction of the casting conductor A. On the other hand, step S21
In step S23, if the properties measured in step S10 do not match other properties of the specified combination type,
And the disposal of the concrete in the hopper 11 is performed. Then, the measurement of the material is stopped in step S24,
Proceeding to step S25, the cause of the formation of the concrete having no specified property is determined.
【0029】上記ステップS23のコンクリートの廃棄
処理は、以下のように行われる。The concrete disposal in step S23 is performed as follows.
【0030】まず、上記ホッパー11内のコンクリート
をトランスファーカー3に積み込んだ後、このトランス
ファーカー3は、タワークレーン6側に向けてバンカー
線4を走行する。そして、上記トランスファーカー3が
バンカー線4の途中に設けられたポイント13に到達す
る前に、ポイント13を分岐線14側に切り換える。そ
の後、上記トランスファーカー3は、分岐線14を走行
して、捨場15の直前で停止する。そして、上記トラン
スファーカー3内のコンクリートを捨場15に廃棄す
る。なお、上記捨場15に廃棄されたコンクリートは水
洗いされ、セメントと骨材を分離して、その骨材を再利
用するようにしている。First, after the concrete in the hopper 11 is loaded on the transfer car 3, the transfer car 3 travels on the bunker line 4 toward the tower crane 6 side. Then, before the transfer car 3 reaches the point 13 provided in the middle of the bunker line 4, the point 13 is switched to the branch line 14. Thereafter, the transfer car 3 travels on the branch line 14 and stops immediately before the dumping ground 15. Then, the concrete in the transfer car 3 is discarded at the dump 15. The concrete discarded at the dump 15 is washed with water to separate the cement and the aggregate and reuse the aggregate.
【0031】このように、上記ミキサー21,22によ
って混練された後、ホッパー11内に貯蔵されたコンク
リートの性状を性状測定装置25によって測定して、コ
ンクリートが指定された性状のときは、予定打設地点に
打設する。一方、上記コンクリートが指定された性状で
なく、かつ指定された配合種類で他の性状に合うとき
は、打設指揮者Aにその配合種類と性状を知らせて、適
切な打設地点に打設する。また、指定された配合種類で
他の性状に合わないときは、廃棄処理する。したがっ
て、何らかの原因で指定した性状のコンクリートが作れ
なかった場合、打設前にそのコンクリートの性状を確認
するから、異なった性状のコンクリートを予定打設地点
に打設するのを防止することができ、品質のよいダムを
建設することができる。また、指定した性状のコンクリ
ートが作れなかった場合でも、コンクリートが同一の配
合種類で他の性状と合致するときは、そのコンクリート
に合った打設地点に打設することができ、コンクリート
を廃棄することなく利用することができるので、打設作
業の中断を減らして、作業効率を向上することができ
る。As described above, the properties of the concrete stored in the hopper 11 after being kneaded by the mixers 21 and 22 are measured by the property measuring device 25, and when the concrete has the specified property, Cast at the set point. On the other hand, if the concrete does not have the specified properties and is of the specified mix type and fits other properties, it informs the casting commander A of the mix type and the properties and places it at the appropriate casting site. I do. If the specified blending type does not suit other properties, it is discarded. Therefore, if the concrete of the specified property cannot be made for some reason, the property of the concrete is checked before casting, so that it is possible to prevent the concrete of different properties from being cast at the scheduled placement site. , Can build a high quality dam. Even if the concrete with the specified properties cannot be made, if the concrete matches the other properties with the same compounding type, the concrete can be poured into the placement site that matches the concrete and the concrete is discarded Therefore, it is possible to reduce the interruption of the casting work and improve the working efficiency.
【0032】また、指定した性状のコンクリートが作れ
ず、コンクリートが同一の配合種類で他の性状と合致し
ない場合は、そのコンクリートをトランスファーカー3
に積み込んで捨場15まで運搬して廃棄するから、原因
究明作業が迅速にでき、復旧時間を短縮することができ
る。If the concrete of the specified property cannot be made and the concrete does not match the other properties with the same compounding type, the concrete is transferred to the transfer car 3.
Since it is transported to the dump 15 and disposed of, the work for investigating the cause can be performed quickly and the recovery time can be shortened.
【0033】また、上記ミキサー21,22によって混
練された後、一定形状のホッパー11内に放出されたコ
ンクリートの表面の凹凸形状の高低差や勾配等は、その
コンクリートの性状を表わすから、上記性状測定装置2
5は、ホッパー11内のコンクリートの表面の高低差や
勾配を求めることで、そのコンクリートの性状を測定す
ることができる。Further, the height difference, gradient, etc. of the irregularities on the surface of the concrete discharged into the hopper 11 having a predetermined shape after being kneaded by the mixers 21 and 22 indicate the properties of the concrete. Measuring device 2
5 is to obtain the height difference and the gradient of the surface of the concrete in the hopper 11 so that the property of the concrete can be measured.
【0034】上記実施例では、距離センサーとして超音
波センサー33を用いたが、距離センサーはこれに限ら
ず、光センサー等を用いてもよい。In the above embodiment, the ultrasonic sensor 33 was used as the distance sensor, but the distance sensor is not limited to this, and an optical sensor or the like may be used.
【0035】また、上記ホッパー11内のコンクリート
の表面形状を超音波センサー33とロータリエンコーダ
34およびモータ35で構成された性状測定装置25を
用いたが、コンクリートの性状測定装置はこれに限ら
ず、コンクリートに棒を挿入して、その棒の挿入抵抗を
測定したり、コンクリートに光を照射して、その反射光
から水分比を測定したりして、コンクリートの性状を測
定してもよい。また、ミキサーを電動機で駆動する場
合、その電動機の電流を測定してもよい。Further, although the surface shape of the concrete in the hopper 11 is measured using the property measuring device 25 composed of the ultrasonic sensor 33, the rotary encoder 34 and the motor 35, the concrete property measuring device is not limited to this. The properties of the concrete may be measured by inserting a bar into the concrete and measuring the insertion resistance of the bar, or irradiating the concrete with light and measuring the moisture ratio from the reflected light. When the mixer is driven by an electric motor, the current of the electric motor may be measured.
【0036】また、上記ホッパー11内のコンクリート
の性状の測定を行ったが、混練してから打設するまでの
トランスファーカーやバケット等に収容されたコンクリ
ートの性状を測定してもよい。Although the properties of the concrete in the hopper 11 were measured, the properties of the concrete accommodated in a transfer car, a bucket, or the like from kneading to casting may be measured.
【0037】また、上記ダム7にコンクリートの打設を
行ったが、ダムに限らず、大量にコンクリートを用いる
構築物のコンクリートの打設作業において、この発明の
コンクリートの打設方法やコンクリートの性状測定装置
を用いてもよい。Although the concrete was poured into the dam 7, the concrete placing method and concrete property measurement of the present invention are not limited to the dam, but in the concrete placing work of a structure using a large amount of concrete. An apparatus may be used.
【0038】[0038]
【発明の効果】以上より明らかなように、請求項1の発
明のコンクリートの打設方法は、指定された配合種類と
流動性に応じてコンクリートの材料を計量して、上記計
量されたコンクリートの材料をミキサーで混練した後、
上記ミキサーで混練されたコンクリートの流動性を測定
し、その測定結果に基づき、上記コンクリートの流動性
が予定した流動性であると判別したときのみにコンクリ
ートを予定打設地点に打設するものである。As is clear from the above, the concrete casting method of the first aspect of the present invention measures the concrete material in accordance with the specified mixing type and fluidity, and the concrete After kneading the ingredients with a mixer,
Measure the fluidity of the concrete kneaded with the mixer, based on the measurement results, only when it is determined that the fluidity of the concrete is the expected fluidity, concrete is poured at the scheduled placement point is there.
【0039】したがって、請求項1の発明のコンクリー
トの打設方法によれば、コンクリートの流動性が予定し
た流動性であると判別したときのみにコンクリートを予
定打設地点に打設する一方、所定量のセメントが混ざら
なかったり、骨材が少なかったり、あるいは骨材の表面
水が多く全体に水量が多かったりして、予定した流動性
のコンクリートでないときには、コンクリートを予定打
設地点に打設しない。したがって、予定打設地点に異な
った流動性のコンクリートを打設するのを防止すること
ができる。Therefore, according to the concrete casting method of the first aspect of the present invention, the concrete is poured into the scheduled placement site only when it is determined that the fluidity of the concrete is the expected fluidity. When the concrete is not the expected fluidity due to the lack of a fixed amount of cement, a small amount of aggregate, or a large amount of water on the surface of the aggregate, the concrete will not be cast at the scheduled site. . Therefore, it is possible to prevent the concrete having different fluidity from being poured at the scheduled placement point.
【0040】また、請求項2の発明のコンクリートの打
設方法は、請求項1のコンクリートの打設方法におい
て、上記コンクリートの測定された流動性が、上記コン
クリートの指定された流動性と略同一でなくて、指定さ
れた上記配合種類と同一配合種類で打設に用いられる他
の流動性であるときに、上記他の流動性に合致する打設
地点に打設するように表示するものである。According to a second aspect of the present invention, in the concrete placing method, the measured fluidity of the concrete is substantially the same as the specified fluidity of the concrete. Rather, when it is another fluidity used for casting with the same blending type as the specified blending type, it is displayed so as to be placed at the casting location that matches the other fluidity. is there.
【0041】したがって、請求項2の発明のコンクリー
トの打設方法によれば、指定された流動性と異なる流動
性のコンクリートが作られても、指定された配合種類と
同一配合種類で打設に用いられる他の流動性である場合
には、他の流動性に合致する打設地点に打設するように
表示ので、打設指揮者はその表示にしたがって、作業者
や運搬機の操作者にコンクリートの流動性に合った打設
地点を指示して打設できる。したがって、指定された配
合種類と同一配合種類で打設に用いられる他の流動性で
あれば、利用することができるので、そのコンクリート
を廃棄処分する作業や打設作業の中断を減らすことがで
き、作業効率を向上することができる。Therefore, according to the concrete casting method of the second aspect of the present invention, even if concrete having fluidity different from the designated fluidity is produced, the concrete can be poured with the same blending type as the designated blending type. If it is another liquidity to be used, it will be displayed so that it will be placed at the casting point that matches the other liquidity, so the placement conductor will follow the display and give the operator and the operator of the transporter It can be cast by indicating the casting site that matches the fluidity of the concrete. Therefore, any other fluidity that can be used for casting with the same mix type as the specified mix type can be used, and the work of disposing of the concrete and the interrupting work can be reduced. , Work efficiency can be improved.
【0042】また、請求項3の発明のコンクリートの性
状測定装置は、ミキサーから投入された一定形状の容器
内のコンクリートの表面までの距離を測定する距離セン
サーと、上記距離センサーを回動するモータと、上記距
離センサーの回動角を測定するロータリーエンコーダと
を備え、上記距離センサーからの上記コンクリートの表
面までの距離を表わす信号とロータリエンコーダからの
距離センサーの回動角を表わす信号とに基づいて、上記
容器内のコンクリートの表面の凹凸形状を求めるもので
ある。According to a third aspect of the present invention, there is provided a concrete property measuring device, comprising: a distance sensor for measuring a distance from a mixer to a surface of concrete in a container having a predetermined shape; and a motor for rotating the distance sensor. And a rotary encoder for measuring the rotation angle of the distance sensor, based on a signal representing the distance from the distance sensor to the surface of the concrete and a signal representing the rotation angle of the distance sensor from the rotary encoder. Then, the uneven shape of the surface of the concrete in the container is determined.
【0043】したがって、請求項3の発明のコンクリー
トの性状測定装置によれば、上記距離センサーをモータ
で回動して、上記容器内のコンクリートの表面までの距
離を距離センサーによって測定すると共に、距離センサ
ーの回動角をロータリーエンコーダによって測定する。
そして、上記距離センサーからのコンクリートの表面ま
での距離を表わす信号とロータリエンコーダからの距離
センサーの回動角を表わす信号とに基づいて、上記容器
内のコンクリートの表面の凹凸形状を求める。したがっ
て、上記容器内のコンクリートの表面の凹凸形状の高低
差や勾配等はコンクリートの性状を表わすから、その高
低差や勾配等とコンクリートの性状とを予め照合してお
くことによって、上記容器内のコンクリートの性状を測
定することができる。Therefore, according to the concrete property measuring device of the third aspect of the present invention, the distance sensor is rotated by the motor to measure the distance to the surface of the concrete in the container by the distance sensor. The rotation angle of the sensor is measured by a rotary encoder.
Then, based on a signal indicating the distance to the surface of the concrete from the distance sensor and a signal indicating the rotation angle of the distance sensor from the rotary encoder, the uneven shape of the surface of the concrete in the container is obtained. Therefore, since the difference in height or gradient of the uneven shape of the surface of the concrete in the container represents the property of the concrete, the height difference or the gradient or the like is compared with the property of the concrete in advance, so that the inside of the container is checked. The properties of concrete can be measured.
【図1】 図1はこの発明の一実施例のコンクリートの
打設方法を用いたコンクリート打設設備の概略図であ
る。FIG. 1 is a schematic diagram of a concrete placing facility using a concrete placing method according to one embodiment of the present invention.
【図2】 図2は上記実施例のコンクリート打設設備を
上方から見た概略図である。FIG. 2 is a schematic view of the concrete pouring equipment of the embodiment as viewed from above.
【図3】 図3は上記実施例のコンクリートプラントの
ミキサーとホッパーの断面図である。FIG. 3 is a sectional view of a mixer and a hopper of the concrete plant according to the embodiment.
【図4】 図4は上記実施例のホッパー内のコンクリー
トの性状を測定するコンクリートの性状測定装置の側面
図である。FIG. 4 is a side view of the concrete property measuring device for measuring the property of concrete in the hopper of the embodiment.
【図5】 図5は上記実施例のコンクリート打設作業を
示すシーケンス図である。FIG. 5 is a sequence diagram showing concrete placing work of the embodiment.
1…骨材ビン、2…コンクリートプラント、3…トラン
スファーカー、4…バンカー線、5…バケット、6…タ
ワークレーン、6a…ブーム、7…ダム、10…昇降
機、11…ホッパー、12…ゲート、13…ポイント、
14…分岐線、15…捨場、16…打設地点、20…配
管、21,22…ミキサー、25…性状測定装置、30
…支持部材、31…ブラケット、32…回転軸、33…
超音波センサー、34…ロータリーエンコーダ、35…
モータ。DESCRIPTION OF SYMBOLS 1 ... Aggregate bin, 2 ... Concrete plant, 3 ... Transfer car, 4 ... Bunker line, 5 ... Bucket, 6 ... Tower crane, 6a ... Boom, 7 ... Dam, 10 ... Elevator, 11 ... Hopper, 12 ... Gate, 13 ... points,
14 branch line, 15 disposal site, 16 placement site, 20 piping, 21, 22 mixer, 25 property measuring device, 30
... Support member, 31 ... Bracket, 32 ... Rotating shaft, 33 ...
Ultrasonic sensor, 34 ... Rotary encoder, 35 ...
motor.
フロントページの続き (72)発明者 堀 保夫 大阪府大阪市阿倍野区松崎町2丁目2番 2号 株式会社奥村組内 (72)発明者 廣中 哲也 大阪府大阪市阿倍野区松崎町2丁目2番 2号 株式会社奥村組内 (56)参考文献 実開 平5−30906(JP,U) (58)調査した分野(Int.Cl.6,DB名) E04G 21/02 E02B 7/00 Continuation of the front page (72) Inventor Yasuo Hori 2-2-2 Matsuzakicho, Abeno-ku, Osaka-shi, Osaka Inside Okumura Gumi Co., Ltd. (72) Inventor Tetsuya Hironaka 2-2-2 Matsuzakicho, Abeno-ku, Osaka-shi, Osaka No. Okumura Gumi Co., Ltd. (56) References Japanese Utility Model Hei 5-30906 (JP, U) (58) Fields investigated (Int. Cl. 6 , DB name) E04G 21/02 E02B 7/00
Claims (3)
ンクリートの材料を計量するステップと、 上記計量されたコンクリートの材料をミキサーで混練す
るステップと、 上記ミキサーで混練された上記コンクリートの流動性を
測定するステップと、 上記コンクリートの流動性を測定するステップにおける
測定結果に基づき、上記コンクリートの流動性が予定し
た流動性であると判別したときのみに上記コンクリート
を予定打設地点に打設するステップとを有することを特
徴とするコンクリートの打設方法。1. A step of measuring a concrete material according to a specified blending type and fluidity; a step of kneading the measured concrete material with a mixer; and a step of flowing the concrete kneaded with the mixer. Measuring the fluidity of the concrete, and placing the concrete at the scheduled placement site only when it is determined that the fluidity of the concrete is the expected fluidity based on the measurement result in the step of measuring the fluidity of the concrete And a step of casting concrete.
法において、上記コンクリートの測定された上記流動性
が、上記コンクリートの指定された上記流動性と略同一
でなくて、指定された上記配合種類と同一配合種類で打
設に用いられる他の流動性であるときに、上記他の流動
性に合致する打設地点に打設するように表示するステッ
プを有することを特徴とするコンクリートの打設方法。2. The method of claim 1, wherein the measured flowability of the concrete is not substantially the same as the specified flowability of the concrete, and the specified mix A step of displaying so that when another fluidity is used for casting with the same blending type as that of the type, the concrete is set to be cast at a casting location matching the other fluidity. Installation method.
内のコンクリートの表面までの距離を測定する距離セン
サーと、 上記距離センサーを回動するモータと、 上記距離センサーの回動角を測定するロータリーエンコ
ーダとを備え、 上記距離センサーからの上記コンクリートの表面までの
距離を表わす信号と上記ロータリエンコーダからの上記
距離センサーの回動角を表わす信号とに基づいて、上記
容器内の上記コンクリートの表面の凹凸形状を求めるこ
とを特徴とするコンクリートの性状測定装置。3. A distance sensor for measuring a distance from a mixer to a surface of concrete in a container having a predetermined shape, a motor for rotating the distance sensor, and a rotary for measuring a rotation angle of the distance sensor. And an encoder, based on a signal representing the distance from the distance sensor to the surface of the concrete and a signal representing the rotation angle of the distance sensor from the rotary encoder. An apparatus for measuring the properties of concrete, which is characterized by determining the uneven shape.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP24264393A JP2948070B2 (en) | 1993-09-29 | 1993-09-29 | Concrete placing method and concrete property measuring device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP24264393A JP2948070B2 (en) | 1993-09-29 | 1993-09-29 | Concrete placing method and concrete property measuring device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0797862A JPH0797862A (en) | 1995-04-11 |
| JP2948070B2 true JP2948070B2 (en) | 1999-09-13 |
Family
ID=17092102
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP24264393A Expired - Lifetime JP2948070B2 (en) | 1993-09-29 | 1993-09-29 | Concrete placing method and concrete property measuring device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2948070B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101115235B1 (en) * | 2008-07-17 | 2012-02-15 | 임채영 | Measuring device of concrete slump |
-
1993
- 1993-09-29 JP JP24264393A patent/JP2948070B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0797862A (en) | 1995-04-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6186654B1 (en) | Portable and modular batching and mixing plant for concrete and the like | |
| JP6644453B1 (en) | Mobile batcher plant | |
| US20120230147A1 (en) | Portable cement mixing apparatus | |
| US20210339427A1 (en) | Concrete mixer | |
| KR20100033699A (en) | Cold mix recycling asphalt concrete manufacture apparatus | |
| JP2948070B2 (en) | Concrete placing method and concrete property measuring device | |
| US3415498A (en) | Mobile concrete mixing equipment | |
| JP3433468B2 (en) | Mud solidification equipment | |
| JP3162275B2 (en) | Sediment improvement system and soil improvement method | |
| JP4014685B2 (en) | Mobile concrete material kneader | |
| RU2036092C1 (en) | Installation for preparation, feed and placing of concrete mix | |
| JP2948068B2 (en) | Concrete mixing method | |
| CN220171043U (en) | Concrete collapse amount detection device | |
| JP3660070B2 (en) | Construction surplus soil effective utilization method | |
| JP2021070992A (en) | Supply method of fluidized soil, and supply system of fluidized soil | |
| JPH1072846A (en) | Treatment method of soil | |
| JP7617618B2 (en) | On-site mixing manufacturing unit for track construction, and track construction method using this on-site mixing manufacturing unit | |
| Hasan | Concrete Mixing Placing and Curing | |
| JP3364843B2 (en) | Mud solidification equipment | |
| JPH0852729A (en) | Concrete plant with vacuum cooling tank and exhaust system | |
| JP3577276B2 (en) | Method of manufacturing backfill grout | |
| US994802A (en) | Loader for concrete-batch mixers. | |
| JPH1071328A (en) | Mixer drum for sediment treatment | |
| JPS6140967A (en) | Kneading supply apparatus of vehicle mount unit type under-floor material | |
| GB2170730A (en) | Apparatus for mixing bulk materials |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 12 Free format text: PAYMENT UNTIL: 20110702 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 12 Free format text: PAYMENT UNTIL: 20110702 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140702 Year of fee payment: 15 |
|
| EXPY | Cancellation because of completion of term |