Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP2952008B2 - Construction method of boiling water reactor pressure vessel pedestal - Google Patents
[go: Go Back, main page]

JP2952008B2 - Construction method of boiling water reactor pressure vessel pedestal - Google Patents

Construction method of boiling water reactor pressure vessel pedestal

Info

Publication number
JP2952008B2
JP2952008B2 JP2161203A JP16120390A JP2952008B2 JP 2952008 B2 JP2952008 B2 JP 2952008B2 JP 2161203 A JP2161203 A JP 2161203A JP 16120390 A JP16120390 A JP 16120390A JP 2952008 B2 JP2952008 B2 JP 2952008B2
Authority
JP
Japan
Prior art keywords
pedestal
rpv
rpv pedestal
construction method
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2161203A
Other languages
Japanese (ja)
Other versions
JPH0452595A (en
Inventor
厚志 平野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2161203A priority Critical patent/JP2952008B2/en
Publication of JPH0452595A publication Critical patent/JPH0452595A/en
Application granted granted Critical
Publication of JP2952008B2 publication Critical patent/JP2952008B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Pressure Vessels And Lids Thereof (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】 [発明の目的] (産業上の利用分野) 本発明は改良型沸騰水型原子炉圧力容器ペデスタルの
建設工法に係る。
DETAILED DESCRIPTION OF THE INVENTION [Object of the Invention] (Industrial application field) The present invention relates to a construction method of an improved boiling water reactor pressure vessel pedestal.

(従来の技術) 改良型沸騰水型原子炉(以下ABWRと呼ぶ)を使用した
原子力発電所(以下ABWR型原子力発電所と呼ぶ)の原子
炉圧力容器(以下RPVと呼ぶ)ペデスタルは、従来第3
図A、第3図B、第4図に示すようにして建設されてい
る。先ず、原子炉建屋マット10を施工しその工事が完了
した後、その上にクレーンによってRPVペデスタル基部
を構成するRPVペデスタル1のブロックを吊り下ろし、
所定の位置に据え付けていく。前記RPVペデスタル1の
ブロックと原子炉建屋マット10との取合部は、図示省略
のアンカーボルトによって固定される。次に予め製作し
ておいたベント管2を同じくクレーンで吊り下ろし、RP
Vペデスタル1のブロックに取り付けて固定する。
(Prior art) The reactor pressure vessel (hereinafter referred to as RPV) pedestal of a nuclear power plant (hereinafter referred to as ABWR) using an improved boiling water reactor (hereinafter referred to as ABWR) 3
It is constructed as shown in FIGS. A, 3B and 4. First, after constructing the reactor building mat 10 and completing the construction, a block of the RPV pedestal 1 constituting the base of the RPV pedestal is suspended by a crane thereon,
Install in place. The joint between the block of the RPV pedestal 1 and the reactor building mat 10 is fixed by an anchor bolt (not shown). Next, the previously manufactured vent pipe 2 is also suspended by a crane, and RP
Attach it to the block of V pedestal 1 and fix it.

なお、RPVペデスタル1のブロックは横断面が肉厚の
円筒の一部をなすものであり、その両側面には半円状の
溝がそれぞれ設けられている。而して、ベント管2は一
側面の前記半円状の溝に係合して取り付けられる。
The block of the RPV pedestal 1 forms a part of a cylinder whose cross section is thick, and semicircular grooves are provided on both side surfaces thereof. Thus, the vent pipe 2 is attached by engaging with the semicircular groove on one side.

第4図にはRPVペデスタルブロックは1a〜1cの3箇し
か示されていないが、これ等のペデスタルブロックの据
付を順次およびそれ等に対応するベント管2a〜2cの取付
を行い、第3図A、Bに示すような円筒状のRPVペデス
タル下段を構成する。すなわち、RPVペデスタルブロッ
ク1aおよびベント管2a、RPVペデスタルブロック1bおよ
びベント管2b、RPVペデスタルブロック1cおよびベント
管2cの据付および取付を順に行う。前記のRPVペデスタ
ルブロック1bの取付に際しては、その一側面の半円状の
溝をRPVペデスタルブロック1aに取り付けたベント管2a
に係合させる。また、ベント管2bはRPVペデスタルブロ
ック1bの他の側面の半円状の溝に係合させて取り付けら
れる。
Although only three RPV pedestal blocks 1a to 1c are shown in FIG. 4, the installation of these pedestal blocks is performed sequentially and the corresponding vent pipes 2a to 2c are attached. The lower part of the cylindrical RPV pedestal shown in FIGS. That is, the installation and installation of the RPV pedestal block 1a and the vent pipe 2a, the RPV pedestal block 1b and the vent pipe 2b, the RPV pedestal block 1c and the vent pipe 2c are sequentially performed. When attaching the RPV pedestal block 1b, a vent pipe 2a having a semicircular groove on one side thereof attached to the RPV pedestal block 1a
To be engaged. Also, the vent pipe 2b is attached by engaging with a semicircular groove on the other side of the RPV pedestal block 1b.

次いで、前記RPV下段上に前記と同様の工法によってR
PVペデスタルブロックの据付、連通管3および空調ダク
ト4の取付を行ってRPVペデスタル上段を構成し、RPVペ
デスタル1を完成する。
Next, R is formed on the lower part of the RPV by the same method as described above.
The RPV pedestal 1 is completed by installing the PV pedestal block, attaching the communication pipe 3 and the air conditioning duct 4 to form the upper stage of the RPV pedestal.

なお、前記各RPVペデスタルブロックの合せ目は熔接
によって固定される。
The joint of each of the RPV pedestal blocks is fixed by welding.

上記のようにしてRPVペデスタル1が完成されると、
その内部の空間にはコンクリートが充填される。
When the RPV pedestal 1 is completed as described above,
The space inside is filled with concrete.

なお、図中11はRPVで前記のようにしてRPVペデスタル
1が完成した後、RPVペデスタル1状に据付られ、アン
カーボルト(図示しない)によって固定されたものであ
る。
In the figure, reference numeral 11 denotes an RPV, which is mounted on the RPV pedestal 1 after the RPV pedestal 1 is completed as described above and fixed by anchor bolts (not shown).

(発明が解決しようとする課題) 上記従来のRPVペデスタル建設工法には下記のような
問題がある。すなわち、 RPVペデスタルブロックの据付に際して、その倒れ防
止用のステー・ワイヤなどでペデスタルブロックの芯出
し、位置決めをしなければならないが、この作業はかな
り面倒であること。
(Problems to be Solved by the Invention) The above-mentioned conventional RPV pedestal construction method has the following problems. In other words, when installing the RPV pedestal block, the pedestal block must be centered and positioned with stay wires and the like to prevent it from falling down, but this operation is quite troublesome.

さらに、複数のRPVペデスタルブロックを組み合わせ
て円筒状とし、それ等の間を熔接によって固定するもの
であるから、RPVペデスタルブロックの配列および熔接
時の歪に十分配慮しなければ、円筒状の真円度を得られ
ないこと。
Furthermore, since a plurality of RPV pedestal blocks are combined into a cylindrical shape, and the space between them is fixed by welding, unless the arrangement of the RPV pedestal blocks and distortion during welding are sufficiently considered, a cylindrical perfect circle is formed. Inability to gain a degree.

しかも、RPVペデスタルブロック、ベント管、空調ダ
クト等を現場において組み立てるものであるから、現地
工数が大となり据付工期長期化の原因となっていること
(これは原子力発電所建設工期の長期化の原因ともなっ
ている)。
In addition, since the RPV pedestal block, vent pipe, air conditioning duct, etc. are assembled on site, the number of man-hours required on-site increases and the installation period is prolonged. (This is the cause of the prolongation of the nuclear power plant construction period. Is also).

本発明は上記の事情に基づきなされたもので、RPVペ
デスタルの建設工期の短縮、RPV完成精度の向上を図る
ことができるRPVペデスタル建設工法を提供することを
目的としている。
The present invention has been made in view of the above circumstances, and an object of the present invention is to provide an RPV pedestal construction method capable of shortening the construction period of an RPV pedestal and improving RPV completion accuracy.

[発明の構成] (課題を解決するための手段) 本発明のペデスタル建設工法は沸騰水型原子力発電所
の原子炉圧力容器ペデスタルを建設するに際して、前記
ペデスタルの建設場所とは別の作業性の良い場所におい
て、ペデスタル上段とペデスタル下段との上下分割で、
かつペデスタル上段には空調ダクトを、またペデスタル
下段にはベント管を組付けた状態に夫々を製作し、つい
でこれらのペデスタル上段およびペデスタル下段を組合
わせて完成状態でペデスタル全体の寸法を検査確認し、
その後に再度ペデスタル上段とペデスタル下段とに分離
してから、前記建設場所に搬送して据付け組立て、しか
る後にこれらの相互間を熔接して連結することを特徴と
する。
[Constitution of the Invention] (Means for Solving the Problems) The pedestal construction method of the present invention, when constructing a reactor pressure vessel pedestal of a boiling water nuclear power plant, requires different workability from the construction site of the pedestal. In a good place, the upper and lower pedestals are divided vertically.
The upper pedestal is equipped with an air conditioning duct, and the lower pedestal is assembled with a vent pipe. ,
Thereafter, the upper pedestal and the lower pedestal are separated again, transported to the construction site, installed and assembled, and then these are welded and connected.

(作用) 上記工程からなる本発明のRPVペデスタル建設工法に
おいては、工場等の環境、作業性のよい場所で予め完成
させた各分割区分をRPVペデスタル建設現場で組合せ、
結合するのみでよいから、現場作業の工期をRPVペデス
タブロック、ベント管、連通口、空調ダクト等の現場組
立を必要とする従来の建設工法に比し、著しく短縮する
ことができる。
(Function) In the RPV pedestal construction method of the present invention comprising the above steps, in the environment of a factory or the like, each division section completed in advance in a place with good workability is combined at the RPV pedestal construction site,
Since only the connection is required, the construction period of the on-site work can be remarkably reduced as compared with the conventional construction method which requires on-site assembly of the RPV pedestal block, the vent pipe, the communication port, the air conditioning duct, and the like.

また、各分割区分は作業性のよい場所で、真円度を確
認しながら製作されるとともにそれ等へのベント管、連
通口、空調ダクト等の組み込みもなされるので、精度の
高いRPVペデスタルとすることができる。
In addition, each divided section is manufactured in a place with good workability while checking roundness, and vent pipes, communication ports, air conditioning ducts, etc. are also incorporated into them, so that high precision RPV pedestal and can do.

(実施例) 第3図と同一部分には同一符号を付した第1図は本発
明一実施例の中間工程における斜視図、第2図は本発明
のRPVペデスタル建設工法と従来のそれとを比較して示
す工程図である。
(Embodiment) FIG. 1 is a perspective view of an intermediate step of one embodiment of the present invention, in which the same parts as those in FIG. 3 are denoted by the same reference numerals, and FIG. 2 compares the RPV pedestal construction method of the present invention with that of a conventional method. FIG.

本発明のRPVペデスタル建設工法においては、RPVペデ
スタル下段1dを工場等の環境、作業性のよい場所で数ブ
ロックに分けて製作する。これに並行してベント管2を
分割して製作し、その完成後に耐圧試験、寸法検査等を
実施し、RPVペデスタル下段1dの組立に備える。
In the RPV pedestal construction method of the present invention, the lower part 1d of the RPV pedestal is manufactured by dividing it into several blocks in a place such as a factory where the environment and workability are good. In parallel with this, the vent pipe 2 is divided and manufactured, and after its completion, a pressure resistance test, a dimensional inspection, and the like are performed to prepare for the assembly of the lower RPV pedestal 1d.

数ブロックに分割して製作したRPVペデスタルブロッ
クを、真円度を確保しながらベント管2とともに円筒状
に組み立てる。ベント管2を組み込む手順は前記ブロッ
ク分けの態様によって異なるものとなる。上記のように
してRPVペデスタル下段を完成させる。
The RPV pedestal block manufactured by dividing into several blocks is assembled into a cylindrical shape together with the vent pipe 2 while ensuring roundness. The procedure for incorporating the vent pipe 2 differs depending on the mode of the block division. Complete the lower part of the RPV pedestal as described above.

次いで、RPVペデスタル上段1eを前記RPVペデスタル下
段1dと同様の製作手順によって製作する。この製作と並
行して連通口3、空調ダクト4も製作し、RPVペデスタ
ル下段1dにおける組立手順と同様にして組み込み、RPV
ペデスタル上段1eを完成させる。
Next, the upper RPV pedestal 1e is manufactured by the same manufacturing procedure as the lower RPV pedestal 1d. In parallel with this production, the communication port 3 and the air-conditioning duct 4 were also produced and assembled in the same manner as the assembly procedure in the lower 1d of the RPV pedestal.
Complete the upper pedestal 1e.

上記のようにしてRPVペデスタル下段1d、RPVペデスタ
ル上段1eを完成させた後、これ等を組み合わせて全体の
寸法等を確認し、RPVペデスタル1の製作を完了する。
After completing the lower RPV pedestal 1d and the upper RPV pedestal 1e as described above, combining them and confirming the overall dimensions and the like, the manufacture of the RPV pedestal 1 is completed.

上記のようにして完成されたRPVペデスタル1はRPVペ
デスタル下段1d、RPVペデスタル上段1eに分離した状態
で現地に搬送する。現地においては、原子炉建屋マット
10が完成したら、前記のように製作、搬送されたRPVペ
デスタル下段1dをクレーンで吊り込み、所定の位置に位
置決めしこれを固定する。次に、RPVペデスタル上段1e
を前記と同様にクレーンで吊り込み、RPVペデスタル下
段1d上に載置し、位置決めを行い、取合部の熔接を行
う。
The RPV pedestal 1 completed as described above is transported to the site while being separated into the lower RPV pedestal 1d and the upper RPV pedestal 1e. In the field, the reactor building mat
After completion of 10, the lower RPV pedestal 1d produced and transported as described above is suspended by a crane, positioned at a predetermined position, and fixed. Next, RPV pedestal upper 1e
Is suspended by a crane in the same manner as described above, placed on the lower RPV pedestal 1d, positioned, and welded at the joint.

上記の建設手順は第2図に手順Aとして示されてい
る。なお、第2図において手順Bは従来の建設工法にお
ける建設手順を示す。この図から本発明の建設工法にあ
っては、工場等の環境、作業性のよい場所で予め完成さ
せたRPVペデスタル上段1d、RPVペデスタル下段1eを現場
で組合せ、結合するのみでよいから、現場作業の工期は
手順Bを必要とする従来の建設工法に比し、著しく短縮
できることがわかる。
The above construction procedure is shown as procedure A in FIG. In FIG. 2, procedure B shows a construction procedure in a conventional construction method. From this figure, in the construction method of the present invention, in the environment such as a factory, the upper stage 1d of the RPV pedestal and the lower stage 1e of the RPV pedestal completed in advance in a place with good workability need only be combined and combined on site, It can be seen that the work period of the work can be significantly shortened as compared with the conventional construction method requiring the procedure B.

また、本発明の建設工法においては、RPVペデスタル
下段1d、RPVペデスタル上段1e共に工場製作時にそれ等
の真円度が確認され、完成されているので、RPVペデス
タル1の据付精度は向上される。
Moreover, in the construction method of the present invention, the roundness of the lower RPV pedestal 1d and the upper RPV pedestal 1e are confirmed at the time of manufacturing the factory, and the RPV pedestal 1 is completed. Therefore, the installation accuracy of the RPV pedestal 1 is improved.

なお、本発明は上記実施例に限定されない。例えば円
筒状のRPVペデスタルを、軸に垂直な面で3以上の複数
箇に分割して各分割区分毎に製作し、これ等を現場に搬
入して結合、据付を行うようにしてもよい。
The present invention is not limited to the above embodiment. For example, a cylindrical RPV pedestal may be divided into a plurality of three or more sections in a plane perpendicular to the axis, manufactured for each of the divided sections, and these may be carried to the site to be combined and installed.

[発明の効果] 上記から明らかなように本発明のRPVペデスタル建設
工法においては、RPVペデスタルを複数区分の分割構成
とし、各分割区分を原子炉建設現場とは別の環境、作業
性のよい工場等で予め製作し、各分割区分を前記現場に
搬入して据付を行うようにしているから、RPVペデスタ
ル建設に要する工期従って原子炉建設に要する工期を短
縮することができる。
[Effects of the Invention] As is clear from the above, in the RPV pedestal construction method of the present invention, the RPV pedestal is divided into a plurality of sections, and each section is separated from the reactor construction site in a different environment and a factory with good workability. And so on, and the divided sections are carried into the site and installed, so that the construction period required for the construction of the RPV pedestal and therefore the construction period required for the construction of the reactor can be shortened.

また、各分割区分は作業性のよい場所で、真円度を確
認しながら製作されるとともにそれ等へのベント管、連
通口、空調ダクト等の組み込みもなされるので、精度の
高いものとすることができる。
In addition, each divided section is manufactured in a place with good workability while checking roundness, and a vent pipe, a communication port, an air conditioning duct, etc. are incorporated therein, so that high accuracy is achieved. be able to.

さらに、原子炉建屋マット上での作業を最小限とする
ことができるので、建設作業の安全性、能率の向上を図
ることができる。
Furthermore, since the work on the reactor building mat can be minimized, the safety and efficiency of the construction work can be improved.

【図面の簡単な説明】[Brief description of the drawings]

第1図は本発明一実施例の中間工程における斜視図、第
2図は本発明のRPVペデスタル建設工法と従来のそれと
を比較して示す工程図、第3図Aは従来のRPVペデスタ
ルの建設工法を説明するためのRPVペデスタルの縦断面
図、第3図Bは第3図AのB−B線における断面図、第
4図は従来のRPVペデスタル建設工法の中間段階におけ
る斜視図である。 1……RPVペデスタル、1a〜1c……RPVペデスタルブロッ
ク、1d……RPVペデスタル下段、1e……RPVペデスタル上
段、2、2a〜2c……ベント管、3……連通口、4……空
調ダクト、10……原子炉建屋マット、11……RPV
FIG. 1 is a perspective view of an intermediate process of an embodiment of the present invention, FIG. 2 is a process diagram showing a comparison between the RPV pedestal construction method of the present invention and a conventional method, and FIG. 3A is the construction of a conventional RPV pedestal. FIG. 3B is a longitudinal sectional view of the RPV pedestal for explaining the method of construction, FIG. 3B is a sectional view taken along the line BB of FIG. 3A, and FIG. 4 is a perspective view at an intermediate stage of the conventional RPV pedestal construction method. 1 RPV pedestal, 1a to 1c RPV pedestal block, 1d RPV pedestal lower, 1e RPV pedestal upper, 2, 2a to 2c Vent pipe 3, Communication port 4, Air conditioning duct , 10 …… Reactor building mat, 11 …… RPV

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】沸騰水型原子力発電所の原子炉圧力容器ペ
デスタルを建設するに際して、前記ペデスタルの建設場
所とは別の作業性の良い場所において、ペデスタル上段
とペデスタル下段との上下分割で、かつペデスタル上段
には空調ダクトを、またペデスタル下段にはベント管を
組付けた状態に夫々を製作し、ついでこれらのペデスタ
ル上段およびペデスタル下段を組合わせて完成状態でペ
デスタル全体の寸法を検査確認し、その後に再度ペデス
タル上段とペデスタル下段とに分離してから、前記建設
場所に搬送して据付け組立て、しかる後にこれらの相互
間を熔接して連結することを特徴とする沸騰水型原子炉
圧力容器ペデスタルの建設工法。
When constructing a reactor pressure vessel pedestal of a boiling water nuclear power plant, in a location having good workability different from the construction location of the pedestal, the upper pedestal and the lower pedestal are divided vertically. The upper pedestal is equipped with an air conditioning duct, and the lower pedestal is fitted with a vent pipe. Thereafter, the pedestal is separated again into an upper pedestal lower stage and a lower pedestal lower stage, and then transported to the above-mentioned construction site for installation and assembly. Construction method.
JP2161203A 1990-06-21 1990-06-21 Construction method of boiling water reactor pressure vessel pedestal Expired - Fee Related JP2952008B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2161203A JP2952008B2 (en) 1990-06-21 1990-06-21 Construction method of boiling water reactor pressure vessel pedestal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2161203A JP2952008B2 (en) 1990-06-21 1990-06-21 Construction method of boiling water reactor pressure vessel pedestal

Publications (2)

Publication Number Publication Date
JPH0452595A JPH0452595A (en) 1992-02-20
JP2952008B2 true JP2952008B2 (en) 1999-09-20

Family

ID=15730558

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2161203A Expired - Fee Related JP2952008B2 (en) 1990-06-21 1990-06-21 Construction method of boiling water reactor pressure vessel pedestal

Country Status (1)

Country Link
JP (1) JP2952008B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8007226B2 (en) 2006-10-17 2011-08-30 Denso Corporation Fuel pump

Also Published As

Publication number Publication date
JPH0452595A (en) 1992-02-20

Similar Documents

Publication Publication Date Title
JP5523179B2 (en) Building construction method and room module
CN115758553B (en) A modular assembly machine room implementation method based on BIM technology
CN117010065A (en) Construction method of mechanical and electrical pipeline of narrow corridor of hospital based on BIM technology
JP2952008B2 (en) Construction method of boiling water reactor pressure vessel pedestal
CN117684700A (en) A kind of tree-like column structure of the main body of the station and its construction method
JPS5840627B2 (en) Reinforcement sleeve structure for through holes in concrete structures
JP3445907B2 (en) Construction method of reactor pressure vessel foundation and module used in the method
US3461635A (en) Building wall sections approximating a predetermined curvature and method of making the same
CN107010170B (en) Manufacturing method and closing method of riser base platform
JPS61106007A (en) Control panel foundation construction method
CN214402199U (en) Integrated steel structure modular node and assembly type building
JPS62228975A (en) Method of construction of nuclear plant
CN219665568U (en) Steel construction reticulated shell processing location auxiliary device
CN215254742U (en) Positioning tool for hoisting composite floor slab
CN121827495A (en) Special-shaped floor support-free template system and construction method thereof
CN213329469U (en) Sectional type steel construction modularization node and assembled building
CN120442341A (en) Bending cage device and installation method of bending cage device
JP2006145343A (en) How to replace vent tube bellows in reactor containment
CN109128722B (en) Method for manufacturing node of assembled thin-wall square tube special-shaped column component
JP2901462B2 (en) Lower drywell steel structure and method of installation
CN121088083A (en) Modular assembly type building rectangular beam column connecting system
JPH0792298A (en) Filter wall unit and air conditioning filter room construction method
JP2874510B2 (en) Truss assembly method
JP2000329879A (en) Manufacturing method of vacuum vessel for fusion reactor
JPH0457240B2 (en)

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees