JP2973774B2 - Pier construction method - Google Patents
Pier construction methodInfo
- Publication number
- JP2973774B2 JP2973774B2 JP5097006A JP9700693A JP2973774B2 JP 2973774 B2 JP2973774 B2 JP 2973774B2 JP 5097006 A JP5097006 A JP 5097006A JP 9700693 A JP9700693 A JP 9700693A JP 2973774 B2 JP2973774 B2 JP 2973774B2
- Authority
- JP
- Japan
- Prior art keywords
- formwork
- concrete
- block
- elements
- pier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims description 18
- 238000009415 formwork Methods 0.000 claims description 41
- 239000004567 concrete Substances 0.000 claims description 25
- 229910000831 Steel Inorganic materials 0.000 claims description 13
- 239000010959 steel Substances 0.000 claims description 13
- 239000000463 material Substances 0.000 claims description 11
- 238000000034 method Methods 0.000 claims description 7
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims description 3
- 239000011178 precast concrete Substances 0.000 claims description 3
- 238000005266 casting Methods 0.000 claims description 2
- 239000002243 precursor Substances 0.000 claims description 2
- 230000003014 reinforcing effect Effects 0.000 description 9
- 230000010354 integration Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 239000003822 epoxy resin Substances 0.000 description 1
- 229920000647 polyepoxide Polymers 0.000 description 1
- 239000003566 sealing material Substances 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Description
【0001】[0001]
【産業上の利用分野】この発明は、例えば高橋脚に適用
される橋脚の施工方法に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pier construction method applied to, for example, a high pier.
【0002】[0002]
【従来の技術】橋脚を構築するには、従来一般に基礎上
に配筋される主筋に横筋を組み合わせ施工するととも
に、その外周に型枠を配置し、型枠内にコンクリートを
打設する方法が取られている。2. Description of the Related Art Conventionally, in order to construct a pier, a method of combining a main reinforcing bar generally arranged on a foundation with a horizontal reinforcing bar, arranging a formwork on the outer periphery thereof, and placing concrete in the formwork is known. Has been taken.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、この種
の施工方法では比較的高さが低い橋脚などには適合する
が、高橋脚の施工に適用した場合には、強度を確保する
上で多数の主筋や横方向の鉄筋や隅角部のハンチ筋、あ
るいは組立て用鉄筋などが輻湊し、配筋作業、特に高橋
脚を構築する場合には荷重が大きくなることから主筋が
多数列配されるが、そのときの横鉄筋の組立作業は困難
さを増すとともに、型枠材やセパレータの組立およびそ
の解体撤去、作業足場などの組立や解体撤去などの作業
工数が膨大となり、多人数の熟練労務者を必要とするた
め、短期急速施工の点において著しく不利であり、建設
コストも極めて高いものとなっていた。型枠の組立て・
解体を容易にするため、PCa型枠等の埋殺し型枠を用
いることもあるが、型枠組立用セパレータの取付けなど
の手間は除去されない。However, this type of construction method is suitable for a pier having a relatively low height, but when applied to construction of a high pier, a large number of piers are required to secure the strength. The main bars, lateral bars, haunch bars at the corners, or assembling bars are congested, and when arranging, especially when constructing high piers, the load increases, so many main bars are arranged in rows. At that time, the assembling work of the horizontal reinforcing bars is becoming more difficult, and the number of man-hours for assembling and dismantling formwork materials and separators, disassembling and removing work scaffolds, etc. becomes enormous, and a large number of skilled workers Therefore, it is disadvantageous in terms of short-term rapid construction, and the construction cost is extremely high. Formwork assembly
In order to facilitate disassembly, a buried form such as a PCa form may be used, but the trouble such as mounting a form assembling separator is not eliminated.
【0004】この発明は以上の問題を解決するものであ
って、その目的は、型枠の組立や解体,撤去作業並びに
鉄筋組みが不要で、急速施工や自動化,省力化に好適な
橋脚の施工方法を提供するものである。The present invention has been made to solve the above problems, and has as its object to assemble, disassemble, and remove a formwork and to assemble a pier suitable for rapid construction, automation, and labor saving without the need for reinforcing bars. It provides a method.
【0005】[0005]
【課題を解決するための手段】前記目的を達成するた
め、この発明は、中空の断面多角形状をなす単一形状の
複数のプレキャストコンクリート製型枠エレメントのみ
を該型枠エレメントの面同士を水平方向に接した状態で
基礎上に立設して型枠ブロックを組み立て、この型枠ブ
ロック内にコンクリートを打設することで前記水平方向
に接する面に形成された開口を通じて該水平方向に隣接
する型枠エレメントが打設コンクリートにより一体化さ
れてなる下部躯体を構築した後、この下部躯体の上方に
前記新たな型枠エレメントを継ぎ足して前記新たな型枠
ブロックを組み立てる作業と、この型枠ブロック内にコ
ンクリートを打設して当該水平方向に隣接する新たな型
枠エレメント同士を打設コンクリートによって一体化す
る作業とを所要の高さとなるまで交互に繰り返すことを
特徴とする橋脚の施工方法。[SUMMARY OF] To achieve the above object, the present invention is a horizontal plane between only the mold frame elements a plurality of precast concrete formwork elements of a single shape forming a hollow polygonal section The form block is assembled by erected on the foundation in a state of contact with the direction, and concrete is poured into the form block to make the horizontal direction.
Horizontally adjacent through an opening formed in the surface
Forming elements are integrated by cast concrete
That after building the lower precursor comprising, working with, the horizontal and Da設concrete to the mold block assembling the upper to the new mold the new mold block shirttail elements of the lower skeleton New type adjacent in direction
A method for constructing a pier, wherein the work of integrating frame elements with cast concrete is alternately repeated until the required height is reached.
【0006】前記型枠ブロック内にコンクリートを打設
する際に、前記各型枠エレメントの中空部に該コンクリ
ートと一体化される補強用の鉄筋籠を、各型枠エレメン
トから上方に突出するように挿入することができる。ま
た、前記型枠エレメントを型枠ブロックに組み立てる際
に、前記型枠エレメント同士を連結する連繋用鋼材を複
数の型枠エレメント間に跨って配置することが好まし
い。When concrete is poured into the formwork block, a reinforcing steel cage integrated with the concrete is hollowly protruded from each formwork element in the hollow portion of each formwork element. Can be inserted. In addition, when assembling the form elements into a form block, it is preferable that a connecting steel material for connecting the form elements be arranged across a plurality of form elements.
【0007】[0007]
【作用】以上の施工方法によれば、予め工場において型
枠エレメントを形成しておき、これを現場に搬入し、現
場においてタワークレーン等により型枠エレメントを基
礎上に立設して型枠ブロックを組み立てるとともにその
内部にコンクリートを打設して下部躯体を構築した後、
この下部躯体の上方に新たな型枠エレメントを前記タワ
ークレーン等により継ぎ足して型枠ブロックを組み立て
る作業とその内部にコンクリートを打設する作業とを交
互に繰り返すことで所要高さの橋脚を容易且つ急速に構
築することができる。According to the above construction method, a formwork element is formed in a factory in advance, carried into a site, and the formwork element is erected on a foundation by a tower crane or the like at the site to form a formwork block. After assembling and casting concrete inside it to construct the lower frame,
The work of assembling a formwork block by adding a new formwork element above the lower frame by the tower crane or the like and the work of placing concrete therein are alternately repeated so that a pier having a required height can be easily and easily formed. Can be built quickly.
【0008】[0008]
【実施例】以下、この発明の一実施例を図面を用いて詳
細に説明する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below in detail with reference to the drawings.
【0009】図1はこの発明の施工方法を高橋脚の施工
法に適用した場合の現場における概念図を示し、この発
明において高橋脚を構築するには、まず地上部に構築さ
れた基礎1上に、予め工場において製作され中空の断面
六角形状をなすプレキャストコンクリート製の型枠エレ
メント2を複数立設し、型枠エレメント2の各面同士を
接した状態でハニカム状の型枠ブロック4を組み立て
る。型枠ブロック4は、橋脚の断面形状に沿った配列と
なるように、型枠エレメント2を例えば横6列,縦3列
に組み立てる。型枠ブロック4の組立てにはタワークレ
ーン5が用いられる。次いで型枠ブロック4の内側に中
詰めコンクリートCを打設して、前記基礎1に一体化し
た下部躯体6aを構築する。FIG. 1 shows a conceptual diagram of a construction site where the construction method of the present invention is applied to a construction method of a high pier. In the present invention, in order to construct a high pier, first, on a foundation 1 constructed on a ground portion. A plurality of precast concrete formwork elements 2 which are manufactured in a factory in advance and have a hollow hexagonal cross section are erected, and a honeycomb formwork block 4 is assembled in a state where the surfaces of the formwork elements 2 are in contact with each other. . In the formwork block 4, the formwork elements 2 are assembled in, for example, six rows and three rows so as to be arranged along the cross-sectional shape of the pier. A tower crane 5 is used to assemble the form block 4. Next, the concrete filling C is cast inside the form block 4 to construct the lower frame 6a integrated with the foundation 1.
【0010】型枠ブロック4の組立て及びコンクリート
の打設のための作業足場としては、自昇式足場7が用い
られ、足場7と地上部とはエレベータ8によって連絡さ
れる。A self-elevating scaffold 7 is used as a work scaffold for assembling the form block 4 and placing concrete, and the scaffold 7 is connected to the ground by an elevator 8.
【0011】次いで、新たな型枠エレメント2を吊り上
げて既に構築された下部躯体6aの上部に継ぎ足して型
枠ブロック4を組み立てた後、この型枠ブロック4の内
部にコンクリートCを打設する。以上の型枠エレメント
2の継ぎ足し作業とコンクリートCの打設作業とを交互
に繰り返すことによって、構造物の大部分を占める中間
躯体6bから橋桁9が設置される上部躯体6cまでを構
築し、図2に示すように所要高さの躯体6を完成する。
なお、上下の型枠ブロック4同士は、機械的な接続手段
によって仮止めしたり、凹凸嵌合により位置決めするこ
ともでき、この場合、接合面にエポキシ樹脂等を介在さ
せることで液密性を確保した方がよいことは勿論であ
る。Next, a new form element 2 is lifted up and added to the upper portion of the lower frame 6a already constructed to assemble the form block 4, and concrete C is poured into the form block 4. By alternately repeating the work of adding the form elements 2 and the work of placing the concrete C, the construction from the intermediate structure 6b occupying most of the structure to the upper structure 6c where the bridge girder 9 is installed is constructed. As shown in FIG. 2, a frame 6 having a required height is completed.
The upper and lower mold blocks 4 can be temporarily fixed by mechanical connection means or positioned by fitting unevenness. In this case, the liquid-tightness can be improved by interposing an epoxy resin or the like on the joint surface. Needless to say, it is better to secure them.
【0012】躯体6の構築が完成し、橋桁9の架橋が完
了した時点で、前記作業足場7は解体されつつタワーク
レーン5により地上部に吊り下ろされ、エレベータ8も
順次上部側から解体されつつ吊り下ろされ、最終的にク
レーン5も上部から順に解体撤去される。When the construction of the frame 6 is completed and the bridge girder 9 is bridged, the work scaffold 7 is suspended on the ground by the tower crane 5 while being dismantled, and the elevators 8 are sequentially dismantled from the upper side. The crane 5 is suspended and finally dismantled and removed from the top.
【0013】工場で製作される型枠エレメント2は、図
3(a)に示すように、その六面のうち互いに隣り合う
型枠エレメント2,2同士が接する2つの面ないし全て
の面に、例えば上中下の三箇所に開口部2aが開口形成
されており、該型枠エレメント2を構成するコンクリー
トの内部には多数の鉄筋2bが縦横に配されている。型
枠ブロック4は、各開口部2aが対面するように各面を
接した状態で型枠エレメント2を組み立てることによ
り、各開口部2aを通じてコンクリートが流通可能な空
間が内部に形成される(図4参照)。As shown in FIG. 3 (a), the form element 2 manufactured at the factory is provided with two or all of the six form elements adjacent to each other. For example, openings 2a are formed in three places, that is, upper, middle, and lower. A large number of reinforcing bars 2b are arranged vertically and horizontally inside the concrete forming the formwork element 2. The formwork block 4 assembles the formwork elements 2 in a state where the respective surfaces are in contact with each other so that the respective openings 2a face each other, so that a space through which the concrete can flow through each of the openings 2a is formed therein (FIG. 4).
【0014】また、図3(b)に示すように、コンクリ
ートCを打設する前には、各型枠エレメント2の中空部
に円筒形の鉄筋籠3を各型枠エレメント2の上部に突出
するように前述のタワークレーンを用いて建込み、上下
の型枠エレメント2の接合部に交差して配筋することに
より、構築される型枠ブロック4の縦方向の一体化を図
っている。As shown in FIG. 3B, before the concrete C is cast, a cylindrical reinforcing cage 3 is projected into the hollow portion of each form element 2 above the form element 2. As described above, the form blocks are constructed using the above-described tower crane and arranged so as to intersect the joints of the upper and lower form elements 2, thereby integrating the form blocks 4 to be constructed in the vertical direction.
【0015】型枠ブロック4には、図5に示すように、
その断面を長さ方向に貫通して複数の型枠エレメント2
に跨がる連繋用鋼材としての一対のPC鋼材10a,1
0a及びこれに交差する一対のPC鋼材10b,10b
を張設する。ここで、PC鋼材10a,10aは図5中
で上下の型枠エレメント列を左右方向に貫通するように
配設し、PC鋼材10b,10bの一方は、同図中で左
上に位置する型枠エレメントから右下がり状態で延びた
後、下の型枠エレメント列中を右方向に延び、さらに右
上がり状態で延びて右上に位置する型枠エレメントに至
るように配設し、他方はこれとは逆に左下に位置する型
枠エレメントから右下に位置する型枠エレメントに至る
ように配設する。それぞれの鋼材10a,10bは型枠
ブロック4の外側部にその両端を固定し、型枠ブロック
4の一体化を図る。[0015] As shown in FIG.
A plurality of form elements 2 penetrate the cross section in the length direction.
PC steel 10a, 1 as a connecting steel straddling the
0a and a pair of PC steel materials 10b, 10b intersecting therewith
Is installed. Here, the PC steel materials 10a, 10a are disposed so as to penetrate the upper and lower mold element rows in the left-right direction in FIG. 5, and one of the PC steel materials 10b, 10b is located at the upper left in FIG. After extending downward from the element in the lower right state, it extends to the right in the lower form element row, and further extends upward to the right to reach the form element located in the upper right, and the other is Conversely, it is arranged so as to extend from the formwork element located at the lower left to the formwork element located at the lower right. Both ends of the steel materials 10a and 10b are fixed to the outer portion of the form block 4, and the form block 4 is integrated.
【0016】また、PC鋼材10a,10bに替えて、
図6に示すように、型枠ブロック4の長手方向に延びて
六つの型枠エレメント2に跨がる二本の形鋼11aと、
これとX字形に交差して三つの型枠エレメント2に跨が
る三組の形鋼11bを用いて型枠ブロック4を一体化す
ることもできる。Further, instead of the PC steel materials 10a and 10b,
As shown in FIG. 6, two section steels 11 a extending in the longitudinal direction of the form block 4 and straddling the six form elements 2,
The form block 4 can also be integrated by using three sets of section steels 11b crossing the X form and straddling the three form elements 2.
【0017】いずれの場合においても、組立時に各型枠
エレメント2の各面間にシール材等(図示しない)を介
在させることで、コンクリートCの打設時における液密
性を保持することができる。In any case, the liquid-tightness at the time of placing the concrete C can be maintained by interposing a sealing material or the like (not shown) between the respective surfaces of the form elements 2 at the time of assembling. .
【0018】図4(a)に示すように、下部躯体6aの
型枠ブロック4を構成する全ての型枠エレメント2の内
部は開口部2aを介して全て流通しており、中空部全て
にコンクリートCが打設され、基礎1との一体化が図ら
れている。また、図4(b)に示す中間躯体6bの中心
に配置される型枠エレメント2の長手方向両側には六角
形状断面の空間部12が形成され、この空間部12は図
4(c)に示すように上部躯体6cに連続して形成され
ている。As shown in FIG. 4 (a), the inside of all the form elements 2 constituting the form block 4 of the lower frame 6a are all circulated through the openings 2a, and the concrete is entirely filled in the hollow parts. C is cast and integrated with the foundation 1. A space portion 12 having a hexagonal cross section is formed on both sides in the longitudinal direction of the form element 2 disposed at the center of the intermediate body 6b shown in FIG. 4B. As shown, it is formed continuously with the upper frame 6c.
【0019】なお、型枠ブロック4の形状も型枠エレメ
ント2の組み合わせに応じて該当する橋脚の断面形状に
応じて種々デザインすることができる。また、以上の実
施例では六角形断面の型枠エレメント2を用いて型枠ブ
ロック4を組立てる場合を示したが、断面強度を十分に
確保できるのなら、四角形等の他の多角形断面の型枠エ
レメントを用いることも可能である。The shape of the form block 4 can be variously designed in accordance with the combination of the form elements 2 and the sectional shape of the corresponding pier. Further, in the above embodiment, the case where the form block 4 is assembled using the form elements 2 having a hexagonal cross section has been described. However, if the cross-sectional strength can be sufficiently secured, the mold of another polygonal cross section such as a quadrangle can be used. It is also possible to use frame elements.
【0020】[0020]
【発明の効果】以上実施例によって詳細に説明したよう
に、この発明にかかる橋脚の施工方法にあっては、型枠
エレメントを予め工場にて製作しておけば、現場にてこ
れを継いで型枠ブロックを組み立てる作業とその内部に
コンクリートを打設する作業とを交互に繰り返すこと
で、従来の型枠材の組立てやその解体撤去、作業足場な
どの組立てや解体撤去並びに鉄筋組みを伴うことなく、
所要高さの橋脚を容易且つ急速に構築することができ、
作業の省力化、合理化を図ることができる。As described in detail in the above embodiment, in the method for constructing a pier according to the present invention, if form elements are manufactured in advance in a factory, they can be connected on site. By alternately repeating the work of assembling the formwork block and the work of placing concrete inside it, assembling and dismantling and removing the conventional formwork materials, assembling and dismantling of the work scaffolding, etc. Not
A pier of the required height can be easily and rapidly constructed,
Labor saving and rationalization of work can be achieved.
【0021】また、型枠ブロック内にコンクリートを打
設する際に、各型枠エレメントから上方に突出するよう
に鉄筋籠を挿入すれば、上下の型枠ブロックそれぞれに
設けた鉄筋を個別に継ぐことなく、上下の型枠ブロック
同士を簡便な方法で縦方向に一体化することができる。When concrete is poured into the formwork block, if the reinforcing bar cage is inserted so as to protrude upward from each formwork element, the reinforcing bars provided on the upper and lower formwork blocks are individually connected. Without this, the upper and lower mold blocks can be integrated in the vertical direction by a simple method.
【0022】さらに、型枠ブロックの組立時に、各型枠
エレメント同士を連結する連繋用鋼材を配置すれば、型
枠エレメントの一体化を図ることができる。Further, when the linking steel material for connecting the form elements is arranged at the time of assembling the form blocks, the form elements can be integrated.
【図1】この発明にかかる橋脚の施工方法を高橋脚に適
用した場合の構築手順を示す全体的な概念を説明するも
ので、(a)は正断面図、(b)は側断面図である。BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a view for explaining an overall concept showing a construction procedure in a case where a pier construction method according to the present invention is applied to a high pier, wherein (a) is a front sectional view and (b) is a side sectional view. is there.
【図2】同高橋脚の完成図を示し、(a)は正断面図、
(b)は側断面図である。FIG. 2 shows a completed view of the pier, and FIG.
(B) is a side sectional view.
【図3】型枠エレメントの詳細図を示し、(a)は平面
図及び側面図、(b)は建込まれる鉄筋籠の平面図及び
側面図である。3A and 3B are detailed views of the formwork element, wherein FIG. 3A is a plan view and a side view, and FIG. 3B is a plan view and a side view of a reinforcing steel cage to be built.
【図4】(a),(b),(c)はそれぞれ図2(a)
のA−A線,B−B線,C−C線における断面図であ
る。FIGS. 4 (a), (b) and (c) are each those of FIG. 2 (a)
3 is a cross-sectional view taken along line AA, line BB, and line CC of FIG.
【図5】型枠ブロックのPC鋼材による一体化の例を示
す断面図である。FIG. 5 is a cross-sectional view showing an example of integration of a form block with a PC steel material.
【図6】型枠ブロックの鉄筋による一体化の例を示す断
面図である。FIG. 6 is a cross-sectional view showing an example of integration of a form block by a reinforcing bar.
1 基礎 2 型枠エレメント 2a 開口部 4 型枠ブロック 6 躯体 6a 下部躯体 C コンクリート DESCRIPTION OF SYMBOLS 1 Foundation 2 Formwork element 2a Opening 4 Formwork block 6 Frame 6a Lower frame C Concrete
───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平6−264414(JP,A) 実開 昭61−206709(JP,U) (58)調査した分野(Int.Cl.6,DB名) E01D 19/02 E01D 21/00 ──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-A-6-264414 (JP, A) JP-A-61-206709 (JP, U) (58) Fields investigated (Int. Cl. 6 , DB name) E01D 19/02 E01D 21/00
Claims (3)
数のプレキャストコンクリート製型枠エレメントのみを
該型枠エレメントの面同士を水平方向に接した状態で基
礎上に立設して型枠ブロックを組み立て、この型枠ブロ
ック内にコンクリートを打設することで前記水平方向に
接する面に形成された開口を通じて該水平方向に隣接す
る型枠エレメントが打設コンクリートにより一体化され
てなる下部躯体を構築した後、この下部躯体の上方に前
記新たな型枠エレメントを継ぎ足して前記新たな型枠ブ
ロックを組み立てる作業と、この型枠ブロック内にコン
クリートを打設して当該水平方向に隣接する新たな型枠
エレメント同士を打設コンクリートによって一体化する
作業とを所要の高さとなるまで交互に繰り返すことを特
徴とする橋脚の施工方法。1. A formwork comprising a plurality of precast concrete formwork elements of a single shape having a hollow polygonal cross section standing on a foundation with the surfaces of the formwork elements in horizontal contact with each other. Assemble the block and cast concrete into this formwork block to
Adjacent to the horizontal direction through an opening formed in the contact surface
Form elements are integrated by casting concrete
After building the lower precursor comprising Te, and the work of assembling the new mold block replenishing the new mold element above the lower skeleton, the horizontal direction by Da設concrete to the mold block New formwork adjacent to
A pier construction method characterized by alternately repeating the operation of integrating elements with cast concrete until the required height is reached.
設する際に、前記各型枠エレメントの中空部に該コンク
リートと一体化される補強用の鉄筋籠を、各型枠エレメ
ントから上方に突出するように挿入することを特徴とす
る請求項1記載の橋脚の施工方法。2. When concrete is poured into the form block, a reinforcing steel cage integrated with the concrete is protruded upward from each form element into a hollow portion of each form element. The pier construction method according to claim 1, wherein the pier is inserted so as to be inserted.
み立てる際に、前記型枠エレメント同士を連結する連繋
用鋼材を複数の型枠エレメント間に跨って配置すること
を特徴とする請求項1または2記載の橋脚の施工方法。3. The assembling method according to claim 1, wherein, when assembling the formwork elements into a formwork block, a linking steel material for connecting the formwork elements is arranged across a plurality of formwork elements. 2. Construction method of the pier described in 2.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5097006A JP2973774B2 (en) | 1993-03-31 | 1993-03-31 | Pier construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5097006A JP2973774B2 (en) | 1993-03-31 | 1993-03-31 | Pier construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH06287914A JPH06287914A (en) | 1994-10-11 |
| JP2973774B2 true JP2973774B2 (en) | 1999-11-08 |
Family
ID=14180172
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP5097006A Expired - Fee Related JP2973774B2 (en) | 1993-03-31 | 1993-03-31 | Pier construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2973774B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101818479B (en) | 2009-10-10 | 2012-08-29 | 中交二公局第二工程有限公司 | Construction process for overhead back-up movement and dismantlement of movable shuttering form |
-
1993
- 1993-03-31 JP JP5097006A patent/JP2973774B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH06287914A (en) | 1994-10-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3333786B2 (en) | Prefabricated piers and concrete blocks for piers | |
| JP2973774B2 (en) | Pier construction method | |
| JP2622013B2 (en) | Reinforced concrete shear wall structure | |
| JP2001207410A (en) | Pier structure and its constructing method | |
| JP2982551B2 (en) | Pier structure | |
| JP2973775B2 (en) | Formwork block | |
| JP7213154B2 (en) | Top slab construction method for shaft and top slab structure | |
| JP3322701B2 (en) | Prefabricated piers and concrete blocks for piers | |
| KR101055361B1 (en) | Deck construction deck of bridge deck | |
| JP2003293506A (en) | Reinforced concrete floor structure | |
| SU1521843A1 (en) | Skeleton of building or structure erected on sinking foundations | |
| JPH1122106A (en) | Composite bending main material of concrete structure and method of constructing concrete structure using composite bending main material | |
| JP3245824B2 (en) | Column and beam joint structure of RC structure and its construction method | |
| JP2001200594A (en) | Method for constructing structure consisting of column with large section and beam | |
| JP2900171B2 (en) | Construction method of flat slab | |
| JPH03279533A (en) | Constructing method for rigid-frame type rc super-high building | |
| JP2972955B2 (en) | Column and beam joining method and its structure | |
| KR20020089636A (en) | Structure means and it's structure operation method of a building | |
| JP2025152882A (en) | Frame structures for large-scale buildings | |
| JP2565825Y2 (en) | Formwork for casting flat beams that also serves as the skeleton | |
| JPH0781355B2 (en) | Construction method of joist slab using precast concrete girder | |
| JP2777515B2 (en) | Method of constructing high-rise structure with closed cross section using steel element | |
| JPS61134406A (en) | Prefabricated type concrete bridge construction method | |
| JPH07102632A (en) | Connection structure of pillar and beam in building structure | |
| JPH0699956B2 (en) | Construction method of reinforced concrete structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080903 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090903 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100903 Year of fee payment: 11 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100903 Year of fee payment: 11 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110903 Year of fee payment: 12 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110903 Year of fee payment: 12 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110903 Year of fee payment: 12 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120903 Year of fee payment: 13 |
|
| LAPS | Cancellation because of no payment of annual fees |