JP2977486B2 - Tower tower mounting equipment - Google Patents
Tower tower mounting equipmentInfo
- Publication number
- JP2977486B2 JP2977486B2 JP8063137A JP6313796A JP2977486B2 JP 2977486 B2 JP2977486 B2 JP 2977486B2 JP 8063137 A JP8063137 A JP 8063137A JP 6313796 A JP6313796 A JP 6313796A JP 2977486 B2 JP2977486 B2 JP 2977486B2
- Authority
- JP
- Japan
- Prior art keywords
- plate
- slide
- screw
- frame
- tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Foundations (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【0001】[0001]
【発明の属する技術分野】この発明は、架空送電線等を
支持する鉄塔の脚材を地中に埋設するのに使用される鉄
塔脚材据付装置に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tower leg installation apparatus used for burying a tower leg supporting an overhead transmission line or the like in the ground.
【0002】[0002]
【従来の技術】架空送電線等を支持する鉄塔は地上から
相当の高さ位置を走行する送電線を支持するため、かな
りの高さがあり、これを安全に設置するためその脚材は
地中に埋設されコンクリートで固められる。2. Description of the Related Art A tower supporting an overhead transmission line or the like has a considerable height in order to support a transmission line traveling at a considerable height from the ground. It is buried inside and hardened with concrete.
【0003】脚材を地中に埋設する場合、先ず測量によ
り鉄塔中心位置を地上の所定の位置に決め、この鉄塔中
心位置を中心として4つの脚材を埋設する大略の位置に
埋設穴が設けられ、各埋設穴内に脚材が据付けられる。
埋設穴底はコンクリートで固められ、あるいは、その穴
底が固い地盤の場合にはそのままその地盤上に、上下端
にフランジ部を設けた脚材の下端のフランジを置き、一
般には地上の鉄塔構造に合わせて所定角度傾けて設置さ
れる。When burying a leg material in the ground, the center position of the tower is first determined at a predetermined position on the ground by surveying, and a burial hole is provided at a general position where the four leg members are buried with the center position of the tower as the center. Then, a leg material is installed in each buried hole.
The buried hole bottom is hardened with concrete, or if the hole bottom is hard ground, the lower end flange of the leg material with flanges at the upper and lower ends is placed on the ground as it is, and generally the tower tower structure on the ground It is installed at a predetermined angle in accordance with.
【0004】埋設穴底と脚材下端フランジとの間には、
小型の油圧ジャッキ等を挿入して上下方向の調整を行な
い、水平方向には下端フランジ部をバールでこじたり叩
いたりし、あるいは上端フランジの直下付近をロッドで
押し引きして調整し、その後脚材全体を配筋で囲み、コ
ンクリートを流し込んで全体を固める。[0004] Between the bottom of the buried hole and the bottom flange of the leg material,
Adjust the vertical direction by inserting a small hydraulic jack or the like, and pry or hit the lower end flange with a crowbar in the horizontal direction, or push and pull the area immediately below the upper end flange with a rod, and then adjust the legs. Surround the whole material with reinforcement and pour concrete to harden the whole.
【0005】このような鉄塔脚材の据付は、上下方向、
水平方向、及び傾き等の調整が全て人手で行われる。上
下方向の調整を油圧ジャッキで行った後、調整後は油圧
ジャッキを取り外し、配筋を施工したり、コンクリート
の流し込みをするため、最終的に出来上がったものは、
少し寸法が狂うこともある。しかし、脚材の据付けはミ
リ単位の精度で調整されるため、僅かな狂いも許されな
い。[0005] The installation of such steel tower legs is performed in the vertical direction.
Adjustments such as horizontal direction and tilt are all performed manually. After adjusting the vertical direction with a hydraulic jack, remove the hydraulic jack after adjustment, install reinforcement, and pour concrete, so the final product is
The dimensions may be slightly out of order. However, the installation of the legs is adjusted with millimeter accuracy, so slight deviations are not allowed.
【0006】このため、再び配筋を解体したり、油圧ジ
ャッキを押し込んだりする必要が生じるが、脚材と上端
配筋との隙間は大略70〜100cm程度であり、埋設
穴との隙間も人が入り込むのには十分ではなく、狭い隙
間からこれらの作業をするのは容易ではない。このよう
な作業を人手によらずに行えるようにした発明として特
願平6−223073号に開示された装置がある。For this reason, it is necessary to disassemble the reinforcing bars again or to push in the hydraulic jack, but the gap between the leg material and the upper end reinforcing bars is about 70 to 100 cm, and the gap between the burial holes is also human. Is not enough to penetrate, and it is not easy to perform these operations from a narrow gap. An apparatus disclosed in Japanese Patent Application No. 6-223073 is an invention which enables such operations to be performed without manual operation.
【0007】このものは、上記埋設穴底に載置する固定
ベース上に、水平、垂直、回転のいずれかの移動をそれ
ぞれ独立に又はその組み合わせの移動を自在とする機械
的な移動機構を設け、その移動機構に取り付けた移動ベ
ース上面に鉄塔脚材下端を据え付け、その移動機構の動
力伝達操作のみを人手あるいはモータ駆動で行うように
している。In this apparatus, a mechanical moving mechanism is provided on a fixed base placed on the bottom of the buried hole, which allows any one of horizontal, vertical, and rotational movements independently or a combination thereof. The lower end of the tower leg material is mounted on the upper surface of the moving base attached to the moving mechanism, and only the power transmission operation of the moving mechanism is performed manually or driven by a motor.
【0008】この装置により、脚材の据え付け調整作業
が機械仕掛けで行われるので、作業員が狭い埋設穴内に
入って手作業で調整操作をする必要がなく、地上から動
力伝達操作のみを行えばよいので、労力の省力化ととも
に正確な据え付け作業が実現できる。[0008] With this device, the installation and adjustment work of the leg material is performed mechanically, so that there is no need for the operator to enter the narrow burial hole and perform the adjustment operation manually, and only the power transmission operation from the ground is performed. Since it is good, it is possible to realize accurate installation work while saving labor.
【0009】[0009]
【発明が解決しようとする課題】しかしながら、上記の
据付け装置では、上記移動ベースの移動調整機構の動力
伝達軸への入力機構として歯車機構を多用しており、精
密機械要素である歯車は他の一般的機械要素に比べて非
常にコスト高であり、重量があって取扱もしにくい。However, in the above-mentioned installation apparatus, a gear mechanism is frequently used as an input mechanism to the power transmission shaft of the movement adjusting mechanism of the moving base, and the gear which is a precision mechanical element is different from other gears. It is very expensive compared to general mechanical elements, and is heavy and difficult to handle.
【0010】また、この据付け装置は、最終的に鉄塔脚
材埋設穴にコンクリートが流し込まれる際、鉄塔脚材と
ともに据付け穴に埋め込まれるが、歯車が多用された上
記移動調整機構では、歯車そのものの形状やそれに係合
する周辺の機械要素全体が複雑な形状をなすので、それ
らが形成する空隙部分にはコンクリートが行き渡りにく
く、硬化したコンクリートに巣が残りやすい。これは強
度上大きな問題である。In addition, when the concrete is finally poured into the steel tower leg material embedding hole, the installation device is embedded in the mounting hole together with the steel tower leg material. Since the shape and the entire peripheral mechanical element engaging with it have a complicated shape, concrete does not easily spread to the voids formed by them, and nests tend to remain on hardened concrete. This is a major problem in strength.
【0011】そこで、この発明の課題は、上記のような
鉄塔脚材据付装置について、鉄塔脚材が据付けられる移
動ベースの移動機構が簡略に構成された、特に、歯車等
の複雑な形状やコスト高になる機械要素を用いないよう
な装置にすることにある。[0011] Accordingly, an object of the present invention is to provide a tower base member installation apparatus as described above, in which a moving mechanism of a moving base on which the tower base member is installed is simply configured. The purpose is to make the apparatus not to use high mechanical elements.
【0012】[0012]
【課題を解決するための手段】上記課題を解決するため
に、この発明の鉄塔脚材据付装置は、平行リンクで構成
されたジャッキ機構を有し、そのジャッキ機構は、前記
リンクが、その支点回りに送りねじ機構により押し引き
され、支点回りに回動することにより昇降し、前記ジャ
ッキ機構には、その載置面に垂直に固定軸が設けられ、
その固定軸には、固定軸回りに回動可能となった回動板
が挿嵌されており、その回動板は送りねじ機構により押
し引きされて回動し、その回動板の上面には、送りねじ
機構により押し引きされ、回動板に板面を平行にしてス
ライド可能となった第1のスライド板が設けられ、その
第1のスライド板の上面には、送りねじ機構により押し
引きされ、第1のスライド板に板面を平行にし、かつ、
第1のスライド板のスライド方向に直交する方向にスラ
イド可能となった第2のスライド板が設けられ、その第
2のスライド板の上面に鉄塔脚材下端を据え付け、支持
するようにしたのである。SUMMARY OF THE INVENTION In order to solve the above-mentioned problems, a tower leg material installation apparatus according to the present invention has a jack mechanism formed of parallel links, and the jack mechanism is configured such that the link has a fulcrum. It is pushed and pulled around by a feed screw mechanism, and moves up and down by rotating around a fulcrum. The jack mechanism is provided with a fixed shaft perpendicular to the mounting surface thereof,
A rotary plate that is rotatable around the fixed axis is inserted into the fixed shaft, and the rotary plate is pushed and pulled by a feed screw mechanism to rotate, and is mounted on the upper surface of the rotary plate. Is provided with a first slide plate which is pushed and pulled by a feed screw mechanism and is slidable with the plate surface parallel to the rotating plate, and the upper surface of the first slide plate is pushed by the feed screw mechanism. Is pulled, the plate surface is made parallel to the first slide plate, and
A second slide plate slidable in a direction perpendicular to the slide direction of the first slide plate is provided, and the lower end of the tower leg material is installed on the upper surface of the second slide plate to support it. .
【0013】上記のような構成によれば、鉄塔脚材下端
が据え付けられる第2のスライド板の全ての方向(垂直
方向、水平面内の点回りおよび互いに直交する方向)に
ついての位置調整が送りねじ機構を操作するだけで実現
できる。According to the above construction, the position adjustment of the second slide plate on which the lower end of the tower leg member is installed in all directions (vertical direction, directions around points in a horizontal plane, and directions orthogonal to each other) is performed by the feed screw. It can be realized only by operating the mechanism.
【0014】[0014]
【実施の形態】以下、この発明の実施の形態を図に基づ
いて説明する。図1における実施形態の据え付け装置A
は、垂直方向の位置調整を行うジャッキ機構Jが、水平
面内の位置調整に係る回動板R、スライド枠Yおよびス
ライド板Xを支持している。脚材の位置調整の際には、
前記ジャッキ機構J部が図示省略した脚材埋設穴内の基
盤上に載置され、スライド板Xの上面に図示省略した鉄
塔脚材の下端が据え付けられる。DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described below with reference to the drawings. The installation device A of the embodiment in FIG.
The jack mechanism J for adjusting the position in the vertical direction supports the rotary plate R, the slide frame Y, and the slide plate X for position adjustment in the horizontal plane. When adjusting the position of the legs,
The jack mechanism J is placed on a base in a leg material embedding hole not shown, and the lower end of a steel tower leg material not shown is mounted on the upper surface of the slide plate X.
【0015】そして、スライド板Xが下方のジャッキ機
構Jの昇降により垂直方向に移動し、回動板Rの回動に
より水平面内の点の回りに回動し、スライド枠Yの移動
により水平面内で直線移動し、それ自身もスライド枠Y
上をスライド枠Yの移動方向に直交する方向に移動し
て、脚材の位置調整が行われる。以下、この装置Aの、
上記各方向への移動行うための機構について説明する。Then, the slide plate X moves vertically by raising and lowering the lower jack mechanism J, rotates around a point in the horizontal plane by the rotation of the rotation plate R, and moves in the horizontal plane by the movement of the slide frame Y. To move linearly, and the slide frame itself
The upper leg is moved in a direction orthogonal to the moving direction of the slide frame Y, and the position of the leg member is adjusted. Hereinafter, the device A
A mechanism for performing the movement in each direction will be described.
【0016】(1)垂直方向の位置調整機構 垂直方向の位置調整は図2及び図3に示すジャッキ機構
Jで行う。このジャッキ機構Jは、上枠1、中枠2、下
枠3の三つの矩形枠が垂直方向に平行に配設され、大小
のリンク4…、51…、52…で連結されて平行リンク
JL を成している。(1) Vertical Position Adjustment Mechanism Vertical position adjustment is performed by a jack mechanism J shown in FIGS. In this jack mechanism J, three rectangular frames of an upper frame 1, a middle frame 2, and a lower frame 3 are arranged in parallel in the vertical direction, and are connected by large and small links 4,..., 51,. L is formed.
【0017】上枠1と下枠3はともにL型鋼を溶接して
矩形状に形成されており、それぞれ一組の対向辺15、
15、35、35の側面に所定のピッチでシャフト穴1
6…、36…が設けられている。Each of the upper frame 1 and the lower frame 3 is formed in a rectangular shape by welding an L-shaped steel, and a pair of opposing sides 15 and
Shaft holes 1 at predetermined pitches on the sides of 15, 35, 35
6,... Are provided.
【0018】上枠1の面中心にはこの位置を通る梁11
の上に固定軸12が垂直に溶接されており、この固定軸
12に後述する回動板Rが挿嵌される。At the center of the surface of the upper frame 1, a beam 11 passing through this position
A fixed shaft 12 is vertically welded to the upper surface of the shaft, and a rotating plate R described later is inserted into the fixed shaft 12.
【0019】下枠3の一組の対辺35、35の水平部に
はナット31が溶着されており、そのナット31に中心
を合わせて設けられたきり穴32を通して、ナット32
に螺合するボルト33が挿入されている。このボルト3
3は後述するように装置Aを基盤上に据え付けた際に装
置Aの水平を出すためのものである。A nut 31 is welded to a horizontal portion of a pair of opposite sides 35, 35 of the lower frame 3, and a nut 32 is inserted through a bore 32 provided at the center of the nut 31.
The bolt 33 to be screwed into is inserted. This bolt 3
Numeral 3 is for raising the level of the apparatus A when the apparatus A is installed on a base as described later.
【0020】中枠2は長方形をなし、短辺の一方がパイ
プ21で形成され、他方が中実角材22で、両長辺が帯
状の鋼板23で形成され、それぞれ溶接で固定されてい
る。中枠2内には、前記短辺のパイプ21に平行に、前
記上下枠1、3側面のシャフト穴16…、36…の穴ピ
ッチと等しい距離を置いてもう一本のパイプ24が設け
られている。長辺側面には、前記両パイプ21、24の
パイプ穴に連続してそのパイプ穴と同径のシャフト穴2
6…が貫通して設けられている。The middle frame 2 has a rectangular shape, one of its short sides is formed by a pipe 21, the other is a solid square member 22, and both long sides are formed by a strip-shaped steel plate 23, and are fixed by welding. In the middle frame 2, another pipe 24 is provided in parallel with the short side pipe 21 at a distance equal to the hole pitch of the shaft holes 16, 36. ing. On the long side surface, a shaft hole 2 having the same diameter as the pipe hole is formed continuously with the pipe holes of the pipes 21 and 24.
6 are provided penetrating therethrough.
【0021】また、前記中実角材22の中央を通り、中
枠2に平行な面に沿って中枠2の長手方向にネジ穴28
が貫通して設けられている。A screw hole 28 extends in the longitudinal direction of the middle frame 2 along a plane parallel to the middle frame 2 through the center of the solid square member 22.
Are provided through.
【0022】以上のような形状の各枠1、3、2に対
し、上枠1と下枠3についてはそれぞれのシャフト穴1
6…、36…に、また、中枠2については前記両パイプ
21、24に、それぞれ枠の幅寸法より長いリンクシャ
フト25が挿入され、リンクシャフト25が枠の側面か
ら突出した部分に小リンク51…、52…が取り付けら
れる。For each of the frames 1, 3 and 2 having the above-described shapes, the upper frame 1 and the lower frame 3 have respective shaft holes 1.
6 and 36, and for the middle frame 2, a link shaft 25 longer than the width of the frame is inserted into the two pipes 21 and 24, respectively. 51, 52 ... are attached.
【0023】また、前記上下枠1、3それぞれの両側面
の前記中実角材22側の小リンク51、51の取付け位
置には等長の大リンク4、4の一端が取り付けられ、両
大リンク4、4の他端は前記中枠2の延長面上で枠の幅
方向に配設される角パイプ27の両端の突出軸に取り付
けられる。こうして平行リンクJL 全体が形成されてい
る。この平行リンクJL は送りネジ機構SJ によって起
伏されるが、次にこの平行リンクJL の送りネジ機構S
J について説明する。One end of large links 4, 4 of equal length is attached to the mounting positions of the small links 51, 51 on both sides of the upper and lower frames 1, 3 on the side of the solid square member 22, respectively. The other ends of the pipes 4 and 4 are attached to projecting shafts at both ends of a square pipe 27 disposed on the extension surface of the middle frame 2 in the width direction of the frame. Thus, the entire parallel link J L is formed. The parallel link J L is raised and lowered by the feed screw mechanism S J , and then the feed screw mechanism S of the parallel link J L is
J will be described.
【0024】前記角パイプ27中央には中枠2の長手方
向に沿ってきり穴29が設けられており、前記中実角材
22に設けられたネジ穴28に螺合する寸切りボルトB
J が、そのネジ穴28とこのきり穴29を貫通して挿入
され、その両端は中実角材22側と角パイプ27側でと
もに突出している。At the center of the square pipe 27, there is provided a through hole 29 along the longitudinal direction of the inner frame 2, and a slicing bolt B screwed into a screw hole 28 provided in the solid square member 22.
J is inserted through the screw hole 28 and the bore hole 29, and both ends protrude from the solid square member 22 side and the square pipe 27 side.
【0025】この寸切りボルトBJ の角パイプ27側の
突出端には寸切りボルト操作用ナットNJ1が溶着されて
おり、中実角材22側の突出端にはストッパ用(兼抜け
止め用)のナットNJ3が溶着されている。また、操作用
ナットNJ1側には角パイプ27を挟んでストッパ用のナ
ットNJ2が溶着され、両ナットNJ1、NJ2により角パイ
プ27が寸切りボルトBJ の長さ方向に拘束されてい
る。さらに、寸切りボルトBJ の中実角材22と角パイ
プ27に挟まれた部分には前記ストッパ用のナットNJ2
とは別にナットNJ4が前記ナットNJ3から所定の距離の
位置に溶着されている。The stop for missing (and stopper for this Zungiri bolt B is the square pipe 27 side of the projecting end of the J being welded Zungiri bolt operating nut N J1, solid square bar 22 side of the projecting end ) Nut N J3 is welded. A nut N J2 for stopper is welded to the operation nut N J1 side with the square pipe 27 interposed therebetween, and the square pipe 27 is restrained in the length direction of the cut bolt B J by both nuts N J1 and N J2. ing. Further, a nut N J2 for the stopper is provided between the solid square member 22 and the square pipe 27 of the trimming bolt B J.
Apart from this, a nut N J4 is welded to a position at a predetermined distance from the nut N J3 .
【0026】以上がジャッキ機構Jの平行リンクJL と
その送りネジ機構SJ の構成であるが、それを操作する
には前記送りネジ機構SJ の寸切りボルト操作用ナット
NJ1を操作して寸切りボルトBJ を回動させる。そうす
ると、図4に示すように、前記中枠2の中実角材22の
ネジ穴28と寸切りボルトBJ の間の送りネジ作用によ
り、中実角材22と前記角パイプ27とが互いに近づい
たり遠のいたりし、大リンク4、4を介して中実角材2
2側の小リンク51、51がリンクシャフト25を軸に
して回動する。従って、図の二点鎖線で示すように前記
平行リンクJLが起伏し、上枠1が下枠3に対して昇降
する。こうして垂直方向の位置調整が行える。この場
合、平行リンクJL が最も起きた時に前記ナットNJ4
が前記中実角材22の側面と当接し、平行リンクJL が
最も伏せた時にナットNJ3が中実角材22の側面に当接
するようになっており、両ナットNJ4、NJ3はともに、
ジャッキJの昇降ストローク両端でのストッパの役目を
果たしている。The configuration of the parallel link J L of the jack mechanism J and its feed screw mechanism S J has been described above. To operate the same, the nut N J1 for operating the cutting bolt of the feed screw mechanism S J is operated. And turn the cutting bolt BJ . Then, as shown in FIG. 4, the solid square member 22 and the square pipe 27 come close to each other due to the feed screw action between the screw hole 28 of the solid square member 22 of the middle frame 2 and the cutting bolt BJ. It is far away, and the solid timber 2 is through the large links 4 and 4.
The small links 51 on the second side rotate about the link shaft 25. Thus, the parallel link J L is contoured as indicated by two-dot chain lines in FIG., The upper frame 1 is raised and lowered relative to the lower frame 3. Thus, vertical position adjustment can be performed. In this case, when the parallel link J L occurs most, the nut N J4
Abuts against the side surface of the solid square member 22, and the nut N J3 comes into contact with the side surface of the solid square member 22 when the parallel link J L is most down. Both nuts N J4 and N J3 are
It serves as a stopper at both ends of the lifting stroke of jack J.
【0027】(2)水平面内での点回りの回動による角
度調整機構 図5に示すように、前記ジャッキ機構Jの固定軸12に
は、矩形の回動板Rが、その面中心にある回動穴81を
挿嵌させ、下面をジャッキ機構Jの上枠1上面に当接し
てその固定軸12の回りに回動可能となっている。水平
面内での点回りの回動(角度調整)は、この回動板Rを
回動させて行う。なお、固定軸12が設けられている前
記上枠1の梁の上面は上枠1の上面より下にあり、回動
板Rは梁11の上面には当接せず、上枠1の上面にのみ
当接して回動する。(2) Angle Adjusting Mechanism by Rotation about a Point in a Horizontal Plane As shown in FIG. 5, the fixed shaft 12 of the jack mechanism J has a rectangular rotating plate R at the center of its surface. The rotation hole 81 is inserted, and the lower surface thereof is in contact with the upper surface of the upper frame 1 of the jack mechanism J so as to be rotatable around the fixed shaft 12 thereof. Rotation (angle adjustment) around a point in a horizontal plane is performed by rotating the rotation plate R. The upper surface of the beam of the upper frame 1 on which the fixed shaft 12 is provided is lower than the upper surface of the upper frame 1, and the rotating plate R does not contact the upper surface of the beam 11, And rotate only in contact with.
【0028】回動板Rに設けた四方の穴HR …は装置を
埋設穴に据え付けた後、装置をコンクリートで固める際
に、コンクリート注入時に一緒に流入してくる空気が回
動板Rの下方に滞留しないための逃がし穴である。Four holes H R ... Provided in the rotating plate R are installed in the buried hole and then, when the device is solidified with concrete, air flowing in at the time of pouring the concrete together with the rotating plate R is used. This is a relief hole so that it does not stay below.
【0029】回動板Rの回動は前記ジャッキ機構Jに設
けられた送りネジ機構SR によって行われるが、次に、
この回動板Rの送りネジ機構SR について説明する。The rotation of the rotation plate R is performed by a feed screw mechanism S R provided on the jack mechanism J.
For feed screw mechanism S R of the rotating plate R will be described.
【0030】図6に示すように、前記ジャッキ機構Jの
上枠1の側板端部には水平方向に張り出す帯状鋼板のネ
ジホルダ73が設けられており、回動板R下面にもスペ
ーサ82を介して水平方向に張り出す帯状鋼板のネジホ
ルダ83が設けられている。両ネジホルダ73、83の
スライド枠Y側面からの突出部には、それぞれ図7に示
すようにピン穴74、84が設けられており、そのピン
穴74、84には回動ピン75、85を縁部に備えたネ
ジ受け76、86のピン部が遊嵌され、ネジ受け76、
86がネジホルダ73、83に垂直に設けられている。
両ネジ受け76、86のピン75、85がネジホルダ7
3、83から突出した下端は抜け止めのワッシャWR が
溶着されている。As shown in FIG. 6, a screw holder 73 made of a strip-like steel plate extending in the horizontal direction is provided at an end of the side plate of the upper frame 1 of the jack mechanism J, and a spacer 82 is also provided on the lower surface of the rotating plate R. There is provided a screw holder 83 made of a strip-shaped steel plate extending horizontally in the middle. As shown in FIG. 7, pin holes 74 and 84 are provided on the protrusions of the two screw holders 73 and 83 from the side surface of the slide frame Y, and the rotation holes 75 and 85 are provided in the pin holes 74 and 84, respectively. The pin portions of the screw receivers 76 and 86 provided on the edges are loosely fitted, and the screw receivers 76 and 86
86 is provided vertically on the screw holders 73 and 83.
Pins 75 and 85 of both screw receivers 76 and 86 are screw holder 7
Washer W R of the protruded lower end stopper is welded from 3,83.
【0031】また、回動板側ネジホルダ83のネジ受け
86には板面の略中央にネジ穴87が設けられており、
ジャッキ上枠1側ネジホルダ73のネジ受け76にはネ
ジ穴87の谷径より大きな径のきり穴77が設けられて
いる。このきり穴77と前記ネジ穴87に亘って、その
ネジ穴87に螺合する寸切りボルトBR が挿入されてお
り、寸切りボルトBR のネジ受け76寄りの端部には、
このネジ受け76を挟んだ両側の位置に寸切りボルト操
作用ナットNR1とストッパ用のナットNR2(図8参照)
が溶着されている。The screw holder 86 of the screw holder 83 on the rotating plate side is provided with a screw hole 87 substantially at the center of the plate surface.
A screw hole 76 having a diameter larger than the root diameter of the screw hole 87 is provided in the screw receiver 76 of the screw holder 73 on the jack upper frame 1 side. The piercer over the hole 77 in the screw holes 87, are inserted Zungiri bolts B R screwed into the screw hole 87, the end portion of the screw receiving 76 side of the Zungiri bolt B R is
The nut N R1 for operating the trimming bolt and the nut N R2 for the stopper are located on both sides of the screw receiver 76 (see FIG. 8).
Is welded.
【0032】以上が回動板Rの送りネジ機構SR の構造
であるが、回動板Rを回動させるには前記寸切りボルト
操作用ナットNR1を操作して寸切りボルトBR を回動さ
せる。そうすると、図8に示すように、回動板側ネジ受
け86のネジ穴87と寸切りボルトBR の送りネジ作用
により、ネジ受け86が寸切りボルトBR 上を進退する
ので、このネジ受け86が取り付けられた回動板側ネジ
ホルダ83を介して回動板Rが固定軸12の回りに回動
する。この際、両ネジホルダ73、83のピン穴74、
84と、そのピン穴74、84に挿嵌されるネジ受け7
6、86の回動ピン75、85とは、前記したように遊
嵌状態にあるので、ネジ受け86が寸切りボルトBR 上
を直線運動しても、その方向に直交する方向(回動軌跡
の半径方向)において回動ピン75、85がピン穴7
4、84内で移動可能であり、回動板Rが滑らかに回動
する。The above is the structure of the feed screw mechanism S R of the rotary plate R, a Zungiri bolt B R by operating the Zungiri bolt operating nut N R1 to rotate the rotary plate R Rotate. Then, as shown in FIG. 8, by a feed screw action of the screw holes 87 and Zungiri bolt B R of the turning plate side screw receiving 86, since screw receiving 86 moves forward and backward on Zungiri bolt B R, receive the screw The rotation plate R rotates around the fixed shaft 12 via the rotation plate-side screw holder 83 to which the 86 is attached. At this time, the pin holes 74 of both screw holders 73 and 83,
And a screw receiver 7 inserted into the pin holes 74, 84 thereof.
The pivot pin 75 and 85 of 6,86, since the loosely fitted state as described above, even if the screw receiving 86 to linear movement on Zungiri bolt B R, the direction (rotation perpendicular to the direction In the radial direction of the trajectory), the rotation pins 75 and 85
4, 84, and the rotating plate R smoothly rotates.
【0033】なお、回動板Rを滑らかに回動させるた
め、装置の組み立て時、以下の点について現合で調整す
る。 前記ピン穴74、84の径と、そのピン穴74、84
が設けられた両ネジホルダ73、83の水平方向の位置
関係を現合で加工・修正し、前記回動ピン75、85と
ピン穴74、84の遊嵌状態を調整する。In order to rotate the rotating plate R smoothly, the following points are adjusted at the time of assembling the apparatus. The diameter of the pin holes 74, 84 and the pin holes 74, 84
The horizontal positional relationship between the two screw holders 73 and 83 provided with the holes is processed and corrected at the present time, and the loosely fitted state of the rotating pins 75 and 85 and the pin holes 74 and 84 is adjusted.
【0034】前記ジャッキ上枠1側ネジ受け76のき
り穴77中心と回動板側ネジ受け86のネジ穴87中心
が基準面(例えば、前記ジャッキ機構Jの下枠3の背板
35上面)から同じ高さにあるように、前記ジャッキ上
枠側、回動板側両ネジホルダ73、83の垂直方向の取
付けを回動板側ネジホルダ83のスペーサ82の高さ寸
法を修正加工して溶着する。The center of the hole 77 of the screw holder 76 on the jack upper frame 1 side and the center of the screw hole 87 of the screw holder 86 on the rotating plate side are reference surfaces (for example, the upper surface of the back plate 35 of the lower frame 3 of the jack mechanism J). The vertical mounting of the screw holders 73, 83 on the jack upper frame side and the rotating plate side is carried out by correcting the height dimension of the spacer 82 of the rotating plate side screw holder 83 so that they are at the same height from each other. .
【0035】(3)水平面内の互いに直交する二方向で
の直線移動の位置調整機構 この実施形態では、二方向の内の一方向の直線移動は、
図9に示すように、前記回動板Rに嵌められたスライド
枠Yを回動板Rに対してスライドさせて行う。(3) Position adjustment mechanism for linear movement in two directions orthogonal to each other in a horizontal plane In this embodiment, linear movement in one of the two directions is
As shown in FIG. 9, the slide frame Y fitted on the rotating plate R is slid with respect to the rotating plate R.
【0036】スライド枠Yは断面の寸法形状が等しい四
つのL型鋼61、61、62、62を矩形の枠に形成し
たもので、対向する一組の対辺61、61の両端にもう
一組の対辺62、62の端部が乗り上げる形になってい
る。枠の内部はL型鋼が図10のように組まれており、
L型鋼の一組の対辺61、61の水平方向の背板61a
の側面が前記回動板Rの側縁に嵌まり込み、対辺62、
62が回動板Rの縁部に乗り上げる形で回動板Rに支持
され、スライド枠Yと回動板Rは背板61aの側面と回
動板Rの側縁が互いの摺動面となり、互いにスライド可
能となっている。このスライド枠Yは、回動板Rに対し
送りネジ機構SY によってスライドされるが、次に、そ
の送りネジ機構SY を説明する。The slide frame Y is formed by forming four L-shaped steels 61, 61, 62, 62 having the same cross-sectional dimensions and shape in a rectangular frame, and another pair of opposing sides 61, 61 at opposite ends. The ends of the opposite sides 62, 62 are shaped to ride on. The inside of the frame is made of L-shaped steel as shown in FIG.
A horizontal back plate 61a of a pair of opposite sides 61, 61 of an L-shaped steel
Is fitted into the side edge of the rotating plate R, and the opposite side 62,
The sliding frame Y and the rotating plate R are supported by the rotating plate R so that the sliding frame 62 rides on the edge of the rotating plate R. The side surface of the back plate 61a and the side edge of the rotating plate R serve as sliding surfaces for each other. , Can slide with each other. The slide frame Y is is slid by a feed screw mechanism S Y relative rotation plate R, will now be described the feed screw mechanism S Y.
【0037】送りネジ機構SY は、図9に示すように、
回動板Rの下面に突設された鋼板のネジホルダ80を有
し、ネジホルダ80の板面はスライド枠Yのスライド方
向に直角に向いている。ネジホルダ80の板面略中央に
はきり穴80aが設けられており、このネジホルダ80
に平行なスライド枠Y側板には、そのきり穴80aを通
って回動板Rのスライド方向に平行な直線上に、そのき
り穴80aと同じ大きさのきり穴69が設けられてい
る。The feed screw mechanism S Y is, as shown in FIG.
The screw holder 80 has a steel plate projecting from the lower surface of the rotating plate R, and the surface of the screw holder 80 is perpendicular to the sliding direction of the slide frame Y. A drilled hole 80a is provided at substantially the center of the plate surface of the screw holder 80.
The slide frame Y side plate, which is parallel to, is provided with a cutout 69 having the same size as the cutout 80a on a straight line parallel to the sliding direction of the rotating plate R through the cutout 80a.
【0038】スライド枠Y側板のきり穴69部外面に
は、そのきり穴69と中心を等しくして谷径がきり穴6
9の径より小さいナットNY0が溶接されており、このナ
ットNY0に螺合する寸切りボルトBY が前記ネジホルダ
80のきり穴80aとスライド枠Yのきり穴69に亘っ
て挿入されている。On the outer surface of the hole 69 of the slide frame Y side plate, the center of the hole 69 is made equal to that of the
A nut N Y0 smaller than a diameter of 9 is welded, and a slicing bolt BY to be screwed with the nut N Y0 is inserted over a bore 80 a of the screw holder 80 and a bore 69 of the slide frame Y. .
【0039】寸切りボルトBY の両端はそれぞれ、ネジ
ホルダ80とスライド枠Y側板ナットNY0から突出して
おり、ナットNY0側端部にはボルト操作用ナットNY1が
溶接され、ネジホルダ80側端部には抜け止め用のナッ
トNY3が溶接されている。さらに、寸切りボルトBY の
ネジホルダ80外面側には、前記抜け止め用のナットN
Y3とともにネジホルダ80をゆるやかに挟むような取付
け間隔でもってストッパ用のナットNY2が溶接されてい
る。Both ends of the trimming bolt BY protrude from the screw holder 80 and the plate nut N Y0 on the slide frame Y side, and a nut N Y1 for bolt operation is welded to an end of the nut N Y0 side. A nut N Y3 for retaining is welded to the portion. Further, on the outer surface of the screw holder 80 of the trimming bolt BY , the nut N for retaining
The nut N Y2 for the stopper is welded at an installation interval that gently sandwiches the screw holder 80 together with Y 3 .
【0040】以上が、スライド枠Yの送りネジ機構SY
であり、スライド枠Yをスライドさせるには、前記操作
用ナットNY1を介して寸切りボルトBY を回動させる。
そうすると、寸切りボルトBY と、それに螺合したスラ
イド枠Y側板のナットNY0との送りネジ作用によりスラ
イド枠Yが回動板Rの側縁に沿って図の矢印y方向にス
ライドする。The above is the description of the feed screw mechanism S Y of the slide frame Y.
, And the to slide the slide frame Y rotates the Zungiri bolt B Y through the operating nut N Y1.
Then, the slide frame Y slides along the side edge of the rotating plate R in the direction of the arrow y in the figure by the feed screw action of the trimming bolt BY and the nut N Y0 of the slide frame Y side plate screwed thereto.
【0041】次に、このスライド枠Yのスライド方向に
直交する方向での位置調整機構について説明する。この
方向の位置調整は、図9に示すように、スライド枠Yに
嵌め込まれたスライド板Xを移動させて行う。スライド
枠Yは、前記したように、その一組の対辺61、61の
背板61a、61a端部にもう一組の対辺62、62の
背板62a端部が乗り上げる形で組まれているが、図1
1に示すように、その背板62aの厚み分の段差部に、
段差部の平面矩形形状の幅寸法と等しい幅寸法を有する
矩形鋼板のスライド板Xが嵌め込まれている。スライド
板Xの下面は前記回動板R上面と前記背板61a、61
a上面に当接し、前記背板62aの側面に沿ってスライ
ド可能となっている。また、両背板62a、62aの両
端部上面には枠の内向きに一部を突設させる形で押さえ
板63…が溶接されており、スライド板Xが背板62a
上面から飛び出さないようになっている。Next, a description will be given of a mechanism for adjusting the position of the slide frame Y in a direction orthogonal to the sliding direction. Position adjustment in this direction is performed by moving a slide plate X fitted into a slide frame Y, as shown in FIG. As described above, the slide frame Y is assembled in such a manner that another set of opposite sides 62, 62 has an end portion of the back plate 62a on one end of the opposite side plate 61a, 61a. , FIG.
As shown in FIG. 1, at the step portion corresponding to the thickness of the back plate 62a,
A slide plate X of a rectangular steel plate having a width dimension equal to the width dimension of the planar rectangular shape of the step portion is fitted. The lower surface of the slide plate X includes the upper surface of the rotating plate R and the back plates 61a, 61.
a, and is slidable along the side surface of the back plate 62a. Pressing plates 63 are welded to upper surfaces of both end portions of both back plates 62a, 62a so as to partially project inward of the frame, and the slide plate X is connected to the back plate 62a.
It does not protrude from the top.
【0042】なお、スライド板Xの面中心に設けた穴H
C は、その下方にある前記回動板Rの回動用固定軸12
の逃がし穴であり、面の四方に設けた穴HX …は、前記
回動板Rの場合と同様、装置埋設の際のコンクリート注
入時に一緒に流入してくる空気を逃がすための穴であ
る。このスライド板Xは、スライド枠Yの側面に設けら
れた送りネジ機構SX で押し引きされてスライドする。A hole H provided at the center of the surface of the slide plate X
C is a rotating fixed shaft 12 of the rotating plate R below it.
A relief holes, the hole H X ... is provided at the four sides of the face, as in the case of the rotating plate R, a hole to allow air to escape coming flow together when the concrete injected at the time of the device embedded in the . The slide plate X is pulling has been slid press the slide frame feed provided on a side surface of the Y screw mechanism S X.
【0043】送りネジ機構SX はスライド枠Yの側面に
設けられたアーチ型のボルトホルダ64、スライド板X
の上面に側縁から突出して設けられたL字型のネジ板9
1、および寸切りボルトBX で構成されている。The feed screw mechanism S X bolt holder 64 arched provided on the side surface of the slide frame Y, the slide plate X
L-shaped screw plate 9 protruding from the side edge on the upper surface of
1, and it is constituted by Zungiri bolt B X.
【0044】前記ボルトホルダ64の梁板64aおよび
ネジ板91の垂直部91aはともにスライド枠Yの側面
に平行になっており、これらボルトホルダ64の梁板6
4a、ネジ板91の垂直部91aおよびスライド枠Y側
板にはこの順で、スライド板Xのスライド方向に平行な
一直線上に、きり穴65、ネジ穴92、きり穴66が設
けられている。両きり穴65、66はネジ穴92の谷寸
法より大きな径を有し、この三つの穴65、92、66
に亘ってネジ板91のネジ穴92に螺合する寸切りボル
トBX が挿入され、両端部はそれぞれ梁板64a、スラ
イド枠Y側板から突出している。The beam plate 64a of the bolt holder 64 and the vertical portion 91a of the screw plate 91 are both parallel to the side surface of the slide frame Y.
4a, the vertical portion 91a of the screw plate 91 and the slide frame Y side plate are provided with a cutting hole 65, a screw hole 92, and a cutting hole 66 in this order on a straight line parallel to the sliding direction of the slide plate X. The two holes 65, 66 have a diameter larger than the root dimension of the screw hole 92, and these three holes 65, 92, 66
Over and in Zungiri bolt B X screwed into the screw hole 92 of the screw plate 91 is inserted, both ends protrude respectively beam plate 64a, a slide frame Y side plate.
【0045】この寸切りボルトBX の両端部には、それ
ぞれ前記ボルトホルダ64の梁板64a外面とスライド
枠Yの側板内面とをゆるやかに挟むような間隔でもって
ボルト操作用ナットNX1と抜け止め用のナットNX3が溶
接されている。[0045] The Zungiri at both ends of the bolt B X is missing a bolt operating nut N X1 with each beam plate 64a outer surface and the slide frame interval, such as loosely sandwich the side plate inner surface of Y of the bolt holder 64 The nut N X3 for stopping is welded.
【0046】スライド板Xをスライドさせるには、ボル
ト操作用ナットNX1を回動させる。そうすると、寸切り
ボルトBX とネジ板91のネジ穴92との送りネジ作用
によりネジ板91の垂直部91aが寸切りボルトBX 上
を移動し、ネジ板91が溶着されたスライド板Xが図の
矢印x方向にスライドする。To slide the slide plate X, the nut N X1 for bolt operation is rotated. Then, the vertical portion 91a of the screw plate 91 moving on Zungiri bolt B X by the feed screw action of the screw holes 92 of Zungiri bolt B X and the screw plate 91, slide plate X which screw plate 91 is welded Slide in the direction of arrow x in the figure.
【0047】この実施形態の装置Aは以上のような構成
であり、鉄塔脚材が載置されるベース(前記スライド板
X)の垂直方向の位置調整、水平面内での点回りの回動
および互いに直交する方向の位置調整が全て、それぞれ
の調整機構に設けられた送りネジ機構の寸切りボルトB
J 、BR 、BY 、BX を回動するだけで容易に実現でき
る。従って、この装置Aは各寸切りボルトBJ 、BR 、
BY 、BX をレンチを用いて手動で操作できるが、寸切
りボルトBJ 、BR 、BY 、BX の操作用ナットNJ1、
NR1、NY1、NX1に小型モータを接続し、電動で操作し
てもよい。次に、この装置Aを用いた鉄塔脚材の据え付
け作業を示す。The apparatus A of this embodiment is configured as described above, and adjusts the vertical position of the base (the slide plate X) on which the steel tower legs are placed, rotates around a point in a horizontal plane, and All of the position adjustments in the directions orthogonal to each other are performed by the cutting bolt B of the feed screw mechanism provided in each adjustment mechanism.
J, B R, B Y, can only easily achieved pivots B X. Therefore, this device A is provided with each of the cut bolts B J , B R ,
B Y, but the B X can be operated manually using a wrench, Zungiri bolt B J, B R, B Y , operating nut B X N J1,
A small motor may be connected to N R1 , N Y1 , N X1 and operated electrically. Next, the installation work of the tower leg material using the device A will be described.
【0048】先ず、図12に示すように、据え付け装置
Aを鉄塔脚材埋設穴Q内の基盤T上に設置し、水準器を
当て、前記ジャッキ機構下枠3の水平割り出し用ボルト
33を回動させ装置Aの水平を出す。First, as shown in FIG. 12, the installation device A is installed on the base T in the steel tower leg material embedding hole Q, a level is applied, and the horizontal indexing bolt 33 of the jack mechanism lower frame 3 is turned. To make the device A level.
【0049】次に、水平が出た装置Aのスライド板Xの
上に鉄塔用の脚材Pを所定角度傾斜した状態で設置す
る。この時、脚材Pの大略の位置は作業員の目測で所定
の位置および角度付近に設定されているが、脚材Pの据
え付け状態は、その上部の鉄塔の支柱とミリ単位に正確
に調整して接続する必要がある。Next, the leg material P for the steel tower is installed on the slide plate X of the device A in a horizontal position while being inclined at a predetermined angle. At this time, the approximate position of the leg material P is set to a predetermined position and near an angle by visual inspection of an operator, but the installation state of the leg material P is accurately adjusted to the support of the steel tower on the upper part and the millimeter unit. Need to connect.
【0050】そのため、脚材PのサポータSを調整機構
Dにより押し引きして調整するとともに、脚材Pの下部
位置での水平、垂直移動および回動の微調整をこの発明
の実施形態の据え付け装置Aで行う。各方向の操作順序
は任意であり、前述したように、送りネジ機構の操作を
小型電動モータを用いて電動で行う場合には全て同時に
行うこともできる。小型モータMの操作は制御部CTに
より調整するが、この調整は位置データ、傾斜データを
小型のパーソナルコンピュータCからの制御信号により
行う。また、小型モータMの操作を手動スイッチで行う
ような形にしてもよい。Therefore, the supporter S of the leg material P is adjusted by pushing and pulling by the adjusting mechanism D, and the fine adjustment of the horizontal, vertical movement and rotation at the lower position of the leg material P is performed according to the embodiment of the present invention. This is performed by the device A. The order of operation in each direction is arbitrary, and as described above, when the operation of the feed screw mechanism is performed electrically using a small electric motor, all operations can be performed simultaneously. The operation of the small motor M is adjusted by the control unit CT, and the adjustment is performed based on the position data and the inclination data by the control signal from the small personal computer C. Alternatively, the small motor M may be operated by a manual switch.
【0051】こうして、鉄塔脚材Pが据え付けられたス
ライド板X上の設定中心が事前測量によって定められ鉄
塔脚材Pの据付け中心に一致すれば埋設穴Qにコンクリ
ートを流し込み、装置Aを鉄塔脚材Pともどもコンクリ
ートで固める。In this way, if the set center on the slide plate X on which the tower base member P is installed is determined by prior survey and coincides with the installation center of the tower base member P, concrete is poured into the burial hole Q, and the apparatus A is connected to the tower base. Material P is hardened with concrete.
【0052】以上のように、この実施形態の据え付け装
置Aは鉄塔脚材Pが据え付けられるスライド板X(移動
ベース)を位置調整するための各方向への移動が全て送
りネジ機構SJ 、SR 、SY 、SX のボルトBJ 、
BR 、BY 、BX の回動だけで実現できる簡単な構成と
なる。As described above, in the installation apparatus A of this embodiment, all the movements in the respective directions for adjusting the position of the slide plate X (moving base) on which the steel tower leg material P is installed are all the feed screw mechanisms S J and S. R , S Y , S X bolt B J ,
B R, B Y, a simple configuration can be realized only by the rotation of B X.
【0053】また、その移動方式がスライド式であるの
で動かし易い。Since the moving system is a sliding system, it is easy to move.
【0054】[0054]
【発明の効果】以上示したように、この発明によれば、
鉄塔脚材の据え付け装置について、脚材が据え付けられ
る移動ベースの各方向(垂直方向、水平面内での点回り
および互いに直交する方向)への移動操作の入力を、複
雑な歯車機構を用いず、全て送りねじ機構で行うように
したので、装置が非常にシンプルな構造となる。As described above, according to the present invention,
Regarding the installation device of the tower leg material, the input of the movement operation in each direction (vertical direction, around the point in the horizontal plane and in the direction orthogonal to each other) of the movement base on which the leg material is installed, without using a complicated gear mechanism, Since all the operations are performed by the feed screw mechanism, the device has a very simple structure.
【0055】装置の構造がシンプルであるので、位置調
整の終了した脚材を埋設穴内にコンクリートを流し込ん
で固める際、流し込まれるコンクリートが装置内部に行
き渡り易く、鉄塔埋設部の構造が強化されるという利点
がある。Since the structure of the device is simple, when the leg material whose position has been adjusted is poured into concrete and hardened by pouring it into the burying hole, the poured concrete easily spreads inside the device and the structure of the steel tower buried portion is strengthened. There are advantages.
【0056】また、構造がシンプルであるので、加工が
容易で製作費が易くなるという利点があり、量産向きで
ある。Further, since the structure is simple, there is an advantage that processing is easy and manufacturing cost is easy, and it is suitable for mass production.
【図1】実施形態を示す斜視図FIG. 1 is a perspective view showing an embodiment.
【図2】ジャッキ機構を示す斜視図FIG. 2 is a perspective view showing a jack mechanism.
【図3】ジャッキ機構の分解斜視図FIG. 3 is an exploded perspective view of a jack mechanism.
【図4】ジャッキ機構の動きを示す側面図FIG. 4 is a side view showing the movement of the jack mechanism.
【図5】回動板の取付けを示す分解斜視図FIG. 5 is an exploded perspective view showing the mounting of the rotating plate.
【図6】回動板操作用送りネジ機構を示す斜視図FIG. 6 is a perspective view showing a feed screw mechanism for rotating plate operation.
【図7】同上の要部斜視図FIG. 7 is a perspective view of a main part of the above.
【図8】回動板の回動の様子を示す平面図FIG. 8 is a plan view showing a state of rotation of a rotation plate.
【図9】スライド枠とスライド板を示す斜視図FIG. 9 is a perspective view showing a slide frame and a slide plate.
【図10】回動板に対するスライド枠の取付けを示す図
1の線I−Iによる断面図FIG. 10 is a cross-sectional view taken along line II of FIG. 1 showing attachment of the slide frame to the rotating plate;
【図11】スライド枠に対するスライド板の取付けを示
す図1の線II−IIによる断面図FIG. 11 is a sectional view taken along line II-II of FIG. 1, showing the mounting of the slide plate to the slide frame.
【図12】実施形態の据え付け装置による脚材据え付け
作業を説明する図FIG. 12 is a view for explaining a leg material installation operation by the installation device of the embodiment.
J ジャッキ機構 1 上枠 2 中枠 3 下枠 JL 平行リンク R 回動板 Y スライド枠 X スライド板 SJ 、SR 、SY 、SX 送りネジ機構J jack mechanism 1 on frame 2 middle frame 3 lower frame J L parallel link R rotary plate Y slide frame X slide plate S J, S R, S Y , S X feed screw mechanism
───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平5−272241(JP,A) 実開 昭61−192461(JP,U) 実開 平2−26807(JP,U) 実開 平6−16400(JP,U) (58)調査した分野(Int.Cl.6,DB名) E04H 12/00 - 12/10 E04H 12/22 E04G 21/14 - 21/18 ──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-A-5-272241 (JP, A) JP-A-61-192461 (JP, U) JP-A-2-26807 (JP, U) JP-A-5-272241 16400 (JP, U) (58) Fields investigated (Int. Cl. 6 , DB name) E04H 12/00-12/10 E04H 12/22 E04G 21/14-21/18
Claims (1)
有し、そのジャッキ機構は、前記リンクが、その支点回
りに送りねじ機構により押し引きされ、支点回りに回動
することにより昇降し、 前記ジャッキ機構には、その載置面に垂直に固定軸が設
けられ、 その固定軸には、固定軸回りに回動可能となった回動板
が挿嵌されており、 その回動板は送りねじ機構により押し引きされて回動
し、 その回動板の上面には、送りねじ機構により押し引きさ
れ、回動板に板面を平行にしてスライド可能となった第
1のスライド板が設けられ、 その第1のスライド板の上面には、送りねじ機構により
押し引きされ、第1のスライド板に板面を平行にし、か
つ、第1のスライド板のスライド方向に直交する方向に
スライド可能となった第2のスライド板が設けられ、 その第2のスライド板の上面に鉄塔脚材下端を据え付
け、支持するようにした鉄塔脚材据付装置。1. A jack mechanism comprising a parallel link, wherein the link is pushed and pulled around a fulcrum by a feed screw mechanism, and is raised and lowered by rotating about the fulcrum. The jack mechanism is provided with a fixed shaft perpendicular to the mounting surface, and a rotary plate rotatable around the fixed shaft is inserted into the fixed shaft, and the rotary plate is fed. A first slide plate, which is pushed and pulled by a screw mechanism and turns, is provided on the upper surface of the turn plate and is slidable by a feed screw mechanism and which can slide with the plate surface parallel to the turn plate. The upper surface of the first slide plate is pushed and pulled by a feed screw mechanism so that the plate surface is parallel to the first slide plate and slidable in a direction perpendicular to the slide direction of the first slide plate. The second slide plate that became Vignetting, mounting the tower leg members lower end to the upper surface of the second sliding plate, tower leg member mounting apparatus designed to support.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8063137A JP2977486B2 (en) | 1996-03-19 | 1996-03-19 | Tower tower mounting equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8063137A JP2977486B2 (en) | 1996-03-19 | 1996-03-19 | Tower tower mounting equipment |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH09256681A JPH09256681A (en) | 1997-09-30 |
| JP2977486B2 true JP2977486B2 (en) | 1999-11-15 |
Family
ID=13220591
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP8063137A Expired - Fee Related JP2977486B2 (en) | 1996-03-19 | 1996-03-19 | Tower tower mounting equipment |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2977486B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6628964B2 (en) * | 2014-12-12 | 2020-01-15 | 大和ハウス工業株式会社 | Precast foundation position adjustment jig |
| JP7010807B2 (en) * | 2018-12-13 | 2022-01-26 | 本田技研工業株式会社 | How to use spacers, battery devices, floor height adjustment mechanisms and spacers |
| JP7010808B2 (en) * | 2018-12-13 | 2022-01-26 | 本田技研工業株式会社 | How to use spacers, battery devices, mobile terminal accommodating devices and spacers |
-
1996
- 1996-03-19 JP JP8063137A patent/JP2977486B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH09256681A (en) | 1997-09-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207405625U (en) | Steel reinforcement cage and lattice column positioning device | |
| JP3253145B2 (en) | Temporary assembly welding jig for through column of steel structure | |
| JP2977486B2 (en) | Tower tower mounting equipment | |
| KR101607890B1 (en) | The hand push type car equipped with a floor post | |
| KR200291983Y1 (en) | Foundation structure for steel tower | |
| CN107254890B (en) | A limiting device for truncation and rectification of prefabricated square piles | |
| CN222253107U (en) | Formwork supporting device for polygonal concrete column | |
| KR101274464B1 (en) | Construction apparatus for boundary stone | |
| EP1740771B1 (en) | Device for adjusting a track structure and switches | |
| EP4199280B1 (en) | Workpiece carrier for switchgear and controlgear construction | |
| JP6588180B1 (en) | Columnar structure cutting device | |
| JP3038598B2 (en) | Column prefabricated reinforcing bar assembly equipment | |
| JP2520567B2 (en) | Backfilling method and equipment for Yamadome wall | |
| JP3536123B2 (en) | PC foundation construction position adjustment method and adjustment jig | |
| CN223497140U (en) | Torch arm installation supporting equipment | |
| CN222060655U (en) | Template device for prefabricated component | |
| DE19745063C1 (en) | Tool for bending concrete reinforcement rods | |
| JP2000199230A (en) | Installing method for anchor bolt | |
| DE3238150C2 (en) | ||
| JP4278085B2 (en) | Anchor bolt installation method | |
| JP3700105B2 (en) | Ground member assembly equipment | |
| JPH11323840A (en) | Drilling method for concrete floor slab | |
| JPH0423942Y2 (en) | ||
| JPH081069B2 (en) | Anchor bolt centering device and centering method | |
| EP0590624B1 (en) | Positioning device for a vertical panel saw |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20070910 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080910 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090910 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090910 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100910 Year of fee payment: 11 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100910 Year of fee payment: 11 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110910 Year of fee payment: 12 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110910 Year of fee payment: 12 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120910 Year of fee payment: 13 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120910 Year of fee payment: 13 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130910 Year of fee payment: 14 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |